					Minutes of the 173rd meeting of the Committee Constituted for Deciding the Consent under Orange Category, held on 02.11.2011 in the Conference Room of
Chairman, DPCC.

 The following persons attended the meeting:

Sh. Keshav Chandra, Chairman, DPCC
Sh. Sandeep Mishra, Member Secretary, DPCC
Prof. S. K. Gupta, IIT-Delhi
Sh. B. Kumar, Addl. Director, DPCC.
Sh. M. Dwarakanth, SSO, Dept. of Env., GNCTD.
SEEs of CMC – I, II, III & IV.
SEE, BMW Cell
EEs of CMC – I, II, III & IV.
EE, BMW Cell


Following are the minutes of the meeting:-

Agenda Item No. 1 : Consent to Operate(Renewal) cases under Orange category               of redevelopment areas from 12.08.2009 to 22.03.2011, considered by
                 Scrutinizing Committee on 09.09.2011/ 12.09.2011(70 cases).

This agenda could not be taken up by the Committee, due to paucity of time, and it was decided to take up the same in the next meeting.

Agenda Item No. 2 : Cases in which closure directions u/s 31(A) of the Air Act/ 33(A) of the Water Act / 5 of EPA are in force, considered by Scrutinizing Committee
                    on 22.09.2011/ 23.09.2011 / 26.09.2011 (145 cases).
Decisions taken with respect to 52 cases of this agenda are tabulated and annexed as Annexure – 1. The remaining cases of this agenda could not be taken up by the
Committee, due to paucity of time, and it was decided to take up the same in the next meeting.

Agenda Item No. 3 : Inspection cases in compliance of earlier CMC's decisions, considered by Scrutinizing Committee on 22.09.2011/ 23.09.2011 / 26.09.2011 (39
                 cases).

This agenda could not be taken up by the Committee, due to paucity of time, and it was decided to take up the same in the next meeting.

Agenda Item No 4: Table Agenda Item No. 1 w.r.t. status of the cases of Udyog Nagar Indl. Area in which action was taken in pursuance of the complaint received
                 Sh. Ramesh Kumar, Member of Parliament, considered by Scrutinizing Committee on 22.09.2011/ 23.09.2011 / 26.09.2011 (35 cases).

This agenda could not be taken up by the Committee, due to paucity of time, and it was decided to take up the same in the next meeting.

Agenda Item No. 5- Fresh Consent to Operate / Renewal cases under Orange category w.e.f. 04.06.2011 excluding the cases of redevelopment areas, considered
                  online by Scrutinizing Committee on 17.10.2011 (30cases).

This agenda could not be taken up by the Committee, due to paucity of time, and it was decided to take up the same in the next meeting.

Agenda Item No. 6 :- Special reference case considered by Scrutinizing Committee on 17.10.2011 (01 case).

This agenda could not be taken up by the Committee, due to paucity of time, and it was decided to take up the same in the next meeting.
Table Agenda Item No 1: M/s HRA E-Waste Private Limited, A-60, First Floor, Jhilmil Industrial Area, Delhi 95


Issue consent to establish.


Table Agenda Item No 2: M/s Chintan Environmental Research and Action Group, A-14, First Floor, GTK Road Industrial Area, Delhi-33


Issue consent to establish.


Table Agenda Item No 3: During the course of meeting, it was deliberated that a list activities proposed to be included in the negative list of MPD-2021 depending
upon their pollution potential be prepared. It was decided that all the CMCs may submit a note in this regard to the Addl. Director, DPCC.


Table Agenda Item No 4: The Committee deliberated on the issue of compliance of disconnection of the electricity supply in pursuance of closure directions issued
by DPCC. It was decided that the Enquiry Counter should obtain the information w.r.t. K. No of the electricity supply of the unit while accepting the consent
application in DPCC.


Meeting ended with thanks to the chair.
Sl.   I.D.   appl_dt   Industry Name   Industry Address   Industrial Area   Category   Activitiy /   Consent /       Earlier Committee Decision   Remarks / Action Taken /   Recommendations   Decision
No    No                                                                               Product       Authorization                                ATR                        of Scrutinizing   recommen
                                                                                                     Status                                                                  Committee on      ded by
                                                                                                                                                                             22.09.2011 /      CMC(Ora
                                                                                                                                                                             23.09.2011 /
                                                                                                                                                                             26.09.2011
                                                                                                                                                                                               nge) on
                                                                                                                                                                                               02.11.2011
1   23681   27.09.07   PASHUPATI MOTORS   A-2, DDA SHED,   OKHLA        Orange   Workshop     (1) CTE : issued on               13.12.07                     (1) ETP: Installed.                   Ask the                Ask the
                                          PHASE-I          INDUSTRIAL            cum          18.11.09 vd CNO         Let the unit apply for authorization   (a) AR dated 23.07.09 issued by       compliance from        compliance
                                                           AREA                  Service      21908                   under HWM Rules also with clear        DCE submitted.                        DJB & MCD and          from DJB &
                                                                                                                      information on waste/used oil
                                                                                 Station of   (2) CTO: not yet                                               (b) Effluent analysis report dated    also ask the SDM       MCD and
                                                                                                                                 16.03.09
                                                                                 two          applied                 Ask the unit to file permission        23.07.09 issued by DCE                for effective          also ask the
                                                                                 wheelers     (3) CTO(R) : N/a        from Central Ground Water              submitted.                            closure of the unit.   SDM for
                                                                                              (4) Authorization       Authority for extracting the           (c) 5 number of parameters                                   effective
                                                                                              under HWM Rules :       ground water and fresh adequacy        analyzed which are within                                    closure of
                                                                                              applied on 20.02.08     report of ETP and noise                prescribed limit.                                            the unit.
                                                                                              vd ID 4486              monitroing report of D.G set from      (2) ECS: N/A
                                                                                              (5) Date of             approved laboratories of DPCC.         (3) D.G.Set: .Nil
                                                                                                                      Call on 29.04.09
                                                                                              Commissioning :                                                (4) Inspection details: The
                                                                                                                                     11.05.09
                                                                                              after NOC               Time allowed till 24.06.09 for full    inspection of the unit was
                                                                                              (6) BUA : 1200 sq ft    complaince. Call on 24.06.09           conducted by DPCC officials on
                                                                                              (7) Water                              24.06.09                12.11.09 and following were
                                                                                              consumption: 4000       Time allowed for the last chance.      observed:
                                                                                              lt/day                  Call on 26.08.09                       1. The unit found in operation. 2.
                                                                                              (8) Ground Water :                    20.10.09 (Orange)        ETP was installed but not found
                                                                                              4000 lt/day             Issue consent to establish.            in working condition. 3. CTO
                                                                                                                      Subsequently inspection by
                                                                                              (9) Waste water                                                not applied.4. Washing activity
                                                                                                                      trainee, CMC be conducted
                                                                                              discharge :                         21.12.09/22.12.9           was found & waste water goes
                                                                                              (a) Domestic effluent   Issue closure directions               directly into the sewer. 5. HW
                                                                                              : 800 lt/day                     13.08.10                      Log book maintained but some
                                                                                              (b) Trade effluent:     Ask the unit to submit bank            data has been repeated and only
                                                                                              3000 lt/day             guarantee of RS. One lakh under        one display board was found.
                                                                                                                      Water act & HWM Rules valid for        (5) SCN u/s 33(A)/5 of EPA
                                                                                                                      one year.                              details : not issued direct closure
                                                                                                                                        07.02.11
                                                                                                                                                             directions issued
                                                                                                                      Seek compliance report from the
                                                                                                                      concerned agencies.                    (6) Closure directions u/s 33(A)
                                                                                                                                                             & 5 of EPA details: Closure
                                                                                                                                                             directions u/s 5 of EPA and u/s
                                                                                                                                                             33 (A) of the Water Act was
                                                                                                                                                             issued to the unit on 02.02.10.
                                                                                                                                                             Accordingly the unit submitted
                                                                                                                                                             its representation on 22.02.10
                                                                                                                                                             along with adequacy report of
                                                                                                                                                             ETP with test certificate dt
                                                                                                                                                             23.07.09 stating that at time of
                                                                                                                                                             inspection ETP was under
                                                                                                                                                             servicing and now ETP is perfect
                                                                                                                                                             and working properly.
Further, as decided by CMC in
its meeting held on 13.08.10, a
letter for submission of Bank
guarantee of Rs. One Lakh under
Water Act & HWM Rules was
issued to the unit on 21.09.10.
However, the letter was received
back undelivered. Again the
letter for submission of bank
guarantee was issued at the
residential address on 27.10.10.
Inspection of the unit was
carried out by the DPCC
officials on 27.12.10 and
following were observed:
1. The unit was found locked
from outside. 2. As per the local
enquiry the unit has been closed
& shifted to some other place.
As decided by CMC dated
07.02.11, Letters were issued to
concerned authority i.e MCD,
BSES & DJB on 09.03.11
Letter received fron BSES on
29.04.11 stating that
thay has disconnected electricity
supplu on 16.03.11
2   _   _   National Zoological Park   Mathura Road,   NC   _   cafetaria     (1) CTE : Not applied                   24.06.09       (1) ETP: Not installed.             Ask the                Ask the
            Cafeteria (adjacent to     New Delhi                (200 seats)   (2) CTO: Not applied    SIT-I to inspect and report.   (2) ECS: No proper hood &           compliance from        compliance
            Zoo parking)                                                      (3) CTO(R) : N/a        Call on 26.08.2009             suction arrangement in the          discom & MCD           from discom
                                                                              (4) Authorization              21.12.2009/22.12.2209   kitchen.                            and also ask the       & MCD and
                                                                              under HWM Rules :       Decision to confirm the        (3) D.G.Set: Nil.                   SDM for effective      a suitable
                                                                              N/a                     dirctions ratified.            (4) Inspection details: conducted   closure of the unit.   D.O. letter
                                                                              (5) Date of                               13.08.10     on 21.07.09 & following were                               for the
                                                                              Commissioning :         Seek compliance report from    observed:                                                  Director,
                                                                              (6) BUA : 3500 Sq. ft   concerned authorities.         (a) Cafeteria is located in zoo                            Zoo be put
                                                                              ( as per inspection                                    area, near to car parking.                                 up after
                                                                              report)                                                (b) Ownership lies with the M/s                            conducting
                                                                              (7) Water                                              National Zoological Park .                                 an
                                                                              consumption: 14 KLd                                    (c) Total seating arrangement is                           inspection.
                                                                              ( as per inspection                                    around 200 seats.
                                                                              report)                                                (d) As informed average
                                                                              (8) Ground Water :                                     occupancy is around 50%.
                                                                              (9) Waste water                                        (e) Waste water is discharged
                                                                              discharge :                                            into sewer without any
                                                                              (a) Domestic effluent                                  treatment.
                                                                              :                                                      (f) No oil & grease trap exists.
                                                                              (b) Trade effluent:                                    Also, no ETP exists.
                                                                                                                                     (g) Unit should install proper
                                                                                                                                     hood & suction device over
                                                                                                                                     stove in the kitchen area.
                                                                                                                                     (h) Name of the contractor is Sh.
                                                                                                                                     Shiv Kumar Singh.
                                                                                                                                     (i) No CTE obtained
                                                                                                                                     (5) SCN u/s 31(A) & 33(A)
                                                                                                                                     details : issued on 28.10.09.
                                                                                                                                     (6) Closure directions u/s
                                                                                                                                     31(A)/33(A)/5 of EPA details
                                                                                                                                     :issued on 03.02.10.Since, no
                                                                                                                                     reply received
                                                                                                                                     As decided by the CMC dated,
                                                                                                                                     letter issued to conserned
                                                                                                                                     authority on 29.09.10.
                                                                                                                                     Letter received from DJB on
                                                                                                                                     08.02.11 confirming that
                                                                                                                                     dissconnection of water supply.
                                                                                                                                     No complaince received from
                                                                                                                                     conserned authorities i.e MCD &
BSES.
3   __   __   Hotel Paul’s Court &   5/62, Ajmal Khan    NC   __   Hotel -cum-    (1) CTE : not           24.06.2009                     (1) ETP: not installed ( as per     Ask the                Ask the
              Utsav Restaurant,      Raod, Karol Bagh,             Restaurant (   applied                 SIT-I to inspect and report.   inspection report)                  compliance from        compliance
                                     New Delhi.                    36 seats &     (2) CTO: not applied    Call on 26.08.2010             (2) ECS: N/a                        discom, DJB &          from
                                                                   24 No.         (3) CTO(R) : not                                       (3) D.G.Set: 2x 45 KVA ( as per     MCD and also ask       discom, DJB
                                                                   Guest          applied                 21.12.2009/22.12.2209          inspection report)                  the SDM for            & MCD and
                                                                   rooms)         (4) Authorization       Decision to confirm the        (4) Inspection details: conducted   effective closure of   also ask the
                                                                                  under HWM Rules :       dirctions ratified.            on 21.07.09 & following were        the unit.              SDM for
                                                                                  N/A                        13.08.10                    observed:                                                  effective
                                                                                  (5) Date of             Seek compliance report from    (a) The unit is a hotel-cum-                               closure of
                                                                                  Commissioning :         concerned authorities.         restaurant which was found                                 the unit.
                                                                                  (6) BUA : 1000 Sq.                                     operational, during inspection.
                                                                                  mts ( as per                                           (b) Source of water supply is
                                                                                  inspection report)                                     bore well. No information
                                                                                  (7) Water                                              provided regarding DJB
                                                                                  consumption: 11.16                                     permission.
                                                                                  KLD ( as per                                           (c) Waste water is discharged
                                                                                  inspection report)                                     into sewer without any
                                                                                  (8) Ground Water :                                     treatment. No oil & grease trap/
                                                                                  11.16 KLD ( as per                                     ETP exist at site.
                                                                                  inspection report)                                     (d) Acoustic enclosure should be
                                                                                  (9) Waste water                                        provided with DG set and stack
                                                                                  discharge :                                            height should be raised as per
                                                                                  (a) Domestic effluent                                  norms.
                                                                                  :-                                                     (e) There are 02 kitchens. Proper
                                                                                  (b) Trade effluent: -                                  hood, suction device and
                                                                                                                                         chimney should be provided.
                                                                                                                                         (f) No CTE obtained.

                                                                                                                                         (5) SCN u/s 31(A) & 33(A)
                                                                                                                                         details : issued on 28.10.09.
                                                                                                                                         However,no reply was received
                                                                                                                                         in response to aforesaid SCN
                                                                                                                                         and therefore directions for
                                                                                                                                         closure u/s 33 (A) of Water Act
                                                                                                                                         & 31 (A) of the Air Act was
                                                                                                                                         issued
                                                                                                                                         (6) Closure directions u/s 31(A)
                                                                                                                                         & 33(A)details : issued on
                                                                                                                                         03.02.10.
                                                                                                                                         As decided by CMC dated
                                                                                                                                         13.08.10, letters were issued to
concerned authoritied i.e. MCD,
BSES & DJB issued on 29.09.10
No complaince received from
the unit as well as
concerned authorities i.e MCD,
DJB & BSES.
4   33447   07.04.10   JAWA ENTERPRISES   A-141, DDA      OKHLA        Operate   Mfg. of    (1) CTE :applied on                 131st                     (1) ETP: N/a                        Ask the                Decision
                                          SHEDS, PHASE-   INDUSTRIAL             Poly bag   11.02.10 vd ID 32762    Issue closure directions u/s 33(A)    (2) ECS: N/a                        compliance from        taken w.r.t.
                                          II              AREA                              (2) CTO: applied        of the Water Act and effective        (3) D.G.Set: Nil                    discom, DJB &          M/s Matha
                                                                                                                    closure u/s 5 of the EPA, 1986 to
                                                                                            on07.04.10 vd ID                                              (4) Inspection details: conducted   MCD. Issue final       Offset Pvt.
                                                                                                                    both units.
                                                                                            33447                                 136th                   on 05.11.09                         reminder to M/s        Ltd. be
                                                                                            (3) CTO(R) :N/a         Pursue for effective closure order.   1. M/s Jawa Enterprises/ Asia       Matha Offset Pvt.      implemented
                                                                                            (4) Authorization       Recommendations of                    Enterprises operating at Ground     Ltd. / premises        .
                                                                                            under HWM Rules         Scrutinizing Committee on             Floor. M/s Jawa Enterprises was     owner for
                                                                                            :applied on 07.04.10    18.05.2010/19.05.2010/20.05.2010      issued closure direction u/s 5 of   submission of bank
                                                                                            vd ID 0080              Ask the unit to submit Bank           EPA. Still the unit is in           guarantee as per
                                                                                            (5) Date of             Guarantee of Rs. One Lakh each        operation. Electricity              earlier
                                                                                                                    under Air Act and HWM Rules. If
                                                                                            Commissioning : Jan,                                          connection/ Water connection is     CMC(Orange)
                                                                                                                    unit submits, the Bank Guarantee,
                                                                                            2005                    closure directions be revoked         still not disconnected.             decision dated
                                                                                            (6) BUA : 1200          provided Bank Guarantee is also       2. Unit M/s Matha Offset is also    13.08.2010, failing
                                                                                            Sq.mts                  submitted by M/s Matha Offset         in operation, ETP is installed.     which, SDM will
                                                                                            (7) Water               Pvt. Ltd.                             3. ETP not in operation defunct.    be asked for
                                                                                            consumption: 270                       13.08.2010             (5) Closure directions u/s          effective closure of
                                                                                            Lt/day                  Ask the unit to submit Bank           31(A)/33(A)/5 of EPA details :      the unit.
                                                                                            (8) Ground Water :      Guarantee of Rs. One Lakh each        issued on 04.02.10 ( earlier
                                                                                                                    under Air Act and HWM Rules. If
                                                                                            Nil                                                           closure direction were issued to
                                                                                                                    unit submits, the Bank Guarantee,
                                                                                            (9) Waste water         closure directions be revoked         the unit on 25.07.07 )
                                                                                            discharge :             provided Bank Guarantee is also       The unit has submitted the BG
                                                                                            (a) Domestic effluent   submitted by M/s Matha Offset         of Rs. 1 lakh each under Air Act
                                                                                            : 240 Lt/day            Pvt. Ltd. as decided in earlier       & HWM Rules on 12.01.2011.
                                                                                            (b) Trade effluent:     CMC's decision dated 26.07.2010.      However, M/s Matha Offset Pvt.
                                                                                            Nil                     If, units submit the Bank             Ltd. has failed to submit BG of
                                                                                                                    Guarantee, consent to operate and     Rs. 1 Lakh each under Air Act,
                                                                                                                    consent to establish be issued.
                                                                                                                                                          Water Act & HWM Rules in
                                                                                                                                      17.06.11
                                                                                                                    Decision taken on file ratified.      responce to this office letter
                                                                                                                                                          dated 11.09.10 & 17.03.11.
                                                                                                                                                          As approved, reminder letter
                                                                                                                                                          was also issued to MCD, BSES
                                                                                                                                                          & DJB on 09.08.11 to send the
                                                                                                                                                          compliance report for in
                                                                                                                                                          compliance of closure direction.
                                                                                                                                                          However, no compliance has
                                                                                                                                                          been received so far.
5   35523   13.04.10   MATHA OFFSET P.   A-141, DDA       OKHLA        Offset     (1) CTE : issued on     05.10.09                         (1) ETP: installed                   Decision taken        Consent be
                       LTD               SHED, PHASE-II   INDUSTRIAL   Printing   27.10.09 vd CNO         Issue CTE. Subsequently,         (a) AR dated March, 2007             w.r.t. M/s Jawa       refused and
                                                          AREA                    21638                   inspection be conducted to       issued by GGSIU submitted.           Enterprises be        SDM be
                                                                                  (2) CTO: applied on     know the present status of the   (b) Effluent analysis report dated   implemented. Also     asked for
                                                                                  12.06.07 vd ID 21795    unit.                            22.02.10 issued by DPCC              issue SCN for         effective
                                                                                  (3) CTO(R) : applied    21.12.09/ 22.12.09               submitted ( Total 13 parametre       refusal of consent    closure of
                                                                                  on 13.04.10 vd ID       Issue closure direction.         analysied against 10 prescibed       to establish and      the unit.
                                                                                  33523                                                    parametres. Bio-assay test not       consent to operate    Also ask the
                                                                                  (4) Authorization       26.07.10                         carried out).                        as the unit has       compliance
                                                                                  under HWM Rules :       Ask the unit to submit Bank      (c) 9 number of parameters           represented that it   from
                                                                                  apaplied on 07.04.10    Guarantee of Rs. One Lakh        analyzed which are within limit      is non operational.   discom, DJB
                                                                                  vd ID 0079              each under Air Act, Water Act    & 1 parametre i.e Bio assay test                           & MCD.
                                                                                  (5) Date of             and HWM Rules. If unit           not carried out.
                                                                                  Commissioning : Oct,    submits, the Bank Guarantee,     (2) ECS: N/a
                                                                                  2007 ( In CTE File)     closure directions be revoked    (3) D.G.Set: Nil
                                                                                  & Jan,2005 ( In CTO     subject to submission of Bank    (4) Inspection details: conducted
                                                                                  file)                   Guarantee by M/s Jawa            on 05.11.09 & it was found that:
                                                                                  (6) BUA : 1200 Sq.      Internprises.                    (a) M/s Jawa Enterprises/ Asia
                                                                                  mts                                                      Enterprises operating at Ground
                                                                                  (7) Water                                                Floor. M/s Jawa Enterprises was
                                                                                  consumption: 200                                         issued closure direction u/s 5 of
                                                                                  Ll/day                                                   EPA. Still the unit is in
                                                                                  (8) Ground Water :                                       operation. Electricity
                                                                                  Nil                                                      connection/ Water connection is
                                                                                  (9) Waste water                                          still not disconnected.
                                                                                  discharge :                                              (b) Unit M/s Matha Offset is
                                                                                  (a) Domestic effluent                                    also in operation, ETP is
                                                                                  : 100Lt/day                                              installed.
                                                                                  (b) Trade effluent:                                      (c) ETP not in operation,
                                                                                  100 Lt/day                                               defunct.

                                                                                                                                           (5) Closure directions u/s 31
                                                                                                                                           (A), 33(A) & 5 of EPA details :
                                                                                                                                           issued on 04.02.10 ( earlier
                                                                                                                                           closure direction were issued to
                                                                                                                                           the unit on 25.07.07 )
                                                                                                                                           The unit M/s Matha Offset Pvt.
                                                                                                                                           Ltd. has submitted a letter on
                                                                                                                                           19.01.2011 informing that they
                                                                                                                                           have not carried out any activity
                                                                                                                                           in the premises from Dec 2010
& they will start after getting
prior permission from DPCC.
They have also requested to not
to take any action on their plot
against any pollution related
matter.
No complaince received from
the conserned authorities i.e
MCD, DJB & BSES. The unit
has not submitted BG of Rs. One
Lakh each under Air Act, Water
Act and HWM Rules as asked
vd this office letter dated
11.09.10. Premises owner/ unit
has not submitted the BG's as
asked vide this office letter dated
17.03.11 .
6   Lamba Enterprises Pvt.   6A   Tilak Nagar       Orange   Servicing   (1) CTE : dated         Decision on 25.01.2010      (1) ETP: Installed.                  Ask the                Ask the
    Ltd                           Industrial Area            of bikes    08.08.2008 refused      Refused consent and issue   (a) AR dated 23.07.2009.issued       compliance from        compliance
                                                                         on 22.02.2010           closure directions.         by DTU submitted.                    discom & DJB and       from discom
                                                                         (2) CTO: dated on                                   (b) Effluent analysis report dated   also ask the SDM       & DJB and
                                                                         25.09.2009 refused                                  23.07.2009 issued by DTU             for effective          also ask the
                                                                         on 22.02.2010                                       submitted.                           closure of the unit.   SDM for
                                                                         (3) CTO(R) :NA                                      (c) 5 number of parameters                                  effective
                                                                         (4) Authorization                                   analyzed which are within limit /                           closure of
                                                                         under HWM Rules                                     beyoud prescribed limit.                                    the unit.
                                                                         :NA                                                 (2) ECS: NA
                                                                         (5) Date of                                         (3) D.G.Set:nil
                                                                         Commissioning :                                     (4) Inspection details: conducted
                                                                         2008                                                on 20.11.2009, during the
                                                                         (6) BUA : 168 sqm                                   inspection following were
                                                                         (7) Water                                           observed:
                                                                         consumption: 3.5                                    i) ETP was found defunt and
                                                                         KLD                                                 disconnected.
                                                                         (8) Ground Water                                    ii) No ETP slugde was seen at
                                                                         :Nil                                                the site.
                                                                         (9) Waste water                                     iii) One bore well exist at site.
                                                                         discharge :                                         (5) Refusal of consent details
                                                                         (a) Domestic effluent                               :issued on 22.02.2010
                                                                         : 0.4 KLD                                           (6) Closure directions 33(A) of
                                                                         (b) Trade effluent:                                 the Water Act details :
                                                                         3.0 KLD                                             24.02.2010
7   28786   27-01-09   MEHANDRU      T-16, PHASE-II   OKHLA        Establish   work shop     (1) CTE : appplied on   07.05.2010                         (1) ETP: …………                                 Bank guarantee     Decision of
                       AUTOMOBILES                    INDUSTRIAL               cum service   27.01.09 vd ID 28786     Seek compliance report from       (a) AR dated ………….issued by                   submitted by the   CMC(Orang
                                                      AREA                     station of    (2) CTO:not applied     concerned authorities.             ……………..submitted.                             landlord.          e) dated
                                                                                                                                                        (b) Effluent analysis report dated
                                                                               two           (3) CTO(R) : N/a        13.08.10                                                                         Implement the      02.09.2011
                                                                                                                                                        ………….issued by
                                                                               wheelers      (4) Authorization       Re-inspection be conducted to      ……………..submitted.                             CMC(Orange)        implemented
                                                                                             under HWM Rules :       know the operational status of     (c) ..........number of parameters            decision dated     . No action
                                                                                             (5) Date of             the unit through pasting the       analyzed which are within limit /             02.09.2011.        warranted in
                                                                                             Commissioning :         letter.                            beyoud prescribed limit.                                         this meeting.
                                                                                             after getting NOC       07.02.11                           (2) ECS: …………
                                                                                             (6) BUA : 150 Sq.mts    Seek compliance report from        (a) AR dated ………….issued by
                                                                                             (7) Water               the concerned agencies.            ……………..submitted.
                                                                                                                                                        (b) Stack monitoring report dated
                                                                                             consumption: 4000         02.09.11
                                                                                                                                                        ………….issued by
                                                                                             Lt/day                  Ask the landlord to submit an      ……………..submitted
                                                                                             (8) Ground Water :      affidavit to the effect that any   (c) ..........number of parameters
                                                                                             4000 Lt/day             unit, in future, will be           analyzed which are within limit /
                                                                                             (9) Waste water         established in the premises        beyoud prescribed limit.
                                                                                             discharge :             with prior approval of DPCC        (3) D.G.Set: ................
                                                                                             (a) Domestic effluent   only. Also ask the landlord to     (a) Noise monitoring report of
                                                                                             : 800 Lt/day            submit the bank guarantee of       ............KVA dated................issued
                                                                                                                                                        by ...........submitted and noise levels
                                                                                             (b) Trade effluent:     Rs. 1 Lakh each under Water
                                                                                                                                                        are within limit / beyond limit.
                                                                                             3000 Lt/day             Act and HWM Rules valid for        (b) Stack monitoring report (for
                                                                                                                     one year. If landlord does so,     more than 1000 KVA) dated
                                                                                                                     closure directions be revoked.     ............... issued by
                                                                                                                                                        ................submitted and parameters
                                                                                                                                                        within limit / not satisfactory.
                                                                                                                                                        (4) Inspection details: conducted on
                                                                                                                                                        22.10.09 & followinf were oberved :
                                                                                                                                                        (a) The unit is in operation at the
                                                                                                                                                        change address w.e.f Jan, 2009.
                                                                                                                                                        (b) ETP sludge is being send to
                                                                                                                                                        disposal through private parties as
                                                                                                                                                        reported.
                                                                                                                                                        (c) Not applied for CTO.
                                                                                                                                                        (d) CTE applied vd ID 28786 dated
                                                                                                                                                        27.01.09
                                                                                                                                                        (e) No room for HW is there.
                                                                                                                                                        (f) ETP is non-operational.
                                                                                                                                                        (5) Closure directions u/s 31(A),
                                                                                                                                                        33(A) & 5 of EPA details : issued on
                                                                                                                                                        24.02.10.
                                                                                                                                                        As decided by CMC dated 07.05.10,
                                                                                                                                                        letter issued to MCD, BSES & DJB
                                                                                                                                                        on 09.07.10.
No complaince received from
concerned Authority. However letter
from the unit returned back.
Inspection carried out by DPCC
officials and following were
observed:
1. Unit found closed and removed
plant and machinery from the
premises.
2. Premises is being used as a
godown for wooden and no
industrial activity was observed.
3. As reported, power supply of
premises has been disconnected.
As decided by CMC dated 07.02.11,
letters again issued to concerned
authorities on 04.03.11
Reply received from the owner of
the premises on 08.04.11 stating that
the M/s MEHANDRU
AUTOMOBILES is now left the
premises and now there is not any
pollution activity carried out.
Decision of CMC dated 02.09.11 yet
to be implemented
8   Mittal Electricals   H-181,     Bawana       Orange   Dyeing of   1) CTE : Not applied    08.04.2011                   (1) ETP: No                           Inspection be          Inspection
                         Sector-5   Industrial            jeans.      (2) CTO: Not applied    Seek Comliance report from   (2) ECS: : No                         conducted to verify    be
                                    Area                              (3) CTO(R) : Not        concerned agencies.          (3) D.G.Set: N/A                      the operation status   conducted
                                                                      applied                                              (4) Inspection details: On            of the unit.           by the SEE,
                                                                      (4) Authorization                                    05.02.2010.Observation Are:                                  CMC-II
                                                                      under HWM Rules                                      i)Unit was found in operation.                               along with
                                                                      :Not applied                                         ii)unit is engaged in the activity                           EE, CMC-
                                                                      (5) Date of                                          of Mfg. of Jeans.                                            IV and
                                                                      Commissioning :                                      iii) No ETP provided to treat the                            report be
                                                                      unknown                                              trade effluent.                                              submitted to
                                                                      (6) BUA : 100 Sq mt                                  iv) No ECS provided with the                                 the Member
                                                                      (7) Water                                            coal fired boilers.                                          Secretary,
                                                                      consumption:                                         v) No responsible person                                     DPCC
                                                                      unknown                                              available during inspection.                                 within 07
                                                                      (8) Ground Water                                     (5) SCN u/s 31(A) of EPA                                     days. This
                                                                      :No                                                  details :issued on 25.03.2010                                may be done
                                                                      (9) Waste water                                      (6) Closure directions u/s 31(A)                             without
                                                                      discharge :                                          and 33 (A) issued on                                         waiting for
                                                                      (a) Domestic effluent                                12.03.2010.                                                  minutes.
                                                                      :Yes, unknown
                                                                      (b) Trade                                            Letter for seeking compliance
                                                                      effluent:Yes,                                        report was issued to unit on
                                                                      unknown                                              16.06.2011.
                                                                                                                           Report received from NDPL on
                                                                                                                           14.07.2011 stating that no
                                                                                                                           industry exists at the site and the
                                                                                                                           plots are vacant.
9   11577   20.10.2010   CITI WIRE    1/124/36-A   FRIENDS      ORANGE      Super       (1) CTE :27.05.2008.    16.02.2009                       (1) ETP: Not applicable.           Ask the               Ask the
                         INDUSTRIES                COLONY       ESTABLISH   Enameling   (2) CTO: 02.06.2002,    Show cause notice to be issued   (2) ECS: Not provided.             compliance from       compliance
                                                   INDUSTRIAL                           01.08.2005, Not         to the unit.                     (3) D.G.Set: 125 KVA.              discom & DJB and      from discom
                                                   AREA                                 Applied.                                                 (a) Noise monitoring report of     also ask the SDM      & DJB and
                                                                                        (3) CTO(R) : Not        17.06.2009                       Not submitted.                     for effective         also ask the
                                                                                        Applied                 Time allowed. Call on            (b) Stack monitoring report (for   closure of the unit   SDM for
                                                                                        (4) Authorization       19.08.2009.                      more than 1000 KVA) : Not          in view of the        effective
                                                                                        under HWM Rules :                                        applicable.                        super enamelling      closure of
                                                                                        11.05.2006,                                              (4) Inspection details:            activity.             the unit.
                                                                                        Authorisation with                                       09.10.2010: ECS not installed.
                                                                                        fee not applied.                                         D.G Set w/o A/E.
                                                                                        (5) Date of                                              (5) SCN u/s 31(A) details :
                                                                                        Commissioning                                            Issued on 25.03.2009
                                                                                        :2002.                                                   (6) Closure directions u/s 31(A)
                                                                                        (6) BUA : 60 Sq.m.                                       details : 17.03.2010.
                                                                                        (7) Water                                                Consent refused on 25.03.2009.
                                                                                        consumption: 200
                                                                                        L/Day.
                                                                                        (8) Ground Water
                                                                                        :Nil
                                                                                        (9) Waste water
                                                                                        discharge :
                                                                                        (a) Domestic effluent
                                                                                        : 50 LPD
                                                                                        (b) Trade effluent:
                                                                                        Nil
10   BHARTIYAM      PALLA       DELHI   Party lawn   (1) CTE : (R) Vide      15.02.2010                         (1) Inspection details: Inspection of       Ask the                Ask the
     VILLAGE FARM   BAKHTAWAR           for          R.No. 2090, refused     Case be considered after           the unit was conducted on                   compliance from        compliance
     HOUSE          ROAD                marriages    on 09.03.2011.          implementation of decision of      12.01.2010.                                 discom & DJB and       from discom
                                                                                                                Observations:
                                        and other    (2) CTO: Not            scrutinizing committee (Issue                                                  also ask the SDM       & DJB and
                                                                                                                1. Premises is having one lawns, one
                                        social       Applied                 directions u/s 31 (A) of the Air   building having four                        for effective          MCD for
                                        functions.   (3) CTO : Not           Act and u/s 33 (A) of the water    rooms at Ground Floor & First Floor,        closure of the unit.   cancellation
                                                     Applied                 Act with emergency clause for      one hall at basement. 2. No ETP             Inspection may         of
                                                     (4) Authorization       closure of the unit,               installed in the premises. 3. Unit has      also be conducted      permission
                                                     under HWM Rules :       cancellation of MCD                made 5 pits (1 parking, 2 front lawn,       as per decision        and also ask
                                                     (5) Date of             permission, disconnection of       2 back lawn) for discharge of rain          taken on file.         the SDM for
                                                     Commissioning :         electricity/ water supply to the   water in the ground water fitted with                              effective
                                                                                                                4 inch pipe.
                                                     2010                    unit and to SDM for taking                                                                            closure of
                                                                                                                4. One collection tank is made near
                                                     (6) BUA : 250 sq        necessary action for effective     banquet hall for collection                                        the unit.
                                                     mtrs                    closure of the unit and            and discharge of waste water
                                                     (7) Water               operation of D.G. Set).            generated from kitchen in the ground
                                                     consumption: 3.2 kilo                                      water. 5. D.G Set found installed
                                                     ltr/day                 20.05.2010                         with acoustic enclosure. 6. As
                                                     (8) Ground Water :      In view of letter and CTE          informed unit has started its
                                                     Nil                     applied on 26.05.10, ask the       operation about one year back.
                                                                                                                (2) Closure directions u/s
                                                     (9) Waste water         unit to submit bank guarantee
                                                                                                                31(A)/33(A)/5 of EPA details :
                                                     discharge :             of Rs. 1 Lakh each under Air       17.03.2010.
                                                     (a) Domestic effluent   Act and Water Act valid for        Reply has been received on
                                                     : 0.1 kilo ltrs/day     one eyar. If the unit submits      30.03.2010 requesting for 60 days
                                                     (b) Trade effluent:     the B.G, closure directions be      time to install the desired ETP and
                                                     3.0 kilo ltr/day        revoked and issue consent to       stating that they will not
                                                                             establish. Also ask the unit to    use this facility untill the installation
                                                                             submit adequacy report and         of said ETP.
                                                                                                                Reply has been received on
                                                                             effluent analysis report of ETP
                                                                                                                26.05.2010 alongwith an affidavit
                                                                             from approved agency of            informing taht the application for
                                                                             DPCC within 15 days, failing       CTE has been submitted
                                                                             which inspectrion be               (Id.No.33993 dated 26.05.2010) and
                                                                             conducted.                         the ETP has been installed,
                                                                             30.07.2010                          fees for the adequecy and test report
                                                                             Issue SCN for refusal of           has been submitted in G.G.S.I.P.U.
                                                                             consent.                            Further, requested to revike the
                                                                                                                closure direction and issue CTE.
                                                                                                                As per the decision taken up
                                                                                                                CMC(O) dated 26.05.2010, letter
                                                                                                                was sent on
                                                                                                                 08.08.2010 regarding submission of
                                                                                                                Bank guarantee oof Rs. 1 lakh each
                                                                                                                under Air and Water Act, alongwith
adequecy reportanf effluent
analysis report of ETP.
Reply has been received on
05.07.2010 stating that the effluent
treatment plant has been installed.
As per the decision taken up in CMC
(O) dated 30.07.2010 SCN
for refusal of consent was sent on
14.09.2010.
Reply has not been received.
11   21728   07.06.2007   DHANJAL      PLOT NO-20,   BAWANA       Orange   Engg works   (1) CTE : issued to       05.10.2009                   (1) ETP: N/A                         Ask the                Ask the
                          INDUSTRIES   POCKET-B,     INDUSTRIAL            with         the unit on              Issue Consent to Establish.   (2) ECS: no                          compliance from        compliance
                                       SECTOR-3,     AREA                  buffing      19.11.2009.              Subsequently, inspection be   (3) D.G.Set: nil                     discom & DJB and       from discom
                                       DSIDC                                            (2) CTO: Not applied     conducted.                    (4) Inspection details: Inspection   also ask the SDM       & DJB and
                                                                                        (3) CTO(R) :Not          12.02.2010/15.02.2010         conducted on 19.11.2009.             for effective          also ask the
                                                                                        Applied                  Issue closure directions.     i. The unit was found in             closure of the unit.   SDM for
                                                                                        (4) Authorization        08.04.2011                    operation and is enagaged in                                effective
                                                                                        under HWM Rules          Seek compliance report from   Engg works with buffing.                                    closure of
                                                                                        :N/A                     concerned agencies.           ii. Two exhaust fans are installed                          the unit.
                                                                                        (5) Date of                                            at the premises.
                                                                                        Commissioning :                                        iii. Buffing activity is also
                                                                                        August 2007                                            observed at the premises.No
                                                                                        (6) BUA : 90 Sq mt                                     hood and suction device was
                                                                                        (7) Water                                              installed over the buffing
                                                                                        consumption:500 lpd                                    machines. As informed,they will
                                                                                        (8) Ground Water                                       stop the buffing activity within 8
                                                                                        :500 lpd                                               months.
                                                                                        (9) Waste water                                        iv.One borewell exists.
                                                                                        discharge :                                            v. No DG set found.
                                                                                        (a) Domestic effluent
                                                                                        : 300lpd                                               (5) SCN u/s 31(A):Nil
                                                                                        (b) Trade effluent:nil                                 (6) Closure directions u/s 31(A)
                                                                                                                                               : Issued to the unit on
                                                                                                                                               25.03.2010

                                                                                                                                               Reply received on 27.04.2010
                                                                                                                                               along with the photographs of
                                                                                                                                               absence of buffing activity.

                                                                                                                                               Reply again received on
                                                                                                                                               12.01.2011 with a copy of draft
                                                                                                                                               to GGSIPU for adequacy report.
                                                                                                                                               Letter for seeking of compliance
                                                                                                                                               report send to concerned agency
                                                                                                                                               on 16.06.2011.
12   _   _   VIKRAM FARM   M.G. Road,        NC-S   _   Party lawn          12.02.2010 / 15.02.2010         (1) ETP: No installed( as per             Issue reminder to   Issue
                           Sultanpur, Near              with            Issue directions u/s 31(A) of       inspection report)                        MCD in              reminder to
                           Metro Station.               banquet         the Air Act and u/s 33(A) of        (2) ECS: No data available                compliance of       MCD in
                                                                                                            (3) D.G.Set: .No data available
                           New Delhi-30                 hall facility   the Water Act with emergency                                                  earlier             compliance
                                                                                                            (4) Inspection details: A public
                                                        (farm           clause for closure of the unit,     complaint was received in this office     CMC(Orange)         of earlier
                                                        house)          cancellation of MCD                 against party lawns/restaurants           decision dated      CMC(Orang
                                                                        permission, disconnection of        operating at M.G Road.                    07.02.2011.         e) decision
                                                                        electricity / water supply to the   Subsequently inspection of the unit                           dated
                                                                        unit and to SDM for taking          was carried out by DPCC officials                             07.02.2011.
                                                                        necessary action for effective      on 03.02.10 and following
                                                                        closure of the unit and             observations were made:
                                                                                                            1. Waste food is disposed off M.C. D
                                                                        operation of D.G. Set.
                                                                                                            dust bin.
                                                                                            16.06.10        2. Liquid waste in a pit.
                                                                        Random inspection be                3. 2 no.s of bore well water exists for
                                                                        conducted and the local             use having 5 H.P. capacity of motor
                                                                        enquiry be also carried out.        each.
                                                                                        07.02.11            4. Kitchen waste water seen into the
                                                                        Confirm from the MCD                open drain in front of the unit.
                                                                        whether the premises is being       5. Domestic effluent and trade
                                                                                                            effluent was being discharged into
                                                                        used for commercial use and
                                                                                                            drain.
                                                                        also the status of the licenses     6. No Sewage Treatement Plant
                                                                        issued to the unit for              (STP) was installed by the unit, only
                                                                        premitting the unit for             storage tank was made.
                                                                        commercial use.                     7. D.G sets are also taken on rent
                                                                                                            which without acoustic enclosure
                                                                                                            and inadequae stack height.
                                                                                                            (5) SCN u/s 31(A) & 33(A) details :
                                                                                                            not issued direct directions issued
                                                                                                            (6) Closure directions u/s 31(A) &
                                                                                                            33(A) details : As per the CMC
                                                                                                            dated 12.02.2010 / 15.02.2010,
                                                                                                            Directions issued to the unit on
                                                                                                            07.04.10.Subsequently the reply of
                                                                                                            the unit was received on 21.04.10
                                                                                                            stating that the firm is not used for
                                                                                                            any commercial activity and for any
                                                                                                            activities that are detrimental and
                                                                                                            requested for revokation of closure
                                                                                                            directions. As per the decision of
                                                                                                            CMC in its meeting held on
                                                                                                            16.06.10, inspection of the unit was
                                                                                                            carried out by the DPCC officials on
                                                                                                            13.12.10 and follwoing observations
were made:
1. During the inspection no function
was observed in the premises.
2. Electricity connection has been
disconnected by BSES which was
for domestic purpose.
3. As reported only family functions
are oragnised in the premises which
was confirmed by the chaukidar of
adjacent farm house i.e. Bansal Farm
House.

As decided by CMC dated 07.02.11,
letter issued to MCD on 29.03.11
No complaince received from the
unit as well as conserned authorities
i.e MCD, DJB & BSES.
13   A. S. Concept    75, WHS,          Kirti Nagar       orange   Glass        Not applied   (1) ETP: Not installed               Ask the                Ask the
                      Furniture Block   Industrial Area            processing                 (2) ECS: Not installed               compliance from        compliance
                                                                                              (3) D.G.Set: nil                     discom & DJB and       from discom
                                                                                              (4) Inspection details:conducted     also ask the SDM       & DJB and
                                                                                              on 21.10.2009, during the            for effective          also ask the
                                                                                              inspection air and water             closure of the unit.   SDM for
                                                                                              pollution observed by the                                   effective
                                                                                              machineries and no emission                                 closure of
                                                                                              control system and ETP was                                  the unit.
                                                                                              found installed.
                                                                                              (5) SCN u/s 31(A) & 33(A)
                                                                                              issued on 14.12.2009.
                                                                                              (6) Closure directions u/s 31(A)
                                                                                              & u/s 31(A) issued on
                                                                                              13.04.2010
                                                                                              No compliance ahs been
                                                                                              received from NDPL & DJB.
14   Maharoof Glass   75, WHS,          Kirti Nagar       orange   Glass        Not applied   (1) ETP: Not installed               Inspection be          Inspection
                      Furniture Block   Industrial Area            processing                 (2) ECS: Not installed               conducted.             be
                                                                                              (3) D.G.Set: nil                                            conducted.
                                                                                              (4) Inspection details:conducted
                                                                                              on 20.10.2009, during the
                                                                                              inspection following were
                                                                                              observed:
                                                                                              i) unit engaged in the activity of
                                                                                              glass processing works.
                                                                                              ii) No air pollution control
                                                                                              system has been provied at the
                                                                                              premises.
                                                                                              iii) No license shown.
                                                                                              iv) work of the unit was going
                                                                                              on outside the premises.
                                                                                              (5) SCN u/s 31(A) & 33(A)
                                                                                              issued on 14.12.2009.
                                                                                              (6) Closure directions u/s 31(A)
                                                                                              issued on 13.04.2010
                                                                                              Unit submitted its reply on
                                                                                              22.04.2010 and stated that unit
                                                                                              has been closed the said address.
                                                                                              Compliance received from
                                                                                              NDPL stated that there is no
connection and industry existing
at site against M/s Maharoof
Glass.
15   21915   20-06-   AAR GEE POWER   PLOT NO-54,   Bawana       Orange   Mfg of         (1) CTE : Granted on    05.10.2009                        (1) ETP: no                          Ask the                Ask the
             2007     CONTROL         POCKET-J,     Industrial            electrical &   19.11.2009. Applied     Issue Consent to Establish        (2) ECS: yes                         compliance from        compliance
                                      SECTOR-2,     Area                  electronic     again on 14.05.2010     without phosphating.              (a) AR :No                           discom & DJB and       from discom
                                      DSIDC                               power          (2) CTO:Not Applied     Subsequently, inspection be       (b) Stack monitoring report :No      also ask the SDM       & DJB and
                                                                          control        (3) CTO(R) :Not         conducted.                        (c)number of parameters              for effective          also ask the
                                                                          panels         Applied                 12.02.2010                        analyzed which are within limit /    closure of the unit.   SDM for
                                                                          (powder        (4) Authorization       File be put up administratively   beyoud prescribed limit :N/A                                effective
                                                                          coating        under HWM Rules         with the provisions of the        (3) D.G.Set: 15 kva                                         closure of
                                                                                         :No                     MPD-2021.                         (a) Noise monitoring report :Not                            the unit.
                                                                                         (5) Date of             26.07.2010                        submitted
                                                                                         Commissioning : Aug     Ask the unit to submit Bank       (4) Inspection details:Inspection
                                                                                         2010                    Guarantee of Rs. 1 Lakh each      conducted on 30.11.2009:
                                                                                         (6) BUA : 200 Sq mt     under Air Act, Water Act and      Unit found engaged in mfg of
                                                                                         (7) Water               HWM Rules valid for one           electrical & electronic power
                                                                                         consumption: :1100      year. If, unit submits the Bank   control panels.
                                                                                         lpd                     Guarantee, closure directions     Powder coating activity is being
                                                                                         (8) Ground Water        be revoked and consent to         carried out at 2nd floor. Cyclone
                                                                                         :yes                    establish be issued.              found installed, but not in
                                                                                         (9) Waste water                                           operation.
                                                                                         discharge :                                               Phosphating is carried out. No
                                                                                         (a) Domestic effluent                                     ETP installed.
                                                                                         : 50lpd                                                   One DG set of 15 KVA installed
                                                                                         (b) Trade                                                 without acoustic enclosre &
                                                                                         effluent::800 lpd                                         inadequate stack ht.
                                                                                                                                                   One borewell exists at site.
                                                                                                                                                    (5) SCN u/s 31(A)/33(A)/5 of
                                                                                                                                                   EPA details :no

                                                                                                                                                   Revocation of consent issued to
                                                                                                                                                   the unit on 26.04.2010

                                                                                                                                                   No reply received.
                                                                                                                                                   (6) Closure directions u/s 31(A)
                                                                                                                                                   and 33(A) : Issued to the unit on
                                                                                                                                                   26.04.2010
                                                                                                                                                                       Reply
                                                                                                                                                   received from NDPL. No reply
                                                                                                                                                   received other agencies till date.
16   6226   23-05-   RAMA METAL   B-65, DSIDC   JHILMIL      GREEN /     Mfg. of                                30.03.2010:Closure order be      (1) ETP:NA                         Ask the               Inspection
            2008     INDUSTRIES                 INDUSTRIAL   ESTABLISH   sanitory       (1) CTE : 23.05.2008    issued. Enquiry Counter be       (2) ECS: No                        compliance from       be
                                                AREA                     bath fitting   (Refused)               intimated regarding refusal of   (3) D.G.Set: NIL..                 discom & DJB          conducted.
                                                                                        (2) CTO: No             the consent already issued.      (4) Inspection                     regarding the
                                                                                        (3) CTO(R) :No                                           details:12.087.2009: Buffing       disconnection of
                                                                                        (4) Authorization                                        activity observed. Brass dust      power and water
                                                                                        under HWM Rules                                          generated during grinding          supply to M/s
                                                                                        :NA                                                      process not found stored           Rama Metal
                                                                                        (5) Date of                                              properly and found scattered.      Industries and also
                                                                                        Commissioning :                                          (5) SCN u/s 31(A) details          ask the unit to
                                                                                        2003.                                                    :25.02.2010. SCN for refusal on    submit the
                                                                                        (6) BUA : 48 Sqm                                         11.12.2009.                        documentary proof
                                                                                        (7) Water                                                (6) Closure directions u/s 31(A)   of closure of the
                                                                                        consumption: 100                                         details : 07.05.2010. Reply        unit e.g.
                                                                                        LPD                                                      recieved on 19.05.2010.Unit        surendering its
                                                                                        (8) Ground Water                                         owner replied that Rama Metal      MCD license / Sale
                                                                                        :100 LPD                                                 has vacated the premises & M/s     Tax Registration
                                                                                        (9) Waste water                                          S.K.Electrical is operating.       etc.
                                                                                        discharge :
                                                                                        (a) Domestic effluent
                                                                                        : 80 L
                                                                                        (b) Trade effluent:
                                                                                        NIL.
17   7423   01-05-   AMIT CABLE   429/8A, GALI NO   FRIENDS      ORANGE      PVC Wire     (1) CTE :01.05.2009.    17.06.09                           (1) ETP:Not applicable.             Compliance from       EE, CMC-
            2009                  1                 COLONY       ESTABLISH   and Cables   (2) CTO:Not Applied     Ask the unit to file full          (2) ECS: Chanelization not          BSES recevied         IV would
                                                    INDUSTRIAL                            (3) CTO(R) :Not         compliance by 30.06.2009.          provided                            stating that M/s      accompany
                                                    AREA                                  Applied                 Issue letter without waiting for   (3) D.G.Set: .NIL.                  Amit Cable has not    the BSES to
                                                                                          (4) Authorization       minutes. Call on 19.08.2009        (a) Noise monitoring report : Nil   been found at the     ensure the
                                                                                          under HWM Rules :       07.05.2010Confirm closure          (b) Stack monitoring report (for    said address and      disconnectio
                                                                                          (5) Date of             directions.                        more than 1000 KVA) : Not           owner of the          n of the unit
                                                                                          Commissioning :                                            applicable.                         premises has          and submit a
                                                                                          2009.                                                      (4) Inspection details: inspected   requested for         report to
                                                                                          (6) BUA : 149 sqm                                          on 12.02.2009. Unit should          revocation of         MS, DPCC.
                                                                                          (7) Water                                                  install proper chanelization and    closure directions.
                                                                                          consumption: 220                                           suction device.                     Ask the landlord to
                                                                                          KLD                                                        (5) SCN u/s 31(A) details           submit a bank
                                                                                          (8) Ground Water                                           :16.04.2009.                        guarantee of Rs.
                                                                                          :NIL                                                       (6) Closure directions u/s 31(A)    One Lakh valid for
                                                                                          (9) Waste water                                            details : 05.06.2010.               one year to the
                                                                                          discharge :                                                                                    effect that no
                                                                                          (a) Domestic effluent                                                                          industrial unit
                                                                                          : 150 KLD                                                                                      without the prior
                                                                                          (b) Trade effluent:                                                                            consent of DPCC
                                                                                          Nil                                                                                            will be allowed in
                                                                                                                                                                                         the premises.
18   6921   03-11-   G.S. METALS (INDIA)   PLOT NO 458-   FRIENDS      ORANGE      Copper    (1) CTE : Applied on    16.02.09                          (1) ETP: Not applicable.           Closure direction     Closure
            2008                           466,           COLONY       ESTABLISH   Wire      03.11.2008.Refused      Issue SCN under Water Act,        (2) ECS: Chanelization             to the unit was       directions be
                                           SHAMBHUNATH    INDUSTRIAL   &           Drawing   on 09.06.2010.          1974                              provided.                          issued for not        revoked
                                           COMPOUND,      AREA         OPERATE.              (2) CTO: valid upto     17.06.09                          (3) D.G.Set: Nil                   submitting the        with a
                                           GALI NO-8                                         22.08.2007.             Paste the letter on the           (a) Noise monitoring report of :   reply of the SCN.     direction to
                                                                                             (3) CTO(R) : Applied    premises. Call on 19.08.2009      Not applicable.                    Later on, reply of    apply for
                                                                                             on 21.08.2007.          07.05.2010: Consent refused       (b) Stack monitoring report (for   the unit was traced   consent to
                                                                                             (4) Authorization       and confirm closure directions.   more than 1000 KVA): Not           in the record and     operate and
                                                                                             under HWM Rules :                                         applicable.                        also an inspection    fresh
                                                                                             (5) Date of                                               (4) Inspection details:            was conducted         authorizatio
                                                                                             Commissioning :                                           12.04.2010: Pickling found         during which unit     n under
                                                                                             2002                                                      Closed & pit removed. No D.G       was not found         HWM Rules
                                                                                             (6) BUA : 130 sq yd                                       Set.                               polluting. Ask the    within 30
                                                                                             (7) Water                                                 (5) SCN u/s 33(A) details          unit to submit bank   days.
                                                                                             consumption: 50                                           :24.04.2009.                       guarantee of Rs.
                                                                                             lit/day                                                   (6) Closure directions u/s 31(A)   One Lakh under
                                                                                             (8) Ground Water                                          & 33 (A) details : 09.06.2010.     Air Act valid for
                                                                                             :Nil                                                                                         one year. If unit
                                                                                             (9) Waste water                                                                              submits the bank
                                                                                             discharge :                                                                                  guarantee, closure
                                                                                             (a) Domestic effluent                                                                        directions be
                                                                                             : 20 lit/day                                                                                 revoked with a
                                                                                             (b) Trade effluent:                                                                          direction to apply
                                                                                             Nil.                                                                                         for consent to
                                                                                                                                                                                          operate and fresh
                                                                                                                                                                                          authorization under
                                                                                                                                                                                          HWM Rules within
                                                                                                                                                                                          30 days.
19   7431   15.06.2010   K.M UDYOG   PLOT NO           FRIENDS      ORANGE/     Mfg. of        (1) CTE :               07.05.2010.: confirm closure   (1) ETP: NA                       Implement the         Time
                                     1/536/B-9, GALI   COLONY       ESTABLISH   sanitory       Applied,16.04.2009.     direction.                     (2) ECS: Bag house                earlie                allowed for
                                     NO 5              INDUSTRIAL               bath fitting   (2) CTO:applied                                        (a) AR dated Feb, 2011 issued     CMC(Orange)           15 days for
                                                       AREA                                    11.04.2011.                                            by GGSIPU submitted.              decision dated        submission
                                                                                               (3) CTO(R) :Not                                        (b) Stack monitoring report       07.09.2011as          of bank
                                                                                               applied.                                               dated 14.02.2011issued by         follows : Ask the     guarantee of
                                                                                               (4) Authorization                                      GGSIPU submitted                  unit to submit bank   Rs. One
                                                                                               under HWM Rules                                        (c) One number of parameters      guarantee of Rs.      Lakh under
                                                                                               :NA                                                    analyzed which are within limit   One Lakh under        Air Act
                                                                                               (5) Date of                                            (3) D.G.Set: NIL.                 Air Act valid for     valid for one
                                                                                               Commissioning : Oct                                    (4) Inspection                    one year. If unit     year. If unit
                                                                                               2008.                                                  details:09.02.2009.: No ECS       submits the bank      submits the
                                                                                               (6) BUA : 38 Sqm.                                      found on buffing.                 guarantee, closure    bank
                                                                                               (7) Water                                              (5) SCN u/s 31(A) details         directions be         guarantee,
                                                                                               consumption:                                           :25.03.2009.                      revoked and           closure
                                                                                               200LPD                                                 (6) Closure directions u/s        consent to operate    directions be
                                                                                               (8) Ground Water                                       31(A)/33(A)/5 of EPA details :    be issued.            revoked and
                                                                                               :NIIL                                                  15.06.2010. Reply recieved that   Subsequently,         consent to
                                                                                               (9) Waste water                                        ECS installed.                    inspection be         operate be
                                                                                               discharge :                                                                              conducted. In         issued,
                                                                                               (a) Domestic effluent                                                                    addition to the       failing
                                                                                               : 150 LPD                                                                                above decision, ask   which,
                                                                                               (b) Trade effluent:                                                                      the discom and        discom and
                                                                                               NIL                                                                                      DJB to submit the     DJB be
                                                                                                                                                                                        compliance report.    directed to
                                                                                                                                                                                                              disconnect
                                                                                                                                                                                                              electricity /
                                                                                                                                                                                                              water
                                                                                                                                                                                                              supply.
20   7460   04-05-   STEPHY INDUSTRIES   PLOT NO 7,   FRIENDS      ORANGE /   Mfg of       (1) CTE :21.05.2009.    26.07.2010: Ask the unit to    (1) ETP: Not applicable             Closure directios    Closure
            2010                         GALI NO 4    COLONY       OPERATE    Kitchen      (2) CTO:04.05.2010.     submit the Bank Guarantee of   (2) ECS: Bag house                  be revoked in view   directios be
                                                      INDUSTRIAL              Wares with   (3) CTO(R) :            Rs.100000/-under Air Act       (a) AR dated …March 2010            of submission of     revoked in
                                                      AREA                    Buffing      (4) Authorization       valid for one year.            issued by GGSIPU submitted.         the requisition of   view of
                                                                                           under HWM Rules                                        (b) Stack monitoring report         bank guarantee.      submission
                                                                                           :NA                                                    dated                                                    of the
                                                                                           (5) Date of                                            …16.03.2010……….issued by                                 requisite
                                                                                           Commissioning : Jan                                    ……GGSIPU………..submitted                                   bank
                                                                                           2009.                                                  (c) One number of parameters                             guarantee.
                                                                                           (6) BUA : 125 sq mt.                                   analyzed which are within limit /
                                                                                           (7) Water                                              beyoud prescribed limit.
                                                                                           consumption: 100                                       (3) D.G.Set: NIL.
                                                                                           Lt/Day                                                 (4) Inspection
                                                                                           (8) Ground Water                                       details:11.02.2009: Buffing
                                                                                           :Nil                                                   activity was found w/o ECS.
                                                                                           (9) Waste water                                        (5) SCN u/s 31(A) details
                                                                                           discharge :                                            :24.07.2009.
                                                                                           (a) Domestic effluent                                  (6) Closure directions u/s 31(A)
                                                                                           : 50 Lt/day                                            details : 16.06.2010.
                                                                                           (b) Trade effluent:                                    (7) The unit has submitted a BG
                                                                                           Nil                                                    of Rs.100000/- under Air Act on
                                                                                                                                                  12.10.2010, as per last CMC
                                                                                                                                                  decision dated 26.07.2010.
21   OM DRISHIAN     PLOT NO 58,   SSI IND AREA   ESTABLISH   S.S. Circle   (1) CTE :(Y) Green      06.05.2010          (1) Inspection details: Inspection   Ask the                Ask the
     INTERNATIONAL                                            cutting &     C.NO.18625. issued      File be put up      of the unit was conducted on         compliance from        compliance
     LTD                                                      S.S.          on 01.07.2008 valid     Administratively.   08.01.2010.                          discom & DJB and       from discom
                                                              Utensils      upto 30.06.2009.                            Observations:                        ask the unit to        & DJB and
                                                              (without      (2) CTO(R) : Green                          1. The plot number SSI 58 is         confirm on an          ask the unit
                                                              buffing &     refusal No 2010.                            divided into two parts M/s Om        affidavit that it is   to confirm
                                                              polishing)    (3) Date of                                 Drishan is                           non operational in     on an
                                                                            Commissioning :                              located right side of the plot.     compliance of          affidavit that
                                                                            2008                                        2. M/s Om Drishan was found          closure directions     it is non
                                                                            (4) BUA : 1021.92                           engaged in S.S. circle cutting       failing which,         operational
                                                                            Sq.mtr                                       and utensils manufacturing          SDM will be asked      in
                                                                            (5) Water                                   without buffing at groung floor.     for the effective      compliance
                                                                            consumption: 300                            3. Manufacturing activity has not    closure of the unit.   of closure
                                                                            ltr/day                                     found operational during                                    directions
                                                                            (6) Ground Water :                           inspection but office was found                            failing
                                                                            NIL                                         open.                                                       which, SDM
                                                                            (7) Waste water                             4. Acoustic enclosure and proper                            will be
                                                                            discharge :                                 stack height need to be                                     asked for the
                                                                            (a) Domestic effluent                        provided with D.G. Set .                                   effective
                                                                            : 100 ltr/day                               (2) SCN u/s 31(A)/33(A) details                             closure of
                                                                            (b) Trade effluent:                         : Issued on 03.03.2010.                                     the unit.
                                                                            NIL                                         Reply has not been received.
                                                                                                                        (3) Closure directions u/s
                                                                                                                        31(A)/33(A) details : Issued on
                                                                                                                        02.07.2010.
                                                                                                                        Reply has not been received.
22   _   _   FANCY DYERS   A-228, PHASE-I   OKHLA        _   Job work of   (1) CTE : not applied   07.05.10                         (1) ETP: Not installed.              Ask the                Ask the
                                            INDUSTRIAL       Dyeing &      (2) CTO: not applied    Issue closure directions.        (2) ECS: Not applicable.             compliance from        compliance
                                            AREA             washing of    (3) CTO(R) : not        Issue SCN 21/22 of the Air       (3) D.G.Set: Nil                     discom, DJB &          from
                                                             garments/     applied                 Act and u/s 25/26 of the Water   (4) Inspection details: conducted    MCD and also ask       discom, DJB
                                                             cloth         (4) Authorization       Act to M/s Deepak Metal.         on 13.01.10 & following were         the SDM for            & MCD and
                                                             (fabric)      under HWM Rules :       13.08.10                         observed:                            effective closure of   also ask the
                                                                           not applied             Seek compliance report from      (a) The unit was found in            the unit.              SDM for
                                                                           (5) Date of             concerned authorities            operation in one part of the                                effective
                                                                           Commissioning : -                                        premises no A-228, OIA, Ph-I.                               closure of
                                                                           (6) BUA : -                                              (b) Part of the premises ( appox                            the unit.
                                                                           (7) Water                                                2/3) is being used by the unit for
                                                                           consumption: -                                           thread cutting (light engineering
                                                                           (8) Ground Water :-                                      work) by the unit operating at A-
                                                                           (9) Waste water                                          229, OIA, Ph-I.
                                                                           discharge :                                              (c) No ETP has been install to
                                                                           (a) Domestic effluent                                    treat the trade effluent generated
                                                                           :-                                                       from the process.
                                                                           (b) Trade effluent: -                                    As approved, SCN u/s 21/22 of
                                                                                                                                    Air Act & 25/26 of Water Act
                                                                                                                                    issued on 05.07.10 to M/s
                                                                                                                                    Deepak Metal, A-229, OIA, Ph-
                                                                                                                                    I. No reply received from the
                                                                                                                                    unit.
                                                                                                                                    (5)Closure directions u/s
                                                                                                                                    31(A)/33(A)/5 of EPA details :
                                                                                                                                    issued on 05.07.10.
                                                                                                                                    closure direction returned back
                                                                                                                                    undelivered.. Hence, direction
                                                                                                                                    hand delivered & inspectionwas
                                                                                                                                    conducted on 20.08.10 &
                                                                                                                                    following were observed:
                                                                                                                                    (a) The unit was found in
                                                                                                                                    operation.
                                                                                                                                    (b) Closure directions has been
                                                                                                                                    delivered by hand to Sh. Kadir
                                                                                                                                    Khan, Proprietor of the unit.
                                                                                                                                    (c) No ETP has been installed.
                                                                                                                                    (d) The unit is being operated in
                                                                                                                                    open space of the plot
                                                                                                                                    (approximately 1/3).
                                                                                                                                    (e) Electricity and water is being
taken by the unit from near by
jhuggis.
Trade effluent is being
discharged in a pit in the plot
without any treatment.
Letter for seeking complaince
were sent to the concerned
authoriies on 06.09.10
As approved by CMC in its
meeting on 13.08.10, again
letters for seeking complaince
were issued on 29.09.10.
23   Footwear (Klick) India   D-3    Udyog Nagar      Orange   Mfg. of     (1) CTE :Issued valid   (1) ETP:N/A                         Follow up the       Closure
     Pvt. Ltd., LANCER              Industrial Area            footwear.   upto 24.09.2003 vide    (2) ECS: No                         further action on   directions
                                                                           consent order no.       (3) D.G.Set:125 KVA                 file.               revoked. No
                                                                           1586.                   (According to the inspection)                           action
                                                                           (2) CTO:Issued valid    (4) Inspection details:Conducted                        warranted in
                                                                           upto 20.02.2009 vide    on 02.08.2011, during the                               this meeting.
                                                                           consent order no        inspection following were
                                                                           16490                   observed :
                                                                           (3) CTO(R) :Applied     i) Channelization system is not
                                                                           on 27.04.2009 vide      installed to control fumes from
                                                                           ID no. 29686            the process.
                                                                           (4) Authorization       ii) One DG set of 125 KVA
                                                                           under HWM Rules         found installed without acoustic
                                                                           :Applied on             enclousre and inadequate stack
                                                                           07.09.2011 vide ID      height.
                                                                           no. 0925 (Fresh)        iii) Unit generating Hazardous
                                                                           (5) Date of             waste from printing ink and do
                                                                           Commissioning :         not follow any HWM Rules.
                                                                           2006                    (5) SCN u/s 31(A) & /5 of EPA
                                                                           (6) BUA : 800 sqm       details :28.06.2011
                                                                           (7) Water               (6) Closure directions u/s
                                                                           consumption: 1.5        31(A)/5 of EPA details
                                                                           KLD                     :17.08.2011
                                                                           (8) Ground Water        Unit submitted its reply along
                                                                           :Nil                    with an affdavit, application for
                                                                           (9) Waste water         authrization under HWM Rules
                                                                           discharge :             and unit confirm on an affidavit
                                                                           (a) Domestic effluent   that adequate channelization
                                                                           : 0.8 KLD               system has been provided.
                                                                           (b) Trade effluent:
                                                                           Nil                     A letter has been issued to the
                                                                                                   unit on 19.09.2011 for the
                                                                                                   submission of doccumentry
                                                                                                   proof i.e. photographs of stack
                                                                                                   and DG set & for B.G of Rs.
                                                                                                   One Lakh each Air Act and
                                                                                                   HWM Rules.
24   21328   15.05.2007   KRISHNA PIPE   G-101,      Bawana       Orange   Mfg of    1) CTE :valid upto       05.10.2009                       (1) ETP: N/A                        Ask the              Ask the unit
                          INDUSTRIES     SECTOR-1,   Industrial            conduit   18.11.2010               Issue consent to establish       (2) ECS: : N/A                      compliance from      to apply for
                                         DSIDC       Area                   pipe     (2) CTO: Not applied     without use of plastic scrap.    (3) D.G.Set:: N/A                   discom & DJB.        consent to
                                                                                     (3) CTO(R) : Not         Subsequently, inspection         (4) Inspection details: On          Ask the unit to      establish for
                                                                                     applied                   be conducted to ascertain the   02.02.2010.Observation Are:         submit bank          the new
                                                                                     (4) Authorization        raw material.                    i)Unit was found in operation in    guarantee of Rs.     proposed
                                                                                     under HWM Rules          12.02.2010/15.02.2010            mfg. of conduit pipe.               One Lakh under       activity.
                                                                                     :N/A                     Issue SCN u/s 31(A) of Air       ii)1 grinder and 2 mixer machine    Air Act valid for
                                                                                     (5) Date of              Act for not providing suction    were fond and no mhood sction       one year. If unit
                                                                                     Commissioning :          and channelization system.       mdevice were installed.             submits the bank
                                                                                     15.06.2007               Also ask the unit to apply for   iii) Scraps & PVC resin are         guarantee, closure
                                                                                     (6) BUA : 200 Sq mt      consent to operate.              mixed together to make pipes.       directions be
                                                                                     (7) Water                31.03.2011                       iv) 1 borewell exists exists, no    revoked.
                                                                                     consumption: 250 lpd     File be put administratively.    information regarding DJB
                                                                                     (8) Ground Water         File was put up                  permission.
                                                                                     :No                      administratively and was         (5) SCN u/s 31(A) of EPA
                                                                                     (9) Waste water          decided to confirm closure       details :issued on 25.03.2010
                                                                                     discharge :              direction.                       (6) Closure directions u/s
                                                                                     (a) Domestic effluent                                     31(A)of EPA details :issued on
                                                                                     : 150 lpd                                                 23.08.2011.
                                                                                     (b) Trade effluent:Nil
                                                                                                                                               Reply received on 06.09.2011
                                                                                                                                               Compliance received from SDM
                                                                                                                                               Narela on 06.09.2011
                                                                                                                                               Reply along with affidavit
                                                                                                                                               received from the unit requesting
                                                                                                                                               to revoke the directions as unit
                                                                                                                                               has closed down about three
                                                                                                                                               months ago due to separation of
                                                                                                                                               partner and eager to establish
                                                                                                                                               new unit with prior permission
                                                                                                                                               from DPCC.
25   21058   18-04-   DAIJEX AUTO   191, SECTOR-2,   Bawana       Orange   Mfg of auto   (1) CTE :21058 ID       Decision on 09.09.2009             (1) ETP: Proposed Unit              Ask the           Ask the
             2007     INDUSTRIES    POCKET-O,        Industrial            parts and     (orange) applied on     Case be considered after           (2) ECS: Proposed Unit              compliance from   compliance
                                    DSIDC            Area                  accessories   18.04.2007, 29258 ID    implementation of decision of      (3) D.G.Set: nil                    discom, DJB and   from
                                                                                         (Green) Valid upto      Scrutinizing Committee.i.e.        (4) Inspection details: conducted   SDM.              discom, DJB
                                                                                         23.04.2010              inspection to resolve the issue.   on 12.11.2009                                         and SDM.
                                                                                         (2) CTO: Not            12.02.2010/15.02.2010              i) Unit found engaged in mfg. of
                                                                                         Applied                 Issue SCN for Closure              auto parts and accessories with
                                                                                         (3) CTO(R) :Not         31.03.2011                         buffing and painting.
                                                                                         Applied                 File be put administratively.      ii) Three buffing machines
                                                                                         (4) Authorization       File was put up                    installed without ECS.
                                                                                         under HWM Rules :       administratively and it was        iii) A Separate room is provided
                                                                                         Proposed unit           decided to Confirm the closure     for spray painting, no
                                                                                         (5) Date of             direction.                         channelization provided.
                                                                                         Commissioning :                                            iv) One dismental DG. Set lying
                                                                                         October 2007                                               at site.
                                                                                         (6) BUA : 120 Sq mt                                        v) One borewell exist at site.
                                                                                         (7) Water                                                  (5) SCN u/s 31(A) : Issued on
                                                                                         consumption: 800 lpd                                       25.03.2011
                                                                                         (8) Ground Water :                                                           Reply received
                                                                                         Yes                                                        on 05.04.2010
                                                                                         (9) Waste water                                            (6) Closure directions u/s 31(A)
                                                                                         discharge :                                                : Issued on 29.08.2011
                                                                                         (a) Domestic effluent
                                                                                         : 200 lpd                                                  No reply received till date.
                                                                                         (b) Trade effluent:                                        Unit has submitted its reply
                                                                                         Nil                                                        along with affidavit on
                                                                                                                                                    20.09.2011 stating that ECS has
                                                                                                                                                    been installed and facility of
                                                                                                                                                    spray paitning and D.G. Set have
                                                                                                                                                    been removed.
26   COLOUR APPARELS   C-46/1   LAWRENCE     Dyeing of   (1) Inspection details: Inspection   Ask the                Ask the
                                ROAD         jeans.      of the unit was conducted on         compliance from        compliance
                                INDUSTRIAL               11.05.2010.                          discom & DJB and       from discom
                                AREA                     Observations:                        also ask the SDM       & DJB and
                                                         1. Unit found in opertion.           for effective          also ask the
                                                         2. unit is enaged in dyeing of       closure of the unit.   SDM for
                                                         jeans.                                                      effective
                                                         3. No ETP installed to treat the                            closure of
                                                         trade effluents generating fron                             the unit.
                                                         dyeing of jeans.
                                                         (2) SCN u/s 31(A)/33(A) details
                                                         : Issued on 30.60.2010.
                                                         Reply has not been received.
                                                         (3) Closure directions u/s
                                                         31(A)/33(A)/5 of EPA details :
                                                         Issued on 06.09.2010.
                                                         Reply has not been received.
27   35275   01.10.2010   RAHUL POLYMER   T-2/218, (F.F.   MANGOLPURI   ESTABLISH   mgf. of       (1) CTE : (P) Vide ID   17.06.2011                 (1) ETP: N/A                         Ask the             Consent to
                                          AND F.F.),       INDL AREA                plastic       No. 25275, applied      Inspection be conducted.   (2) ECS: N/A                         compliance from     establish be
                                          PHASE-I                                   compound      on 01.10.2010                                      (3) D.G.Set: NIL                     discom & DJB.       refused to
                                                                                    (granules),   (2) CTO: Not                                       (4) Inspection details: Inspection   Issue SCN u/s       M/s Rahul
                                                                                    Beads &       Applied                                            of the unit was conducted on         21/22 of the Air    Polymer.
                                                                                    Master        (3) CTO(R) : Not                                   08.07.2010.                          Act and u/s 25/26   Ask the
                                                                                    Batch.        Applied                                            Observations:                        of the Water Act    compliance
                                                                                                  (4) Authorization                                  1. Unit is enaged in activity of     to the new unit     from discom
                                                                                                  under HWM Rules :                                  Mfg. of Palstic dana using           found during        & DJB.
                                                                                                  (5) Date of                                        kneader                              inspection for      Issue SCN
                                                                                                  Commissioning :                                    machine and is operating             operating without   u/s 21/22 of
                                                                                                  15.12.2009                                         without any consent.                 consent.            the Air Act
                                                                                                  (6) BUA : 200 sq                                   2. No ECS installed over                                 and u/s
                                                                                                  mtrs                                               kneader/moulding machine.                                25/26 of the
                                                                                                  (7) Water                                          (5) SCN u/s 31(A) details :                              Water Act
                                                                                                  consumption: 0.3                                   issued on 16.08.2010.                                    to the new
                                                                                                  kl/day                                             Reply has not been received.                             unit found
                                                                                                  (8) Ground Water :                                 (6) Closure directions u/s                               during
                                                                                                  Nil                                                31(A)/33(A)/5 of EPA details :                           inspection
                                                                                                  (9) Waste water                                    Issued on 15.09.2010.                                    for operating
                                                                                                  discharge :                                        Reply has not been received.                             without
                                                                                                  (a) Domestic effluent                              Unit is again inspected on                               consent.
                                                                                                  : 0.25 kl/day                                      22.09.2011 as per decision of
                                                                                                  (b) Trade effluent:                                CMC(Orange) dated 17.06.2011
                                                                                                  Nil                                                and it was found that M/s Rahul
                                                                                                                                                     POlymer has been closed and
                                                                                                                                                     shifted and premises is being
                                                                                                                                                     used for packaging of cables.
28   31277   31.08.2009   SHIVA PLASTIC   POCKET-O,      Bawana       Orange   LDP (food   (1) CTE : valid upto      09.09.2009                        (1) ETP: N/A                         Ask the           Ask the
                          INDUSTRIES      PLOT NO-147,   Industrial            grade       09.11.2007                Inspection be conducted           (2) ECS: No                          compliance from   compliance
                                          SECTOR-1,      Area                  Plastic)    (2) CTO:Applied on        13.11.2009                        (3) D.G.Set: 82.5 KVA                discom & DJB.     from discom
                                          DSIDC                                            31.08.2009                Reinspection with prior notice.   (a) Noise monitoring report                            & DJB and
                                          COMPLEX                                          (3) CTO(R) :Not           12.02.2010/15.02.2010             :dated15.06.2009 issued by DCE                         ask the unit
                                                                                           Applied                   Issue SCN for closure.            submitted and noise levels are                         to confirm
                                                                                           (4) Authorization         19.08.2010                        within limit                                           on an
                                                                                           under HWM Rules :         Reply of unit is not related to   (4) Inspection details: Inspection                     affidavit that
                                                                                           Applied on                SCN,therefore SCN remain          Carried out on 02.02.2010 and                          it is non
                                                                                           13.01.2009 (I.Do          unanswered.Consent refused        descriepancies were observed.                          operational
                                                                                           4882)                     and issue closure directions.     (5) SCN u/s 31(A AND 33(A) :                           in
                                                                                           (5) Date of               08.04.2011                        SCN issued to unit on                                  compliance
                                                                                           Commissioning : Jan       File be put up                    22.03.2010.                                            of closure
                                                                                           2007                      administrativley.                                                                        directions
                                                                                           (6) BUA :160 Sq mt        File was put administratively     Reply received from the unit on                        failing
                                                                                           (7) Water                 and it was decided to confirm     04.06.2010.                                            which, SDM
                                                                                           consumption: 120 lpd      the closure direction.                                                                   will be
                                                                                           (8) Ground Water :                                          Refusal Of consent issued to unit                      asked for the
                                                                                           no                                                          on 29.09.2010.                                         effective
                                                                                           (9) Waste water                                             (6) Closure directions u/s 31(A)                       closure of
                                                                                           discharge :                                                 : Issued to unit on 29.09.2010.                        the unit.
                                                                                           (a) Domestic effluent
                                                                                           : 100 lpd                                                   Reply received from the unit on
                                                                                           (b) Trade effluent: nil                                     08.10.2010
                                                                                                                                                         Again reply along with
                                                                                                                                                       photographs and submission of
                                                                                                                                                       annual return of hazardous waste
                                                                                                                                                       received on
                                                                                                                                                        19.10.2010.
                                                                                                                                                         Letters for Seeking of
                                                                                                                                                       compliance from various
                                                                                                                                                       agencies were sent on
                                                                                                                                                       27.07.2011
                                                                                                                                                         Reply was received from
                                                                                                                                                       NDPL on 10.08.2011
                                                                                                                                                         Letter was sent again to NDPL
                                                                                                                                                       for seeking of compliance on
                                                                                                                                                       02.09.2011.
                                                                                                                                                         No compliance received.
29   10912   11-01-   A.S. TRADERS   355-A/1, OLD      FRIENDS      ORANGE    Mfg. of      (1) CTE :Applied on     16.02.2009                       (1) ETP: NA                          The bank guarantee     The unit be
             2010                    PLOT NO 45, KH.   COLONY       OPERATE   Auto Parts   12.012.2006.            Letter for CTE to issued.        a) AR : Not applicable.              of Rs. One Lakh        asked to
                                     NO 336/313,       INDUSTRIAL             with die     (2) CTO:Refused on                                       (b) Effluent analysis report : Not   submitted by the       submit fresh
                                     GALI NO 6         AREA                   casting      09.06.2010.             17.06.2009                       applicable.                          unit has expired.      bank
                                                                                           (3) CTO(R) :Nil         File be submitted                (c) Number of parameters             The unit be asked      guarantee of
                                                                                           (4) Authorization       administratively.                analyzed : Not applicable.           to submit fresh        Rs One
                                                                                           under HWM Rules         23.03.2010                       (2) ECS: Channelization              bank guarantee of      Lakh under
                                                                                           :NA                     Issue refusal of consent to      provided.                            Rs One Lakh under      Air Act
                                                                                           (5) Date of             establish. Issue SCN u/s 31(A)   (a) AR : Not applicable.             Air Act valid for      valid for one
                                                                                           Commissioning : Jan,    of the Air Act for closure of    (b) Stack monitoring report          one year and           year and
                                                                                           2008                    the unit.                        dated 13.11.2009 issued by           Account Section be     Account
                                                                                           (6) BUA : 173 sqm                                        DPCC submitted                       requested to release   Section be
                                                                                           (7) Water                                                (c) Two number of parameters         the old bank           requested to
                                                                                           consumption: 150                                         analyzed which are within limit.     guarantee. If the      release the
                                                                                           Llt/day                                                  (3) D.G.Set: .62 KVA without         unit submits the       old bank
                                                                                           (8) Ground Water                                         acoustic enclosure.                  fresh bank             guarantee. If
                                                                                           :Nil                                                     (a) Noise monitoring report not      guarantee, closure     the unit
                                                                                           (9) Waste water                                          submitted.                           directions may be      submits the
                                                                                           discharge :                                              (b) Stack monitoring report (for     revoked and unit       fresh bank
                                                                                           (a) Domestic effluent                                    more than 1000 KVA) : Not            be asked to apply      guarantee,
                                                                                           : 50 ltr/day                                             applicable.                          for consent to         closure
                                                                                           (b) Trade effluent:                                      (4) Inspection details:Carried out   operate within 30      directions
                                                                                           Nil                                                      on 09.02.2009.                       days. In the           may be
                                                                                                                                                    (5) SCN u/s 31(A) :Issued on         meantime,              revoked and
                                                                                                                                                    22.04.2010.                          compliance from        unit be
                                                                                                                                                    Unit was asked to submit the         discom and DJB be      asked to
                                                                                                                                                    bank guarantee of Rs One Lakh        asked.                 apply for
                                                                                                                                                    under Air Act vide letter dated                             consent to
                                                                                                                                                    21.10.2009. Reply received on                               operate
                                                                                                                                                    08.11.2009 stating that they are                            within 30
                                                                                                                                                    not able to submit BG due to                                days.
                                                                                                                                                    financial condition. DG Set is
                                                                                                                                                    out of order and in defunct
                                                                                                                                                    condition. Stack height has been
                                                                                                                                                    raised and the fees for
                                                                                                                                                    monitoring report has been
                                                                                                                                                    submitted.
                                                                                                                                                    (6) Closure directions u/s
                                                                                                                                                    31(A)details :Issued on
                                                                                                                                                    04.10.2010. Reply recieved on
                                                                                                                                                    08.10.2010 and (B.G submitted
on 20.10.2010) that
compliance has been done.
Requested
for refund of B.G.
30   11019   05-10-09   The Belle             1/562.Street no-8   Friends Colony    ORANGE      mfg of      (1) CTE :               Ask the unit to improve         (1) ETP: Not Provided.              Ask the unit to         Inspection
                        Laboratories(P).Ltd                       Industrial Area   ESTABLISH   silicon     (2) CTO:                exhaust system. Issue SCN u/s   (a) AR : Not submitted. (b)         confirm on an           be
                                                                                                detergent   (3) CTO(R) :            21/22 of the Air Act and u/s    Effluent analysis report : Not      affidavit that waste    conducted.
                                                                                                            (4) Authorization       25/26 of the Water Act.         submitted.                          water from the
                                                                                                            under HWM Rules :                                       (c) Number of parameters            process is not
                                                                                                            (5) Date of                                             analyzed : Not applicable.          discharged and
                                                                                                            Commissioning :                                         (2) ECS: Not applicable.            spillage of any raw
                                                                                                            (6) BUA :                                               (a) AR : Not applicable.(b) Stack   material / product
                                                                                                            (7) Water                                               monitoring report : Not             will be avoided
                                                                                                            consumption:                                            applicable.                         during floor
                                                                                                            (8) Ground Water :                                      (c) Number of parameters            washing and
                                                                                                            (9) Waste water                                         analyzed : Not applicable.          submit a bank
                                                                                                            discharge :                                             (3) D.G.Set: one DG set was         guarantee of Rs.
                                                                                                            (a) Domestic effluent                                   observed lying in a disfunction     One Lakh under
                                                                                                            :                                                       condition (5-7.5 KVA).              Water Act valid for
                                                                                                            (b) Trade effluent:                                     (a) Noise monitoring report : Not   one year. If the unit
                                                                                                                                                                    submitted. (b) Stack monitoring     submits the
                                                                                                                                                                    report (for more than 1000          aforesaid
                                                                                                                                                                    KVA) : Not applicable.              documents, closure
                                                                                                                                                                    (4) Inspection details:inspection   directions be
                                                                                                                                                                    conducted by DPCC officials on      revoked. In the
                                                                                                                                                                    19.05.10 & following                meantime, ask the
                                                                                                                                                                    observations have been made:        discom and DJB to
                                                                                                                                                                    1.the unit was found operational    submit compliance
                                                                                                                                                                    & deals in Mfg of silicon           report.
                                                                                                                                                                    detergent.
                                                                                                                                                                    2.the activity involves mixing of
                                                                                                                                                                    the raw materials in the definite
                                                                                                                                                                    proportion so as to get the
                                                                                                                                                                    product.
                                                                                                                                                                    3. one DG set was observed
                                                                                                                                                                    lying in a disfunction condition
                                                                                                                                                                    (5-7.5 KVA).
                                                                                                                                                                    4.one small lab exits for
                                                                                                                                                                    checking & testing
                                                                                                                                                                    5.As informed by the person
                                                                                                                                                                    contacted the waste water which
                                                                                                                                                                    of emerges out of floor washing
                                                                                                                                                                    and utensil washing is diposed
                                                                                                                                                                    off without treatment.
                                                                                                                                                                    6.exhaust system needs to be
improved.
(5) SCN u/s /33(A)/ details :NIL
(6) Closure directions u/s
31(A)/33(A) details :
05.10.2010.
As per the decision dated
12.02.10
31   11552   03-12-10   KARAN WIRE   340/61, GALI NO.   FRIENDS      Orange    Copper        (1) CTE : Not           16.03.2011: Ask the unit to      (1) ETP: NA                         As compliance         Ask the
                        INDUSTRIES   1B, FRIENDS        COLONY       Renewal   Wire          required as CTO         submit the Bank Guarantee of     (2) ECS: Wet scrubber.              regarding             compliance
                                     COLONY             INDUSTRIAL             Drawing       issued on 27.11.2003    Rs. 1 Lakh each under Air Act    (3) D.G.Set: ...125 KVA W/O....     submission of bank    from discom
                                     INDUSTRIAL         AREA                   with Super    was valid upto          and HWM Rules valid for one      A/E.............                    guarantee of Rs.      & DJB and
                                     AREA, G.T.                                Enamelling.   12.08.2005.             year. If unit submits the Bank   (a) Noise monitoring report of      One Lakh each         also ask the
                                     ROAD,                                                   (2) CTO:Applied on      Guarantee, closure directions    ..125..........KVA                  under Air Act and     SDM for
                                     SHAHDARA                                                12.08.05.               be revoked temporarily for 45    dated.......NIL.........issued by   HWM Rules and         effective
                                                                                             (3) CTO(R) :            days to enable the unit the      ......NA.....submitted              status of providing   closure of
                                                                                             03.12.2010.             submission of the monitoring     (b) Stack monitoring report (for    acoustic enclosure    the unit.
                                                                                             (4) Authorization       reports from approved            more than 1000 KVA) dated           with the D.G. Set
                                                                                             under HWM Rules         laboratory of DPCC.              ..NA............. issued by         not done. Ask the
                                                                                             :Not applied.                                            ...NA.............submitted         compliance from
                                                                                             (5) Date of                                              (4) Inspection details:             discom & DJB and
                                                                                             Commissioning :                                          24.09.2010: ECS not working.        also ask the SDM
                                                                                             2002.                                                    D.G set w/o A/E.                    for effective
                                                                                             (6) BUA : 130 Sqm.                                       (5) SCN u/s 31(A)/33(A)/5 of        closure of the unit
                                                                                             (7) Water                                                EPA details : Nil.                  in view of the
                                                                                             consumption:150LPD                                       (6) Closure directions u/s          super enamelling
                                                                                             (8) Ground Water                                         31(A)/33(A)/5 of EPA details :      activity.
                                                                                             :NIL                                                     closure direction on 20.10.10 as
                                                                                             (9) Waste water                                          no ECS was not found in
                                                                                             discharge :NIL                                           operation on 24.09.2010.
                                                                                             (a) Domestic effluent
                                                                                             : 30 LPD
                                                                                             (b) Trade effluent:
                                                                                             NIL
32   NA   NOT       KRISHNA UDYOG   A-5/11, JHILMIL   JHILMIL      ORANGE   Al utensils   ((1) CTE :Not            Directions for closure has   (1) ETP: ………NA…                    Ask the               Inspection
          APPLIED                   INDUSTRIAL        INDUSTRIAL            with          Applied                 been issued on 20.10.2010     (2) ECS: …Not installed            compliance from       be
                                    AREA              AREA                  buffing.      (2) CTO:Not Applied     regarding ECS, in view of     (3) D.G.Set: ..NIL..               discom & DJB and      conducted.
                                                                                          (3) CTO(R) Not          CWG-XIX-2010.                 (4) Inspection                     also ask the SDM      In case of
                                                                                          Applied                                               details:06.10.2010: No ECS         for effective         deficiencies
                                                                                          (4) Authorization                                     found                              closure of the unit   found,
                                                                                          under HWM Rules                                       (5) SCN u/s 31(A) details :NIl     in view of the        effective
                                                                                          :Not Applied                                          (6) Closure directions u/s 31(A)   buffing activity.     closure
                                                                                          (5) Date of                                           details : 20.10.2010.                                    through
                                                                                          Commissioning :                                                                                                SDM be
                                                                                          OPERATING                                                                                                      done.
                                                                                          (6) BUA : Not
                                                                                          Applied
                                                                                          (7) Water
                                                                                          consumption: Not
                                                                                          Applied
                                                                                          (8) Ground Water
                                                                                          :Not Applied
                                                                                          (9) Waste water
                                                                                          discharge :Not
                                                                                          Applied
                                                                                          (a) Domestic effluent
                                                                                          :Not Applied
                                                                                          (b) Trade effluent:
                                                                                          Not Applied
33   11542   26-11-   DEV MATTEL   1/424/63,GALI   Friends Colony    ORANGE      Job work of   (1) CTE :26.11.2010     14.02.2011:& 16.03.2011: Ask      (1) ETP: Not applicable.            Ask the                Ask the
             2010     INDUSTRIAL   NO IB FRIENDS   Industrial Area   ESTABLISH   Supper        (2) CTO: 22.12.2010.    the unit to submit an affidavit   (2) ECS: Wet scrubber installed.    compliance from        compliance
                                   COLONY                                        Enamel        (3) CTO(R) :NA          w.r.t. the rectification of the   (a) AR dated 30.11.2010 issued      discom & DJB and       from discom
                                   INDUSTRIAL                                    Paint on      (4) Authorization       deficiencies regarding            by GGSIPU submitted.                also ask the SDM       & DJB and
                                   AREA                                          Aluminum      under HWM Rules         hazardous waste management        (b) Stack monitoring report : Not   for effective          also ask the
                                                                                 Wire Unit.    :Not applied.           and acosutic enclosure with       submitted & stating that the        closure of the unit    SDM for
                                                                                               (5) Date of             two D.G. Sets and a Bank          same will be submitted after        in view of the         effective
                                                                                               Commissioning :         Guarantee of Rs. One Lakh         revocation.                         super enamelling       closure of
                                                                                               2010.                   each under Air Act and HWM        (c) Number of parameters            activity as unit has   the unit.
                                                                                               (6) BUA : 85 Sqm.       Rules valid for one year. If      analyzed : Not submitted.           concealed
                                                                                               (7) Water               unit submits the aforesaid        (3) D.G.Set: Two DG sets of         information
                                                                                               consumption: 200        documents, closure directions     62.5 KVA without A/E were           regarding D.G. Set
                                                                                               L/D                     be revoked and consent to         found.                              and status of
                                                                                               (8) Ground Water        establish be issued.              (a) Noise monitoring report : Not   acoustic enclosure
                                                                                               :Nil                                                      submitted.                          not mentioned.
                                                                                               (9) Waste water                                           (b) Stack monitoring report (for    Also ask the unit to
                                                                                               discharge :                                               more than 1000 KVA) : Not           submit full
                                                                                               (a) Domestic effluent                                     applicable.                         compliance report
                                                                                               : 200 L/D(AS PER                                          (4) Inspection                      i.e. providing
                                                                                               AFFIDAVIT)                                                details:09.10.2010.: Operating      acoustic enclosure
                                                                                               (b) Trade effluent:                                       W/O consent. ECS not                and stack height
                                                                                               Nil                                                       installed.Two DG sets of 62.5       with the D.G. Set
                                                                                                                                                         KVA without A/E were found.         and comliance
                                                                                                                                                         (5) SCN u/s 31(A)/33(A)/5 of        regarding
                                                                                                                                                         EPA details :Nil                    hazardous waste
                                                                                                                                                         (6) Closure directions u/s 31(A)    mangement.
                                                                                                                                                         details : closure direction were
                                                                                                                                                         issued to the unit wrt CWG on
                                                                                                                                                         20.10.2010. Reply received on
                                                                                                                                                         29.11.2010.
34   Not       Not       JOGINDER           340/38, Gali No-1-   FRIENDS      ORANGE   Super       (1) CTE :Not Applied    16.03.2011: issue CTE with      (1) ETP: No                        Ask the               Ask the
     applied   applied   KHANEJA/SHASHANK   B                    COLONY                Enameling   (Applied in the name    the stipulations of MPD-2021,   (2) ECS: Not Provided              compliance from       compliance
                         MITTAL                                  INDUSTRIAL                        of Shashank Mittal      regarding number of worker      (3) D.G.Set: .NIL.                 discom & DJB and      from discom
                                                                 AREA                              for wire & cable &      and plot area.                  (4) Inspection details:Inspected   also ask the SDM      & DJB and
                                                                                                   granted on                                              on 02.07.2009. ECS not found,.     for effective         also ask the
                                                                                                   05.04.2011).                                            (5) SCN u/s 31(A) details :NA      closure of the unit   SDM for
                                                                                                   (2) CTO:Not Applied                                     (6) Closure directions u/s 31(A)   in view of the        effective
                                                                                                   (3) CTO(R) :Not                                         details :20.10.2010.               super enamelling      closure of
                                                                                                   Applied                                                                                    activity.             the unit.
                                                                                                   (4) Authorization
                                                                                                   under HWM Rules
                                                                                                   :Not Applied
                                                                                                   (5) Date of
                                                                                                   Commissioning : No
                                                                                                   information.
                                                                                                   (6) BUA : No
                                                                                                   information.
                                                                                                   (7) Water
                                                                                                   consumption:No
                                                                                                   information.
                                                                                                   (8) Ground Water
                                                                                                   :No information.
                                                                                                   (9) Waste water
                                                                                                   discharge :No
                                                                                                   information.
                                                                                                   (a) Domestic effluent
                                                                                                   : No information.
                                                                                                   (b) Trade effluent:
                                                                                                   NA
35   NA   NOT       MANOJ WIRE WORKS   A-5/11, JHILMIL   JHILMIL      ORANGE   Mfg. of     ((1) CTE :Not            Directions for closure has   (1) ETP: Not applicable.             Ask the               Ask the
          APPLIED                      INDUSTRIAL        INDUSTRIAL            Copper      Applied                 been issued on 20.10.2010     (2) ECS: …………                        compliance from       compliance
                                       AREA              AREA                  Wire        (2) CTO:Not Applied     regarding ECS, in view of     (a) AR dated ………….issued             discom & DJB and      from discom
                                                                               Drawing     (3) CTO(R) Not          CWG-XIX-2010.                 by ……………..submitted.                 also ask the SDM      & DJB and
                                                                               and Super   Applied                                               (b) Stack monitoring report          for effective         also ask the
                                                                               Enameling   (4) Authorization                                     dated ………….issued by                 closure of the unit   SDM for
                                                                               on copper   under HWM Rules                                       ……………..submitted                     in view of the        effective
                                                                               wires.      :Not Applied                                          (c) ..........number of parameters   super enamelling      closure of
                                                                                           (5) Date of                                           analyzed which are within limit /    activity.             the unit.
                                                                                           Commissioning :                                       beyoud prescribed limit.
                                                                                           OPERATING                                             (3) D.G.Set: ................
                                                                                           (6) BUA : Not                                         (a) Noise monitoring report of
                                                                                           Applied                                               ............KVA
                                                                                           (7) Water                                             dated................issued by
                                                                                           consumption: Not                                      ...........submitted and noise
                                                                                           Applied                                               levels are within limit / beyond
                                                                                           (8) Ground Water                                      limit.
                                                                                           :Not Applied                                          (b) Stack monitoring report (for
                                                                                           (9) Waste water                                       more than 1000 KVA) dated
                                                                                           discharge :Not                                        ............... issued by
                                                                                           Applied                                               ................submitted and
                                                                                           (a) Domestic effluent                                 parameters within limit / not
                                                                                           :Not Applied                                          satisfactory.
                                                                                           (b) Trade effluent:                                   (4) Inspection
                                                                                           Not Applied                                           details::06.10.2010: No ECS
                                                                                                                                                 found
                                                                                                                                                 (5) SCN u/s 31(A)/33(A)/5 of
                                                                                                                                                 EPA details :
                                                                                                                                                 (6) Closure directions u/s
                                                                                                                                                 31(A)details : 20.10.2010.
36   ABHAY RAM   A-30, GROUP   WAZIRPUR     Buffing of   (1) Inspection details: Inspection     Ask the                Ask the
                               INDUSTRIAL   S.S.         of the unit was conducted on           compliance from        compliance
                               AREA         utensils.    17.09.2010.                            discom & DJB.          from discom
                                                         observations:                          Ask the unit to        & DJB and
                                                         1. Duriong inspection, buffing         submit is reply on     also ask the
                                                         activity on stainless steel utensils   an affidavit           SDM for
                                                         was observed and no ECS was            regarding closing      effective
                                                         provided to chanelise the              down its activity in   closure of
                                                         emissions generated from               pursuance of           the unit.
                                                         buffing. This activity was             closure directions
                                                         observed on Ist and 2nd floor.         within 15 days,
                                                         2. basement of the premises is         failing which SDM
                                                         being used by M/s M.K. Steel           will be asked for
                                                         engaged in circle cutting with         effective closure of
                                                         the help of double action press        the unit.
                                                         machine (1 no.).
                                                         3. Ground floor of the premises
                                                         is being used for Engg. work
                                                         owned by M/s Ajit Singh 4 nos.
                                                         of lathe machines and 1 no. of
                                                         sinle press machine was seen.
                                                         4. First floor of the premises is
                                                         being used for buffing work and
                                                         half portion for office purpose.
                                                         5. Second floor of the premises
                                                         is being used for buffin activity
                                                         owned by M/s Ram kumar &
                                                         M/s Raffequ & Safiq ( First
                                                         Floor).
                                                         (2) SCN u/s 21/22 of Air Act &
                                                         25/26 of WAter Act details :
                                                         Issued on 28.10.2010.
                                                         Reply has not been received.
                                                         (3) Closure directions u/s 31(A)
                                                         details : Issued on 20.10.2010.
                                                         Reply has been received on
                                                         31.12.2010 stating that they have
                                                         closed the activity due to ill
                                                         health
                                                         and so have not applied for
                                                         CTE/CTO.
37   11532   22-12-10   SHRI GANESH    1/424/37,GALI   FRIENDS      Orange    Job work of   (1) CTE :26.11.2010.     14.02.2011: Ask the unit       (1) ETP: NA                        Ask the unit to       Ask the
                        WINDING WIRE   NO IB FRIENDS   COLONY       Operate   Supper        (2) CTO:22.12.2010.     submit an affidavit w.r.t the   (2) ECS: Yes                       submit the            compliance
                                       COLONY          INDUSTRIAL             Enamel        (3) CTO(R) :Not         rectifications of the           (a) AR dated …Nov 2010 issued      compliance w.r.t.     from discom
                                       INDUSTRIAL      AREA                   Paint on      applicable.             deficiencies regarding          by GGSIPU submitted.               hazardous waste       & DJB and
                                       AREA                                   Aluminum      (4) Authorization       hazardous waste management      (b) Stack monitoring report        management in         also ask the
                                                                              Wire Unit.    under HWM Rules :       & a BG of Rs.100000/- each      dated …Not Submitted               order to fully        SDM for
                                                                                            Not applied.            under Air Act & HWM Rules       (3) D.G.Set: ..NIL.                compliance of         effective
                                                                                            (5) Date of             valid for one year. If unit     (4) Inspection                     CMC(Orange)           closure of
                                                                                            Commissioning :         submits the above said          details:09.10.2010.No ECS was      decision dated        the unit.
                                                                                            2010.                   documents, closure direction    found.                             14.02.2011. In the
                                                                                            (6) BUA : 75 (in sq.    be revoked and CTE be issued.   (5) SCN u/s 31(A) details :Nil     meantime, ask the
                                                                                            meter)                  16.03.2011: Implement           (6) Closure directions u/s 31(A)   compliance from
                                                                                            (7) Water               decision of CTE.                dtails : 20.10.2010.               discom & DJB and
                                                                                            consumption: 100                                        HWM not yet applied.               also ask the SDM
                                                                                            liters/day                                              Bank Guarantee of Rs. One          for effective
                                                                                            (8) Ground Water                                        Lakh each under Air Act and        closure of the unit
                                                                                            :Nil                                                    HWM Rules submitted.               in view of the
                                                                                            (9) Waste water                                                                            super enamelling
                                                                                            discharge :                                                                                activity.
                                                                                            (a) Domestic effluent
                                                                                            : 80 liters/day
                                                                                            (b) Trade effluent:
                                                                                            Nil
                                                                                            .ECS:Yes,
                                                                                            30.11.2010. Test
                                                                                            Report(Air) within
                                                                                            Limit ---- N/A.
                                                                                            D.G.Set: Nil. NMR
                                                                                            Sumitted ---- N/A
                                                                                            unit has been issued
                                                                                            closure direction
                                                                                            under 31(A) of Air
                                                                                            Act.
38   36617   04-03-11   GANESH ENGG &   PLOT NO-A-9/2-   JHILMIL      GREEN /     Light         (1) CTE :04.03.2011     04-02-2011 : Directions for    (1) ETP: NA                          CMC(Green) in its      CMC(Green
                        METAL WORKS     A                INDUSTRIAL   ESTABLISH   Engineering   (2) CTO:No              closure has been issued on     (2) ECS: wet scrubber                meeting dated          ) in its
                                                         AREA                     works         (3) CTO(R) :No          20.10.2010 regarding ECS, in   (a) AR dated ……Nov 2010              08.09.2011 has         meeting
                                                                                                (4) Authorization       view of CWG-XIX-2010. CTE      …….issued by                         decided to ask the     dated
                                                                                                under HWM Rules         ---- Applied on 26.11.2010     …GGSIPU…………..submitted.              unit to submit bank    08.09.2011
                                                                                                :NA                     (Pending)                      (b) Stack monitoring report          guarantee of Rs.       has decided
                                                                                                (5) Date of             23.05.2011: Inspection be      dated ………….issued by                 One Lakh under         to ask the
                                                                                                Commissioning :         conducted                      ……GGSIPU……..submitted                Air Act valid for      unit to
                                                                                                03.2011                                                (c) ..........number of parameters   one year. If unit      submit bank
                                                                                                (6) BUA : 250Sqm.                                      analyzed which are within limit /    submits the bank       guarantee of
                                                                                                (7) Water                                              beyoud prescribed limit.             guarantee, closure     Rs. One
                                                                                                consumption: 100                                       (3) D.G.Set: .NA.                    directions be          Lakh under
                                                                                                LPD                                                    (4) Inspection                       revoked and            Air Act
                                                                                                (8) Ground Water                                       details:02.06.2011:-Facilities for   consent to establish   valid for one
                                                                                                :NIL                                                   foundry have been removed.           be issued.             year. If unit
                                                                                                (9) Waste water                                        (5) SCN u/s 31(A)details :Nil                               submits the
                                                                                                discharge :                                            (6) Closure directions u/s 31(A)                            bank
                                                                                                (a) Domestic effluent                                  details : 20.10.2010. Unit has                              guarantee,
                                                                                                : 50 LPD                                               applied after changing activity to                          closure
                                                                                                (b) Trade effluent:                                    engg works.                                                 directions be
                                                                                                NIL                                                                                                                revoked and
                                                                                                                                                                                                                   consent to
                                                                                                                                                                                                                   establish be
                                                                                                                                                                                                                   issued.
39   11713   27-09-   PAWAN KUMAR   PLOT NO 458-     FRIENDS      ORANGE/     Mfg. of    (1) CTE : 27.09.2010.   25.11.2010:                       (1) ETP: Proposed                  Consent be             Inspection
             2010                   466, GALI NO 8   COLONY       ESTABLISH   sanitory   (2) CTO:Not applied     Ask the unit to submit Bank       (2) ECS: Proposed                  refused. Ask the       be
                                                     INDUSTRIAL               goods.     (3) CTO(R) :nil         Guarantee of Rs. One Lakh         (3) D.G.Set: NIL.                  compliance from        conducted.
                                                     AREA                                (4) Authorization       each under Air Act & Water        (4) Inspection details: On         discom & DJB and
                                                                                         under HWM Rules         Act valid for one year. If unit   08.09.2010: ETP & ECS not          also ask the unit to
                                                                                         :Nil                    submits the Bank Guarantee,       found.                             submit the
                                                                                         (5) Date of             closure directions be revoked     (5) SCN u/s 31(A)/33(A)/5 of       documentary proof
                                                                                         Commissioning : Oct     and consent to establish be       EPA details : NIl                  of closure of the
                                                                                         2010.                   granted.                          (6) Closure directions u/s         unit e.g.
                                                                                         (6) BUA : 42 Sqm.                                         31(A)/33(A)/5 of EPA details :     surendering its
                                                                                         (7) Water                                                 27.10.2010.                        MCD license / Sale
                                                                                         consumption: 500                                          Letter asking the unit to submit   Tax Registration
                                                                                         LPD.                                                      Bank Guarantee of Rs. One          etc.
                                                                                         (8) Ground Water                                          Lakh each under Air Act &
                                                                                         :NIL                                                      Water Act valid for one year was
                                                                                         (9) Waste water                                           send on 11.01.2011. So far no
                                                                                         discharge :                                               bank guarantee has been
                                                                                         (a) Domestic effluent                                     received.
                                                                                         : 50 LPD                                                  Reply with affidavit received on
                                                                                         (b) Trade effluent:                                       23.08.2011, Stating that unit hs
                                                                                         400LPD                                                    been closed due to financial
                                                                                                                                                   problem.
40   11722   27-09-   SANJAY   PLOT NO 458-     FRIENDS      ORANGE/     Mfg. of    (1) CTE : 27.09.2010.   25.11.2010:                       (1) ETP: Proposed                  Consent be             Inspection
             2010              466, GALI NO 8   COLONY       ESTABLISH   sanitory   (2) CTO:Not applied     Ask the unit to submit Bank       (2) ECS: Proposed                  refused. Ask the       be
                                                INDUSTRIAL               goods.     (3) CTO(R) :nil         Guarantee of Rs. One Lakh         (3) D.G.Set: NIL.                  compliance from        conducted.
                                                AREA                                (4) Authorization       each under Air Act & Water        (4) Inspection details: On         discom & DJB and
                                                                                    under HWM Rules         Act valid for one year. If unit   08.09.2010: ETP & ECS not          also ask the unit to
                                                                                    :Nil                    submits the Bank Guarantee,       found.                             submit the
                                                                                    (5) Date of             closure directions be revoked     (5) SCN u/s 31(A)/33(A)/5 of       documentary proof
                                                                                    Commissioning : Oct     and consent to establish be       EPA details : NIl                  of closure of the
                                                                                    2010.                   granted.                          (6) Closure directions u/s         unit e.g.
                                                                                    (6) BUA : 42 Sqm.                                         31(A)/33(A)/5 of EPA details :     surendering its
                                                                                    (7) Water                                                 27.10.2010.                        MCD license / Sale
                                                                                    consumption: 500                                          Letter asking the unit to submit   Tax Registration
                                                                                    LPD.                                                      Bank Guarantee of Rs. One          etc.
                                                                                    (8) Ground Water                                          Lakh each under Air Act &
                                                                                    :NIL                                                      Water Act valid for one year was
                                                                                    (9) Waste water                                           send on 11.01.2011. So far no
                                                                                    discharge :                                               bank guarantee has been
                                                                                    (a) Domestic effluent                                     received.
                                                                                    : 50 LPD                                                  Reply with affidavit received on
                                                                                    (b) Trade effluent:                                       23.08.2011, Stating that unit hs
                                                                                    400LPD                                                    been closed due to financial
                                                                                                                                              problem.
41   11567   01-11-   AGGARWAL          A-5/11, JHILMIL   JHILMIL      ORANGE /    Mfg. of      (1) CTE :01.11.2010     14.02.2011: Ask the unit to         (1) ETP:NA                           Ask the                Reply
             2010     INSULATORS PVT.   INDUSTRIAL        INDUSTRIAL   ESTABLISH   Copper       (2) CTO: No             submit an affidavit w.r.t. the      (2) ECS: installed.                  compliance from        received on
                      LTD.              AREA              AREA                     Wire         (3) CTO(R) :No          rectification of the deficiencies   (3) D.G.Set: ...NIL..                discom & DJB and       26.09.2011
                                                                                   Drawing      (4) Authorization       regarding hazardous waste           (4) Inspection details:              also ask the SDM       in CMC-IV.
                                                                                   and Super    under HWM Rules         management and a Bank               06.10.2010. No ECS was               for effective          Closure
                                                                                   Enameling    :No                     Guarantee of Rs. One Lakh           installed.                           closure of the unit    directions
                                                                                   on copper    (5) Date of             each under Air Act and HWM          (5) SCN u/s 31(A)/33(A)/5 of         in view of the         revoked on
                                                                                   wires.       Commissioning :         Rules valid for one year. If        EPA details :No.                     super enamelling       13.10.2011
                                                                                                September 2010.         unit submits the aforesaid          (6) Closure directions u/s 31(A)     activity.              on file. No
                                                                                                (6) BUA : 150 Sqm.      documents, closure directions       details : 28.10.2010.                                       action
                                                                                                (7) Water               be revoked and consent to                                                                       warranted in
                                                                                                consumption: 150        establish be issued.                                                                            this meeting.
                                                                                                LPD
                                                                                                (8) Ground Water
                                                                                                :YES
                                                                                                (9) Waste water
                                                                                                discharge :
                                                                                                (a) Domestic effluent
                                                                                                : 50 LPD
                                                                                                (b) Trade effluent:
                                                                                                NIL
42                    S.K. LALTOO       A-32 (FIRST       WAZIRPUR                 Buffing on                                                               (4) Inspection details: Inspection   Ask the                Ask the
                                        FLOOR)            INDUSTRIAL               stainless                                                                of the unit was conducted on         compliance from        compliance
                                                          AREA                     steel                                                                    21.09.2010.                          discom & DJB and       from discom
                                                                                   utensils.                                                                Observations:                        also ask the SDM       & DJB and
                                                                                                                                                            1. Unit was not in operation         for effective          also ask the
                                                                                                                                                            during inspection, but all the       closure of the unit.   SDM for
                                                                                                                                                            facilities was existing regarding                           effective
                                                                                                                                                            buffing.                                                    closure of
                                                                                                                                                            2. ECS has been installed to                                the unit.
                                                                                                                                                            channelise the trade emissions,
                                                                                                                                                            but the same ws not operating
                                                                                                                                                            condition.
                                                                                                                                                            3. As informed due to scarcity of
                                                                                                                                                            labour, the unit is not operation.
                                                                                                                                                            (6) Closure directions u/s
                                                                                                                                                            31(A)/33(A) details : Issued on
                                                                                                                                                            01.11.2010.
                                                                                                                                                            Reply has not been received.
43   TAHIR/NAWAB   A-22, GROUP   WAZIRPUR     Buffing of    (4) Inspection details:             Ask the           Ask the
                   BACK SIDE     INDUSTRIAL   S.S.         Inspection of the unit was           compliance from   compliance
                                 AREA         utensils.    conducted on 17.08.2010:             discom & DJB.     from discom
                                                           Observations:                        Inspection be     & DJB.
                                                           1. Unit found operating engaged      conducted.        Inspection
                                                           in buffing of S.S. utensils at 4th                     be
                                                           floor.                                                 conducted.
                                                           2. No ECS installed.
                                                           (5) Closure directions u/s 31(A)
                                                           details : issued on 01.11.2010.
                                                           Reply has been received on
                                                           18.11.2010 alongwith an
                                                           affidavit stating
                                                           that they have vacated the
                                                           premises.
44   Not       Not       SUSHIL         421/c, Gali No-6   FRIENDS      ORANGE   Super       (1) CTE :Not Applied    Issue SCN for refusal of           (1) ETP: No                          Ask the               Ask the
     applied   applied   PANDIT/GINNI                      COLONY                Enameling   (2) CTO:Not Applied     consent in view of no response     (a) AR : Not applicable.             compliance from       compliance
                         PLASTIC                           INDUSTRIAL                        (3) CTO(R) :Not         received w.r.t. the letter dated   (b) Effluent analysis report : Not   discom & DJB and      from discom
                                                           AREA                              Applied                 23.06.2010 issued by DPCC          applicable.                          also ask the SDM      & DJB and
                                                                                             (4) Authorization       for necessary measures.            (c) Nnumber of parameters            for effective         also ask the
                                                                                             under HWM Rules         Confirm closure directions to      analyzed : Not applicable.           closure of the unit   SDM for
                                                                                             :Not Applied            M/s Sushil Pandit.                 (2) ECS: Not Provided                in view of the        effective
                                                                                             (5) Date of                                                (a) AR : No ECS.                     super enamelling      closure of
                                                                                             Commissioning : No                                         (b) Stack monitoring report : Not    activity.             the unit.
                                                                                             information.                                               Provided
                                                                                             (6) BUA : No                                               (c) Number of parameters
                                                                                             information.                                               analyzed : Not applicable.
                                                                                             (7) Water                                                  (3) D.G.Set: .NIL.
                                                                                             consumption:No                                             (a) Noise monitoring report : Not
                                                                                             information.                                               applicable.
                                                                                             (8) Ground Water                                           (b) Stack monitoring report (for
                                                                                             :No information.                                           more than 1000 KVA) : Not
                                                                                             (9) Waste water                                            applicable.
                                                                                             discharge :No                                              (4) Inspection details:Inspected
                                                                                             information.                                               on 02.07.2009. ECS not found.
                                                                                             (a) Domestic effluent                                      (5) SCN u/s 31(A) details :Not
                                                                                             : No information.                                          issued.
                                                                                             (b) Trade effluent:                                        (6) Closure directions u/s 31(A)
                                                                                             NA                                                         details :22.11.2010.
45   35915   10.12.2010   WALKY       I-2134 (FIRST   NARELA      ESTABLISH   Mfg. of     (1) CTE : (P) Vide ID   16.03.2011                        (1) Inspection details: Inspection   Ask the                Ask the
                          FOOTWEARS   FLOOR), DSIDC   INDL AREA               PVC         No. 35915 applied on    Ask the unit (i) to install       of the unit was conducted on         compliance from        compliance
                                                                              Footwear    10.12.2010.             Emission Control System /         03.09.2010.                          discom & DJB and       from discom
                                                                              and EVA     (2) CTO: (R) Refusal    channelization for the process    observations:                        ask the unit to        & DJB and
                                                                              Footwear.   No. 2120 dated          emissions (ii) to submit an       1. The unit found in operation       submit compliance      ask the unit
                                                                                          03.06.2011              affidavit confirming the          and is enaged in mfg. of EVA         report in response     to submit
                                                                                          (3) CTE(R):             installation of ECS /             footwear.                            to DPCC's letter       compliance
                                                                                          (4) Authorization       Channelization and removal of     2. Printing is done over patawa      dated 07.07.2011,      report in
                                                                                          under HWM Rules :       printing activity, and Bank       of the shoes.                        failing which,         response to
                                                                                          (5) Date of             Guarantee of Rs. One Lakh         3. HW is not maintained              SDM will be asked      DPCC's
                                                                                          Commissioning : July    each under Air Act and HWM        properly as per HWM rules. the       for effective          letter dated
                                                                                          2010.                   Rules. If the unit submits the    cloth or wood                        closure of the unit.   07.07.2011,
                                                                                          (6) BUA : 200 sq        aforesaid documents, closure      used in printing of (patawa)                                failing
                                                                                          mtrs.                   directions be revoked and         shoes is not stored as per HWM                              which, SDM
                                                                                          (7) Water               consent to establish be issued.   rules.                                                      will be
                                                                                          consumption: 125                                          4. one Borewell found. No DJB                               asked for
                                                                                          ltr/day.                                                  permission.                                                 effective
                                                                                          (8) Ground Water :                                        5. No DG found.                                             closure of
                                                                                          Nil                                                       (2) SCN u/s 31(A) details :                                 the unit.
                                                                                          (9) Waste water                                           Issued on 01.11.2010.
                                                                                          discharge :                                               Reply has been received on
                                                                                          (a) Domestic effluent                                     14.12.2011 alongwith an
                                                                                          : 60 ltr/day.                                             affidavit stating
                                                                                          (b) Trade effluent:                                        that you are using the fresh
                                                                                          Nil.                                                      EVA compound for
                                                                                                                                                    manufacturing of EVA
                                                                                                                                                     Footwears. hence ECS syaytem
                                                                                                                                                    is not required & stopped the
                                                                                                                                                    activity of printing,
                                                                                                                                                    Applied for CTE/CTO. Further,
                                                                                                                                                    requested for revocation of
                                                                                                                                                    Show cause notice.
                                                                                                                                                    (3) Closure directions u/s 31(A)
                                                                                                                                                    details : Issued on 28.12.2010.
                                                                                                                                                    Reply has been received on
                                                                                                                                                    04.01.2011 stating that unit has
                                                                                                                                                    already applied for CTE & CTO.
                                                                                                                                                    As per the decision taken up by
                                                                                                                                                    CMC (O) dated 16.03.2011,
                                                                                                                                                    letter was sent on
                                                                                                                                                    07.07.2011 in which you are
directed (i) to install Emission
Control System / channelization
for the process emissions (ii) to
submit an affidavit confirming
the installation
of ECS / Channelization and
removal of printing activity, and
Bank Guarantee of
 Rs. One Lakh each under Air
Act and HWM Rules.
46   SHRI SAI      B-27/2   WAZIRPUR    Anneling       (1) CTE : (Y) Vide      (4) Inspection details: Inspection of   Ask the                Inspection
     ENTERPRISES            INDL AREA   and cold re-   C.No. 1198 issued on    the unit was conducted on               compliance from        be
                                        rolling.       12.08.2004 & valid      02.04.2011.                             discom & DJB.          conducted.
                                                                               observations:
                                                       upto 20.07.2005.                                                Also ask the unit to
                                                                               1. Unit found operating, enaged in
                                                       (2) CTO: (Y) vide       S.S. Pickling, Annealing & Cold re-     submit the
                                                       C.No. 16345 issued      rolling.                                documentary proof
                                                       on 27.07.2006 &         2. ETP found insatlled but same is      of the closure i.e.
                                                       valid upto              lying defunct. filter press is also     surendering of
                                                       30.07.2007.             lying                                   MCD licence and
                                                       (3) CTO : (P)           defunct & even not connected with       Sales Tax
                                                       Applied on              ETP. No wet sludge seen. Dozing         Registration etc.
                                                                               tanks
                                                       05.10.2005 Vide ID                                              Inspection may
                                                                               are dry & labour hand gloves &
                                                       No. 23785.              cloths are filled.                      also be conducted.
                                                       (4) CTE : (Y) Vide      3. ECS found installed but same is
                                                       C.No. 18451 issued      not working wet scrubbing system is
                                                       on 04.03.2008 &         defunct. Hood size & chhenelization
                                                       valid upto              stck of annealing furnace found
                                                       03.03.2009.             broken
                                                       (5) Authorization        & below roof level.
                                                                               4. HWM Rules are not complied
                                                       under HWM Rules :
                                                                               with.
                                                       (6) Date of             5. Borewell connection exist=01 nos.
                                                       Commissioning :         (5) SCN u/s 31(A)/33(A)/5 of EPA
                                                       (7) BUA :               details : Issued on 02.05.2011.
                                                       (8) Water               Reply has been received on
                                                       consumption:            09.05.2011 alongwioth an affidavit
                                                       (9) Ground Water :      stating
                                                       (10) Waste water         that they have rectified all the
                                                                               deficiencies observed during
                                                       discharge :
                                                                               inspection.
                                                       (a) Domestic effluent   (6) Inspection details: Inspection of
                                                       :                       the unit was again conducted on
                                                       (b) Trade effluent:     20.05.2011.
                                                                               observations:
                                                                               1. Unit found operating, enaged in
                                                                               S.S. Pickling, Annealing & Cold re-
                                                                               rolling.
                                                                               2. Deficiencies as observed earlier
                                                                               partially removed filter press agin
                                                                               found
                                                                               defunct & even not connected with
                                                                               ETP. ETP non- operational. No wet
                                                                               wet sludge seen.
                                                                               3. ECS (Wet scrubber) attached with
pickling section found in working
condition.
4. Stack attached with annealing
furnace again found in broken
condition & below roof level.
5. Borewell connection exist=01 nos.
(7) Closure directions u/s
31(A)/33(A) details : Issued on
08.01.2011.
reply has been received on
11.07.2011stating that M/s Sri Sai
Enterprises
 has stopped their activity of S.S.
Pickling and also removed at the
related
 machinary/ equipment. Now there is
no S.S. pickling is carried out.
The other unit which is operating at
B-27/2 is M/s Ankit Exim Pvt Ltd
 activity Cold re-rolling & Annealing
of S.S. Sheet. Further, requested for
 revocation of closure directions.
47   28025   05.11.2008   KUMAR         A-100/2   WAZIRPUR    ESTABLISH   mfg. of     (1) CTE : (P) Applied   07.05.2010                       (1) ETP: N/A                         Ask the                Ask the
                          ENTERPRISES             INDL AREA               S.S. wire   on 05.11.2008 &         Case be considered after         (2) ECS: N/A                         compliance from        compliance
                                                                          baskets     Vide ID No. 28025.      implementation of decision of    (3) D.G.Set: NIL                     discom & DJB and       from discom
                                                                          with        (4) Authorization       scrutinizing Committee ( Issue   (4) Inspection details: Inspection   also ask the SDM       & DJB and
                                                                          buffing.    under HWM Rules :       SCN for refusal of consent and   odf the unit was conducted on        for effective          also ask the
                                                                                      (5) Date of             SCN for closure of the unit)     07.07.2009.                          closure of the unit.   SDM for
                                                                                      Commissioning : Nov                                      Observations:                                               effective
                                                                                      2008                                                     1. Unit found operational & is                              closure of
                                                                                      (6) BUA : 320 sq mtr                                     engaged in mfg. of stainless steel                          the unit.
                                                                                      (7) Water                                                wire basket
                                                                                      consumption: 50 ltr/d                                     ( Kitchen Basket) with buffing
                                                                                      (8) Ground Water :                                       & is located at Ist & 2nd floor.
                                                                                      Nil                                                      2. ECS has not been connected
                                                                                      (9) Waste water                                          to buffing machines however,
                                                                                      discharge : Nil                                          buffing is being carried out.
                                                                                      (a) Domestic effluent                                    (5) SCN u/s 31(A) & Refusal of
                                                                                      : Nil                                                    consent details : Issued on
                                                                                      (b) Trade effluent:                                      21.06.2010.
                                                                                      N/A                                                      Reply has not been received.
                                                                                                                                               (6) Closure directions u/s 31(A)
                                                                                                                                               details : Issued on 18.01.2011.
                                                                                                                                               Reply has not been received.
48   13978   12-03-   KRISHNA METAL   PLOT NO 340/20-   FRIENDS      GREEN /     Light         (1) CTE :valid upto     30.12.2010: consent refused &   (1) ETP: Not applicable.              Ask the                Inspection
              2009    INDSUTRY        A, GALI NO 1B     COLONY       ESTABLISH   Engineering   15.08.2011.             confirm closure.                (a) AR : Not applicable.              compliance from        be
                                                        INDUSTRIAL               works         (2) CTO:valid upto                                      (b) Effluent analysis report : Not    discom & DJB and       conducted.
                                                        AREA                                   18.01.2009.                                             applicable.                           also ask the unit to
                                                                                               (3) CTO(R) :Refused                                     (c) Number of parameters              submit the
                                                                                               (4) Authorization                                       analyzed : Not applicable.            documentary proof
                                                                                               under HWM Rules                                         (2) ECS: Not applicable.              of closure of the
                                                                                               :NA                                                     (a) AR : Not applicable.              unit e.g.
                                                                                               (5) Date of                                             (b) Stack monitoring report : Not     surendering its
                                                                                               Commissioning :                                         applicable.                           MCD license / Sale
                                                                                               01.2004.                                                (c) Number of parameters              Tax Registration
                                                                                               (6) BUA : 85 Sqm                                        analyzed : Not applicable.            etc.
                                                                                               (7) Water                                               (3) D.G.Set: .Nil.
                                                                                               consumption: 100                                        (a) Noise monitoring report : Not
                                                                                               LPD                                                     applicable.
                                                                                               (8) Ground Water                                        (b) Stack monitoring report (for
                                                                                               :NIL                                                    more than 1000 KVA) : Not
                                                                                               (9) Waste water                                         applicable.
                                                                                               discharge :                                             (4) Inspection details:Inspection
                                                                                               (a) Domestic effluent                                   done on 15.01.2010
                                                                                               : 50 LPD                                                (5) SCN u/s 31(A) details
                                                                                               (b) Trade effluent:                                     :25.11.2010.
                                                                                               NIL                                                     (6) Closure directions u/s 31(A)
                                                                                                                                                       details :21.01.2011.
                                                                                                                                                       B.G of Rs.50,000/- submitted on
                                                                                                                                                       21.02.2011.
                                                                                                                                                       Green renewal refused
                                                                                                                                                       21.01.2011.(ID No.29216). File
                                                                                                                                                       was administratively put up and
                                                                                                                                                       decided that notice u/s 21/22 &
                                                                                                                                                       25/26 be issued to seek CTO.
                                                                                                                                                       Letter issued on 13.06.2011. unit
                                                                                                                                                       replied that, it has closed its all
                                                                                                                                                       activities.
49   22995   02.08.2007   D.D. MOTORS (A     6   WAZIRPUR    OPERATE   Bodyshop,      (1) CTE : (Y) Vide      16.06.2010                        (1) ETP: Installed                      Ask the                Ask the
                          DIVISION OF D.D.       INDL AREA             Denting,       C.No. 21675 issued      Case be considered after          (a) AR dated 30.03.2011, issued by      compliance from        compliance
                          INDUSTRIES LTD)                              Painting,      on 28.10.2009 &         implementation of decision of     G.G.S.I.PU submitted.                   discom and DJB.        from discom
                                                                                                                                                (b) Effluent analysis report dated
                                                                       Repairing      valid upto 27.10.10.    Scrutinizing Committee (Issue                                             Ask the unit to        and DJB.
                                                                                                                                                30.03.2011 issued by G.G.S.I.P.U
                                                                       of vehicles.   (2) CTO: (P) Applied    SCN for revocation of consent     submitted.                              submit bank            Ask the unit
                                                                                      on 02.08.07 & Vide      and SCN u/s 33 (A) of the         (c) 4 number of parameters analyzed     guarantee of Rs. 2     to submit
                                                                                      ID No. 22995.           water Act, u/s 5 of HWM           which are within limit.                 Lakh each under        bank
                                                                                      (3) CTO : (P)           Rules and u/s 31 (A) of the Air   (2) ECS: N/A                            Air Act, Water Act     guarantee of
                                                                                      Applied on 11.05.11     Actfor closure of the unit.       (b) Stack monitoring report dated       and HWM Rules          Rs. 2 Lakh
                                                                                      & Vide ID No.                                             07.03.2011 issued by DPCC               valid fo one year as   each under
                                                                                      37037.                                                    submitted.                              decided by             Air Act,
                                                                                                                                                (c) 1 number of parameters analyzed
                                                                                      (4) Authorization                                                                                 Scurtinizing           Water Act
                                                                                                                                                which are within limit.
                                                                                      under HWM Rules :                                         (3) D.G.Set: 62.5 KVA                   Committee on           and HWM
                                                                                      (5) Date of                                               (a) Noise monitoring report of 63       18.08.2011.            Rules valid
                                                                                      Commissioning :                                           KVA dated 01.03.2011 issued by                                 fo one year
                                                                                      2006                                                       DPCC submitted and noise levels                               as decided
                                                                                      (6) BUA : 1000 sq                                         are within limit.                                              by
                                                                                      mtr                                                       (4) Inspection details: Inspection of                          Scurtinizing
                                                                                      (7) Water                                                 the unti was conducted on                                      Committee
                                                                                                                                                04.05.2010.
                                                                                      consumption: 6000                                                                                                        on
                                                                                                                                                Observations:
                                                                                      kld/day                                                   1. During inspection, servicing and                            18.08.2011.
                                                                                      (8) Ground Water :                                        washing of vehicles was being
                                                                                      Nil                                                       carried out.
                                                                                      (9) Waste water                                           2. During inspection, ETP was not
                                                                                      discharge :                                               found in operation and absence of
                                                                                      (a) Domestic effluent                                     fresh sludge indicates taht ETP was
                                                                                      : Nil                                                     not in operation for last 1-2 weeks.
                                                                                                                                                3. No sludge drying beds provided to
                                                                                      (b) Trade effluent:
                                                                                                                                                collect the sludge drying beds.
                                                                                      5000 kld/day                                              4. Acoustic enclosures has been
                                                                                                                                                provided with both the D.G sets but
                                                                                                                                                the
                                                                                                                                                 stack height was inadequate. A D.G
                                                                                                                                                set of 62.5 KVA was not in
                                                                                                                                                opertaing
                                                                                                                                                condition. As informed, this D.G. set
                                                                                                                                                is not in use.
                                                                                                                                                5. No record about the use of
                                                                                                                                                chemicals used in ETP shown.
                                                                                                                                                6. No record shown about the
                                                                                                                                                maintainance of hazardous waste.
                                                                                                                                                (5) SCN u/s 31(A)/33(A)/5 of EPA
                                                                                                                                                details : Issued on 26.07.2010.
reply has been received on
23.08.2010 alongwith photograph of
sludge drying
beds & hazardous waste storage
stating taht they have rectified all the
deficiencies
observed during inspection.
(4) Inspection details: Inspection of
the unti was conducted on
16.12.2010.
Observations:
1. Unit found operating engaged in
service, repair & washing of cars.
2. ETP found installed but lying
defunct. waste water is being
discharged
 without treatment & by- passed
sample of waste water collected in
presence
of S. Devender Supervisor
maintains. waste awter collection
tank is over flow.
3. paint booth exist at G.F & 2nd
floor. Stack height of both paint
booth are inadequate.
 No HWM Rules are complied.
4. D.G set found with acoustic
enclosure. Stack height inadequiate.
5. Borewell connection exist=01 nos.
(6) Closure directions u/s
31(A)/33(A)/5 of EPA details :
Issued on 01.02.2011.
Reply has been received on
10.03.2011 alongwith an affidavit,
Analysis report
 of water effluent, stack monitoring
report & nosie monitoring report.
50   S.N.S. VEGETABLES   D-37 (IST   SMA INDL   Food and     (1) CTE (P) : Applied   10.08.2011                        (1) ETP: Not Submitted.               Ask the                Ask the
                         FLOOR)      AREA,      Fruit        on14.03.2011 Vide       Issue final reminder of the       (2) D.G.Set: NIL                      compliance from        compliance
                                                Processing   Id.No.36683.            letter issued administratively.   (4) Inspection details: Inspection    discom & DJB. If       from discom
                                                             (2) CTO:                                                  of the unit was conducted on          unit fails to submit   & DJB. If
                                                             (3) CTO(R) :                                              30.10.2010.                           the compliance in      unit fails to
                                                             (4) Authorization                                         Observations:                         response to letter     submit the
                                                             under HWM Rules :                                         1. Unit found operating enaged        dated 19.09.2011,      compliance
                                                             (5) Date of                                               in food processing vegetables         SDM will be asked      in response
                                                             Commissioning :                                           are being washed                      for effective          to letter
                                                             (6) BUA :                                                  and processed/ packaed and sale      closure of the unit.   dated
                                                             (7) Water                                                 to hotelier/ restaurants. chiken                             19.09.2011,
                                                             consumption:                                              meet                                                         SDM will be
                                                             (8) Ground Water :                                         also stored/ packed for sale in                             asked for
                                                             (9) Waste water                                           hotels.                                                      effective
                                                             discharge :                                               2. No ETP installed for the                                  closure of
                                                             (a) Domestic effluent                                     treatment of waste water                                     the unit.
                                                             :                                                         generated.
                                                             (b) Trade effluent:                                       3. As informed unit shifted from
                                                                                                                       Chhaterpur area to present
                                                                                                                       premise since last 3 months.
                                                                                                                       (3) SCN u/s 31(A)/33(A) details
                                                                                                                       : Issued on 15.12.2010.
                                                                                                                       Reply has been received on
                                                                                                                       03.01.2011 stating that the
                                                                                                                       applicant never deals
                                                                                                                       in Meat from the above address
                                                                                                                       and moreover using mineral
                                                                                                                       water for washing
                                                                                                                       of vegetables, for waste water
                                                                                                                       ETP is installed at the above
                                                                                                                       address and CTE & CTO
                                                                                                                       is under process. Further, no
                                                                                                                       officials visited for inspection on
                                                                                                                       30.10.2010 in the
                                                                                                                       presence of the applicant.
                                                                                                                       (4) Closure directions u/s
                                                                                                                       31(A)/33(A) details : Issued on
                                                                                                                       07.02.2011.
                                                                                                                       Reply has been received on
                                                                                                                       09.03.2011 alonwith an affidavit
                                                                                                                       stating that they have
 applied for CTE (O) , installed
ETP & requested to revoke the
closure directions.
As per the decision taken up by
Competent Autority letter was
sent to the unit on
10.06.2011 regarding
submission of Bank Guarantee,
CTO, Adequecy and test
report of ETP & Noise
monitoring report.
Reply has not been received.
Final reminder was sent on
19.09.2011.
Reply has not been received.
51   33638   23-04-10   LEATHER & TEXTILE   B-164, PHASE-I   OKHLA        Establish   Mfg. of    (1) CTE : refused on             26.05.10                (1) ETP: not installed               Ask the                Ask the
                        INC.                                 INDUSTRIAL               Leather    17.02.11 vd refusal     Inspection be conducted w.r.t.   (2) ECS: Oil fired boiler            compliance from        compliance
                                                             AREA                     Garments   no. 2088.               trade effluent discharge.        installed.                           discom, DJB &          from
                                                                                                 (2) CTO: Not applied        13.08.10                     (b) Stack monitoring report : Not    MCD and also ask       discom, DJB
                                                                                                 (3) CTO(R) : Not        Inspection done. Issue SCN       submitted.                           the SDM for            & MCD and
                                                                                                 applied                 for refusal of consent and SCN   (3) D.G.Set: 63 KVa installed        effective closure of   also ask the
                                                                                                 (4) Authorization       for closure of the unit.         and inadequate stack height.         the unit.              SDM for
                                                                                                 under HWM Rules :           09.11.10                     (a) Noise monitoring report : Not                           effective
                                                                                                 N/a                     Issue SCN for closure u/s        submitted. .                                                closure of
                                                                                                 (5) Date of             31(A) of the Air Act and u/s     (4) Inspection details: Carried                             the unit.
                                                                                                 Commissioning :         33(A) of the Water Act.          out on 09.08.10 & following
                                                                                                 01.07.10                Inform to DJB regarding          were observed:
                                                                                                 (6) BUA : 261.8 Sq.     ground water extraction.         1. The unit is engaged in mfg of
                                                                                                 mts                                                      Leather Accessories & mfg of
                                                                                                 (7) Water                                                Readymade Garments including
                                                                                                 consumption: 7500                                        Washing.
                                                                                                 Lt/day                                                   2. No ETP has been installed to
                                                                                                 (8) Ground Water :                                       treat the trade effluent generated
                                                                                                 Nil                                                      from washing.
                                                                                                 (9) Waste water                                          3. Adequate stack height has not
                                                                                                 discharge :                                              been provided with the oil fired
                                                                                                 (a) Domestic effluent                                    boiler.
                                                                                                 : 500Lt/day                                              4. Adequate stack height &
                                                                                                 (b) Trade effluent:                                      acoustic enclosure has no been
                                                                                                 7000 Lt/day                                              provided with the DG Set of
                                                                                                                                                          62.5 KVA.
                                                                                                                                                          5. One Bore Well exists.
                                                                                                                                                          (5) SCN u/s 31(A) &
                                                                                                                                                          33(A)details : issued on
                                                                                                                                                          27.10.10. Returned back
                                                                                                                                                          undelivered & same was
                                                                                                                                                          delivered by hand on 05.01.11 &
                                                                                                                                                          it was observed that the unit is
                                                                                                                                                          still being operated without
                                                                                                                                                          installation of ETP. ( SCN for
                                                                                                                                                          refusal of CTE also issued on
                                                                                                                                                          27.10.10).
                                                                                                                                                          Unit has failed to submit its
                                                                                                                                                          reply within stiplated time.
                                                                                                                                                          (6) Closure directions u/s 31(A)
                                                                                                                                                          & 33(A) details : issued on
17.02.11.( Refusal of CTE also
issued on 17.02.11).
No complaince received from
the unit as
well as conserned authorities i.e
MCD, DJB & BSES.
52   DIVINE GARDEN   20, MILESTONE   ALIPUR,   Farm         (1) CTE : Applied on    10.08.2011                     (1) ETP: Not Installed                   Decision taken on   Consent to
                     BUDHPUR         DELHI     House, A     28.04.2011 Vide         Ask the unit to submit bank    (2) ECS: N/A                             file be pursued.    establish be
                     VILLAGE,                  Party Lawn   Id.No.36978.            guarantee of Rs. One lakh      (3) D.G.Set:125 KVA                      Compliance          made
                                                                                                                   (a) Noise monitoring report of 125
                     NANGLI, NEAR                           (2) CTO:                each under Air Act and Water                                            received from       infructuous.
                                                                                                                   KVA : not submitted.
                     SAROJ GAS                              (3) CTO(R) :            Act for one year and           (4) Inspection details: Inspectioon of   NDPL & SDM.         Closure
                     AGENCY                                 (4) Authorization       permission from MCD.           the unit was                                                 directions be
                                                            under HWM Rules :                                       conducted on                                                revoked.
                                                            (5) Date of                                            23.11.2010.Observations:
                                                            Commissioning :                                        1. Farm House cum restaurant in
                                                            2010                                                   operational however, no function is
                                                            (6) BUA : 3 Bigah &                                    going on..
                                                                                                                   2. Decorative light fittting work is
                                                            15 Biswa.
                                                                                                                   going on. 3. No STP/ETP installed to
                                                            (7) Water                                              treat the waste water
                                                            consumption: 6                                         generates during the functions.
                                                            kl/day                                                 4. At back side kitchen, a brick
                                                            (8) Ground Water :6                                    masonary well of
                                                            kl/day                                                 about '12' dia & '20' deep covered
                                                            (9) Waste water                                        with RCC
                                                            discharge :                                            slab with a man hole found full of
                                                                                                                   dirty waste water & garbage.
                                                            (a) Domestic effluent
                                                                                                                   5. No channelizationsystem provided
                                                            :1.5 kl/day                                            in kitchen.6. Cattering tabels/
                                                            (b) Trade effluent:                                    furniture & tent cloth etc. exist.
                                                            4.5 kl/day                                             7. For toilet discharge septic tank
                                                                                                                   installed. 8. Bore well connection
                                                                                                                   exist =01 nos.
                                                                                                                   (5) SCN u/s 31(A)/33(A) details :
                                                                                                                   Issued on 03.01.2011.
                                                                                                                   Reply has not been received.
                                                                                                                   (6) Closure directions u/s
                                                                                                                   31(A)/33(A) details : Issued on
                                                                                                                   08.03.2011.
                                                                                                                   Reply has been received on
                                                                                                                   09.08.2011 along with
                                                                                                                   an affidavit statinf that they have
                                                                                                                   install the ETP (Biological)
                                                                                                                   type. Further requested for
                                                                                                                   revocation of closure directions.
                                                                                                                   As per the decision taken up by
                                                                                                                   CMC (O) dated 10.08.2011
                                                                                                                    letter was sent on 19.09.2011 in
                                                                                                                   which you were directed
                                                                                                                   to submit bank guarantee of Rs. 1
                                                                                                                   lakh
each under Air Act & Water Act
along with
the permission from the Municipal
Corporation of Delhi.

				