                                                                       Methodology: Phase 3 Common Design

                                                                       Template: Swimlane Outcomes
                                                                       Document




 <Programme Name>
 <Business                Process Name> / <Swimlane Ref. No.>
 PHYSICAL DESIGN – SWIMLANE OUTCOMES DOCUMENT

 Purpose

 This document captures the agreed Outcomes from each of the Physical Design workshops. This document supports
 the completed Swimlane process diagram <Enter Swimlane Diagram notation here in BOLD> and documents the
 Outcomes from each of the completed Business Process design workshops.

 These documents will provide both information for the completion of the Common Design Report and a record of
 discussions and agreements made during the Design workshops.

 The document is designed as a quick template to complete & distribute a record of the Outcomes of the Physical
 Design workshop sessions

 By signing below, the signatories are confirming their acceptance that the content is a
 true record of the output of the Physical Design for this process.

                                                     APPROVALS



 CLIENT
 Representative           Name:
                                                             Signature and Date


 WORKSTREAM               Name:
 LEAD
                                                             Signature and Date


 METHOD &                 Name:
 QUALITY ADVISOR
                                                             Signature and Date



DOCUMENT INFORMATION

 PBS No.

 Master Location

 File Name

 Distribution                     To:

                                  For Info:

Version 1.1 Swimlane Workshop Outcomes Document                                                                Page 1 of 13
Issued: September 13th 2006                                                                            Author: Nick Denington
                                          Service Birmingham / Business Transformation / Centre of Excellence / Methodology


CHANGE HISTORY

 Version No.       Date                  Details of Changes included in Update              Author(s)

 0.1               04.09.06              Initial Draft for Review                           Nick Denington

 1.0                06.09.06             Version for Issue, updated format                  Nick Denington

 1.1.               13.09.06             Updated with changes to section 9                  Nick Denington
                                         following feedback from CST Physical
                                         Design team




Version 1.1 Swimlane Outcomes Document                                                                                  Page 2 of 13
Issued: September 13th 2006                                               Business Transformation / Centre of Excellence / Methodology
                                                             Service Birmingham / Business Transformation / Centre of Excellence / Methodology




Contents
CONTENTS........................................................................................................................................................................ 3

1.      INTRODUCTION ..................................................................................................................................................... 4
     1.1        SCOPE.................................................................................................................................................................. 4
     1.2        SWIMLANE DIAGRAM .......................................................................................................................................... 4
2.      PROCESS DESCRIPTION ...................................................................................................................................... 4

3.      OBJECTIVES OF THE PROCESS ........................................................................................................................ 5

4.      PROCESS MEASURES ........................................................................................................................................... 5
     4.1        BUSINESS KEY PERFORMANCE INDICATORS (KPI’S)........................................................................................... 5
     4.2        BUSINESS PROCESS INDICATORS (PI’S) ............................................................................................................... 5
5.      ORGANISATION ..................................................................................................................................................... 6
     5.1        KEY SKILL REQUIREMENTS ................................................................................................................................. 6
     5.2        CONSTRAINTS & PRINCIPLES UPON ORGANISATION DESIGN ............................................................................... 6
     5.3        POTENTIAL BUSINESS IMPACTS OF PHYSICAL DESIGN ........................................................................................ 6
6.      BENEFITS ................................................................................................................................................................. 7
     6.1        BENEFITS CARDS ................................................................................................................................................. 7
     6.2        ADDITIONAL BENEFITS IDENTIFIED ..................................................................................................................... 7
7.      PROCESS INTEGRATION POINTS ..................................................................................................................... 7
     7.1        IN-PROGRAMME INTEGRATION ........................................................................................................................... 7
     7.2        CROSS-PROGRAMME INTEGRATION..................................................................................................................... 7
8.      DATA & INFORMATION MANAGEMENT REQUIREMENTS ...................................................................... 8
     8.1        DATA /MASTER DATA REQUIREMENTS ............................................................................................................... 8
     8.2        INFORMATION MANAGEMENT REQUIREMENTS ................................................................................................... 8
9.      SOLUTION REQUIREMENTS .............................................................................................................................. 9
     9.1        TECHNOLOGY SOLUTION DETAILS ...................................................................................................................... 9
     9.2        SYSTEM STRUCTURES/ORGANISATIONAL REQUIREMENTS .................................................................................. 9
     9.3        CONFIGURATION REQUIREMENTS ....................................................................................................................... 9
     9.4        TRANSACTIONAL AUTHORITIES .......................................................................................................................... 9
     9.5        HARDWARE REQUIREMENTS ............................................................................................................................. 10
     9.6        FUNCTIONAL DESIGN GAPS ............................................................................................................................... 10
     9.7        DEVELOPMENT REQUIREMENTS ........................................................................................................................ 10
     9.8        INTERFACE REQUIREMENTS .............................................................................................................................. 10
     9.9        ENHANCEMENT REQUIREMENTS ....................................................................................................................... 11
     9.10       WORKFLOW REQUIREMENTS ............................................................................................................................. 11
     9.11       PORTAL REQUIREMENTS ................................................................................................................................... 11
     9.12       TECHNICAL SERVICE LEVEL REQUIREMENTS .................................................................................................... 12
     9.13       POTENTIAL FUTURE IMPROVEMENTS ................................................................................................................ 12
10.         CAR PARK/CAPTURED ISSUES/COMMENTS ........................................................................................... 12

11.         HOW WILL IT WORK – DAY IN THE LIFE OF… ..................................................................................... 13




Version 1.1 Swimlane Outcomes Document                                                                                                                                  Page 3 of 13
Issued: September 13th 2006                                                                                    Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology




1. Introduction
1.1 Scope
Describe the scope of this Business Process Physical Design.


            What services does it cover?


            What are the boundaries of this Physical Design?


1.2 Swimlane Diagram
Detail below any Swimlane diagrams to which this Support document refers:

Swimlane Ref. No.        Process Description                                              Version         Held in/File Path
                                                                                           No.


12                       Procuring Services                                               1.0           SharePoint… (File
                                                                                                        path…)




2. Process Description
Provide a brief description for each of the Processes that have been designed in the section below,
(processes defined within the Swimlanes supported by this Outcomes document), including:

        It’s purpose


        Any Process variants


        It’s Business Triggers – what will trigger off this process within the Business area?


        Outputs/Results – e.g. Information being generated or being sent to another process




Version 1.1 Swimlane Outcomes Document                                                                                 Page 4 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


3. Objectives of the Process
Detail below the main objectives of this process, what is it trying to achieve?



        Objective 1


        Objective 2


        Objective 3




4. Process Measures
4.1 Business Key Performance Indicators (KPI’s)
List the Key Performance Indicators that will be used to monitor the performance of the overall Business
Areas defined within the scope of this Business Process.

(This information will feed into the Process Measures Matrix where a greater level of detail on the KPIs and
PIs will be defined)


Swimlane Ref.      Key Performance Indicator           KPI Type & Description
No./Activity
Ref. No.




4.2 Business Process Indicators (PI’s)
Briefly describe the Business Process Indicators that will be used to monitor the performance of this individual
Business process. These should relate to the overall Business Area KPIs in 3.1. , above.

(Full detail of these PI’s as defined within the Process Measures Document and how they relate to the
processes in the Process Measures Matrix should be detailed in Appendix i)


Swimlane           Performance Indicator                                         Supporting KPI
Ref./Activity
Ref. No.




Version 1.1 Swimlane Outcomes Document                                                                                 Page 5 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


5. Organisation
5.1 Key Skill Requirements


List any potential business impacts that have been identified during the Design Workshop of this Business
Process. A full Physical Design Change Impact Assessment will be undertaken later in the Physical Design
Stage of the Business Transformation Methodology Life-cycle. (If no Impacts identified enter N/A)

Activity No.                  Role                            Key Skill Required                 Scale of Impact (H/M/L)




5.2 Constraints & Principles upon Organisation Design
Where applicable, briefly describe any specific constraints & principles relating to this Business process that
will need to be applied to the Organisation Design..


5.3 Potential Business Impacts of Physical Design
List any potential business impacts that have been identified during the Design Workshop of this Business
Process. A full Physical Design Change Impact Assessment will be undertaken later in the Physical Design
Stage of the Business Transformation Methodology Life-cycle. (If no Impacts identified enter N/A)

Potential Business            Business Areas likely to        Description of Impact              Scale of Impact (H/M/L)
Impact                        be Impacted




.




Version 1.1 Swimlane Outcomes Document                                                                                 Page 6 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


6. Benefits
6.1 Benefits Cards
Detail here, where relevant, any existing Benefit Cards that are relevant to the process detailed within this
Outcomes document. Include all reference numbers, to ensure that the Benefits can be validated during
Stage 3.14. of the Common Design. (If no Benefits enter N/A)


Benefit Card Ref.               Benefits to be Achieved by this Process




6.2 Additional Benefits Identified
Detail here, where relevant, any additional Business or Financial Benefits that have been identified during the
Physical Design of the process detailed within this Outcomes document. These should be documented within
a Benefit Card and a Benefit Owner assigned & ownership agreed before validating the additional benefits
identified during Stage 3.14. of the Common Design Phase.



7. Process Integration Points
7.1 In-Programme Integration
Detail here, where relevant, any Integration points with processes contained internally within this Programme.
These should also be entered onto the Programme Integration Log on SharePoint:


Activity Ref. No.       Integration with                Input from                           Output To
                        Workstream/Process
                                                        (Provide Input details,              (Provide Output details,
                                                        including source process)            including target process)




7.2 Cross-Programme Integration
Detail here, where relevant, any Integration points with processes contained within other BT Programmes
external to this Programme. These should also be entered onto the Programme Integration Log on
SharePoint:


Activity Ref. No.       Integration with                Input from                           Output To
                        Workstream/BT
                        Programme/Process               (Provide Input details,              (Provide Output details,
                                                        including source process)            including target process)




Version 1.1 Swimlane Outcomes Document                                                                                 Page 7 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


8. Data & Information Management Requirements
List here the data & Information Management, (Reporting), requirements that have been defined during the
Design workshop.

Provide a detailed view of the state of the Data set that is to be utilised within this Physical Design, i.e. Is the
data ‘felt’ to be in good order, well maintained and ‘clean’ or is the data set likely to require substantial pre-
work to cleanse before it can be utilised to support the design in this document.

Add additional rows where required.

Additional information that may be considered at this stage:

               Data protection

               Data integrity

               Data retention periods

               Data Warehousing requirements

Data support requirements

8.1 Data /Master Data Requirements

Activity       Data Description          Entity/Type      Source          Target             Business              State of
Ref.                                                                                         Owner                 Data (If
                                                                                                                   known)
                                                                                                                   Good,
                                                                                                                   Average,
                                                                                                                   Poor




8.2 Information Management Requirements

Activity       Reporting Requirement     Frequency          Data         Solution Details                Functional
Ref.                                     Requirement        Source                                       Specification Ref.




Version 1.1 Swimlane Outcomes Document                                                                                 Page 8 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


9. Solution Requirements
9.1 Technology Solution Details

Detail here the Technology that will be utilised to undertake the activities detailed within the process
detailed within this Outcomes document:
Activity       Technology Solution to be Utilised
Ref.


e.g.           SAP – ERP System
10010



9.2 System Structures/Organisational Requirements


List here any System Structures or Organisational Structure requirements for the relevant solution/system that
will or may be required to support the overall newly designed Business Process.

Activity       Organisation Structure Requirement                                System Org. Structure Ref.
Ref.


e.g.
10010



9.3 Configuration Requirements
List here any Configuration requirements for the relevant solution/system that will or may be required to
support the overall newly designed Business Process.

Activity       Configuration Requirement                                         Configuration Document Ref.
Ref.


e.g.           Customer Interaction Centre                                       SB-CST-P4-04-6000-10
10010




9.4 Transactional Authorities
List here any Transactional Authorities that will be required by the relevant solution/system, by each role to
undertake the relevant activities identified within the Swimlane process map. (Add additional rows where
required):



Generic Role Title              Transactions Required


e.g. Order Capture              e.g. SAP:      VA01 – Create Sales Order



Version 1.1 Swimlane Outcomes Document                                                                                 Page 9 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


9.5 Hardware Requirements
List here any Hardware requirements that will or may be required to support the overall newly designed
Business Process.

Activity       Hardware Requirement              Potential/Firm           Reason for Requirement (Core, support)
Ref.




9.6 Functional Design Gaps


List here, where relevant, any potential design gaps between the Physical design and the functionality
planned.

Activity       Development Requirement                                      Development Specification Document
Ref.                                                                        Ref.




9.7 Development Requirements
List here, where relevant, any potential development requirements that will be or may be required to support
this newly designed Business Process.



Activity       Development Requirement                                      Development Specification Document
Ref.                                                                        Ref.




9.8 Interface Requirements
List here, where relevant, any potential Interface requirements that will be or may be required to support this
newly designed Business Process.



Activity       Interface Requirement                                        Interface Specification Document Ref.
Ref.




Version 1.1 Swimlane Outcomes Document                                                                                Page 10 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


9.9 Enhancement Requirements
List here, where relevant, any potential development requirements that will be or may be required to support
this newly designed Business Process.



Activity       Enhancement Requirement                                      Enhancement Specification Document
Ref.                                                                        Ref.




9.10 Workflow Requirements


List here, where relevant, any Workflow requirements that will be or may be required to support this newly
designed Business Process.



Activity       Workflow Requirement                                         Workflow Specification Document Ref.
Ref.




9.11 Portal Requirements
List here, where relevant, any Portal requirements that will be or may be required to support this newly
designed Business Process.



Activity       Portal Requirement                                           Portal Specification Document Ref.
Ref.




Version 1.1 Swimlane Outcomes Document                                                                                Page 11 of 13
Issued: September 13th 2006                                              Business Transformation / Centre of Excellence / Methodology
                                          Service Birmingham / Business Transformation / Centre of Excellence / Methodology


9.12 Technical Service Level Requirements
Describe here, where relevant, any Technical Service Level requirements that will be or may be required to
support the newly designed Business Process.



Activity Ref.             Service Level           Covering which           Reason for Requirement
                          Requirement             Solution




9.13 Potential Future Improvements
Describe here, where relevant, any potential future improvements that may be currently considered out of
scope, but should be considered for the future.



Activity Ref.             Potential Future Improvement                    Impact of Potential Future Improvement




10. Car Park/Captured Issues/Comments
Detail here, where relevant:


               Any Car Park issues identified that could not be discussed within the Workshop session, but need
                to be addressed


               Captured Issues that were discussed and any outcomes from these discussions.


               Additional comments or concerns expressed about the completed Logical Design, the Workshop
                itself.




Version 1.1 Swimlane Outcomes Document                                                                                 Page 12 of 13
Issued: September 13th 2006                                               Business Transformation / Centre of Excellence / Methodology
                                         Service Birmingham / Business Transformation / Centre of Excellence / Methodology


11. How Will It Work – Day in the Life Of…
Detail here, in plain English, a brief scenario detailing in Business language how the process detailed within
this Outcomes document will operate once it is implemented.


            Provide a Business ‘Story’ of how this process will operate, (No more than half a page). This will
             help to explain this process to other people that have not been involved within the design
             sessions.