                                                Procurement Plan for first 18 months of the project
                                                        Rural Roads Project 2 (PMGSY)

      This is an indicative plan prepared by the Project for the initial period of 18 months. The Project shall update the Procurement Plan annually or as needed
      through out the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional
      capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. This plan has been reviewed during
      negotiations


I.     General

1.     Bank’s approval Date of the procurement Plan November 24, 2010
2.     Date of General Procurement Notice issued for Consultancies only: September 14, 2010. Updated GPN for the complete project is to be
       issued.
3.     Period covered by this procurement plan: First 18 months of the project.

II.   Goods and Works

1.     Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in
       Appendix 1 to the Guidelines for Procurement.

                 Expenditure Category              Procurement Method    Prior Review Threshold                                Comments
                                                                                     US$
                                                           GOODS, EQUIPMENT & MACHINERY
        1.    Goods and Equipment                           ICB         All contracts                          World Bank SBD will be used and the
              estimated to cost equivalent of                                                                  procurement will be as per procedures
              US$ 300,000 or more per                                                                          described in World Bank Guidelines
              contract

        2.    Goods and Equipment                          NCB                 First contract for goods for    The NCB bidding document agreed with
              estimated to cost less than                                      each state , irrespective of    GOI will be used and the procurement will
              US$ 300,000 and greater than                                     value and all contracts         be as per procedures described in the
              US$ 50,000 equivalent per                                        estimated to cost more than     Procurement and Contract Management
     contract                                                    US$ 200,000 equivalent per     Manual.
                                                                 contract

3.   Goods and Equipment           Shopping procedure with at    All post review
     estimated to cost less than   least three quotations from
     US$ 50,000 equivalent per     qualified bidders in
     contract                      accordance with the
                                   provisions of paragraph 3.5
                                   of procurement Guidelines.

                                   Procurement through
                                   DGS&D rate contracts will
                                   be considered equivalent to
                                   shopping procedure.

4.   Goods and Equipment that      Direct Contracting            All prior review
     meet the requirements of
     paragraph 3.6 and 3.7 of
     Procurement Guidelines.

     ct

                                                           CIVIL WORKS
5.   Civil works contracts                    ICB *            All contracts                    World Bank SBD will be used and the
.    estimated to cost more than                                                                procurement will be as per procedures
     US$ 10,000,000 equivalent                                                                  described in World Bank Guidelines.
     per contract
     Civil works contracts                    NCB                First contract for works for   The procurement will be done as per
6.   estimated to cost up to US$                                 each state, irrespective of    procedures described in the Procurement
     10,000,000 equivalent per                                   value and all contracts        cum Contract Management Manual and
     contract                                                    estimated to cost more than    using the « Model Bidding Document »
                                                                 US$ 5,000,000 equivalent       cleared by the Bank
                                                                 per contract will be subject
                                                                 to prior review by the Bank.
                                                                 All other works contracts
                                                                            will be subject to post
                                                                            review.

            * As per current planning, no ICB contracts are envisaged for civil works.

2.       Pre-qualification. Not Applicable

3.       Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable

4.       Reference to (if any) Project Operational/Procurement Manual: A Procurement cum contract Management Manual is under preparation
         by NRRDA. The manual will be reviewed with the Bank and after clearance of the Manual by the Bank all procurement in the project will
         be done as per procedures described in it. .

5.       Any Other Special Procurement Arrangements:

     The following provisions constitute additional provisions applicable for purposes of National Competitive Bidding (NCB). NCB will be
     conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions:

            Only the model bidding documents for procurement of works through NCB agreed with the Bank (and as amended for time to time),
             shall be used for bidding;
            Invitations to bid shall be advertised in at least one widely circulated national daily newspaper, at least 30 days prior to the deadline for
             the submission of bids;
            No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign
             bidders, state-owned enterprises, small scale enterprises or enterprises from any given State;
            Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated
             bidder;
            Extension of bid validity shall not be allowed for prior review packages, without the prior concurrence of the World Bank (i) for the first
             request for extension if it is longer than four weeks; and (ii) for prior approved packages, all subsequent requests for extension
             irrespective of the period (such concurrence will be considered by the Bank only in cases of Force Majeure and circumstances beyond
             the control of the Purchaser/Employer);
            Re-bidding shall not be carried out without the prior concurrence of the Bank. The system of rejecting bids outside a pre-determined
             margin or "bracket" of prices shall not be used in the project;
       Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures.
                Such contracts will be acceptable however for any procurement under the Shopping procedures;
              Two or three envelop system will not be used. However, as an exception in this project, two part bidding for NCB works (as described in
                the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards(e-procurement system and
                complaint handling mechanism acceptable to the Bank)
              All procurement of works through NCB in the seven participating states will be done through a standardized e-procurement system
                acceptable to the Bank.
               As per paragraph 1.14(e) of the World Bank's Procurement Guidelines, the Association's right to inspect the accounts and records of
                bidders, suppliers and contractors will be included in the bidding documents.

III.     Selection of Consultants

1.      Selection Methods and Prior Review Threshold: Selection decisions shall be subject to Prior Review by Bank as stated in Appendix 1 to
        the Guidelines Selection and Employment of Consultants:



               Expenditure                        x                                Selection Method                    Prior Review Threshold
               Category              Value threshold per contract

               Consultancy                                             -Quality and Cost Based (QCBS) method        All prior review.
               contracts to be       Each contract estimated to cost   -REOI to be published in UNDB on line
               awarded to            US$ 200,000 equivalent or
               Consultant firms      more per contract
               including                                               -Quality and Cost Based (QCBS) method        All single source selection of
               selection of          Each contract estimated to cost   -Quality Based (QBS) method of selection     consultants with estimated cost
               training institutes   less than US$ 200,000             in accordance with the provisions of         of more than US$ 30,000
               by                    equivalent per contract           paragraph 3.1 to 3.4 of Consultant’s         equivalent per contract will be
               NRRDA/SRRDAs                                            Guidelines.                                  subject to prior review. All
                                                                       -Consultant’s Qualifications (CQS) method.   other contracts will be subject to
                                                                       -Least Cost Method (LCS).                    post review but with TORs
                                                                       -Fixed BudgetMethod.                         subject to prior review by the
                                                                       -Single Source Selection                     Bank
                              Individual Consultant             -Through comparison of qualifications of at   All cases subject to post review
                              estimated to cost less than US$   least three candidates.                       but with TORs subject to prior
                              30,000 or equivalent per                                                        review by the Bank.
                              contract                                                                        All contracts for single source
                                                                -Sole Source Selection                        d\selection of individual
                                                                                                              consultant will be subject to
                                                                                                              prior review.


2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent
   per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
  Any Other Special Selection Arrangements: NIL
                                               Rural Roads Project II (P124639)
                                            Procurement Packages with Methods and Time Schedule


                       Procurement Plan with Methods & Time Schedule for 18 Months period- for CIVIL WORKS

                                                                                              Review by
            Reference                                               Estimated
                                                        Length                  Procurement     Bank      Expected bid
 Sl. no     Package        Contract (Description)                   Cost (Rs.                                            Comments
                                                         (Km)                     Method       (Prior /   opening date
               No.                                                  In Lakh)
                                                                                               Post) *
* First contract of each State will be subject to prior review by the Bank
NRRDA - Civil Works
           PCU Office Work
               None
1. HIMACHAL PRADESH - CIVIL WORKS
                                                                                                          15th May to
    1       HP-08-237     Maloh to Saryun road.           3.00         97.00       NCB            Post    31st May
                                                                                                          2011
                                                                                                          15th May to
                          C/o Sainj Ropa road i/c 1
    2       HP-08-244                                     4.00        240.00       NCB            Post    31st May
                          No. 30 mtr span bridge.
                                                                                                          2011
                                                                                                          15th May to
    3       HP-08-245     C/o Kandha Badhin road.         3.95        162.61       NCB            Post    31st May
                                                                                                          2011
                                                                                                          15th May to
    4       HP-08-117     Bahi to Mana (Shana)            9.00        164.75       NCB            Post    31st May
                                                                                                          2011
                                                                                                          15th May to
    5       HP-08-167     Bandli to Kamaru.               5.00        150.24       NCB            Post    31st May
                                                                                                          2011
                                                                            15th May to
6    HP-08-169   Jhungi to Matyog.            7.00    245.41   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
7    HP-08-181   Nainj Bhamrala.              8.00    201.48   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
8    HP-08-180   Teban to Joi.                3.30    105.15   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
9    HP-08-182   DPF Richhni Kumehri.         12.00   163.31   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
10   HP-08-179   Rakni to DPF Restadhar.      3.30    123.73   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
11   HP-08-184   Baryogi to Lassi.            4.15    93.39    NCB   Post   31st May
                                                                            2011
                                                                            15th May to
12   HP-08-246   Bhajoni to Chawag.           4.00    120.00   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
                 Link road to village
13   HP-06-111                                3.75    166.76   NCB   Post   31st May
                 solang
                                                                            2011
                                                                            15th May to
                 Link road to village Dhara
14   HP-06-104                                6.40    239.85   NCB   Post   31st May
                 to runga
                                                                            2011
                                                                            15th May to
15   HP-04-01    Sirmani to Mandhu            2.59    144.84   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
16   HP-04-02    Rulohar to lameread          3.88    367.15   NCB   Post
                                                                            31st May
                                                                           2011
                                                                           15th May to
17   HP-04-03    Simbal to mehla Road        1.66    132.13   NCB   Post   31st May
                                                                           2011
                                                                           15th May to
                 Link road to village
18   HP-04-04                                1.00    82.14    NCB   Post   31st May
                 khajoern
                                                                           2011
                                                                           15th May to
19   HP-08-238   Katola to kundi kha rd      6.75    405.75   NCB   Post   31st May
                                                                           2011
                                                                           15th May to
20   HP-08-239   Masar to balaul road        4.50    292.97   NCB   Post   31st May
                                                                           2011
                                                                           15th May to
21   HP-08-240   Ralla to Shery road         2.50    173.74   NCB   Post   31st May
                                                                           2011
                                                                           15th May to
22   HP-08-241   Nagrota to Holu road        1.96    110.12   NCB   Post   31st May
                                                                           2011
                                                                           15th May to
                 Majharnoo to siguri arthi
23   HP-08-242                               5.78    154.06   NCB   Post   31st May
                 road
                                                                           2011
                                                                           15th May to
24   HP-08-243   Bharour to hanogi road      15.00   400.00   NCB   Post   31st May
                                                                           2011
                                                                           15th May to
25   HP-09-241   Pajhor to kharal road       7.50    322.00   NCB   Post   31st May
                                                                           2011
                                                                           15th May to
26   HP-09-244   Mural sujala Road           7.00    188.49   NCB   Post   31st May
                                                                           2011
                                                                            15th May to
27   HP-09-245   Pujarali Thanari road         3.00   150.00   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
                 Link road to village
28   HP-09-246                                 4.80   297.00   NCB   Post   31st May
                 dhansal
                                                                            2011
                                                                            15th May to
                 C/o of chorni ser to chauri
29   HP-09-247                                 3.90   320.00   NCB   Post   31st May
                 road
                                                                            2011
                                                                            15th May to
                 c/o of pandaranoo sainj
30   HP-09-248                                 9.40   250.00   NCB   Post   31st May
                 road
                                                                            2011
                                                                            15th May to
31   HP-09-249   C/o Dhadi link road           1.73   32.00    NCB   Post   31st May
                                                                            2011
                                                                            15th May to
                 Mandal jakher pujarali
32   HP-09-250                                 2.00   132.00   NCB   Post   31st May
                 road
                                                                            2011
                                                                            15th May to
                 Changer Ghumaran to
33   HP-11-194                                 4.30   260.00   NCB   Post   31st May
                 Nisaal road
                                                                            2011
                                                                            15th May to
34   HP-11-195   Link road to hatra            2.60   94.00    NCB   Post   31st May
                                                                            2011
                                                                            15th May to
                 Cheod Khad to samlech
35   HP-11-196                                 1.41   59.40    NCB   Post   31st May
                 road
                                                                            2011
                                                                            15th May to
36   HP-11-197   Kiarag to seili road          7.00   268.27   NCB   Post   31st May
                                                                            2011
                                                                            15th May to
37   HP-12-93    Link to village saloori       3.12   292.59   NCB   Post
                                                                            31st May
                                                                                 2011
                                                                                 15th May to
                 Link to village bater
38   HP-12-94                                      2.86    348.39   NCB   Post   31st May
                 parali
                                                                                 2011
                                                                                 15th May to
39   HP-01-112   Ghajal to Dabar road              11.00   511.43   NCB   Post   31st May
                                                                                 2011
                 1. Thalla to Serkaw                                             15th May to
40               (Portion Mando to                                  NCB   Post   31st May
     HP-02-37    Serkaw).                          5.500   110.00                2011
                                                                                 15th May to
41               1. Link road Banoon to                             NCB   Post   31st May
     HP-02-04    Awan.                             3.000   60.00                 2011
                 1. Link road to                                                 15th May to
42               Rajindoo.(Sahu to                                  NCB   Post   31st May
     HP-02-08    Rajindoo).                        3.000   60.00                 2011
                                                                                 15th May to
43               1. Link road from Rori to                          NCB   Post   31st May
     HP-02-34    Gaila Gatyanu.                    5.000   100.00                2011
                                                                                 15th May to
44                                                                  NCB   Post   31st May
     HP-02-20    1. Link road to village Simni.    2.570   51.40                 2011
                                                                                 15th May to
45                                                                  NCB   Post   31st May
     HP-02-21    3. Link road to village Manjir.   0.825   16.50                 2011
                 2. Link road to village
                                                                                 15th May to
46               Chhapa (upto village Dob-                          NCB   Post   31st May
     HP-02-21    Darkund).                         1.750   35.00                 2011
                 1. Link road to village
                                                                                 15th May to
47               Chhappa (Dob-Darkund to                            NCB   Post   31st May
     HP-02-26    Nera).                            2.250   45.00                 2011
                                                                                15th May to
48              1. Link road Nehra to Marour                       NCB   Post   31st May
     HP-02-15   (Gehra to Marour).               3.500    70.00                 2011
                                                                                15th May to
49                                                                 NCB   Post   31st May
     HP-02-35   1. Rajera to Dhullara road.      2.500    50.00                 2011
                                                                                15th May to
50              1. Link road from Daruhi to                        NCB   Post   31st May
     HP-03-08   village Khaggal.                 6.500    130.00                2011
                                                                                15th May to
51                                                                 NCB   Post   31st May
     HP-05-07   1.Lippa Asrang road.             10.100   202.00                2011
                                                                                15th May to
52              1.Road from Leo bridge to                          NCB   Post   31st May
     HP-05-08   Hango.                           16.000   320.00                2011
                                                                                15th May to
53              1.Karchham Shong road to                           NCB   Post   31st May
     HP-05-11   Boning Saring.                   7.920    158.40                2011
                                                                                15th May to
54   HP-06-     1.Manseri to Soil road (                           NCB   Post   31st May
     31/26      Sarsai to Dashal Soil).          2.300    46.00                 2011
                                                                                15th May to
55              1.Link road to village Bharari                     NCB   Post   31st May
     HP-06-05   Bagan upto Peej.                 8.000    160.00                2011
                                                                                15th May to
56   HP-06-     1.Pah Nallah (Dohra Nallah                         NCB   Post   31st May
     16/10      Kaisdhar Khadiyar road).         8.600    172.00                2011
                                                                                15th May to
57              1.Link road to Bhallan-II                          NCB   Post   31st May
     HP-06-18   (Gadsa to Bhallan-II road).      10.500   210.00                2011
     HP-06-     1.Bakhali Barghtohli to                                         15th May to
58                                                                 NCB   Post
     33/23      Bastori road.                    6.075    121.50                31st May
                                                                            2011

                                                                            15th May to
59              1.Road from Damothi to                         NCB   Post   31st May
     HP-06-20   Dharthi Dhar.                14.500   290.00                2011
                                                                            15th May to
60              1.Road from Salwar to                          NCB   Post   31st May
     HP-06-21   Kanon road upto Tandi.       6.000    120.00                2011
                                                                            15th May to
61                                                             NCB   Post   31st May
     HP-06-09   1.Rana Bagh to Karsai Gad.   14.500   290.00                2011
                                                                            15th May to
62              1.Nainawati Langoti to                         NCB   Post   31st May
     HP-06-13   Karad road.                  11.795   235.90                2011
                                                                            15th May to
63              1.Link road Soi Dhar to                        NCB   Post   31st May
     HP-06-27   Beungal.                     8.500    170.00                2011
                                                                            15th May to
64                                                             NCB   Post   31st May
     HP-06-12   1.Bagipul Jaon Chail road.   12.000   240.00                2011
                1.Brow Randal Panasha                                       15th May to
                Poshna Rali via Parantla                                    31st May
65              Randal (Bari) (Brow to
                                                               NCB   Post
     HP-06-14   Poshna)                      13.180   263.60
                                                                            2011
                                                                            15th May to
66              1.Link road from Devdhank                      NCB   Post   31st May
     HP-06-15   to Ghatoo.                   10.600   212.00                2011
                                                                            15th May to
67                                                             NCB   Post   31st May
     HP-08-07   1.Bhiuli Chhipnu road.       4.000    80.00                 2011
                                                                            15th May to
68                                                             NCB   Post   31st May
                2.Bagla Barsu road.          5.000    100.00                2011
                                                                             15th May to
69                                                              NCB   Post   31st May
     HP-08-08   1.Ghata Sihan road.           1.900    38.00                 2011
                                                                             15th May to
70                                                              NCB   Post   31st May
     HP-08-09   1.Gagal Khandala road.        3.850    77.00                 2011
                                                                             15th May to
71                                                              NCB   Post   31st May
     HP-08-23   1.Chambi to Kangar road.      4.000    80.00                 2011
                                                                             15th May to
72                                                              NCB   Post   31st May
                2.Segali to Palotha road.     3.000    60.00                 2011
                                                                             15th May to
73                                                              NCB   Post   31st May
                3.Pungh to Thalla road.       2.500    50.00                 2011
                                                                             15th May to
74              1.Slapper to Jarol via                          NCB   Post   31st May
     HP-08-24   Kandar road.                  5.000    100.00                2011
                                                                             15th May to
75              1.Ghassi Nallah to Dehavi                       NCB   Post   31st May
     HP-08-26   road.                         2.000    40.00                 2011
                                                                             15th May to
76                                                              NCB   Post   31st May
                2.Dehavi to Gumahu road.      5.000    100.00                2011
                                                                             15th May to
77              1.Leda Gharwashan Tarwai                        NCB   Post   31st May
     HP-08-29   road.                         5.500    110.00                2011
                                                                             15th May to
78                                                              NCB   Post   31st May
     HP-08-61   1.Halyater to Gushali road.   8.000    160.00                2011
                                                                             15th May to
79                                                              NCB   Post
     HP-08-34   1.Gohar Kanda road.           16.000   320.00                31st May
                                                                               2011

                                                                               15th May to
80                                                                NCB   Post   31st May
     HP-08-35   1.Bagtha Gadhiman road.          6.000   120.00                2011
                                                                               15th May to
81                                                                NCB   Post   31st May
     HP-08-36   1.Link road to Shilhanu.         5.100   102.00                2011
                                                                               15th May to
82              2.Sainj Bara road ( Portion                       NCB   Post   31st May
     HP-08-36   Sainj to Gowar).                 5.000   100.00                2011
                                                                               15th May to
83              1.Kot to Kandi road ( Portion                     NCB   Post   31st May
     HP-08-42   Bagshiar to Mahunag).            8.000   160.00                2011
                                                                               15th May to
84              1.Tattapani Kamdheri                              NCB   Post   31st May
     HP-08-43   Lamshar road.                    6.660   133.20                2011
                1.Link road to village
                                                                               15th May to
85              Tungadhar Chail Janjehali                         NCB   Post   31st May
     HP-08-40   road.                            2.000   40.00                 2011
                                                                               15th May to
86              2.Link road to village Dhar                       NCB   Post   31st May
                from Chail Janjehali road.       2.000   40.00                 2011
                                                                               15th May to
87              1.Link road to village Harijan                    NCB   Post   31st May
     HP-08-01   Basti Sain.                      3.500   70.00                 2011
                1.Datoli Kalthar (Datoli
                                                                               15th May to
88              Khudla Serus Samlon via                           NCB   Post   31st May
     HP-08-49   Kalthar).                        5.500   110.00                2011
                2.Paonta Sulpur (Bag
                                                                               15th May to
89              Paonta Bahi via Kharsyal                          NCB   Post   31st May
                School).                         2.250   45.00                 2011
                                                                             15th May to
90               1.Dabrog Badar Ghadyani (                      NCB   Post   31st May
      HP-08-51   Badhani to Badar).           6.000    120.00                2011
                                                                             15th May to
91                                                              NCB   Post   31st May
                 2.Tihra to Kot road.         5.000    100.00                2011
                                                                             15th May to
92                                                              NCB   Post   31st May
      HP-08-56   1.Cholthara to Kothi road.   13.500   270.00                2011
                                                                             15th May to
93               1.Pandoh Shiva road                            NCB   Post   31st May
      HP-08-06   ( Phase-II ).                6.300    126.00                2011
                                                                             15th May to
94               1.Link road to village                         NCB   Post   31st May
      HP-08-10   Sagnehar.                    0.750    15.00                 2011
                                                                             15th May to
95               2.Sukabag Matroo Bhajrala                      NCB   Post   31st May
                 road via Stain.              1.750    35.00                 2011
                                                                             15th May to
96                                                              NCB   Post   31st May
                 3.Raja Bharola Nagan road.   1.000    20.00                 2011
                                                                             15th May to
97               1.Sandhu Lambidhar                             NCB   Post   31st May
      HP-09-03   Majgaon,Chalawag road.       5.700    114.00                2011
                                                                             15th May to
98                                                              NCB   Post   31st May
      HP-09-51   1.Koti to Piran road.        28.020   560.40                2011
                                                                             15th May to
99               1.Link road to village                         NCB   Post   31st May
      HP-09-17   Dharogra from DGBR road.     8.100    162.00                2011
                                                                             15th May to
100                                                             NCB   Post
      HP-09-21   1.Railla Khanog road.        3.000    60.00                 31st May
                                                                               2011

                                                                               15th May to
101                                                               NCB   Post   31st May
      HP-09-23   1.Ganvi Keo road.              2.500    50.00                 2011
                                                                               15th May to
102                                                               NCB   Post   31st May
      HP-09-40   1.Tutupani Kuthari road.       10.500   210.00                2011
                                                                               15th May to
103              1.Badiara Masli Kharot                           NCB   Post   31st May
      HP-09-27   Dhakgaon road.                 12.000   240.00                2011
                                                                               15th May to
104                                                               NCB   Post   31st May
      HP-09-37   1.Jatwari to Gawas road.       4.500    90.00                 2011
                                                                               15th May to
105   HP-09-                                                      NCB   Post   31st May
      29/22      1.Marathu Tharolla road.       16.000   320.00                2011
                                                                               15th May to
106                                                               NCB   Post   31st May
      HP-09-44   1.Sawara to Thana link road.   7.000    140.00                2011
                                                                               15th May to
107              1.Link road from Khajurna to                     NCB   Post   31st May
      HP-10-01   Malonwala.                     3.000    60.00                 2011
                 1.Link road from village
                                                                               15th May to
108              Shampur Bhood to Manpur                          NCB   Post   31st May
      HP-10-05   Deora.                         3.000    60.00                 2011
                                                                               15th May to
109              1.Km.2/500 to Ghutanpur                          NCB   Post   31st May
      HP-10-25   road.                          2.200    44.00                 2011
                                                                               15th May to
110              1.Digwa Chimnu Gunali                            NCB   Post   31st May
      HP-10-09   road.(Mila to Bindla Digwa)    8.000    160.00                2011
                                                                                15th May to
111              1.Link road to village Koti                       NCB   Post   31st May
      HP-10-10   Uttron ( TMB road to Uttron).   6.000    120.00                2011
                                                                                15th May to
112              2.Link road to village Rast                       NCB   Post   31st May
                 (Ronahat to Rast).              6.000    120.00                2011
                                                                                15th May to
113              1.Gangtoli to Pab Manal                           NCB   Post   31st May
      HP-10-21   road.                           2.600    52.00                 2011
                 1.Chowki Mirgwal Barwas
                                                                                15th May to
114              Kanti Maswa road (Link road                       NCB   Post   31st May
      HP-10-24   to village Chowki Mirgwal)      6.500    130.00                2011
                                                                                15th May to
115              1.Link road to village                            NCB   Post   31st May
      HP-10-12   Choakar.                        3.000    60.00                 2011
                 1.Jarwa Juneli Kinnu Kalan
                                                                                15th May to
116              road from Solan Meenus                            NCB   Post   31st May
      HP-10-14   road.                           3.000    60.00                 2011
                 2.Andheri Koti Dhimans road
                                                                                15th May to
117              from village Ranphua                              NCB   Post   31st May
                 Jabrog.                         5.000    100.00                2011
                                                                                15th May to
118                                                                NCB   Post   31st May
      HP-10-22   1.Kharkoli to Ganog road.       9.170    183.40                2011
                                                                                15th May to
119                                                                NCB   Post   31st May
      HP-11-05   1.Sitalpur to Nanowal road.     18.400   368.00                2011
                                                                                15th May to
120                                                                NCB   Post   31st May
      HP-11-10   1.Link road to village Gahi.    6.675    133.50                2011
                                                                                15th May to
121                                                                NCB   Post
      HP-11-19   1.Damsite to Bisha road.        8.000    160.00                31st May
                                                                              2011

                                                                              15th May to
122              1.Link road to village Wakna                    NCB   Post   31st May
      HP-11-20   ( Hatri to Wakna)              2.000   40.00                 2011
                                                                              15th May to
123              1.Link road from Repoh to                       NCB   Post   31st May
      HP-12-02   Kudet Jandoh Suri.             6.000   120.00                2011
                 1.Link road from Amrah
                                                                              15th May to
124              Nagar to Karluhi Kinnu via                      NCB   Post   31st May
      HP-12-03   Babehar.                       2.000   40.00                 2011
                                                                              15th May to
125              2.Link road to village                          NCB   Post   31st May
                 Athmah.                        2.800   56.00                 2011
                                                                              15th May to
126              1.Link road from Bharwain to                    NCB   Post   31st May
      HP-12-04   Duhal Bangwala.                3.000   60.00                 2011
                                                                              15th May to
127              2.Link road from Bhaira to                      NCB   Post   31st May
                 Hamboli.                       4.000   80.00                 2011
                                                                              15th May to
128              1.Link road to village                          NCB   Post   31st May
      HP-12-05   Kharoh.                        3.825   76.50                 2011
                                                                              15th May to
129              1.Link road to village                          NCB   Post   31st May
      HP-12-06   Ghangret.                      4.000   80.00                 2011
                 1.Link road to village
                                                                              15th May to
130              Kuneran.( N.M.T. road to                        NCB   Post   31st May
      HP-12-01   village Kuneran).              3.000   60.00                 2011
                 1.Link road to village
                                                                              15th May to
131              Marwari ( from Nangal Una                       NCB   Post   31st May
      HP-12-07   Mubarikpur Talwara road)       4.000   80.00                 2011
                                                                                15th May to
132              2.Link road to village Oel (                      NCB   Post   31st May
                 from Gagret Oel Ispur road).     2.840   56.80                 2011
                 1.Link road to village
                                                                                15th May to
133              Saghnai (from Gagret                              NCB   Post   31st May
      HP-12-08   Daulatpur road).                 6.570   131.40                2011
                                                                                15th May to
134              1.Link road to village Barrian                    NCB   Post   31st May
      HP-12-10   from Chowkiminar road.           2.840   56.80                 2011
                                                                                15th May to
135              1.Link road to village Makrer                     NCB   Post   31st May
      HP-12-11   from Una Pirnigah road.          6.000   120.00                2011
                                                                                15th May to
136              1.Link road to village                            NCB   Post   31st May
      HP-12-12   Badwar from T.M.B.D. road.       6.000   120.00                2011
                 1.Link road to village Basal
                                                                                15th May to
137              from Una Amb Mubarakpur                           NCB   Post   31st May
      HP-12-14   road.                            3.330   66.60                 2011
                                                                                15th May to
138              1.Link road to village                            NCB   Post   31st May
      HP-12-15   Lamlehara from Jankour.          4.285   85.70                 2011
                 1.Link road to village
                                                                                15th May to
139              Kungrat via                                       NCB   Post   31st May
      HP-12-19   Kalehra.(Kalehra to Kungrat)     1.795   35.90                 2011
                                                                                15th May to
140              1.Link road to village                            NCB   Post   31st May
      HP-12-20   Dharampur from Jaijon road.      2.225   44.50                 2011
                 2.Link road to village
                                                                                15th May to
141              Padouri (Bhadouri) road                           NCB   Post   31st May
                 from Jaijon road).               1.600   32.00                 2011
                 1.Link road to village Nagroli                                 15th May to
142                                                                NCB   Post
      HP-12-21   from Gagret road.                5.510   110.20                31st May
                                                                                    2011

                                                                                    15th May to
  143              1.Link road to village                              NCB   Post   31st May
        HP-12-22   Pandoga from Gagret road.       3.470     69.40                  2011
                   2.Link road to village Kangar
                                                                                    15th May to
  144              from Saloh Bhadauri road                            NCB   Post   31st May
                   (Una Jaijon road to Kangar).    2.000     40.00                  2011
                                                                                    15th May to
  145              1.Link road to village                              NCB   Post   31st May
        HP-12-23   Badehra from Jaijon road.       5.500     110.00                 2011
                                                                                    15th May to
  146              1.Link road to village                              NCB   Post   31st May
        HP-12-12   Badwar from T.M.B.D. road.      6.000     120.00                 2011
        Total                                      822.55   20637.75
2. PUNJAB
                   Construction and                                                 04th February
                   Maintenance of village                                           to 15th
   1    PB-0138                                     7.86     370.02    NCB   Post
                   road from Manj to                                                February
                   Bachiwind                                                        2011
                   Construction and                                                 04th February
                   Maintenance of village                                           to 15th
   2    PB-0139    road from Amritsar              16.98     951.79    NCB   Post   February
                   Wagha to Amritsar                                                2011
                   Chabal Road
                   Construction and                                                 04th February
                   Maintenance of village                                           to 15th
   3    PB-0140                                    19.92     945.72    NCB   Post
                   road from Amritsar                                               February
                   Ajnala road to Chetanpura                                        2011
               Construction and                                           04th February
               maintenance of village                                     to 15th
4    PB-0141                               13.55   650.97    NCB   Post
               road from Gaggomahal,                                      February
               Chamiari to Khatrai Kalan                                  2011
               Construction and                                           04th February
     PB-0142   maintenance of village                                     to 15th
5                                          12.16   583.14    NCB   Post
     MB        road from Burj to Lahori                                   February
               Mal Bhakna Road                                            2011
               Construction and                                           04th February
               maintenance of village                                     to 15th
     PB-0144
6              road from Bandala to G.T.    24     1033.25   NCB   Post   February
     MB
               Road                                                       2011
               (NH-I)
               Construction and                                           04th February
     PB-0145   Maintenance of village                                     to 15th
7                                          9.72    464.03    NCB   Post
     MB        road from APK road to                                      February
               Jandiala                                                   2011
               Construction and                                           04th February
     PB-0146   Maintenance of Village                                     to 15th
8                                          15.72   726.69    NCB   Post
     MB        road from Amritsar                                         February
               Ajnala road to APK road                                    2011
               Construction and                                           04th February
               maintenance of village                                     to 15th
9    PB-0147   road from G.T. NH-I         15.75   671.09    NCB   Post   February
               (Khilchian) to Amritsar                                    2011
               Mehta Road
               Construction and
                                                                          04 th
               maintenance of village
                                                                          February to
               road from Kathu Nangal
10   PB-0151                                6.3    268.23    NCB   Post   15 th
               to Bebbowall road
                                                                          February
               (Section Fattu Bhilla to
                                                                          2011
               Babbowal)
                                                                        04 th
                                                                        February to
     PB-0143
11             Jandiala Verowal to Bath   10.32   410.11   NCB   Post   15 th
     MB
                                                                        February
                                                                        2011
                                                                        04 th
                                                                        February to
               Khadoor Sahib to
12   PB-0149                               8.6    392.92   NCB   Post   15 th
               Verowal Road
                                                                        February
                                                                        2011
                                                                        04 th
               Valtoha to Wan Tara                                      February to
13   PB-0150   Singh (Section Rajoke to   12.75   627.47   NCB   Post   15 th
               Wan Tara Singh)                                          February
                                                                        2011
                                                                        04 th
                                                                        February to
               Mallanwala to Fatehgarh
14   PB-0533                              11.42   576.8    NCB   Post   15 th
               Sabhraon
                                                                        February
                                                                        2011
                                                                        04 th
                                                                        February to
15   PB-0534   Ferozepur to Maboke        15.69   783.59   NCB   Post   15 th
                                                                        February
                                                                        2011
                                                                        04 th
                                                                        February to
16   PB-0535   Mamdot to Maboke           10.7    537.74   NCB   Post   15 th
                                                                        February
                                                                        2011
               Chak Moban Hardo                                         04 th
17   PB-0536                              20.9    911.26   NCB   Post
               Dhandi to Tahliwala                                      February to
                                                                        15 th
                                                                        February
                                                                        2011
                                                                        04 th
               Guruharsahai to MKT-                                     February to
18   PB-0537   Jallalabad road via Boor   22.5    1142.1   NCB   Post   15 th
               Wala Kuti road                                           February
                                                                        2011
                                                                        04 th
               NH-15 (Km 168.50) to
                                                                        February to
     PB-0538   Fatehgarh Sabraon via
19                                        7.91    378.53   NCB   Post   15 th
     MB        Nizimudin, Wattu Bhatti
                                                                        February
               Gatta Badshah)
                                                                        2011
                                                                        04 th
               NH-10 (Km 391.25
                                                                        February to
     PB-0539   Ghallu) to Ghallu,
20                                        13.13   632.31   NCB   Post   15 th
     MB        Khippan wali, Azamwala,
                                                                        February
               Kheo wali Dhab
                                                                        2011
                                                                        04 th
               NH-10 (Km 393.00) to                                     February to
     PB-0540
21             Kathera, Kamal Wala,        15     722.51   NCB   Post   15 th
     MB
               Islamwala                                                February
                                                                        2011
               NH-15 (KM 170.60) to                                     04 th
               Sadar wala, Ghuddu wala,                                 February to
     PB-0541
22             Behak Fattu, Islambad,     13.58   680.42   NCB   Post   15 th
     MB
               Lohke Kalan, Thatha                                      February
               Kishan Singh                                             2011
                                                                        04 th
               Mamdot to SH-20                                          February to
23   PB-0542                              20.13   967.39   NCB   Post
               Ferozepur Fazilka raod                                   15 th
                                                                        February
                                                                         2011

                                                                         04 th
               Ferozepur City to
                                                                         February to
               Pharymal Bhalla to ODR-
24   PB-0543                              24.7    1192.85   NCB   Post   15 th
               20 Ferozepur Mallanwala
                                                                         February
               road
                                                                         2011
               Gharota to Dinanagar
               Gurdaspur Trimmu road                                     04 th
               Section Chounta to                                        February to
25   PB-0637   Dinanagar (via Jharoli     14.03   560.89    NCB   Post   15 th
               Pachowal, Sadana,                                         February
               Bhagwanpur) Km 5.39 to                                    2011
               19.42 = 14.03 Km
                                                                         04 th
               Dhobra Taragarh to
                                                                         February to
               Kathlour Kohlian
26   PB-0638                              19.41   956.47    NCB   Post   15 th
               Fatehpur Kharkhra Road
                                                                         February
               (Km 17.77 to 37.18 )
                                                                         2011
                                                                         04 th
               ASR-Mehta-Shri
                                                                         February to
               Hargobindpur road to
27   PB-0639                              10.35   454.13    NCB   Post   15 th
               Batala Shri Hargobindpur
                                                                         February
               road
                                                                         2011
                                                                         04 th
                                                                         February to
28   PB-0640   Qadian to Udhanwal road     11     357.07    NCB   Post   15 th
                                                                         February
                                                                         2011
               Udhanwal to Darawali via                                  04 th
29   PB-0641   Ghuman (Section            12.65   502.41    NCB   Post   February to
               Udhanwal to Ghoman                                        15 th
                                                                        February
                                                                        2011
                                                                        04 th
                                                                        February to
     PB-0642   Aliwal to Ramdass
30                                       3.67    190.58    NCB   Post   15 th
     MB        (Km 17.00 to 20.67)
                                                                        February
                                                                        2011
                                                                        04 th
               FGC-DBN road Dehra                                       February to
     PB-0643
31             Gawar Shikar Machhian      8.7    414.15    NCB   Post   15 th
     MB
               (Km 5.90 to 14.60)                                       February
                                                                        2011
                                                                        04 th
                                                                        February to
     PB-0644
32             Dhianpur to APK road      25.75   1188.66   NCB   Post   15 th
     MB
                                                                        February
                                                                        2011
                                                                        04 th
                                                                        February to
     PB-0645   PTK-Shahpur Kandi Road
33                                       6.24     372.8    NCB   Post   15 th
     MB        to Tharra Jhikla Sukret
                                                                        February
                                                                        2011
                                                                        04 th
                                                                        February to
     PB-0646
34             Dunera to Phangota        5.85    309.09    NCB   Post   15 th
     MB
                                                                        February
                                                                        2011
                                                                        04 th
                                                                        February to
     PB-0647   Dhakki to Dhira Dina
35                                       15.33    751.1    NCB   Post   15 th
     MB        Nagar
                                                                        February
                                                                        2011
                                                                                           04 th
                      Badani-Madhopur to                                                   February to
         PB-0648
   36                 Mamoon Madhopur              17.1     857.56     NCB      Post       15 th
         MB
                      NH-1                                                                 February
                                                                                           2011
                      Total                       499.37   23535.84
3. Jharkhand
          JH-01-HS-                                                                    15th to 28th
    1                 Machatanr To Nayanband      4.625    114.600    NCB    Post
          18                                                                           February 2011
          JH-01-HS-                                                                    15th to 28th
    2                 Nh-32 To Kolbendi           5.500    143.870    NCB    Post
          23                                                                           February 2011
          JH-01-HS-   Gomi Karmatanr To                                                15th to 28th
    3                                             21.650   601.181    NCB    Post
          38          Tiskopi                                                          February 2011
          JH-01-HS-                                                                    15th to 28th
    4                 Talaiya To Dakasaram        4.000    98.858     NCB    Post
          39                                                                           February 2011
          JH-01-HS-                                                                    15th to 28th
    5                 Bagda To Bhawanipur         2.000    48.785     NCB    Post
          47                                                                           February 2011
          JH-01-HS-   Chapri To Kodawadih Via                                          15th to 28th
    6                                             3.700    104.737    NCB    Post
          59          Denga Pani                                                       February 2011
          JH-01-HS-   Cirudih Telo Road Tthm                                           15th to 28th
    7                                             2.500    67.279     NCB    Post
          61          To Khalcho                                                       February 2011
          JH-01-HS-   Mines Board Road To                                              15th to 28th
    8                                             8.200    212.458    NCB    Post
          69          Champi                                                           February 2011
                                                                                       15th to 28th
   9     JH-0201      Pachmore To Tapsa           11.100   265.837    NCB    Post
                                                                                       February 2011
                      Paroka Kala To Tilra Part                                        15th to 28th
   10                                             2.800    68.075     NCB    Post
                      Ii                                                               February 2011
         JH-0206
                                                                                       15th to 28th
   11                 Banajang To Malakpur        2.500    59.594     NCB    Post
                                                                                       February 2011
                                                                                       15th to 28th
   12    JH-0207      Jangi More To Jangi         8.100    184.801    NCB    Post
                                                                                       February 2011
                                                                         15th to 28th
13   JH-0208   Lukoiyo To Jamdih         10.600   270.412   NCB   Post
                                                                         February 2011
                                                                         15th to 28th
14   JH-0209   Sidki To Chiloy           15.700   430.371   NCB   Post
                                                                         February 2011
                                                                         15th to 28th
15   JH-0210   Bukru To Padampur         7.100    168.373   NCB   Post
                                                                         February 2011
     JH-06-                                                              15th to 28th
16             Kharbanda To Katasmara    2.000    53.847    NCB   Post
     NPCC-60                                                             February 2011
     JH-06-    Rupaskundi Chowk To                                       15th to 28th
17                                       1.500    38.019    NCB   Post
     NPCC-62   Sapdhara                                                  February 2011
     JH-06-    Shyamsundarur Road To                                     15th to 28th
18                                       0.850    24.434    NCB   Post
     NPCC-63   Khairbani                                                 February 2011
     JH-06-    Mahlipara To                                              15th to 28th
19                                       1.770    48.119    NCB   Post
     NPCC-65   Charkpathar                                               February 2011
     JH-06-                                                              15th to 28th
20             Gobargushi To Sisda       3.200    81.186    NCB   Post
     NPCC-66                                                             February 2011
     JH-06-    Patamda Khas Ghagra                                       15th to 28th
21                                       1.450    34.864    NCB   Post
     NPCC-68   Road To Barudih                                           February 2011
     JH-06-    Chirudih Rajdoha Road                                     15th to 28th
22                                       1.250    35.469    NCB   Post
     NPCC-70   To Chologora                                              February 2011
     JH-06-                                                              15th to 28th
23             Muslwa To Kankidih        1.550    40.793    NCB   Post
     NPCC-72                                                             February 2011
     JH-06-    Birkham Meghda To                                         15th to 28th
24                                       2.075    54.404    NCB   Post
     NPCC-73   Majhidih                                                  February 2011
     JH-06-    Amjhare Birkham Road                                      15th to 28th
25                                       2.150    58.374    NCB   Post
     NPCC-74   To Pakartola                                              February 2011
     JH-06-                                                              15th to 28th
26             Mohanpur To Bataluka      1.775    51.745    NCB   Post
     NPCC-75                                                             February 2011
     JH-06-                                                              15th to 28th
27             Muchidih To Chingragora   1.000    25.644    NCB   Post
     NPCC-76                                                             February 2011
     JH-06-                                                              15th to 28th
28             Nipania To Dangar         1.450    36.790    NCB   Post
     NPCC-78                                                             February 2011
     JH-06-     Katin Nh33 Jsr To                                        15th to 28th
29                                        1.325   37.818    NCB   Post
     NPCC-79    Jharbani                                                 February 2011
     JH-06-                                                              15th to 28th
30              Mudidihdih To Goalkatta   1.500   40.382    NCB   Post
     NPCC-80                                                             February 2011
     JH-06-                                                              15th to 28th
31              Kujhurdih To Katagora     2.600   69.135    NCB   Post
     NPCC-81                                                             February 2011
     JH-06-                                                              15th to 28th
32              Bikrampur To Balidungri   1.850   41.970    NCB   Post
     NPCC-83                                                             February 2011
     JH-06-                                                              15th to 28th
33              Pungora To Bangora        3.400   78.220    NCB   Post
     NPCC-91                                                             February 2011
     JH-06-     Buatand Via Murakanjia                                   15th to 28th
34                                        2.900   62.150    NCB   Post
     NPCC-99    To Bhagasole                                             February 2011
     JH-06-     Nh-33 Nayagram To                                        15th to 28th
35                                        1.800   47.310    NCB   Post
     NPCC-123   Betana                                                   February 2011
     JH-06-                                                              15th to 28th
36              Betna More To Kharkasol   1.850   50.780    NCB   Post
     NPCC-124                                                            February 2011
     JH-06-                                                              15th to 28th
37              Pukhuria To Brajbani      2.050   53.810    NCB   Post
     NPCC-125                                                            February 2011
     JH-06-     Bend Road To                                             15th to 28th
38                                        5.800   153.430   NCB   Post
     NPCC-126   Jaganathpur                                              February 2011
     JH-06-                                                              15th to 28th
39              Dighi More To Rajabandh   5.100   131.420   NCB   Post
     NPCC-127                                                            February 2011
     JH-06-     Lodhasoli Sardiha To                                     15th to 28th
40                                        2.850   74.410    NCB   Post
     NPCC-128   Bagadiha                                                 February 2011
     JH-06-     Amardanga To                                             15th to 28th
41                                        1.700   45.010    NCB   Post
     NPCC-129   Kanimahuli                                               February 2011
     JH-06-     Chakulia Road To                                         15th to 28th
42                                        2.000   52.440    NCB   Post
     NPCC-130   Dhobasol                                                 February 2011
     JH-06-     Chakulia Road To                                         15th to 28th
43                                        7.250   171.550   NCB   Post
     NPCC-131   Khadandih                                                February 2011
     JH-06-                                                              15th to 28th
44              Sarasbad To Baikunthpur   2.350   61.760    NCB   Post
     NPCC-132                                                            February 2011
     JH-06-                                                             15th to 28th
45              Bariagajar To Kalajhor    0.700   18.520   NCB   Post
     NPCC-133                                                           February 2011
     JH-06-                                                             15th to 28th
46              Salbani To Jirapara       1.700   45.250   NCB   Post
     NPCC-134                                                           February 2011
     JH-06-     Baliyabandh Chowk To                                    15th to 28th
47                                        1.825   47.710   NCB   Post
     NPCC-135   Salkagoriya                                             February 2011
     JH-06-     Hutuldungri More To                                     15th to 28th
48                                        1.150   30.480   NCB   Post
     NPCC-136   Junbani Tola - 6                                        February 2011
     JH-06-     Roladihmore To                                          15th to 28th
49                                        1.150   29.970   NCB   Post
     NPCC-137   Junbanitola 5                                           February 2011
     JH-06-                                                             15th to 28th
50              Nekrasoli To Murakati-2   1.275   32.700   NCB   Post
     NPCC-138                                                           February 2011
     JH-06-     Chengjora Digha To                                      15th to 28th
51                                        2.800   71.860   NCB   Post
     NPCC-139   Khairkasole                                             February 2011
     JH-06-     Bada Govindpur To                                       15th to 28th
52                                        3.575   92.760   NCB   Post
     NPCC-140   Kukaradih                                               February 2011
     JH-06-                                                             15th to 28th
53              Salbani To Hirachuni      2.950   69.600   NCB   Post
     NPCC-141                                                           February 2011
     JH-06-                                                             15th to 28th
54              Mosjobi To Banamguttu     2.700   71.000   NCB   Post
     NPCC-142                                                           February 2011
     JH-06-     Salboni Hiruchuni To                                    15th to 28th
55                                        1.550   40.590   NCB   Post
     NPCC-143   Dhaniya                                                 February 2011
     JH-06-                                                             15th to 28th
56              Kowali To Godinda         2.500   65.900   NCB   Post
     NPCC-144                                                           February 2011
     JH-06-                                                             15th to 28th
57              T04 To Bansil             3.150   82.180   NCB   Post
     NPCC-145                                                           February 2011
     JH-06-                                                             15th to 28th
58              Parodiha To Pokharia      2.500   65.290   NCB   Post
     NPCC-146                                                           February 2011
     JH-06-                                                             15th to 28th
59              Nega To Kendmuri          2.025   53.070   NCB   Post
     NPCC-147                                                           February 2011
     JH-06-                                                             15th to 28th
60              Sj Road To Jadughutu      1.050   30.080   NCB   Post
     NPCC-148                                                           February 2011
     JH-06-                                                            15th to 28th
61              T08 To Darusai           1.025   28.040   NCB   Post
     NPCC-149                                                          February 2011
     JH-06-                                                            15th to 28th
62              T08 To Barabandhu        2.250   54.960   NCB   Post
     NPCC-150                                                          February 2011
     JH-06-                                                            15th to 28th
63              Nh-33 To Golkatta        4.000   98.686   NCB   Post
     NPCC-153                                                          February 2011
     JH-06-     State Highway To                                       15th to 28th
64                                       3.550   86.350   NCB   Post
     NPCC-157   Bhitardarhi                                            February 2011
     JH-06-                                                            15th to 28th
65              Nh-33 To Ulda Tola       1.000   24.255   NCB   Post
     NPCC-159                                                          February 2011
     JH-06-                                                            15th to 28th
66              Mahatam To Paharpur      1.000   24.586   NCB   Post
     NPCC-161                                                          February 2011
     JH-06-     Burudih Check Post To                                  15th to 28th
67                                       0.700   15.045   NCB   Post
     NPCC-162   Hiraganj                                               February 2011
     JH-06-     Hatta Msb Road To                                      15th to 28th
68                                       0.700   16.692   NCB   Post
     NPCC-165   Annanagur                                              February 2011
     JH-06-     Dungrudih Via Barka To                                 15th to 28th
69                                       2.700   77.579   NCB   Post
     NPCC-166   Dalmakocha                                             February 2011
                Hata Msb Road Via
     JH-06-                                                            15th to 28th
70              Rupridih To Ghaghra      1.100   25.540   NCB   Post
     NPCC-167                                                          February 2011
                Nala
     JH-06-     Kulamara Road To                                       15th to 28th
71                                       1.000   24.810   NCB   Post
     NPCC-168   Dalmabeda                                              February 2011
     JH-06-     Msb Dumaria Road To                                    15th to 28th
72                                       0.650   15.128   NCB   Post
     NPCC-170   Bhuiya Bora                                            February 2011
     JH-06-     Msb Dumaria Road To                                    15th to 28th
73                                       3.650   98.436   NCB   Post
     NPCC-171   Kathsakra                                              February 2011
     JH-06-     Rajib Chowk To South                                   15th to 28th
74                                       0.900   20.497   NCB   Post
     NPCC-172   Surda                                                  February 2011
     JH-06-     Tilabani Road To                                       15th to 28th
75                                       0.750   16.444   NCB   Post
     NPCC-173   Larandih                                               February 2011
     JH-06-                                                              15th to 28th
76              Chaidiha To Chhota Asti   1.050   26.247    NCB   Post
     NPCC-174                                                            February 2011
     JH-06-                                                              15th to 28th
77              Teghri To Rajbandh        0.700   17.247    NCB   Post
     NPCC-176                                                            February 2011
     JH-06-                                                              15th to 28th
78              Nh-06 To Gohalmara        3.125   78.079    NCB   Post
     NPCC-177                                                            February 2011
     JH-06-                                                              15th to 28th
79              Db Road To Pankhisol      0.600   13.408    NCB   Post
     NPCC-179                                                            February 2011
     JH-06-                                                              15th to 28th
80              Choira To Tilabanikhas    3.650   90.711    NCB   Post
     NPCC-180                                                            February 2011
     JH-06-     Nh-33 Ektal More To                                      15th to 28th
81                                        2.400   56.424    NCB   Post
     NPCC-181   Bangarkola Khas                                          February 2011
     JH-06-                                                              15th to 28th
82              Nh-33 To Bharudih         0.750   19.053    NCB   Post
     NPCC-182                                                            February 2011
     JH-06-                                                              15th to 28th
83              Nh-33 To Murkati 1        1.150   27.487    NCB   Post
     NPCC-183                                                            February 2011
     JH-06-                                                              15th to 28th
84              Nh-33 To Choirakhas       1.350   33.814    NCB   Post
     NPCC-184                                                            February 2011
     JH-06-                                                              15th to 28th
85              Rly Gate To Chhabisa      1.700   42.217    NCB   Post
     NPCC-185                                                            February 2011
     JH-06-                                                              15th to 28th
86              T07 To Putlupung          1.000   24.601    NCB   Post
     NPCC-188                                                            February 2011
     JH-06-                                                              15th to 28th
87              Manhara To Sundarpur      2.000   47.596    NCB   Post
     NPCC-189                                                            February 2011
     JH-06-                                                              15th to 28th
88              Raspal To Gamahariya      5.700   145.046   NCB   Post
     NPCC-190                                                            February 2011
     JH-06-                                                              15th to 28th
89              Jharia To Lepo            1.300   33.920    NCB   Post
     NPCC-193                                                            February 2011
     JH-06-                                                              15th to 28th
90              Hj Road To Modhasai       1.325   35.690    NCB   Post
     NPCC-194                                                            February 2011
     JH-06-                                                              15th to 28th
91              Harina To Bagabera        1.150   30.320    NCB   Post
     NPCC-195                                                            February 2011
      JH-06-     Chotapichka To                                           15th to 28th
92                                         2.600   66.960    NCB   Post
      NPCC-196   Kharbandh                                                February 2011
      JH-06-                                                              15th to 28th
93               T04 To Badejura           1.825   47.170    NCB   Post
      NPCC-197                                                            February 2011
      JH-06-                                                              15th to 28th
94               Birgha To Karikola        3.775   97.240    NCB   Post
      NPCC-198                                                            February 2011
      JH-06-                                                              15th to 28th
95               Hessalbil To Jahatu       3.875   99.810    NCB   Post
      NPCC-199                                                            February 2011
      JH-06-                                                              15th to 28th
96               Taladhir To Sugnikocha    6.675   171.610   NCB   Post
      NPCC-200                                                            February 2011
      JH-06-     Chotabandhura To                                         15th to 28th
97                                         3.300   84.730    NCB   Post
      NPCC-201   Bengdih                                                  February 2011
      JH-06-     Benagariya To                                            15th to 28th
98                                         5.300   129.180   NCB   Post
      NPCC-202   Khamandih                                                February 2011
      JH-06-                                                              15th to 28th
99               Reo Road To Ghaghra       4.250   94.410    NCB   Post
      NPCC-203                                                            February 2011
      JH-06-     Balijuri Road To                                         15th to 28th
100                                        1.825   51.590    NCB   Post
      NPCC-204   Lakrabasa                                                February 2011
      JH-06-                                                              15th to 28th
101              Nh33 To Jarbani           3.600   92.360    NCB   Post
      NPCC-205                                                            February 2011
      JH-06-                                                              15th to 28th
102              Nh33 To Singhpura         2.700   72.950    NCB   Post
      NPCC-206                                                            February 2011
      JH-06-                                                              15th to 28th
103              Nh06 To Gohalmara         3.650   92.580    NCB   Post
      NPCC-207                                                            February 2011
      JH-06-                                                              15th to 28th
104              Jamjurki Road To Bhadua   1.850   47.280    NCB   Post
      NPCC-208                                                            February 2011
      JH-06-                                                              15th to 28th
105              Reo Road To Sonakora      3.010   72.630    NCB   Post
      NPCC-209                                                            February 2011
      JH-06-                                                              15th to 28th
106              Baram To Dhobani          5.200   126.140   NCB   Post
      NPCC-210                                                            February 2011
      JH-06-                                                              15th to 28th
107              Amjhore To Khokhro        5.625   133.420   NCB   Post
      NPCC-211                                                            February 2011
      JH-06-                                                            15th to 28th
108              Chuasol To Taladih       1.000   22.260   NCB   Post
      NPCC-212                                                          February 2011
      JH-06-                                                            15th to 28th
109              Jyotindih To Bangora     1.300   33.370   NCB   Post
      NPCC-213                                                          February 2011
      JH-06-     Hata Msb Road To Low                                   15th to 28th
110                                       1.550   40.990   NCB   Post
      NPCC-214   Keshra                                                 February 2011
      JH-06-     Hata Msb Road To                                       15th to 28th
111                                       0.600   16.530   NCB   Post
      NPCC-215   Sidhedanga                                             February 2011
      JH-06-                                                            15th to 28th
112              Nh06To Kastarua          1.700   41.740   NCB   Post
      NPCC-216                                                          February 2011
      JH-06-                                                            15th to 28th
113              Reo Road To Pachbaria    1.350   34.800   NCB   Post
      NPCC-217                                                          February 2011
      JH-06-     Chitreshwar Road To                                    15th to 28th
114                                       1.050   28.460   NCB   Post
      NPCC-218   Kanimaholi                                             February 2011
      JH-06-     Bhadarsole To                                          15th to 28th
115                                       1.050   27.650   NCB   Post
      NPCC-219   Kendokotha                                             February 2011
      JH-06-                                                            15th to 28th
116              Mahulchui To Parashiya   2.200   47.370   NCB   Post
      NPCC-220                                                          February 2011
      JH-06-                                                            15th to 28th
117              Db Road To Jankata       0.600   14.820   NCB   Post
      NPCC-221                                                          February 2011
      JH-06-                                                            15th to 28th
118              Reo To Barabera          1.600   41.520   NCB   Post
      NPCC-222                                                          February 2011
      JH-06-     Mangrosol To                                           15th to 28th
119                                       1.100   29.070   NCB   Post
      NPCC-223   Swargchhira                                            February 2011
      JH-06-                                                            15th to 28th
120              Reo Road To Kadamdiha    2.050   51.120   NCB   Post
      NPCC-224                                                          February 2011
      JH-06-                                                            15th to 28th
121              Nirudih To Palasboni     1.950   50.970   NCB   Post
      NPCC-225                                                          February 2011
      JH-06-                                                            15th to 28th
122              Reo Road To Bahadurpur   1.350   34.650   NCB   Post
      NPCC-226                                                          February 2011
      JH-06-     Reo Road To Dakshin                                    15th to 28th
123                                       1.250   31.540   NCB   Post
      NPCC-227   Sole                                                   February 2011
      JH-06-                                                              15th to 28th
124              Bamni To Lakro            4.600   106.170   NCB   Post
      NPCC-228                                                            February 2011
      JH-06-                                                              15th to 28th
125              T04 To Kukru              3.600   92.900    NCB   Post
      NPCC-229                                                            February 2011
      JH-06-                                                              15th to 28th
126              Sagiburu To Hariyakocha   2.100   49.030    NCB   Post
      NPCC-230                                                            February 2011
      JH-06-     Patamda Khas Gagra                                       15th to 28th
127                                        3.700   93.300    NCB   Post
      NPCC-231   Road To Bardih                                           February 2011
      JH-06-     Chirudih Cholagora To                                    15th to 28th
128                                        2.600   61.940    NCB   Post
      NPCC-232   Chamidih                                                 February 2011
      JH-06-                                                              15th to 28th
129              Huchukdih To Mudidih      1.800   42.590    NCB   Post
      NPCC-233                                                            February 2011
      JH-06-     Duyaridih To                                             15th to 28th
130                                        1.500   37.590    NCB   Post
      NPCC-234   Ghorabandha                                              February 2011
      JH-06-     Bamni Lakro To Kasidih                                   15th to 28th
131                                        2.000   48.740    NCB   Post
      NPCC-235   Gugulbani                                                February 2011
      JH-06-     Bansgarh Mukurdih To                                     15th to 28th
132                                        2.050   51.140    NCB   Post
      NPCC-236   Sardar Tola                                              February 2011
      JH-06-     Gengra Bardih Road To                                    15th to 28th
133                                        4.050   89.720    NCB   Post
      NPCC-237   Majhidih                                                 February 2011
      JH-06-                                                              15th to 28th
134              Mahlipara To Buguda       2.000   46.790    NCB   Post
      NPCC-238                                                            February 2011
      JH-06-                                                              15th to 28th
135              Mahulbasa To Sari         1.000   24.560    NCB   Post
      NPCC-239                                                            February 2011
      JH-06-     Katin Nh33 Jsr Road To                                   15th to 28th
136                                        3.600   89.180    NCB   Post
      NPCC-240   Chardungi                                                February 2011
      JH-06-     Barasusani To Rakhdih                                    15th to 28th
137                                        1.500   36.500    NCB   Post
      NPCC-241   From Mudidih                                             February 2011
      JH-06-     Sardardih To                                             15th to 28th
138                                        2.500   55.340    NCB   Post
      NPCC-242   Batamukhiya Tola                                         February 2011
      JH-06-                                                              15th to 28th
139              Punsa To Jogidih          1.000   26.210    NCB   Post
      NPCC-243                                                            February 2011
      JH-06-     Amjhore Birkham To                                      15th to 28th
140                                      1.500    37.370    NCB   Post
      NPCC-244   Kiyabahal                                               February 2011
      JH-06-                                                             15th to 28th
141              Kumarda To Kariguttu    1.500    34.880    NCB   Post
      NPCC-245                                                           February 2011
      JH-06-                                                             15th to 28th
142              Belgora To Beldih       1.150    26.020    NCB   Post
      NPCC-246                                                           February 2011
      JH-06-                                                             15th to 28th
143              Nh33 To Raghunathdih    3.900    85.350    NCB   Post
      NPCC-261                                                           February 2011
      JH-06-                                                             15th to 28th
144              Juri To Samersai        1.100    26.450    NCB   Post
      NPCC-264                                                           February 2011
      JH-06-                                                             15th to 28th
145              Mudasasi To Tataldih    1.000    25.830    NCB   Post
      NPCC-265                                                           February 2011
      JH-06-                                                             15th to 28th
146              L72 To Barasai          4.900    119.020   NCB   Post
      NPCC-268                                                           February 2011
      JH-06-                                                             15th to 28th
147              T07 To Telangkocha      1.675    44.220    NCB   Post
      NPCC-269                                                           February 2011
      JH-06-                                                             15th to 28th
148              Sj Road To Paharkocha   0.900    23.130    NCB   Post
      NPCC-271                                                           February 2011
                                                                         15th to 28th
149   JH-0725    Jhurkali To Rapura      17.000   350.526   NCB   Post
                                                                         February 2011
                                                                         15th to 28th
150              L046 To Jala            5.500    116.477   NCB   Post
                                                                         February 2011
                                                                         15th to 28th
151   JH-0726    T01 To Nawadih          5.175    110.767   NCB   Post
                                                                         February 2011
                                                                         15th to 28th
152              L048 To Garnaha         4.400    91.355    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
153              Khonhar To Ajaniya      1.500    31.238    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
154   JH-0728    T01 To Singhpur         4.200    88.206    NCB   Post
                                                                         February 2011
                 Parti Kushwani To                                       15th to 28th
155                                      2.400    51.440    NCB   Post
                 Paniakhar                                               February 2011
                                                                        15th to 28th
156             Adhaura To Dubey Toal    4.000   83.124    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
157             Ambakoreya To Sakti      3.450   70.506    NCB   Post
                                                                        February 2011
      JH-0729
                Haliwanta Khurd To                                      15th to 28th
158                                      4.100   86.504    NCB   Post
                Pataria Khurd                                           February 2011
                                                                        15th to 28th
159             T04 To Bhadaitola        5.300   111.062   NCB   Post
                                                                        February 2011
      JH-0730
                                                                        15th to 28th
160             T02 To Samda Tola        9.000   206.116   NCB   Post
                                                                        February 2011
                                                                        15th to 28th
161             L031 To Barahiya         9.400   199.094   NCB   Post
                                                                        February 2011
      JH-0731
                                                                        15th to 28th
162             T02 To Garahi            2.550   56.859    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
163             L031 To Barwahitola      1.200   26.771    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
164             T03 To Kumbhi            3.000   63.271    NCB   Post
                                                                        February 2011
                T02 To Tisartetuka                                      15th to 28th
165   JH-0732                            3.000   62.275    NCB   Post
                Harijantola                                             February 2011
                                                                        15th to 28th
166             L047 To Kewartola        2.400   48.443    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
167             Sao Tola To Rajbandha    3.800   78.570    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
168             Pipardih To Suguadamar   4.200   85.923    NCB   Post
                                                                        February 2011
      JH-0733
                                                                        15th to 28th
169             Paraswar To Lohbandha    6.300   129.535   NCB   Post
                                                                        February 2011
                                                                        15th to 28th
170             L021 To Manjori          3.000   63.739    NCB   Post
                                                                        February 2011
      JH-0734
                Kalakhajuri To                                          15th to 28th
171                                      2.500   54.444    NCB   Post
                Kumbhiyakona                                            February 2011
                                                                           15th to 28th
172   JH-0734   Janewa To Bangalidera       2.435   54.423    NCB   Post
                                                                           February 2011
      JH-07-                                                               15th to 28th
173             Morbey To Jhina             1.000   25.183    NCB   Post
      NBCC-11                                                              February 2011
      JH-07-                                                               15th to 28th
174             L031 To Atiyari             5.000   127.558   NCB   Post
      NBCC-12                                                              February 2011
      JH-07-                                                               15th to 28th
175             Bhuiyan Tola To Siswa       3.050   93.875    NCB   Post
      NBCC-13                                                              February 2011
      JH-07-                                                               15th to 28th
176             T03 To Chopania Tola        0.550   15.710    NCB   Post
      NBCC-14                                                              February 2011
      JH-07-                                                               15th to 28th
177             T01 To Tarke                5.500   138.483   NCB   Post
      NBCC-15                                                              February 2011
      JH-07-                                                               15th to 28th
178             Sirfaliya To Buthhat Tola   1.100   25.233    NCB   Post
      NBCC-16                                                              February 2011
      JH-07-                                                               15th to 28th
179             Belwadamar To Mangrahi      2.650   71.587    NCB   Post
      NBCC-17                                                              February 2011
                Akasi To Karamdoni Part                                    15th to 28th
180                                         1.000   23.100    NCB   Post
                -A                                                         February 2011
                Akasi To Aramdoni Part -                                   15th to 28th
181                                         4.000   86.456    NCB   Post
                B                                                          February 2011
                                                                           15th to 28th
182   JH-1004   Monghaon To Kothi           2.200   48.091    NCB   Post
                                                                           February 2011
                                                                           15th to 28th
183             Natawal To Tati             4.000   92.736    NCB   Post
                                                                           February 2011
                Reo Road Jairagi To                                        15th to 28th
184                                         2.500   56.971    NCB   Post
                Dahkul                                                     February 2011
                Sisai Bargaon Road To                                      15th to 28th
185                                         6.000   127.591   NCB   Post
                Zindatoli                                                  February 2011
      JH-1010
                Sisai Bargaon Road To                                      15th to 28th
186                                         4.150   91.053    NCB   Post
                Pahartoli                                                  February 2011
                                                                          15th to 28th
187             T08 To Patratoli           2.450   54.395    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
188             Kasir Road To Uchadih      2.300   45.830    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
189   JH-1017   Kundra To Katasaru         3.000   65.545    NCB   Post
                                                                          February 2011
                Kasir Road To Nicha                                       15th to 28th
190                                        7.000   164.180   NCB   Post
                Dumri                                                     February 2011
                                                                          15th to 28th
191             T01 To Singrauli           2.550   54.847    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
192             T01 To Khasitoli           2.700   56.711    NCB   Post
                                                                          February 2011
      JH-1018
                Atkora More To Saibatoli                                  15th to 28th
193                                        2.100   46.794    NCB   Post
                Part - A                                                  February 2011
                Atkora More To Saibatoli                                  15th to 28th
194                                        1.400   31.461    NCB   Post
                Part - B                                                  February 2011
                Sh Trundu To Amtoli Part                                  15th to 28th
195                                        3.200   67.282    NCB   Post
                A                                                         February 2011
      JH-1027
                Sh Trundu To Amtoli Part                                  15th to 28th
196                                        3.250   72.487    NCB   Post
                B                                                         February 2011
                                                                          15th to 28th
197   JH-1028   Bamhani To Kuli            2.600   58.071    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
198   JH-1028   Bamhani To Kurmul          4.200   91.729    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
199             Kurkura To Betarkera       5.450   117.301   NCB   Post
                                                                          February 2011
      JH-1029
                                                                          15th to 28th
200             Jamdih To Panduloya        3.000   64.502    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
201             Bamidih To Tangarsikwar    2.100   47.695    NCB   Post
                                                                          February 2011
      JH-1034
                                                                          15th to 28th
202             Bansari To Kotari          5.600   120.237   NCB   Post
                                                                          February 2011
                Pwd Road Hapamuni To                                       15th to 28th
203                                         2.250   44.432    NCB   Post
                Chama Part - C                                             February 2011
      JH-1036
                                                                           15th to 28th
204             Ganharda To Balakhatang     2.100   45.152    NCB   Post
                                                                           February 2011
                                                                           15th to 28th
205             Pwd Road To Mile            3.400   73.401    NCB   Post
                                                                           February 2011
      JH-1037
                                                                           15th to 28th
206             Sh Adra To Ghuti Part - B   1.050   22.955    NCB   Post
                                                                           February 2011
                                                                           15th to 28th
207             Pwd Road To Kasporiya       3.100   68.963    NCB   Post
                                                                           February 2011
                                                                           15th to 28th
208   JH-1039   Bartoli To Katchapara       3.000   64.265    NCB   Post
                                                                           February 2011
                                                                           15th to 28th
209             Dhidhadi To Makra           2.450   50.068    NCB   Post
                                                                           February 2011
                Bakaspur Chandatola To
                                                                           15th to 28th
210             Bikuma Bikma Via            4.500   90.680    NCB   Post
                                                                           February 2011
                Morha Toli
      JH-1040   Sh School Loenga More                                      15th to 28th
211                                         1.500   33.191    NCB   Post
                To Akra Via Garra                                          February 2011
                                                                           15th to 28th
212             Gara To Karichuan           5.000   107.053   NCB   Post
                                                                           February 2011
                T02 Monjbira To Semra                                      15th to 28th
213                                         4.300   92.100    NCB   Post
                Pakertoli                                                  February 2011
      JH-1041
                Nirmaha To Dobitoli Via                                    15th to 28th
214                                         7.300   152.892   NCB   Post
                Merangbira                                                 February 2011
                Mahuagaon To Birju Part                                    15th to 28th
215                                         6.500   137.632   NCB   Post
                B                                                          February 2011
                Mahuagaon To Birju Part                                    15th to 28th
216   JH-1042                               0.650   13.794    NCB   Post
                C                                                          February 2011
                Mahuagaon To Birju Via                                     15th to 28th
217                                         3.500   74.059    NCB   Post
                Icha                                                       February 2011
                                                                          15th to 28th
218             T02 To Jogiya              3.600   73.948    NCB   Post
                                                                          February 2011
                T02 To Lakyabanstoli                                      15th to 28th
219                                        1.500   32.591    NCB   Post
                Part - B                                                  February 2011
      JH-1043
                                                                          15th to 28th
220             T02 To Sakrolikhas         4.700   104.069   NCB   Post
                                                                          February 2011
                T02 Amlatoli To                                           15th to 28th
221                                        2.700   58.803    NCB   Post
                Karanjtoli Via Bagaitoli                                  February 2011
                Sisai Bargaon Road To                                     15th to 28th
222                                        3.250   69.138    NCB   Post
                Kulamkery                                                 February 2011
      JH-1045
                T03 To Lohaiyra Naditoli                                  15th to 28th
223                                        2.550   56.169    NCB   Post
                Via Lada                                                  February 2011
                Kapri Bpdp Road To                                        15th to 28th
224                                        3.000   64.257    NCB   Post
                Farsma                                                    February 2011
      JH-1049
                                                                          15th to 28th
225             Karamtoli To Dakia         5.450   117.682   NCB   Post
                                                                          February 2011
                Banari Ghaghra Road To                                    15th to 28th
226                                        2.000   45.090    NCB   Post
                Bethod Part B                                             February 2011
                                                                          15th to 28th
227             Banari Ghaghra To Labga    3.200   73.419    NCB   Post
                                                                          February 2011
      JH-1051
                Banari Ghaghra To                                         15th to 28th
228                                        5.400   117.476   NCB   Post
                Barang                                                    February 2011
                Banari Ghaghra To                                         15th to 28th
229                                        3.000   61.430    NCB   Post
                Barang Part - B                                           February 2011
                                                                          15th to 28th
230             Oriya To Tithi             3.500   76.746    NCB   Post
                                                                          February 2011
      JH-1054
                                                                          15th to 28th
231             Pwd Road Kokotoli          2.000   47.267    NCB   Post
                                                                          February 2011
                Kotengsera To Kutwa                                       15th to 28th
232                                        4.000   88.275    NCB   Post
                Road                                                      February 2011
      JH-1065
                                                                          15th to 28th
233             L024 To Karamtoli          2.700   56.409    NCB   Post
                                                                          February 2011
                Mahili Soso To Katasaru                                    15th to 28th
234                                         1.500   31.745    NCB   Post
                Part B                                                     February 2011
                                                                           15th to 28th
235             Nh-23 Lamge To Chauli       2.500   53.728    NCB   Post
                                                                           February 2011
                Reo Road Mahuatoli To                                      15th to 28th
236                                         3.000   65.679    NCB   Post
                Bela Part B                                                February 2011
      JH-1066   T09 To Behira Toli Via                                     15th to 28th
237                                         2.500   56.819    NCB   Post
                Kulhi Part B                                               February 2011
                Aerodram To Tangratoli                                     15th to 28th
238                                         2.500   56.184    NCB   Post
                Part B                                                     February 2011
                Sh Basia To Kulusera Part                                  15th to 28th
239                                         6.350   141.489   NCB   Post
                A                                                          February 2011
      JH-1069
                                                                           15th to 28th
240             Karamtoli To Majhkera       2.250   53.090    NCB   Post
                                                                           February 2011
                                                                           15th to 28th
241             Mamarla To Bangoloya        3.400   73.758    NCB   Post
                                                                           February 2011
      JH-1070
                                                                           15th to 28th
242             Maharajganj To Nawatoli     7.350   176.194   NCB   Post
                                                                           February 2011
                                                                           15th to 28th
243             Tiral To Bombiyari          4.000   84.624    NCB   Post
                                                                           February 2011
      JH-1074
                Konbir To Kadamdih Part                                    15th to 28th
244                                         8.000   175.074   NCB   Post
                A                                                          February 2011
                Tangratoli To Madanpur                                     15th to 28th
245                                         5.000   107.595   NCB   Post
                Part A                                                     February 2011
                Tangratoli To Madanpur                                     15th to 28th
246   JH-1078                               1.500   33.087    NCB   Post
                Part B                                                     February 2011
                T01 Palmadeepa To                                          15th to 28th
247                                         1.000   22.601    NCB   Post
                Turiyamba Part-C                                           February 2011
                                                                           15th to 28th
248             Banohatoli To Kathikura     2.600   59.024    NCB   Post
      JH-1079                                                              February 2011
249             Jouli To Omsera             1.300   30.389    NCB   Post   15th to 28th
                                                                          February 2011
                Pwd To Nawatoli Via                                       15th to 28th
250                                       2.250    51.440    NCB   Post
                Baghiya                                                   February 2011
                                                                          15th to 28th
251             Chapartoli To Tirradih    3.250    72.544    NCB   Post
                                                                          February 2011
                Bpdp Road To Sokarahatu                                   15th to 28th
252   JH-1080                             22.000   478.536   NCB   Post
                Part B                                                    February 2011
                Banalat Reo Raod To                                       15th to 28th
253                                       8.750    190.043   NCB   Post
                Jamati                                                    February 2011
      JH-1081
                Banari Ghaghra Road To                                    15th to 28th
254                                       3.500    78.692    NCB   Post
                Bethod                                                    February 2011
                Tangatoli To Kamalpur                                     15th to 28th
255                                       4.500    106.247   NCB   Post
                Kambatoli                                                 February 2011
      JH-1085
                T01 Palmadipa To                                          15th to 28th
256                                       2.500    56.614    NCB   Post
                Turiyamba Part B                                          February 2011
      JH-
                                                                          15th to 28th
257   10NBCC-   Ramja To Bhijpur          3.575    78.852    NCB   Post
                                                                          February 2011
      17
      JH-
                                                                          15th to 28th
258   10NBCC-   Kasir Road To Lalmati     3.400    81.715    NCB   Post
                                                                          February 2011
      18
                T06 Rud More To                                           15th to 28th
259   JH-1105                             6.250    129.649   NCB   Post
                Gwaltola Dumraon                                          February 2011
                Nh-33 Birhortola To                                       15th to 28th
260                                       2.300    48.474    NCB   Post
                Dangi                                                     February 2011
                T03 Deoriya More To                                       15th to 28th
261   JH-1106                             3.500    77.535    NCB   Post
                Ghaghra Khurd                                             February 2011
                                                                          15th to 28th
262             Daria To Phuphundi        5.450    113.615   NCB   Post
                                                                          February 2011
                                                                          15th to 28th
263   JH-1108   Reo Road To Madhopur      5.200    112.724   NCB   Post
                                                                          February 2011
                                                                         15th to 28th
264             Guljartola To Dudhpania   0.950   20.317    NCB   Post
                                                                         February 2011
      JH-1109
                                                                         15th to 28th
265             Reo Road To Bairisal      5.700   124.884   NCB   Post
                                                                         February 2011
                                                                         15th to 28th
266             Nh-100 To Murkoi          4.400   93.172    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
267   JH-1110   T013 To Burwadih          1.425   30.369    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
268             Bankharo To Uchaghana     2.450   54.603    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
269   JH-1111   Jharpo To Garisaram       7.950   178.899   NCB   Post
                                                                         February 2011
                                                                         15th to 28th
270             Nh Gorhar To Patitiri     3.800   87.494    NCB   Post
                                                                         February 2011
      JH-1113
                                                                         15th to 28th
271             Nh2 To Meramgadda         1.900   43.823    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
272             Garu Khura To Gotia       1.500   37.109    NCB   Post
                                                                         February 2011
      JH-1115
                                                                         15th to 28th
273             Gt Road To Dhurgargi      3.000   69.559    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
274             Suji To Hathinder         3.525   79.192    NCB   Post
                                                                         February 2011
      JH-1116
                                                                         15th to 28th
275             Uchahi To Parsawan        1.500   35.932    NCB   Post
                                                                         February 2011
                Balsara Mandu Main                                       15th to 28th
276                                       1.450   34.223    NCB   Post
                Road To Dariya                                           February 2011
                                                                         15th to 28th
277   JH-1122   Budhibagi To Royang       3.325   74.380    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
278             Rikwa To Kurra            2.800   64.420    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
279   JH-1124   Ango To Bedam             3.225   81.342    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
280             Bahera To Chanaro         2.645   58.871    NCB   Post
                                                                         February 2011
                Deria Khurd To Deori                                     15th to 28th
281                                       1.825   40.344    NCB   Post
                Kala                                                     February 2011
      JH-1126
                                                                         15th to 28th
282             Sinuari To Nagari         2.000   44.892    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
283             T01 To Magarpatta         4.400   104.390   NCB   Post
                                                                         February 2011
      JH-1131
                                                                         15th to 28th
284             Churchu To Pipra          1.150   28.511    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
285             Hutpa To Tarwa            2.825   63.353    NCB   Post
                                                                         February 2011
      JH-1138
                                                                         15th to 28th
286             Demotand To Bakaspura     0.800   20.234    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
287             Gt Road To Kendua         3.225   75.433    NCB   Post
                                                                         February 2011
                Gt Road To Ahari                                         15th to 28th
288   JH-1117                             2.500   54.715    NCB   Post
                Nawadih                                                  February 2011
                                                                         15th to 28th
289             Jagdishpur To Gangaahar   1.100   24.261    NCB   Post
                                                                         February 2011
                Nawaghar To (Mahuabab)                                   15th to 28th
290                                       2.050   47.381    NCB   Post
                Kanti                                                    February 2011
      JH-1118
                                                                         15th to 28th
291             Reo Road To Ramchak       2.739   65.899    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
292             Gaira To Bero Khurd       2.075   54.190    NCB   Post
                                                                         February 2011
      JH-1119
                                                                         15th to 28th
293             Gaida To Basramo          2.400   56.788    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
294             Daihar To Sohara          4.300   96.851    NCB   Post
                                                                         February 2011
      JH-1120
                                                                         15th to 28th
295             Gt Road To Jokat          4.175   93.156    NCB   Post
                                                                         February 2011
                                                                        15th to 28th
296             Bhadel To Amroli         4.300   99.112    NCB   Post
                                                                        February 2011
      JH-1121
                                                                        15th to 28th
297             Chaikala To Akurahawa    2.125   47.618    NCB   Post
                                                                        February 2011
                2Nd Km Of T05 To                                        15th to 28th
298                                      8.500   185.555   NCB   Post
                Telaniadih                                              February 2011
      JH-1123
                                                                        15th to 28th
299             T012 To Beram            5.400   116.217   NCB   Post
                                                                        February 2011
                                                                        15th to 28th
300             Ango To Deogarha         4.425   100.991   NCB   Post
                                                                        February 2011
                                                                        15th to 28th
301   JH-1125   Badam To Pakaria Tola    3.500   78.646    NCB   Post
                                                                        February 2011
                Gondalpura To                                           15th to 28th
302                                      1.100   32.467    NCB   Post
                Kadmatola                                               February 2011
                                                                        15th to 28th
303             Pandaul To Mardu Soti    1.900   44.141    NCB   Post
                                                                        February 2011
      JH-1127
                                                                        15th to 28th
304             Sikari Gaon To Parpain   3.750   87.978    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
305             Edla To Hesakudar        5.000   109.265   NCB   Post
                                                                        February 2011
                                                                        15th to 28th
306   JH-1128   Odrana To Jamuaria       3.400   74.810    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
307             Raibar To Horia          3.000   60.841    NCB   Post
                                                                        February 2011
                                                                        15th to 28th
308             T08 Simraia To Ara       4.750   105.531   NCB   Post
                                                                        February 2011
      JH-1129
                                                                        15th to 28th
309             Katkamsandi To Ulanj     3.400   71.991    NCB   Post
                                                                        February 2011
                Nh-100 To Bhutahi                                       15th to 28th
310                                      3.800   83.378    NCB   Post
                Murgaon                                                 February 2011
      JH-1130
                                                                        15th to 28th
311             Nh-100 To Chalanga       2.750   58.544    NCB   Post
                                                                        February 2011
                                                                       15th to 28th
312             Sarukudar To Chihuta    3.750   80.799    NCB   Post
                                                                       February 2011
                Reo Road Bero Kala To                                  15th to 28th
313                                     5.000   112.011   NCB   Post
                Ghorbanda                                              February 2011
      JH-1132
                                                                       15th to 28th
314             Manpur To Kendua        2.025   52.391    NCB   Post
                                                                       February 2011
                                                                       15th to 28th
315             Alagdiha To Barano      3.700   96.439    NCB   Post
                                                                       February 2011
      JH-1133
                Reo Toad Kimania To                                    15th to 28th
316                                     3.250   89.726    NCB   Post
                Burhiadih                                              February 2011
                3Rd Km Of T05 To                                       15th to 28th
317                                     5.300   123.866   NCB   Post
                Mangaro                                                February 2011
                1St Km Of T03 To                                       15th to 28th
318   JH-1134                           2.125   47.282    NCB   Post
                Gundro                                                 February 2011
                                                                       15th to 28th
319             Ledi More To Simaria    4.250   93.857    NCB   Post
                                                                       February 2011
                                                                       15th to 28th
320   JH-1135   Kenduadih To Amatand    6.000   124.552   NCB   Post
                                                                       February 2011
                2Nd Km T05 To                                          15th to 28th
321                                     2.150   47.409    NCB   Post
                Bhelwachar                                             February 2011
                                                                       15th to 28th
322             Bara To Gantarbara      1.825   39.199    NCB   Post
                                                                       February 2011
      JH-1136
                Govindpur Kala To                                      15th to 28th
323                                     3.450   72.852    NCB   Post
                Govindpur Khurd                                        February 2011
                                                                       15th to 28th
324             T010 Uprouli Murgaon    2.825   62.407    NCB   Post
                                                                       February 2011
                                                                       15th to 28th
325   JH-1137   Debo To Margoja         5.600   127.915   NCB   Post
                                                                       February 2011
                                                                       15th to 28th
326             Bundu More To Telodih   1.200   26.093    NCB   Post
                                                                       February 2011
      JH-1139
                                                                       15th to 28th
327             Gt Road To Jarahiya     2.850   59.625    NCB   Post
                                                                       February 2011
                                                                            15th to 28th
328               Reo Road To Chatro        2.000    43.938    NCB   Post
                                                                            February 2011
                                                                            15th to 28th
329               Gt Road To Laskari        1.500    32.495    NCB   Post
                                                                            February 2011
                                                                            15th to 28th
330   JH-1140     Nh-33 To Dumardiha        4.675    102.447   NCB   Post
                                                                            February 2011
                  Bedo Kala To                                              15th to 28th
331                                         2.350    60.687    NCB   Post
                  Chandgarha                                                February 2011
      JH-1141
                                                                            15th to 28th
332               Palma More To Sewatarn    3.525    79.081    NCB   Post
                                                                            February 2011
                  Ramjita To Nayakhap                                       15th to 28th
333                                         2.400    51.518    NCB   Post
                  Sirma                                                     February 2011
      JH-1143
                                                                            15th to 28th
334               Rampur To Asnabad         2.225    52.073    NCB   Post
                                                                            February 2011
      JH-11-HS-                                                             15th to 28th
335               Nh-2 To Jawar Paharpur    7.055    172.702   NCB   Post
      15                                                                    February 2011
      JH-14-                                                                15th to 28th
336               Hesla Rud Road To Betar   15.200   376.060   NCB   Post
      NPCC-35                                                               February 2011
      JH-14-                                                                15th to 28th
337               Tarwadih To Kodag         5.000    138.850   NCB   Post
      NPCC-38                                                               February 2011
      JH-14-                                                                15th to 28th
338               Rechuguta To Bathatkala   3.250    85.440    NCB   Post
      NPCC-39                                                               February 2011
      JH-14-                                                                15th to 28th
339               Pakrar To Jadiang         3.400    92.630    NCB   Post
      NPCC-40                                                               February 2011
      JH-14-                                                                15th to 28th
340               Nindir To Kudag           1.000    27.170    NCB   Post
      NPCC-41                                                               February 2011
      JH-14-                                                                15th to 28th
341               Latehar To Orea           4.800    125.670   NCB   Post
      NPCC-42                                                               February 2011
      JH-14-                                                                15th to 28th
342               Demu To Sakwar            7.450    191.520   NCB   Post
      NPCC-44                                                               February 2011
      JH-14-                                                                15th to 28th
343               Nawadih To Kuku           3.600    93.400    NCB   Post
      NPCC-45                                                               February 2011
      JH-14-    Pwd Road Labhar To                                       15th to 28th
344                                      7.000    187.450   NCB   Post
      NPCC-46   Karmdih                                                  February 2011
      JH-14-    Labhar Mandal Road To                                    15th to 28th
345                                      1.200    32.410    NCB   Post
      NPCC-49   Gasedag                                                  February 2011
      JH-14-                                                             15th to 28th
346             Pwd Road To Ladi         3.500    96.260    NCB   Post
      NPCC-50                                                            February 2011
      JH-14-    Mahuadar To Parewa Via                                   15th to 28th
347                                      4.100    105.870   NCB   Post
      NPCC-51   Chatkpur                                                 February 2011
      JH-14-    Pwd Road Akashi To                                       15th to 28th
348                                      20.000   564.520   NCB   Post
      NPCC-52   Korgi                                                    February 2011
      JH-14-                                                             15th to 28th
349             Pwd Road To Harmunda     3.000    78.460    NCB   Post
      NPCC-53                                                            February 2011
      JH-14-                                                             15th to 28th
350             Namudag To Manikdih      2.000    54.030    NCB   Post
      NPCC-56                                                            February 2011
      JH-14-                                                             15th to 28th
351             Nh Road To Deobar        3.100    84.840    NCB   Post
      NPCC-57                                                            February 2011
      JH-14-                                                             15th to 28th
352             Bandua To Hesatu         5.600    147.700   NCB   Post
      NPCC-58                                                            February 2011
      JH-14-                                                             15th to 28th
353             Nadbelwa To Sewan        2.000    52.070    NCB   Post
      NPCC-59                                                            February 2011
      JH-14-                                                             15th to 28th
354             Nh99 To Gurway           2.700    68.440    NCB   Post
      NPCC-60                                                            February 2011
      JH-14-                                                             15th to 28th
355             Rajwar To Lakshipur      2.000    54.840    NCB   Post
      NPCC-61                                                            February 2011
      JH-14-                                                             15th to 28th
356             Endwa To Sirsa Madh      2.500    65.240    NCB   Post
      NPCC-62                                                            February 2011
      JH-14-    Pwd Road To Mukundpur                                    15th to 28th
357                                      14.500   409.180   NCB   Post
      NPCC-63   Via Korwatoli                                            February 2011
      JH-14-    Korwa Toli To Purni                                      15th to 28th
358                                      2.500    67.560    NCB   Post
      NPCC-65   Dabri                                                    February 2011
      JH-14-                                                             15th to 28th
359             Pwd Garu To Henar        8.000    223.990   NCB   Post
      NPCC-66                                                            February 2011
      JH-
                                                                         15th to 28th
360   15NBCC-   Kota More To Dumari       2.025   47.568    NCB   Post
                                                                         February 2011
      01
      JH-
                                                                         15th to 28th
361   15NBCC-   Kaspur More To Kaspur     3.050   66.015    NCB   Post
                                                                         February 2011
      02
      JH-15-    Dhanamunjee More To                                      15th to 28th
362                                       0.850   17.833    NCB   Post
      NBCC-03   Dhanamunjee                                              February 2011
      JH-15-                                                             15th to 28th
363             Nawa Toli To Akhileshar   1.975   45.160    NCB   Post
      NBCC-04                                                            February 2011
      JH-15-    Reo Road Barkichapi                                      15th to 28th
364                                       1.800   49.512    NCB   Post
      NBCC-05   More To Dubang                                           February 2011
      JH-15-    Pwd Road Rajrom To                                       15th to 28th
365                                       3.100   73.099    NCB   Post
      NBCC-06   Chitakoni                                                February 2011
      JH-15-    Reo Road Sinju More To                                   15th to 28th
366                                       2.125   52.029    NCB   Post
      NBCC-07   Bardih Rcc Bridge                                        February 2011
      JH-
                Pwd Road Pandra More                                     15th to 28th
367   15NBCC-                             1.850   40.044    NCB   Post
                To Pandra Village                                        February 2011
      08
      JH-       Reo Road Sukumar More
                                                                         15th to 28th
368   15NBCC-   To Kamale More Via        2.350   54.434    NCB   Post
                                                                         February 2011
      09        Sukumar
      JH-15-    Pwd Road Madarsa To                                      15th to 28th
369                                       2.575   58.733    NCB   Post
      NBCC-10   Chirana                                                  February 2011
      JH-
                                                                         15th to 28th
370   15NBCC-   Hisri To Aroga            6.400   143.185   NCB   Post
                                                                         February 2011
      11
      JH-
                                                                         15th to 28th
371   15NBCC-   Nirhu More To Nirhu       2.125   52.948    NCB   Post
                                                                         February 2011
      12
      JH-
                                                                           15th to 28th
372   15NBCC-    Pajhri To Semra More      4.400    97.025    NCB   Post
                                                                           February 2011
      13
      JH-
                 Reo Road Kundgaraha                                       15th to 28th
373   15NBCC-                              2.250    49.927    NCB   Post
                 More To Kungarha                                          February 2011
      14
      JH-
                                                                           15th to 28th
374   15NBCC-    Bitpi More To Bitpi       2.500    57.408    NCB   Post
                                                                           February 2011
      15
                 REO Road Salagi More to                                   15th to 28th
375   JH- 1507                             5.250    113.670   NCB   Post
                 Khambhar                                                  February 2011
                 Kisko to Agardih Banpur                                   15th to 28th
376   JH- 1508                             30.550   73.040    NCB   Post
                 to Bhushar                                                February 2011
                                                                           15th to 28th
377   JH- 1509   Bagru to Kerar            30.550   658.750   NCB   Post
                                                                           February 2011
                                                                           15th to 28th
378   JH-1510    Barki Champi to Hotwar    5.200    110.420   NCB   Post
                                                                           February 2011
                 REO Road Bandu Sarna                                      15th to 28th
379   JH- 1511                             5.000    102.580   NCB   Post
                 Toli to Chatakpur                                         February 2011
      JH-18-     Kota Village Maszid To                                    15th to 28th
380                                        1.000    23.281    NCB   Post
      NBCC-44    Sarnatoli                                                 February 2011
      JH-18-                                                               15th to 28th
381              Edcherro More To Lada     1.500    31.497    NCB   Post
      NBCC-45                                                              February 2011
                 T06 (Karra Dumargari
      JH-18-                                                               15th to 28th
382              Lodhma Road) To           2.200    50.343    NCB   Post
      NBCC-60                                                              February 2011
                 Sardula
      JH-18-                                                               15th to 28th
383              Tilmi To Masko            2.500    57.701    NCB   Post
      NBCC-61                                                              February 2011
      JH-18-                                                               15th to 28th
384              Jamhar To Samundar        1.500    39.681    NCB   Post
      NBCC-62                                                              February 2011
      JH-18-                                                               15th to 28th
385              Gari To Tetartoli         3.600    92.048    NCB   Post
      NBCC-63                                                              February 2011
      JH-18-                                                              15th to 28th
386             Mahuatoli To Limra         1.500   36.978    NCB   Post
      NBCC-64                                                             February 2011
      JH-18-                                                              15th to 28th
387             Nimdih To Nakidih          1.000   24.344    NCB   Post
      NBCC-65                                                             February 2011
      JH-18-                                                              15th to 28th
388             Reo Road To Kuryamu        1.750   43.199    NCB   Post
      NBCC-66                                                             February 2011
      JH-18-                                                              15th to 28th
389             Murutdih To Galau          1.500   40.761    NCB   Post
      NBCC-67                                                             February 2011
      JH-18-                                                              15th to 28th
390             Jamudag To Magandih        2.000   50.585    NCB   Post
      NBCC-68                                                             February 2011
      JH-18-                                                              15th to 28th
391             T03 Jamudag To Sigidh      2.000   46.779    NCB   Post
      NBCC-69                                                             February 2011
      JH-18-                                                              15th to 28th
392             Fadimarch To Chututoli     1.400   34.235    NCB   Post
      NBCC-70                                                             February 2011
      JH-18-    Puriyo Chachkopi Road                                     15th to 28th
393                                        1.750   41.433    NCB   Post
      NBCC-71   To Graha Toli                                             February 2011
      JH-18-                                                              15th to 28th
394             Tuju To Nachaldag          0.900   21.352    NCB   Post
      NBCC-72                                                             February 2011
      JH-18-                                                              15th to 28th
395             Nh33 Harbul To Jaraya      3.000   73.196    NCB   Post
      NBCC-73                                                             February 2011
      JH-18-    Raisatoli Tunju Road                                      15th to 28th
396                                        3.100   72.819    NCB   Post
      NBCC-74   Jirkitoli To Sogad                                        February 2011
      JH-18-    Sh Bhursudih To                                           15th to 28th
397                                        4.630   106.733   NCB   Post
      NBCC-75   Domadih                                                   February 2011
      JH-18-    Bijupara Khelari Road To                                  15th to 28th
398                                        2.200   53.314    NCB   Post
      NBCC-78   Bokatoli                                                  February 2011
      JH-18-                                                              15th to 28th
399             T03 To Irku                1.300   37.288    NCB   Post
      NBCC-80                                                             February 2011
      JH-18-    Choriya Road To                                           15th to 28th
400                                        1.300   30.950    NCB   Post
      NBCC-83   Nawagardh                                                 February 2011
      JH-18-    L001 Baludih To Ichahatu                                  15th to 28th
401                                        2.400   55.443    NCB   Post
      NBCC-85   Via Tetla                                                 February 2011
                                                                          15th to 28th
402             Patratu To Mundudih       2.575    61.894    NCB   Post
                                                                          February 2011
                Chakarbali To                                             15th to 28th
403                                       3.400    83.759    NCB   Post
                Hethkhakbra                                               February 2011
      JH-2402
                                                                          15th to 28th
404             Korambe To Hesai          3.250    81.056    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
405             Bazartand To Butgorwa     2.125    52.103    NCB   Post
                                                                          February 2011
                Betul Kalan To Betul                                      15th to 28th
406                                       2.475    57.413    NCB   Post
                Khurd                                                     February 2011
                                                                          15th to 28th
407             Bariatu Tonaghatu         1.550    35.311    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
408             Sondimra To Uladaka       1.650    41.060    NCB   Post
                                                                          February 2011
                Uparbarga To Asharhi                                      15th to 28th
409   JH-2403                             0.544    11.854    NCB   Post
                Bagan                                                     February 2011
                                                                          15th to 28th
410             Golamuri To Govindpur     2.164    55.089    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
411             Jangi To Tutatola         0.900    23.030    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
412             Gola To Barbatar          1.450    37.630    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
413   JH-2405   Churchu Simana To Tutki   13.650   298.785   NCB   Post
                                                                          February 2011
                Oriyatu To Ormanjhi                                       15th to 28th
414   JH-2406                             9.250    221.210   NCB   Post
                Ranchi Sima                                               February 2011
                                                                          15th to 28th
415             Teliyatu To Kander        4.125    99.015    NCB   Post
                                                                          February 2011
      JH-2407
                                                                          15th to 28th
416             Chetma To Lem             1.900    54.111    NCB   Post
                                                                          February 2011
                                                                          15th to 28th
417   JH-2408   Tapin To Routa - 2        5.500    138.850   NCB   Post
                                                                          February 2011
                                                                         15th to 28th
418             Hesagarha To Bhutahi      3.320   77.657    NCB   Post
                                                                         February 2011
                                                                         15th to 28th
419             Bargon To Bhuiadih        3.660   87.989    NCB   Post
                                                                         February 2011
      JH-2409
                                                                         15th to 28th
420             Laiyo To Gaichandawa      6.750   161.335   NCB   Post
                                                                         February 2011
      JH-22-    Chambrasai to Chhota                                     15th to 28th
421                                       3.300   79.773    NCB   Post
      NPCC-19   Guli                                                     February 2011
      JH-22-                                                             15th to 28th
422             Siyaljora to Baisai       2.550   65.492    NCB   Post
      NPCC-20                                                            February 2011
      JH-22-                                                             15th to 28th
423             Gangimud to Jangiburu     7.200   185.630   NCB   Post
      NPCC-21                                                            February 2011
      JH-22-    Banisagar Kharpos Road                                   15th to 28th
424                                       2.350   640.056   NCB   Post
      NPCC-22   to Janumpi                                               February 2011
      JH-22-                                                             15th to 28th
425             Kochra to Papupi          2.850   682.308   NCB   Post
      NPCC-23                                                            February 2011
      JH-22-    Jojosai to Bunumlata                                     15th to 28th
426                                       2.900   72.568    NCB   Post
      NPCC-24   Road                                                     February 2011
      JH-22-                                                             15th to 28th
427             Kasiyapecha to Jojogutu   4.350   115.910   NCB   Post
      NPCC-25                                                            February 2011
      JH-22-                                                             15th to 28th
428             REO Road to Pradhanpali   2.800   70.160    NCB   Post
      NPCC-26                                                            February 2011
      JH-22-    PWD Main Road to Bara                                    15th to 28th
429                                       1.750   43.315    NCB   Post
      NPCC-27   Kudhna                                                   February 2011
      JH-22-    RWD Road to Roagat                                       15th to 28th
430                                       1.750   375.451   NCB   Post
      NPCC-28   Road Via Kotagara                                        February 2011
      JH-22-    Kotagara to Jonkopai                                     15th to 28th
431                                       2.350   61.254    NCB   Post
      NPCC-29   Road                                                     February 2011
      JH-22-    Jomro to Ragrakocha Via                                  15th to 28th
432                                       3.450   85.745    NCB   Post
      NPCC-30   Ghaghra                                                  February 2011
      JH-22-    Chaibasa Main Road To                                    15th to 28th
433                                       4.300   101.059   NCB   Post
      NPCC-31   Tunia Border                                             February 2011
      JH-22-    Bara Main Road To                                          15th to 28th
434                                         2.300   55.053    NCB   Post
      NPCC-32   Jamjuri                                                    February 2011
      JH-22-    Bogda Main Road                                            15th to 28th
435                                         3.050   79.274    NCB   Post
      NPCC-33   Tarkatocha                                                 February 2011
      JH-22-    Kuira Main Road                                            15th to 28th
436                                         2.250   57.449    NCB   Post
      NPCC-34   Patahatu                                                   February 2011
      JH-22-    Toklo to Hessalkuti Via                                    15th to 28th
437                                         3.000   70.889    NCB   Post
      NPCC-35   Kumrmunda Road                                             February 2011
      JH-22-    Chainpur To Dudhkundi                                      15th to 28th
438                                         2.250   56.624    NCB   Post
      NPCC-36   Road                                                       February 2011
      JH-22-                                                               15th to 28th
439             Jatragara to Bhutnasa       2.050   52.306    NCB   Post
      NPCC-37                                                              February 2011
      JH-22-                                                               15th to 28th
440             Porahat to Upper Tola       4.650   107.415   NCB   Post
      NPCC-38                                                              February 2011
      JH-22-                                                               15th to 28th
441             Matkambiri to Chadai        1.750   41.889    NCB   Post
      NPCC-39                                                              February 2011
      JH-22-    Bachichamhatu to                                           15th to 28th
442                                         3.050   70.644    NCB   Post
      NPCC-40   Churgui                                                    February 2011
      JH-22-    PWD Ganjubasa to                                           15th to 28th
443                                         2.750   65.356    NCB   Post
      NPCC-41   Talabasa                                                   February 2011
      JH-22-    Bara Raikaman to Baida                                     15th to 28th
444                                         2.200   56.395    NCB   Post
      NPCC-42   Road                                                       February 2011
      JH-22-    Barabalijori to Meralgora                                  15th to 28th
445                                         5.650   132.184   NCB   Post
      NPCC-43   Road                                                       February 2011
      JH-22-                                                               15th to 28th
446             Ichakuti to Torlo           2.600   59.542    NCB   Post
      NPCC-44                                                              February 2011
      JH-22-    Pwd Damodarpur To                                          15th to 28th
447                                         5.100   121.129   NCB   Post
      NPCC-45   Kochra                                                     February 2011
      JH-22-    Matkamhatu To Kudapi                                       15th to 28th
448                                         3.000   73.030    NCB   Post
      NPCC-46   Road                                                       February 2011
      JH-22-    Nawagaon To                                                15th to 28th
449                                         1.950   58.092    NCB   Post
      NPCC-47   Bishwanathpur                                              February 2011
      JH-22-                                                               15th to 28th
450             Balandia To Baibera        1.500    39.570    NCB   Post
      NPCC-48                                                              February 2011
      JH-22-                                                               15th to 28th
451             Reo Road To Pendergarai    1.350    34.017    NCB   Post
      NPCC-49                                                              February 2011
      JH-22-    Hesabandh To Kumartoli                                     15th to 28th
452                                        3.175    73.338    NCB   Post
      NPCC-50   Road Part Ii                                               February 2011
      JH-22-                                                               15th to 28th
453             Baihatu To Ladurasai       10.600   264.377   NCB   Post
      NPCC-51                                                              February 2011
      JH-22-    Pwd Main Road To                                           15th to 28th
454                                        17.500   446.088   NCB   Post
      NPCC-52   Nawada                                                     February 2011
      JH-22-    Porenger Road To                                           15th to 28th
455                                        6.450    151.150   NCB   Post
      NPCC-53   Ganjana                                                    February 2011
      JH-22-                                                               15th to 28th
456             Chorarappa To Sidua        5.500    148.746   NCB   Post
      NPCC-54                                                              February 2011
      JH-22-    Lumbai To Matiloyang                                       15th to 28th
457                                        3.500    92.932    NCB   Post
      NPCC-55   Road                                                       February 2011
      JH-22-    Dhobasai To Tilopoda                                       15th to 28th
458                                        3.300    79.685    NCB   Post
      NPCC-56   Road                                                       February 2011
      JH-22-    Ichapi To Jowaribhanga                                     15th to 28th
459                                        5.150    124.338   NCB   Post
      NPCC-57   Road                                                       February 2011
      JH-22-    Dalposi To Adiwasi Tolly                                   15th to 28th
460                                        4.100    98.927    NCB   Post
      NPCC-65   Road                                                       February 2011
                Kharpos To Benisagar
      JH-22-                                                               15th to 28th
461             Sima Benisagar Sima Via    5.600    135.930   NCB   Post
      NPCC-69                                                              February 2011
                Panguaburu
      JH-22-    Nayagaon Gobardhan                                         15th to 28th
462                                        2.250    52.707    NCB   Post
      NPCC-70   Road                                                       February 2011
      JH-22-    Pwd Main Road To                                           15th to 28th
463                                        3.200    77.526    NCB   Post
      NPCC-71   Tartara Via Tirla                                          February 2011
      JH-22-                                                               15th to 28th
464             Dondari To Salai           2.850    74.918    NCB   Post
      NPCC-73                                                              February 2011
      JH-22-                                                            15th to 28th
465             Barakasel To Jojobir     3.350   82.616    NCB   Post
      NPCC-75                                                           February 2011
      JH-22-                                                            15th to 28th
466             Pansua To Kurabir        4.750   130.720   NCB   Post
      NPCC-76                                                           February 2011
      JH-22-    Chhota Kudabera To                                      15th to 28th
467                                      2.250   54.484    NCB   Post
      NPCC-77   Porlong Part Ii                                         February 2011
      JH-22-                                                            15th to 28th
468             Parsa To Jamkojun        2.425   57.538    NCB   Post
      NPCC-79                                                           February 2011
      JH-22-                                                            15th to 28th
469             Tergo To Tantnagar       1.600   43.497    NCB   Post
      NPCC-80                                                           February 2011
      JH-22-    Mundasai To                                             15th to 28th
470                                      2.225   52.108    NCB   Post
      NPCC-81   Sanmirghingi To Nimdih                                  February 2011
      JH-22-                                                            15th to 28th
471             Gura To Buyasai Road     2.650   61.152    NCB   Post
      NPCC-82                                                           February 2011
      JH-22-                                                            15th to 28th
472             Ruia Road To Ichapi      1.250   29.002    NCB   Post
      NPCC-83                                                           February 2011
      JH-22-                                                            15th to 28th
473             Rutasai To Bichhagutu    3.800   91.260    NCB   Post
      NPCC-84                                                           February 2011
      JH-22-                                                            15th to 28th
474             Tentre Road To Murdih    1.700   44.841    NCB   Post
      NPCC-85                                                           February 2011
      JH-22-    Pwd Main Road To                                        15th to 28th
475                                      4.850   111.442   NCB   Post
      NPCC-86   Kulaburu Road                                           February 2011
      JH-22-    Pasuhatu To Galubasa                                    15th to 28th
476                                      5.175   119.027   NCB   Post
      NPCC-87   Road Part Ii                                            February 2011
      JH-22-                                                            15th to 28th
477             Badia To Mahulsai Road   7.200   168.167   NCB   Post
      NPCC-88                                                           February 2011
      JH-22-    Manjhari Canal To                                       15th to 28th
478                                      3.050   74.139    NCB   Post
      NPCC-89   Jangiulla Road                                          February 2011
      JH-22-    Ukamadkam To Pukripi                                    15th to 28th
479                                      2.650   61.052    NCB   Post
      NPCC-90   Road                                                    February 2011
      JH-22-                                                            15th to 28th
480             Konabasa To Harila       2.000   46.304    NCB   Post
      NPCC-91                                                           February 2011
          JH-22-      Ulihatu To Manjhagaon                                       15th to 28th
  481                                            3.375     81.139    NCB   Post
          NPCC-92     Benisagar Sonaposi Road                                     February 2011
          JH-22-      Bpdp Road To Rugari                                         15th to 28th
  482                                            1.700     41.647    NCB   Post
          NPCC-93     Road                                                        February 2011
          JH-22-      Sarjamdih To Kishunpur                                      15th to 28th
  483                                            6.300    149.191    NCB   Post
          NPCC-94     Road                                                        February 2011
          JH-22-                                                                  15th to 28th
  484                 Munda Tola To Udaypur      1.050     25.854    NCB   Post
          NPCC-95                                                                 February 2011
          JH-22-                                                                  15th to 28th
  485                 Rajbijaypur To Tilopoda    1.050     26.953    NCB   Post
          NPCC-97                                                                 February 2011
          JH-22-                                                                  15th to 28th
  486                 Reo Road To Jilingutu      1.500     39.251    NCB   Post
          NPCC-98                                                                 February 2011
                      Total                     1662.92   40404.95
4. Meghalaya
                                                                                  20th March to
   1      MG/03/01    Mustem-Iongnoh             5.00      340.73    NCB   Post
                                                                                  15th May 2011
                      Lakadong to                                                 20th March to
   2      MG/03/02                               8.00      572.69    NCB   Post
                      Madanpohkseh                                                15th May 2011
                                                                                  20th March to
   3      MG/03/03    Barato to Iongkwang        4.00      241.64    NCB   Post
                                                                                  15th May 2011
                                                                                  20th March to
   4      MG/03/04    Mulait to Mukhain          6.20      387.01    NCB   Post
                                                                                  15th May 2011
                                                                                  20th March to
   5      MG/03/05    Sutnga- Sumer to Kyrluh    3.70      267.44    NCB   Post
                                                                                  15th May 2011
                                                                                  20th March to
   6      MG//03/06   Syntuksiar to Chyrmang     5.50      125.78    NCB   Post
                                                                                  15th May 2011
                                                                                  20th March to
   7      MG/03/07    Mynsngad to Umladang       9.00      322.86    NCB   Post
                                                                                  15th May 2011
                                                                                  20th March to
   8      MG/03/08    DSSMH to Thuruk            14.50    1067.98    NCB   Post
                                                                                  15th May 2011
   9      MG/04/01    UJ road to Pamrinai via    7.40      592.43    NCB   Post   20th March to
                Pamlaban                                               15th May 2011
                Umsning-Mawrong road                                   20th March to
10   MG/04/02                            4.00    282.39   NCB   Post
                to Banbudai                                            15th May 2011
                                                                       20th March to
11   MG/04/03   Umta to Mawkangi         4.62    329.36   NCB   Post
                                                                       15th May 2011
                MMR Road to Nongrim                                    20th March to
12   MG/04/04                            10.00   853.18   NCB   Post
                Jirang                                                 15th May 2011
                Myrdon-Mawtari road to                                 20th March to
13                                       2.50    83.41    NCB   Post
                Myrdon Nongbah                                         15th May 2011
     MG/04/05
                Umsning-Mawrong road                                   20th March to
14                                       3.00    87.32    NCB   Post
                to Syngku                                              15th May 2011
                17th.km of UK road to                                  20th March to
15   MG/04/06                            15.75   503.00   NCB   Post
                Sohjarang-Umpdem                                       15th May 2011
                                                                       20th March to
16   MG/04/07   Sonidan-Lamalong Road    9.00    315.05   NCB   Post
                                                                       15th May 2011
                Chekweibibra-Rongbing                                  20th March to
17   MG/01/01                            4.16    183.09   NCB   Post
                Boldak                                                 15th May 2011
                                                                       20th March to
18   MG/01/02   T03-Gabil Koksi          4.21    270.03   NCB   Post
                                                                       15th May 2011
                T03-Mandalanggre-                                      20th March to
19   MG/01/03                            5.00    471.81   NCB   Post
                Bulpoma                                                15th May 2011
                Rongdu Haslong-                                        20th March to
20   MG/01/04                            9.71    689.17   NCB   Post
                Dabitgittim                                            15th May 2011
                                                                       20th March to
21   MG/01/05   T02-New Kantolguri       1.537   86.96    NCB   Post
                                                                       15th May 2011
                                                                       20th March to
22   MG/01/06   L32-Millawe              2.045   150.71   NCB   Post
                                                                       15th May 2011
                Williamnagar-                                          20th March to
23   MG/01/07                            3.07    157.30   NCB   Post
                Chekwebibra                                            15th May 2011
                                                                       20th March to
24   MG/05/01   Jongkol to Dabram        2.50    89.00    NCB   Post
                                                                       15th May 2011
                Kenegre to                                                  20th March to
25   MG/05/02                                 6.00    195.94   NCB   Post
                Emandurabanda                                               15th May 2011
                Jaisrugittim to Darang                                      20th March to
26   MG/05/03                                9.907    836.44   NCB   Post
                Boldak via Darang Dura                                      15th May 2011
                                                                            20th March to
27   MG/05/04   Budugre to Jetragre          11.752   626.97   NCB   Post
                                                                            15th May 2011
                70th km of AMPT Road                                        20th March to
28   MG/06/01                                1.998    105.92   NCB   Post
                to Singwilgre                                               15th May 2011
                Baljek Agal to Rongsep                                      20th March to
29   MG/06/02                                3.323    212.26   NCB   Post
                Adinggre                                                    15th May 2011
                10th km of AMPT Road                                        20th March to
30   MG/06/03                                4.660    283.21   NCB   Post
                (Gnarugre) to Rongalgre                                     15th May 2011
                Kalchenggre to                                              20th March to
31   MG/06/04                                2.557    156.30   NCB   Post
                Rongramgre (Phase II)                                       15th May 2011
                18th km of AP Road to                                       20th March to
32   MG/06/05                                3.227    215.51   NCB   Post
                Somonpara                                                   15th May 2011
                Rongchadenggre to
                                                                            20th March to
33   MG/06/06   Wakantagre                   1.807    124.85   NCB   Post
                                                                            15th May 2011
                ( upto Jamanggre ) Sec - I
                7th km of Ampati
                                                                            20th March to
34   MG/06/07   Boldamagre Road to           3.927    247.03   NCB   Post
                                                                            15th May 2011
                Kangbakpara
                Joyfar to Kashra Phase I                                    20th March to
35   MG/06/08                                2.906    156.10   NCB   Post
                (upto Belbari)                                              15th May 2011
                4th km of KG Road to                                        20th March to
36   MG/06/09                                4.779    335.29   NCB   Post
                Dinangpara                                                  15th May 2011
                58th km of AMPT Road                                        20th March to
37   MG/06/10                                2.181    182.09   NCB   Post
                to Balujhora                                                15th May 2011
                Waringtonggre to                                            20th March to
38   MG/06/11                                2.935    168.39   NCB   Post
                Gondenggre                                                  15th May 2011
                Kamaboldakgre to                                            20th March to
39   MG/06/12                                3.714    230.52   NCB   Post
                Sotmarenggre                                                15th May 2011
                                                                        20th March to
40   MG/06/13   Hatisil to Muji Agalgre   1.711   114.94   NCB   Post
                                                                        15th May 2011
                Rongchadenggre to
                                                                        20th March to
41   MG/06/14   Wakantagre                5.962   331.46   NCB   Post
                                                                        15th May 2011
                ( Sec-II )
                Damal Asim to                                           20th March to
42   MG/06/15                             5.846   367.47   NCB   Post
                Tebronggre upto Dipogre                                 15th May 2011
                Pedaldoba Raksamgre                                     20th March to
43   MG/06/16                             5.284   386.81   NCB   Post
                Road to Megapara                                        15th May 2011
                14th km of KG Road to                                   20th March to
44   MG/06/17                             4.564   433.15   NCB   Post
                Rongsepgre                                              15th May 2011
                3rd km of Chengjora
                                                                        20th March to
45   MG/06/18   Anderkhona Road to        2.141   145.15   NCB   Post
                                                                        15th May 2011
                Abiselagre
                2nd km. of Selsella
                                                                        20th March to
46   MG/06/19   Tangaon Road to           4.422   323.89   NCB   Post
                                                                        15th May 2011
                Chamaguri
                Bokda Apal to Waram                                     20th March to
47                                        4.359   165.03   NCB   Post
                Asimgre                                                 15th May 2011
                Dolong Manda to                                         20th March to
48                                        8.000   202.14   NCB   Post
                Chikasingre                                             15th May 2011
     MG/06/20                                                           20th March to
49              Rongkhon to Darechikgre   2.000   86.85    NCB   Post
                                                                        15th May 2011
                39th km of Rongram
                                                                        20th March to
50              Phulbari Road to          2.825   97.88    NCB   Post
                                                                        15th May 2011
                Sadolpara
                TD Road (NH-51) to                                      20th March to
51                                        3.620   96.49    NCB   Post
                Agindarenggre                                           15th May 2011
                TD Road (NH-51) to                                      20th March to
52   MG/06/21                             1.600   60.06    NCB   Post
                Kharonggre                                              15th May 2011
                Dengnakpara to                                          20th March to
53                                        4.000   102.50   NCB   Post
                Rongchadenggre                                          15th May 2011
                Chengjhora to                                            20th March to
54                                         3.000   91.76    NCB   Post
                Anderkhona                                               15th May 2011
                109th km of AMPT Road                                    20th March to
55                                         2.000   70.06    NCB   Post
                to Dopatchigre                                           15th May 2011
                Betasing Bazar to                                        20th March to
56                                         2.000   95.50    NCB   Post
                Banduraja                                                15th May 2011
                                                                         20th March to
57   MG/06/22   Marharlipara to Garagre    2.500   107.59   NCB   Post
                                                                         15th May 2011
                8th km of AP Road to                                     20th March to
58                                         3.550   125.26   NCB   Post
                Darugre via Chepagre                                     15th May 2011
                                                                         20th March to
59              Shyamnagar to Gopalthan    2.000   88.22    NCB   Post
                                                                         15th May 2011
                60th km of AMPT Road                                     20th March to
60                                         1.640   50.98    NCB   Post
                to Askikandi                                             15th May 2011
     MG/06/23
                New Bhaitbari to                                         20th March to
61                                         1.500   53.94    NCB   Post
                Peradanga                                                15th May 2011
                44th km of AMPT Road                                     20th March to
62                                         1.000   32.92    NCB   Post
                to Puskarnipara                                          15th May 2011
                                                                         20th March to
63              Bollongitok to Dolwakgre   8.500   295.11   NCB   Post
                                                                         15th May 2011
     MG/06/24
                                                                         20th March to
64              NEC Bye Pass to Kalajhar   3.707   114.28   NCB   Post
                                                                         15th May 2011
                2nd km of Mawlat
                                                                         20th March to
65   MG/02/01   Wahlakhiat Road to         6.000   398.17   NCB   Post
                                                                         15th May 2011
                Mawkria Wahlyngdoh
                                                                         20th March to
66   MG/02/02   Rangphlang to Rasong       6.000   666.92   NCB   Post
                                                                         15th May 2011
                                                                         20th March to
67   MG/02/03   Khrang to Sder             8.000   779.28   NCB   Post
                                                                         15th May 2011
                Mawryngkang to                                           20th March to
68   MG/02/04                              2.500   256.11   NCB   Post
                Nongthymmai (Mawshun)                                    15th May 2011
                Lyngkhat Tmar to                                          20th March to
69   MG/02/05                               3.000   278.83   NCB   Post
                Nongsohphan (Sec- II)                                     15th May 2011
                Extension of LLMS Road                                    20th March to
70   MG/02/06                               2.750   245.15   NCB   Post
                to Sohkynduh (Sec- II)                                    15th May 2011
                Mawkhanu to Jaroit                                        20th March to
71   MG/02/10                               5.000   168.65   NCB   Post
                (Stage - II)                                              15th May 2011
                Hurupukni to
                                                                          20th March to
72              Pyndengborsora,Lalpani      2.488   199.39   NCB   Post
                                                                          15th May 2011
                (Sec - II) (i/c Stage II)
     MG/02/11
                Balat Shella Road to
                                                                          20th March to
73              Terajamra,Khadarbri (Sec    2.342   171.97   NCB   Post
                                                                          15th May 2011
                - II) (i/c Stage - II)
                TTM Road to Thynroit                                      20th March to
74                                          2.000   52.66    NCB   Post
                (Stage - II)                                              15th May 2011
                Laitkor to Nonglum                                        20th March to
75   MG/02/12                               1.856   47.57    NCB   Post
                (Stage - II)                                              15th May 2011
                Smit Umiew to Maw-U-                                      20th March to
76                                          2.402   66.13    NCB   Post
                Sam (Stage - II)                                          15th May 2011
                Pomlakrai to Mawnarain                                    20th March to
77                                          1.500   40.96    NCB   Post
                (Stage - II)                                              15th May 2011
                Laitkor to Lumheh (Stage                                  20th March to
78   MG/02/13                               1.674   38.90    NCB   Post
                - II)                                                     15th May 2011
                Maweitnai to Lyngkien                                     20th March to
79                                          2.922   69.11    NCB   Post
                (Stage - II)                                              15th May 2011
                NN Road to Bangla                                         20th March to
80                                          1.500   44.56    NCB   Post
                (Stage - II)                                              15th May 2011
                SWN Road to Umsaw                                         20th March to
81                                          1.500   44.00    NCB   Post
     MG/02/14   Village (Stage - II)                                      15th May 2011
                3rd km of MM Road to
                                                                          20th March to
82              Mawreng (Sohtun) (Stage     1.000   23.76    NCB   Post
                                                                          15th May 2011
                - II)
                16th km of NH-40 to                                       20th March to
83                                        1.000     24.71    NCB   Post
                Nongbet (Stage - II)                                      15th May 2011
                16 th km of NH-40 to                                      20th March to
84                                        1.000     24.70    NCB   Post
                Lyngkien (Stage - II)                                     15th May 2011
                Bororyngku to Betgora                                     20th March to
85                                        1.900    102.40    NCB   Post
                (Stage - II)                                              15th May 2011
     MG/02/15
                Mawphlang Balat Road to                                   20th March to
86                                        1.000     34.73    NCB   Post
                Lumdiengngan                                              15th May 2011
                T-05 (Mawpyrshong) to                                     20th March to
87   MG/02/07                             4.354    586.14    NCB   Post
                Madan Langning                                            15th May 2011
                                                                          20th March to
88   MG/02/08   Mawlong to Lumkseh        7.475    870.58    NCB   Post
                                                                          15th May 2011
                JAROIT TO Nonghali &                                      20th March to
89   MG/02/09                             10.190   1058.21   NCB   Post
                Mynriang                                                  15th May 2011
                                                                          20th March to
90   MG/07/01   Shngimawlein to Sohma     4.270    354.99    NCB   Post
                                                                          15th May 2011
                                                                          20th March to
91   MG/07/02   Photjaud to Mawbidong     5.500    382.88    NCB   Post
                                                                          15th May 2011
                                                                          20th March to
92   MG/07/03   Umjarain to Diwah         8.000    566.86    NCB   Post
                                                                          15th May 2011
                                                                          20th March to
93   MG/07/04   Mawdoh to Synia           5.000    272.27    NCB   Post
                                                                          15th May 2011
                                                                          20th March to
94   MG/07/05   Rangthong to Ngunraw      12.000   366.71    NCB   Post
                                                                          15th May 2011
                Mawkyrwat to                                              20th March to
95   MG/07/07                             5.000    111.20    NCB   Post
                Marshillong                                               15th May 2011
                                                                          20th March to
96   MG/07/10   Tyllang to Nongriat       5.000    105.59    NCB   Post
                                                                          15th May 2011
                Nongjri to Jynruniang-                                    20th March to
97   MG/07/12                             20.000   1802.06   NCB   Post
                brak                                                      15th May 2011
                                                                          20th March to
98   MG/07/13   Nayapara to Koltapara     3.000    184.00    NCB   Post
                                                                          15th May 2011
                     Total                      446.93   27026.75
5. Uttarakhand
                     Jakoli Bend to Gauna                                        15th to 31st
   1      UT/01/01                              20.55    1233.00    NCB   Post
                     Motor RoadStage-I                                           May 2011
                     Sadar to Saknana Motor                                      15th to 31st
   2      UT/01/02                               5.00     300.00    NCB   Post
                     Road-Stage-I                                                May 2011
                     Chamtola to Papoli Motor                                    15th to 31st
   3      UT/01/03                               2.25      135      NCB   Post
                     Road-Stage-I                                                May 2011
                     Dayalikhet to Airoli                                        15th to 31st
   4      UT/01/04                              15.00      900      NCB   Post
                     Motor Road-Stage-I                                          May 2011
                     Meen dagoti Rd to
                                                                                 15th to 31st
   5      UT/03/01   Hanskoti Motor Road-        4.00      240      NCB   Post
                                                                                 May 2011
                     Stage-I
                     Mathar to Airoli Motor                                      15th to 31st
   6      UT/03/02                               4.00      240      NCB   Post
                     Road-Stage-I                                                May 2011
                     Kanak Chauri to Pangatha                                    15th to 31st
   7      UT/03/03                               3.00      180      NCB   Post
                     Motor Road-Stage-I                                          May 2011
                     Matholia Gaon to Majuli                                     15th to 31st
   8      UT/07/01                               5.00      300      NCB   Post
                     Motor Road-Stage-I                                          May 2011
                     Sarana to Khawakhet                                         15th to 31st
   9      UT/07/02                               5.00      300      NCB   Post
                     Motor Road-Stage-I                                          May 2011
                     Nachani to Bhaiskot                                         15th to 31st
   10     UT/09/01                              15.00      900      NCB   Post
                     Motor Road-Stage-I                                          May 2011
                     Lambgondi to Tulanga                                        15th to 31st
   11     UT/10/01                               9.00      540      NCB   Post
                     Motor Road-Stage-I                                          May 2011
                     Chopda to Udamanda                                          15th to 31st
   12     UT/10/02                              18.00     1080      NCB   Post
                     Motor Road-Stage-I                                          May 2011
                     Gyansu-Sald-Uprikot to
                                                                                 15th to 31st
   13     UT/13/01   Bharar Gaon Motor Road-     7.50      450      NCB   Post
                                                                                 May 2011
                     Stage-I
                     Jakhol to Liwari Motor                                      15th to 31st
   14     UT/13/02                              20.00     1200      NCB   Post
                     Road-Stage-I                                                May 2011
                ODR-36 to Jalahat Motor                                   15th to 31st
15   UT/01/05                               4.70     188     NCB   Post
                Road-Stage-II                                             May 2011
                Maniyagar to Khola                                        15th to 31st
16   UT/01/06                               7.79    311.6    NCB   Post
                Motor Road-Stage-II                                       May 2011
                Petshal-Bamanswal to
                                                                          15th to 31st
17   UT/01/07   Kapkot Motor Road-          15.18   607.2    NCB   Post
                                                                          May 2011
                Stage-II
                Guranabanj to Chami
                                                                          15th to 31st
18   UT/01/08   Archoli Motor Road-         13.36   534.4    NCB   Post
                                                                          May 2011
                Stage-II
                Saundhar to Panua
                                                                          15th to 31st
19   UT/01/09   Dekhan Motor Road-          15.75    630     NCB   Post
                                                                          May 2011
                Stage-II
                Harsila to Nan Kanyalikot                                 15th to 31st
20   UT/02/01                               10.00    400     NCB   Post
                Motor Road-Stage-II                                       May 2011
                MunarBend to Supi Motor                                   15th to 31st
21   UT/02/02                               8.00     320     NCB   Post
                Road-Stage-II                                             May 2011
                Mathro Patli to Lakhani                                   15th to 31st
22   UT/02/03                               14.00    560     NCB   Post
                Motor Road-Stage-II                                       May 2011
                Simar to Kansyari Motor                                   15th to 31st
23   UT/02/04                               4.62    184.8    NCB   Post
                Road-Stage-II                                             May 2011
                Kafligair-Kholsir to
                                                                          15th to 31st
24   UT/02/05   Naugaon Sainj Motor         6.66    266.4    NCB   Post
                                                                          May 2011
                Road-Stage-II
                Ayatula Wajula to Charon                                  15th to 31st
25   UT/02/06                               1.86     74.4    NCB   Post
                Motor Road-Stage-II                                       May 2011
                Upper Chamoli to
                                                                          15th to 31st
26   UT/03/04   Khainuri Motor Road-        7.83    313.20   NCB   Post
                                                                          May 2011
                Stage-II
                Thirpak to Kandai Motor                                   15th to 31st
27   UT/03/05                               14.81   592.40   NCB   Post
                Road-Stage-II                                             May 2011
                Parkhal to Dungri Motor                                  15th to 31st
28   UT/03/06                              11.95   478.00   NCB   Post
                Road-Stage-II                                            May 2011
                Bareth to Pindwali Motor                                 15th to 31st
29   UT/03/07                              8.72    348.80   NCB   Post
                Road-Stage-II                                            May 2011
                Mulagarh to Matai Motor                                  15th to 31st
30   UT/03/08                              10.84   433.60   NCB   Post
                Road-Stage-II                                            May 2011
                Tharali to Kurar Motor                                   15th to 31st
31   UT/03/09                              16.89   675.60   NCB   Post
                Road-Stage-II                                            May 2011
                Dungri to Ratgaon Motor                                  15th to 31st
32   UT/03/10                              6.01    240.40   NCB   Post
                Road-Stage-II                                            May 2011
                PDL Road-Stage-II to
                                                                         15th to 31st
33   UT/04/01   Salna- Kanakot Motor       10.30    412     NCB   Post
                                                                         May 2011
                Road-Stage-II
                Lipulekh-Bhind Road
                Km-329 to                                                15th to 31st
34   UT/04/02                              1.07     42.8    NCB   Post
                PanchPakhariya Motor                                     May 2011
                Road Stage-II
                Walik to Gagar Motor                                     15th to 31st
35   UT/04/03                              17.00    680     NCB   Post
                Road-Stage-II                                            May 2011
                Mandlak Pande to Selpar                                  15th to 31st
36   UT/04/04                              4.65     186     NCB   Post
                Motor Road-Stage-II                                      May 2011
                Champawat-Kharkkarki
                                                                         15th to 31st
37   UT/04/05   to Mudiyani Motor Road-    8.50     340     NCB   Post
                                                                         May 2011
                Stage-II
                Bagoti to Dungraleti                                     15th to 31st
38   UT/04/06                              9.50     380     NCB   Post
                Motor Road-Stage-II                                      May 2011
                Dungrabora Kayal Km-1
                                                                         15th to 31st
39   UT/04/07   to Matiyani Motor Road-    7.00     280     NCB   Post
                                                                         May 2011
                Stage-II
                Champawat Munch to
                                                                         15th to 31st
40   UT/04/08   Neerh Motor Road-Stage-    6.00     240     NCB   Post
                                                                         May 2011
                II
                Vantoli to Dayartoli                                    15th to 31st
41   UT/04/09                              5.63    225.2   NCB   Post
                Motor Road-Stage-II                                     May 2011
                Tanakpur-Tawaghat Road
                                                                        15th to 31st
42   UT/04/10   to Bapratalla Motor Road   4.50    180     NCB   Post
                                                                        May 2011
                Stage-II
                Langha to Binhar Motor                                  15th to 31st
43   UT/05/01                              15.59   623.6   NCB   Post
                Road-Stage-II                                           May 2011
                Hanol to Chatra Motor                                   15th to 31st
44   UT/05/02                              3.03    121.2   NCB   Post
                Road-Stage-II                                           May 2011
                Lokhandi Tibba to Lohari                                15th to 31st
45   UT/05/03                              4.91    196.4   NCB   Post
                Motor Road-Stage-II                                     May 2011
                Pajitilani to Chhibau
                                                                        15th to 31st
46   UT/05/04   Khamroli Motor Road-       2.92    116.8   NCB   Post
                                                                        May 2011
                Stage-II
                Chakrata-Mussoorie Road
                                                                        15th to 31st
47   UT/05/05   Km-72 to Hayo Tagri         12     480     NCB   Post
                                                                        May 2011
                Motor Road Stage-II
                JPPR Road Km-156 to
                                                                        15th to 31st
48   UT/05/06   Radu Mundhol Motor         18.46   738.4   NCB   Post
                                                                        May 2011
                Road Stage-II
                JPRR-Raigi Road to
                                                                        15th to 31st
49   UT/05/07   Kulha Motor Road Stage-    9.51    380.4   NCB   Post
                                                                        May 2011
                II
                Kimari to Rikholi Motor                                 15th to 31st
50   UT/05/08                              3.05    122     NCB   Post
                Road-Stage-II                                           May 2011
                Starting Point of
                Horawala-Koti-Dhalani                                   15th to 31st
51   UT/05/09                              2.55    102     NCB   Post
                Motor Road-Stage-II                                     May 2011
                (Missing Link)
                JPRR Motor Road Km-
                                                                        15th to 31st
52   UT/05/10   158 to Raigi Motor Road    7.49    299.6   NCB   Post
                                                                        May 2011
                Stage-II
                Chhachwakhera to Dungri                                    15th to 31st
53   UT/05/11                                10.83   433.2    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Kyarapur to Kota Myunda                                    15th to 31st
54   UT/05/12                                21.63   865.2    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Chhirakhan to Amjar                                        15th to 31st
55   UT/07/03                                26.28   1051.2   NCB   Post
                Motor Road-Stage-II                                        May 2011
                Kathgodam-Bhawali-
                                                                           15th to 31st
56   UT/07/04   Nathuwakhan to Gargaon       5.00     200     NCB   Post
                                                                           May 2011
                Motor Road-Stage-II
                Bedikhal to Chorkinda                                      15th to 31st
57   UT/08/01                                4.35     174     NCB   Post
                Motor Road-Stage-II                                        May 2011
                Naudkhal to Mallakota                                      15th to 31st
58   UT/08/02                                8.28    331.2    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Dharkot to Kalwari Motor                                   15th to 31st
59   UT/08/03                                4.03    161.2    NCB   Post
                Road-Stage-II                                              May 2011
                Majiyari to Kulasu Motor                                   15th to 31st
60   UT/08/04                                10.28   411.2    NCB   Post
                Road-Stage-II                                              May 2011
                Bungidhar to Riksal                                        15th to 31st
61   UT/08/05                                2.33     93.2    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Pinanidhar to Pinani                                       15th to 31st
62   UT/08/06                                3.66    146.4    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Sadarbend to Aithi Motor                                   15th to 31st
63   UT/08/07                                7.00     280     NCB   Post
                Road-Stage-II                                              May 2011
                Parsundakhal to Kandai
                                                                           15th to 31st
64   UT/08/08   Malli Motor Road-Stage-      6.63    265.2    NCB   Post
                                                                           May 2011
                II
                Piplipani to Nauli Dharkot                                 15th to 31st
65   UT/08/09                                6.32    252.8    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Bharoli to Maithana                                        15th to 31st
66   UT/08/10                                1.60     64      NCB   Post
                Motor Road-Stage-II                                        May 2011
                Chakisain to Jakh Motor                                    15th to 31st
67   UT/08/11                                1.50     60      NCB   Post
                Road-Stage-II                                              May 2011
                Timta-Bungligunth Motor                                    15th to 31st
68   UT/09/02                               29.00   1160.00   NCB   Post
                Road-Stage-II Km-1 to 29                                   May 2011
                Gurna Gogina Km-5 to
                                                                           15th to 31st
69   UT/09/03   Salla Motor Road-Stage-     16.10   644.00    NCB   Post
                                                                           May 2011
                II
                Thal Munsyari Road-
                                                                           15th to 31st
70   UT/09/04   Stage-II Km-43 to Samkot    16.05   642.00    NCB   Post
                                                                           May 2011
                Motor Road-Stage-II
                Dasaithal to Uprara Motor                                  15th to 31st
71   UT/09/05                               5.25    210.00    NCB   Post
                Road-Stage-II                                              May 2011
                Sangor to Dasholi Danu                                     15th to 31st
72   UT/09/06                               4.00    160.00    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Khirmande to Naini                                         15th to 31st
73   UT/09/07                               8.00    320.00    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Chaunala Barsunbari to
                                                                           15th to 31st
74   UT/09/08   Damde Motor Road-           3.50    140.00    NCB   Post
                                                                           May 2011
                Stage-II
                Kafaldungri Sangar Baste
                                                                           15th to 31st
75   UT/09/09   Gangara Motor Road-         5.00    200.00    NCB   Post
                                                                           May 2011
                Stage-II
                Bansbagar to Dhamigaon                                     15th to 31st
76   UT/09/10                               8.00    320.00    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Starting Point of
                Devalthal Urai Motor                                       15th to 31st
77   UT/09/11                               0.82     32.80    NCB   Post
                Road-Stage-II (Missing                                     May 2011
                Link)
                Basukedar to Kyark
                                                                           15th to 31st
78   UT/10/03   Basuri Motor Road-Stage-    2.85    114.00    NCB   Post
                                                                           May 2011
                II
                Barawmalla to Kandi                                        15th to 31st
79   UT/10/04                               8.10    324.00    NCB   Post
                Motor Road-Stage-II                                        May 2011
                Gorpa Sirwari to
                                                                         15th to 31st
80   UT/10/05   Kurchhola Motor Road-      19.15   766.00   NCB   Post
                                                                         May 2011
                Stage-II
                Basti to Hat Motor Road-                                 15th to 31st
81   UT/10/06                              17.78   711.20   NCB   Post
                Stage-II                                                 May 2011
                Shivpuri to Timli Motor                                  15th to 31st
82   UT/11/01                              16.02   640.8    NCB   Post
                Road-Stage-II                                            May 2011
                Tipri to Chahgadoliya                                    15th to 31st
83   UT/11/02                              14.97   598.8    NCB   Post
                Motor Road-Stage-II                                      May 2011
                Khola to Dharpayankoti                                   15th to 31st
84   UT/11/03                              17.66   706.4    NCB   Post
                Motor Road-Stage-II                                      May 2011
                PT Road-Stage-II Km-20
                                                                         15th to 31st
85   UT/11/04   to Kaflog Motor Road-      5.00     200     NCB   Post
                                                                         May 2011
                Stage-II
                Naini to Pathwara Motor                                  15th to 31st
86   UT/11/05                              12.86   514.4    NCB   Post
                Road-Stage-II                                            May 2011
                Gairiraj to Kordi Motor                                  15th to 31st
87   UT/11/06                              3.65     146     NCB   Post
                Road-Stage-II                                            May 2011
                Khatwar Bend to Ringoli
                                                                         15th to 31st
88   UT/11/07   Malli Motor Road-Stage-    6.00     240     NCB   Post
                                                                         May 2011
                II
                Hindolakhal to Unana                                     15th to 31st
89   UT/11/08                              6.07    242.8    NCB   Post
                Motor Road-Stage-II                                      May 2011
                Lakhamandal to Bhankoli                                  15th to 31st
90   UT/13/03                              9.14    365.60   NCB   Post
                Motor Road-Stage-II                                      May 2011
                Phoolchatti to Kharsali                                  15th to 31st
91   UT/13/04                              8.77    350.80   NCB   Post
                Motor Road-Stage-II                                      May 2011
                Barkot to Bhatiya Motor                                  15th to 31st
92   UT/13/05                              5.88    235.20   NCB   Post
                Road-Stage-II                                            May 2011
                ODR-6 (Mori) to Nanai                                    15th to 31st
93   UT/13/06                              6.53    261.20   NCB   Post
                Motor Road-Stage-II                                      May 2011
                 Km- 65 of MDR-5 to
                                                                           15th to 31st
94    UT/13/07   Kishanpur Motor Road-       3.69    147.60   NCB   Post
                                                                           May 2011
                 Stage-II
                 Khalsi Link Road to
                                                                           15th to 31st
95    UT/13/08   Khalsi Motor Road Stage-    18.79   751.60   NCB   Post
                                                                           May 2011
                 II
                 Extn. of Rajgarhi-
                                                                           15th to 31st
96    UT/13/09   Gangtari-Sarnaul Motor      15.77   630.80   NCB   Post
                                                                           May 2011
                 Road-Stage-II
                 Gangori to Nald Motor                                     15th to 31st
97    UT/13/10                               6.48    259.20   NCB   Post
                 Road-Stage-II                                             May 2011
                 NH-94 Khurmola to
                                                                           15th to 31st
98    UT/13/11   Naggaon Motor Road-         8.05    322.00   NCB   Post
                                                                           May 2011
                 Stage-II
                 Patigair to Dangkarkoti                                   15th to 31st
99    UT/01/10                               5.00    300.00   NCB   Post
                 Motor Road                                                May 2011
                 Dudliy Bisht to Sungari                                   15th to 31st
100   UT/01/11                               15.00   900.00   NCB   Post
                 Motor Road                                                May 2011
                 Baur Malla to Baur Talla                                  15th to 31st
101   UT/01/12                               3.00    180.00   NCB   Post
                 Motor Road                                                May 2011
                 Katkinal to Ajoli Talli                                   15th to 31st
102   UT/01/13                               10.00   600.00   NCB   Post
                 Motor Road                                                May 2011
                 Balighat Dofar to Khuldor                                 15th to 31st
103   UT/02/07                               9.00    540.00   NCB   Post
                 Motor Road                                                May 2011
                 Jarkhot Sundil to Sundil                                  15th to 31st
104   UT/02/08                               2.00    120.00   NCB   Post
                 Junayal Motor Road                                        May 2011
                 Bijarijhal to Ukhalson                                    15th to 31st
105   UT/02/09                               5.00    300.00   NCB   Post
                 Motor Road                                                May 2011
                 Wacham to Khati Motor                                     15th to 31st
106   UT/02/10                               6.00    360.00   NCB   Post
                 Road                                                      May 2011
                 Dangoli to Bunga Motor                                    15th to 31st
107   UT/02/11                               5.00    300.00   NCB   Post
                 Road                                                      May 2011
                 Pokhari to Kandai Motor                                   15th to 31st
108   UT/03/11                               16.00   960.00   NCB   Post
                 Road                                                      May 2011
                 Walson to Puniyal Motor                                   15th to 31st
109   UT/04/11                               11.00   660.00   NCB   Post
                 Road                                                      May 2011
                 Barakot to Kothera Motor                                  15th to 31st
110   UT/04/12                               15.00   900.00   NCB   Post
                 Road                                                      May 2011
                 Silikhad to Jabrad Motor                                  15th to 31st
111   UT/05/13                               6.00    360.00   NCB   Post
                 Road                                                      May 2011
                 Sahastradhara to Naliwala                                 15th to 31st
112   UT/05/14                               10.00   600.00   NCB   Post
                 Motor Road                                                May 2011
                 Kotha Band to Pajiya                                      15th to 31st
113   UT/05/15                               15.00   900.00   NCB   Post
                 Motor Road                                                May 2011
                 Takura Bridge Rd Km 4                                     15th to 31st
114   UT/07/05                               5.00    300.00   NCB   Post
                 to Tugrar Motor Road                                      May 2011
                 Bereilly Almora Rd Km                                     15th to 31st
115   UT/07/06                               3.00    180.00   NCB   Post
                 172 to Sirsa Motor Road                                   May 2011
                 Dove to Mallatirdakot                                     15th to 31st
116   UT/07/07                               4.00    240.00   NCB   Post
                 Motor Road                                                May 2011
                 NH-87 Km-97 to Maluti                                     15th to 31st
117   UT/07/08                               9.00    540.00   NCB   Post
                 Motor Road                                                May 2011
                 Saliakot to Anarpa Motor                                  15th to 31st
118   UT/07/09                               5.00    300.00   NCB   Post
                 Road                                                      May 2011
                 Dhabkhal to Uneri Motor                                   15th to 31st
119   UT/08/12                               12.00   720.00   NCB   Post
                 Road                                                      May 2011
                 Patoli to Kalun Motor                                     15th to 31st
120   UT/08/13                               3.00    180.00   NCB   Post
                 Road                                                      May 2011
                 Paithani to Mankhohi                                      15th to 31st
121   UT/08/14                               6.00    360.00   NCB   Post
                 Motor Road                                                May 2011
                 Chakisain to Banjkot                                      15th to 31st
122   UT/08/15                               8.00    480.00   NCB   Post
                 Motor Road                                                May 2011
                 Bansbagar to Manidhami                                    15th to 31st
123   UT/09/12                               15.00   900.00   NCB   Post
                 Motor Road                                                May 2011
                       Girgaon to Gimmi Motor                                        15th to 31st
  124     UT/09/13                                  5.00      300.00    NCB   Post
                       Road                                                          May 2011
                       Bungchina to Kusail                                           15th to 31st
  125     UT/09/14                                  12.00     720.00    NCB   Post
                       Motor Road                                                    May 2011
                       Jakhali Guptkashi Mt Rd.                                      15th to 31st
  126     UT/10/07                                  3.00      180.00    NCB   Post
                       to Taljaman Motor Road                                        May 2011
                       Nag Jagagi to Damar                                           15th to 31st
  127     UT/10/08                                  5.00      300.00    NCB   Post
                       Motor Road                                                    May 2011
                       San to Bajyun Motor                                           15th to 31st
  128     UT/10/09                                  14.00     840.00    NCB   Post
                       Road                                                          May 2011
                       Kyark Band to Pailing                                         15th to 31st
  129     UT/10/10                                  5.00      300.00    NCB   Post
                       Motor Road                                                    May 2011
                       Binak Khal to Kundi                                           15th to 31st
  130     UT/11/09                                  6.00      360.00    NCB   Post
                       Motor Road                                                    May 2011
                       Amani to Kimkhola                                             15th to 31st
  131     UT/11/10                                  6.00      360.00    NCB   Post
                       Motor Road                                                    May 2011
                       Meletha to Jakher Motor                                       15th to 31st
  132     UT/11/11                                  17.00    1020.00    NCB   Post
                       Road                                                          May 2011
                       D T Road to Kumarkot                                          15th to 31st
  133     UT/13/12                                  3.00      180.00    NCB   Post
                       Motor Road                                                    May 2011
                                                                                     15th to 31st
  134     UT/13/13     Malla to Sari Motor Road     10.00     600.00    NCB   Post
                                                                                     May 2011
                       Kalasi to Bingasari Motor                                     15th to 31st
  135     UT/13/14                                  8.00      480.00    NCB   Post
                       Road                                                          May 2011
                       Gajoli to Naugaon Motor                                       15th to 31st
  136     UT/13/15                                  5.00      300.00    NCB   Post
                       Road                                                          May 2011
                       Total                       1196.58   56569.20
6. Rajasthan (Abstract)
    1      $            Alwar                        2.80      60.80    NCB   Post   01st to 15th
    2      $            Banswara                    61.50    1620.55    NCB   Post   Feb. 2011
    3      $            Barmer                      14.28     332.60    NCB   Post
 4   $       Bhilwara      27.93     715.02   NCB   Post
 5   $       Bikaner       16.00     286.95   NCB   Post
 6       $   Bundi          1.10      35.14   NCB   Post
 7       $   Dungarpur     82.06    1953.48   NCB   Post
 8       $   Jaipur         2.00      41.90   NCB   Post
 9       $   Jalore        15.52     369.37   NCB   Post
10       $   Jhalawar       0.90      33.08   NCB   Post
11       $   Jhunjhunu     10.75     344.93   NCB   Post
12       $   Jodhpur       25.10     389.45   NCB   Post
13       $   Pali           5.60     117.40   NCB   Post
14       $   Pratapgarh    22.00     543.86   NCB   Post
15       $   Rajsamand      1.03      48.87   NCB   Post
16       $   S.Madhopur     1.80      49.52   NCB   Post
17       $   Sikar          1.60      75.01   NCB   Post
18       $   Udaipur       43.63    1344.26   NCB   Post
19       $   Ajmer          19.30    523.40   NCB   Post
20       $   Banswara      274.25   7114.97   NCB   Post
21       $   Baran         104.65   2243.41   NCB   Post
22       $   Bikaner       165.75   3219.54   NCB   Post   01st to 15th
23       $   Churu           5.20    100.87   NCB   Post   Feb. 2011
         $                          10893.7
24           Dungarpur     464.67             NCB   Post
                                        7
25       $   Jaipur          1.80     45.02   NCB   Post
26       $   Jaiselmer      18.00    281.56   NCB   Post
27       $   Jalore        160.70   3694.50   NCB   Post
28       $   Jhunjhunu      90.80   2930.68   NCB   Post
29       $   Jodhpur       463.14   7740.58   NCB   Post
30       $   Nagaur         89.82   1793.15   NCB   Post
31       $   Hanumangarh     7.85    210.16   NCB   Post
32       $   Pali           57.45   1572.16   NCB   Post
33       $   Pratapgarh     47.00   1187.94   NCB   Post
   34           $        Rajsamand                      6.20        146.62       NCB            Post
   35           $        Sikar                         29.43       1037.75       NCB            Post
                $                                                  15883.8
    36                   Udaipur                        435.07                   NCB            Post
                                                                      1
    37            $      Ajmer                           18.46      571.98       NCB            Post
    38            $      Alwar                           66.25     1843.85       NCB            Post
    39            $      Baran                           12.05      594.25       NCB            Post
    40            $      Bharatpur                       34.22      944.98       NCB            Post
    41            $      Bhilwara                        64.91     1820.16       NCB            Post
    42            $      Bundi                           23.68      890.40       NCB            Post
    43            $      Chittor                          3.80      117.31       NCB            Post
    44            $      Dausa                            4.75      140.26       NCB            Post
    45            $      Dholpur                         31.73      881.58       NCB            Post
    46            $      Jaipur                          30.78     1019.03       NCB            Post
    47            $      Karauli                         49.70     1991.15       NCB            Post
    48            $      Kota                             7.50      332.79       NCB            Post
    49            $      Pratapgarh                      19.00      532.55       NCB            Post
    50            $      Rajsamand                       16.91      627.45       NCB            Post
    51            $      S.Madhopur                      12.88      457.14       NCB            Post
    52            $      Sirohi                          21.70     1115.58       NCB            Post
    53            $      Tonk                            21.83      645.49       NCB            Post
    54            $      Udaipur                         14.50      503.91       NCB            Post
    55            $      Baran                           66.50     2526.52       NCB            Post
    56            $      Bhilwara                        83.75     2508.00       NCB            Post
    57            $      Jodhpur                        143.05     2487.07       NCB            Post
    58            $      Rajsamand                       76.80     2507.30       NCB            Post
                         Total                          3601.43 94040.83
$ -Details of bid packages to be invited district wise are tabulated above. Package wise details will be added subsequently.
6.     Uttar Pradesh
                                                                                                           15th to 31st
                                                                                  NCB           Post
        1 UP0151        Agra                                   4.593    152.69                             March 2011
                                                           15th to 31st
                                              NCB   Post
2 UP0152    Agra             6.060   201.66                March 2011
                                                           15th to 31st
                                              NCB   Post
3 UP0153    Agra             5.350   177.35                March 2011
                                                           15th to 31st
                                              NCB   Post
4 UP0154    Agra             4.500   145.39                March 2011
                                                           15th to 31st
                                              NCB   Post
5 UP0155    Agra             2.650    84.93                March 2011
                                                           15th to 31st
                                              NCB   Post
6 UP0461    Ambedkarnagar    5.800   244.58                March 2011
                                                           15th to 31st
                                              NCB   Post
7 UP0462    Ambedkarnagar   10.300   441.59                March 2011
                                                           15th to 31st
                                              NCB   Post
8 UP0463    Ambedkarnagar    7.300   309.95                March 2011
                                                           15th to 31st
                                              NCB   Post
9 UP0464    Ambedkarnagar    5.350   230.93                March 2011
                                                           15th to 31st
                                              NCB   Post
10 UP0465   Ambedkarnagar    5.175   251.94                March 2011
                                                           15th to 31st
                                              NCB   Post
11 UP0466   Ambedkarnagar    6.375   278.02                March 2011
                                                           15th to 31st
                                              NCB   Post
12 UP0467   Ambedkarnagar    6.000   252.52                March 2011
                                                           15th to 31st
                                              NCB   Post
13 UP0468   Ambedkarnagar    8.375   375.42                March 2011
                                                           15th to 31st
                                              NCB   Post
14 UP0545   Auraiya          1.425    66.94                March 2011
                                                           15th to 31st
                                              NCB   Post
15 UP0546   Auraiya          4.400   214.01                March 2011
                                                           15th to 31st
                                              NCB   Post
16 UP0547   Auraiya          1.975    99.32                March 2011
                                                           15th to 31st
                                              NCB   Post
17 UP0978   Bahraich         6.320   363.93                March 2011
                                                      15th to 31st
                                         NCB   Post
18 UP0979   Bahraich    7.800   452.26                March 2011
                                                      15th to 31st
                                         NCB   Post
19 UP0980   Bahraich    6.900   407.71                March 2011
                                                      15th to 31st
                                         NCB   Post
20 UP0981   Bahraich    8.250   511.00                March 2011
                                                      15th to 31st
                                         NCB   Post
21 UP0982   Bahraich    6.800   383.05                March 2011
                                                      15th to 31st
                                         NCB   Post
22 UP0983   Bahraich    9.950   584.01                March 2011
                                                      15th to 31st
                                         NCB   Post
23 UP0984   Bahraich    7.100   415.52                March 2011
                                                      15th to 31st
                                         NCB   Post
24 UP1147   Balrampur   5.800   267.55                March 2011
                                                      15th to 31st
                                         NCB   Post
25 UP1148   Balrampur   8.300   482.53                March 2011
                                                      15th to 31st
                                         NCB   Post
26 UP1149   Balrampur   8.700   472.76                March 2011
                                                      15th to 31st
                                         NCB   Post
27 UP1150   Balrampur   6.200   280.73                March 2011
                                                      15th to 31st
                                         NCB   Post
28 UP1147   Balrampur   1.300    62.62                March 2011
                                                      15th to 31st
                                         NCB   Post
29 UP2038   Deoria      3.250   134.81                March 2011
                                                      15th to 31st
                                         NCB   Post
30 UP2039   Deoria      4.150   158.82                March 2011
                                                      15th to 31st
                                         NCB   Post
31 UP2175   Etah        5.035   198.91                March 2011
                                                      15th to 31st
                                         NCB   Post
32 UP2176   Etah        3.675   146.22                March 2011
                                                      15th to 31st
                                         NCB   Post
33 UP2177   Etah        6.905   270.57                March 2011
                                                        15th to 31st
                                           NCB   Post
34 UP2178   Etah          5.310   225.01                March 2011
                                                        15th to 31st
                                           NCB   Post
35 UP2179   Etah          6.540   252.45                March 2011
                                                        15th to 31st
                                           NCB   Post
36 UP2180   Etah          8.440   321.53                March 2011
                                                        15th to 31st
                                           NCB   Post
37 UP2181   Etah          5.100   240.23                March 2011
                                                        15th to 31st
                                           NCB   Post
38 UP2356   Faizabad      3.950   193.65                March 2011
                                                        15th to 31st
                                           NCB   Post
39 UP2357   Faizabad      6.050   295.04                March 2011
                                                        15th to 31st
                                           NCB   Post
40 UP2358   Faizabad      3.650   164.50                March 2011
                                                        15th to 31st
                                           NCB   Post
41 UP2359   Faizabad      5.600   304.84                March 2011
                                                        15th to 31st
                                           NCB   Post
42 UP2360   Faizabad      5.865   239.75                March 2011
                                                        15th to 31st
                                           NCB   Post
43 UP2459   Farrukhabad   4.150   185.43                March 2011
                                                        15th to 31st
                                           NCB   Post
44 UP2478   Farrukhabad   5.875   282.73                March 2011
                                                        15th to 31st
                                           NCB   Post
45 UP2455   Farrukhabad   8.500   387.41                March 2011
                                                        15th to 31st
                                           NCB   Post
46 UP2550   Fatehpur      4.150   176.27                March 2011
                                                        15th to 31st
                                           NCB   Post
47 UP2551   Fatehpur      5.100   207.66                March 2011
                                                        15th to 31st
                                           NCB   Post
48 UP2552   Fatehpur      4.250   171.97                March 2011
                                                        15th to 31st
                                           NCB   Post
49 UP2553   Fatehpur      5.830   242.78                March 2011
                                                      15th to 31st
                                         NCB   Post
50 UP2554   Fatehpur    4.250   181.82                March 2011
                                                      15th to 31st
                                         NCB   Post
51 UP2555   Fatehpur    4.600   193.53                March 2011
                                                      15th to 31st
                                         NCB   Post
52 UP2556   Fatehpur    5.850   200.57                March 2011
                                                      15th to 31st
                                         NCB   Post
53 UP2557   Fatehpur    6.300   212.23                March 2011
                                                      15th to 31st
                                         NCB   Post
54 UP2558   Fatehpur    4.650   157.02                March 2011
                                                      15th to 31st
                                         NCB   Post
55 UP2559   Fatehpur    4.300   149.32                March 2011
                                                      15th to 31st
                                         NCB   Post
56 UP3045   Gonda       3.830   176.41                March 2011
                                                      15th to 31st
                                         NCB   Post
57 UP3046   Gonda       5.225   243.97                March 2011
                                                      15th to 31st
                                         NCB   Post
58 UP3047   Gonda       3.915   218.00                March 2011
                                                      15th to 31st
                                         NCB   Post
59 UP3048   Gonda       7.400   361.64                March 2011
                                                      15th to 31st
                                         NCB   Post
60 UP3049   Gonda       5.250   235.18                March 2011
                                                      15th to 31st
                                         NCB   Post
61 UP3050   Gonda       3.970   195.72                March 2011
                                                      15th to 31st
                                         NCB   Post
62 UP3184   Gorakhpur   2.000   120.49                March 2011
                                                      15th to 31st
                                         NCB   Post
63 UP3374   Hardoi      3.900   187.45                March 2011
                                                      15th to 31st
                                         NCB   Post
64 UP3375   Hardoi      3.250   162.59                March 2011
                                                      15th to 31st
                                         NCB   Post
65 UP3376   Hardoi      5.600   249.77                March 2011
                                                             15th to 31st
                                                NCB   Post
66 UP3377   Hardoi             5.900   258.88                March 2011
                                                             15th to 31st
                                                NCB   Post
67 UP3538   J.B.F.Nagar        4.305   198.91                March 2011
                                                             15th to 31st
                                                NCB   Post
68 UP4052   Kanpur Dehat       7.450   384.13                March 2011
                                                             15th to 31st
                                                NCB   Post
69 UP4053   Kanpur Dehat       3.925   208.15                March 2011
                                                             15th to 31st
                                                NCB   Post
70 UP4054   Kanpur Dehat       5.475   273.52                March 2011
                                                             15th to 31st
                                                NCB   Post
71 UP4055   Kanpur Dehat       4.475   241.65                March 2011
                                                             15th to 31st
                                                NCB   Post
72 UP4056   Kanpur Dehat       5.600   251.61                March 2011
                                                             15th to 31st
                                                NCB   Post
73 UP4452   Lakhimpur-Kherii   6.000   308.54                March 2011
                                                             15th to 31st
                                                NCB   Post
74 UP4453   Lakhimpur-Kherii   9.125   442.01                March 2011
                                                             15th to 31st
                                                NCB   Post
75 UP4454   Lakhimpur-Kherii   6.350   314.69                March 2011
                                                             15th to 31st
                                                NCB   Post
76 UP4455   Lakhimpur-Kherii   4.700   212.88                March 2011
                                                             15th to 31st
                                                NCB   Post
77 UP4456   Lakhimpur-Kherii   4.650   208.79                March 2011
                                                             15th to 31st
                                                NCB   Post
78 UP4457   Lakhimpur-Kherii   8.490   393.70                March 2011
                                                             15th to 31st
                                                NCB   Post
79 UP4458   Lakhimpur-Kherii   5.450   246.72                March 2011
                                                             15th to 31st
                                                NCB   Post
80 UP4459   Lakhimpur-Kherii   9.940   436.69                March 2011
                                                             15th to 31st
                                                NCB   Post
81 UP4460   Lakhimpur-Kherii   4.530   224.33                March 2011
                                                              15th to 31st
                                                 NCB   Post
82 UP4461    Lakhimpur-Kherii   3.400   154.96                March 2011
                                                              15th to 31st
                                                 NCB   Post
83 UP4462    Lakhimpur-Kherii   5.830   252.81                March 2011
                                                              15th to 31st
                                                 NCB   Post
84 UP4659    Lucknow            4.150   209.09                March 2011
                                                              15th to 31st
                                                 NCB   Post
85 UP4660    Lucknow            2.775   152.73                March 2011
                                                              15th to 31st
                                                 NCB   Post
86 UP4661    Lucknow            3.825   186.37                March 2011
                                                              15th to 31st
                                                 NCB   Post
87 UP4662    Lucknow            2.955   138.91                March 2011
                                                              15th to 31st
                                                 NCB   Post
88 UP4755A   Maharajganj        2.925   175.43                March 2011
                                                              15th to 31st
                                                 NCB   Post
89 UP4755B   Maharajganj        4.250   234.12                March 2011
                                                              15th to 31st
                                                 NCB   Post
90 UP4756A   Maharajganj        2.525   154.40                March 2011
                                                              15th to 31st
                                                 NCB   Post
91 UP4756B   Maharajganj        2.850   241.69                March 2011
                                                              15th to 31st
                                                 NCB   Post
92 UP4757A   Maharajganj        2.200   118.24                March 2011
                                                              15th to 31st
                                                 NCB   Post
93 UP4757B   Maharajganj        3.495   229.45                March 2011
                                                              15th to 31st
                                                 NCB   Post
94 UP5149    Mau                3.450   149.68                March 2011
                                                              15th to 31st
                                                 NCB   Post
95 UP5150    Mau                2.400   106.41                March 2011
                                                              15th to 31st
                                                 NCB   Post
96 UP5151    Mau                6.100   267.68                March 2011
                                                              15th to 31st
                                                 NCB   Post
97 UP5152    Mau                3.250   139.20                March 2011
                                                                  15th to 31st
                                                     NCB   Post
98 UP5153    Mau                    5.050   213.23                March 2011
                                                                  15th to 31st
                                                     NCB   Post
99 UP5154    Mau                    6.550   365.98                March 2011
                                                                  15th to 31st
                                                     NCB   Post
100 UP5374   Mirzapur               4.800   150.15                March 2011
                                                                  15th to 31st
                                                     NCB   Post
101 UP5375   Mirzapur               3.750   105.06                March 2011
                                                                  15th to 31st
                                                     NCB   Post
102 UP5376   Mirzapur              10.500   368.01                March 2011
                                                                  15th to 31st
                                                     NCB   Post
103 UP5377   Mirzapur               8.850   319.03                March 2011
                                                                  15th to 31st
                                                     NCB   Post
104 UP5495   Moradabad              4.125   197.36                March 2011
                                                                  15th to 31st
                                                     NCB   Post
105 UP5657   Pilibhit               1.800    75.67                March 2011
                                                                  15th to 31st
                                                     NCB   Post
106 UP5869   Rae Bareli             3.700   178.76                March 2011
                                                                  15th to 31st
                                                     NCB   Post
107 UP5870   Rae Bareli             4.750   231.13                March 2011
                                                                  15th to 31st
                                                     NCB   Post
108 UP5871   Rae Bareli             4.000   179.50                March 2011
                                                                  15th to 31st
                                                     NCB   Post
109 UP5872   Rae Bareli             5.200   218.41                March 2011
                                                                  15th to 31st
                                                     NCB   Post
110 UP5873   Rae Bareli             3.900   197.94                March 2011
                                                                  15th to 31st
                                                     NCB   Post
111 UP5874   Rae Bareli             7.850   393.29                March 2011
                                                                  15th to 31st
                                                     NCB   Post
112 UP5875   Rae Bareli             5.000   209.89                March 2011
                                                                  15th to 31st
                                                     NCB   Post
113 UP6133   S.R. Nagar(Bhadohi)    5.650   230.51                March 2011
                                                                 15th to 31st
                                                    NCB   Post
114 UP6134   S.R. Nagar(Bhadohi)   5.500   230.52                March 2011
                                                                 15th to 31st
                                                    NCB   Post
115 UP6135   S.R. Nagar(Bhadohi)   3.950   155.11                March 2011
                                                                 15th to 31st
                                                    NCB   Post
116 UP6136   S.R. Nagar(Bhadohi)   7.850   305.74                March 2011
                                                                 15th to 31st
                                                    NCB   Post
117 UP6137   S.R. Nagar(Bhadohi)   7.300   286.04                March 2011
                                                                 15th to 31st
                                                    NCB   Post
118 UP6138   S.R. Nagar(Bhadohi)   8.800   352.09                March 2011
                                                                 15th to 31st
                                                    NCB   Post
119 UP6384   Shahjahanpur          3.250   165.78                March 2011
                                                                 15th to 31st
                                                    NCB   Post
120 UP6385   Shahjahanpur          5.900   279.68                March 2011
                                                                 15th to 31st
                                                    NCB   Post
121 UP6386   Shahjahanpur          3.450   172.58                March 2011
                                                                 15th to 31st
                                                    NCB   Post
122 UP6387   Shahjahanpur          5.500   308.94                March 2011
                                                                 15th to 31st
                                                    NCB   Post
123 UP6388   Shahjahanpur          5.500   256.02                March 2011
                                                                 15th to 31st
                                                    NCB   Post
124 UP6389   Shahjahanpur          3.700   193.36                March 2011
                                                                 15th to 31st
                                                    NCB   Post
125 UP6390   Shahjahanpur          2.650   141.94                March 2011
                                                                 15th to 31st
                                                    NCB   Post
126 UP6391   Shahjahanpur          2.400   119.92                March 2011
                                                                 15th to 31st
                                                    NCB   Post
127 UP6559   Siddharathnagar       4.360   178.04                March 2011
                                                                 15th to 31st
                                                    NCB   Post
128 UP6560   Siddharathnagar       4.905   260.04                March 2011
                                                                 15th to 31st
                                                    NCB   Post
129 UP6561   Siddharathnagar       4.050   214.85                March 2011
                                                             15th to 31st
                                                NCB   Post
130 UP6562   Siddharathnagar   4.655   228.26                March 2011
                                                             15th to 31st
                                                NCB   Post
131 UP6563   Siddharathnagar   5.450   289.54                March 2011
                                                             15th to 31st
                                                NCB   Post
132 UP6564   Siddharathnagar   5.600   310.09                March 2011
                                                             15th to 31st
                                                NCB   Post
133 UP6565   Siddharathnagar   5.825   299.71                March 2011
                                                             15th to 31st
                                                NCB   Post
134 UP6566   Siddharathnagar   6.450   333.68                March 2011
                                                             15th to 31st
                                                NCB   Post
135 UP6657   Sitapur           5.800   270.81                March 2011
                                                             15th to 31st
                                                NCB   Post
136 UP6658   Sitapur           5.850   353.29                March 2011
                                                             15th to 31st
                                                NCB   Post
137 UP6659   Sitapur           4.100   229.01                March 2011
                                                             15th to 31st
                                                NCB   Post
138 UP6660   Sitapur           5.510   306.48                March 2011
                                                             15th to 31st
                                                NCB   Post
139 UP6661   Sitapur           4.950   249.82                March 2011
                                                             15th to 31st
                                                NCB   Post
140 UP6662   Sitapur           5.250   279.50                March 2011
                                                             15th to 31st
                                                NCB   Post
141 UP6663   Sitapur           5.975   305.29                March 2011
                                                             15th to 31st
                                                NCB   Post
142 UP6664   Sitapur           4.675   272.44                March 2011
                                                             15th to 31st
                                                NCB   Post
143 UP6665   Sitapur           4.850   261.65                March 2011
                                                             15th to 31st
                                                NCB   Post
144 UP6666   Sitapur           3.300   183.51                March 2011
                                                             15th to 31st
                                                NCB   Post
145 UP6667   Sitapur           4.700   241.86                March 2011
                                                        15th to 31st
                                           NCB   Post
146 UP6668    Sitapur     4.500   219.74                March 2011
                                                        15th to 31st
                                           NCB   Post
147 UP68116   Sultanpur   4.250   190.48                March 2011
                                                        15th to 31st
                                           NCB   Post
148 UP68117   Sultanpur   4.500   189.22                March 2011
                                                        15th to 31st
                                           NCB   Post
149 UP68118   Sultanpur   7.350   290.34                March 2011
                                                        15th to 31st
                                           NCB   Post
150 UP68119   Sultanpur   7.625   287.87                March 2011
                                                        15th to 31st
                                           NCB   Post
151 UP68120   Sultanpur   8.675   320.03                March 2011
                                                        15th to 31st
                                           NCB   Post
152 UP6968    Unnao       5.330   317.96                March 2011
                                                        15th to 31st
                                           NCB   Post
153 UP6969    Unnao       5.050   289.84                March 2011
                                                        15th to 31st
                                           NCB   Post
154 UP6970    Unnao       7.225   362.51                March 2011
                                                        15th to 31st
                                           NCB   Post
155 UP6971    Unnao       4.025   197.19                March 2011
                                                        15th to 31st
                                           NCB   Post
156 UP6972    Unnao       3.000   153.73                March 2011
                                                        15th to 31st
                                           NCB   Post
157 UP6973    Unnao       2.400   118.71                March 2011
                                                        15th to 31st
                                           NCB   Post
158 UP6974    Unnao       6.575   337.88                March 2011
                                                        15th to 31st
                                           NCB   Post
159 UP6988    Unnao       7.455   376.28                March 2011
                                                        15th to 31st
                                           NCB   Post
160 UP6989    Unnao       2.000    94.52                March 2011
                                                        15th to 31st
                                           NCB   Post
161 UP6990    Unnao       3.200   161.37                March 2011
   Total      838.098 39350.77
                       301566.1
Grand Total            0
                        Procurement plan with Method & Time Schedule for 18 Months period -- for GOODS & EQUIPMENT

 Ref    Contract                 Estimated Cost (Rs. In Lakhs)       Procurement       Domestic Preference    Review by      Expected         Comments
 No.    (Description)                                                  Method              (Yes/No)             Bank        Bid-Opening
                                                                                                             (Prior/Post)      Date)

A. NRRDA
        PCU Office
  1     Office furniture for                   **                      Shopping                No                Post            **
        PCU

  2      Procurement of                                               ICB                  Yes                 prior             **
         Synchronized Chip                     **
         Sealing Machine
         for improved
         bituminous surface
** Details of Goods and Equipments to be procured by NRRDA are being worked out and will be added to the procurement plan at a later stage.
B. STATES
1. Himachal Pradesh - To be decided later on, if required
2. Punjab- To be decided later on, if required
3. Jharkhand- To be decided later on, if required
4. Meghalaya- To be decided later on, if required
5. Rajasthan (package wise details will be submitted by Rajasthan at a later Stage.)
   1     IT Equipments,                        495
         Softwares, Survey
         and Quality Control
         Equipments
6. Uttar Pradesh- To be decided later on, if required
7. Uttarakhand- To be decided later on, if required
                Procurement plan with Method & Time Schedule for 18 Months period -- for CONSULTANCY
Ref.           Description of Assignment                   Estimated Cost   Selection   Review      Expected     Comments
No.                                                                         Method        by        Proposals
                                                                                         Bank      Submission
                                                                                        (Prior /      Date
                                                                                         Post)6
A. NRRDA
    1. Consultancy services for Project                    US $ 3,000,000    QCBS        Prior     March/April
       Performace Review                                                                             2011
    2. Consultancy services for Procurement                 US $ 350,000     QCBS        Prior      May/June
       Capacity Building in the participating                                                        2011
       states
    3. Selection of Chartered Accountant firm for                            QCBS
       internal audit in the seven participating
       states
B. States
HIMACHAL PRADESH
  1    Consultancy Services for selection of a             US $ 1,500,000    QCBS        Prior     Feb./March
       consultancy firm to provide Project                                                            2011
       Management Services
  2    Road Maintenance Management System                   US $ 327,000     QCBS        Prior         @
       and road condition inventories.
  3    Road Maintenance Policy formulation                  US $ 100,000     QCBS        Post          @
PUNJAB
  1    Consultancy Services for selection of a                               QCBS        Prior     Feb./March
       consultancy firm to provide Project                 US $ 1,000,000                             2011
       Management Services
  2  Road Maintenance Management System                     US $ 850,000     QCBS        Prior         @
     and road condition inventories.
 3   Road Maintenance Policy formulation                    US $ 100,000     QCBS        Post          @
JHARKHAND
 1   Consultancy Services for selection of a               US $ 3,000,000    QCBS        Prior     Feb./March
       consultancy  firm   to       provide      Project                                              2011
       Management Services
Ref.          Description of Assignment                Estimated Cost   Selection   Review      Expected    Comments
No.                                                                     Method        by        Proposals
                                                                                     Bank      Submission
                                                                                    (Prior /      Date
                                                                                     Post)6
 2     Road Maintenance Management System              US $ 1,886,000    QCBS        Prior         @
       and road condition inventories.
 3     Road Maintenance Policy formulation              US $ 100,000     QCBS        Post          @


MEGHALAYA
    1             Consultancy       Services     for   US $ 2,500,000    QCBS        Prior     Feb./March
                  selection of a consultancy firm to                                              2011
                  provide Project Management
                  Services
       2          Road Maintenance                      US $ 323,000     QCBS        Prior         @
                  Management System and road
                  condition inventories.
       3          Road Maintenance Policy               US $ 100,000     QCBS        Post          @
                  formulation
RAJASTHAN
     1            Consultancy       Services     for   US $ 2,000,000    QCBS        Prior     Feb./March
                  selection of a consultancy firm to                                              2011
                  provide Project Management
                  Services
       2     Road Maintenance                           US $ 600,000     QCBS        Prior         @
             Management System and road
             condition inventories.
     3       Road Maintenance Policy                    US $ 100,000     QCBS        Post          @
             formulation
UTTAR PRADESH

       1          Consultancy       Services     for   US $ 3,000,000    QCBS        Prior     Feb./March
                  selection of a consultancy firm to                                              2011
                  provide Project Management
                  Services
       2          Road Maintenance                     US $ 1,313,000    QCBS        Prior         @
                  Management System and road
                  condition inventories.
Ref.        Description of Assignment                Estimated Cost              Selection   Review      Expected    Comments
No.                                                                              Method        by        Proposals
                                                                                              Bank      Submission
                                                                                             (Prior /      Date
                                                                                              Post)6
       3        Road Maintenance Policy               US $ 100,000                QCBS        Post          @
                formulation
UTTRAKHAND
     1          Consultancy       Services     for   US $ 2,000,000               QCBS        Prior     Feb./March
                selection of a consultancy firm to                                                         2011
                provide Project Management
                Services
       2        Road Maintenance                      US $ 300,000                QCBS        Prior         @
                Management System and road
                condition inventories.
       3        Road Maintenance Policy               US $ 100,000                QCBS        Post          @
                formulation

  @ - These details are being worked out and will be advised at a later stage.

								
To top