PRBoA 4Q Quarter 2011 Report by w9XF65FG

VIEWS: 17 PAGES: 14

									                                                                                        Republic of the Philippines
                                                                            Department of Labor and Employment
                                                                                                            (DoLE)




                                                                     Professional Regulation Commission
                                                                                                 (PRC)




                                                                        Professional Regulatory Board
                                                                                           of Architecture
                                                                                                            (PRBoA)

                                                                       4th Quarter Report
                                                                            for the Period
                                                    01 October through 31 December 2011



                                                                                          29 December 2011


____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 1 of 14
                                                                                 Republic of the Philippines
                                                                 Department of Labor & Employment (DoLE)
                                                     Professional Regulation Commission (PRC)



                                Professional Regulatory Board of Architecture (PRBoA)
                                                           2011 Fourth (4th) Quarter Report (Narrative)
                                                    for the Period 01 October through 31 December 2011



A. PRBoA Meeting/s Held
   For the period October through December 2011, the PRBoA en banc officially met on various
   dates i.e. on at least six (6) separate occasions, at the PRC (the “Commission”) and elsewhere to
   discuss pending matters on the implementation and enforcement of R.A. No. 9266 (The
   Architecture Act of 2004, its 2004 IRR and derivative regulations), that need to be addressed the
   soonest.

B. FLEA
   On 20 December 2011, the PRBoA and the Commission jointly released the results of the 2011
   Foreign Licensure Examination for Architects (FLEA) as part of the 2011 Special Professional
   Licensure Board Examinations (SPLBE) held in early December 2011 at 4 test sites i.e. Abu
   Dhabi, United Arab Emirates (UAE); in Jeddah and Riyadh, Kingdom of Saudi Arabia (KSA) and
   in Doha, Qatar. Only 203 out of 423 (48%) passed the FLEA, which is of exactly the same quality
   and content as the LEAs administered in Manila.

C. Review of/ Hearings for/ Decision on Docketed Cases
   There were 5 administrative cases reviewed and about 6 hearings attended by the PRBoA at the
   Commission. Orders and/or decisions for about 5 cases were also released during the 4th quarter of
   2011. A major administrative complaint filed by the Government against a very prominent
   architect is awaiting a trial schedule from the PRC Legal and Investigation Division (LID). There
   are approx. 50 pending administrative cases against registered and licensed architects (RLAs)
   generally involving complaints pertaining to gross negligence/ malpractice, dishonorable/
   unethical/ unprofessional conduct and immorality.

D. Monitoring of the Full Implementation and Enforcement of R.A. No. 9266
   (The Architecture Act of 2004) and of Various Legislative Initiatives that Shall Materially
   Affect Said Law
   The PRBoA has consistently monitored developments concerning the full implementation and
   enforcement of R.A. No. 9266, its 2004 IRR and derivative regulations (DRs). During the 4th
   Quarter of 2011, the PRBoA was very active in both Houses of Congress, consistently monitoring,
   issuing calls/ notices to and conducting online and face-to-face/ focus group discussions (FGDs)
   among RLAs, coordination with the concerned Senate/ House of Representative Committees,
   filing position papers and following up developments on the following bills:
   1) Pending Bills at the Senate at Committee level (hearings and Technical Working Group/
        TWG meetings held) :
        (i) two (2) bills on civil engineering (CE);
        (ii) the bill on environmental planning (EnP);
        (iii) the bill on interior design (ID); and
____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 2 of 14
       (iv) three (3) bills on the creation of a new Department (a major line agency);
    2) Pending Bills/ Resolution at the House of Representatives :
       (i) four (4) bills on civil engineering (CE); and
       (ii) a House Committee Resolution to allow more foreign participation in
            architectural and other professional firms.

    During the 4th Quarter of 2011, the PRBoA was also very active in both Houses of Congress and in
    the executive branch in crafting the following bills to help address the practice environment of
    RLAs in the country (+/-28,000 registrants and +/-11,000 PRC ID card holders), to wit:
    1) repeal of P.D. No. 1096, otherwise known as the 1977 National Building Code of the
        Philippines (NBCP);
    2) the creation of a new Department (a major line agency) that shall hopefully take over full
        jurisdiction over all buildings on Philippine soil (from the DPWH);
    3) the full professionalization of the local government position (LGU) position of Local
        Building Official (LBO) and Assistant Building Official (ABO);
    4) Non-Mobile Billboards;
    5) Anti-Graft Law; and
    6) Consulting Services Board.

    Among the key developments being monitored by the PRBoA are:
    1) the matter of the preparation/ signing/ dry sealing of ARCHITECTURAL documents as
       part of building permit application applications required by the DPWH through the LGU
       Offices of Acting Building Officials (ABOs); the PRBoA has been consistent in reminding/
       warning national and local government officials of the mandated and sworn duties of their
       officials to fully implement the multiple provisions of R.A. No. 9266 and under Secs. 302.3
       & 4 of the 2004 Revised IRR of P.D. No. 1096, otherwise known as the 1977 National
       Building Code of the Philippines (NBCP) that limit the preparation/ signing/ dry sealing of
       ARCHITECTURAL plans and documents only to registered and licensed architects (RLAs),
       violations of which merit stiff administrative and criminal penalties; with the 04 May 2009
       Order of the Court AFFIRMING its 29 January 2008 Decision ordering the LIFTING/
       DISSOLUTION of the 24 May 2005 injunction on Secs. 302.3 & 4 of the 2004 Revised IRR
       of P.D. No. 1096 (which are mere executive issuances, not laws that also limit to Architects
       the acts of signing/ sealing architectural documents, there is presently NO legal impediment
       to the implementation of Philippine laws and regulations that purposely LIMIT/ RESTRICT
       the preparation/ signing/ dry sealing of ARCHITECTURAL plans/ documents only to
       RLAs i.e. there is NO TRO, NO injunction and NO pending constitutional question
       before any Philippine Court on any of the provisions of R.A. No. 9266, a valid and
       subsisting law; as such, no other registered and licensed professional (RLP), particularly civil
       engineers (CEs), can lay claim to expertise in the preparation of such documents;
       notwithstanding the protests of the accredited professional organization (APO) of the CEs, the
       pendency of their appeal before the Court of Appeals (CA) cannot have any effect on the
       2008 automatic lifting of the preliminary injunction on Secs. 302.3 & 4 of the 2004 Revised
       IRR of P.D. No. 1096 (a mere executive issuance, not a law like R.A. No. 9266); since the
       dissolved writ of preliminary injunction on Secs. 302.3 & 4 of the 2004 Revised IRR of P.D.
       No. 1096 was merely “interlocutory and ancillary in character, [it is] automatically lifted
       upon dismissal of the main case (on 29 January 2008), regardless of whether the period for
       filing a motion for reconsideration of the order dismissing the case or appeal therefrom has
       expired or not.” [Golez v. Leonidas, 107 SCRA 187 (1981), citing Roldan, Jr. vs. Arca, 65
       SCRA 336, 344 (1975); National Sugar Workers' Union, etc. vs. La Carlota Sugar Central, et
       al., 45 SCRA 104, 109 (1972); Lazaro vs. Mariano, 59 Phil. 627, 631 (1934); Saavedra vs.
       Ibañez, 56 Phil. 33, 37 (1931); Hi Caiji vs. Phil. Sugar Estates and Development Company, 50
       Phil. 592, 594 (1927)]


____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 3 of 14
         Very Important Notes:
         1) Under Department of Public Works and Highways (DPWH )Special Order No. 73, series of
             2011, dated 04 April 2011, the incumbent Hon. DPWH Secretary Rogelio L. Singson re-
             appointed PRBoA Acting Chairman Armando N. Alli to the position of Vice Chairman of the
             DPWH Board of Consultants (BoC), a public-private advisory collaboration tasked with
             policy changes relating to the implementation and enforcement of P.D. No. 1096 (the 1977
             National Building Code of the Philippines/ NBCP, including its 2004 Revised IRR) and its
             current main task of repealing P.D. No. 1096. PRBoA Acting Chairman Alli has been a
             member of the DPWH BoC since 2002, becoming its Co-Vice Chairman in March 2007. He is
             joined in the 2011 BoC by 2 representatives of the IAPOA-UAP.

              By the end of September 2011, the PRBoA completed its first draft of the one
              hundred forty (140)-page repeal bill for P.D. No. 1096 (the 1977 NBCP), which
              proposes to substantially overhaul the 34-year old law. Copies of the bill have been
              disseminated to possible sponsors in both Houses of Congress and to RLA-
              stakeholders as well as to selected RLPs from the allied professions. A hardcopy of
              said bill has also been personally furnished DPWH Secretary Rogelio Singson by the
              PRBoA on 04 October 2011, during their meeting with the PRBoA counsels.

         2) The PRBoA has been in active coordination with two (2) of its counsels during the 4th
            quarter of 2011 i.e. relative to the possible filing of a Petition for Mandamus with
            respect to R.A. No. 9266 and to possibly file a criminal complaint against one or
            several large property developers which illegally hire foreign architects (FAs) without
            Temporary/ Special Permits (TSPs) for projects on Philippine soil or possibly against
            firms that have been illegally formed/ continue to be unregistered with the PRBoA,
            but continue to illegally offer and undertake architectural services. A third (3rd)
            PRBoA counsel is still separately working on the November 2009 complaint the
            PRBoA filed against the former DPWH Secretary (Ebdane), two (2) DPWH
            Undersecretaries, Atty. Vicente Foz (reportedly now deceased) and the APO of the
            CEs and on other pertinent cases involving the PRBoA or its Acting Chairman before
            the Office of the Ombudsman. Two (2) more pro-bono senior external counsels also
            periodically assist the PRBoA on other matters.

    2) on the separate matter of the preparation/ signing/ dry sealing of “subdivision” plan
       documents as part of development applications required by the Housing and Land Use
       Regulatory Board (HLURB); with the firm Commission position (stated in its letter dated 01
       Feb 2007 to the HLURB) as regards the matter of the signatory to “subdivision” plans, it may
       now be the opportune time to officially discuss the matter among the four (4) professional
       regulatory boards (PRBs) involved i.e. PRBoA(rchitecture), PRBoE(nvironmental) P(lanning),
       PRBoC(ivil) E(ngineering) and PRBoG(eodetic) E(ngineering), possibly in a non-
       confrontational manner, so that the proper nomenclature of the pertinent site/ subdivision
       planning documents could be agreed upon and would therefore serve as the primary guide for
       the HLURB in its future policy-making functions; otherwise the PRBoA must continue a
       similar campaign for implementation and enforcement of R.A. No. 9266 provisions that limit
       to RLAs the preparation/ signing/ dry sealing of architectural documents in the form of
       physical or site plans in general i.e. specifically subdivision plans.

    The PRBoA is also presently monitoring the implementation and enforcement of the following
    provisions of R.A. No. 9266:
    1) registration of architectural firms under Sec. 37;
    2) application, processing and issuance of temporary special permits (TSPs) for foreign architects
        (FAs) working on projects on Philippine soil under Sec. 38 of R.A. No. 9266;
    3) continuing professional development/ education (CPD/E) under Secs. 7 (i) and 28 of R.A. No.
        9266 and professional specialization for RLAs; the IAPoA was accredited by the CPE Council
        for Architecture as a CPE Provider on 07 August 2009; however, the law prescribes that the
        PRBoA be the one to accredit CPD/E Providers;
____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 4 of 14
    4) updating of the B.S. Architecture curriculum together with the CHED Technical Panel for
       Architecture, where the CODHASP and the IAPoA-UAP are represented;
    5) the intellectual property rights (IPR) of RLAs to their crafted architectural documents (which
       are apparently misappropriated/ illegally used by unscrupulous entities whenever the same are
       submitted under various governmental permitting processes ;
    6) the filling up of all national and local positions that require the training and expertise of RLAs
       i.e. specifically the work of ABOs or ABO architectural review staff in LGUs with or without
       ABOs or Offices of ABOs, a provision under R.A. No. 9266 that has been in full effect since
       10 April 2007;
    7) RLA participation in the procurement process (under R.A. No. 9184 and its 2009 IRR) and
       with the Build-Operate-Transfer (BOT) law i.e. public-private partnerships (PPPs); and
    8) preparations attendant to the filing of criminal and/or administrative complaints at various
       venues against offending national and/or local government officials and the private entities
       who have directly benefitted from official violations of R.A. No. 9266, etc.

E. General Dissemination of Information on R.A. No. 9266
    Over the period October through December 2011, the PRBoA has actively taken part in (or has
    attended) various activities relative to the general dissemination of information on R.A. No. 9266
    and the proposed laws and executive issuances that affect it e.g. information exchanges at its
    various mailboxes and through its website at www.architectureboard.ph i.e. messages,
    clarifications, statements, general regulation documents, etc., direct mailing to parties (electronic
    and courier); fora on addressing graft and corruption, general architecture advocacy meetings,
    meetings/ conferences with various groups of RLAs, etc.

    The PRBoA website continues to serve as a major platform for PRBoA advocacies, which now
    include the need to correct many provisions of the R.A. No. 7160 (The Local Government Code of
    1991) to make the same fully conform to the correct professional practices enshrined under valid
    and subsisting professional regulatory laws (PRLs, such as R.A. No. 9266).
    By the end of December 2011, about eight hundred eighty five thousand (885,000) pageloads/
    visits to the PRBoA website have been logged (since mid-2008, or approx. 295,000 pageloads/
    visits annually). Again, while the IAPOA-UAP website is presently linked to the new PRC
    website, the PRBoA website is not for the entire year 2011. This possible oversight still needs to
    be addressed by the Commission.

F. Liaison and Current Relationship with the Accredited IAPOA (UAP) and with Other
   Associations of Architects (OAAs) and Other Stakeholders
    During the 4th Quarter of 2011, the PRBoA has attended (and actively taken part in) the various
    IAPOA-UAP and other local/ international architectural organization (PIA, AAIF, APEC
    Architect Register, ASEAN MRAr/ MRA, etc.) activities pertaining to R.A. No. 9266
    implementation and enforcement in the Philippines and overseas or have attended to matters
    concerning the PRBoA relations with such entities.

    Of particular import was the 29 October 2011 meeting with the Executive Committee and some
    Past Presidents of the UAP-IAPOA during which discussions focused/ touched on several issues
    that continue to affect the harmonious PRBoA-IAPOA (UAP) relationship. These include the
    following (some of which were not sufficiently discussed during said meeting):
    1. the progress and quality of the current IAPOA-UAP efforts at implementing P.D. No.
        1096 (a general law), in direct relation to R.A. No, 9266 (a special and later law) through
        the executive branch of Government, as the PRBoA views that the earlier 2011 IAPOA
        efforts may amount to possibly little or no change from the supposed status quo;
        nonetheless, the PRBoA acceded in the interim to allow the IAPOA-UAP more time to
        achieve its intended result/s, after which the PRBoA shall perforce consider resort to (or

____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 5 of 14
         consider active support for independently-initiated) legal action against the major violators
         of R.A. No. 9266 and of P.D. No. 1096 in the Government and in the private sector; the
         PRBoA maintains that even with a future CA decision that may reverse the early 2008
         RTC decision favoring the RLAs (in the case about Secs. 302.3 & 4 of the 2004 Revised
         IRR of P.D. No. 1096, a mere executive issuance i.e. not a law, there is still no TRO, no
         injunction, no Court Order and no pending constitutional question on any of the provisions
         of R.A. No. 9266, a valid and subsisting special and later law;
    2.   the 2009 By-Laws of the IAPOA, portions of which may already directly contravene R.A.
         No. 9266, specifically the matter of democratic elections in the selection of IAPOA-UAP
         officers as prescribed under Sec. 40 of R.A. No. 9266, the professional regulatory law
         (PRL) for PH RLAs;
    3.   the status of the Certificate of Good Standing (CoGS) in relation to the Certificate of
         Membership (CoM), both of which find no mention under Sec. 40 of R.A. No. 9266;
    4.   the non-mandatory status of CPD with respect to PRC license (ID card) renewal under
         Sec. 7 (i) of R.A. No. 9266, which is a special law;
    5.   the non-drafting format of the LEA which has already been thoroughly explained by the
         PRBoA as the proper and lawful mode of design testing but which many RLAs still
         inexplicably continue to oppose; the PRBoA maintains that the non-drafting format: a)
         fully complies with the prescriptions for a fully computerized test and result under both
         R.A. Nos. 9266 and 8981; b) corrected the utterly subjective nature of the test i.e. there is
         now a one-to-one correspondence between a question and a required answer unlike in the
         previous drafting examination mode where one question (a long design problem) has
         several correct answers/ solutions; c) offered additional security for the checking of the
         results of the Licensure Examination for Architects (LEA) as there is now no contact
         between the PRBoA checker and the test sheets; d) has correctly tested for knowledge
         which young architects must process as entry-level workers of the profession, particularly
         on matters of compliances with P.D. No. 1096 (the 1977 National Building Code of the
         PH/ NBCP and its 2004 Revised IRR) and its various Referral Codes such as R.A. No.
         9514, the 2008 Fire Code of the Philippines/ FCP and its 2009 IRR, B.P. No. 344, The
         Accessibility Law and its IRR, the 2000 Architectural Code, etc.; e) has facilitated the
         immediate release of the LEA/ FLEA results; and f) may have somehow contributed to
         increases in the passing rates of schools and examinees, particularly in the case of
         repeaters i.e. the LEA/ FLEA passing rate since January 2010 has hovered at about 50%
         i.e. well above the national passing rate for examinations of State-regulated professions;
         and
    6.   the potentially undue delay in the IAPOA crafting of the Architects’ Guidelines, a support
         document for the 2010 Standards of Professional Practice (SPP), and which must contain
         the schedule of professional fees for RLAs.

The IAPOA-UAP has initially offered to call and host such consultative meetings with the PRBoA
on a monthly basis. Since no meetings materialized in November and December 2011, the PRBoA
has since resolved to call the meetings at the PRC. Said consultations shall be done together with
the other associations of architects (OAAs) such as the PIA and the AAIF.

G. Liaison with the PRC and PAPRB
    During the 4th quarter of 2011, the PRBoA has actively supported the various activities carried out
    by the PRC with the PAPRB, including multi-sectoral and cross-sectoral events, as well as those
    relating to planning activities for the proposed Professional Summit in 2012.

    Attachments follow.
    (Attachment A (in 8 pages): 4th Quarter 2011 Schedule of Official PRBoA Activities (undertaken from 01
    October through 31 December 2011); and Attachment B (in 5 pages): Schedule of Official OUTGOING
    PRBoA Correspondences (prepared/ issued 01 October through 31 December 2011) and Their Status


____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 6 of 14
                                                                Attachment A.
                        4th Quarter 2011 Schedule of Official PRBoA Activities
                                  (undertaken from 01 October through 31 December 2011)

I.        October 2011
                   PRBoA                                                                                        Description/
 Oct       2011                                  Activity*                                 Venue
                   Member                                                                                        Objective
                               Work on the repeal of P.D. No. 1096 (the 1977
                                                                                  ADNAapec Home Office,
     1      Sat    Alli, AN       NBCP) and on various PRBoA emails/                                             The full
                                                                                          TR
                                             correspondences
                   ATCC                                                                                        implement-
                   MBS                                                                                           ation &
                                                                                  ADNAapec Home Office,
     2      Sun    Alli, AN    Work on PRBoA reports and correspondences
                                                                                          TR                  enforce-ment
                   ATCC                  Emails re SPLBE queries                    ATCC Home Office           of R.A. No.
                   MBS                                                                                            9266
                              1) Work on PRBoA reports, emails and
                                 correspondences;                                1) ADNAapec       Home
                              2) Meeting with Com. AY Po re oath-taking             Office, TR;
                                 activities;                                     2) PRC Checking Room;
     3     Mon     Alli, AN                                                                                        -do-
                              3) Meeting with the DPWH NBCDO Director and        3) UAP HQ Office of the
                                 the UAP-IAPOA President re urgent DPWH             President; and
                                 matters; and                                    4) UAP HQ 7/F
                              4) Luncheon Meeting with UAP fellows/ elders
                               Consultative Meeting with Com. AY Po re oath-     PRC Checking Room;
                   ATCC                                                                                            -do-
                                                taking activities;
                               Consultative Meeting with Com. AY Po re oath-     PRC Checking Room;
                    MBS                                                                                            -do-
                                                taking activities;
     4      Tue    Alli, AN       Meeting with the UAP Camarines Chapter                 Naga City                 -do-
                                Meeting with the DPWH Secretary (The Hon.
                                                                                    Office of the DPWH
                   ATCC         Rogelio Singson) as arranged by the PRBoA                                          -do-
                                                                                         Secretary
                                                 Lead Counsels
                    MBS                               -do-                                -do-                     -do-
                              Work on 3 PRBoA reports to the PRC; and work       ADNAapec Home Office,
     5     Wed     Alli, AN                                                                                        -do-
                                         on pending administrative case.         TR
                   ATCC       Review administrative cases                        PRC Checking Room                 -do-
                   MBS
                              1) Work on 3 PRBoA reports to the PRC; and         1) ADNAapec        Home
     6      Thu    Alli, AN                                                         Office, TR; and
                                                                                                                   -do-
                              2) Work on pending PRBoA documents.                2) PRC Checking Room
                                                                                    PRC Checking Room,
                   ATCC       Review Administrative cases, follow up SPLBE                                         -do-
                                                                                    Chair’s office
                    MBS            Signed administrative case order              PRC Checking Room;                -do-
                              1) Work on 3 PRBoA reports to the PRC;
                                                                                 1) ADNAapec         Home
                                 research work on pending administrative case;
                                                                                    Office, TR;
     7       Fri   Alli, AN   2) Meeting of the CPE Council for Architecture;                                      -do-
                                                                                 2) PRC SID; and
                                 and
                                                                                 3) Com. Po’s Office
                              3) PRBoA en banc Meeting with Com. AY Po
                              Review Administrative cases, follow up SPLBE,      PRC Checking Room,
                   ATCC                                                                                            -do-
                              meeting w Com Po                                   Com Po’s office
                              1. Work on printing the PRBOA reports and
                                  submitted personally to the office of          Chairperson's office
                    MBS                                                                                            -do-
                                  Chairperson.                                   Comm. Po's office
                              2. Meeting with Comm Po
                                 Work on PRBoA correspondences*            and    ADNAapec Home Office,
     8      Sat    Alli, AN                                                                                        -do-
                                 emails                                                   TR
                    ATCC
                    MBS
     9      Sun    Alli, AN
                    ATCC
                    MBS
                                  Meeting with PRC regarding the Special
     10    Mon     Alli, AN     Professional Licensure Board Examinations         PRC Conference Room              -do-
                                         (SPLBE) in the Middle East
                              Review Administrative cases                          PRC Checking Room
                   ATCC       Consultation w TQ consultants                            FOP office                  -do-
                              Meeting with PRC regarding the Special              PRC Conference Room
 ____________________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 7 of 14
                             Professional Licensure Board Examinations
                             (SPLBE)
                             Meeting with PRC regarding the Special
                  MBS        Professional Licensure Board Examinations              PRC Conference Room               -do-
                             (SPLBE)
                              Attend hearing of the House of Representatives      House of Representatives,
 11      Tue     Alli, AN                                                                                             -do-
                                 Committee on Constitutional Amendments                 Quezon City
                  ATCC
                  MBS
 12     Wed      Alli, AN
                  ATCC       Review Administrative cases                             PRC Checking Room                -do-
                  MBS
                               Separate meetings with the PRC Chairperson
                               (with Atty. Lalusis, Chief of the PRC LID), with
 13      Thu     Alli, AN     the PRC Commissioner (with oversight function                  PRC                      -do-
                               over the PRBoA) and with the Secretary of the
                                   Professional Regulatory Boards (PRBs)
                  ATCC                               -do-                                     -do-                    -do-
                              Occular inspection with Comm. Po & PRA reps.
                  MBS                                                               MOA area, Pasay City              -do-
                                in Macapagal highway for new PRC building
                              Work on PRBoA Special Memorandum 1 for the           ADNAapec Home Office,
 14       Fri    Alli, AN                                                                                             -do-
                                                     PRC                                   TR
                  ATCC
                             1. PAPRB monthly Board meeting                          PAPRB mtg. room
                  MBS                                                                                                 -do-
                             2. Signed the administrative case                      PRC Checking Room;
                             Work on PRBoA Special Memorandum 1 for the            ADNAapec Home Office,
 15      Sat     Alli, AN                                                                                             -do-
                                                  PRC                                      TR
                              Draft memos to Commission re TQ, Correlation
                  ATCC                                                                ATCC Home office                -do-
                                     of Exam format to Results of ALE
                  MBS
 16     Sun      Alli, AN
                  ATCC
                  MBS
                             Work on PRBoA Special Memorandum 2 & 3 for           ADNAapec Home Office,
 17     Mon      Alli, AN                                                                                             -do-
                                                the PRC                                     TR
                  ATCC                Draft special memos for PRC                   ATCC Home office                  -do-
                              Mtg with Comm. Po & NDC held in NDC bldg,           NDC Bldg, Tordesillas St.,
                  MBS                                                                                                 -do-
                                               Makati City                              Makati City
                             Work on PRBoA Special Memorandum 3 for the           ADNAapec Home Office,
 18      Tue     Alli, AN                                                                                             -do-
                                                  PRC                                       TR
                  ATCC
                  MBS
 19     Wed      Alli, AN
                  ATCC        Informal consultation meeting w UAP Singapore                Singapore                  -do-
                  MBS
                              Work on PRBoA Special Memorandum 3 for the           ADNAapec Home Office,
 20      Thu     Alli, AN                                                                                             -do-
                                               PRC                                         TR
                  ATCC
                  MBS
                              Work on PRBoA Special Memorandum 3 for the           ADNAapec Home Office,
 21       Fri    Alli, AN                                                                                             -do-
                                               PRC                                         TR
                  ATCC
                  MBS
                                                                                  Penthouse, Prince Plaza II,
 22      Sat     Alli, AN         40th day mass for Former Chair Rosero
                                                                                         Makati City
                  ATCC
                  MBS
 23     Sun      Alli, AN
                  ATCC
                  MBS
                                                                                   ADNAapec Home Office,
 24     Mon      Alli, AN           Work on PRBoA correspondences*                                                    -do-
                                                                                           TR
                  ATCC              Coordination via telephone w UAP                 ATCC Home Office                 -do-
                              Meeting with Comm. Po re: Hasekani's case of
                                                                                       Comm.Po's office
                  MBS                            PAPRB                                                                -do-
                                                                                    3rd floor PAPRB lounge
                              (and set up Christmas tree in PAPRB lounge)
 25      Tue     Alli, AN
                                                                                           Dali Restaurant, Quezon
                  ATCC        General Membership Meeting UAP New Manila                                               -do-
                                                                                                      City
                                                                                              DOLE Bldg, 2nd flr
                                    Mtg wih Ms. Lily Guerrero of DOLE re: Pre-Bid
                      MBS                                                                   exec.office, Intramuros,  -do-
                                                              mtg
                                                                                                     Manila
 26      Wed        Alli, AN             Attend meeting of the CHED Technical              CHED HEDC Conference       -do-
____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                           page 8 of 14
                                          Committee for Architecture                   Room, HEDC Bldg. QC;
                   ATCC                      TQDS for SPLBE                              ATCC Home Office
                   MBS
                                                                                       ADNAapec Home Office,
  27      Thu     Alli, AN            Work on PRBoA correspondences*                                                    -do-
                                                                                               TR
                   ATCC
                               Phil. Institute of Interior Designers (PIID) monthly   CW Home Depot, Pasong
                    MBS
                                                         GMM                            Tamo, Makati City
                                Work on PRBoA correspondences*, report and            ADNAapec Home Office,
  28       Fri    Alli, AN                                                                                              -do-
                                                   SPLBE matters                              TR
                   ATCC                           TQDS for SPLBE                        ATCC Home Office                -do-
                                 PAPRB office re: signing of checks for staff
                    MBS                                                                     PAPRB office                -do-
                                                payroll & misc exp.
                                                                                        5/F UAP Headquarters
  29      Sat     Alli, AN      PRBoA en banc Meeting with the IAPOA-UAP                                                -do-
                                                                                          Office, Quezon City
                   ATCC                               -do-                                        -do-                  -do-
                   MBS                                -do-                                        -do-                  -do-
  30      Sun     Alli, AN
                   ATCC
                   MBS
                               Work on PRBoA report, webposts and SPLBE                ADNAapec Home Office,
  31     Mon      Alli, AN                                                                                              -do-
                                                  matters                                      TR
                   ATCC       Emails, Financial Report Oath taking, TQDS                 ATCC Home Office               -do-
                   MBS
*Note: For selected emails and official correspondences issued by the PRBoA in 2011, please refer to separate schedules accompanying
this Activity listing.


II. November 2011
                  PRBoA                                                                                             Description/
 Nov     2011                                       Activity*                                   Venue
                  Member                                                                                             Objective
                                       Work on various PRBoA emails,                   ADNAapec Home Office,
   1     Tue      Alli, AN                                                                                            The full
                                   correspondences*, webposts and reports                      TR
                                                                                                                    implement-
                   ATCC       Work on various PRBoA emails, financial report              ATCC Home Office
                                                                                                                      ation &
                    MBS                                                                                              enforce-
                                                                                      1) ADNAapec          Home
                              1) Work     on     various  PRBoA     emails,
                                                                                         Office,TR;
                                 correspondences*;
                                                                                                                    ment of R.A.
                              2) Review and sign documents (including
   2     Wed      Alli, AN                                                                                           No. 9266
                                 logbooks for the December 2011 special
                                                                                      2) PRC         Examiners’
                                 professional licensure board examinations/
                                                                                         Checking Room
                                 SPLBE)
                   ATCC
                   MBS
                               1) Work on various PRBoA correspondences*;
                                  and                                                  ADNAapec Home Office,
   3     Thu      Alli, AN                                                                                              -do-
                               2) continue research work on statutory                          TR
                                  construction for general reference by RLAs
                   ATCC
                               Prepare test questions (TQ) for the 2011 foreign
                    MBS                                                                   MBS Home office               -do-
                                 licensure examinations for architects (FLEA)
                               continue research work on statutory construction        ADNAapec Home Office,
   4      Fri     Alli, AN                                                                                              -do-
                                        for general reference by RLAs;                           TR
                                                                                        PRC Examiners’
                   ATCC                Review/ sign administrative cases                Checking Room                   -do-

                                Review and administrative cases and signed
                    MBS                                                                 PRC Examiner's room             -do-
                                                     orders
                              1) finish research work on statutory construction
                                 for general reference by RLAs; and
                                                                                       ADNAapec Home Office,
   5      Sat     Alli, AN    2) research on procurement law/s for consulting                                           -do-
                                                                                               TR
                                 services for public infrastructure projects in the
                                 PH
                              UAP College of Fellows Meeting                          UAP-IAPOA Headquarters
                   ATCC                                                                                                 -do-
                              Encoding of TQs for SPLBE                                   ATCC Home Office
                    MBS                           Prepare TQ                               MBS Home office              -do-
                              1) Work on PRBoA correspondences* and on                3) ADNAapec        Home
   6     Sun      Alli, AN       Special Memo No. 4;                                     Office, TR;                    -do-
                              2) research work on motu proprio cases;                 4) -do-
                   ATCC       Analysis of Rating of Top10 from 1999-2011                  ATCC Home Office              -do-

 ____________________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 9 of 14
                            Preparation of charts
                            Encoding of TQs
                  MBS                         Prepare TQ                            MBS Home office                -do-
                            1) Work on PRBoA correspondences* (including        3) ADNAapec       Home
 7      Mon     Alli, AN       emails) and on Special Memo No. 4;                  Office 2;                       -do-
                            2) research work on motu proprio cases;             4) -do-
                            Encoding of TQs
                 ATCC                                                               ATCC Home Office               -do-
                            Work on various PRBoA emails
                  MBS                         Prepare TQ                             MBS Home office               -do-
                            1) Work on PRBoA correspondences* (including
                                                                                 ADNAapec Home Office,
 8      Tue     Alli, AN       emails); and                                                                        -do-
                                                                                         TR
                            2) continue work on SPLBE test questions (TQ)
                            Encoding of TQs
                 ATCC                                                               ATCC Home Office               -do-
                            Work on various PRBoA emails
                  MBS                         Prepare TQ                           MBS Home office                 -do-
                              Work on PRBoA correspondences* (including          ADNAapec Home Office,
 9     Wed      Alli, AN                                                                                           -do-
                                                  emails)                                TR
                 ATCC
                 MBS
                              Work on PRBoA correspondences* (including
 10     Thu     Alli, AN                                                               Mandaue City                -do-
                                              emails)
                 ATCC
                 MBS
 11     Fri     Alli, AN
                               Prepare memo re Analysis of Rating Top 10
                 ATCC                                                               ATCC Home Office               -do-
                                             1999-2011
                  MBS
                                Work on SPLBE Test Question Data Bank            ADNAapec Home Office,
 12     Sat     Alli, AN                                                                                           -do-
                                              (TQDS)                                     TR
                                           Encoding of TQs
                 ATCC                                                               ATCC Home Office               -do-
                 MBS             Encoding of manuscript of TQ                   MBS home office                    -do-
 13     Sun     Alli, AN
                            Preparation of Memo re Analysis of Rating of
                 ATCC                                                               ATCC Home Office               -do-
                            Top10 from 1999-2011
                  MBS                   Encoding of manuscript of TQ                 MBS home office               -do-
                            1) Work on PRBoA correspondences*; and              1) ADNAapec Home Office,
                                                                                   TR; and
 14     Mon     Alli, AN                                                                                           -do-
                            2) Review administrative cases, sign orders and     2) Checking Room, PRC
                               process SPLBE logbooks                              Rating Division
                            Filing of Memo re Rating Top 10 to Chair’s office
                 ATCC                                                                      PRC                     -do-
                                    Review / sign administrative cases
                  MBS                                                                                              -do-
                            1) Work on PRBoA correspondences* (including        1) ADNAapec Home Office,
                               emails);                                            TR;
 15     Tue     Alli, AN    2) Work on SPLBE Test Questions; and                2) -do-; and                       -do-
                            3) Process SPLBE logbooks and encode SPLBE          3) Encoding Room, PRC
                               Test Questions                                      Rating Division
                 ATCC                Work on various PRBoA emails                    ATCC Home Office
                                                                                Conti's in Greenbelt, Makati
                  MBS           Judge in UAP Makati chapter photo contest
                                                                                   City
                                                                                 ADNAapec Home Office,
 16    Wed      Alli, AN           Work on PRBoA correspondences*                                                  -do-
                                                                                             TR
                 ATCC       Work on various PRBoA emails
                                1. Signed the registration of firms,
                                     reviewed administrative cases and            PRC examiners' room              -do-
                  MBS
                                     signed its orders.                              PAPRB office
                                2. Worked in PAPRB on its finances
                                                                                 ADNAapec Home Office,
 17     Thu     Alli, AN           Work on PRBoA correspondences*;                                                 -do-
                                                                                          TR
                                           Launch of PRC Hour                       Mariners, Malate
                 ATCC
                                    Work on various PRBoA emails                   ATCC Home Office
                               Consultation on preparation of TQ with Dra.
                  MBS                                                                  PAPRB office                -do-
                                                 Tibigar
 18     Fri     Alli, AN            Checking of logbooks for SPLBE                Checking Room, PRC               -do-
                               Review / sign administrative cases                 Checking Room, PRC
                 ATCC
                               Consultation w Atty Lalusis                        Legal Div                        -do-
                 MBS                       PAPRB Board meeting                       PAPRB office                  -do-
 19     Sat     Alli, AN
                 ATCC                     Encoding of TQs                           ATCC Home Office               -do-
                                 Continue on TQ preparation and encoding
                  MBS                                                                MBS home office               -do-
                                             of its manuscript
 20     Sun     Alli, AN      Work on PRBoA correspondences* (including          ADNAapec Home Office,             -do-
____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 10 of 14
                                                     emails)                                     TR
                   ATCC
                   MBS
                               1) Commission Meeting re SPLBE; and                  1) Conference Room, 2/F
  21     Mon      Alli, AN                                                             PRC Building; and                 -do-
                               2) Checking of logbooks for SPLBE.                   2) Checking Room, PRC.
                   ATCC                       Encoding of TQs                           ATCC Home Office                 -do-
                   MBS
                               1) Work on PRBoA correspondences*             and    1) ADNAapec Home Office,
                                   positions;                                          TR;
  22     Tue      Alli, AN                                                                                               -do-
                               2) TQDS for SPLBE; and                               2) -do-and
                               3) Encoding for SPLBE.                               3) Encoding Room, PRC.
                               Editing of TQs Data Bank                                   PRC Rating Div
                   ATCC                                                                                                  -do-
                               Consultation w Atty Lalusis                                 PRC Legal Div
                                                                                       Inside the PRC Rating
                    MBS                    Review the TQ's in data bank                                                  -do-
                                                                                                room
                               1) Seminar/ Workshop on the Amendment/               1) OSHC, Quezon City;
                                  Repeal of Professional Regulatory Laws
                                  (PRLs)
  23     Wed      Alli, AN     2) Work on PRBoA correspondences* and                2) ADNAapec Office;                  -do-
                                  positions; and
                               3) 29th Anniversary of the UAP Quezon City           3) Ortigas Home Depot.
                                  Silangan Chapter.
                   ATCC               Editing of TQs Data Bank, Merging                  PRC Rating Div                  -do-
                                PAPRB seminar workshop on amendments of                OSHC, Quezon City;
                    MBS                                                                                                  -do-
                                               professional laws
                                                                                    1) Encoding Room, PRC;
                               1) Encoding for SPLBE; and
  24     Thu      Alli, AN                                                             and                               -do-
                               2) Merging for SPLBE.
                                                                                    2) Merging Room, PRC.
                   ATCC        In Transit to Bohol, NCCA-NCAAA Meeting                Manila- Panglao, Bohol
                   MBS               UAP Makati chapter 37th anniversary                  AIM, Makati City
                                                                                     ADNAapec Home Office,
  25      Fri     Alli, AN               Work on PRBoA correspondences*                                                  -do-
                                                                                                TR
                   ATCC                   NCCA-NCAAA Meeting                              Panglao, Bohol                 -do-
                   MBS                         Encoding of TQ                           PRC encoding room                -do-
                                Work on PRBoA correspondences*, report and           ADNAapec Home Office,
  26      Sat     Alli, AN                                                                                               -do-
                                                 webposts                                       TR
                   ATCC                   In transit, Bohol-Manila                         Bohol-Manila
                   MBS
                               1) Test Question (TQ) extraction for SPLBE;          1) Merging Room, PRC;
                               2) Checking of logbooks for SPLBE; and               2) Licensure Division and
                                                                                       Confidential     Room,
  27     Sun      Alli, AN                                                             PRC; and                          -do-
                               3) Printing of SPLBE questionnaires (with no         3) Confidential Room
                                  contact between PRBoA members and
                                  questionnaires)
                                                                                     Merging Rm, Rating, Confi
                   ATCC              Extraction / Printing of TQ for SPLBE                                               -do-
                                                                                               Rm
                                    1.     Merging & Extraction of TQ for SPLBE.
                                    2.     Printing of SPLBE questionnaires (with        PRC Rating room
                    MBS                                                                                                  -do-
                                           no contact between PRBoA members            PRC Confidential room
                                           and questionnaires)
                                                                                      ADNAapec Home Office,
  28     Mon      Alli, AN      Work on PRBoA correspondences* and report                                                -do-
                                                                                              TR
                                   E-mail communications , Logbook format
                   ATCC                                                                  ATCC Home Office                -do-
                                                 revisions
                    MBS
                                   Work on PRBoA correspondences* and                 ADNAapec Home Office,
  29     Tue      Alli, AN                                                                                               -do-
                                                  webposts                                    TR
                   ATCC                               -do-                                   -do-                        -do-
                               Purchase the raffle prizes for PAPRB Christmas
                    MBS                                                                  Puregold Tayuman
                                                     party
                                                                                      ADNAapec Home Office,
  30     Wed      Alli, AN      Work on PRBoA correspondences* and report                                                -do-
                                                                                              TR
                   ATCC
                   MBS
*Note: For selected emails and official correspondences issued by the PRBoA in November 2011, please refer to separate schedules that
accompanying this Activity listing.




 ____________________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 11 of 14
III. December 2011
                PRBoA                                                                                          Description/
Dec    2011                                     Activity*                                 Venue
                Member                                                                                          Objective
                                Urgent PRBoA en banc meeting with the                                            The full
 1      Thu     Alli, AN      Commission relating to protocols covering the       PRC Conference Room          implement-
                               various PRBoA outgoing communications                                             ation &
                 ATCC                             -do-                                     -do-                 enforce-
                                                  -do-                                                            ment
                                                                                          -do-
                  MBS            Signed case orders and registration of                                        of R.A. No.
                                                                                Examiner's checking room
                                          architectural firms                                                     9266
 2        Fri   Alli, AN
                                      Administrative cases (re-set)              PRC Legal & Inv Division
                 ATCC                                                                                              -do-
                                 Various e mails re SPLBE requirements             ATCC Home Office
                  MBS
                            1) AAIF Christmas Party; and
                            2) Meeting with Sen. AQ Pimentel, Jr. re              Max’s Restaurant, QC
 3       Sat    Alli, AN                                                                                           -do-
                               implementation and enforcement of R.A. No.
                               9266
                 ATCC        College of Fellows Meeting & Christmas Party       UAP-IAPOA Headquarters
                                 Purchase PAPRB raffle prizes for Annual
                  MBS                                                               Puregold, Tayuman
                                     Congress and Christmas Party
 4      Sun     Alli, AN
                 ATCC
                 MBS
 5      Mon     Alli, AN        Meeting with the UAP Camarines Chapter                  Naga City                  -do-
                 ATCC
                                Purchase PAPRB raffle prizes for Annual
                  MBS                                                               Puregold, Tayuman
                                     Congress and Christmas Party
                            Ribbon-cutting of OPUS (Works by Naga City/
                            CamSur Architects) in celebration of the 2011
 6      Tue     Alli, AN                                                             2/F SM Naga City
                            Nationwide Architecture Week (NAW) and                                                 -do-
                            luncheon with UAP CamSur Members
                 ATCC
                                 1.    Purchase PAPRB raffle prizes for             Puregold, Tayuman
                  MBS                  Annual Congress and Christmas Party
                                 2. Worked on PAPRB Treasurer's Report                 PAPRB office
                            Lecture-presentation before the Don Bosco
                            Technical College (DBTC) Department of
 7      Wed     Alli, AN    Architecture in celebration of the 2011 NAW and      DBTC Mandaluyong City             -do-
                            its Founding Anniversary celebrations; exhibit
                            tour and luncheon with the faculty
                 ATCC                    PAPRB Christmas Party                       Mariners, Malate
                 MBS          PAPRB Annual Congress and Christmas Party              Mariners, Malate
 8      Thu     Alli, AN
                 ATCC
                 MBS              UAP-Makati Chapter Christmas Party                 AIM, Makati
                                                                                 ADNAapec Home Office,
 9        Fri   Alli, AN       Draft PRBoA correspondences* and emails                                             -do-
                                                                                         TR
                 ATCC
                 MBS
 10      Sat    Alli, AN
                 ATCC
                 MBS
 11     Sun     Alli, AN
                 ATCC
                 MBS
                                                                                 ADNAapec Home Office,
 12     Mon     Alli, AN       Draft PRBoA correspondences* and emails                                             -do-
                                                                                         TR
                              Get FLEA answer sheet from Rating Division;
                                                    and
                               Wait for appointment w/ Com Po to discuss
                                                                                PRC Examiners’ Checking
                 ATCC          letter to advertising companies promoting                                           -do-
                                                                                        Room
                               practice of foreign architects (FAs) without
                               Temporary/ Special Permits (TSPs) in the
                                                Philippines
                  MBS
                                                                                 ADNAapec Home Office,
 13     Tue     Alli, AN       Draft PRBoA correspondences* and emails                                             -do-
                                                                                         TR
                 ATCC
                 MBS
 14     Wed     Alli, AN                  Draft PRBoA reports                    ADNAapec Home Office,             -do-

____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 12 of 14
                                                                                               TR
                                  Meeting with Com Po and Atty Lalusis re
                 ATCC              format of communication to advertising         PRC Office of Com. Po            -do-
                                  companies promoting FAs without TSPs
                  MBS
                                                                                 ADNAapec Home Office,
 15     Thu     Alli, AN                  Draft PRBoA reports                                                      -do-
                                                                                          TR
                 ATCC                     Answer TQ for SPLBE                      ATCC Home Office                -do-
                 MBS         Secure the answer sheets for Dec 2011 SPLBE            Rating Division                -do-
 16       Fri   Alli, AN
                                Reading / correcting TQ SPLBE, review
                 ATCC        administrative cases, follow-up with Legal & Inv    PRC Rating Division, LID          -do-
                                            Division on cases
                  MBS                                                                 Rating Division
                            1) AAIF Christmas Party; and
                            2) Attens UAP Cainta Christmas Party; and
 17      Sat    Alli, AN                                                             SM Mall Marikina              -do-
                            3) Meeting with Past and Present UAP officers
                               and members and a past PRBoA Member
                 ATCC
                 MBS
                            1) Secure materials relating to the Dec 2011
                               SPLBE FLEA from the PRC Rating Division;         1) PRC Rating Division;
                               and
                            2) Initial work on various pending PRBoA            2) -do-; and
 18     Sun     Alli, AN       documents including the cursory review of                                           -do-
                               some January 2012 LEA applications and
                               accompanying logbooks; and                       3) ADNAapec Home Office,
                            3) Work on Dec 2011 SPLBE FLEA answer                  TR
                               sheets.
                 ATCC
                  MBS
                            1) Work on Dec 2011 SPLBE FLEA answer
 19     Mon     Alli, AN       sheets; and                                       ADNAapec NDCS office              -do-
                            2) Work on PRBoA reports
                 ATCC
                 MBS
                            1) Release of results of the December 2011
                               SPLBE FLEA with Rating Division and Com.           Examiners’ Checking
                               AY Po;                                            Room at the PRC Rating
 20     Tue     Alli, AN                                                                                           -do-
                            2) PRBoA en banc Meeting; and                               Division
                            3) Review of January 2012 LEA applications and
                               their accompanying logbooks
                            1) Release of results of the December 2011
                                SPLBE FLEA with Rating Division and Com.
                                                                                               -do-
                 ATCC           AY Po;                                                                             -do-
                            2) PRBoA en banc Meeting; and
                            3) Revision of logbook format
                            1) Release of results of the December 2011
                                                                                  Examiners’ Checking
                                SPLBE FLEA with Rating Division and Com.
                                                                                 Room at the PRC Rating
                  MBS           AY Po;                                                                             -do-
                                                                                        Division
                            2) PRBoA en banc Meeting;
                            3) Signed case orders
                                Work on PRBoA webposts, report and draft         ADNAapec Home Office,
 21     Wed     Alli, AN                                                                                           -do-
                                           correspondences*                              TR
                 ATCC                        Various e mails                       ATCC Home Office
                 MBS             PRBs Annual Planning Meeting with PRC          PAPRB Conference Room              -do-
 22     Thu     Alli, AN
                 ATCC                        Various e mails                        ATCC Home Office
                 MBS
                             Review Test Question (TQ) manuscripts for the       ADNAapec Home Office,
 23       Fri   Alli, AN                                                                                           -do-
                                          January 2012 LEA                               TR
                 ATCC
                 MBS
                               Formulate new architectural design and site
                                                                                 ADNAapec Home Office,
 24      Sat    Alli, AN       planning (ADSP) problems and TQs for the                                            -do-
                                                                                         TR
                                          January 2012 LEA
                 ATCC
                 MBS
                            1) Formulate new ADSP problems and TQs for
                                                                                 ADNAapec Home Office,
 26     Mon     Alli, AN       the January 2012 LEA; and                                                           -do-
                                                                                         TR
                            2) Work on PRBoA reports*
                 ATCC                       Various e mails                         ATCC Home Office               -do-

____________________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 13 of 14
                    MBS
                                                                                     ADNAapec Home Office,
  27      Tue     Alli, AN                 Work on PRBoA reports*                                                       -do-
                                                                                             TR
                   ATCC
                   MBS
  28     Wed      Alli, AN
                   ATCC
                   MBS
  29      Thu     Alli, AN
                   ATCC
                   MBS
                                                                                     ADNAapec Home Office,
  30       Fri    Alli, AN                 Work on PRBoA reports*                                                       -do-
                                                                                             TR
                   ATCC
                   MBS
*Note: For selected emails and official correspondences issued by the PRBoA in 2011, please refer to separate schedules accompanying
this Activity listing.


Attachment B follows (in 7 pages) i.e. the Schedule of Official OUTGOING PRBoA Correspondences
(prepared/ issued 01 October through 31 December 2011) and Their Status




 ____________________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Fourth (4th) Quarter Report (Narrative) for the Period 01 October through 31 December 2011                       page 14 of 14

								
To top