FPM Science Hall Fire Suppression System Upgrade 2011 Addendum2
Document Sample


Purchasing Department
5700 Cass Avenue, suite 4200
Detroit, Michigan 48202
(313) 577-3734
Division of Finance and Facilities Management FAX (313) 577-3747
October 26, 2011
Addendum #2 To
Request for Proposal
For Science Hall: Upgrade Fire Suppression System: Project 005-189670-1
Minutes of the Pre-bid Conference
Dated October 14, 2011
The Addendum must be acknowledged on your lump sum bid.
The pre-bid conference for Request for Proposal for Science Hall: Upgrade Fire Suppression System, Project
005-189670-1 was held on October 26, 2011, at 2:00 p.m. (local time) – at Detroit, MI 48202. Kimberly
Tomaszewski reviewed the highlights of the pre-bid package, especially concerning details such as bid due dates
and who vendors may contact during the live bid process. Kipp Cycholl discussed the technical aspects of the
project and bid requirements, and conducted the Q & A session.
NOTE: You must have attended a pre-bid conference in order to be eligible to bid on a particular project. Receipt
of minutes or addenda without being at a pre-bid conference does not qualify your company to bid.
Numerous simple questions and answers were addressed at the pre-bid meeting. Some of the issues were
as follows:
A bid bond is not required for bids below $50,000. Otherwise, a bid bond (5%) will be required for the full
amount of the bid.
Performance Bond and Material & Labor Payment Bond requirements are listed in the specifications of the
job. Performance & Material & Labor Payment Bonds must be provided by the awarded Vendor with the
submission of the signed contract; which will then be submitted to FP&M management for counter
signature.
The Performance Bond may not be purchased by the University. As a result, the cost for the Performance
Bond must be included as a separate item for Base Bid.
The awarded vendor must provide the required Certificate of Insurance in compliance with Section 800,
article 11 of the bid specifications prior to commencement of any work.
University Design Standards are found on the University website
http://www.forms.purchasing.wayne.edu/Adv_bid/Adv_bid.html. These standards are inclusive to
the drawing and contract documents. Any discrepancies between the drawings and the University Design
Standards must be identified by bidders during the bid phase for clarification.
If your company has not previously done business with the University you may go to the Purchasing
website at www.purchasing.wayne.edu and look for the “new vendor” link under “Information for
Vendors” on the left. You may submit a new vendor request form and an IRS form W-9. This will register
your company on our vendor list. (NOTE: this does not replace the listserv.)
This Project Requires the Contractor and any subcontractors to compensate all employees who come to
the job site at no less than State of Michigan Prevailing Wage Rates. A Prevailing Wage Rate Schedule is
included in Section 00410 of the Bid Specifications. Vendors must review these requirements to be sure
they are in compliance with the requirements of the University and the State of Michigan. Contact the
State of Michigan if further information on prevailing wage rate is needed at website
http://www.michigan.gov/dleg/0,1607,7-154-27673_27706---,00.html. Vendors must post wages at the
job site in compliance with the complete Prevailing Wage Rate listing provided in Bid Documents.
PREVAILING WAGE RATE SCHEDULE 00410 - 1
1099 workers and subcontractors using 1099 workers are NOT acceptable
Certified Payroll must be provided with each of the contractor’s pay applications for all workers who
worked at the job site, in compliance with the State of Michigan policy. Failure to provide certified payroll
will constitute breach of contract and pay applications will be returned unpaid, and remain so until
satisfactory supporting documents are provided.
Signed waivers from all Subcontractors and suppliers must accompany Pay Applications or they will be
returned for such documentation prior to approval.
A properly executed sworn statement is required from all tiers of contractors, sub-contractors and
suppliers which provide services or product of $1,000.00 or greater. Sworn statements must accompany
applications for payment
All documents listed in the Front End Section 0410-2 “Wayne State Prevailing Wage Requirements” must
accompany applications for payment. Failure to do so will result in the entire application package returned
for correction. A current State of Michigan Prevailing Wage Schedule for this project is attached.
A checklist of all Pay Application requirements can be found in Section 00430-1.
The competency and responsibility of Bidders will be considered in making the award. The Owner does
not obligate himself to accept the lowest or any other bids. The Owner reserves the right to reject any and
all bids and to waive any informalities in the Proposals
Parking on WSU campus lots and structures are $5.00/access. Vendor must build parking into their lump
sum bid (monthly parking passes can be purchased at WSU Welcome Center).
Section 300, Form of Proposal has changed very recently, review carefully and complete in its entirety to
avoid disqualification. The Form of Proposal has been REVISED. Please submit your bid using the
REVISED form only.
The contractors must fill out our prequalification form. They can attach additional information if they
would like but at a minimum the information requested must be filled in on our form so that we do not have
to hunt to find the information.
Contractors who have withdrawn a bid after a University bid opening and/or refused to enter into a
contract with the University upon notification of award within the last 3 years are not eligible to bid on this
project.
Project hours of operation are 7:00am – 5:00 pm. Anything else requires advance notice and approval.
Over time rates are to be included in your lump sum proposal. Off hour work will require the approval of
the Project Manager and requires 48-hour notice.
Prequalification meeting will be held the first business day after bid openings. Contractors must be
available. The Project Manager will coordinate the meetings.
Pre Award meeting includes Schedule of Values from the Contractor, including a list of Contractor’s
subcontractors and other qualifications
An unsigned contract will be given to the successful Contractor at the conclusion of the Pre Award
meeting, if all aspects of the bid are in order. The Contractor has 5 business days to return the contract to
the Project Manager for University counter signature. The contractor must also submit a Performance
Bond as outlined above and a Certificate of Insurance in the same 5 business day period. In the event the
Contractor fails to return the documents in this 5 day period, the University reserves the right to award the
contract to the next most responsive bidder.
An Optional second walk thru was scheduled for Tuesday, November 1, 2011 at 10am.
Permit requirements are the responsibility of the awarded contractor as listed on Section 800 Article 4.
Contractors will need state electrical, and mechanical permits. They will also need to send the fire
projection drawings to the State of Michigan Bureau of Fire Services.
Vendor must provide their own dumpster if needed, which must be rubber or plywood padded if placed on
concrete. Location and duration must be coordinated with the project manager. Dumpster must be
tagged with the name of your company clearly displayed. Any lawn damage must be restored.
The deadline for questions has been extended until November 03, 2011 at 12:00 noon.
The Bid Due Date has been extended. The Bids are due no later than 2:00 p.m., November 08,
2011, at 5700 Cass Ave. Room 4200 AAB. Bid opening will follow in room 4400 AAB
The Time of Completion has been changed: The Contract is expected to be fully executed on or about
25 calendar days after successful bidder qualification and recommendation of award. The undersigned
agrees to start construction immediately after receipt of a fully executed contract and Purchase Order,
PREVAILING WAGE RATE SCHEDULE 00410 - 2
and to complete the work as follows: Substantial Completion, and State Approved Inspections (if
appropriate), no later than January 31, 2012.
Your lump sum proposal must include the cost for a storage unit with working utility hook-ups. The unit
must be placed no further than 300 feet from the Science Hall Building. An allowance of $2,795.00/
month has been added to the Form of Proposal to cover the cost. The size of each storage unit is 20 X 8
X 9”4” four-hour rated hazmat storage containers with explosion relief panels, lighting and ventilation dry
chemical fire protection system with heating (2) each. Location of storage units TBD. Shelving must be
60” X 24” X 84” and shelving capable of supporting minimum of 2,500 lbs. per shelve. An asbestos
material survey will be provided to the awarded contractor. Any asbestos that is uncovered during this
project must be reported to the Project Manager immediately. Abatement will be handled by the University
and is not part of this project.
A copy of the sign in sheet is available for downloading from the University Purchasing Web Site at
http://www.forms.purchasing.wayne.edu/Adv_bid/Adv_bid.html.
This is an occupied area, awarded vendor must be considerate of environment (noise, cleanliness, etc).
There are also teaching labs in the space above where the work is being done. Work with a high noise
level must be pre-arranged with the Project Manager.
IMPORTANT- This is an addendum which MUST be acknowledged on your bid form
We will require two copies each of your lump sum proposals, vendor qualification questionnaire and your
bid bond documents.
All questions concerning this project must be emailed to: Kimberly Tomaszewski, Purchasing Department.
Email: ac9934@wayne.edu, copy Loretta McClary, Senior Buyer, at rfpteam1@wayne.edu.
Do not contact either FP&M or the Design Firm directly as this may result in disqualification of your
proposal.
Thank you for interest shown in working with Wayne State University.
Kimberly Tomaszewski
Senior Buyer
CC: Kipp Cycholl (Project Manager), Loretta McClary, Senior Buyer, Attendee list.
PREVAILING WAGE RATE SCHEDULE 00410 - 3
VENDOR NAME
GENERAL CONTRACT - PROPOSAL FORM (revised 1 - 2011)(REVISED 10/26/2011)
Please Note – Vendors must Pre-qualify themselves when responding to this bid opportunity. Our
Prequalification questions can be found on page 4 of this section.
OWNER: Board of Governors
Wayne State University
PROJECT: Science Hall: Upgrade Fire Suppression System
PROJECT NO.: WSU PROJECT NO. 005-189670-1
PROJECT TYPE: Mechanical Work
PURCHASING AGENT: Kimberly Tomaszewski, Senior Buyer
WSU – Purchasing Department
5700 Cass, Suite 4200
Detroit, Michigan 48202
313-577-3757/ 313-577-3747 fax
ac9934@wayne.edu & copy rfpteam1@wayne.edu
OWNER'S REPRESENTATIVE: Kipp Cycholl, Project Manager
Design & Construction Services
Facilities Planning & Management
Wayne State University
5454 Cass Avenue
Detroit, Michigan 48202
Board of Governors
TO:
Wayne State University
Detroit, Michigan
BASE PROPOSAL:
The undersigned agrees to enter into an Agreement to complete the entire work
of the Science Hall: Upgrade Fire Suppression System project (WSU Project
No. 005-189670-1) in accordance with the Bidding Documents for the following
amounts:
$ Dollars
PERFORMANCE BOND COST (Revised 6-17-2011):
If, at the request of the Owner, a Performance Bond is deemed to be necessary
at the time of execution of the contract for this project, the undersigned agrees to
provide a Performance Bond covering the contractor’s base bid, meeting all
requirements defined herein, which cost shall be:
ADD $ Dollars
PREVAILING WAGE RATE SCHEDULE 00410 - 4
Allowance:
A $2,795.00 allowance and material to be added in the proposal must
include the cost for a storage unit with working utility hook-ups. The unit
must be placed no further than 300 feet from the Science Hall Building.
The size of each storage unit is 20 X 8 X 9”4” four-hour rated hazmat
storage containers with explosion relief panels, lighting and ventilation dry
chemical fire protection system with heating (2) each. Location of storage
unitsTBD. The allowance expenditure must be accounted for and
approved in advance by WSU and the architect during the construction
phase of the project:
$ Dollars
TOTAL BASE PROPOSAL WITH ALLOWANCE:
$ Dollars
LAWN REPLACEMENT: The undersigned agrees that, in the event of existing lawn or landscaping
damage, due to the Contractor's work, that has not been properly addressed and
repaired to the satisfaction of the University, the University may repair/replace the
lawn and/or landscaping, and that the expense will be at a unit cost of $10.00
per square yard for lawn, and landscaping at a rate of 1.5 times the cost of
said repairs, the full cost of which shall be reimbursed by the contractor.
CONTRACT CHANGE The undersigned agrees to the following pricing formula and rates
ORDERS: (revised 4-01-2011) for changes in the contract work:
1. For subcontract work, Contractor's markup for handling, overhead, profit
and bonding on subcontractor's sell price, shall not exceed 5%.
1.1. For subcontract work that is provided on a time and material
basis, the subcontractor shall be permitted a single markup
for handling, overhead, profit and bonding of 5%. When a
markup is identified in the subcontractor’s hourly labor rate,
additional markup on labor is not permitted.
1.1.1 For changes that are based upon a lump sum value,
subcontractor shall provide all labor and material back-ups
to ensure that duplicative charges are avoided and
authorized mark-ups for OH&P can be confirmed
.
2. For work by his own organization, Contractor's markup for job* and
general overhead, profit and bonding shall not exceed 5% of the net
labor** and material costs.
Within 14 days of the project’s contract execution Contractor shall provide
to the Owner; Subcontractor’s hourly labor rate breakdown details. This
requirement shall extend to the lowest level of subcontractor participation.
PREVAILING WAGE RATE SCHEDULE 00410 - 5
* Job and general overhead includes supervision and executive expenses; use
charges on small tools, scaffolding, blocking, shores, appliances, etc., and other
miscellaneous job expenses.
** Net labor cost is the sum of the base wages, fringe benefits established by
governing trade organizations, applicable payroll taxes, and increased expense
for contractor's liability insurance (Workman's Compensation, P.L. and P.D.).
TIME OF COMPLETION: (revised 4-01-2011)
The Contract is expected to be fully executed on or about 25 calendar days after
successful bidder qualification and recommendation of award. The undersigned
agrees to start construction immediately after receipt of a fully executed
contract, and to complete the work as follows:
Substantial Completion will be completed no later than January 31, 2012.
LIQUIDATED DAMAGES: It is understood and agreed that, if project is not completed within the time
specified in the contract plus any extension of time allowed pursuant thereto, the
actual damages sustained by the Owner because of any such delay, will be
uncertain and difficult to ascertain, and it is agreed that the reasonable
foreseeable value of the use of said project by Owner would be the sum of
$250.00, Two hundred and fifty Dollars per day, and therefore the contractor
shall pay as liquidated damages to the Owner the sum of $250.00, Two hundred
and fifty Dollars per day for each day's delay in substantially completing said
project beyond the time specified in the Contract and any extensions of time
allowed thereunder.
TAXES: The undersigned acknowledges that prices stated above include all applicable
taxes of whatever character or description. Michigan State Sales Tax is
applicable to the work. Bidder understands that the Owner reserves the right to
reject any or all bids and to waive informalities or irregularities therein.
ADDENDA: The undersigned affirms that the cost of all work covered by the following
Addenda are included in the lump sum price of this proposal.
Addendum No. Date Addendum No. Date
Addendum No. Date Addendum No. Date
Addendum No. Date Addendum No. Date
Addendum No. Date Addendum No. Date
Addendum No. Date Addendum No. Date
CONTRACTOR'S PREQUALIFICATION STATEMENT & QUESTIONNAIRE:
Our Minimum Requirements for Construction Bids are:
WSU considers this project: Mechanical Work.
Criteria Small Project Medium Project Large Project Very Large Project
bid less than bid between $50,001 bid between bid greater than $2
$50,000 and $250,000 $250,001 and $2 million
PREVAILING WAGE RATE SCHEDULE 00410 - 6
million
EMR Rating 1.0 or Less 1.0 or Less 1.0 or Less 1.0 or Less
(Experience
Modification Rating)
Bondable Vendor N.A. Required Required Required
Length of Time in 2 Years 3 Years 5 Years 5 Years
Construction
Business
Demonstrated 1 or more 1 or more 2 or more 3 or more
Experience in
Projects Similar in
Scope and Price in
the last 3 years
Unsuccessful None Allowed None Allowed None Allowed None Allowed
Projects on Campus
in last 3 years
Failure to comply None Allowed None Allowed None Allowed None Allowed
with Prevailing
Wage and/or Project
Labor requirements
Withdrawn 2 or less 2 or less 1 or less 1 or less
University Bid (with
or without Bond
forfeiture) within the
last 3 years **
Company currently 1 Year 2 Years 3 Years 3 Years
not in Chapter 11 of
the US Bankruptcy
Code
** Withdrawal of a bid is subject to the University suspension policy, for a period up to one year.
Contractors must complete the following information to determine their eligibility to participate in this bid.
This information is required with your Bid to the University
Failure to complete this form in its entirety will result in your bid being disqualified.
Check one of the following on the makeup of your company:
Corporation Individual
Partnership Joint Venture
Other (Explain)
1. How many years has your organization been in business as a contractor?
2. How many years has your organization been in business under its present business name?
PREVAILING WAGE RATE SCHEDULE 00410 - 7
3. List states in which your organization is legally qualified to do business.
4. Provide the Name and Address of your Liability Insurance Carrier.
5. What is your current EMR Rating?
The minimum requirement is an EMR Rating of 1.0 or less for all projects. Bidders with a rating higher than
1.0 understand that their bid may be disqualified, at the sole discretion of the University.
6. What percentage of the work do you normally perform with your own work force/employees?
7. Have you ever failed to complete any work awarded to you? If so, attach a separate sheet of explanation.
Include the name of the Project, the customer, the dates of the work, and the amount of the contract ?
8. Have you withdrawn a bid after a University bid opening and/or refused to enter into a contract with the
University upon notification of award within the last 3 years? If so, state the Project Name and Number,
and the date of bid submission below.
9. Has any officer or partner of your organization ever been an officer or partner of another organization
that failed to complete a construction contract? If so, attach a separate sheet of explanation.
10. List the construction experience of the principals and superintendents of your company.
Name: __________________________________ Title: _____________________________________
_________________________________________________________________________________
Name: __________________________________ Title: _____________________________________
_________________________________________________________________________________
Name: __________________________________ Title: _____________________________________
_________________________________________________________________________________
11. List the construction Projects, and approximate dates, when you performed work similar in Scope to this
project.
Project: ___________________________________ Owner:__________________________________
Contract Amount: ___________________________ Date Completed: _________________________
PREVAILING WAGE RATE SCHEDULE 00410 - 8
Project: ___________________________________ Owner: __________________________________
Contract Amount: ___________________________ Date Completed: _________________________
Project: ___________________________________ Owner: __________________________________
Contract Amount:___________________________ Date Completed: _________________________
12. List the construction Projects, and approximate dates, when you performed work similar in Dollar Amount to
this project.
Project:___________________________________ Owner:__________________________________
Contract Amount: __________________________ Date Completed: _________________________
Project: __________________________________ Owner: __________________________________
Contract Amount: __________________________ Date Completed: _________________________
Project: ___________________________________ Owner: __________________________________
Contract Amount: ___________________________ Date Completed: _________________________
13. Is your Company “bondable”? Yes No
14. What is your present bonding capacity? $
15. Who is your bonding agent?
NAME:
ADDRESS:
PHONE: ( )
CONTACT:
16. Does your company agree to provide financial reports to the University upon request? Failure to agree may
result in disqualification of your bid. Yes No
17. Does your company agree that all of the Terms and Conditions of this RFP and Vendor’s Response Proposal
become part of any ensuing agreement? Yes No
18. Does your company agree to execute a contract containing the clauses shown in Section 00500 “Agreement
Between Contractor and Owner for Construction”? Yes No
If “No”, clearly note any exceptions to any information contained in the contract documents and include with
your proposal.
Note: Contractors submitting proposals for this project may, at the discretion of the University, be required to
submit references including contact information to be used to assist in the post bid evaluation process for the
subject project
ACKNOWLEDGEMENT OF The undersigned has read and understands the minimum qualifications
PREVAILING WAGE RATE SCHEDULE 00410 - 9
MINIMUM QUALIFICATIONS: for University construction projects, and has completed the
Prequalification section completely and accurately. The undersigned
understands that a contractor, who fails to meet the minimum
qualifications in the category identified for this project, will be
disqualified from consideration for the project.
ACCEPTANCE OF PROPOSAL: The undersigned agrees to execute a Contract, being the Wayne State
University standard form titled "Agreement Between Contractor and
Owner for Construction", provided that we are notified of the acceptance
of our Proposal within sixty (60) days of the date set for the opening
thereof.
The undersigned below understands that the bid will be disqualified if the
Prequalification information above is not completed in its entirety.
NAME OF COMPANY:
OFFICE ADDRESS:
PHONE NUMBER: DATE
FAX NUMBER:
SIGNED BY:
Signature
(Please print or type name here)
TITLE
PREVAILING WAGE RATE SCHEDULE 00410 - 10
PREVAILING WAGE RATE SCHEDULE (revised 4-05-2010)
A. See also Page 00100-4 Section 12.B
B. Wayne State University requires all project contractors, including subcontractors, who provide labor on
University projects to compensate at a rate no less than prevailing wage rates.
C. Contracts requiring prior approval of the Board of Governors between the University and a construction
manager, design builder, or general contractor will include a requirement that the construction manager,
design builder, or general contractor, with its contractors and subcontractors on that project, enter into a
Project Labor Agreement in connection with that project, and may specify one or more of the items that the
PLA must contain. See Section 00100 for additional information.
D. The rates of wages and fringe benefits to be paid to each class of laborers and mechanics by each
VENDOR and subcontractor(s) (if any) shall be not less than the wage and fringe benefit rates prevailing in
Wayne County, Michigan, as determined by the United States Secretary of Labor. Individually contracted
labor commonly referred to as “1099 Workers” and subcontractors using 1099 workers are not acceptable
for work related to this project.
E. To maintain compliance with State of Michigan Ordinances, Certified Payroll must be provided for each of
the contractor’s or subcontractor’s payroll periods for work performed on this project. Certified Payroll
should accompany all Pay Applications. Failure to provide certified payroll will constitute breach of contract,
and pay applications will be returned unpaid and remain so until satisfactory supporting documents are
provided.
A Prevailing Wage Rate Schedule has been issued from the State of Michigan that is enclosed in this
section
Additional information can be found on the University Purchasing Department’s web site at the following
URL address:
http://purchasing.wayne.edu/vendors/wage-rates.php
If you have any questions, or require rates for additional classifications, please contact:
Michigan Department of Consumer & Industry Services,
Bureau of Safety and Regulation, Wage and Hour Division,
7150 Harris Drive,
P.O. Box 30476,
Lansing, Michigan 48909-7976
http://www.michigan.gov/dleg/0,1607,7-154-27673_27706---,00.html
F. Wayne State University's Prevailing Wage Requirements:
When compensation will be paid under prevailing wage requirements, the University shall require the
following:
A. The contractor shall obtain and keep posted on the work site, in a conspicuous place, a copy of all
current prevailing wage and fringe benefit rates.
PREVAILING WAGE RATE SCHEDULE 00410 - 11
B. The contractor shall obtain and keep an accurate record showing the name and occupation of and
the actual wages and benefits paid to each laborer and mechanic employed in connection with
this contract.
C. The contractor shall submit a completed certified payroll document [U.S. Department of Labor
Form WH 347] verifying and confirming the prevailing wage and benefits rates for all employees
and subcontractors for each payroll period for work performed on this project. The contractor
shall include copies of pay stubs for all employee or contract labor payments related to Wayne
State University work. The certified payroll form can be downloaded from the Department of
Labor website at http://www.dol.gov/whd/forms/wh347.pdf.
D. A properly executed sworn statement is required from all tiers of contractors, sub-contractors and
suppliers which provide services or product of $1,000.00 or greater. Sworn statements must
accompany applications for payment. All listed parties on a sworn statement and as a
subcontractor must submit Partial or Full Conditional Waivers for the amounts invoiced on the
payment application. A copy of the acceptable WSU Sworn Statement and Waiver will be
provided to the awarded contractor.
E. Apprentices for a skilled trade must provide proof of participation in a Certified Apprenticeship
Program and the level of hours completed in the program.
F. Daily project sign-in sheets and field reports for the project must be turned in weekly.
Note: Contractor invoices WILL NOT be processed until all listed certified payroll
documents are received.
G. If the VENDOR or subcontractor fails to pay the prevailing rates of wages and fringe benefits and does not
cure such failure within 10 days after notice to do so by the UNIVERSITY, the UNIVERSITY shall have the
right, at its option, to do any or all of the following:
1. Withhold all or any portion of payments due the VENDOR as may be considered necessary
by the UNIVERSITY to pay laborers and mechanics the difference between the rates of
wages and fringe benefits required by this contract and the actual wages and fringe benefits
paid;
2. Terminate this contract and proceed to complete the contract by separate agreement with
another vendor or otherwise, in which case the VENDOR and its sureties shall be liable to the
UNIVERSITY for any excess costs incurred by the UNIVERSITY.
3. Propose to the Director of Purchasing that the Vendor be considered for Debarment in
accordance with the University’s Debarment Policy, found on our website at
http://purchasing.wayne.edu/docs/appm28.pdf
Terms identical or substantially similar to this section of this RFP shall be included in any
contract or subcontract pertaining to this project.
H. The current applicable prevailing wage rates as identified by the State of Michigan Department of Consumer
& Industry Services, Bureau of Safety and Regulation, Wage and Hour Division are attached. Refer to item
C above if additional information is required.
I. Prior to award of the project, the apparent low bidder will be required to produce a schedule of values which
will include the proposed subcontractors for each division of work and whether the subcontractor is signatory
or non-signatory. A letter of intent or contract will not be issued to the apparent low bidder until this
document is provided. The apparent low bidder will have one week to produce this document. If the
PREVAILING WAGE RATE SCHEDULE 00410 - 12
required document is not received within this time, the bidder will be disqualified, and the next low bidder will
be required to provide this schedule of values.
SEE ATTACHED STATE PREVAILING WAGE INFORMATION
PREVAILING WAGE RATE SCHEDULE 00410 - 13
State of Michigan
WHPWRequest@michigan.gov
Official Request #: 1121
Requestor: Wayne State University
Project Description: Science Hall Upgrade Fire Suppression System
Project Number: 005-189670-1
Wayne County
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 1 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Asbestos & Lead Abatement Laborer
Asbestos & Lead Abatement Laborer MLDC $37.95 $50.75 $63.54 H H H X X X X D Y
4 ten hour days @ straight time allowed Monday-Saturday, 9/26/2011
must be consecutive calendar days
Asbestos & Lead Abatement, Hazardous Material Handler
Asbestos and Lead Abatement, Hazardous Material Handler AS207 $37.95 $50.85 $63.75 H H H X X X X D Y
9/26/2011
4 ten hour days @ straight time allowed Monday-Saturday,
Boilermaker
Boilermaker BO169 $54.70 $81.08 $107.45 H H H H H H H D Y
8/14/2009
Apprentice Rates:
1st 6 months $40.31 $59.49 $78.67
2nd 6 months $41.45 $61.21 $80.95
3rd 6 months $42.57 $62.88 $83.19
4th 6 months $43.69 $64.57 $85.43
5th 6 months $44.81 $66.24 $87.67
6th 6 months $49.53 $73.40 $97.26
7th 6 months $49.32 $73.01 $96.69
8th 6 months $51.58 $76.40 $101.21
Bricklayer
Bricklayer, stone mason, pointer, cleaner, caulker BR1 $50.18 $75.27 $100.36 H H D H D D D D N
12/4/2008
Apprentice Rates:
First 6 months $30.22 $45.33 $60.44
2nd 6 months $32.07 $48.10 $64.14
3rd 6 months $33.92 $50.88 $67.84
4th 6 months $35.77 $53.66 $71.54
5th 6 months $37.62 $56.43 $75.24
6th 6 months $39.47 $59.20 $78.94
7th 6 months $41.32 $61.98 $82.64
8th 6 months $43.17 $64.76 $86.34
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 1 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 14
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 2 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Carpenter
Carpet and Resilient Floor Layer, (does not include CA1045 $46.04 $65.56 $85.07 X X H X X X X D Y
installation of prefabricated formica & parquet flooring 9/15/2011
which is to be paid carpenter rate)
Apprentice Rates:
1st 6 months $22.62 $30.43 $38.23
2nd 6 months $26.52 $36.27 $46.03
3rd 6 months $28.48 $39.21 $49.95
4th 6 months $30.43 $42.14 $53.85
5th 6 months $32.39 $45.08 $57.77
6th 6 months $34.33 $48.00 $61.65
7th 6 months $36.29 $50.94 $65.57
8th 6 months $38.23 $53.84 $69.45
Carpenter-four 10s allowed Mon-Thurs with bad weather CA687Z1 $51.19 $73.14 $95.09 H H D H D D D D Y
makeup day Fri 9/12/2011
Apprentice Rates:
1st year $31.45 $43.53 $55.61
3rd 6 months $33.64 $46.82 $59.99
4th 6 months $35.83 $50.10 $64.37
5th 6 months $38.02 $53.38 $68.75
6th 6 months $40.22 $56.69 $73.15
7th 6 months $42.41 $59.98 $77.53
8th 6 months $44.61 $63.27 $81.93
Piledriver CA687Z1P $51.19 $73.14 $95.09 H H D H D D D D Y
Four 10s allowed Monday-Thurs. Friday makeup day for 9/12/2011
bad weather.
Apprentice Rates:
1st 6 months $31.45 $43.53 $55.61
2nd 6 months $35.83 $50.10 $64.37
3rd 6 months $40.22 $56.69 $73.15
4th 6 months $44.61 $63.27 $81.93
Cement Mason
Cement Mason br1cm $45.50 $64.36 $83.22 H H D H H H H D N
12/30/2009
Apprentice Rates:
1st 6 months $26.41 $35.85 $45.29
2nd 6 months $28.28 $38.66 $49.03
3rd 6 months $32.06 $44.33 $56.59
4th 6 months $35.82 $49.97 $64.11
5th 6 months $37.71 $52.80 $67.89
6th 6 months $41.48 $58.46 $75.43
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 2 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 15
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 3 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Cement Mason CE514 $45.16 $63.75 $82.34 H H D H H H H D N
7/28/2010
Apprentice Rates:
1st 6 months $26.17 $35.47 $44.76
2nd 6 months $28.03 $38.26 $48.48
3rd 6 months $31.74 $43.83 $55.90
4th 6 months $35.45 $49.39 $63.32
5th 6 months $37.32 $52.19 $67.06
6th 6 months $41.03 $57.76 $74.48
Drywall
Drywall Taper PT-22-D $41.70 $54.58 $67.45 H H D H D D D D N
10/15/2009
Apprentice Rates:
First 3 months $28.83 $35.27 $41.71
Second 3 months $31.40 $39.13 $46.85
Second 6 months $33.97 $42.98 $51.99
Third 6 months $36.55 $46.85 $57.15
4th 6 months $37.84 $48.79 $59.73
Electrician
Road Way Electrical Work EC-17 $48.61 $70.50 $92.39 H H H H H H H D Y
Double time due after 16 hours on any calendar day and all 5/31/2011
hours Sunday.
Apprentice Rates:
1st 6 months $31.11 $44.26 $57.38
2nd 6 months $33.30 $47.52 $61.76
3rd 6 months $35.48 $50.81 $66.14
4th 6 months $37.68 $54.08 $70.51
5th 6 months $39.86 $57.38 $74.89
6th 6 months $44.23 $63.94 $83.64
Inside Wireman EC-58-IW $56.51 $75.12 $93.74 H H H H H H H D N
2/18/2011
Apprentice Rates:
0-1000 hours $35.36 $43.41 $51.45
1000-2000 hours $37.12 $46.04 $54.97
2000-3500 hours $38.88 $48.69 $58.49
3500-5000 hours $40.65 $51.34 $62.03
5000-6500 hours $44.18 $56.64 $69.09
6500-8000 hours $47.70 $61.92 $76.13
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 3 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 16
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 4 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Sound and Communication Installer/Technician EC-58-SC $32.54 $44.20 $55.86 H H H H H H H D N
1/7/2008
Apprentice Rates:
Period 1 $20.88 $26.71 $32.54
Period 2 $22.04 $28.46 $34.86
Period 3 $23.21 $30.21 $37.20
Period 4 $24.38 $31.96 $39.54
Period 5 $25.55 $33.72 $41.88
Period 6 $26.71 $35.46 $44.20
Elevator Constructor
Elevator Constructor EL 36 $56.46 $94.99 D D D D D D D D Y
Elevator Constructor 8/7/2007
Apprentice Rates:
1st Year Apprentice $37.74 $58.93
2nd Year Apprentice $41.90 $66.94
3rd Year Apprentice $43.98 $70.95
4th Year Apprentice $48.14 $78.96
Glazier
Glazier GL-357 $45.49 $63.69 $81.88 H H H H H H H D Y
If a four 10 hour day workweek is scheduled, four 10s must 9/12/2011
be consecutive, M-F.
Apprentice Rates:
1st 6 months $31.13 $42.15 $53.16
2nd 6 months $32.59 $44.34 $56.08
3rd 6 months $35.35 $48.48 $61.60
4th 6 months $36.80 $50.65 $64.50
5th 6 months $38.25 $52.83 $67.40
6th 6 months $39.70 $55.01 $70.30
7th 6 months $41.15 $57.18 $73.20
8th 6 months $44.04 $61.51 $78.98
Heat and Frost Insulator
Spray Insulation AS25S $20.14 $29.14 H H H H H H H H N
3/5/2007
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Statewide
Page 4 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 17
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 5 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Heat and Frost Insulator and Asbestos Worker
Heat and Frost Insulators and Asbestos Workers AS25 $53.15 $68.54 $83.92 H H H H H H H D Y
Four 10s must be worked for a minimum of 2 weeks 8/14/2009
consecutively, Monday thru Thursday. All hours worked in
excess of 10 will be paid at double time. All hours worked
on the fifth day, Monday thru Friday will paid at time and
one-half.
Apprentice Rates:
1st Year $39.30 $47.76 $56.22
2nd Year $42.38 $52.38 $62.38
3rd Year $43.92 $54.69 $65.46
4th Year $47.00 $59.31 $71.62
Ironworker
Fence, Sound Barrier & Guardrail erection/installation and IR-25-F1 $32.30 $44.30 $56.30 X X H X X X H D Y
Exterior Signage work 10/6/2011
Four ten hour work days may be worked during Monday-
Saturday.
Apprentice Rates:
60% Level $22.00 $29.20 $36.40
65% Level $23.29 $31.09 $38.89
70% Level $24.58 $32.98 $41.38
75% Level $25.86 $34.86 $43.86
80% Level $27.15 $36.75 $46.35
85% Level $28.44 $38.64 $48.84
Siding, Glazing, Curtain Wall IR-25-GZ2 $43.36 $55.02 $66.68 H H H H H H D D Y
4 tens may be worked Monday thru Thursday @ straight 10/10/2011
time. If bad weather, Friday may be a make up day. If
holiday celebrated on a Monday, 4 10s may be worked
Tuesday thru Friday. Work in excess of 12 hours per day
must be paid @ double time.
Apprentice Rates:
Level 1 $27.03 $33.64 $40.23
Level 2 $29.14 $36.38 $43.60
Level 3 $31.26 $39.13 $46.99
Level 4 $33.38 $41.88 $50.37
Level 5 $35.49 $44.62 $53.75
Level 6 $37.61 $47.37 $57.13
Pre-engineered Metal Work IR-25-PE-Z1 $43.69 $53.99 $64.28 X X H X X X X D Y
10/11/2011
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 5 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 18
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 6 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Reinforced Iron Work IR-25-RF $52.36 $74.85 $97.34 H H D H D D D D N
10/10/2011
Apprentice Rates:
Level 1 $33.01 $45.52 $58.04
Level 2 $35.38 $50.51 $64.68
Level 3 $37.74 $52.62 $67.50
Level 4 $40.28 $57.86 $74.48
Level 5 $42.81 $60.22 $77.64
Level 6 $45.35 $64.04 $82.72
Rigging Work IR-25-RIG $57.73 $86.41 $115.08 H H H H H H H D N
10/10/2011
Apprentice Rates:
Level 1& 2 $33.28 $49.67 $66.05
Level 3 $36.11 $53.92 $71.71
Level 4 $38.93 $58.14 $77.35
Level 5 $41.76 $62.39 $83.01
Level 6 $44.59 $66.63 $88.67
Decking IR-25-SD $49.44 $73.91 $98.37 H H H H H H D D Y
4 tens may be worked Monday thru Thursday @ straight 10/10/2011
time. If bad weather, Friday may be a make up day. If
holiday celebrated on a Monday, 4 10s may be worked
Tuesday thru Friday. Work in excess of 12 hours per day
must be paid @ double time.
Structural, ornamental, conveyor, welder and pre-cast IR-25-STR $58.11 $86.91 $115.71 H H H H H H D D Y
4 tens may be worked Monday thru Thursday @ straight 10/10/2011
time. If bad weather, Friday may be a make up day. If
holiday celebrated on a Monday, 4 10s may be worked
Tuesday thru Friday. Work in excess of 12 hours per day
must be paid @ double time.
Apprentice Rates:
Levels 1 & 2 $32.77 $49.15 $65.54
Level 3 $35.60 $53.40 $71.20
Level 4 $38.42 $57.63 $76.84
Level 5 $41.25 $61.88 $82.50
Level 6 $44.08 $66.13 $88.16
Level 7 $46.90 $70.35 $93.80
Level 8 $49.73 $74.60 $99.46
Industrial Door erection & construction IR-25-STR-D $58.17 $72.60 $87.02 H H D H H H D D Y
10/10/2011
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 6 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 19
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 7 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Laborer
Construction Laborer, Demolition Laborer, Mason L33401-A-CC $40.96 $58.16 $75.35 X X H X H H H D Y
Tender,Carpenter Tender, Drywall Handler, Concrete 8/8/2011
Laborer, Cement Finisher Tender, Concrete Chute, and
Concrete Bucket Handler
Apprentice Rates:
0-1,000 work hours $35.12 $49.40 $63.67
1,001 - 2,000 work hours $36.29 $51.15 $66.01
2,001 - 3,000 work hours $37.46 $52.91 $68.35
3,001 - 4,000 work hours $39.79 $56.41 $73.01
Signal Man (on sewer & caisson work), Air, Electric or L33401-B-SB $41.22 $58.55 $75.87 X X H X H H H D Y
Gasoline Tool Operator, Concrete Vibrator Operator, 8/8/2011
Acetylene Torch & Air Hammer Operator; Scaffold Builder,
Caisson Worker
Furnace Battery Heater Tender, Burning Bar & Oxy- L33401-D-HH $41.46 $58.71 $76.15 X X H X H H H D Y
Acetylene Gun 8/8/2011
Expediter Man, Top Man and/or Bottom Man (Blast Furnace L33401-E-EX $42.21 $60.03 $77.85 X X H X H H H D Y
Work or Battery Work) 8/8/2011
Cleaner/Sweeper Laborer; Furniture Laborer L33401-F-CL $35.51 $49.98 $64.45 X X H X H H H D Y
8/8/2011
Lansing Burner, Blaster & Powder Man; Air, Electric or L334C $41.71 $59.28 $76.85 X X H X H H H D Y
Gasoline Tool Operator (Blast Furance Work or Battery 8/8/2011
Work)
Plasterer Tender, Plastering Machine Operator LPT-1 $40.96 $58.16 $75.35 X X H X H H H D N
9/26/2011
Apprentice Rates:
0 - 1,000 hours $35.13 $49.41 $63.69
1,001 - 2,000 hours $36.29 $51.15 $66.01
2,001 - 3,000 hours $37.46 $52.91 $68.35
3,001 - 4,000 hours $39.79 $56.41 $73.01
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
PREVAILING WAGE RATE SCHEDULE 00410 - 20
County: Wayne
Page 7 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 21
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 8 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Laborer - Hazardous
Class A performing work in conjunction with site LHAZ-Z1-A $39.56 $56.16 $72.75 H H H H H H H D Y
preparation and other preliminary work prior to actual 1/10/2011
removal, handling, or containment of hazardous waste
substances not requiring use of personal protective
equipment required by state or federal regulations; or a
laborer performing work in conjunction with the removal,
handling, or containment of hazardous waste substances
when use of personal protective equipment level "D" is
required.
Apprentice Rates:
0-1,000 work hours $33.79 $47.50 $61.21
1,001-2,000 work hours $34.94 $49.22 $63.51
2,001-3,000 work hours $36.10 $50.96 $65.83
3,001-4,000 work hours $38.41 $54.43 $70.45
Class B performing work in conjunction with the removal, LHAZ-Z1-B $40.56 $57.66 $74.75 H H H H H H H D Y
handling, or containment of hazardous waste substances 1/10/2011
when the use of personal protective equipment levels "A",
"B" or "C" is required.
Apprentice Rates:
0-1,000 work hours $34.54 $48.62 $62.71
1,001-2,000 work hours $35.74 $50.42 $65.11
2,001-3,000 work hours $36.95 $52.24 $67.53
3,001-4,000 work hours $39.36 $55.86 $72.35
Laborer Underground - Tunnel, Shaft & Caisson
Class I - Tunnel, shaft and caisson laborer, dump man, LAUCT-Z1-1 $35.97 $46.66 $57.34 H H H H H H H D Y
shanty man, hog house tender, testing man (on gas), and 10/14/2011
watchman.
Apprentice Rates:
0-1,000 work hours $31.15 $39.43 $47.70
1,001-2,000 work hours $32.12 $40.88 $49.64
2,001-3,000 work hours $33.08 $42.32 $51.56
3,001-4,000 work hours $35.01 $45.21 $55.42
Class II - Manhole, headwall, catch basin builder, bricklayer LAUCT-Z1-2 $36.08 $46.82 $57.56 H H H H H H H D Y
tender, mortar man, material mixer, fence erector, and 10/14/2011
guard rail builder.
Apprentice Rates:
0-1,000 work hours $31.24 $39.56 $47.88
1,001-2,000 work hours $32.20 $41.00 $49.80
2,001-3,000 work hours $33.17 $42.45 $51.74
3,001-4,000 work hours $35.11 $45.37 $55.62
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 8 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 22
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 9 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Class III - Air tool operator (jack hammer man, bush LAUCT-Z1-3 $36.14 $46.91 $57.68 H H H H H H H D Y
hammer man and grinding man), first bottom man, second 10/14/2011
bottom man, cage tender, car pusher, carrier man,
concrete man, concrete form man, concrete repair man,
cement invert laborer, cement finisher, concrete shoveler,
conveyor man, floor man, gasoline and electric tool
operator, gunnite man, grout operator, welder, heading
dinky man, inside lock tender, pea gravel operator, pump
man, outside lock tender, scaffold man, top signal man,
switch man, track man, tugger man, utility man, vibrator
man, winch operator, pipe jacking man, wagon drill and air
track operator and concrete saw operator (under 40 h.p.).
Apprentice Rates:
0-1,000 work hours $31.28 $39.62 $47.96
1,001-2,000 work hours $32.25 $41.07 $49.90
2,001-3,000 work hours $33.22 $42.53 $51.84
3,001-4,000 work hours $35.17 $45.45 $55.74
Class IV - Tunnel, shaft and caisson mucker, bracer man, LAUCT-Z1-4 $36.32 $47.18 $58.04 H H H H H H H D Y
liner plate man, long haul dinky driver and well point man. 10/14/2011
Apprentice Rates:
0-1,000 work hours $31.42 $39.83 $48.24
1,001-2,000 work hours $32.40 $41.30 $50.20
2,001-3,000 work hours $33.38 $42.77 $52.16
3,001-4,000 work hours $35.34 $45.71 $56.08
Class V - Tunnel, shaft and caisson miner, drill runner, LAUCT-Z1-5 $36.57 $47.56 $58.54 H H H H H H H D Y
keyboard operator, power knife operator, reinforced steel 10/14/2011
or mesh man (e.g. wire mesh, steel mats, dowel bars)
Apprentice Rates:
0-1,000 work hours $31.60 $40.10 $48.60
1,001-2,000 work hours $32.60 $41.60 $50.60
2,001-3,000 work hours $33.59 $43.09 $52.58
3,001-4,000 work hours $35.58 $46.07 $56.56
Class VI - Dynamite man and powder man. LAUCT-Z1-6 $36.90 $48.05 $59.20 H H H H H H H D Y
10/14/2011
Apprentice Rates:
0-1,000 work hours $31.85 $40.47 $49.10
1,001-2,000 work hours $32.86 $41.99 $51.12
2,001-3,000 work hours $33.87 $43.51 $53.14
3,001-4,000 work hours $35.89 $46.53 $57.18
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 9 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 23
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 10 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Class VII - Restoration laborer, seeding, sodding, planting, LAUCT-Z1-7 $30.18 $37.97 $45.76 H H H H H H H D Y
cutting, mulching and topsoil grading and the restoration of 10/14/2011
property such as replacing mail boxes, wood chips, planter
boxes and flagstones.
Apprentice Rates:
0-1,000 work hours $26.81 $32.91 $39.02
1,001-2,000 work hours $27.48 $33.92 $40.36
2,001-3,000 work hours $28.16 $34.94 $41.72
3,001-4,000 work hours $29.51 $36.97 $44.42
Landscape Laborer
Landscape Specialist includes air, gas, and diesel LLAN-Z1-A $26.78 $37.04 $47.29 X X H X X X H D Y
equipment operator, skidsteer (or equivalent), lawn 9/16/2011
sprinkler installer on landscaping work where seeding,
sodding, planting, cutting, trimming, backfilling, rough
grading or maintenance of landscape projects occurs.
Sundays paid at time & one half. Holidays paid at double
time.
Skilled Landscape Laborer: small power tool operator, LLAN-Z1-B $22.56 $30.71 $38.85 X X H X X X H D Y
lawn sprinkler installers' tender, material mover, truck 9/16/2011
driver when seeding, sodding, planting, cutting, trimming,
backfilling, rough grading or maintaining of landscape
projects occurs
Sundays paid at time & one half. Holidays paid at double
time.
Seeding, sodding, planting, cutting, trimming, backfilling, LLAN-Z1-C $13.90 $20.85 $27.80 X X H X X X H D Y
rough grading or maintaining of landscape projects. 9/16/2011
Sundays paid at time & one half. Holidays paid at double
time
Marble Finisher
Marble Finisher BR1-MF $41.37 $51.86 $62.34 H H D H D D D D Y
A 4 ten workweek may be worked Monday thru Thursday or 8/11/2009
Tuesday thru Friday.
Apprentice Rates:
Level 1 $18.11 $24.00 $29.89
Level 2 $19.25 $25.71 $32.17
Level 3 $25.69 $32.40 $39.12
Level 4 $27.09 $34.50 $41.92
Level 5 $28.53 $36.15 $43.77
Level 6 $30.07 $38.06 $46.06
Level 7 $31.68 $39.73 $47.79
Level 8 $33.10 $41.42 $49.74
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
PREVAILING WAGE RATE SCHEDULE 00410 - 24
County: Wayne
Page 10 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 25
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 11 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Marble Mason
Marble Mason BR1-MM $47.85 $61.58 $75.30 H H D H D D D D Y
A 4 ten workweek may be worked Monday thru Thursday or 8/11/2009
Tuesday thru Friday.
Apprentice Rates:
Level 1 $23.92 $31.19 $38.47
Level 2 $26.83 $34.85 $42.87
Level 3 $31.79 $40.02 $48.26
Level 4 $34.40 $43.55 $52.69
Level 5 $36.55 $45.94 $55.33
Level 6 $40.04 $51.10 $62.16
Level 7 $40.67 $51.90 $63.14
Level 8 $41.56 $53.24 $64.92
Operating Engineer
Crane with boom & jib or leads 120' or longer EN-324-A120 $54.01 $71.10 $88.18 H H D H D D D D Y
8/5/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Crane with boom & jib or leads 140' or longer EN-324-A140 $54.83 $72.33 $89.82 H H D H D D D D Y
8/5/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Crane with boom & jib or leads 220' or longer EN-324-A220 $55.13 $72.78 $90.42 H H D H D D D D Y
Four ten hour days may be scheduled Monday-Thursday. 8/5/2011
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
PREVAILING WAGE RATE SCHEDULE 00410 - 26
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 11 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 27
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 12 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Crane with boom & jib or leads 300' or longer EN-324-A300 $56.63 $75.03 $93.42 H H D H D D D D Y
8/5/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Crane with boom & jib or leads 400' or longer EN-324-A400 $58.13 $77.28 $96.42 H H D H D D D D Y
6/9/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Compressor or welding machine EN-324-CW $43.16 $54.82 $66.48 H H D H D D D D Y
8/8/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Forklift, lull, extend-a-boom forklift EN-324-FL $50.47 $65.79 $81.10 H H D H D D D D Y
8/8/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Fireman or oiler EN-324-FO $42.13 $53.28 $64.42 H H D H D D D D Y
Four ten hour days may be scheduled Monday-Thursday. 8/8/2011
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Regular crane, job mechanic, concrete pump with boom EN-324-RC $53.15 $69.81 $86.46 H H D H D D D D Y
8/5/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
PREVAILING WAGE RATE SCHEDULE 00410 - 28
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 12 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 29
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 13 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Regular engineer, hydro-excavator, remote controlled EN-324-RE $52.18 $68.35 $84.52 H H D H D D D D Y
concrete breaker 8/5/2011
Four ten hour days may be scheduled Monday-Thursday.
Work in excess of 10 hours but less than 12 per day shall be
paid at time and one-half. Work in excess of 12 per day
shall be paid at double time. When bad weather or holiday
occurs during this time, Friday may be scheduled for a
minimum of 8 hours.
Apprentice Rates:
0-999 hours $41.87 $53.19 $64.50
1,000-1,999 hours $43.49 $55.62 $67.74
2,000-2,999 hours $45.12 $58.06 $71.00
3,000-3,999 hours $46.73 $60.48 $74.22
4,000-4,999 hours $48.35 $62.90 $77.46
5,000-5,999 hours $49.96 $65.32 $80.68
Operating Engineer - Marine Construction
Diver/Wet Tender, Engineer (hydraulic dredge) GLF-1 $59.91 $78.51 $97.11 X X H H H H H D Y
1/12/2011
Holiday pay= $115.71 per hour, wages & fringes
Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters
Crane/Backhoe Operator, 70 ton or over Tug Operator, GLF-2 $58.41 $76.26 $94.11 X X H H H H H D Y
Mechanic/Welder, Assistant Engineer (hydraulic dredge), 1/12/2011
Leverman (hydraulic dredge), Diver Tender
Holiday pay = $111.96 per hour, wages & fringes
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters
Deck Equipment Operator, Machineryman, Maintenance of GLF-3 $54.51 $70.41 $86.31 X X H H H H H D Y
Crane (over 50 ton capacity) or Backhoe (115,000 lbs or 1/12/2011
more), Tug/Launch Operator, Loader, Dozer on Barge,
Deck Machinery
Holiday pay = $102.21 per hour, wages & fringes
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters
Deck Equipment Operator, (Machineryman/Fireman), (4 GLF-4 $49.16 $62.39 $75.61 X X H H H H H D Y
equipment units or more), Off Road Trucks, Deck Hand, Tug 1/12/2011
Engineer, & Crane Maintenance 50 ton capacity and under
or Backhoe 115,000 lbs or less, Assistant Tug Operator
Holiday pay = $88.83 per hour, wages & fringes
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
PREVAILING WAGE RATE SCHEDULE 00410 - 30
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Statewide
Page 13 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 31
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 14 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Operating Engineer Hazardous Waste Class I
Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWCI-Z1A $49.74 $65.66 $81.57 H H H H H H H D Y
pressure demand, full face piece SCBA or pressure demand 10/1/2009
supplied air respirator w/ escape SCBA. The highest
available level of respiratory, skin and eye protection.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Apprentice Rates:
1st 6 months $39.70 $50.85 $61.99
2nd 6 months $41.28 $53.22 $65.15
3rd 6 months $42.87 $55.60 $68.33
4th 6 months $44.47 $58.01 $71.53
5th 6 months $46.06 $60.38 $74.71
6th 6 months $47.66 $62.79 $77.91
Level B & C protection. B - Pressure demand, full face SCBA EN-324-HWCI-Z1B $48.79 $64.23 $79.67 H H H H H H H D Y
or pressure demand supplied air respirator w/ escape 10/1/2009
SCBA w/chemical resistant clothing. C - Full face piece, air
purifying canister-equipped respirator w/chemical resistant
clothing.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Apprentice Rates:
1st 6 months $39.02 $49.82 $60.63
2nd 6 months $40.57 $52.15 $63.73
3rd 6 months $42.11 $54.46 $66.81
4th 6 months $43.65 $56.77 $69.89
5th 6 months $45.20 $59.10 $72.99
6th 6 months $46.75 $61.42 $76.09
Level D - Coveralls, safety boots, glasses or chemical splash EN-324-HWCI-Z1D $47.49 $62.28 $77.07 H H H H H H H D Y
goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Apprentice Rates:
1st 6 months $38.11 $48.46 $58.81
2nd 6 months $39.59 $50.69 $61.77
3rd 6 months $41.08 $52.92 $64.75
4th 6 months $42.55 $55.12 $67.69
5th 6 months $44.03 $57.34 $70.65
6th 6 months $45.50 $59.54 $73.59
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 14 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 32
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 15 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Level D When Capping Landfill Coveralls, safety boots, EN-324-HWCI-Z1DCL $47.24 $61.91 $76.57 H H H H H H H D Y
glasses or chemical splash goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Apprentice Rates:
1st 6 months $37.94 $48.21 $58.47
2nd 6 months $39.40 $50.40 $61.39
3rd 6 months $40.87 $52.60 $64.33
4th 6 months $42.34 $54.81 $67.27
5th 6 months $43.80 $56.99 $70.19
6th 6 months $45.26 $59.19 $73.11
Operating Engineer Hazardous Waste Class II
Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWCII-Z1A $45.51 $59.31 $73.11 H H H H H H H D Y
pressure demand, full face piece SCBA or pressure demand 10/1/2009
supplied air respirator w/ escape SCBA. The highest
available level of respiratory, skin and eye protection.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level B & C protection. B - Pressure demand, full face SCBA EN-324-HWCII-Z1B $44.56 $57.89 $71.21 H H H H H H H D Y
or pressure demand supplied air respirator w/ escape 10/2/2009
SCBA w/chemical resistant clothing. C - Full face piece, air
purifying canister-equipped respirator w/chemical resistant
clothing.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level D - Coveralls, safety boots, glasses or chemical splash EN-324-HWCII-Z1D $43.26 $55.94 $68.61 H H H H H H H D Y
goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level D When Capping Landfill Coveralls, safety boots, EN-324-HWCII-Z1DCL $43.01 $55.56 $68.11 H H H H H H H D Y
glasses or chemical splash goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
PREVAILING WAGE RATE SCHEDULE 00410 - 33
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 15 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 34
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 16 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Operating Engineer Hazardous Waste Crane w/ Boom & Jib leads
140' or longer
Level A - Fully encapsulating chemical resistant suit w/ EN-324-HW140-Z1A $52.39 $69.63 $86.87 H H H H H H H D Y
pressure demand, full face piece SCBA or pressure demand 10/1/2009
supplied air respirator w/ escape SCBA. The highest
available level of respiratory, skin and eye protection.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level B & C protection. B - Pressure demand, full face SCBA EN-324-HW140-Z1B $51.44 $68.21 $84.97 H H H H H H H D Y
or pressure demand supplied air respirator w/ escape 10/1/2009
SCBA w/chemical resistant clothing. C - Full face piece, air
purifying canister-equipped respirator w/chemical resistant
clothing.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level D Coveralls, safety boots, glasses or chemical splash EN-324-HW140-Z1D $50.14 $66.26 $82.37 H H H H H H H D Y
goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level D When Capping Landfill Coveralls, safety boots, EN-324-HW140-Z1DCL $49.89 $65.88 $81.87 H H H H H H H D Y
glasses or chemical splash goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Operating Engineer Hazardous Waste Crane w/ Boom & Jib leads
220' or longer
Level A - Fully encapsulating chemical resistant suit w/ EN-324-HW220-Z1A $52.69 $70.08 $87.47 H H H H H H H D Y
pressure demand, full face piece SCBA or pressure demand 10/1/2009
supplied air respirator w/ escape SCBA. The highest
available level of respiratory, skin and eye protection.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level B & C protection. B - Pressure demand, full face SCBA EN-324-HW220-Z1B $51.74 $68.66 $85.57 H H H H H H H D Y
or pressure demand supplied air respirator w/ escape 10/1/2009
SCBA w/chemical resistant clothing. C - Full face piece, air
purifying canister-equipped respirator w/chemical resistant
clothing.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
PREVAILING WAGE RATE SCHEDULE 00410 - 35
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 16 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 36
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 17 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Level D Coveralls, safety boots, glasses or chemical splash EN-324-HW220-Z1D $50.44 $66.71 $82.97 H H H H H H H D Y
goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Level D When Capping Landfill Coveralls, safety boots, EN-324-HW220-Z1DCL $50.19 $66.33 $82.47 H H H H H H H D Y
glasses or chemical splash goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Operating Engineer Hazardous Waste Regular Crane, Job
Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
Operator and Concrete Pump with boom
Level D When Capping Landfill Coveralls, safety boots, EN-324-HWRC-Z1DCL $47.59 $62.43 $77.27 H H H H H H H D Y
glasses or chemical splash goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Operating Engineer Hazardous Waste Regular Crane, Job
Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
Operator and Concrete Pump with Boom Operator
Level D - Coveralls, safety boots, glasses or chemical splash EN-324-HWRC-Z1D $48.46 $63.74 $79.01 H H H H H H H D Y
goggles and hard hats. 10/2/2009
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Operating Engineer Hazardous Waste Regular Crane, Job
Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
Operator and Concrete Pump with booms
Level B & C protection. B - Pressure demand, full face SCBA EN-324-HWRC-Z1B $49.76 $65.69 $81.61 H H H H H H H D Y
or pressure demand supplied air respirator w/ escape 10/1/2009
SCBA w/chemical resistant clothing. C - Full face piece, air
purifying canister-equipped respirator w/chemical resistant
clothing.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
PREVAILING WAGE RATE SCHEDULE 00410 - 37
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 17 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 38
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 18 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Operating Engineer Hazardous Waste Regular Crane, Job
Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
Operators and Concrete Pump with booms
Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWRC-Z1A $50.71 $67.11 $83.51 H H H H H H H D Y
pressure demand, full face piece SCBA or pressure demand 10/1/2009
supplied air respirator w/ escape SCBA. The highest
available level of respiratory, skin and eye protection.
Four 10 hour days may be worked Monday-Thursday with
Friday as a straight-time make up day.
Operating Engineer Steel Work
Forklift, 1 Drum Hoist EN-324-ef $55.06 $72.80 $90.53 H H D H H H D D Y
10/12/2011
Crane w/ 120' boom or longer EN-324-SW120 $57.51 $76.47 $95.43 H H D H H H D D Y
10/12/2011
Crane w/ 120' boom or longer w/ Oiler EN-324-SW120-O $58.51 $77.97 $97.43 H H D H H H D D Y
10/12/2011
Crane w/ 140' boom or longer EN-324-SW140 $58.69 $78.24 $97.79 H H D H H H D D Y
10/12/2011
Crane w/ 140' boom or longer W/ Oiler EN-324-SW140-O $59.69 $79.74 $99.79 H H D H H H D D Y
10/12/2011
Boom & Jib 220' or longer EN-324-SW220 $58.96 $78.65 $98.33 H H D H H H D D Y
10/12/2011
Crane w/ 220' boom or longer w/ Oiler EN-324-SW220-O $59.96 $80.15 $100.33 H H D H H H D D Y
10/12/2011
Boom & Jib 300' or longer EN-324-SW300 $60.46 $80.90 $101.33 H H D H H H D D Y
10/12/2011
Crane w/ 300' boom or longer w/ Oiler EN-324-SW300-O $61.46 $82.40 $103.33 H H D H H H D D Y
10/12/2011
Boom & Jib 400' or longer EN-324-SW400 $61.96 $83.15 $104.33 H H D H H H D D Y
10/12/2011
Crane w/ 400' boom or longer w/ Oiler EN-324-SW400-O $62.96 $84.65 $106.33 H H D H H H D D Y
10/12/2011
Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator EN-324-SWCO $57.15 $75.93 $94.71 H H D H H H D D Y
10/12/2011
Apprentice Rates:
0-999 hours $45.28 $58.42 $71.57
1,000-1,999 hours $47.17 $61.25 $75.34
2,000-2,999 hours $49.04 $64.07 $79.09
3,000-3,999 hours $50.91 $66.87 $82.83
4,000-4,999 hours $52.79 $69.69 $86.59
5,000 hours $54.67 $72.51 $90.35
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 18 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 39
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 19 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Crane w/ Oiler EN-324-SWCO-O $58.15 $77.43 $96.71 H H D H H H D D Y
10/12/2011
Compressor or Welder Operator EN-324-SWCW $49.70 $64.76 $79.81 H H D H H H D D Y
10/12/2011
Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe EN-324-SWHO $56.51 $74.97 $93.43 H H D H H H D D Y
10/12/2011
Oiler EN-324-SWO $48.29 $62.64 $76.99 H H D H H H D D Y
10/12/2011
Tower Crane & Derrick where work is 50' or more above EN-324-SWTD50 $58.24 $77.57 $96.89 H H D H H H D D Y
first level 10/12/2011
Tower Crane & Derrick 50' or more w/ Oiler where work EN-324-SWTD50-O $59.24 $79.07 $98.89 H H D H H H D D Y
station is 50' or more above first level 10/12/2011
Operating Engineer Underground
Class I Equipment EN-324A1-UC1 $49.34 $64.08 $78.82 H H H H H H H D Y
10/13/2011
Apprentice Rates:
0-999 hours $39.89 $50.21 $60.52
1,000-1,999 hours $41.36 $52.41 $63.46
2,000-2,999 hours $42.84 $54.63 $66.42
3,000-3,999 hours $44.32 $56.85 $69.38
4,000-4,999 hours $45.79 $59.05 $72.32
5,000-5,999 hours $47.26 $61.26 $75.26
Class II Equipment EN-324A1-UC2 $44.61 $56.99 $69.36 H H H H H H H D Y
10/13/2011
Class III Equipment EN-324A1-UC3 $43.88 $55.89 $67.90 H H H H H H H D Y
10/13/2011
Class IV Equipment EN-324A1-UC4 $43.31 $55.04 $66.76 H H H H H H H D Y
10/13/2011
Master Mechanic EN-324A1-UMM $49.59 $64.46 $79.32 H H H H H H H D Y
10/13/2011
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 19 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 40
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 20 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Painter
Painter (8 hours of repaint work performed on Sunday shall PT-22-P $39.86 $52.22 $64.57 H H D H D D D D Y
be paid time & one half rate) 10/15/2009
Four 10s allowed Monday-Thursday with Friday makeup day
if job down due to weather, holiday or other conditions
beyond the control of the employer.
Apprentice Rates:
First 6 months $27.51 $33.69 $39.87
Second 6 months $31.21 $39.24 $47.27
Third 6 months $32.45 $41.10 $49.75
Fourth 6 months $33.68 $42.95 $52.21
Fifth 6 months $34.92 $44.81 $54.69
Final 6 months $36.15 $46.65 $57.15
Pipe and Manhole Rehab
General Laborer for rehab work or normal cleaning and TM247 $26.50 $35.83 H H H H H H H H N
cctv work-top man, scaffold man, CCTV assistant, jetter-vac 1/11/2011
assistant
Tap cutter/CCTV Tech/Grout Equipment Operator: unit TM247-2 $31.00 $42.58 H H H H H H H H N
driver and operator of CCTV; grouting equipment and tap 1/11/2011
cutting equipment
CCTV Technician/Combo Unit Operator: unit driver and TM247-3 $29.75 $40.70 H H H H H H H H N
operator of cctv unit or combo unit in connection with 1/11/2011
normal cleaning and televising work
Boiler Operator: unit driver and operator of steam/water TM247-4 $31.50 $43.33 H H H H H H H H N
heater units and all ancillary equipment associated 1/11/2011
Combo Unit driver & Jetter-Vac Operator TM247-5 $31.50 $43.33 H H H H H H H H N
1/11/2011
Pipe Bursting & Slip-lining Equipment Operator TM247-6 $32.50 $44.83 H H H H H H H H N
8/4/2011
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
PREVAILING WAGE RATE SCHEDULE 00410 - 41
Project Number: 005-189670-1 prescribed in a contract.
County: Statewide
Page 20 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 42
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 21 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Pipefitter
Pipefitter PF-636 $63.33 $84.16 $100.98 H H D H D D D D N
6/1/2011
Apprentice Rates:
1st & 2nd periods $26.63 $34.98 $41.98
3rd period $28.63 $37.98 $45.98
4th period $29.88 $39.86 $48.48
5th period $31.13 $41.73 $50.98
6th period $32.38 $43.60 $53.48
7th period $33.63 $45.48 $55.98
8th period $34.63 $46.98 $57.98
9th period $35.63 $48.48 $59.98
10th period $37.06 $50.62 $62.84
Plasterer
Plasterer BR1P $43.84 $65.76 $87.68 H H H H H H H D N
12/16/2008
Apprentice Rates:
1st 6 months $22.41 $33.62 $44.82
2nd 6 months $25.99 $38.99 $51.98
3rd 6 months $29.56 $44.34 $59.12
4th 6 months $33.13 $49.70 $66.26
5th 6 months $36.70 $55.05 $73.40
6th 6 months $40.27 $60.41 $80.54
Plasterer PL67 $44.72 $60.11 $75.50 H H H X D D D D N
9/8/2010
Apprentice Rates:
1st 6 months $29.33 $37.02 $44.72
2nd 6 months $30.87 $39.34 $47.80
3rd 6 months $32.41 $41.64 $50.88
4th 6 months $35.49 $46.26 $57.04
5th 6 months $38.56 $51.16 $63.76
6th 6 months $41.64 $55.49 $69.34
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 21 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 43
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 22 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Plumber
Plumber PL-98 $57.58 $74.45 $89.31 H H D H D D D D N
8/18/2009
Apprentice Rates:
Period 1 $17.76 $24.31 $30.86
Period 2 $17.76 $24.31 $30.86
Period 3 $30.79 $39.88 $48.96
Period 4 $31.42 $40.82 $50.22
Period 5 $32.58 $42.56 $52.54
Period 6 $33.73 $44.28 $54.84
Period 7 $34.88 $43.61 $54.74
Period 8 $36.05 $47.76 $59.48
Period 9 $37.20 $49.49 $61.78
Period 10 $38.35 $51.22 $64.08
Roofer
Commercial Roofer RO-149-WOM $48.46 $62.29 $76.62 H H D H H H D D N
Straight time is not to exceed ten (10) hours per day or 8/18/2008
forty (40) hours per week.
Apprentice Rates:
Apprentice 1 $32.62 $39.86 $48.04
Apprentice 2 $36.80 $44.80 $53.30
Apprentice 3 $38.22 $46.93 $56.14
Apprentice 4 $39.25 $48.48 $58.20
Apprentice 5 $40.47 $50.30 $60.64
Apprentice 6 $41.87 $52.40 $63.44
Sewer Relining
Class I-Operator of audio visual CCTV system including SR-I $41.07 $55.60 $70.12 H H H H H H H D N
remote in-ground cutter and other equipment used in 10/14/2011
conjunction with CCTV system.
Class II-Operator of hot water heaters and circulation SR-II $39.54 $53.30 $67.06 H H H H H H H D N
system; water jetters; and vacuum and mechanical debris 10/14/2011
removal systems and those assisting.
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Statewide
Page 22 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 44
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 23 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Sheet Metal Worker
Sheet Metal Worker SHM-80 $57.23 $74.59 $91.94 H H D H D D D D Y
A 4 10 schedule may be worked during Monday thru Friday. 8/18/2009
Apprentice Rates:
First Year $39.07 $47.92 $56.75
Second Year $40.39 $49.89 $59.39
Third Year $41.75 $51.93 $62.11
Fourth Year $44.42 $55.93 $67.45
Fifth Year $47.12 $59.99 $72.85
Siding & Decking SHM-80-SD $39.32 $51.57 $63.82 H H H H H H H D Y
9/2/2009
Sprinkler Fitter
Sprinkler Fitter SP 704 $61.92 $81.36 $100.80 H H D H D D D D Y
4 ten hour days allowed Monday-Friday only in those weeks 1/10/2011
containing a holiday and the preceding or succeeding the
holiday week
Apprentice Rates:
1st Period $25.45 $33.22 $41.00
2nd Period $40.54 $49.29 $58.04
3rd Period $42.48 $52.20 $61.92
4th Period $44.42 $55.11 $65.80
5th Period $46.37 $58.04 $69.70
6th Period $48.31 $60.94 $73.58
7th Period $50.26 $63.87 $77.48
8th Period $52.20 $66.78 $81.36
9th Period $54.14 $69.69 $85.24
10th Period $56.09 $72.62 $89.14
Terrazzo
Terrazzo Finisher BR1-TRF $41.84 $52.56 $63.28 H H D H D D D D Y
A 4 ten workweek may be worked Monday thru Thursday or 8/11/2009
Tuesday thru Friday.
Apprentice Rates:
Level 1 $18.11 $24.00 $29.89
Level 2 $19.25 $25.71 $32.17
Level 3 $25.69 $32.40 $39.12
Level 4 $27.09 $34.50 $41.92
Level 5 $28.53 $36.15 $43.77
Level 6 $30.07 $38.06 $46.06
Level 7 $31.68 $39.73 $47.79
Level 8 $33.10 $41.42 $49.74
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 23 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 45
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 24 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Terrazzo Worker BR1-TRW $47.31 $60.77 $74.22 H H D H D D D D Y
A 4 ten workweek may be worked Monday thru Thursday or 8/11/2009
Tuesday thru Friday.
Apprentice Rates:
Level 1 $23.92 $31.19 $38.47
Level 2 $26.83 $34.85 $42.87
Level 3 $31.79 $40.02 $48.26
Level 4 $34.40 $43.55 $52.69
Level 5 $36.55 $45.94 $55.33
Level 6 $40.04 $51.10 $62.16
Level 7 $40.67 $51.90 $63.14
Level 8 $41.56 $53.24 $64.92
Tile
Tile Finisher BR1-TF $41.39 $51.89 $62.38 H H D H D D D D Y
A 4 ten workweek may be worked Monday thru Thursday or 8/11/2009
Tuesday thru Friday.
Apprentice Rates:
Level 1 $18.11 $24.00 $29.89
Level 2 $19.25 $25.71 $32.17
Level 3 $25.69 $32.40 $39.12
Level 4 $27.09 $34.50 $41.92
Level 5 $28.53 $36.15 $43.77
Level 6 $30.07 $38.06 $46.06
Level 7 $31.68 $39.73 $47.79
Level 8 $33.10 $41.42 $49.74
Tile Layer BR1-TL $47.26 $60.69 $74.12 H H D H D D D D Y
A 4 ten workweek may be worked Monday thru Thursday or 8/11/2009
Tuesday thru Friday.
Apprentice Rates:
Level 1 $23.92 $31.19 $38.47
Level 2 $26.83 $34.85 $42.87
Level 3 $31.79 $40.02 $48.26
Level 4 $34.40 $43.55 $52.69
Level 5 $36.55 $45.94 $55.33
Level 6 $40.04 $51.10 $62.16
Level 7 $40.67 $51.90 $63.14
Level 8 $41.56 $53.24 $64.92
Truck Driver
on all trucks of 8 cubic yard capacity or less TM-RB1 $38.33 $36.94 H H H H H H H H Y
1/26/2011
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 24 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 46
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 25 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
of all trucks of 8 cubic yard capacity or over TM-RB1A $38.43 $37.09 H H H H H H H H Y
1/26/2011
on euclid type equipment TM-RB1B $38.58 $37.31 H H H H H H H H Y
1/26/2011
Underground Laborer Open Cut, Class I
Construction Laborer LAUC-Z1-1 $35.82 $46.40 $57.01 H H H H H H H D Y
10/13/2011
Apprentice Rates:
0-1,000 work hours $31.04 $39.23 $47.45
1,001-2,000 work hours $32.00 $40.67 $49.37
2,001-3,000 work hours $32.95 $42.10 $51.27
3,001-4,000 work hours $34.86 $44.96 $55.09
Underground Laborer Open Cut, Class II
Mortar and material mixer, concrete form man, signal man, LAUC-Z1-2 $35.93 $46.60 $57.26 H H H H H H H D Y
well point man, manhole, headwall and catch basin 10/13/2011
builder, guard rail builders, headwall, seawall, breakwall,
dock builder and fence erector.
Apprentice Rates:
0-1,000 work hours $31.12 $39.38 $47.64
1,001-2,000 work hours $32.08 $40.82 $49.56
2,001-3,000 work hours $33.05 $42.27 $51.50
3,001-4,000 work hours $34.97 $45.15 $55.34
Underground Laborer Open Cut, Class III
Air, gasoline and electric tool operator, vibrator operator, LAUC-Z1-3 $35.98 $46.67 $57.36 H H H H H H H D Y
drillers, pump man, tar kettle operator, bracers, rodder, 10/13/2011
reinforced steel or mesh man (e.g. wire mesh, steel mats,
dowel bars, etc.), cement finisher, welder, pipe jacking and
boring man, wagon drill and air track operator and
concrete saw operator (under 40 h.p.), windlass and tugger
man, and directional boring man.
Apprentice Rates:
0-1,000 work hours $31.16 $39.44 $47.72
1,001-2,000 work hours $32.12 $40.88 $49.64
2,001-3,000 work hours $33.09 $42.33 $51.58
3,001-4,000 work hours $35.02 $45.23 $55.44
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 25 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 47
Official 2011 Prevailing Wage Rates for State Funded Projects
Issue Date: 10/17/2011
Contract must be awarded by: 1/15/2012
Page 26 of 26
Classification Last Straight Time and Double Overtime
Name Description Updated Hourly a Half Time Provision
====================================================================================================
==========
Underground Laborer Open Cut, Class IV
Trench or excavating grade man. LAUC-Z1-4 $36.06 $46.79 $57.52 H H H H H H H D Y
10/13/2011
Apprentice Rates:
0-1,000 work hours $31.22 $39.53 $47.84
1,001-2,000 work hours $32.19 $40.99 $49.78
2,001-3,000 work hours $33.16 $42.44 $51.72
3,001-4,000 work hours $35.09 $45.33 $55.58
Underground Laborer Open Cut, Class V
Pipe Layer LAUC-Z1-5 $36.12 $46.88 $57.64 H H H H H H H D Y
10/13/2011
Apprentice Rates:
0-1,000 work hours $31.26 $39.59 $47.92
1,001-2,000 work hours $32.24 $41.06 $49.88
2,001-3,000 work hours $33.21 $42.51 $51.82
3,001-4,000 work hours $35.15 $45.43 $55.70
Underground Laborer Open Cut, Class VI
Grouting man, top man assistant, audio visual television LAUC-Z1-6 $33.57 $43.06 $52.54 H H H H H H H D Y
operations and all other operations in connection with 10/13/2011
closed circuit television inspection, pipe cleaning and pipe
relining work and the installation and repair of water
service pipe and appurtenances.
Apprentice Rates:
0-1,000 work hours $29.35 $36.73 $44.10
1,001-2,000 work hours $30.20 $38.00 $45.80
2,001-3,000 work hours $31.04 $39.26 $47.48
3,001-4,000 work hours $32.73 $41.79 $50.86
Underground Laborer Open Cut, Class VII
Restoration laborer, seeding, sodding, planting, cutting, LAUC-Z1-7 $30.19 $37.99 $45.78 H H H H H H H D Y
mulching and topsoil grading and the restoration of 10/13/2011
property such as replacing mail boxes, wood chips, planter
boxes, flagstones etc.
Apprentice Rates:
0-1,000 work hours $26.82 $32.93 $39.04
1,001-2,000 work hours $27.49 $33.93 $40.38
2,001-3,000 work hours $28.17 $34.95 $41.74
3,001-4,000 work hours $29.52 $36.98 $44.44
Official Request #: 1121 Official Rate Schedule
Requestor: Wayne State University Every contractor and subcontractor shall
keep posted
Project Description: Science Hall Upgrade Fire Suppression System on the construction site, in a conspicuous
place, a copy
of all prevailing wage and fringe benefit rates
Project Number: 005-189670-1 prescribed in a contract.
County: Wayne
Page 26 of 26
PREVAILING WAGE RATE SCHEDULE 00410 - 48