Import Guidelines and Clearance Procedures

W
Shared by: HC12071415106
Categories
Tags
-
Stats
views:
6
posted:
7/14/2012
language:
pages:
7
Document Sample
scope of work template
							             Flowcharts of

DESTINATION INSPECTION IMPORT
          GUIDELINES
                  &
    CLEARANCE PROCEDURES
      Through ASYCUDA++ System
                              PROCEDURES BEFORE THE
                                SHIPMENT OF GOODS
                                Scanning                     Authorized
       Customs                  Company                      Dealer Bank                        Importer

                          Carry out a preliminary          Ensure Form M application     Ensure the supplier provide
                          review of Form M                 is duly completed and all     the pro-forma invoice &
                          application and attached         documents provided +          documents according to pre-
                          docs. to accept or reject        carry out proper Know-        defined standards.
                          within (1) working day.          Your-Customer (K-Y-C).


                                                           Retain original copy and      Ensure all documents
                                    Is it a                forward the remaining (3)     forwarded to the
                         No    transaction with
                                                           copies to the Scanning        Authorized Dealer Bank
                                 post landing                                            are genuine and
                                                           Company within (5) days
                                  charges?                                               verifiable.
                                                           after date of approval.

                                         Yes
                          Send copies of docs. to          Receive all copies of
                          Industrial Inspectorate          rejected Form M application   Complete Form M
                          Dept./ FMoI for monitoring       from Scanning Company to      application & attach all
                          purposes & await CBN to          carry out the necessary       supporting documents.
                          advise on issuance of RAR.       rectification.



NCS HQs receives a                                         Confirm acceptance of         Procure the foreign exch
copy of Form M as well                                No   Form M by the Scanning        -ange through the importer’s
as the respective Area            Is Form M                Company before                bank if L/C transaction &
Command/ port of                  accepted?                proceeding with other         advise the supplier to arr-
clearance.                                                 import processes.             ange for shipment of goods.

                                         Yes
                                    PROCEDURES FOR AND AFTER
                                      THE SHIPMENT OF GOODS

                                      Shipping                     AD & Designated
      Customs                                                                                                 Supplier
                                   Lines/ Carriers                     Banks

                                 Ensure all goods being
Assess duty based on the         consigned for shipment are        Forward photocopies  with         Make available (3) sets of
CIF value of the goods           covered by appropriate            a letter duly signed to the        original CCVO, transport
using the rate of exchange       Form M as provided by the         Scanning Company for               documents, packing list and
on the approved Form M.                                            issuance of Risk Assess-           other requested
                                 SCs, and must reflect that
                                 number on B/L.
                                                                   ment Report (RAR).                 documents. 


Ensure duty & charges paid       Make an advance summary           For transactions involving         If “Valid for Foreign
to a designated bank and         of manifest of cargoes            foreign exchange transfer,         Exchange” transaction
receipt issued with serial no.   available to SC electron-         the assessed value on the          and those for which
of the SGD Form stated           ically within (5) days/ sea or    (RAR) shall be the amount          Certificate of Capital
before goods are cleared.        (2) days/ other + NCS docs.       payable.                           Importation issued:
                                                                                                      Forward (2) sets through
                                                                                                      In the case of Bills for
                                                                                                      supplier’s bank to
                                                                                                      Collection and
                                                                   Follow the payment                 overseas correspondent
                                                                                                      unconfirmed L/Cs: (2)
                                                                   procedures adopted by the          bankshould be “Not-Valid
                                                                                                      In the case of to
                                                                                                      sets and copy forwarded
                                       Scanning                    Central Bank of Nigeria for        Authorized Dealer Bank.
                                                                                                      for Foreign Exchange”
                                                                                                      either through the
       Importer                                                    the different types of             transactions: or the
                                                                                                      supplier’s bankonly two
                                       Company                     transactions.                      offshore correspondent of
                                                                                                      sets should be dutiable
                                                                                                      In the case of forwarded
                                                                                                      the issuing bank, to that
                                                                                                      personal the bank the
                                                                                                      directly to effects: (2) sets
                                                                                                      opened bank, while the
                                                                                                      should the Form “M”.
                                                                                                      issuing be forwarded to the
                                                                                                      designated forwarded
                                                                                                      third copy isbank and if
Continue to pay an               Generate RARs not later           Import duty payment shall          directly to the Authorized
                                                                                                      they are not (i.e. normal
administrative charge of 1%      than (5) w. days in the case      continue to be restricted to       Dealer Bank.
                                                                                                      personal effects), the two
of FOB value of all imports      of shipment by sea and (2)        the bank that opened the           sets should be forwarded
based on the exchange rate       w. days for shipments by          Form “M” if it is a designated     to the respective Scanning
on the approved Form M.          Air/Land after receipt of         bank, and a receipt is issued.
                                 documents.                                                           Company.

                                                                  Keep and retain evidence         These documents should be
                                                                    of receipt of documents           forwarded within (14) days
                                                                    for Bank Examiners.               after shipment.
                                                AT THE CPC


                     Declarants                                                            Customs
Complete the SGD, attach all the                                                               Check basic details of SGD, and
necessary supporting documents,                                                 Face Vet       that the required documents are
and present to the designated face                 SGDs May be returned                        attached. Then, the documents
vet officers.                                    back for correction, and/or                   are referred to the TS.
                                                 completion of missing data
                                                    and/or documenets                          Input manifest and SGDs details
                                                                                 Data
                                                                                               into ASYCUDA++ respective
                                                                                Capture
                                                                                               modules, register and print the
                                                                                               ASYCUDA declaration.
If the modification is accepted, then
the declaration is signed and                                                                                Check details against
stamped by the declarant.                                                       Verif. &                     RAR messages,
                                                                                                  Lane?
Otherwise, the dispute settlement                                               Query                        trigger selectivity,
mechanism is followed.                            In case of discrepancy, the                                stamp the declaration
                                                     modified declaration is                                 with selected lane and
Declarants can make the payments                   returned to the declarant.
                                                                                           R     Y    B    G inspector name, and
at the designated banks based on                         Assessment             Verif. &                     modify declarations
the total amount of duties and taxes                       Notice               Query                        (in case of
shown in the Assessment notices.                                                                             discrepancy).
Declarants receive their copies of                                                                    Sort the eight copies
the declarations through the Paging/                       Declarant                                  of the SGD. Record
Importer Copy Seat.. The following                       Copy of SGD      Sorting          Dispatch   the numbers of SGDs
processing steps are carried out at                                                                   that are to be
the terminals.                                                                                        dispatched.
                     The importer’s copy is dispatched to the shipping lines stamped with the
                     selected lane. Also, for yellow-lane declarations, a terminal copy of the SGD is
                     stamped with the selected lane, and with the ALS (Authority to Load for
                     Scanning) stamp, before it is dispatched to NPA to start the release procedures.
                                      LANES PROCEDURES

        If Red
                                                                                                   If Yellow
        Lane?                               If Blue or If Green
                                                                                                     Lane?
                                            Lane?       Lane?
                                                                                                                    ALS
                                                                            No      Payment          Yes          Issued
                                                                     Wait          confirmed?
       Physical                               Declaration
     Examination                              Assessed at                                          Scanning
                                                 CPC

                     Yes                          RO         Payment
      Discrepancy                              Printed at   Procedures                                           No
           ?                                   CPC                                              Discrepancy
                                                                                                     ?
                       AN Printed                                           AN Printed
        No             at Terminal                                          at Scanning                    Yes
                                               Release                          Site
                                              Procedures                                          Physical
                                                                                          Yes   Examination

                       Importer        No                         No         Importer
                       accepts?                                              accepts?
                                                                                                Discrepancy
                               Yes        Dispute Settlement                 Yes                     ?
       Declaration    Extra Payment     Procedures are followed             Extra Payment
                                                                                                           No
      Assessed at      Made by the                                           Made by the
                        Declarant                                             Declarant
                                                                                                 Declaration
      the Terminal
                                                                                                 Assessed at
                                                                                                Scanning Site
 Payment                                                          RO Printed       Payment Input
                     RO Printed                Release
Procedures                                                        at Scanning      into ASY++ at
                     at Terminal              Procedures
                                                                      Site              Site
                                      PAYMENT PROCEUDRES

     Banks                              Declarants                                 Customs

                                                                                    Assessment Notices are printed at
           Receive                        Payment of               Assessment       the Verification & Query Seat, and
          Payments                        duties and                 Notice         handed to declarants. Other
                                            taxes                                   Assessment notices of any
                                                                                    additional taxes, fees and charges
                               Declarants make the payments at                      to be paid will be printed at the
                               the designated banks based on the                    terminals and the scanning site.
                               amount of duties and taxes shown
                               on the Assessment Notices

             Issue
                                                                                    Payment receipts and schedules of
            Receipts                       Receive                    Verify        payments are received by the
                                           Receipts                 Payments        Accounts Seat and input into
                                                                                    PRIMS.
    Issue
 Schedules of
  Payments                                                                          After the assessment of
                                                                                    declarations, the Accounts Seat
                                                                                    officers/ CPC (or at the scanning
                                                                      Input of
                                                                                    site for yellow-lane declarations)
                                                                   Payments into
                                                                                    can input the payments details into
                                                                    ASYCUDA++
For yellow-lane declarations, if the physical examination                           the respective ASYCUDA++
results in a discrepancy, then the container will have to be                        module after verifying that
returned back to the terminal. Consequently, red-lane                               payments were made.
procedures will apply to these cases afterwards, i.e. a                             Upon completion of the payment
message will have to be sent by the Accounts Seat at CPC            Message         procedures for red-lane
to the terminal to start release procedures.                          for           declarations, a message is sent by
                                                                    Release         the Accounts officers/ CPC to the
                                                                                    terminals to start release
                                                                                    procedures.
                                             RELEASE
                                           PROCEDURES

              NPA                           Declarants              Customs
                                                                          Release Orders
                                                                          are printed at
                                            Presentation                  CPC and at the
                                            of RO to NPA    Release Order
                                                                          Scanning Site,
                                             Marketing                    and delivered to
                                                                          declarants.
 Issue TDO to       Issue Debit              Payment of
  Traffic Dept.        Note                 Port Charges




 Traffic Dept.
 Delivers FCL
   and TDO

Note: For yellow-lane declarations, the
release procedures start at an earlier
stage based on the ALS (Authorization        Presentation
to Load for Scanning) issued at CPC.        of FCL, TDO &
Then, containers head to the Scanning         RO to Gate
Site. When scanning procedures are
completed and if no discrepancy is                           Exit Gate &
                                                             SGD Exch.
found, the RO (Release Order) is
                                                            Control Copy
printed and dispatched to NPA so that
the TDO , which was prepared by NPA
earlier, is handed to declarants to
deliver with container to Gate for exit.

						
Related docs
Other docs by HC12071415106
PMAPF inal Evaluation
Views: 0  |  Downloads: 0
Chapter 7
Views: 0  |  Downloads: 0
120606dpsa
Views: 0  |  Downloads: 0
Company Meeting Title
Views: 0  |  Downloads: 0
EE ERSTE JAAR
Views: 119  |  Downloads: 0
Estates Support Service
Views: 5  |  Downloads: 0
Created Date - DOC 5
Views: 0  |  Downloads: 0
Legislation and Policies
Views: 0  |  Downloads: 0