Document Sample
scope of work template
							                                                                                   Purchasing Department
                                                                                   5700 Cass Avenue, suite 4200
                                                                                   Detroit, Michigan 48202
                                                                                   (313) 577-3734
Division of Finance and Facilities Management                                      FAX (313) 577-3747
                                                                                   October 26, 2011

                                              Addendum #2 To
                                           Request for Proposal
                  For Science Hall: Upgrade Fire Suppression System: Project 005-189670-1
                                    Minutes of the Pre-bid Conference
                                             Dated October 14, 2011

 The Addendum must be acknowledged on your lump sum bid.

 The pre-bid conference for Request for Proposal for Science Hall: Upgrade Fire Suppression System, Project
 005-189670-1 was held on October 26, 2011, at 2:00 p.m. (local time) – at Detroit, MI 48202. Kimberly
 Tomaszewski reviewed the highlights of the pre-bid package, especially concerning details such as bid due dates
 and who vendors may contact during the live bid process. Kipp Cycholl discussed the technical aspects of the
 project and bid requirements, and conducted the Q & A session.

 NOTE: You must have attended a pre-bid conference in order to be eligible to bid on a particular project. Receipt
 of minutes or addenda without being at a pre-bid conference does not qualify your company to bid.

 Numerous simple questions and answers were addressed at the pre-bid meeting. Some of the issues were
 as follows:
        A bid bond is not required for bids below $50,000. Otherwise, a bid bond (5%) will be required for the full
         amount of the bid.
        Performance Bond and Material & Labor Payment Bond requirements are listed in the specifications of the
         job. Performance & Material & Labor Payment Bonds must be provided by the awarded Vendor with the
         submission of the signed contract; which will then be submitted to FP&M management for counter
         signature.
        The Performance Bond may not be purchased by the University. As a result, the cost for the Performance
         Bond must be included as a separate item for Base Bid.
        The awarded vendor must provide the required Certificate of Insurance in compliance with Section 800,
         article 11 of the bid specifications prior to commencement of any work.
        University Design Standards are found on the University website
         http://www.forms.purchasing.wayne.edu/Adv_bid/Adv_bid.html. These standards are inclusive to
         the drawing and contract documents. Any discrepancies between the drawings and the University Design
         Standards must be identified by bidders during the bid phase for clarification.
        If your company has not previously done business with the University you may go to the Purchasing
         website at www.purchasing.wayne.edu and look for the “new vendor” link under “Information for
         Vendors” on the left. You may submit a new vendor request form and an IRS form W-9. This will register
         your company on our vendor list. (NOTE: this does not replace the listserv.)
        This Project Requires the Contractor and any subcontractors to compensate all employees who come to
         the job site at no less than State of Michigan Prevailing Wage Rates. A Prevailing Wage Rate Schedule is
         included in Section 00410 of the Bid Specifications. Vendors must review these requirements to be sure
         they are in compliance with the requirements of the University and the State of Michigan. Contact the
         State of Michigan if further information on prevailing wage rate is needed at website
         http://www.michigan.gov/dleg/0,1607,7-154-27673_27706---,00.html. Vendors must post wages at the
         job site in compliance with the complete Prevailing Wage Rate listing provided in Bid Documents.



 PREVAILING WAGE RATE SCHEDULE                                                                    00410 - 1
     1099 workers and subcontractors using 1099 workers are NOT acceptable
     Certified Payroll must be provided with each of the contractor’s pay applications for all workers who
      worked at the job site, in compliance with the State of Michigan policy. Failure to provide certified payroll
      will constitute breach of contract and pay applications will be returned unpaid, and remain so until
      satisfactory supporting documents are provided.
     Signed waivers from all Subcontractors and suppliers must accompany Pay Applications or they will be
      returned for such documentation prior to approval.
     A properly executed sworn statement is required from all tiers of contractors, sub-contractors and
      suppliers which provide services or product of $1,000.00 or greater. Sworn statements must accompany
      applications for payment
     All documents listed in the Front End Section 0410-2 “Wayne State Prevailing Wage Requirements” must
      accompany applications for payment. Failure to do so will result in the entire application package returned
      for correction. A current State of Michigan Prevailing Wage Schedule for this project is attached.
     A checklist of all Pay Application requirements can be found in Section 00430-1.
     The competency and responsibility of Bidders will be considered in making the award. The Owner does
      not obligate himself to accept the lowest or any other bids. The Owner reserves the right to reject any and
      all bids and to waive any informalities in the Proposals
     Parking on WSU campus lots and structures are $5.00/access. Vendor must build parking into their lump
      sum bid (monthly parking passes can be purchased at WSU Welcome Center).
     Section 300, Form of Proposal has changed very recently, review carefully and complete in its entirety to
      avoid disqualification. The Form of Proposal has been REVISED. Please submit your bid using the
      REVISED form only.
     The contractors must fill out our prequalification form. They can attach additional information if they
      would like but at a minimum the information requested must be filled in on our form so that we do not have
      to hunt to find the information.
     Contractors who have withdrawn a bid after a University bid opening and/or refused to enter into a
      contract with the University upon notification of award within the last 3 years are not eligible to bid on this
      project.
     Project hours of operation are 7:00am – 5:00 pm. Anything else requires advance notice and approval.
      Over time rates are to be included in your lump sum proposal. Off hour work will require the approval of
      the Project Manager and requires 48-hour notice.
     Prequalification meeting will be held the first business day after bid openings. Contractors must be
      available. The Project Manager will coordinate the meetings.
     Pre Award meeting includes Schedule of Values from the Contractor, including a list of Contractor’s
      subcontractors and other qualifications
     An unsigned contract will be given to the successful Contractor at the conclusion of the Pre Award
      meeting, if all aspects of the bid are in order. The Contractor has 5 business days to return the contract to
      the Project Manager for University counter signature. The contractor must also submit a Performance
      Bond as outlined above and a Certificate of Insurance in the same 5 business day period. In the event the
      Contractor fails to return the documents in this 5 day period, the University reserves the right to award the
      contract to the next most responsive bidder.
     An Optional second walk thru was scheduled for Tuesday, November 1, 2011 at 10am.
     Permit requirements are the responsibility of the awarded contractor as listed on Section 800 Article 4.
      Contractors will need state electrical, and mechanical permits. They will also need to send the fire
      projection drawings to the State of Michigan Bureau of Fire Services.
     Vendor must provide their own dumpster if needed, which must be rubber or plywood padded if placed on
      concrete. Location and duration must be coordinated with the project manager. Dumpster must be
      tagged with the name of your company clearly displayed. Any lawn damage must be restored.
     The deadline for questions has been extended until November 03, 2011 at 12:00 noon.
     The Bid Due Date has been extended. The Bids are due no later than 2:00 p.m., November 08,
      2011, at 5700 Cass Ave. Room 4200 AAB. Bid opening will follow in room 4400 AAB
     The Time of Completion has been changed: The Contract is expected to be fully executed on or about
      25 calendar days after successful bidder qualification and recommendation of award. The undersigned
      agrees to start construction immediately after receipt of a fully executed contract and Purchase Order,



PREVAILING WAGE RATE SCHEDULE                                                                     00410 - 2
          and to complete the work as follows: Substantial Completion, and State Approved Inspections (if
          appropriate), no later than January 31, 2012.
         Your lump sum proposal must include the cost for a storage unit with working utility hook-ups. The unit
          must be placed no further than 300 feet from the Science Hall Building. An allowance of $2,795.00/
          month has been added to the Form of Proposal to cover the cost. The size of each storage unit is 20 X 8
          X 9”4” four-hour rated hazmat storage containers with explosion relief panels, lighting and ventilation dry
          chemical fire protection system with heating (2) each. Location of storage units TBD. Shelving must be
          60” X 24” X 84” and shelving capable of supporting minimum of 2,500 lbs. per shelve. An asbestos
          material survey will be provided to the awarded contractor. Any asbestos that is uncovered during this
          project must be reported to the Project Manager immediately. Abatement will be handled by the University
          and is not part of this project.
         A copy of the sign in sheet is available for downloading from the University Purchasing Web Site at
          http://www.forms.purchasing.wayne.edu/Adv_bid/Adv_bid.html.
         This is an occupied area, awarded vendor must be considerate of environment (noise, cleanliness, etc).
          There are also teaching labs in the space above where the work is being done. Work with a high noise
          level must be pre-arranged with the Project Manager.
         IMPORTANT- This is an addendum which MUST be acknowledged on your bid form




We will require two copies each of your lump sum proposals, vendor qualification questionnaire and your
bid bond documents.

All questions concerning this project must be emailed to: Kimberly Tomaszewski, Purchasing Department.
Email: ac9934@wayne.edu, copy Loretta McClary, Senior Buyer, at rfpteam1@wayne.edu.

Do not contact either FP&M or the Design Firm directly as this may result in disqualification of your
proposal.

Thank you for interest shown in working with Wayne State University.


Kimberly Tomaszewski
Senior Buyer


CC:       Kipp Cycholl (Project Manager), Loretta McClary, Senior Buyer, Attendee list.




PREVAILING WAGE RATE SCHEDULE                                                                      00410 - 3
VENDOR NAME


           GENERAL CONTRACT - PROPOSAL FORM (revised 1 - 2011)(REVISED 10/26/2011)

Please Note – Vendors must Pre-qualify themselves when responding to this bid opportunity. Our
Prequalification questions can be found on page 4 of this section.

OWNER:                              Board of Governors
                                    Wayne State University

PROJECT:                            Science Hall: Upgrade Fire Suppression System

PROJECT NO.:                        WSU PROJECT NO. 005-189670-1


PROJECT TYPE:                       Mechanical Work


PURCHASING AGENT:                   Kimberly Tomaszewski, Senior Buyer
                                    WSU – Purchasing Department
                                    5700 Cass, Suite 4200
                                    Detroit, Michigan 48202
                                    313-577-3757/ 313-577-3747 fax
                                    ac9934@wayne.edu & copy rfpteam1@wayne.edu

OWNER'S REPRESENTATIVE:             Kipp Cycholl, Project Manager
                                    Design & Construction Services
                                    Facilities Planning & Management
                                    Wayne State University
                                    5454 Cass Avenue
                                    Detroit, Michigan 48202

                                    Board of Governors
TO:
                                    Wayne State University
                                    Detroit, Michigan

BASE PROPOSAL:
                             The undersigned agrees to enter into an Agreement to complete the entire work
                             of the Science Hall: Upgrade Fire Suppression System project (WSU Project
                             No. 005-189670-1) in accordance with the Bidding Documents for the following
                             amounts:


                                                                                      $                Dollars

PERFORMANCE BOND COST (Revised 6-17-2011):

                             If, at the request of the Owner, a Performance Bond is deemed to be necessary
                             at the time of execution of the contract for this project, the undersigned agrees to
                             provide a Performance Bond covering the contractor’s base bid, meeting all
                             requirements defined herein, which cost shall be:

                      ADD                                                      $                Dollars




PREVAILING WAGE RATE SCHEDULE                                                                 00410 - 4
Allowance:
                                      A $2,795.00 allowance and material to be added in the proposal must
                                      include the cost for a storage unit with working utility hook-ups. The unit
                                      must be placed no further than 300 feet from the Science Hall Building.
                                      The size of each storage unit is 20 X 8 X 9”4” four-hour rated hazmat
                                      storage containers with explosion relief panels, lighting and ventilation dry
                                      chemical fire protection system with heating (2) each. Location of storage
                                      unitsTBD. The allowance expenditure must be accounted for and
                                      approved in advance by WSU and the architect during the construction
                                      phase of the project:


                                         $                                              Dollars


TOTAL BASE PROPOSAL WITH ALLOWANCE:

                                         $                                              Dollars



LAWN REPLACEMENT:             The undersigned agrees that, in the event of existing lawn or landscaping
                              damage, due to the Contractor's work, that has not been properly addressed and
                              repaired to the satisfaction of the University, the University may repair/replace the
                              lawn and/or landscaping, and that the expense will be at a unit cost of $10.00
                              per square yard for lawn, and landscaping at a rate of 1.5 times the cost of
                              said repairs, the full cost of which shall be reimbursed by the contractor.

CONTRACT CHANGE             The undersigned agrees to the following pricing formula and rates
ORDERS: (revised 4-01-2011) for changes in the contract work:

                              1.      For subcontract work, Contractor's markup for handling, overhead, profit
                                      and bonding on subcontractor's sell price, shall not exceed 5%.

                                      1.1.     For subcontract work that is provided on a time and material
                                               basis, the subcontractor shall be permitted a single markup
                                               for handling, overhead, profit and bonding of 5%. When a
                                               markup is identified in the subcontractor’s hourly labor rate,
                                               additional markup on labor is not permitted.

                                               1.1.1 For changes that are based upon a lump sum value,
                                               subcontractor shall provide all labor and material back-ups
                                               to ensure that duplicative charges are avoided and
                                               authorized mark-ups for OH&P can be confirmed
                               .
                              2.      For work by his own organization, Contractor's markup for job* and
                                      general overhead, profit and bonding shall not exceed 5% of the net
                                      labor** and material costs.

                              Within 14 days of the project’s contract execution Contractor shall provide
                              to the Owner; Subcontractor’s hourly labor rate breakdown details. This
                              requirement shall extend to the lowest level of subcontractor participation.




PREVAILING WAGE RATE SCHEDULE                                                                     00410 - 5
                              * Job and general overhead includes supervision and executive expenses; use
                              charges on small tools, scaffolding, blocking, shores, appliances, etc., and other
                              miscellaneous job expenses.

                              ** Net labor cost is the sum of the base wages, fringe benefits established by
                              governing trade organizations, applicable payroll taxes, and increased expense
                              for contractor's liability insurance (Workman's Compensation, P.L. and P.D.).

TIME OF COMPLETION:           (revised 4-01-2011)
                              The Contract is expected to be fully executed on or about 25 calendar days after
                              successful bidder qualification and recommendation of award. The undersigned
                              agrees to start construction immediately after receipt of a fully executed
                              contract, and to complete the work as follows:

                              Substantial Completion will be completed no later than January 31, 2012.

LIQUIDATED DAMAGES:           It is understood and agreed that, if project is not completed within the time
                              specified in the contract plus any extension of time allowed pursuant thereto, the
                              actual damages sustained by the Owner because of any such delay, will be
                              uncertain and difficult to ascertain, and it is agreed that the reasonable
                              foreseeable value of the use of said project by Owner would be the sum of
                              $250.00, Two hundred and fifty Dollars per day, and therefore the contractor
                              shall pay as liquidated damages to the Owner the sum of $250.00, Two hundred
                              and fifty Dollars per day for each day's delay in substantially completing said
                              project beyond the time specified in the Contract and any extensions of time
                              allowed thereunder.

TAXES:                        The undersigned acknowledges that prices stated above include all applicable
                              taxes of whatever character or description. Michigan State Sales Tax is
                              applicable to the work. Bidder understands that the Owner reserves the right to
                              reject any or all bids and to waive informalities or irregularities therein.

ADDENDA:                      The undersigned affirms that the cost of all work covered by the following
                              Addenda are included in the lump sum price of this proposal.

                              Addendum No.       Date                  Addendum No.      Date

                              Addendum No.       Date                  Addendum No.      Date

                              Addendum No.       Date                  Addendum No.      Date

                              Addendum No.       Date                  Addendum No.      Date

                              Addendum No.       Date                  Addendum No.      Date



CONTRACTOR'S PREQUALIFICATION STATEMENT & QUESTIONNAIRE:

                        Our Minimum Requirements for Construction Bids are:

WSU considers this project:   Mechanical Work.

Criteria            Small Project           Medium Project         Large Project           Very Large Project
                    bid less than           bid between $50,001    bid between             bid greater than $2
                    $50,000                 and $250,000           $250,001 and $2         million



PREVAILING WAGE RATE SCHEDULE                                                                 00410 - 6
                                                                               million
 EMR Rating                1.0 or Less               1.0 or Less               1.0 or Less            1.0 or Less
 (Experience
 Modification Rating)
 Bondable Vendor           N.A.                      Required                  Required               Required
 Length of Time in         2 Years                   3 Years                   5 Years                5 Years
 Construction
 Business
 Demonstrated              1 or more                 1 or more                 2 or more              3 or more
 Experience in
 Projects Similar in
 Scope and Price in
 the last 3 years
 Unsuccessful              None Allowed              None Allowed              None Allowed           None Allowed
 Projects on Campus
 in last 3 years
 Failure to comply         None Allowed              None Allowed              None Allowed           None Allowed
 with Prevailing
 Wage and/or Project
 Labor requirements
 Withdrawn                 2 or less                 2 or less                 1 or less              1 or less
 University Bid (with
 or without Bond
 forfeiture) within the
 last 3 years **
 Company currently         1 Year                    2 Years                   3 Years                3 Years
 not in Chapter 11 of
 the US Bankruptcy
 Code

** Withdrawal of a bid is subject to the University suspension policy, for a period up to one year.

 Contractors must complete the following information to determine their eligibility to participate in this bid.
 This information is required with your Bid to the University

 Failure to complete this form in its entirety will result in your bid being disqualified.
 Check one of the following on the makeup of your company:

           Corporation                                                      Individual

           Partnership                                                      Joint Venture

           Other (Explain)




 1. How many years has your organization been in business as a contractor?

 2. How many years has your organization been in business under its present business name?




 PREVAILING WAGE RATE SCHEDULE                                                                           00410 - 7
3. List states in which your organization is legally qualified to do business.



4. Provide the Name and Address of your Liability Insurance Carrier.



5. What is your current EMR Rating?
   The minimum requirement is an EMR Rating of 1.0 or less for all projects. Bidders with a rating higher than
   1.0 understand that their bid may be disqualified, at the sole discretion of the University.

6. What percentage of the work do you normally perform with your own work force/employees?

7. Have you ever failed to complete any work awarded to you? If so, attach a separate sheet of explanation.
   Include the name of the Project, the customer, the dates of the work, and the amount of the contract ?


8. Have you withdrawn a bid after a University bid opening and/or refused to enter into a contract with the
   University upon notification of award within the last 3 years? If so, state the Project Name and Number,
   and the date of bid submission below.


9. Has any officer or partner of your organization ever been an officer or partner of another organization
   that failed to complete a construction contract? If so, attach a separate sheet of explanation.



10. List the construction experience of the principals and superintendents of your company.

    Name: __________________________________ Title: _____________________________________

    _________________________________________________________________________________



    Name: __________________________________ Title: _____________________________________

    _________________________________________________________________________________



    Name: __________________________________ Title: _____________________________________

    _________________________________________________________________________________




11. List the construction Projects, and approximate dates, when you performed work similar in Scope to this
    project.


    Project: ___________________________________ Owner:__________________________________

    Contract Amount: ___________________________ Date Completed: _________________________




PREVAILING WAGE RATE SCHEDULE                                                                    00410 - 8
    Project: ___________________________________ Owner: __________________________________

    Contract Amount: ___________________________            Date Completed: _________________________

    Project: ___________________________________            Owner: __________________________________

    Contract Amount:___________________________            Date Completed: _________________________


12. List the construction Projects, and approximate dates, when you performed work similar in Dollar Amount to
    this project.

    Project:___________________________________ Owner:__________________________________

    Contract Amount: __________________________ Date Completed: _________________________

    Project: __________________________________ Owner: __________________________________

    Contract Amount: __________________________ Date Completed: _________________________

    Project: ___________________________________ Owner: __________________________________

    Contract Amount: ___________________________ Date Completed: _________________________

13. Is your Company “bondable”?      Yes                  No

14. What is your present bonding capacity? $

15. Who is your bonding agent?

    NAME:

    ADDRESS:

    PHONE:               (                 )

    CONTACT:

16. Does your company agree to provide financial reports to the University upon request? Failure to agree may
    result in disqualification of your bid. Yes         No

17. Does your company agree that all of the Terms and Conditions of this RFP and Vendor’s Response Proposal
    become part of any ensuing agreement? Yes                  No

18. Does your company agree to execute a contract containing the clauses shown in Section 00500 “Agreement
    Between Contractor and Owner for Construction”? Yes                No

    If “No”, clearly note any exceptions to any information contained in the contract documents and include with
    your proposal.

Note: Contractors submitting proposals for this project may, at the discretion of the University, be required to
submit references including contact information to be used to assist in the post bid evaluation process for the
subject project

ACKNOWLEDGEMENT OF                         The undersigned has read and understands the minimum qualifications



PREVAILING WAGE RATE SCHEDULE                                                                      00410 - 9
MINIMUM QUALIFICATIONS:        for University construction projects, and has completed the
                               Prequalification section completely and accurately. The undersigned
                               understands that a contractor, who fails to meet the minimum
                               qualifications in the category identified for this project, will be
                               disqualified from consideration for the project.


ACCEPTANCE OF PROPOSAL:        The undersigned agrees to execute a Contract, being the Wayne State
                               University standard form titled "Agreement Between Contractor and
                               Owner for Construction", provided that we are notified of the acceptance
                               of our Proposal within sixty (60) days of the date set for the opening
                               thereof.

The undersigned below understands that the bid will be disqualified if the
Prequalification information above is not completed in its entirety.
NAME OF COMPANY:

OFFICE ADDRESS:

PHONE NUMBER:                                                  DATE

FAX NUMBER:

SIGNED BY:
                                                       Signature


                                            (Please print or type name here)

TITLE




PREVAILING WAGE RATE SCHEDULE                                                       00410 - 10
                         PREVAILING WAGE RATE SCHEDULE (revised 4-05-2010)

A.   See also Page 00100-4 Section 12.B

B.   Wayne State University requires all project contractors, including subcontractors, who provide labor on
     University projects to compensate at a rate no less than prevailing wage rates.


C.   Contracts requiring prior approval of the Board of Governors between the University and a construction
     manager, design builder, or general contractor will include a requirement that the construction manager,
     design builder, or general contractor, with its contractors and subcontractors on that project, enter into a
     Project Labor Agreement in connection with that project, and may specify one or more of the items that the
     PLA must contain. See Section 00100 for additional information.

D.   The rates of wages and fringe benefits to be paid to each class of laborers and mechanics by each
     VENDOR and subcontractor(s) (if any) shall be not less than the wage and fringe benefit rates prevailing in
     Wayne County, Michigan, as determined by the United States Secretary of Labor. Individually contracted
     labor commonly referred to as “1099 Workers” and subcontractors using 1099 workers are not acceptable
     for work related to this project.


E.   To maintain compliance with State of Michigan Ordinances, Certified Payroll must be provided for each of
     the contractor’s or subcontractor’s payroll periods for work performed on this project. Certified Payroll
     should accompany all Pay Applications. Failure to provide certified payroll will constitute breach of contract,
     and pay applications will be returned unpaid and remain so until satisfactory supporting documents are
     provided.

     A Prevailing Wage Rate Schedule has been issued from the State of Michigan that is enclosed in this
     section

     Additional information can be found on the University Purchasing Department’s web site at the following
     URL address:



                    http://purchasing.wayne.edu/vendors/wage-rates.php

     If you have any questions, or require rates for additional classifications, please contact:

                    Michigan Department of Consumer & Industry Services,
                    Bureau of Safety and Regulation, Wage and Hour Division,
                    7150 Harris Drive,
                    P.O. Box 30476,
                    Lansing, Michigan 48909-7976

                    http://www.michigan.gov/dleg/0,1607,7-154-27673_27706---,00.html

F.   Wayne State University's Prevailing Wage Requirements:

     When compensation will be paid under prevailing wage requirements, the University shall require the
     following:

           A. The contractor shall obtain and keep posted on the work site, in a conspicuous place, a copy of all
              current prevailing wage and fringe benefit rates.




PREVAILING WAGE RATE SCHEDULE                                                                      00410 - 11
           B. The contractor shall obtain and keep an accurate record showing the name and occupation of and
              the actual wages and benefits paid to each laborer and mechanic employed in connection with
              this contract.

           C. The contractor shall submit a completed certified payroll document [U.S. Department of Labor
              Form WH 347] verifying and confirming the prevailing wage and benefits rates for all employees
              and subcontractors for each payroll period for work performed on this project. The contractor
              shall include copies of pay stubs for all employee or contract labor payments related to Wayne
              State University work. The certified payroll form can be downloaded from the Department of
              Labor website at http://www.dol.gov/whd/forms/wh347.pdf.

           D. A properly executed sworn statement is required from all tiers of contractors, sub-contractors and
              suppliers which provide services or product of $1,000.00 or greater. Sworn statements must
              accompany applications for payment. All listed parties on a sworn statement and as a
              subcontractor must submit Partial or Full Conditional Waivers for the amounts invoiced on the
              payment application. A copy of the acceptable WSU Sworn Statement and Waiver will be
              provided to the awarded contractor.

           E. Apprentices for a skilled trade must provide proof of participation in a Certified Apprenticeship
              Program and the level of hours completed in the program.

           F. Daily project sign-in sheets and field reports for the project must be turned in weekly.


                  Note: Contractor invoices WILL NOT be processed until all listed certified payroll
                  documents are received.

G.   If the VENDOR or subcontractor fails to pay the prevailing rates of wages and fringe benefits and does not
     cure such failure within 10 days after notice to do so by the UNIVERSITY, the UNIVERSITY shall have the
     right, at its option, to do any or all of the following:

             1.      Withhold all or any portion of payments due the VENDOR as may be considered necessary
                     by the UNIVERSITY to pay laborers and mechanics the difference between the rates of
                     wages and fringe benefits required by this contract and the actual wages and fringe benefits
                     paid;

             2.      Terminate this contract and proceed to complete the contract by separate agreement with
                     another vendor or otherwise, in which case the VENDOR and its sureties shall be liable to the
                     UNIVERSITY for any excess costs incurred by the UNIVERSITY.

             3.      Propose to the Director of Purchasing that the Vendor be considered for Debarment in
                     accordance with the University’s Debarment Policy, found on our website at
                     http://purchasing.wayne.edu/docs/appm28.pdf

                     Terms identical or substantially similar to this section of this RFP shall be included in any
                     contract or subcontract pertaining to this project.

H.   The current applicable prevailing wage rates as identified by the State of Michigan Department of Consumer
     & Industry Services, Bureau of Safety and Regulation, Wage and Hour Division are attached. Refer to item
     C above if additional information is required.

I.   Prior to award of the project, the apparent low bidder will be required to produce a schedule of values which
     will include the proposed subcontractors for each division of work and whether the subcontractor is signatory
     or non-signatory. A letter of intent or contract will not be issued to the apparent low bidder until this
     document is provided. The apparent low bidder will have one week to produce this document. If the




PREVAILING WAGE RATE SCHEDULE                                                                   00410 - 12
    required document is not received within this time, the bidder will be disqualified, and the next low bidder will
    be required to provide this schedule of values.




          SEE ATTACHED STATE PREVAILING WAGE INFORMATION




PREVAILING WAGE RATE SCHEDULE                                                                    00410 - 13
          State of Michigan
          WHPWRequest@michigan.gov
           Official Request #: 1121
                     Requestor: Wayne State University
            Project Description: Science Hall Upgrade Fire Suppression System
               Project Number: 005-189670-1

                                                                   Wayne County
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                              Page 1 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Asbestos & Lead Abatement Laborer
         Asbestos & Lead Abatement Laborer                        MLDC                          $37.95    $50.75     $63.54 H H H X X X X D Y
         4 ten hour days @ straight time allowed Monday-Saturday,               9/26/2011
         must be consecutive calendar days


         Asbestos & Lead Abatement, Hazardous Material Handler
         Asbestos and Lead Abatement, Hazardous Material Handler AS207                          $37.95    $50.85     $63.75 H H H X X X X D Y
                                                                                9/26/2011

         4 ten hour days @ straight time allowed Monday-Saturday,


         Boilermaker
         Boilermaker                                                    BO169                   $54.70    $81.08 $107.45 H H H H H H H D Y
                                                                                8/14/2009
                                                       Apprentice Rates:
                                                       1st 6 months                             $40.31    $59.49 $78.67
                                                       2nd 6 months                             $41.45    $61.21 $80.95
                                                       3rd 6 months                             $42.57    $62.88 $83.19
                                                       4th 6 months                             $43.69    $64.57 $85.43
                                                       5th 6 months                             $44.81    $66.24 $87.67
                                                       6th 6 months                             $49.53    $73.40 $97.26
                                                       7th 6 months                             $49.32    $73.01 $96.69
                                                       8th 6 months                             $51.58    $76.40 $101.21

         Bricklayer
         Bricklayer, stone mason, pointer, cleaner, caulker             BR1                     $50.18    $75.27 $100.36 H H D H D D D D N
                                                                                12/4/2008
                                                       Apprentice Rates:
                                                       First 6 months                           $30.22    $45.33     $60.44
                                                       2nd 6 months                             $32.07    $48.10     $64.14
                                                       3rd 6 months                             $33.92    $50.88     $67.84
                                                       4th 6 months                             $35.77    $53.66     $71.54
                                                       5th 6 months                             $37.62    $56.43     $75.24
                                                       6th 6 months                             $39.47    $59.20     $78.94
                                                       7th 6 months                             $41.32    $61.98     $82.64
                                                       8th 6 months                             $43.17    $64.76     $86.34


           Official Request #: 1121                                                                                 Official Rate Schedule
                    Requestor: Wayne State University                                   Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System             on the construction site, in a conspicuous
place, a copy
                                                                                        of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                               prescribed in a contract.
                     County: Wayne
                                                                                                                          Page 1 of 26




PREVAILING WAGE RATE SCHEDULE                                                                                      00410 - 14
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                       Issue Date: 10/17/2011
                                           Contract must be awarded by:       1/15/2012
                                                               Page 2 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Carpenter
         Carpet and Resilient Floor Layer, (does not include           CA1045                     $46.04    $65.56     $85.07 X X H X X X X D Y
         installation of prefabricated formica & parquet flooring                 9/15/2011
         which is to be paid carpenter rate)

                                                        Apprentice Rates:
                                                        1st 6 months                              $22.62    $30.43     $38.23
                                                        2nd 6 months                              $26.52    $36.27     $46.03
                                                        3rd 6 months                              $28.48    $39.21     $49.95
                                                        4th 6 months                              $30.43    $42.14     $53.85
                                                        5th 6 months                              $32.39    $45.08     $57.77
                                                        6th 6 months                              $34.33    $48.00     $61.65
                                                        7th 6 months                              $36.29    $50.94     $65.57
                                                        8th 6 months                              $38.23    $53.84     $69.45

         Carpenter-four 10s allowed Mon-Thurs with bad weather         CA687Z1                    $51.19    $73.14     $95.09 H H D H D D D D Y
         makeup day Fri                                                           9/12/2011

                                                        Apprentice Rates:
                                                        1st year                                  $31.45    $43.53     $55.61
                                                        3rd 6 months                              $33.64    $46.82     $59.99
                                                        4th 6 months                              $35.83    $50.10     $64.37
                                                        5th 6 months                              $38.02    $53.38     $68.75
                                                        6th 6 months                              $40.22    $56.69     $73.15
                                                        7th 6 months                              $42.41    $59.98     $77.53
                                                        8th 6 months                              $44.61    $63.27     $81.93

         Piledriver                                                    CA687Z1P                   $51.19    $73.14     $95.09 H H D H D D D D Y
         Four 10s allowed Monday-Thurs. Friday makeup day for                     9/12/2011
         bad weather.

                                                        Apprentice Rates:
                                                        1st 6 months                              $31.45    $43.53     $55.61
                                                        2nd 6 months                              $35.83    $50.10     $64.37
                                                        3rd 6 months                              $40.22    $56.69     $73.15
                                                        4th 6 months                              $44.61    $63.27     $81.93

         Cement Mason
         Cement Mason                                                  br1cm                      $45.50    $64.36     $83.22 H H D H H H H D N
                                                                                  12/30/2009
                                                        Apprentice Rates:
                                                        1st 6 months                              $26.41    $35.85     $45.29
                                                        2nd 6 months                              $28.28    $38.66     $49.03
                                                        3rd 6 months                              $32.06    $44.33     $56.59
                                                        4th 6 months                              $35.82    $49.97     $64.11
                                                        5th 6 months                              $37.71    $52.80     $67.89
                                                        6th 6 months                              $41.48    $58.46     $75.43

           Official Request #: 1121                                                                                   Official Rate Schedule
                    Requestor: Wayne State University                                     Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System               on the construction site, in a conspicuous
place, a copy
                                                                                          of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                 prescribed in a contract.
                     County: Wayne
                                                                                                                            Page 2 of 26




PREVAILING WAGE RATE SCHEDULE                                                                                        00410 - 15
                              Official 2011 Prevailing Wage Rates for State Funded Projects
                                                     Issue Date: 10/17/2011
                                         Contract must be awarded by:       1/15/2012
                                                             Page 3 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========

         Cement Mason                                               CE514                      $45.16    $63.75     $82.34 H H D H H H H D N
                                                                               7/28/2010
                                                     Apprentice Rates:
                                                     1st 6 months                              $26.17    $35.47     $44.76
                                                     2nd 6 months                              $28.03    $38.26     $48.48
                                                     3rd 6 months                              $31.74    $43.83     $55.90
                                                     4th 6 months                              $35.45    $49.39     $63.32
                                                     5th 6 months                              $37.32    $52.19     $67.06
                                                     6th 6 months                              $41.03    $57.76     $74.48

         Drywall
         Drywall Taper                                              PT-22-D                    $41.70    $54.58     $67.45 H H D H D D D D N
                                                                               10/15/2009
                                                     Apprentice Rates:
                                                     First 3 months                            $28.83    $35.27     $41.71
                                                     Second 3 months                           $31.40    $39.13     $46.85
                                                     Second 6 months                           $33.97    $42.98     $51.99
                                                     Third 6 months                            $36.55    $46.85     $57.15
                                                     4th 6 months                              $37.84    $48.79     $59.73

         Electrician
         Road Way Electrical Work                                   EC-17                      $48.61    $70.50     $92.39 H H H H H H H D Y
         Double time due after 16 hours on any calendar day and all            5/31/2011
          hours Sunday.

                                                     Apprentice Rates:
                                                     1st 6 months                              $31.11    $44.26     $57.38
                                                     2nd 6 months                              $33.30    $47.52     $61.76
                                                     3rd 6 months                              $35.48    $50.81     $66.14
                                                     4th 6 months                              $37.68    $54.08     $70.51
                                                     5th 6 months                              $39.86    $57.38     $74.89
                                                     6th 6 months                              $44.23    $63.94     $83.64

         Inside Wireman                                             EC-58-IW                   $56.51    $75.12     $93.74 H H H H H H H D N
                                                                               2/18/2011
                                                     Apprentice Rates:
                                                     0-1000 hours                              $35.36    $43.41     $51.45
                                                     1000-2000 hours                           $37.12    $46.04     $54.97
                                                     2000-3500 hours                           $38.88    $48.69     $58.49
                                                     3500-5000 hours                           $40.65    $51.34     $62.03
                                                     5000-6500 hours                           $44.18    $56.64     $69.09
                                                     6500-8000 hours                           $47.70    $61.92     $76.13




           Official Request #: 1121                                                                                Official Rate Schedule
                    Requestor: Wayne State University                                  Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System            on the construction site, in a conspicuous
place, a copy
                                                                                       of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                              prescribed in a contract.
                     County: Wayne
                                                                                                                         Page 3 of 26




PREVAILING WAGE RATE SCHEDULE                                                                                     00410 - 16
                              Official 2011 Prevailing Wage Rates for State Funded Projects
                                                     Issue Date: 10/17/2011
                                         Contract must be awarded by:       1/15/2012
                                                             Page 4 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Sound and Communication Installer/Technician               EC-58-SC                      $32.54    $44.20     $55.86 H H H H H H H D N
                                                                               1/7/2008
                                                     Apprentice Rates:
                                                     Period 1                                     $20.88    $26.71     $32.54
                                                     Period 2                                     $22.04    $28.46     $34.86
                                                     Period 3                                     $23.21    $30.21     $37.20
                                                     Period 4                                     $24.38    $31.96     $39.54
                                                     Period 5                                     $25.55    $33.72     $41.88
                                                     Period 6                                     $26.71    $35.46     $44.20

         Elevator Constructor
         Elevator Constructor                                       EL 36                         $56.46               $94.99 D D D D D D D D Y
         Elevator Constructor                                                  8/7/2007

                                                     Apprentice Rates:
                                                     1st Year Apprentice                          $37.74               $58.93
                                                     2nd Year Apprentice                          $41.90               $66.94
                                                     3rd Year Apprentice                          $43.98               $70.95
                                                     4th Year Apprentice                          $48.14               $78.96

         Glazier
         Glazier                                                    GL-357                        $45.49    $63.69     $81.88 H H H H H H H D Y
         If a four 10 hour day workweek is scheduled, four 10s must            9/12/2011
         be consecutive, M-F.

                                                     Apprentice Rates:
                                                     1st 6 months                                 $31.13    $42.15     $53.16
                                                     2nd 6 months                                 $32.59    $44.34     $56.08
                                                     3rd 6 months                                 $35.35    $48.48     $61.60
                                                     4th 6 months                                 $36.80    $50.65     $64.50
                                                     5th 6 months                                 $38.25    $52.83     $67.40
                                                     6th 6 months                                 $39.70    $55.01     $70.30
                                                     7th 6 months                                 $41.15    $57.18     $73.20
                                                     8th 6 months                                 $44.04    $61.51     $78.98

         Heat and Frost Insulator
         Spray Insulation                                           AS25S                         $20.14    $29.14              H H H H H H H H N
                                                                               3/5/2007




           Official Request #: 1121                                                                                   Official Rate Schedule
                    Requestor: Wayne State University                                     Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System               on the construction site, in a conspicuous
place, a copy
                                                                                          of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                 prescribed in a contract.
                     County: Statewide
                                                                                                                            Page 4 of 26




PREVAILING WAGE RATE SCHEDULE                                                                                        00410 - 17
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                              Page 5 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Heat and Frost Insulator and Asbestos Worker
         Heat and Frost Insulators and Asbestos Workers               AS25                          $53.15    $68.54     $83.92 H H H H H H H D Y
         Four 10s must be worked for a minimum of 2 weeks                           8/14/2009
         consecutively, Monday thru Thursday. All hours worked in
         excess of 10 will be paid at double time. All hours worked
         on the fifth day, Monday thru Friday will paid at time and
         one-half.

                                                       Apprentice Rates:
                                                       1st Year                                     $39.30    $47.76     $56.22
                                                       2nd Year                                     $42.38    $52.38     $62.38
                                                       3rd Year                                     $43.92    $54.69     $65.46
                                                       4th Year                                     $47.00    $59.31     $71.62

         Ironworker
         Fence, Sound Barrier & Guardrail erection/installation and   IR-25-F1                      $32.30    $44.30     $56.30 X X H X X X H D Y
         Exterior Signage work                                                      10/6/2011
         Four ten hour work days may be worked during Monday-
         Saturday.

                                                       Apprentice Rates:
                                                       60% Level                                    $22.00    $29.20     $36.40
                                                       65% Level                                    $23.29    $31.09     $38.89
                                                       70% Level                                    $24.58    $32.98     $41.38
                                                       75% Level                                    $25.86    $34.86     $43.86
                                                       80% Level                                    $27.15    $36.75     $46.35
                                                       85% Level                                    $28.44    $38.64     $48.84

         Siding, Glazing, Curtain Wall                                IR-25-GZ2                     $43.36    $55.02     $66.68 H H H H H H D D Y
         4 tens may be worked Monday thru Thursday @ straight                       10/10/2011
         time. If bad weather, Friday may be a make up day. If
         holiday celebrated on a Monday, 4 10s may be worked
         Tuesday thru Friday. Work in excess of 12 hours per day
         must be paid @ double time.

                                                       Apprentice Rates:
                                                       Level 1                                      $27.03    $33.64     $40.23
                                                       Level 2                                      $29.14    $36.38     $43.60
                                                       Level 3                                      $31.26    $39.13     $46.99
                                                       Level 4                                      $33.38    $41.88     $50.37
                                                       Level 5                                      $35.49    $44.62     $53.75
                                                       Level 6                                      $37.61    $47.37     $57.13

         Pre-engineered Metal Work                                    IR-25-PE-Z1                   $43.69    $53.99     $64.28 X X H X X X X D Y
                                                                                    10/11/2011




           Official Request #: 1121                                                                                     Official Rate Schedule
                    Requestor: Wayne State University                                       Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                 on the construction site, in a conspicuous
place, a copy
                                                                                            of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                   prescribed in a contract.
                     County: Wayne
                                                                                                                              Page 5 of 26


PREVAILING WAGE RATE SCHEDULE                                                                                          00410 - 18
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                              Page 6 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Reinforced Iron Work                                      IR-25-RF                      $52.36    $74.85     $97.34 H H D H D D D D N
                                                                                 10/10/2011
                                                    Apprentice Rates:
                                                    Level 1                                      $33.01    $45.52     $58.04
                                                    Level 2                                      $35.38    $50.51     $64.68
                                                    Level 3                                      $37.74    $52.62     $67.50
                                                    Level 4                                      $40.28    $57.86     $74.48
                                                    Level 5                                      $42.81    $60.22     $77.64
                                                    Level 6                                      $45.35    $64.04     $82.72

         Rigging Work                                              IR-25-RIG                     $57.73    $86.41 $115.08 H H H H H H H D N
                                                                                 10/10/2011
                                                    Apprentice Rates:
                                                    Level 1& 2                                   $33.28    $49.67     $66.05
                                                    Level 3                                      $36.11    $53.92     $71.71
                                                    Level 4                                      $38.93    $58.14     $77.35
                                                    Level 5                                      $41.76    $62.39     $83.01
                                                    Level 6                                      $44.59    $66.63     $88.67

         Decking                                                   IR-25-SD                      $49.44    $73.91     $98.37 H H H H H H D D Y
         4 tens may be worked Monday thru Thursday @ straight                    10/10/2011
         time. If bad weather, Friday may be a make up day. If
         holiday celebrated on a Monday, 4 10s may be worked
         Tuesday thru Friday. Work in excess of 12 hours per day
         must be paid @ double time.


         Structural, ornamental, conveyor, welder and pre-cast     IR-25-STR                     $58.11    $86.91 $115.71 H H H H H H D D Y
         4 tens may be worked Monday thru Thursday @ straight                    10/10/2011
         time. If bad weather, Friday may be a make up day. If
         holiday celebrated on a Monday, 4 10s may be worked
         Tuesday thru Friday. Work in excess of 12 hours per day
         must be paid @ double time.

                                                    Apprentice Rates:
                                                    Levels 1 & 2                                 $32.77    $49.15     $65.54
                                                    Level 3                                      $35.60    $53.40     $71.20
                                                    Level 4                                      $38.42    $57.63     $76.84
                                                    Level 5                                      $41.25    $61.88     $82.50
                                                    Level 6                                      $44.08    $66.13     $88.16
                                                    Level 7                                      $46.90    $70.35     $93.80
                                                    Level 8                                      $49.73    $74.60     $99.46

         Industrial Door erection & construction                   IR-25-STR-D                   $58.17    $72.60     $87.02 H H D H H H D D Y
                                                                                 10/10/2011




           Official Request #: 1121                                                                                  Official Rate Schedule
                    Requestor: Wayne State University                                    Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System              on the construction site, in a conspicuous
place, a copy
                                                                                         of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                prescribed in a contract.
                     County: Wayne
                                                                                                                           Page 6 of 26



PREVAILING WAGE RATE SCHEDULE                                                                                       00410 - 19
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                              Page 7 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Laborer
         Construction Laborer, Demolition Laborer, Mason            L33401-A-CC                      $40.96    $58.16     $75.35 X X H X H H H D Y
         Tender,Carpenter Tender, Drywall Handler, Concrete                       8/8/2011
         Laborer, Cement Finisher Tender, Concrete Chute, and
         Concrete Bucket Handler

                                                      Apprentice Rates:
                                                      0-1,000 work hours                             $35.12    $49.40     $63.67
                                                      1,001 - 2,000 work hours                       $36.29    $51.15     $66.01
                                                      2,001 - 3,000 work hours                       $37.46    $52.91     $68.35
                                                      3,001 - 4,000 work hours                       $39.79    $56.41     $73.01

         Signal Man (on sewer & caisson work), Air, Electric or     L33401-B-SB                      $41.22    $58.55     $75.87 X X H X H H H D Y
         Gasoline Tool Operator, Concrete Vibrator Operator,                      8/8/2011
         Acetylene Torch & Air Hammer Operator; Scaffold Builder,
         Caisson Worker


         Furnace Battery Heater Tender, Burning Bar & Oxy-          L33401-D-HH                      $41.46    $58.71     $76.15 X X H X H H H D Y
         Acetylene Gun                                                            8/8/2011


         Expediter Man, Top Man and/or Bottom Man (Blast Furnace L33401-E-EX                         $42.21    $60.03     $77.85 X X H X H H H D Y
         Work or Battery Work)                                                    8/8/2011


         Cleaner/Sweeper Laborer; Furniture Laborer                 L33401-F-CL                      $35.51    $49.98     $64.45 X X H X H H H D Y
                                                                                  8/8/2011

         Lansing Burner, Blaster & Powder Man; Air, Electric or     L334C                            $41.71    $59.28     $76.85 X X H X H H H D Y
         Gasoline Tool Operator (Blast Furance Work or Battery                    8/8/2011
         Work)


         Plasterer Tender, Plastering Machine Operator              LPT-1                            $40.96    $58.16     $75.35 X X H X H H H D N
                                                                                  9/26/2011
                                                      Apprentice Rates:
                                                      0 - 1,000 hours                                $35.13    $49.41     $63.69
                                                      1,001 - 2,000 hours                            $36.29    $51.15     $66.01
                                                      2,001 - 3,000 hours                            $37.46    $52.91     $68.35
                                                      3,001 - 4,000 hours                            $39.79    $56.41     $73.01




           Official Request #: 1121                                                                                      Official Rate Schedule
                    Requestor: Wayne State University                                        Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                  on the construction site, in a conspicuous
place, a copy
                                                                                             of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                    prescribed in a contract.


PREVAILING WAGE RATE SCHEDULE                                                                                           00410 - 20
            County: Wayne
                                      Page 7 of 26




PREVAILING WAGE RATE SCHEDULE   00410 - 21
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                              Page 8 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Laborer - Hazardous
         Class A performing work in conjunction with site             LHAZ-Z1-A                     $39.56    $56.16     $72.75 H H H H H H H D Y
         preparation and other preliminary work prior to actual                     1/10/2011
         removal, handling, or containment of hazardous waste
         substances not requiring use of personal protective
         equipment required by state or federal regulations; or a
         laborer performing work in conjunction with the removal,
         handling, or containment of hazardous waste substances
         when use of personal protective equipment level "D" is
         required.

                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $33.79    $47.50     $61.21
                                                       1,001-2,000 work hours                       $34.94    $49.22     $63.51
                                                       2,001-3,000 work hours                       $36.10    $50.96     $65.83
                                                       3,001-4,000 work hours                       $38.41    $54.43     $70.45

         Class B performing work in conjunction with the removal,     LHAZ-Z1-B                     $40.56    $57.66     $74.75 H H H H H H H D Y
         handling, or containment of hazardous waste substances                     1/10/2011
         when the use of personal protective equipment levels "A",
         "B" or "C" is required.

                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $34.54    $48.62     $62.71
                                                       1,001-2,000 work hours                       $35.74    $50.42     $65.11
                                                       2,001-3,000 work hours                       $36.95    $52.24     $67.53
                                                       3,001-4,000 work hours                       $39.36    $55.86     $72.35

         Laborer Underground - Tunnel, Shaft & Caisson
         Class I - Tunnel, shaft and caisson laborer, dump man,       LAUCT-Z1-1                    $35.97    $46.66     $57.34 H H H H H H H D Y
         shanty man, hog house tender, testing man (on gas), and                    10/14/2011
         watchman.

                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $31.15    $39.43     $47.70
                                                       1,001-2,000 work hours                       $32.12    $40.88     $49.64
                                                       2,001-3,000 work hours                       $33.08    $42.32     $51.56
                                                       3,001-4,000 work hours                       $35.01    $45.21     $55.42

         Class II - Manhole, headwall, catch basin builder, bricklayer LAUCT-Z1-2                   $36.08    $46.82     $57.56 H H H H H H H D Y
          tender, mortar man, material mixer, fence erector, and                    10/14/2011
         guard rail builder.

                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $31.24    $39.56     $47.88
                                                       1,001-2,000 work hours                       $32.20    $41.00     $49.80
                                                       2,001-3,000 work hours                       $33.17    $42.45     $51.74
                                                       3,001-4,000 work hours                       $35.11    $45.37     $55.62



           Official Request #: 1121                                                                                     Official Rate Schedule
                    Requestor: Wayne State University                                       Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                 on the construction site, in a conspicuous
place, a copy
                                                                                            of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                   prescribed in a contract.
                     County: Wayne
                                                                                                                              Page 8 of 26


PREVAILING WAGE RATE SCHEDULE                                                                                          00410 - 22
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                              Page 9 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Class III - Air tool operator (jack hammer man, bush       LAUCT-Z1-3                      $36.14    $46.91     $57.68 H H H H H H H D Y
         hammer man and grinding man), first bottom man, second                     10/14/2011
         bottom man, cage tender, car pusher, carrier man,
         concrete man, concrete form man, concrete repair man,
         cement invert laborer, cement finisher, concrete shoveler,
         conveyor man, floor man, gasoline and electric tool
         operator, gunnite man, grout operator, welder, heading
         dinky man, inside lock tender, pea gravel operator, pump
         man, outside lock tender, scaffold man, top signal man,
         switch man, track man, tugger man, utility man, vibrator
         man, winch operator, pipe jacking man, wagon drill and air
          track operator and concrete saw operator (under 40 h.p.).

                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $31.28    $39.62     $47.96
                                                       1,001-2,000 work hours                       $32.25    $41.07     $49.90
                                                       2,001-3,000 work hours                       $33.22    $42.53     $51.84
                                                       3,001-4,000 work hours                       $35.17    $45.45     $55.74

         Class IV - Tunnel, shaft and caisson mucker, bracer man,      LAUCT-Z1-4                   $36.32    $47.18     $58.04 H H H H H H H D Y
         liner plate man, long haul dinky driver and well point man.                10/14/2011

                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $31.42    $39.83     $48.24
                                                       1,001-2,000 work hours                       $32.40    $41.30     $50.20
                                                       2,001-3,000 work hours                       $33.38    $42.77     $52.16
                                                       3,001-4,000 work hours                       $35.34    $45.71     $56.08

         Class V - Tunnel, shaft and caisson miner, drill runner,      LAUCT-Z1-5                   $36.57    $47.56     $58.54 H H H H H H H D Y
         keyboard operator, power knife operator, reinforced steel                  10/14/2011
         or mesh man (e.g. wire mesh, steel mats, dowel bars)

                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $31.60    $40.10     $48.60
                                                       1,001-2,000 work hours                       $32.60    $41.60     $50.60
                                                       2,001-3,000 work hours                       $33.59    $43.09     $52.58
                                                       3,001-4,000 work hours                       $35.58    $46.07     $56.56

         Class VI - Dynamite man and powder man.                       LAUCT-Z1-6                   $36.90    $48.05     $59.20 H H H H H H H D Y
                                                                                    10/14/2011
                                                       Apprentice Rates:
                                                       0-1,000 work hours                           $31.85    $40.47     $49.10
                                                       1,001-2,000 work hours                       $32.86    $41.99     $51.12
                                                       2,001-3,000 work hours                       $33.87    $43.51     $53.14
                                                       3,001-4,000 work hours                       $35.89    $46.53     $57.18




           Official Request #: 1121                                                                                     Official Rate Schedule
                    Requestor: Wayne State University                                       Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                 on the construction site, in a conspicuous
place, a copy
                                                                                            of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                   prescribed in a contract.
                     County: Wayne
                                                                                                                              Page 9 of 26


PREVAILING WAGE RATE SCHEDULE                                                                                          00410 - 23
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                       Issue Date: 10/17/2011
                                           Contract must be awarded by:       1/15/2012
                                                              Page 10 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Class VII - Restoration laborer, seeding, sodding, planting, LAUCT-Z1-7                   $30.18    $37.97     $45.76 H H H H H H H D Y
         cutting, mulching and topsoil grading and the restoration of              10/14/2011
          property such as replacing mail boxes, wood chips, planter
         boxes and flagstones.

                                                        Apprentice Rates:
                                                        0-1,000 work hours                         $26.81    $32.91     $39.02
                                                        1,001-2,000 work hours                     $27.48    $33.92     $40.36
                                                        2,001-3,000 work hours                     $28.16    $34.94     $41.72
                                                        3,001-4,000 work hours                     $29.51    $36.97     $44.42

         Landscape Laborer
         Landscape Specialist includes air, gas, and diesel            LLAN-Z1-A                   $26.78    $37.04     $47.29 X X H X X X H D Y
         equipment operator, skidsteer (or equivalent), lawn                       9/16/2011
         sprinkler installer on landscaping work where seeding,
         sodding, planting, cutting, trimming, backfilling, rough
         grading or maintenance of landscape projects occurs.

         Sundays paid at time & one half. Holidays paid at double
         time.


         Skilled Landscape Laborer: small power tool operator,         LLAN-Z1-B                   $22.56    $30.71     $38.85 X X H X X X H D Y
         lawn sprinkler installers' tender, material mover, truck                  9/16/2011
         driver when seeding, sodding, planting, cutting, trimming,
         backfilling, rough grading or maintaining of landscape
         projects occurs
         Sundays paid at time & one half. Holidays paid at double
         time.


         Seeding, sodding, planting, cutting, trimming, backfilling,   LLAN-Z1-C                   $13.90    $20.85     $27.80 X X H X X X H D Y
         rough grading or maintaining of landscape projects.                       9/16/2011


         Sundays paid at time & one half. Holidays paid at double
         time


         Marble Finisher
         Marble Finisher                                        BR1-MF                             $41.37    $51.86     $62.34 H H D H D D D D Y
         A 4 ten workweek may be worked Monday thru Thursday or                    8/11/2009
         Tuesday thru Friday.

                                                        Apprentice Rates:
                                                        Level 1                                    $18.11    $24.00     $29.89
                                                        Level 2                                    $19.25    $25.71     $32.17
                                                        Level 3                                    $25.69    $32.40     $39.12
                                                        Level 4                                    $27.09    $34.50     $41.92
                                                        Level 5                                    $28.53    $36.15     $43.77
                                                        Level 6                                    $30.07    $38.06     $46.06
                                                        Level 7                                    $31.68    $39.73     $47.79
                                                        Level 8                                    $33.10    $41.42     $49.74

           Official Request #: 1121                                                                                    Official Rate Schedule
                    Requestor: Wayne State University                                      Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                on the construction site, in a conspicuous
place, a copy
                                                                                           of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                  prescribed in a contract.


PREVAILING WAGE RATE SCHEDULE                                                                                         00410 - 24
            County: Wayne
                                      Page 10 of 26




PREVAILING WAGE RATE SCHEDULE   00410 - 25
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                             Page 11 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========

         Marble Mason
         Marble Mason                                           BR1-MM                                   $47.85    $61.58     $75.30 H H D H D D D D Y
         A 4 ten workweek may be worked Monday thru Thursday or                       8/11/2009
         Tuesday thru Friday.

                                                         Apprentice Rates:
                                                         Level 1                                         $23.92    $31.19     $38.47
                                                         Level 2                                         $26.83    $34.85     $42.87
                                                         Level 3                                         $31.79    $40.02     $48.26
                                                         Level 4                                         $34.40    $43.55     $52.69
                                                         Level 5                                         $36.55    $45.94     $55.33
                                                         Level 6                                         $40.04    $51.10     $62.16
                                                         Level 7                                         $40.67    $51.90     $63.14
                                                         Level 8                                         $41.56    $53.24     $64.92

         Operating Engineer
         Crane with boom & jib or leads 120' or longer                  EN-324-A120                      $54.01    $71.10     $88.18 H H D H D D D D Y
                                                                                      8/5/2011
         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


         Crane with boom & jib or leads 140' or longer                  EN-324-A140                      $54.83    $72.33     $89.82 H H D H D D D D Y
                                                                                      8/5/2011
         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


         Crane with boom & jib or leads 220' or longer                EN-324-A220                        $55.13    $72.78     $90.42 H H D H D D D D Y
         Four ten hour days may be scheduled Monday-Thursday.                         8/5/2011
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.




           Official Request #: 1121                                                                                          Official Rate Schedule
                    Requestor: Wayne State University                                            Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                      on the construction site, in a conspicuous
place, a copy
                                                                                                 of all prevailing wage and fringe benefit rates


PREVAILING WAGE RATE SCHEDULE                                                                                               00410 - 26
       Project Number: 005-189670-1   prescribed in a contract.
               County: Wayne
                                                                        Page 11 of 26




PREVAILING WAGE RATE SCHEDULE                                     00410 - 27
                                 Official 2011 Prevailing Wage Rates for State Funded Projects
                                                         Issue Date: 10/17/2011
                                             Contract must be awarded by:       1/15/2012
                                                                Page 12 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Crane with boom & jib or leads 300' or longer                  EN-324-A300                      $56.63   $75.03     $93.42 H H D H D D D D Y
                                                                                      8/5/2011
         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


         Crane with boom & jib or leads 400' or longer                  EN-324-A400                      $58.13   $77.28     $96.42 H H D H D D D D Y
                                                                                      6/9/2011
         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


         Compressor or welding machine                                  EN-324-CW                        $43.16   $54.82     $66.48 H H D H D D D D Y
                                                                                      8/8/2011
         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


         Forklift, lull, extend-a-boom forklift                         EN-324-FL                        $50.47   $65.79     $81.10 H H D H D D D D Y
                                                                                      8/8/2011
         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


         Fireman or oiler                                             EN-324-FO                          $42.13   $53.28     $64.42 H H D H D D D D Y
         Four ten hour days may be scheduled Monday-Thursday.                         8/8/2011
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


         Regular crane, job mechanic, concrete pump with boom           EN-324-RC                        $53.15   $69.81     $86.46 H H D H D D D D Y
                                                                                      8/5/2011
         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.


          Official Request #: 1121                                                                                          Official Rate Schedule
                   Requestor: Wayne State University                                             Every contractor and subcontractor shall
keep posted
         Project Description: Science Hall Upgrade Fire Suppression System                       on the construction site, in a conspicuous

PREVAILING WAGE RATE SCHEDULE                                                                                              00410 - 28
place, a copy
                                           of all prevailing wage and fringe benefit rates
            Project Number: 005-189670-1   prescribed in a contract.
                    County: Wayne
                                                                            Page 12 of 26




PREVAILING WAGE RATE SCHEDULE                                       00410 - 29
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                             Page 13 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========

         Regular engineer, hydro-excavator, remote controlled           EN-324-RE                      $52.18   $68.35     $84.52 H H D H D D D D Y
         concrete breaker                                                           8/5/2011


         Four ten hour days may be scheduled Monday-Thursday.
         Work in excess of 10 hours but less than 12 per day shall be
          paid at time and one-half. Work in excess of 12 per day
         shall be paid at double time. When bad weather or holiday
         occurs during this time, Friday may be scheduled for a
         minimum of 8 hours.

                                                      Apprentice Rates:
                                                      0-999 hours                                      $41.87   $53.19     $64.50
                                                      1,000-1,999 hours                                $43.49   $55.62     $67.74
                                                      2,000-2,999 hours                                $45.12   $58.06     $71.00
                                                      3,000-3,999 hours                                $46.73   $60.48     $74.22
                                                      4,000-4,999 hours                                $48.35   $62.90     $77.46
                                                      5,000-5,999 hours                                $49.96   $65.32     $80.68

         Operating Engineer - Marine Construction
         Diver/Wet Tender, Engineer (hydraulic dredge)                  GLF-1                          $59.91   $78.51     $97.11 X X H H H H H D Y
                                                                                    1/12/2011

         Holiday pay= $115.71 per hour, wages & fringes

            Subdivision of county       all Great Lakes, islands therein, & connecting & tributary waters
         Crane/Backhoe Operator, 70 ton or over Tug Operator,         GLF-2                         $58.41      $76.26     $94.11 X X H H H H H D Y
         Mechanic/Welder, Assistant Engineer (hydraulic dredge),                    1/12/2011
         Leverman (hydraulic dredge), Diver Tender

         Holiday pay = $111.96 per hour, wages & fringes

            Subdivision of county        All Great Lakes, islands therein, & connecting & tributary waters
         Deck Equipment Operator, Machineryman, Maintenance of GLF-3                                 $54.51     $70.41     $86.31 X X H H H H H D Y
         Crane (over 50 ton capacity) or Backhoe (115,000 lbs or                     1/12/2011
         more), Tug/Launch Operator, Loader, Dozer on Barge,
         Deck Machinery

         Holiday pay = $102.21 per hour, wages & fringes

            Subdivision of county        All Great Lakes, islands therein, & connecting & tributary waters
         Deck Equipment Operator, (Machineryman/Fireman), (4          GLF-4                          $49.16     $62.39     $75.61 X X H H H H H D Y
         equipment units or more), Off Road Trucks, Deck Hand, Tug                   1/12/2011
          Engineer, & Crane Maintenance 50 ton capacity and under
         or Backhoe 115,000 lbs or less, Assistant Tug Operator

         Holiday pay = $88.83 per hour, wages & fringes


            Subdivision of county        All Great Lakes, islands therein, & connecting & tributary waters




           Official Request #: 1121                                                                                       Official Rate Schedule
                    Requestor: Wayne State University                                          Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                    on the construction site, in a conspicuous
place, a copy


PREVAILING WAGE RATE SCHEDULE                                                                                            00410 - 30
                                      of all prevailing wage and fringe benefit rates
       Project Number: 005-189670-1   prescribed in a contract.
               County: Statewide
                                                                       Page 13 of 26




PREVAILING WAGE RATE SCHEDULE                                  00410 - 31
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                       Issue Date: 10/17/2011
                                           Contract must be awarded by:       1/15/2012
                                                              Page 14 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Operating Engineer Hazardous Waste Class I
          Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWCI-Z1A                   $49.74    $65.66     $81.57 H H H H H H H D Y
         pressure demand, full face piece SCBA or pressure demand                10/1/2009
          supplied air respirator w/ escape SCBA. The highest
         available level of respiratory, skin and eye protection.

         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.

                                                        Apprentice Rates:
                                                        1st 6 months                                 $39.70    $50.85     $61.99
                                                        2nd 6 months                                 $41.28    $53.22     $65.15
                                                        3rd 6 months                                 $42.87    $55.60     $68.33
                                                        4th 6 months                                 $44.47    $58.01     $71.53
                                                        5th 6 months                                 $46.06    $60.38     $74.71
                                                        6th 6 months                                 $47.66    $62.79     $77.91

         Level B & C protection. B - Pressure demand, full face SCBA EN-324-HWCI-Z1B                 $48.79    $64.23     $79.67 H H H H H H H D Y
          or pressure demand supplied air respirator w/ escape                     10/1/2009
         SCBA w/chemical resistant clothing. C - Full face piece, air
         purifying canister-equipped respirator w/chemical resistant
          clothing.

         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.

                                                        Apprentice Rates:
                                                        1st 6 months                                 $39.02    $49.82     $60.63
                                                        2nd 6 months                                 $40.57    $52.15     $63.73
                                                        3rd 6 months                                 $42.11    $54.46     $66.81
                                                        4th 6 months                                 $43.65    $56.77     $69.89
                                                        5th 6 months                                 $45.20    $59.10     $72.99
                                                        6th 6 months                                 $46.75    $61.42     $76.09

         Level D - Coveralls, safety boots, glasses or chemical splash EN-324-HWCI-Z1D               $47.49    $62.28     $77.07 H H H H H H H D Y
         goggles and hard hats.                                                      10/2/2009


         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.

                                                        Apprentice Rates:
                                                        1st 6 months                                 $38.11    $48.46     $58.81
                                                        2nd 6 months                                 $39.59    $50.69     $61.77
                                                        3rd 6 months                                 $41.08    $52.92     $64.75
                                                        4th 6 months                                 $42.55    $55.12     $67.69
                                                        5th 6 months                                 $44.03    $57.34     $70.65
                                                        6th 6 months                                 $45.50    $59.54     $73.59




           Official Request #: 1121                                                                                      Official Rate Schedule
                    Requestor: Wayne State University                                        Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                  on the construction site, in a conspicuous
place, a copy
                                                                                             of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                    prescribed in a contract.
                     County: Wayne
                                                                                                                              Page 14 of 26

PREVAILING WAGE RATE SCHEDULE                                                                                           00410 - 32
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                       Issue Date: 10/17/2011
                                           Contract must be awarded by:       1/15/2012
                                                              Page 15 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Level D When Capping Landfill Coveralls, safety boots,        EN-324-HWCI-Z1DCL              $47.24   $61.91     $76.57 H H H H H H H D Y
         glasses or chemical splash goggles and hard hats.                            10/2/2009


         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.

                                                        Apprentice Rates:
                                                        1st 6 months                                  $37.94   $48.21     $58.47
                                                        2nd 6 months                                  $39.40   $50.40     $61.39
                                                        3rd 6 months                                  $40.87   $52.60     $64.33
                                                        4th 6 months                                  $42.34   $54.81     $67.27
                                                        5th 6 months                                  $43.80   $56.99     $70.19
                                                        6th 6 months                                  $45.26   $59.19     $73.11

         Operating Engineer Hazardous Waste Class II
         Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWCII-Z1A                    $45.51   $59.31     $73.11 H H H H H H H D Y
         pressure demand, full face piece SCBA or pressure demand               10/1/2009
          supplied air respirator w/ escape SCBA. The highest
         available level of respiratory, skin and eye protection.

         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.


         Level B & C protection. B - Pressure demand, full face SCBA EN-324-HWCII-Z1B                 $44.56   $57.89     $71.21 H H H H H H H D Y
          or pressure demand supplied air respirator w/ escape                     10/2/2009
         SCBA w/chemical resistant clothing. C - Full face piece, air
         purifying canister-equipped respirator w/chemical resistant
          clothing.

         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.


         Level D - Coveralls, safety boots, glasses or chemical splash EN-324-HWCII-Z1D               $43.26   $55.94     $68.61 H H H H H H H D Y
         goggles and hard hats.                                                      10/2/2009


         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.


         Level D When Capping Landfill Coveralls, safety boots,        EN-324-HWCII-Z1DCL             $43.01   $55.56     $68.11 H H H H H H H D Y
         glasses or chemical splash goggles and hard hats.                            10/2/2009


         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.




          Official Request #: 1121                                                                                       Official Rate Schedule
                   Requestor: Wayne State University                                          Every contractor and subcontractor shall
keep posted
         Project Description: Science Hall Upgrade Fire Suppression System                    on the construction site, in a conspicuous


PREVAILING WAGE RATE SCHEDULE                                                                                           00410 - 33
place, a copy
                                           of all prevailing wage and fringe benefit rates
            Project Number: 005-189670-1   prescribed in a contract.
                    County: Wayne
                                                                            Page 15 of 26




PREVAILING WAGE RATE SCHEDULE                                       00410 - 34
                             Official 2011 Prevailing Wage Rates for State Funded Projects
                                                    Issue Date: 10/17/2011
                                        Contract must be awarded by:       1/15/2012
                                                           Page 16 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
       Operating Engineer Hazardous Waste Crane w/ Boom & Jib leads
       140' or longer
       Level A - Fully encapsulating chemical resistant suit w/ EN-324-HW140-Z1A                  $52.39   $69.63     $86.87 H H H H H H H D Y
       pressure demand, full face piece SCBA or pressure demand              10/1/2009
        supplied air respirator w/ escape SCBA. The highest
       available level of respiratory, skin and eye protection.

       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Level B & C protection. B - Pressure demand, full face SCBA EN-324-HW140-Z1B               $51.44   $68.21     $84.97 H H H H H H H D Y
        or pressure demand supplied air respirator w/ escape                    10/1/2009
       SCBA w/chemical resistant clothing. C - Full face piece, air
       purifying canister-equipped respirator w/chemical resistant
        clothing.

       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Level D Coveralls, safety boots, glasses or chemical splash   EN-324-HW140-Z1D             $50.14   $66.26     $82.37 H H H H H H H D Y
       goggles and hard hats.                                                     10/2/2009


       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Level D When Capping Landfill Coveralls, safety boots,        EN-324-HW140-Z1DCL           $49.89   $65.88     $81.87 H H H H H H H D Y
       glasses or chemical splash goggles and hard hats.                          10/2/2009
       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Operating Engineer Hazardous Waste Crane w/ Boom & Jib leads
       220' or longer
       Level A - Fully encapsulating chemical resistant suit w/ EN-324-HW220-Z1A                  $52.69   $70.08     $87.47 H H H H H H H D Y
       pressure demand, full face piece SCBA or pressure demand              10/1/2009
        supplied air respirator w/ escape SCBA. The highest
       available level of respiratory, skin and eye protection.

       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Level B & C protection. B - Pressure demand, full face SCBA EN-324-HW220-Z1B               $51.74   $68.66     $85.57 H H H H H H H D Y
        or pressure demand supplied air respirator w/ escape                    10/1/2009
       SCBA w/chemical resistant clothing. C - Full face piece, air
       purifying canister-equipped respirator w/chemical resistant
        clothing.

       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.




         Official Request #: 1121                                                                                    Official Rate Schedule
                  Requestor: Wayne State University                                       Every contractor and subcontractor shall


PREVAILING WAGE RATE SCHEDULE                                                                                       00410 - 35
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System   on the construction site, in a conspicuous
place, a copy
                                                                              of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                     prescribed in a contract.
                     County: Wayne
                                                                                                               Page 16 of 26




PREVAILING WAGE RATE SCHEDULE                                                                          00410 - 36
                             Official 2011 Prevailing Wage Rates for State Funded Projects
                                                    Issue Date: 10/17/2011
                                        Contract must be awarded by:       1/15/2012
                                                           Page 17 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
       Level D Coveralls, safety boots, glasses or chemical splash   EN-324-HW220-Z1D              $50.44   $66.71     $82.97 H H H H H H H D Y
       goggles and hard hats.                                                      10/2/2009


       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Level D When Capping Landfill Coveralls, safety boots,        EN-324-HW220-Z1DCL            $50.19   $66.33     $82.47 H H H H H H H D Y
       glasses or chemical splash goggles and hard hats.                           10/2/2009


       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Operating Engineer Hazardous Waste Regular Crane, Job
       Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
        Operator and Concrete Pump with boom
       Level D When Capping Landfill Coveralls, safety boots, EN-324-HWRC-Z1DCL                    $47.59   $62.43     $77.27 H H H H H H H D Y
       glasses or chemical splash goggles and hard hats.                   10/2/2009


       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Operating Engineer Hazardous Waste Regular Crane, Job
       Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
        Operator and Concrete Pump with Boom Operator
       Level D - Coveralls, safety boots, glasses or chemical splash EN-324-HWRC-Z1D               $48.46   $63.74     $79.01 H H H H H H H D Y
       goggles and hard hats.                                                     10/2/2009


       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.


       Operating Engineer Hazardous Waste Regular Crane, Job
       Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
        Operator and Concrete Pump with booms
       Level B & C protection. B - Pressure demand, full face SCBA EN-324-HWRC-Z1B                 $49.76   $65.69     $81.61 H H H H H H H D Y
        or pressure demand supplied air respirator w/ escape                    10/1/2009
       SCBA w/chemical resistant clothing. C - Full face piece, air
       purifying canister-equipped respirator w/chemical resistant
        clothing.

       Four 10 hour days may be worked Monday-Thursday with
       Friday as a straight-time make up day.




         Official Request #: 1121                                                                                     Official Rate Schedule
                  Requestor: Wayne State University                                        Every contractor and subcontractor shall


PREVAILING WAGE RATE SCHEDULE                                                                                        00410 - 37
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System   on the construction site, in a conspicuous
place, a copy
                                                                              of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                     prescribed in a contract.
                     County: Wayne
                                                                                                               Page 17 of 26




PREVAILING WAGE RATE SCHEDULE                                                                          00410 - 38
                              Official 2011 Prevailing Wage Rates for State Funded Projects
                                                    Issue Date: 10/17/2011
                                        Contract must be awarded by:       1/15/2012
                                                           Page 18 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Operating Engineer Hazardous Waste Regular Crane, Job
         Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel
          Operators and Concrete Pump with booms
         Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWRC-Z1A                 $50.71    $67.11     $83.51 H H H H H H H D Y
         pressure demand, full face piece SCBA or pressure demand              10/1/2009
          supplied air respirator w/ escape SCBA. The highest
         available level of respiratory, skin and eye protection.

         Four 10 hour days may be worked Monday-Thursday with
         Friday as a straight-time make up day.


         Operating Engineer Steel Work
         Forklift, 1 Drum Hoist                                    EN-324-ef                      $55.06    $72.80     $90.53 H H D H H H D D Y
                                                                                  10/12/2011

         Crane w/ 120' boom or longer                              EN-324-SW120                   $57.51    $76.47     $95.43 H H D H H H D D Y
                                                                                  10/12/2011

         Crane w/ 120' boom or longer w/ Oiler                     EN-324-SW120-O                 $58.51    $77.97     $97.43 H H D H H H D D Y
                                                                                  10/12/2011

         Crane w/ 140' boom or longer                              EN-324-SW140                   $58.69    $78.24     $97.79 H H D H H H D D Y
                                                                                  10/12/2011

         Crane w/ 140' boom or longer W/ Oiler                     EN-324-SW140-O                 $59.69    $79.74     $99.79 H H D H H H D D Y
                                                                                  10/12/2011

         Boom & Jib 220' or longer                                 EN-324-SW220                   $58.96    $78.65     $98.33 H H D H H H D D Y
                                                                                  10/12/2011

         Crane w/ 220' boom or longer w/ Oiler                     EN-324-SW220-O                 $59.96    $80.15 $100.33 H H D H H H D D Y
                                                                                  10/12/2011

         Boom & Jib 300' or longer                                 EN-324-SW300                   $60.46    $80.90 $101.33 H H D H H H D D Y
                                                                                  10/12/2011

         Crane w/ 300' boom or longer w/ Oiler                     EN-324-SW300-O                 $61.46    $82.40 $103.33 H H D H H H D D Y
                                                                                  10/12/2011

         Boom & Jib 400' or longer                                 EN-324-SW400                   $61.96    $83.15 $104.33 H H D H H H D D Y
                                                                                  10/12/2011

         Crane w/ 400' boom or longer w/ Oiler                     EN-324-SW400-O                 $62.96    $84.65 $106.33 H H D H H H D D Y
                                                                                  10/12/2011

         Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator    EN-324-SWCO                    $57.15    $75.93     $94.71 H H D H H H D D Y
                                                                                  10/12/2011
                                                    Apprentice Rates:
                                                    0-999 hours                                   $45.28    $58.42     $71.57
                                                    1,000-1,999 hours                             $47.17    $61.25     $75.34
                                                    2,000-2,999 hours                             $49.04    $64.07     $79.09
                                                    3,000-3,999 hours                             $50.91    $66.87     $82.83
                                                    4,000-4,999 hours                             $52.79    $69.69     $86.59
                                                    5,000 hours                                   $54.67    $72.51     $90.35



           Official Request #: 1121                                                                                   Official Rate Schedule
                    Requestor: Wayne State University                                     Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System               on the construction site, in a conspicuous
place, a copy
                                                                                          of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                 prescribed in a contract.
                     County: Wayne
                                                                                                                           Page 18 of 26



PREVAILING WAGE RATE SCHEDULE                                                                                        00410 - 39
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                     Issue Date: 10/17/2011
                                         Contract must be awarded by:       1/15/2012
                                                            Page 19 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Crane w/ Oiler                                           EN-324-SWCO-O                  $58.15    $77.43     $96.71 H H D H H H D D Y
                                                                                 10/12/2011

         Compressor or Welder Operator                            EN-324-SWCW                    $49.70    $64.76     $79.81 H H D H H H D D Y
                                                                                 10/12/2011

         Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe   EN-324-SWHO                    $56.51    $74.97     $93.43 H H D H H H D D Y
                                                                                 10/12/2011

         Oiler                                                    EN-324-SWO                     $48.29    $62.64     $76.99 H H D H H H D D Y
                                                                                 10/12/2011

         Tower Crane & Derrick where work is 50' or more above    EN-324-SWTD50                  $58.24    $77.57     $96.89 H H D H H H D D Y
         first level                                                             10/12/2011


         Tower Crane & Derrick 50' or more w/ Oiler where work    EN-324-SWTD50-O                $59.24    $79.07     $98.89 H H D H H H D D Y
         station is 50' or more above first level                                10/12/2011



         Operating Engineer Underground
         Class I Equipment                                        EN-324A1-UC1                   $49.34    $64.08     $78.82 H H H H H H H D Y
                                                                                 10/13/2011
                                                    Apprentice Rates:
                                                    0-999 hours                                  $39.89    $50.21     $60.52
                                                    1,000-1,999 hours                            $41.36    $52.41     $63.46
                                                    2,000-2,999 hours                            $42.84    $54.63     $66.42
                                                    3,000-3,999 hours                            $44.32    $56.85     $69.38
                                                    4,000-4,999 hours                            $45.79    $59.05     $72.32
                                                    5,000-5,999 hours                            $47.26    $61.26     $75.26

         Class II Equipment                                       EN-324A1-UC2                   $44.61    $56.99     $69.36 H H H H H H H D Y
                                                                                 10/13/2011

         Class III Equipment                                      EN-324A1-UC3                   $43.88    $55.89     $67.90 H H H H H H H D Y
                                                                                 10/13/2011

         Class IV Equipment                                       EN-324A1-UC4                   $43.31    $55.04     $66.76 H H H H H H H D Y
                                                                                 10/13/2011

         Master Mechanic                                          EN-324A1-UMM                   $49.59    $64.46     $79.32 H H H H H H H D Y
                                                                                 10/13/2011




           Official Request #: 1121                                                                                  Official Rate Schedule
                    Requestor: Wayne State University                                    Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System              on the construction site, in a conspicuous
place, a copy
                                                                                         of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                prescribed in a contract.
                     County: Wayne
                                                                                                                          Page 19 of 26


PREVAILING WAGE RATE SCHEDULE                                                                                       00410 - 40
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                     Issue Date: 10/17/2011
                                         Contract must be awarded by:       1/15/2012
                                                            Page 20 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Painter
         Painter (8 hours of repaint work performed on Sunday shall PT-22-P                      $39.86    $52.22     $64.57 H H D H D D D D Y
          be paid time & one half rate)                                       10/15/2009


         Four 10s allowed Monday-Thursday with Friday makeup day
          if job down due to weather, holiday or other conditions
         beyond the control of the employer.

                                                      Apprentice Rates:
                                                      First 6 months                             $27.51    $33.69     $39.87
                                                      Second 6 months                            $31.21    $39.24     $47.27
                                                      Third 6 months                             $32.45    $41.10     $49.75
                                                      Fourth 6 months                            $33.68    $42.95     $52.21
                                                      Fifth 6 months                             $34.92    $44.81     $54.69
                                                      Final 6 months                             $36.15    $46.65     $57.15

         Pipe and Manhole Rehab
         General Laborer for rehab work or normal cleaning and       TM247                       $26.50    $35.83              H H H H H H H H N
         cctv work-top man, scaffold man, CCTV assistant, jetter-vac          1/11/2011
         assistant


         Tap cutter/CCTV Tech/Grout Equipment Operator: unit        TM247-2                      $31.00    $42.58              H H H H H H H H N
         driver and operator of CCTV; grouting equipment and tap              1/11/2011
         cutting equipment


         CCTV Technician/Combo Unit Operator: unit driver and       TM247-3                      $29.75    $40.70              H H H H H H H H N
         operator of cctv unit or combo unit in connection with               1/11/2011
         normal cleaning and televising work


         Boiler Operator: unit driver and operator of steam/water   TM247-4                      $31.50    $43.33              H H H H H H H H N
         heater units and all ancillary equipment associated                  1/11/2011


         Combo Unit driver & Jetter-Vac Operator                    TM247-5                      $31.50    $43.33              H H H H H H H H N
                                                                              1/11/2011

         Pipe Bursting & Slip-lining Equipment Operator             TM247-6                      $32.50    $44.83              H H H H H H H H N
                                                                              8/4/2011




           Official Request #: 1121                                                                                  Official Rate Schedule
                    Requestor: Wayne State University                                    Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System              on the construction site, in a conspicuous
place, a copy
                                                                                         of all prevailing wage and fringe benefit rates


PREVAILING WAGE RATE SCHEDULE                                                                                       00410 - 41
       Project Number: 005-189670-1   prescribed in a contract.
               County: Statewide
                                                                        Page 20 of 26




PREVAILING WAGE RATE SCHEDULE                                     00410 - 42
                              Official 2011 Prevailing Wage Rates for State Funded Projects
                                                    Issue Date: 10/17/2011
                                        Contract must be awarded by:       1/15/2012
                                                           Page 21 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Pipefitter
         Pipefitter                                                PF-636                        $63.33    $84.16 $100.98 H H D H D D D D N
                                                                              6/1/2011
                                                    Apprentice Rates:
                                                    1st & 2nd periods                            $26.63    $34.98     $41.98
                                                    3rd period                                   $28.63    $37.98     $45.98
                                                    4th period                                   $29.88    $39.86     $48.48
                                                    5th period                                   $31.13    $41.73     $50.98
                                                    6th period                                   $32.38    $43.60     $53.48
                                                    7th period                                   $33.63    $45.48     $55.98
                                                    8th period                                   $34.63    $46.98     $57.98
                                                    9th period                                   $35.63    $48.48     $59.98
                                                    10th period                                  $37.06    $50.62     $62.84

         Plasterer
         Plasterer                                                 BR1P                          $43.84    $65.76     $87.68 H H H H H H H D N
                                                                              12/16/2008
                                                    Apprentice Rates:
                                                    1st 6 months                                 $22.41    $33.62     $44.82
                                                    2nd 6 months                                 $25.99    $38.99     $51.98
                                                    3rd 6 months                                 $29.56    $44.34     $59.12
                                                    4th 6 months                                 $33.13    $49.70     $66.26
                                                    5th 6 months                                 $36.70    $55.05     $73.40
                                                    6th 6 months                                 $40.27    $60.41     $80.54

         Plasterer                                                 PL67                          $44.72    $60.11     $75.50 H H H X D D D D N
                                                                              9/8/2010
                                                    Apprentice Rates:
                                                    1st 6 months                                 $29.33    $37.02     $44.72
                                                    2nd 6 months                                 $30.87    $39.34     $47.80
                                                    3rd 6 months                                 $32.41    $41.64     $50.88
                                                    4th 6 months                                 $35.49    $46.26     $57.04
                                                    5th 6 months                                 $38.56    $51.16     $63.76
                                                    6th 6 months                                 $41.64    $55.49     $69.34




           Official Request #: 1121                                                                                  Official Rate Schedule
                    Requestor: Wayne State University                                    Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System              on the construction site, in a conspicuous
place, a copy
                                                                                         of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                prescribed in a contract.
                     County: Wayne
                                                                                                                          Page 21 of 26




PREVAILING WAGE RATE SCHEDULE                                                                                       00410 - 43
                               Official 2011 Prevailing Wage Rates for State Funded Projects
                                                      Issue Date: 10/17/2011
                                          Contract must be awarded by:       1/15/2012
                                                             Page 22 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Plumber
         Plumber                                                      PL-98                        $57.58    $74.45     $89.31 H H D H D D D D N
                                                                                   8/18/2009
                                                       Apprentice Rates:
                                                       Period 1                                    $17.76    $24.31     $30.86
                                                       Period 2                                    $17.76    $24.31     $30.86
                                                       Period 3                                    $30.79    $39.88     $48.96
                                                       Period 4                                    $31.42    $40.82     $50.22
                                                       Period 5                                    $32.58    $42.56     $52.54
                                                       Period 6                                    $33.73    $44.28     $54.84
                                                       Period 7                                    $34.88    $43.61     $54.74
                                                       Period 8                                    $36.05    $47.76     $59.48
                                                       Period 9                                    $37.20    $49.49     $61.78
                                                       Period 10                                   $38.35    $51.22     $64.08

         Roofer
         Commercial Roofer                                            RO-149-WOM                   $48.46    $62.29     $76.62 H H D H H H D D N
         Straight time is not to exceed ten (10) hours per day or                  8/18/2008
         forty (40) hours per week.

                                                       Apprentice Rates:
                                                       Apprentice 1                                $32.62    $39.86     $48.04
                                                       Apprentice 2                                $36.80    $44.80     $53.30
                                                       Apprentice 3                                $38.22    $46.93     $56.14
                                                       Apprentice 4                                $39.25    $48.48     $58.20
                                                       Apprentice 5                                $40.47    $50.30     $60.64
                                                       Apprentice 6                                $41.87    $52.40     $63.44

         Sewer Relining
         Class I-Operator of audio visual CCTV system including       SR-I                         $41.07    $55.60     $70.12 H H H H H H H D N
         remote in-ground cutter and other equipment used in                       10/14/2011
         conjunction with CCTV system.


         Class II-Operator of hot water heaters and circulation       SR-II                        $39.54    $53.30     $67.06 H H H H H H H D N
         system; water jetters; and vacuum and mechanical debris                   10/14/2011
         removal systems and those assisting.




           Official Request #: 1121                                                                                    Official Rate Schedule
                    Requestor: Wayne State University                                      Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                on the construction site, in a conspicuous
place, a copy
                                                                                           of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                  prescribed in a contract.
                     County: Statewide
                                                                                                                            Page 22 of 26


PREVAILING WAGE RATE SCHEDULE                                                                                         00410 - 44
                              Official 2011 Prevailing Wage Rates for State Funded Projects
                                                    Issue Date: 10/17/2011
                                        Contract must be awarded by:       1/15/2012
                                                           Page 23 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Sheet Metal Worker
         Sheet Metal Worker                                       SHM-80                          $57.23    $74.59     $91.94 H H D H D D D D Y
         A 4 10 schedule may be worked during Monday thru Friday.              8/18/2009

                                                    Apprentice Rates:
                                                    First Year                                    $39.07    $47.92     $56.75
                                                    Second Year                                   $40.39    $49.89     $59.39
                                                    Third Year                                    $41.75    $51.93     $62.11
                                                    Fourth Year                                   $44.42    $55.93     $67.45
                                                    Fifth Year                                    $47.12    $59.99     $72.85

         Siding & Decking                                          SHM-80-SD                      $39.32    $51.57     $63.82 H H H H H H H D Y
                                                                               9/2/2009

         Sprinkler Fitter
         Sprinkler Fitter                                          SP 704                         $61.92    $81.36 $100.80 H H D H D D D D Y
         4 ten hour days allowed Monday-Friday only in those weeks             1/10/2011
         containing a holiday and the preceding or succeeding the
         holiday week

                                                    Apprentice Rates:
                                                    1st Period                                    $25.45    $33.22     $41.00
                                                    2nd Period                                    $40.54    $49.29     $58.04
                                                    3rd Period                                    $42.48    $52.20     $61.92
                                                    4th Period                                    $44.42    $55.11     $65.80
                                                    5th Period                                    $46.37    $58.04     $69.70
                                                    6th Period                                    $48.31    $60.94     $73.58
                                                    7th Period                                    $50.26    $63.87     $77.48
                                                    8th Period                                    $52.20    $66.78     $81.36
                                                    9th Period                                    $54.14    $69.69     $85.24
                                                    10th Period                                   $56.09    $72.62     $89.14

         Terrazzo
         Terrazzo Finisher                                      BR1-TRF                           $41.84    $52.56     $63.28 H H D H D D D D Y
         A 4 ten workweek may be worked Monday thru Thursday or                8/11/2009
         Tuesday thru Friday.

                                                    Apprentice Rates:
                                                    Level 1                                       $18.11    $24.00     $29.89
                                                    Level 2                                       $19.25    $25.71     $32.17
                                                    Level 3                                       $25.69    $32.40     $39.12
                                                    Level 4                                       $27.09    $34.50     $41.92
                                                    Level 5                                       $28.53    $36.15     $43.77
                                                    Level 6                                       $30.07    $38.06     $46.06
                                                    Level 7                                       $31.68    $39.73     $47.79
                                                    Level 8                                       $33.10    $41.42     $49.74



           Official Request #: 1121                                                                                   Official Rate Schedule
                    Requestor: Wayne State University                                     Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System               on the construction site, in a conspicuous
place, a copy
                                                                                          of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                 prescribed in a contract.
                     County: Wayne
                                                                                                                           Page 23 of 26




PREVAILING WAGE RATE SCHEDULE                                                                                        00410 - 45
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                        Issue Date: 10/17/2011
                                            Contract must be awarded by:       1/15/2012
                                                               Page 24 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Terrazzo Worker                                        BR1-TRW                         $47.31    $60.77     $74.22 H H D H D D D D Y
         A 4 ten workweek may be worked Monday thru Thursday or                 8/11/2009
         Tuesday thru Friday.

                                                          Apprentice Rates:
                                                          Level 1                               $23.92    $31.19     $38.47
                                                          Level 2                               $26.83    $34.85     $42.87
                                                          Level 3                               $31.79    $40.02     $48.26
                                                          Level 4                               $34.40    $43.55     $52.69
                                                          Level 5                               $36.55    $45.94     $55.33
                                                          Level 6                               $40.04    $51.10     $62.16
                                                          Level 7                               $40.67    $51.90     $63.14
                                                          Level 8                               $41.56    $53.24     $64.92

         Tile
         Tile Finisher                                          BR1-TF                          $41.39    $51.89     $62.38 H H D H D D D D Y
         A 4 ten workweek may be worked Monday thru Thursday or                 8/11/2009
         Tuesday thru Friday.

                                                          Apprentice Rates:
                                                          Level 1                               $18.11    $24.00     $29.89
                                                          Level 2                               $19.25    $25.71     $32.17
                                                          Level 3                               $25.69    $32.40     $39.12
                                                          Level 4                               $27.09    $34.50     $41.92
                                                          Level 5                               $28.53    $36.15     $43.77
                                                          Level 6                               $30.07    $38.06     $46.06
                                                          Level 7                               $31.68    $39.73     $47.79
                                                          Level 8                               $33.10    $41.42     $49.74

         Tile Layer                                             BR1-TL                          $47.26    $60.69     $74.12 H H D H D D D D Y
         A 4 ten workweek may be worked Monday thru Thursday or                 8/11/2009
         Tuesday thru Friday.

                                                          Apprentice Rates:
                                                          Level 1                               $23.92    $31.19     $38.47
                                                          Level 2                               $26.83    $34.85     $42.87
                                                          Level 3                               $31.79    $40.02     $48.26
                                                          Level 4                               $34.40    $43.55     $52.69
                                                          Level 5                               $36.55    $45.94     $55.33
                                                          Level 6                               $40.04    $51.10     $62.16
                                                          Level 7                               $40.67    $51.90     $63.14
                                                          Level 8                               $41.56    $53.24     $64.92

         Truck Driver
         on all trucks of 8 cubic yard capacity or less                TM-RB1                   $38.33    $36.94              H H H H H H H H Y
                                                                                1/26/2011



           Official Request #: 1121                                                                                 Official Rate Schedule
                    Requestor: Wayne State University                                   Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System             on the construction site, in a conspicuous
place, a copy
                                                                                        of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                               prescribed in a contract.
                     County: Wayne
                                                                                                                         Page 24 of 26




PREVAILING WAGE RATE SCHEDULE                                                                                      00410 - 46
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                        Issue Date: 10/17/2011
                                            Contract must be awarded by:       1/15/2012
                                                               Page 25 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         of all trucks of 8 cubic yard capacity or over                 TM-RB1A                     $38.43    $37.09              H H H H H H H H Y
                                                                                    1/26/2011

         on euclid type equipment                                       TM-RB1B                     $38.58    $37.31              H H H H H H H H Y
                                                                                    1/26/2011

         Underground Laborer Open Cut, Class I
         Construction Laborer                                           LAUC-Z1-1                   $35.82    $46.40     $57.01 H H H H H H H D Y
                                                                                    10/13/2011
                                                          Apprentice Rates:
                                                          0-1,000 work hours                        $31.04    $39.23     $47.45
                                                          1,001-2,000 work hours                    $32.00    $40.67     $49.37
                                                          2,001-3,000 work hours                    $32.95    $42.10     $51.27
                                                          3,001-4,000 work hours                    $34.86    $44.96     $55.09

         Underground Laborer Open Cut, Class II
         Mortar and material mixer, concrete form man, signal man, LAUC-Z1-2                        $35.93    $46.60     $57.26 H H H H H H H D Y
          well point man, manhole, headwall and catch basin                         10/13/2011
         builder, guard rail builders, headwall, seawall, breakwall,
         dock builder and fence erector.

                                                          Apprentice Rates:
                                                          0-1,000 work hours                        $31.12    $39.38     $47.64
                                                          1,001-2,000 work hours                    $32.08    $40.82     $49.56
                                                          2,001-3,000 work hours                    $33.05    $42.27     $51.50
                                                          3,001-4,000 work hours                    $34.97    $45.15     $55.34

         Underground Laborer Open Cut, Class III
         Air, gasoline and electric tool operator, vibrator operator, LAUC-Z1-3                     $35.98    $46.67     $57.36 H H H H H H H D Y
         drillers, pump man, tar kettle operator, bracers, rodder,                  10/13/2011
         reinforced steel or mesh man (e.g. wire mesh, steel mats,
         dowel bars, etc.), cement finisher, welder, pipe jacking and
         boring man, wagon drill and air track operator and
         concrete saw operator (under 40 h.p.), windlass and tugger
          man, and directional boring man.

                                                          Apprentice Rates:
                                                          0-1,000 work hours                        $31.16    $39.44     $47.72
                                                          1,001-2,000 work hours                    $32.12    $40.88     $49.64
                                                          2,001-3,000 work hours                    $33.09    $42.33     $51.58
                                                          3,001-4,000 work hours                    $35.02    $45.23     $55.44




           Official Request #: 1121                                                                                     Official Rate Schedule
                    Requestor: Wayne State University                                       Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                 on the construction site, in a conspicuous
place, a copy
                                                                                            of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                   prescribed in a contract.
                     County: Wayne
                                                                                                                             Page 25 of 26


PREVAILING WAGE RATE SCHEDULE                                                                                          00410 - 47
                                Official 2011 Prevailing Wage Rates for State Funded Projects
                                                       Issue Date: 10/17/2011
                                           Contract must be awarded by:       1/15/2012
                                                              Page 26 of 26
            Classification                                        Last     Straight Time and Double  Overtime
        Name      Description                                    Updated    Hourly    a Half  Time   Provision
        ====================================================================================================
==========
         Underground Laborer Open Cut, Class IV
         Trench or excavating grade man.                                LAUC-Z1-4                   $36.06    $46.79     $57.52 H H H H H H H D Y
                                                                                    10/13/2011
                                                        Apprentice Rates:
                                                        0-1,000 work hours                          $31.22    $39.53     $47.84
                                                        1,001-2,000 work hours                      $32.19    $40.99     $49.78
                                                        2,001-3,000 work hours                      $33.16    $42.44     $51.72
                                                        3,001-4,000 work hours                      $35.09    $45.33     $55.58

         Underground Laborer Open Cut, Class V
         Pipe Layer                                                     LAUC-Z1-5                   $36.12    $46.88     $57.64 H H H H H H H D Y
                                                                                    10/13/2011
                                                        Apprentice Rates:
                                                        0-1,000 work hours                          $31.26    $39.59     $47.92
                                                        1,001-2,000 work hours                      $32.24    $41.06     $49.88
                                                        2,001-3,000 work hours                      $33.21    $42.51     $51.82
                                                        3,001-4,000 work hours                      $35.15    $45.43     $55.70

         Underground Laborer Open Cut, Class VI
         Grouting man, top man assistant, audio visual television       LAUC-Z1-6                   $33.57    $43.06     $52.54 H H H H H H H D Y
         operations and all other operations in connection with                     10/13/2011
         closed circuit television inspection, pipe cleaning and pipe
         relining work and the installation and repair of water
         service pipe and appurtenances.

                                                        Apprentice Rates:
                                                        0-1,000 work hours                          $29.35    $36.73     $44.10
                                                        1,001-2,000 work hours                      $30.20    $38.00     $45.80
                                                        2,001-3,000 work hours                      $31.04    $39.26     $47.48
                                                        3,001-4,000 work hours                      $32.73    $41.79     $50.86

         Underground Laborer Open Cut, Class VII
         Restoration laborer, seeding, sodding, planting, cutting,      LAUC-Z1-7                   $30.19    $37.99     $45.78 H H H H H H H D Y
         mulching and topsoil grading and the restoration of                        10/13/2011
         property such as replacing mail boxes, wood chips, planter
         boxes, flagstones etc.

                                                        Apprentice Rates:
                                                        0-1,000 work hours                          $26.82    $32.93     $39.04
                                                        1,001-2,000 work hours                      $27.49    $33.93     $40.38
                                                        2,001-3,000 work hours                      $28.17    $34.95     $41.74
                                                        3,001-4,000 work hours                      $29.52    $36.98     $44.44




           Official Request #: 1121                                                                                     Official Rate Schedule
                    Requestor: Wayne State University                                       Every contractor and subcontractor shall
keep posted
          Project Description: Science Hall Upgrade Fire Suppression System                 on the construction site, in a conspicuous
place, a copy
                                                                                            of all prevailing wage and fringe benefit rates
             Project Number: 005-189670-1                                                   prescribed in a contract.
                     County: Wayne
                                                                                                                             Page 26 of 26



PREVAILING WAGE RATE SCHEDULE                                                                                          00410 - 48

						
Related docs
Other docs by W0bfO4HM
draft msrules medicines 270412
Views: 110  |  Downloads: 0
SPEC TURBINE 06 11 1
Views: 0  |  Downloads: 0
Comp. Genomics
Views: 0  |  Downloads: 0
Lec5 regression
Views: 7  |  Downloads: 0
macam macam klien dalam asuhan kebidanan
Views: 478  |  Downloads: 0
BOARD DATE
Views: 0  |  Downloads: 0
random sample
Views: 24  |  Downloads: 0
Backdoor Sets in SAT Instances
Views: 0  |  Downloads: 0