Progress Report

Document Sample
Progress Report Powered By Docstoc
					Template of the National Energy Efficiency
  Action Plans for the years 2011-2013


                 End Use Energy Efficiency
 National Plans for Regional Energy Challenges Workshop
                    Tunis, 26-27 July, 2010




                      Ashraf Kraidy
                      Senior Expert
  Supportive Tools for NEEAPs…1
• Individually advise the member states on the subject
  of preparing NEEAPs and EE target setting and
  provide needed tools to facilitate the procedures.
• Developing evaluation methodology and finding
  criteria for the screening and the evaluation of
  National Energy Efficiency Action Plans (NEEAP) and
  defining the content, structure and format of the
  outcome and reports
   Supportive Tools for NEEAPs..2
• According to NEEAPs, an update of evaluation of
  political and legislative measures, instruments in the
  field of energy efficiency within the framework of the
  EE Directive
• Revision and updating the format of the envisioned
  annual report
• Prepare a draft of the first Arab Energy Efficiency
  Progress Report 2011
  Supportive Tools for NEEAPs…3
• Help to keep communication and exchange of
  information alive with up to 4 highly relevant
  committees working in the same subject area
• Support events for awareness raising, marketing and
  communication
• Make available or give access to newest international
  developments about the subject
NEEAP Template
       Contents of the Template
• Overview : Overall national indicative target
• Sectorial presentation : Energy Efficiency
  measures
• Additional measures
• Horizontal and cross-sectorial measures
• Energy Efficiency policy progress assessment
             Overview
 Overall national indicative targets

• key indicators

• Indicative target

• Name of organization and contact person for NEEAP
  follow-up

• Methodology calculation of the national target
                        Key Indicators
                                                Unit      year   year
                                                          2010   2020
National Electrification rate                     %

Electricity intensity                           GWh/$

                                               GWh/year
National Electricity consumption
Projected Electricity consumption growth        % /year
rate
Share of electricity in final energy              %
consumption
                                                  %
Share of electricity consumption in building
Share of electricity consumption in               %
industry
                Indicative Target
                                  Baseline    2020
                                                        2013
                                 consumpt     (Ten
         Unit (GWh)                                     (First
                                    ion       years
                                                       NEEAP)
                                             period)

National indicative Energy
Efficiency target
                     Sector 1
                      sector 2
                     Sector 3
Methodology calculation of the national
   indicative energy savings target
             Sectorail presentation
           Energy Efficiency measures
    Sector 1
    1- Overview table of all EE measures
                                              Energy saving
   Title and description of the
No                                Timeframe    expected in
           EE measure
                                               2013(GWh)
1    Measure 1
2    Measure 2
3    Measure 3
 2- Detailed information of individual measures

Title of the measure
Status                     Description of specific legislation or program on the measure
Technical description of   Detailed qualitative description of the EE measure and its
the measure                effectiveness to generate energy saving.
Implementing agency        Agency in charge of the process of the EE measure
                           implementation and the assessment of the energy saving to be
                           resulted
Stakeholders involved      Other Partners involved with the implementing agency in the
                           implementation process of the EE measure
Target group               Group which is addressed by the EE measure
Program cost               The total amount dedicated to the program related to the
                           implementation of the EE measure
Cost / kwh saved           The cost of 1kwh saved through the implementation of the EE
                           measure
 2- Detailed information of individual measures….2

Reduction of subsidies   The total amount avoided (which is paid by the government as a
                         difference between the international and the national price to
                         produce electricity-including fuel, plant and equipment-)
Source of fund           International Financial institution, National budget…
Financial instruments    Adopted mechanism to facilitate the implementation of the EE
                         measures (Loan, grant, tax reduction …)
Information              Information campaign, Information centre, training and
                         education…
Assessment of energy     How the measure will enable achievement of the national
saving in the sector     indicative energy saving (indicate the methodology used for the
                         evaluation of energy saving)
       Additional measures….1
• Measures for exemplary role of public sector

                                                    Energy saving
      Title and description of the EE
 No                                     Timeframe    expected in
                 measure
                                                     2013(GWh)

  1   Measure 1
  2   Measure 2
  3   Measure 3
  4   Measure 4
      Additional measures…2
• Measures for utility responsibilities


 No       Responsibility     Qualitative progress

   Provision of data and
 1 information
 2 Providing services
 3 Contributing to a Fund
 4 Awareness
Horizontal and Cross-sectorail measures

                                                     Energy saving
       Title and description of the EE
No                                       Timeframe    expected in
                  measure
                                                      2013(GWh)

1    Measure 1
     Measure 2
2
     Measure 3
3
     Measure 4
4
            Measures without clear
             quantitative savings
   Title and description of the
                                  Qualitative progress
           EE measure
  General of sector specific
1 stand alone awareness
  program
2 Research & Development
  University curriculum
3
  development
4
     Energy Efficiency policy progress assessment
                                                                                       Qualitative
No                                  Action/Activity
                                                                                        progress
1  Public energy efficiency policy announcement
2  Technical committee to write a first draft of the EE known and announced
3  EE policy draft was prepared and had been circulated
4  EE policy paper released to the public
   EE policy paper is also a directive or tabled in parliament as a bill to become a
 5
   law and contains rules and regulations
   EE policy paper contains a target or benchmark to be achieved at a specific
 6
   year
   The EE policy or law is backed up by an action plan (business plan) .This is the
 7
   equivalent of a NEEAP
   The action or business plan contains an estimate of the total resources
 8
   necessary to implement the policy
   The Government is providing a full or partial public or PPP budget to finance
 9
   the action plan
    The Government has decided to treat energy efficiency as a source of energy
10 and publicly tenders the EE business plan as they would tender a new power
   plant
   As We Found

It’s a Peace of Cake

  Let’s Just Do it
            Thank you for your attention.




Regional Centre for Renewable Energy and Energy Efficiency
Nasr City, Cairo, Egypt
Tel. +2 02 241 54 691
Fax +2 02 241 54 661
Eng. Ashraf Kraidy kraidy.ashraf@gtz.de

				