FORM OF TENDER SCHEDULE OF ITEMS AND PRICES - FT-3
DUFFERIN AVENUE
ITEM SPEC. ESTIMATED UNIT TOTAL
NO. NO. DESCRIPTION UNITS QUANTITY PRICE PRICE
PART '1' - STREET LIGHTING - DUFFERIN AVENUE
1.1 OPSS602 Supply and install electrical handholes (HH):
STS a) 445 mm x 775 mm each 8 $0.00
b) 305 mm x 305 mm each 7 $0.00
1.2 OPSS603 Supply and install rigid ducts (thick wall rigid PVC only) in
STS boulevard:
a) 2 x 50 mm m 279 $0.00
b) 1 x 50 mm m 286 $0.00
c) 2 x 75 mm m 15 $0.00
d) 3 x 75 mm m 58 $0.00
e) 1 x 50 mm flex m 22 $0.00
1.3 OPSS603 Supply and install rigid ducts (thick wall rigid pvc only) in
STS pavement
a) 3 x 75 m 59 $0.00
1.3 OPSS609 Grounding
STS i) Ground Rods each 8 $0.00
ii) #6 RWU 90 each 682 $0.00
iii) #2/0 AWG Bare Copper Cable each 25 $0.00
1.4 OPSS604 Supply and install cable in rigid ducts:
STS a) low voltage cables
i) #6 RWU 90 m 3,963 $0.00
ii) #2 RWU 90 (service) m 45 $0.00
iii) #12 AWG riser wire m 685 $0.00
1.5 OPSS615 Install only decorative downtown concrete pole, direct
OPSS616 buried (City to supply)
STS a) 7.6 m each 11 $0.00
1.6 OPSS617 Install only roadway lighting luminaire and bracket assembly
STS (City to supply)
a) 150 Watt HPS on 1.8 m arm each 11 $0.00
b) 70 Watt HPS Globe Luminaire on 600 mm decorative each 11 $0.00
arm c/w flower pot holders and 2 banner arms
1.7 OPSS614 Supply and install a Power Supply Pedestal Assemby (42") each 1 $0.00
STS
SP
1.8 OPSS620 Modifications to Traffic Signal Equipment each 1 $0.00
STS
SP
1.9 OPSS620 Guild Electric traffic signal controllers and signal testing
STS (cash allowance)
a) Testing L.S. 100% $300.00 $300.00
1.10 OPSS610 Removal of electrical equipment L.S. 100% $0.00
STS
TOTAL PART 1
STREET LIGHTING
(Carry to Page FT-7)
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES - FT-4
DUFFERIN AVENUE
ITEM SPEC. ESTIMATED UNIT TOTAL
NO. NO. DESCRIPTION UNITS QUANTITY PRICE PRICE
PART '2' - MISCELLANEOUS - DUFFERIN AVENUE
2.1 GS Transport, erect and remove project sign boards each 2 $ $0.00
2.2 GS Cost of 50 Percent Performance Bond lump sum $ $0.00
2.3 GS Cost of 50 percent Labour and Materials Bond lump sum $ $0.00
2.4 SP-5 Traffic Control lump sum $ $0.00
2.5 SP-6 Landscape Allowance (Provisional) lump sum $10,000.00 $10,000.00
TOTAL PART 2 $
MISCELLANEOUS
(Carry to Page FT-5)
Legend for Specification No.
STS - Supplemental OPSS - City of London Traffic Signal and Street Lighting Specification
GS - General Specifications
SGC - General Conditions
SR - Standard Specifications for Roads
SW - Standard Specifications for Sewer and Water
SP - Special Provisions
Numeric Specification Reference - Ontario Provinical Standard Specifications (O.P.S.S.)
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES -
DUFFERIN AVENUE FT-5
SUMMARY
DUFFERIN AVENUE
PART 1 - STREET LIGHTING $
PART 2 - MISCELLANEOUS $
Total Tender Price $
Contingency Allowance $ 10,000.00
SUB-TOTAL - CONTRACT PRICE $
H.S.T. (13% of Sub-Total) $
TOTAL CONTRACT PRICE $
(carry to page FT-1)
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES -
DUFFERIN AVENUE FT-5
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES -
DUFFERIN AVENUE FT-5
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES -
DUFFERIN AVENUE FT-5
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES -
DUFFERIN AVENUE FT-5
Get documents about "