Docstoc

4th Annual Offshore Wind Construction, Installation and Commissioning Conference 2012

Document Sample
4th Annual Offshore Wind Construction, Installation and Commissioning Conference 2012 Powered By Docstoc
					4th Annual
Offshore Wind Construction, Installation & Commissioning Conference                                                                                 HOME
Hamburg, Germany | 20-22 November 2012
                                                                                  “The Summit gave me great insight into what is happening
                                                                                   for wind farm installation and operations. the experiences
                                                                                    highlighted the challenges ahead, making the summit an
                                                                                           ideal lessons learned forum” Stuart Rickett, DONG      OVERVIEW

Eliminate offshore wind construction


                                                                                                <
                                                   ns for
uncertainty: Leverage advanced installation solutions f cost


                                                                                              3
and time efficient farshore, deepwater project delivery                                                                                            AGENDA


OFFSHORE GRID EXPANSION & CONNECTIONS: Learn about
North Sea offshore wind project connections and the proposed steps to
help speed up offshore wind project integration to the grid

                                                                   &
                                                                                 y
                                                                                ry
                                                                          Industry renowned speaker f

                                                                          O hore Developers
                                                                               ore
                                                                          Offshore
                                                                                            2
                                                                                            speakers from:




                                                                 7
                                                                                                                                                   EXPERT




                                                               )
ADVANCED DEEPWATER FOUNDATION STRUCTURES: Examine
                                                e                                                                                                 SPEAKERS
the next generation of foundations able to cope with hostile weather
                                                                  her
                                                               ather




                                                              $
and diverse seabed conditions and their installation methodologies
                                                            olog
                                                            ologies




                                              5
                                    LOGIE
                                    LOGIES:
RISK FREE CABLE INSTALLATION METHODOLOGIES: Examine
                                                ation,
                                                  ion,
the latest advancements in subsea cable installation, including design
                                                                                                                                                ATTENDEES AND




                                            '
                                           rial
and engineering through to installation, burial and terminations                                                                                 NETWORKING

IMPLEMENTING A COORDINATED LOGISTICS STRATEGY: Discuss
                            OGISTICS STR
                             GIS CS TRA                                   Grid Operators:
                                                  comp
                                                  com
how cost effectively transport all of your major components to and from
                                             ts lo
construction site, in often harsh environments located far from shore

CONTRACT MANAGEMENT, RISK REDUCTION & INSURANCE:                                                                                                 PASSES AND
Find out how to reduce project risks through contract design, better                                                                               PRICES
planning & management, and insurance to cover any eventuality             Turbine Manufacturers:
HEALTH AND SAFETY: Identify the core HSE risks for far shore, deep
water constructions and discuss best practice solutions to mitigate
those risks                                                                                                                                       REGISTER
                                                                                                                                                 ONLINE HERE

                                      Why this is not just ‘another offshore wind conference’, visit:
                                www.windenergyupdate.com/farshore-installation

				
DOCUMENT INFO
Shared By:
Stats:
views:102
posted:7/12/2012
language:English
pages:1
Description: Eliminate farshore wind construction uncertainty: Leverage advanced installation solutions for cost & time efficient deepwater project delivery Between €114 billion and €152 billion of investments are needed in the next eight years to build as much as 35,500 megawatts of offshore wind in the North Sea, including Britain and Germany. The Offshore Wind Construction, Installation and Commissioning Conference will give you all the information you need to successfully deliver projects in this burgeoning period, including: Offshore Grid Expansion & Connections Get the latest on North Sea offshore wind project connections and the proposed steps to help speed up offshore wind project integration to the grid Advanced deepwater foundation structures Examine the next generation of foundations able to cope with hostile weather and diverse seabed conditions and their installation methodologies Risk free cable installation methodologies Examine the latest advancements in subsea cable installation, including design and engineering through to installation, burial and terminations Implementing a coordinated logistics strategy Discuss how cost effectively transport all of your major components to and from construction site, in often harsh environments located far from shore Contract management, risk reduction & insurance Find out how to reduce project risks through contract design, better planning & management, and insurance to cover any eventuality Health & safety requirements for farshore construction Identify the core HSE risks for far shore, deep water constructions and discuss best practice solutions to mitigate those risks