RISK ASSESSMENT                                                     No. 008

Site:

Activity: Excavations in footway and highway

Date:

                                        MAIN HAZARDS ARE:-

   Pedestrians encroaching onto working area
   Vehicles encroaching onto working area



             LIST THOSE WHO ARE MOST AT RISK FROM THE HAZARDS IDENTIFIED:-

   Operatives
   Pedestrians
   Motorists



                                      CONTROLS REQUIRED:-

   Exclude pedestrians & vehicles using barriers
   Divert pedestrian traffic into carriageway – provide buffer zone between pedestrians and traffic
   Transfer traffic onto opposite carriageway and control by means of temporary traffic signals




   ADDITIONAL ACTIONS TO CONTROL THE RISKS, WHERE REASONABLY PRACTICABLE
   TO DO SO:-

   Agree traffic/pedestrian management measures with Local Authority/Police
   NRSWA qualified person on site
   Method statements




  Signed:-                                           Title:-   Site Manager

  Date:


                                                                                               RA008/2008

								