Distribution of Manhours and Total
Dollars for Surveys and Road Design
This form is required for the Prime and each Sub-Consultant
PROJ. MANAGER SENIOR ENGR. ENGINEER TECHNICIAN CREWMAN TOTAL
TASK SUB-
ACTIVITY HOURS DOLLARS HOURS DOLLARS HOURS DOLLARS HOURS DOLLARS HOURS DOLLARS HOURS DOLLARS
PE LOC. CORR. STUDIES 190
SCOPE PROJ./PFR 220
DEV. AERIAL PHOTO/ MAPPING 223
PREP./HOLD LOCATION HEARING 260
ADOPT LOCATION CORRIDOR 270
CONDUCT SURVEY 313
PLAN DESIGN/FIELD INSPECTION 360
HYDRAULIC PLAN DES./FI 362
RIVER MECHAN. PROJ. STUDIES 372
MAJOR STRUCT/BRIDGE SURV. 373
MINOR STRUCT. DATA 400
HYDRAULIC PLAN DES./RW 432
HYDRO/HYDRA. ANALY. 462
APPROVE WILLINGNESS 470
CONDUCT L&D PUBLIC HEARING 480
FURNISH APPROVED RW PLANS 510
HYDRAULIC CONSTR. REVIEW 512
COMPLETE ROADWAY PLANS 650
Per Cent
TOTALS