software project mgmt tool
Shared by: SathyaNarayana8
-
Stats
- views:
- 35
- posted:
- 6/19/2012
- language:
- English
- pages:
- 9
Document Sample


A
PROJECT REPORT
ON
SOFTWARE PROJECT MANAGEMENT TOOL
Submitted in partial fulfillment of the requirement for the award of
BACHELOR OF TECHNOLOGY
IN
INFORMATION TECHNOLOGY
2010-2011
Submitted
By
A.SAI CHARAN 08M11A1205
Under the Guidance of,
Mr. J.VENKATESH ,M.Tech
DEPARTMENT OF INFORMATION TECHNOLOGY
BANDARI SRINIVAS INSTITUTE OF TECHNOLOGY
(Approved by AICTE, Recognized by Govt. of A.P. and affiliated to J.N.T.U., Hyd.)
GOLLAPALLY(V), CHEVELLA(M), R.R.DIST
i
BANDARI SRINIVAS INSTITUTE OF TECHNOLOGY
(Approved by AICTE, Recognized by Govt. of A.P. and affiliated to J.N.T.U., Hyd.)
GOLLAPALLY (V), CHEVELLA (M), R.R.DIST
CERTIFICATE
This is to certify that the dissertation entitled “SOFTWARE PROJECT MANAGEMENT
TOOL”. being submitted by Mr. A.Sai Charan bearing hall ticket No: 08M11A1205 in
partial fulfillment of the requirement for the Award of the Degree of Bachelor of Technology
in INFORMATION TECHNOLOGY, Jawaharlal Nehru Technological University,
Hyderabad, is a record of the bonafide work carried out by him under our guidance and
supervision during the period 2010-2011.
The results presented in this thesis have been verified and are found to be satisfactory. The
result embodied in this project has not been submitted to any other university or institute for
the award of any degree or diploma.
Internal Guide Head of the Department
Mr.J.Venkatesh Mr.M.Narendhar
Assistant Professor Assistant Professor
Department of IT Department of IT
EXTERNAL EXAMINAR
ii
DECLARATION
I A. Sai Charan bearing Roll No: 08M11A1205, a bonafide student of Bandari Srinivas
Institute Technology, would like to declare that the project titled “SOFTWARE
PROJECT MANAGEMENT TOOL”. A partial fulfillment of BACHELOR OF
TECHNOLOGY Degree course of Jawaharlal Nehru Technological University is my
original work in the year 2011 under the guidance of Mr. J.Venkatesh, Associate Professor
of the Department of Information Technology & Engineering.
DATE: NAME: ROLL.NO:
PLACE: A.SAI CHARAN 08M11A1205
iii
ACKNOWLEDGEMENT
This work has been during project period, this present project work method of education is
really a good opportunity to put theoretical knowledge into a planned exercise with an aim to
solve a real life business problem and also develop confidence to face various situations.
I Thanks to Dr.A.Naidu Principal of Bandari Srinivas Institute of
Technology for providing congenial atmosphere and encouragement.
I express my sincere thanks to Head of the Department Mr.M.Narendhar Associate
Professor for giving me moral support and his kind attention and valuable guidance to me
throughout this course.
I would like to express my deep and foremost gratitude to my internal guide Mr.J.Venkatesh
Associate Professor. He has always been a source of inspiration and motivation for me.
iv
ABSTRACT
The project entitled “Software Project Management Tool” deals with the various levels of
project development and will account for time used in analysis, design, Programming, testing
and verification etc.
It is well known fact that software companies undertake huge projects more than one
at a time. Hence there is a profound need for the organizations to manage all the projects
efficiently and ensure that projects cycle goes on smoothly and they are completed on time.
During the lifetime of a project, the organization has to commemorate all the activities
of the project. This tool makes it easier for the organization to monitor the project. It
maintains records and tracks various parameters that influence software project development
process and helps the management to take decisions at various stages of the project
development.
The product will assist the organization in maintaining record of every project it
undertakes. All the information relevant to the projects like size, time, effort and departments
involved, etc is maintained by this tool.
v
LIST OF CONTENTS
S.No Title Page.No
1. INTRODUCTION 1
1.1 DEFINITION 1
1.2 DESCRIPTION 1
1.3 OBJECTIVES 2
1.4 OVERVIEW 2
1.5 PROBLEMS IN EXISTING SYSTEM 3
1.6 SOLUTION OF THESE PROBLEMS 5
2. SYSTEM ANALYSIS 6
2.1 REQUIREMENT ANALYSIS 6
2.2 SOFTWARE REQUIREMENT SPECIFICATIONS 6
2.3 PROPOSED SYSTEM 7
2.4 ROLES 8
2.5 OPERATIONAL FEASIBILITY 9
3. HARDWARE AND SOFTWARE SPECIFICATIONS 10
4. LITERATURE SURVEY 11
4.1 INTRODUCTION TO .NET FRAME WORK 11
4.2 ASP.NET 18
4.3 C#.NET 24
4.4 SQL SERVER 28
5. SYSTEM DESIGN 32
5.1 INTRODUCTION 32
5.2 DATA FLOW DIAGRAMS 33
5.3 E-R DIAGRAM 42
5.4 UML DIAGRAMS 43
vi
6. SYSTEM ENVIRONMENT 47
7. IMPLEMENTATION 58
7.1 SOURCE CODE 58
7.1.1 Home page 58
7.1.2 HR Login 60
8. SYSTEM TESTING 62
8.1 TESTING STRATEGY 62
8.2 SYSTEM TESTING 65
8.3 DISCUSSION AND RESULTS 66
9. CONCLUSION 78
9.1 SUGGESTION FOR FURTHER DEVELOPMENT 78
10. REFERENCES 79
vii
LIST OF FIGURES
Fig. No Name of the Figure Page No’s
4.1.1 Architecture of CLI Diagram 13
4.1.2 Versions of .net Diagram 17
5.2.1 SPMT DFD Diagram 35
5.2.2 Client DFD Diagram 36
5.2.3 BDO DFD Diagram 37
5.2.4 PM LEVEL1 Client Diagram 38
5.2.5 PM LEVEL 2Client Diagram 39
5.2.6 HR DFD Diagram 40
5.2.7 Developer DFD Diagram 41
5.3.1 E-R Diagram 42
5.4.1 Class Diagram 43
5.4.2 Usecase Diagram 44
5.4.3 Client Sequence Diagram 45
viii
LIST OF ABBREVIATIONS
S.NO SYMBOL DESCRIPTION
1 SPMT Software Project Management Tool
2 BDO Business Development Officer
3 HR Human Resource
4 PM Project Manager
5 DFD Data Flow Diagram
6 ER Entity Relationship
7 HTML Hyper Text Markup Language
8 XML Extensible Markup Language
9 GUI Graphical User Interface
10 JIT Just In Time
11 IIS Internet Information Services
12 SQL Structured Query Language
13 DBMS Database Management System
14 OLTP Online Transaction Processing
15 DSS Decision Support System
16 ADO ActiveX Data Objects
17 ASP Active Server Pages
18 CLI Common Language Infrastructure
ix