Request for Proposal: R-1175
Class Item: 91842, 92517, 92544, 92555, 92567, 92570, 92588
Date Advertised: November 25, 2002
Proposal Deadline: 3:00 p.m., December 16, 2002, at the Office of Purchasing Services
REQUEST FOR PROPOSALS
The City of Aurora, Colorado is seeking technical proposals from qualified firms to provide job order
engineering services for the City of Aurora. It is the City’s intent to award two (2) separate contracts to
two (2) Consultants.
Five (5) copies of the technical proposals will be required. Unpriced technical proposals will be accepted at
the Office of Purchasing Services, 1470 South Havana Street, Suite 324, Aurora, Colorado 80012, until 3:00
p.m., December 16, 2002.
Proposals shall consist of:
Job Order Engineering Services
For the period covered: Date of award up to thirty-six (36) months
Pre-Proposal Conference:
A pre-proposal conference is scheduled for Tuesday, December 10, 2002, at 9:00 a.m. at the City Municipal
Building, 1470 South Havana Street, Conference Room 3C. The purpose of the pre-proposal conference is
to provide assistance to prospective offerors in the interpretation of the Request for Proposals, Statement of
Work, Sample Contract, and other technical and contractual matters. Attendance at the pre-proposal
conference is not mandatory, but is highly recommended.
Specific requirements for this study are contained in the attached Scope of Services.
R-1175 Job Order Engineering
A TENTATIVE SCHEDULE of key dates for this solicitation have been established as follows:
November 25, 2002 Advertise RFP
December 10, 2002 Pre-proposal conference at 9:00 a.m.
December 16, 2002 Technical Proposals due by 3:00 p.m.
December 23, 2002 Notification to shortlisted firms
January 3, 2003 Additional information due
January 8, 2003 Interviews with shortlisted firms
January 15, 2003 Notification of top ranked firms
January 20, 2003 Price proposals due
January 23, 2003 Negotiations with top ranked firms
January 29, 2003 Recommendation to Purchasing
February 24, 2003 Council approval
March 15, 2003 Award actions complete
April 17, 2003 Estimated start
The Request for Proposals is being solicited under a multi-step procurement procedure. The first step
requires all firms to submit UNPRICED technical proposals addressing only those items cited in Section II,
Technical Proposal Submittal and Evaluation, of this Request for Proposals. Proposals will be
evaluated and ranked based on the evaluation criteria outlined in Section II, Technical Proposal Submittal
and Evaluation, to select a short list of consultants for further evaluation. Only those firms who are
placed on the short list on the basis of the evaluation criteria will be considered during the second phase.
During the second phase, the short list of firms will be asked to submit additional information and the
selection committee may interview the shortlisted firms. During the third phase, the firms ranked the
highest by the evaluation committee on the basis of the technical proposal, additional information, and
interview shall be solicited for a priced proposal, which shall be subject to negotiation. If a tentative
agreement is reached with the top ranked firm, the staff’s recommendation will be sent to Council for
approval. Council approval may be subject to successful negotiation of a final contract. In that event, the
City and consultant then negotiate the details of the final contract, Council approval of the award is
obtained, the contract is signed, and work may begin. Should the City be unable to reach agreement with
the top ranked consultant, negotiations will commence with the second ranked firm. This process will
continue until a satisfactory contract is negotiated, or the City exercises its right to reject all proposals.
Proposals will be considered only from firms or individuals that are firmly established in an appropriate
business, who are financially responsible, and who have the resources and ability to offer services in a
professional and expedient manner. The City may request additional information as deemed necessary.
Failure to provide such information may result in the proposal being considered non-responsive.
PERIOD OF AWARD
The term of the contract to be from the date of award through the firm price period, and upon the
expiration of said period, the contract will terminate automatically, without notice, written or oral. The
award period will not exceed a total of thirty-six (36) months, including extensions as appropriate.
2
R-1175 Job Order Engineering
EXTENSIONS
The City shall have the option to extend the contract for two additional years from the original date of
award upon the same terms and conditions. If the City desires to extend the contract, not later than thirty
days prior to expiration, the City shall send a notice in writing to the contractor requesting firm pricing
for the next twelve-month period. After the City receives the firm pricing proposal from the contractor, it
will determine whether to extend the contract. All awards and extensions are subject to annual
appropriation of funds. The provisions of the foregoing paragraphs with respect to extension of the term
of the contract shall be null and void if the contract has been terminated or revoked during the initial term
or any extension thereof.
All decisions to extend the contract are at the option of the City.
LICENSES
The successful offeror, without additional expense to the City, shall be responsible for obtaining any
necessary licenses and for complying with any applicable federal, state, and municipal laws, codes and
regulations in connection with the prosecution of the services. The successful offeror and any
subcontractors, if applicable, will be required to obtain an Aurora Business License. The successful
offeror shall provide the Aurora Business License number(s) to Bryn Fillinger, Procurement Agent,
within thirty (30) days of contract award.
AMENDMENTS TO THE REQUEST FOR PROPOSAL
The City of Aurora reserves the right to amend this Request for Proposal by an addendum at any time
prior to the date set for receipt of proposals. Addenda or amendments will be posted to the City of
Aurora web site as soon as available and shall be the responsibility of the vendor to obtain all addenda.
Offerors registered for the paid service shall be notified either by fax or email depending on the service
that they have subscribed to. If revisions are of such a magnitude to warrant, in the City of Aurora’s
opinion, the postponement of the date for receipt of bids, an addendum will be issued announcing the
new date.
Unpriced technical proposals will be accepted at the Office of Purchasing Services, 1470 South Havana
Street, Suite 324, Aurora, Colorado 80012, until 3:00 p.m., December 16, 2002. No late proposals will be
accepted for review or consideration.
Five (5) copies of the proposals will be required. The technical proposals shall be retained by the City of
Aurora and cannot be returned.
The City of Aurora reserves the right to reject any and all proposals, to waive any informalities in the
proposals received, and to accept the proposal deemed most advantageous to the best interest of the City.
3
R-1175 Job Order Engineering
Questions regarding this Request for Proposals may be addressed to Bryn Fillinger, Procurement Agent,
Purchasing Services, Aurora Municipal Building (Suite 324), 1470 South Havana Street, Aurora, Colorado
80012 or by calling (303) 739-7344. Technical questions may be directed to Cesar Sanchez, Project
Manager, by calling (303) 739-7299 or Hoanh Tran by calling (303) 739-7309.
CITY OF AURORA, COLORADO
Bryn Fillinger
Procurement Agent, Purchasing Services
Attachments: Section I Scope of Services
Section II Technical Proposal Submittal and Evaluation
Section III Special Conditions
Section IV Sample Professional Services Agreement
4
R-1175 Job Order Engineering
SECTION I
SCOPE OF SERVICES
Job Order Engineering Services
This document shall be attached to and become part of the Contract for Professional Services.
1.0 DESCRIPTION
1.1 Purpose
The purpose of this RFP is to invite technical proposals from consulting engineering firms
interested in providing engineering services for City projects.
Assignments may include: engineering studies and investigations; aerial mapping;
roadway, water, sanitary, drainage, and traffic design; culvert design; minor bridges;
foundations and footings; retaining walls; masonry walls; environmental clearances; 404,
402, 401, and NPDES permit applications; preparation of letter of map revisions (LOMR)
for floodplain amendments; environmental assessment studies; landscaping design;
construction observation and testing; and other work as required.
1.2 Project Management
1.2.1 Project Coordination
The consultant shall comply with any applicable federal, state, and other agencies
associated with the project. On certain projects, the consultant shall meet the requirements
for Federal Aid Projects. The agencies include, but are not limited to, the following:
Adams County
City and County of Denver
Arapahoe County
Douglas County
Regional Transportation District (RTD)
Denver Regional Council of Governments (DRCOG)
Urban Drainage & Flood Control District (UDFCD)
Colorado Department of Transportation (CDOT)
Colorado Department of Public Health and Environment (CDPHE)
U S Army Corps of Engineers (COE)
Federal Emergency Management Administration (FEMA)
Other agencies as required
The consultant must anticipate that a design, which affects an agency, shall have to be
accepted by that agency prior to acceptance by the City. Submittals to affected agencies
shall be coordinated with the City. The consultant shall arrange all meetings with
individuals and agencies as necessary.
5
R-1175 Job Order Engineering
1.2.2 Communications
The Consultant shall keep Aurora's Project Manager (PM) fully informed of the progress of
the work at all times. The consultant shall provide a written synopsis of pertinent contacts
(both by telephone and in person) with others and copies of pertinent written
communications. The consultant shall be responsible for developing and distributing
minutes or notes of all meetings, including plan review meetings.
1.2.3 Traffic Control
Consultant field activities that interfere with traffic operations shall require traffic control.
The consultant shall be responsible to plan for and provide any required traffic control.
The proposed method shall be in accordance with the Manual on Uniform Traffic Control
Devices (MUTCD). The consultant shall provide a copy of the traffic control plan to the
City when requested.
1.2.4 Right of Entry
Some activities may require work on land not controlled by the City. In such cases the
consultant shall obtain written permission to enter the premises, and furnish copies of
written permission to the PM, when requested.
1.3 Contract Description
1.3.1 General
The agreement shall be an open contract for miscellaneous engineering work required by
the City. The design cost for the projects as assigned, shall normally be less than $50,000.
Most shall be less than $25,000. The prospective consultant shall work as an extension of
the City's engineering staff. The number of projects and amount of work is unknown at this
time.
1.3.2 Scope of Work
A detailed scope of work, cost, and schedule shall be negotiated for each assignment. A
separate notice to proceed shall be issued for each assignment.
1.3.3 Contract Time
The contract with the consultant shall begin after the City issued an open purchase order
(see schedule). The contract shall remain open until December 31, 2003 and be renewable
for 2 additional years. The City or the consultant may elect not to renew the agreement
according to their own best interest. Notice of intent not to renew shall be made not less
than 30 days preceding the renewal date and need not include justification.
6
R-1175 Job Order Engineering
1.3.4 Multiple Contracts
Contracts awarded based on this RFP are non-exclusive. The City plans to award job order
engineering service contracts to two consultants based on this RFP. There may be other job
order service contracts awarded to other consultants in the future, which may overlap the
time period contemplated on this RFP. The City in its sole discretion shall determine the
need for additional job order engineering contracts. Consultant services for most projects
with anticipated fees greater than $25,000 shall be awarded based on a job specific RFP.
Consultants awarded job order engineering service contracts are eligible to compete for job
specific RFP projects.
1.3.5 Apportioning Work
Work shall be apportioned between job order engineering service consultants at the City's
sole discretion and in its best interest. Selected consultants should be aware that the
number or dollar amount of work assignments may not be equal. Should the City fail to
reach agreement with one job order engineering service consultant on a project scope and
fee, the City, in its sole discretion shall negotiate with another job order engineering
services consultant.
2.0 CONTRACT COST
2.1 Within five days after being selected as high scorers for this job order agreement, the
selected consultant(s) shall submit a unit cost fee proposal to the City. Unit cost fees for all
sub-consultants shall be included. Final fee schedules shall be separately negotiated
between the consultant(s) and the City. In the event a fee cannot be negotiated within 14
calendar days, or if an impasse is reached, the City shall go to the consultant with the next
highest score. This shall continue until fee schedules are successfully negotiated with two
consultants.
2.2 The unit cost fee proposal shall include all hourly rates for labor and equipment and costs
for all materials anticipated to be used on job order projects. The unit cost fee proposal
shall include all sub-consultants/team members.
2.3 The unit cost fee proposal shall remain in effect until December 31, 2003. If the City elects
to extend the contract beyond December 31, 2003, the City or the consultant may request
renegotiation of the unit cost fees due to increases or decreases in actual costs. Cost
increases shall only by considered for documented salary increases or other documented
direct cost changes. Extension of the contract shall be contingent upon successful
negotiation of a new unit cost fee. The unit cost fee proposal shall provide an analysis of
the basic hourly wage rates, fringes, and other benefits and any multipliers used to
determine the hourly rate for labor.
7
R-1175 Job Order Engineering
2.4 The consultant and sub-consultant/team members shall provide an analysis of the basic
hourly wage rates, fringes, other benefits, multipliers, and other factors used to determine
the hourly rate for labor. The consultant must anticipate that their wage rates and
multipliers may be submitted to CDOT for audit and approval for reimbursement with
federal funds. Cost and expense associated with an audit shall not be reimbursed.
3.0 INVOICES
3.1 The cost proposal shall be used by the consultant to bill the City for services rendered on
assigned projects. Payment for services on assigned projects shall be based on time and
materials with a not-to-exceed amount based on the scope of work for each project. In no
case shall the overall cost exceed the not-to-exceed amount without an approved change
order (see Section 6). Invoices shall be prepared with reference to the different sections of
the scope of work, but it shall be the overall cost in the negotiated cost proposal, as a not-
to-exceed amount, which shall control.
3.2 The consultant may have more than one project in progress at a time. Invoices for multiple
projects shall not be combined, but must be invoiced separately.
3.3. Each invoice shall be accompanied by a monthly work status report, progress report
narrative, and a monthly time count report. All reports shall be current with the
month being invoiced and signed by the consultant's project manager. Invoices shall
be returned to the consultant if reports are missing or incomplete. See Exhibit B for
report forms and instructions.
4.0 DESCRIPTION OF SERVICES
4.1 DESIGN PHASE
4.1.1 Field Survey
Field Survey – General
All surveys shall be done to Aurora Survey Standards, a copy of which may be obtained
from Aurora's Chief Surveyor.
The consultant shall comply with Section 1.2.4 Right of Entry.
The survey may include the following:
Boundary survey
Control survey for aerial mapping
Design survey
Topographic survey
Construction staking
8
R-1175 Job Order Engineering
The consultant shall use existing City of Aurora primary control to establish horizontal and
vertical controls. Horizontal control shall be tied into all reasonably available aliquot
corners (section corners, 1/4 corners, etc.). Vertical control shall close on City of Aurora
benchmarks with a maximum error of 0.04'.
Non-Electronic Survey
The consultant shall perform surveys as required. The consultant shall submit to the City
clear reproducible copies of all original survey notes related to this project.
Electronic Survey
The consultant shall perform surveys for the project according to CDOT TMOS and PICS
standards as modified by the City. The consultant shall submit an electronic file (CD or e-
mailed attached) of the original survey data, in a format recognized by PICS, latest version,
a DXF file of the survey data as translated by PICS with all errors properly edited and
ready to be line driven by PICS, a TIN file, if the work includes mapping, an X, Y, and Z
file for all points, and a PICSCTL.CTL file for the survey control net. The consultant shall
submit a hard copy (occupied point, BS, and bearing, etc.) of the control net and any field
notes used to establish the control net. Surveys containing crossing terrain strings shall be
returned to the consultant for editing or complete resurvey, avoiding crossing terrain
strings.
Survey Control Drawing
A survey control drawing shall be included in the design plans for all City of Aurora
projects, and shall contain the following:
a) Title of control drawing, identifying location, project name, project number, and
entity doing work
b) North arrow
c) Scale
d) Legend
e) Use City of aurora GIS Horizontal Control System: (e.g., state plane Colorado
central projection 1927)
f) A note that explains the transformation from state plane coordinates to project
coordinates with the grid factor.
g) Coordinates to be in feet
h) Any corner occupied that has been remonumented must be noted.
9
R-1175 Job Order Engineering
i) Tabular listing of control points, aliquot corners, property pins, descriptions,
coordinate values and elevations on control points
j) Use City of Aurora vertical control datum: (e.g., vertical control City of Aurora
based on 1929 datum, benchmark number, elevation, and description)
k) The limits of right-of-way will be used to establish street centerline stationing for
plan and profiles.
l) There must be lines of sight between control points.
A sample of survey control drawing may be obtained from the Technical Services Section
Supervisor.
4.1.2 Geotechnical Investigation
The consultant shall review information contained in existing reports related to or in the
vicinity of the project. The consultant shall perform all necessary soil sampling and
analysis as required for the design including, but not limited to, the following items:
Map with station, offset elevation, and depth of test holes (250' maximum interval).
Submit locations to the City for concurrence.
R-value or Unconfined Compressive Strength and determination of Effective Resilient
Modulus of subgrade soils.
Swell Potential Analysis
Slope stability
Any other feature that may affect the design.
The geotechnical investigation shall meet the requirements of Section 5, City of Aurora
Roadway Design and Construction Specifications and be of sufficient detail to complete
the project design.
4.1.3 Design Standards
All drawings, designs and reports shall be in accordance with the following standards:
City of Aurora Roadway Design and Construction Specifications, latest edition (the
Roadway Design Manual)
City of Aurora Public Utility Improvements, Rules and Regulations Regarding
Standards and Specifications, latest edition (Utility Specifications)
10
R-1175 Job Order Engineering
City of Aurora Storm Drainage Design and Technical Criteria, latest edition (the Storm
Drainage Design manual)
Urban Storm Drainage Criteria Manual, latest edition (UDFCD)
CDOT Design Manual, CDOT Standard Specifications for Road and Bridge
Construction, latest edition (when approved by PM)
Applicable national, federal, and state codes, laws, etc., (AASHTO, OSHA, EPA, etc.)
Other criteria as directed by the PM.
4.1.4 The consultant shall submit a design report, establishing the project design criteria, for
review immediately after notice to proceed for the assigned project. The report shall
contain all design criteria for the project. Design criteria shall be from the latest edition of
the AASHTO green book, Aurora design standards and any other relevant publications
when approved by the PM. For example for roadway design, the design parameters shall
include, but not be limited to, the following:
Design speed
Posted speed
Roadway classification
Lane widths
Maximum/minimum grade
Minimum vertical sight stopping distance
Median width
Traffic counts (ESALs)
Turn lane widths
Roadway cross slope
Sidewalk width
Bike path width
Sheet layout
Drawing size and scale
Superelevation rate
Minimum esals
Maximum/minimum K values
Minimum vertical curve lengths
Horizontal curve minimum radius
Drainage criteria
Right-of-way width
The source of all design criteria shall be indicated. The report shall be approved by the PM
before design begins.
The report shall be summarized in table form indicating the design parameter for Aurora,
AASHTO, etc., and a project recommendation in separate columns. The design criteria
shall be compared, selected, and approved by the PM in consultation with the consultant.
11
R-1175 Job Order Engineering
4.1.5 Utilities
All underground or above ground utilities, public or private, existing or proposed, within
the limits of this project, shall be identified and their respective owners contacted to verify
locations. The consultant shall:
Secure all utility plats and furnish copies to the City.
Field verify and coordinate locations with readily discernable existing features.
The consultant, with the input of the PM, shall obtain an agreement or clearance for
each of the major public utilities (Qwest, Xcel Energy, AT&T Broadband, Phillips
Petroleum Co., and others as required by the PM).
Coordinate potholing to determine exact location and elevation at critical locations.
The PM shall review locations prior to potholing.
Submit design report for water and sanitary with all supporting calculations, in
accordance with the Public Utility Rules and Regulations.
Design according to Aurora standards, codes, and specifications.
Coordinate the design and construction sequencing for all relocations and proposed
facilities.
Provide on the plans a list of contact persons, phone numbers, pager numbers, and
emergency phone numbers.
Submit to the PM copies of all correspondence with private utility companies.
4.1.6 Right-of-Way
The consultant shall evaluate existing right-of-way and make recommendations to the City
on rights-of-way and/or easement acquisitions necessary to accommodate the proposed
improvements, including permanent rights-of-way or easements, slope easements and
temporary (construction) easements. As time is of the essence, all right-of-way and/or
easement requirements shall be brought to the attention of the City seven days after
approval of preliminary design, or as early in the design process as feasible, as determined
by the PM.
4.1.7 Pavement Design
The consultant shall prepare a pavement design analysis, including a structural analysis of
the existing pavement, if necessary. All work shall be as specified in the Roadway Design
Manual.
12
R-1175 Job Order Engineering
4.1.8 Drainage Design
The consultant shall prepare a drainage study as specified in the Aurora Storm Drainage
Design Manual. Normally a preliminary drainage report and final drainage report are
necessary.
4.1.9 Drawings and Drafting
General
The drawings shall include plan and profile sheets and cross section sheets of the project
developed at a horizontal scale appropriate for the specific project or as may be specified
by the PM. Plans shall show all necessary information in adequate detail to permit
construction staking and to indicate and delineate all details necessary for the construction
of the complete facility by a construction contractor. Design work shall be done using
Eagle Point software version specified by the PM.
The consultant shall prepare additional detailed drawings including profile and cross
sections, at an appropriate scale, for all design features requiring additional detailed design
information.
The consultant shall also prepare survey control plans in accordance with Section "4.1.1
Field Survey."
The consultant shall coordinate with the City Traffic Engineer when preparing plans for
striping, traffic handling, traffic control devices, streetlighting, and construction traffic
control plan.
Two sets of prints of the final approved drawings signed and stamped by a Professional
Engineer licensed in the State of Colorado, competent in the work being done and under
whose direct supervision the work was done, shall be submitted to the City in accordance
with Colorado law. One reproducible facsimile set of the final drawings shall be submitted
on Mylar and in electronic format (on CD) at the same time.
Upon completion and final acceptance, all Mylar drawings, AutoCAD drawing files, check
prints, and survey documents shall be submitted to the City for record purposes.
All accepted drawings shall become the property of the City and may be used, altered, or
duplicated as required.
All drafting work shall conform to the following standards.
Drawings
1. Drawings shall be prepared using the AutoCad and CDOT PICS software. The version
shall be specified by the Technical Services Section Supervisor at the beginning of the
project.
13
R-1175 Job Order Engineering
2. Construction drawings shall be prepared on sheets that are 22" x 34".
3. All sheets shall have borders and title blocks provided by the City of Aurora. In
addition, standard project cover sheet, standard (or sample of) survey control plans,
City of Aurora Roadway, Traffic, and Utility standards, erosion control sheets,
standard erosion control notes and details, and other common details may be provided
on CD by the Technical Services Section for the consultant's use in preparing
construction plans.
4. The consulting firm shall place its logo, name, address, phone number, and contact
name in the empty space on the City's standard title block.
5. XREFs and blocks for each drawing shall be included with all electronic submittals.
6. Final submittals of drawings shall be original plots on Mylar film. The image shall be
plotted on the reverse side. Original plots prepared using xerographic processes shall
not be accepted without prior written approval of the Technical Services Section
Supervisor.
7. Final submittals shall include all drawings, surveys, and project files in electronic form
on rewriteable CD. The CD cover shall be clearly labeled with the name of the project,
project number, and consultant name.
Layering
1. Survey data shall be brought into AutoCad using CDOT's PICS software. When so
produced, the surveyed features will be automatically assigned to the appropriate
drawing layer.
2. Most proposed line work and symbology can be added to the drawing using PICS
functions. When added in that manner, the line work and symbology will be placed on
the appropriate layer.
3. Any layers that are not defined with the PICS software shall be named in a manner that
defines the features contained on the layer (i.e., "vertC&G" might adequately define a
layer for standard vertical curb and gutter, "wood_fence" might adequately define a
layer for wood fences, or "ROW" might adequately define a layer for right-of-way
lines. "1", "A", or "concrete" probably would not adequately define any feature).
Text
1. With the exception of title block text, company logos or sheet headings, all text on plan
and profile sheets, cross section drawings, detail or tabulation sheets and Control Plans
shall use the standard AutoCAD Romans Symplex (ROMANS) font.
2. Text labeling existing topographic features shall be .1" high and slanted.
3. Text labeling proposed features, design callouts, and or construction notes shall be .12"
high.
14
R-1175 Job Order Engineering
4. Text labeling names of streets shall be .24" high.
5. Text labeling adjacent sites, buildings, parcels, and other related types of features shall
be .14" high and slanted.
6. Refer to TXT_STD.dwg on the CD provided by Technical Services Section.
Symbology and Line Work
1. Line work and symbology placed on the drawings shall conform to either PICS line
work and symbology or the standard legend provided on the City's cover sheet.
2. Legends shown on the cover sheet shall be amended to show special symbology and
line work used in the plans.
3. All line types used in the drawings shall either be PICS standard or AutoCAD standard
line types.
4. No custom hatch patterns shall be allowed.
Pen Settings
1. Refer to the PENS.dwg on the CD provided by Technical Services Section.
2. Provide an AutoCAD pcp file if different pen settings are used.
Plans Prepared for CDOT
Highway construction plans and right-of-way plans prepared for the CDOT shall follow the
standards and guidelines set forth in the CDOT Design Manual, Volume IV, Computer
Aided Drafting.
File Naming Conventions
1. The Sheet Index on the cover sheet shall include a sheet number beginning with the
cover sheet as sheet 1. The electronic file for each sheet shall include that sheet
number in its name. Each file shall be named "project number"-"sheet number" (i.e.,
the name for sheet 3 of the plans for project number 02075 is 02075-03.dwg).
4.1.10 Quantities
The consultant shall provide a summary of approximate plan quantities in an electronic
format specified by the PM which include the following:
- Item description and Aurora 8-digit item code
- Units
- Plan quantities
- Measurement and payment reference
A "Summary of Approximate Plan Quantities" table shall be shown on the drawings,
preferably on the cover sheet.
15
R-1175 Job Order Engineering
4.1.11 Specifications
Technical specifications and standard details shall be prepared based on computerized City
standards and specifications. The City shall print from its word processor all specifications
and standard details identified by the consultant.
There shall be no modifications made to Aurora's standards and specifications as shown in
the Roadway Design Manual or the Utility Specifications. Any necessary modifications
shall be placed in the special conditions section of the Project Manual.
Special conditions shall be prepared in an electronic format specified by the PM with the
aid of standard work sheets provided by the City. The consultant shall add technical
specifications and other provisions as necessary to describe any item or other matter not
covered in the provided special conditions, the Roadway Design Manual, or the Utility
Specifications.
Construction details which are not covered by the standard details or which are necessary to
complete and clarify the standard details shall be included in the design drawings.
The consultant shall be responsible for developing measurement and payment
specifications for each of the items listed in the quantity summary. Standard Aurora
procedures for measurement and payment shall be followed. Measurement and payment
specifications shall be placed in the section entitled "Measurement and Payment" and/or
included in the special conditions as directed by the PM.
4.1.12 Construction Cost Estimate
The consultant shall furnish an opinion of probable construction cost when the drawings
are submitted for preliminary review, final acceptance, and when requested by the PM.
The cost estimate shall be broken down by item. Each item shall show the unit, unit cost,
quantity, and total cost.
4.1.13 Construction Time
The consultant shall recommend a construction time for the project. The consultant shall
furnish a detailed time schedule of construction activities to support his recommendation.
Time schedule must anticipate bad weather days and show same on the schedule. The City
shall add ten days for mobilization to the construction time to arrive at the total
construction contract time.
16
R-1175 Job Order Engineering
4.1.14 Traffic Control
The consultant shall be responsible for design and preparation of traffic control plans and
specifications. All traffic control shall be according to the Manual on Uniform Traffic
Control Devices (MUTCD). The consultant shall work with the Aurora Traffic Engineer
and the PM to produce the design and allow three weeks for all reviews and final approval
signatures.
4.1.15 Streetlighting
The consultant shall be responsible for coordination of streetlighting with the PM, Traffic
Engineer, and Xcel Energy. The consultant shall show all existing and proposed
streetlighting and support hardware on the plans. The consultant shall obtain a tariff
agreement and cost estimate from Xcel Energy for any work. The agreement shall contain
the following minimum information: work to be performed, cost of work, and coordination
of work with project construction.
4.1.16 Construction Sequencing
The consultant shall propose a suggested construction-sequencing plan to be included in the
construction documents. The plan will be one method of handling traffic during
construction. The plan shall include construction signing, striping removal and
replacement, uniformed traffic control, cones, barricades, etc., and shall be coordinated
with the PM and Traffic Engineer.
4.1.17 Signing
The consultant shall be responsible for designing and showing all signing necessary to
safely conduct traffic after the project construction is complete. All signing shall be
according to the MUTCD. The consultant shall coordinate the signing plan with the
Aurora Traffic Engineer and the PM. Allow two weeks for each review and final approval
signatures.
4.1.18 Striping
The consultant shall prepare a striping plan showing striping removal and proposed
striping. The striping plan shall be in accordance with the MUTCD. The consultant shall
coordinate the striping plan with the Aurora Traffic Engineer and the PM. Allow two
weeks for each review and final approval signatures.
4.1.19 Project Design File
The consultant shall assemble and maintain a Project Design File. The file shall contain all
reports, calculations, correspondence, meeting minutes or notes, permits, and approvals for
the project. The file shall be in a three hole loose leaf, D ring binder(s), indexed, and with
sections separated by tabs. Original documents of the file shall be given to the City. The
design file shall be updated after construction is complete.
17
R-1175 Job Order Engineering
Suggested sections are listed below. Sections may be expanded or combined as necessary
to fit the project. Logs of all correspondence shall be maintained.
- Design criteria - Drainage report
- Pavement design report - Materials/soils investigation
- Utility correspondence - Meeting notes
- General correspondence - Cost estimates
- Construction time - Approvals
- Technical memoranda - Progress meetings
- Appendix - Calculations
Contract document transmittal
Pre-bid notes/minutes
Addenda
4.2 BID PHASE
4.2.1 Final Acceptance
The consultant shall make corrections to the plans, specifications, and other submittals until
final acceptance. Signature by the City Engineer shall be considered final acceptance.
4.2.2 Contract Documents
The consultant shall submit one set of full size (22" x 34") reproducible drawings, and one
set of prints as specified above. The consultant shall submit one unbound set of
reproducible special conditions on 8-1/2" x 11" paper and in electronic format (CD or file
transmitted via e-mail). The special conditions shall be produced in MSWord, version
specified by the PM. The City shall assemble the final package, advertise for bids, and
award the project.
4.2.3 Pre-Bid Conference and Addenda
The consultant shall attend the pre-bid conference to assist the City in interpreting drawings
and specifications. The consultant shall write any addenda necessary to clarify the
drawings and specifications, according to City procedures.
4.3 CONSTRUCTION PHASE
4.3.1 Shop and Working Drawings
The consultant shall review catalog cuts, shop, fabrication, working and erection drawings
and calculations submitted by others for compliance with the contract drawings and
specifications. The consultant's Project Manager shall sign all submittals and distribute
them as directed by the City. Submittals shall be reviewed and returned within five
working days.
18
R-1175 Job Order Engineering
One copy of the reviewed shop drawings with comments shall be submitted to the City, if
the drawings are to be revised and resubmitted. Two copies shall be returned to the City, if
drawings are approved. Consultant may keep one copy. All other copies shall be returned
to the Contractor.
The consultant shall maintain a log of all submittals which includes:
- Submittal description
- Date received
- Date returned
- Status
4.3.2 Technical Assistance
The consultant shall provide technical assistance to the City's PM on an as-needed basis.
This service shall include, but not be limited to, the following:
Attend the pre-construction meeting.
Provide engineering and drafting services for design revisions required by changes in
construction or field conditions.
Visit the construction site periodically to observe whether or not construction is
proceeding according to the intent of the plans and specifications. Provide written
reports to the City.
Assist the City to interpret the meaning and intent of the drawings and specifications.
Evaluate construction problems as directed and report findings and recommendations
to the City.
4.4 PROJECT FILE
The consultant shall assemble and maintain a Project File. The file shall contain all reports,
calculations, correspondence, meeting minutes or notes, permits and approvals for the
project. The file will be in a three-hole, loose-leaf, D ring binder(s), indexed, with sections
separated by tabs. One reproducible copy of the original file shall be given to the City.
Suggested sections are listed below. Sections may be expanded or combined as necessary
to fit the project. Logs shall be maintained for all correspondence.
19
R-1175 Job Order Engineering
- Design criteria - Construction phase
- Drainage report Field orders
- Pavement design report/ Change orders
Soils & materials investigation Payments
- Utility correspondence Meeting notes
- General correspondence Correspondence
- Cost estimates Shop drawings
- Construction time Notice of substantial completion
- Approvals Punch list
- Technical memoranda Notice to Final Completion
- Progress meetings Contractor’s Lien Release
- Bid phase - Appendix
Contract document transmittal - Calculations
Ad notice
Pre-bid notes/minutes
Addenda
Bidders list
Bid tabulations
Recommendation to award
Agenda commentary
Notice of award
Pre-construction conference notes
Contract agreement
Notice to proceed
4.5 DRAFTING SERVICES ONLY
Where drafting services are required but the consultant does not provide other design
services, the drawings shall be submitted in three phases as outlined below.
Preparation of preliminary drawings shall include interpreting and drawing surveys of
existing improvements; drawing existing profiles or topography; researching and drawing
all existing rights-of-way, existing public and private utilities, and existing improvements.
A cover sheet, survey control plan, and cross sections shall be included as a part of the
preparation of preliminary drawings if requested by the City.
Check prints of the completed preliminary drawings shall be forwarded to the Technical
Services Section Supervisor for review of drafting standards, completeness, and accuracy.
When accepted, the consultant shall provide three paper copies to the City, together with
one Mylar copy and compact disks when requested.
20
R-1175 Job Order Engineering
Preparation of design drawings shall include drawing the proposed improvements onto the
preliminary drawings, according to the redline drawings provided by the PM; drafting all
necessary details; adding proposed improvements to existing sections, calculating
earthwork quantities and other work as requested.
Three paper copies of the completed design drawings shall be forwarded to the Technical
Services Section Supervisor for review of drafting standards, completeness, and accuracy.
After the design has been added to the drawings, the City shall review the design for
conformity to City standards and specifications. The consultant shall make required
changes or additions to the drawings and submit revised drawings and check prints. The
consultant shall provide original drawings, AutoCAD files in electronic format, CD or file
transmitted via e-mail, and reference material to the City.
All accepted drawings and electronic files shall become the property of the City, and may
be used, altered, or duplicated as it may be determined necessary by the City.
4.6 CHANGES
The PM may make changes in the final scope of work at any time. The consultant shall
undertake and complete all work at the request of and to the satisfaction of the PM. If the
consultant feels that any work required by the PM is not within the final scope of work and
may warrant a change in time or cost, he shall notify the PM in writing within five calendar
days of the occurrence. The consultant shall submit to the PM documentation supporting
the basis for the change in contract time and/or cost within ten calendar days of initial
notification. Requests and/or documentation, not presented to the PM within said time
limits shall be deemed to have been waived by the consultant. The PM shall evaluate the
consultant's request and supporting documentation and notify the consultant of his decision
within 30 days. The PM's decision is final.
The City has limited time and budget to accomplish the work. It is the intent of the above
requirement to provide notice to the PM, so that mitigation measures may be taken as
warranted to keep the work within budget and time limits.
5.0 SUBMITTALS
5.1 General
The drawings shall be on standard 22" x 34" sheets or 11" x 17", with the approval of the
PM. Reports shall be on 8-1/2" x 11" sheets. Reports shall contain all pertinent
calculations for the recommended design and alternate designs, pertinent correspondence
and references to published material used. The consultant is responsible for assembling
and coordinating all reports, including work done by others. After approval, the consultant
shall submit copies as stated below. Reports shall contain only the final calculations.
21
R-1175 Job Order Engineering
All oversized materials including computer printouts shall be reduced to 8-1/2" x 11" size
and shall be bound and indexed into one or more volumes. All non-pertinent preliminary
calculations, duplications, or items that would detract from the clarity of the submittal shall
not be included. The PM may approve foldouts or oversize material not suitable for
reduction to 8-1/2" x 11". All final reports and drawings shall be signed and sealed by a
Professional Engineer registered in Colorado competent in the work being done and under
whose direct supervision the work was done.
5.2 Drainage Report
The consultant shall submit one copy of the drainage report with the construction drawings
for all reviews and final acceptance. Allow two weeks for review.
5.3 Soils Investigation and Pavement Design Report
The consultant shall submit three copies for review. Allow five workdays for review.
5.4 Drawings
5.4.1 The Consultant shall submit five sets of prints for all reviews. First review will occur at the
30%-50% complete stage. Final review shall occur at the 95+% complete stage. Allow
two weeks for each review.
5.5 Other Submittals
The consultant shall submit one bound and one unbound, reproducible copy of all other
submittals. Other submittals include cost estimates, summary of approximate quantities,
construction time estimate, special conditions, technical specifications, and any other
matters that may require review. Allow two weeks for review.
5.6 Project Design File
The consultant shall submit one copy at the time of project final acceptance. The file shall
be updated immediately after the pre-construction conference and at completion of
construction.
6.0 COORDINATION OF JOB ORDER PROJECT
6.1 Project Time and Scope of Work
6.1.1 Prior to beginning a project assigned by the City, the consultant shall submit a schedule and
scope of work to the PM for review. The schedule shall include time estimates for all
phases of design, review, and approval, and construction, if pertinent. The schedule, in
Gantt form or other suitable form, shall clearly indicate the work to be performed and
completion dates of major events or phases of the work.
22
R-1175 Job Order Engineering
The scope of work shall be approved and notice to proceed issued prior to beginning any
work. Each section in the scope of work shall have a detailed breakdown of man-hours and
rates from the approved rate proposal. The consultant shall use the project estimating
forms in Exhibit A. The PM may approve the use of other formats that provide similar
detail. Man-hours of the individual sections shall be used by the City and the consultant to
monitor and control the project.
6.1.2 The schedule and scope of work shall be approved by the City and agreed to by the
consultant and the PM prior to beginning work. The consultant shall identify the time for
reviews and include it in the schedule. Time extensions equal to the actual delay may be
granted for review time in excess of stated time. All work shall be complete with all plans
and contract documents ready for bidding within the time indicated in the schedule.
6.1.3 The consultant shall have five working days to prepare the scope of work and schedule as
noted above. Revisions shall be resubmitted within two working days after return to the
consultant. The consultant must be able to start work within five working days of approval
of the scope of work and schedule.
6.2 Coordination of Work
The consultant shall coordinate his work with all other involved public and private, persons
or agencies, and their technical staff or consultants to obtain the required approval of the
design by all necessary City departments and to secure the necessary permits. The
consultant shall be responsible to coordinate any work by others that is to be included in
this project. The consultant shall arrange meetings with others as necessary. Minutes or
notes of all meetings shall be kept by the consultant and delivered to the City's PM and all
attendees.
6.3 Progress Meetings
The consultant shall keep the City's PM informed at all times of the progress of the work.
The consultant shall hold formal review meetings with the PM and other City staff, as
needed, but not less than once a month. Meeting notes shall be taken by the consultant and
distributed to all attendees.
6.4 Not-to-Exceed Project Fee
After approval of the scope of work and schedule, the final not-to-exceed total project cost
shall be prepared. It shall be based on the man-hours shown on the scope of work and the
approved rate proposal (see Section 3). The actual project fee shall not exceed this amount
without an approved change order.
7.0 SPECIFIC REQUIREMENTS FOR FEDERAL AID PROJECTS
In some instances, the consultant shall work on City projects which are funded with
Federal Aid money and overseen by the State. An example of this type of project is the
TIP (Transportation Improvement Program) project.
23
R-1175 Job Order Engineering
The following are additional requirements for these projects.
7.1 General
7.1.1 The design work under this contract shall be compatible with the requirements of a
separate contract between the City (Local Agency) and the State (which contract is
incorporated herein by this reference) for the design/construction of the project. The
State is an intended third party beneficiary of this contract for that purpose.
7.1.2 Upon advertisement of the project work for construction, the consultant shall make
available services as requested by the State to assist the State in the evaluation of
construction and the resolution of construction problems that may arise during the
construction of the project.
7.1.3 The consultant shall review the construction contractor's shop drawings for conformance
with the contract documents and compliance with the provisions of the State's
publication, "Standard Specifications for Road and Bridge Construction," in connection
with this work.
7.1.4 The consultant's Comprehensive General Liability and Automobile Liability Certificates
of Insurance shall name the State of Colorado, its officials, employees, and
representatives as additional insured.
7.1.5 It is also the responsibility of the consultant to comply with the federal statutes and
regulations cited in 49 CFR 18.36 (i), specifically (4) Copeland "Anti-Kickback" Act, (5)
Davis-Bacon Act, (6) Contract Work Hours and Safety Standards Act, (10) Access by
FHWA or representative to records, (12) Clean Air Act, Clean Water Act, EPA
regulations, and (13) energy efficiency conservation.
7.2 Retention of Records
The consultant shall maintain a complete file of all records, documents, communications,
and other written materials which pertain to the operation of programs or the delivery of
services under this contract, and shall maintain such records for a period of three (3)
years after the date of termination of this contract or final payment hereunder, whichever
is later, or for such further period as may be necessary to resolve any matters which may
be pending. All such records, documents, communications and other materials shall be
the property of the City and the State, and shall be maintained by the consultant in a
central location and the consultant shall be custodian on behalf of the City and the State.
7.3 State Rights in Data, Documents, and Computer Software
Any software, research, reports, studies, estimates, data, photographs, negatives or other
documents, drawings or materials prepared by the consultant in the performance of its
obligations under this contract shall be the exclusive property of the City and the State,
and all such materials shall be delivered to the City and the State by the consultant upon
completion, termination, or cancellation of this contract. The consultant may, at its own
expense, keep copies of all its writings for its personal files. The consultant shall not use,
24
R-1175 Job Order Engineering
willingly allow, or cause to have such materials used for any purpose other than the
performance of the consultant's obligations under this contract without the prior written
consent of the City and the State; provided, however, that the consultant shall be allowed
to use non-confidential materials for writing samples in pursuit of the work. The
ownership rights described herein shall include, but not be limited to, the right to copy,
publish, display, transfer, prepare derivative works, or otherwise use written works.
7.4 Patent Rights (Federal Funds)
If any invention, improvement, or discovery by the consultant or any of its
subconsultants or subgrantees is conceived or first actually reduced to practice in the
course of or under this contract work, and if such is patentable, the consultant shall
notify the City and the State immediately and provide a detailed written report. The
rights and responsibilities of the consultant, third party consultants, and the City and the
State with respect to such invention, improvement, or discovery will be determined in
accordance with applicable federal laws and regulations in existence on the date of
execution of this contract which define consultant title, right to elect title, federal
government "march in" rights, and the scope of the federal government's right to a
nonexclusive, irrevocable, paid-up license to use the subject invention for its own. The
consultant shall include the requirements of this paragraph in its third party contracts for
the performance of the work under this contract.
7.5 Rights in Data and Copyright (Federal Reserved Rights)
Except for its own internal use, the consultant shall not publish or reproduce any
data/information, in whole or part, that is recorded in any form or medium whatsoever
and that is delivered or specified to be delivered under this contract, nor may it authorize
or permit others to do so, without the written consent of the federal government, through
the State, until such time as the federal government may have released such
data/information to the public.
As authorized by 49 C.F.R. 18.34, the federal government, through the State, reserves a
royalty-free, nonexclusive, and irrevocable license to reproduce, publish or otherwise
use, and to authorize the State and others to use: a) any work developed under this
contract or a resulting third party contract irrespective of whether or not it is
copyrighted; and, b) any rights of copyright to which a consultant, or third party
consultant purchases ownership with federal assistance.
7.6 Disadvantaged Business Enterprise Participation
It is the policy of the United States Department of Transportation (DOT) that DBE firms
as defined in 49 C.F.R. Part 23 shall have the maximum opportunity to participate in the
performance of contracts financed in whole or in part with Federal funds. The City
obtained a grant from the DOT for part of the cost of designing and constructing the
project. In order to qualify for grant funds, the City and its consultants, therefore, must
comply with DOT regulations covering the participation of small business firms owned
or controlled by socially and economically disadvantaged individuals which is defined in
49 C.F.R. Part 23.
25
R-1175 Job Order Engineering
Individuals who are rebuttably presumed to be socially and economically disadvantaged
include Women, Blacks, Hispanics, Native Americans, Asian-Pacific Americans, and
Asian-Indian Americans. A current list of certified firms, and any necessary documents to
be submitted, may be obtained from the State of Colorado Department of Transportation
(State).
The consultant shall identify in its Proposal Disadvantaged Business Enterprises (DBE),
as defined in 49 C.F.R. Part 23, Subpart D, Regulations of the Office of Secretary of
Transportation, which it would retain as subconsultants to perform portions of the
consultant's Scope of Work. Upon execution of the Professional Services Agreement,
the consultant agrees to use its best efforts to enter into agreements with the DBE firms it
identified in its Proposal. Throughout the term of this Agreement, the consultant shall
continue to utilize qualified and available DBE firms which have been and which
continue to be certified by the State of Colorado to the fullest extent which is reasonably
possible to achieve. The goal for dollar value of work performed by DBE firms shall be
seven percent (7%) of the dollar value of all of the consultant's work performed under
this Agreement and the consultant shall make a good faith effort to meet this goal
throughout the term of this Agreement. If a DBE subconsultant must be replaced for any
reason during the term of this Agreement, the consultant shall replace the subconsultant
with another DBE or, if it cannot, demonstrate that it made good faith efforts to do so.
The requirements and procedures for "good faith efforts" are contained in 49 C.F.R. Part
23.
26
R-1175 Job Order Engineering
SECTION II
TECHNICAL PROPOSAL SUBMITTAL AND EVALUATION
1.0 GENERAL
Engineering consulting firms interested in submitting a response to this RFP are
requested to provide five (5) copies of their response.
Submit technical proposals to the following address:
City of Aurora Purchasing & Contracts
1470 South Havana Street, Room 324
Aurora, CO 80012
2.0 SUGGESTED PROPOSAL FORMAT
2.1 The consultant's Technical Proposal should address all the following topics and be
organized into the following six sections with a table of contents. It may include a
cover/introduction letter.
Section 1 Overview
Firm's name, address, phone number, names of principals, company history, year
established, size, type of work normally performed, and any pertinent information
not noted below. Describe the type of work normally performed by the firm,
including sub-consultants. Include names of the principals that will provide
oversight for this project and brief experience summary. Provide description or
affirmative statement concerning all potential conflicts of interest.
Section 2 Project Team
Organization chart and project team with line of accountability and detailed
activities of each member. Summary of pertinent experience of each team member,
including sub-consultant team members. Production facilities available to the
project team.
Section 3 Availability
Indication of workload and capacity over the past 12 months. Availability and
commitment to perform the unscheduled work and meet the project time schedule.
27
R-1175 Job Order Engineering
Section 4 Selected Relevant Experience
List similar projects completed within the past three years, including type, size,
scope, year completed, consultant PM, client, client contact and phone number. List
of all other projects in progress or completed in the past year.
Section 5 Location
Firm's location and travel time with respect to the Aurora Municipal Building. All
consultants within 30 minutes of the Aurora Municipal Building shall receive the
same score for location.
Section 6 Sub-Consultants
Provide information on firm(s) and personnel in the appropriate sections above and
to the same detail as the prime consultant.
Appendix Supplemental Material
Resumes, letters of recommendation or commendation, awards, other material.
2.2 The proposed team shall work on the project until completion. Any substitute of
personnel shall require the approval of the City. Personnel changes shall only be
considered for valid reasons such as an assigned employee leaving the firm, major
illness, or accident. Only persons as well qualified as the proposed individuals shall
be approved.
3.0 CONSULTANT SHORTLIST SELECTION
3.1 A review committee shall score all proposals and shortlist up to five consultants to
be evaluated by the selection committee.
3.2 Submittals shall be scored in 4 of the 5 areas noted in Section 4.3. They are:
1. Experience and competence,
2. Past record of performance,
3. Proximity to site,
4. Overall impression of proposal.
3.3 The shortlisted consultants shall submit additional information one week after
notification of being shortlisted or as directed. The additional information is the
"Benefit to the City" noted in Section 4.3.5 together with other information that may
be requested.
28
R-1175 Job Order Engineering
4.0 CONSULTANT FINAL SELECTION
4.1 Selection Committee
4.1.1 The selection committee shall be a three to five member board. The selection
committee shall review and score all shortlisted consultants. One of the committee
members will be the PM for the project. Other member(s) will be from the
Engineering Division, the funding department, or other knowledgeable
professionals.
4.2 Scoring Procedures and Forms
4.2.1 A method of scoring has been devised which is intended to promote a systematic
procedure of evaluating the prospective firms with the intent that all important
factors are considered in the evaluations. Objectivity is the goal. Consultant
selection should be based on the ability to provide a quality product in a timely
manner.
4.2.2 The scoring approach was developed to evaluate those factors considered critical
and significant to promote the goals of the project. The number of factors have been
kept to a minimum and include only those considered as most important. The
selection committee will review and score the original submittals and additional
information submitted according to Section 3.3. The selection committee may also
interview each of the shortlisted firms. The scores will be totaled for the project
based on the committee's evaluation of the firm's capabilities.
4.2.3 The task of the committee is to recommend to the Director of Public Works the
most qualified firm/consultant who is capable of performing quality work in a
timely manner. The committee's recommendation is subject to approval by the
Director of Public Works and the funding department.
4.2.4 Names of selection committee members are not available to the consultants.
Consultants should not attempt to contact selection committee members. Attempts
to contact or influence the selection committee prior to the interview may be
considered a conflict of interest.
29
R-1175 Job Order Engineering
4.3 Criteria Max. Points
4.3.1 Specialized experience and technical
competence of project team assigned
to this project:
a. Management experience of firm *10
b. Qualifications of project team 30
4.3.2 Past record of performance:
a. Experience record on similar projects 15
b. Firm's primary expertise 10
4.3.3 Proximity to City Municipal Building
a. Firm's location 5
4.3.4 Overall impression of proposal:
a. Organization, clarity,
conciseness and thoroughness 5
4.3.5 Benefit to the City
a. Size, diversity, availability of support staff
from other divisions, offices, etc. 10
b. Computer services and/or software 5
c. Familiarity with Aurora area 5
d. Areas of specialization 5
TOTAL (100 points)
4.4 Modifications
Conflicts of interest 0 to -100
*Sub-consultants, firm size, and diversity
30
R-1175 Job Order Engineering
4.5 Scoring
Each member of the selection committee will total the completed evaluation sheets.
The two consultants with the highest scores will be selected for negotiation of fee
for services and approval of the Director of Public Works. In case of a tie, the PM
will decide who will be selected for fee negotiations. His decision will be final.
5.0 TENTATIVE RFP SCHEDULE
Proposed Date
Advertise in Daily Journal (two weeks) Nov. 25, 2002
Pre-proposal conference Dec. 10, 2002
Technical proposals due Dec. 16, 2002
Proposals screened by review committee Dec. 20, 2002
Shortlist announced Dec. 23, 2002
Additional information due Jan. 3, 2003
Interviews with shortlisted firms Jan. 8, 2003
Notification of selected firms Jan. 15, 2003
Price proposals due Jan. 20, 2003
Review price proposals, meet with selected firms Jan. 23, 2003
Recommendation to Purchasing and Contracts Jan. 29, 2003
Council Approval Feb. 24, 2003
Award Action Complete Mar. 15, 2003
Estimated start April 17, 2003
31
R-1175 Job Order Engineering
COST ESTIMATE
C.O.A. PROJECT NO.
PROJECT: DATE:
TASK HOURS
Category: A B C D E F G H Total Total
Hours Labor
Cost
Hourly Rate: S T U V W X Y Z
Task 1
Subtask A 1 1 2 1xT+1xX
Subtask B 1 1 2 1xU+1xY
Subtask C 1 1 V
A-1
Task 2
Subtask A 1 1 X
Subtask B 1 1 Y
Subtask C 1 1 Z
Task 3
Subtask A 1 1 T
Subtask B 1 1 U
Task 4 1 1 S
Task 5 1 1 W
Total Hours 1 2 2 1 1 2 2 1 12 (TOTAL)
Consultant Comments:
Consultant Authorized Signature
FORM 9302
R-1175 Job Order Engineering
EXHIBIT A
COMPLETING THE
COST ESTIMATE FORM
This form should be used to develop or update the fee schedule.
Show all tasks and subtasks relevant to the work effort.
Category: Identify each classification of personnel which will be involved in the project. Show hourly
rate for the same.
Total Hours are shown by Category and Task or Subtask.
Total Labor costs are shown by Category and by Task or Subtask.
The Project Manager may approve other formats with similar detail.
A-3
R-1175 Job Order Engineering
EXHIBIT B, PART 1
COMPLETING THE
MONTHLY STATUS OF WORK REPORT FORM
Show all tasks relevant to the work effort.
"% of Budget" under Man-hours - divide Total to Date by Budget Hours.
"% Work Complete" is the Consultant's best estimate of the status
of the work effort. It should never exceed 100% and may be
more or less than a figure derived by dividing actual cost to date
by budget cost to date.
"Estimated Completion Date" is the Consultant's best estimate of
when each task will be completed.
R-1175 Job Order Engineering
EXHIBIT B, PART 2
PROGRESS REPORT NARRATIVE
The items which should be clearly identified in the progress report narrative are outlined below:
1. Description of progress made by task.
2. Are the tasks behind or ahead of schedule? Reasons why a task is behind schedule.
3. What problems have been encountered? How have they been or will be resolved? How will this
affect progress?
4. Are certain phases of work being delayed beyond planned completion date? If so, why and what
can be done to overcome the delays?
5. Are work tasks or phases of work behind or ahead of planned costs? If ahead of planned costs,
are there significant reasons? If so, what suggestions can be made to modify activities, etc., to
prevent final overrun?
6. Is there a foreseeable need for changes in the planned costs? Will problems, delays, etc., require
changes in the contract? If so, what changes?
7. Documentation of meetings (date, place, participants, minutes of meeting) are to be attached, or
if submitted previously, referenced in the progress report.
R-1175 Job Order Engineering
EXHIBIT B, PART 3
MONTHLY TIME COUNT REPORT
The time period that the report covers should be consistent with all other documents in the progress
report package, including the invoice. The time period should never overlap or gap the previous report.
Notice to Proceed Date refers to the date on the purchase order or other document authorizing you to
begin work.
Original Contract Days is the actual number of calendar days given to complete the work.
Original Completion Date is figured by adding the Original Contract Days to the Notice to Proceed Date.
Additional Days Allotted is the actual number of days added to the contract time by a written change
order.
Total Days Allotted is the total of the Original Contract Days and Additional Days Allotted by change
order.
Revised Contract Completion Date is figured by adding the Total Days Allotted to the Notice to Proceed
Date.
Time Lost refers to the days lost for review in excess of the normal review time listed in the RFP plus
any calendar day during which activity on the project was suspended. The description of the days lost
should include specific dates and reasons for the delay. Document only new lost time during the
reporting period. Lost time from previous periods can be carried over as "Time Lost From Previous
Periods."
Total Days Lost is the total of the current reporting period lost time, plus lost time from previous reports.
Days Used Through This Period are figured by subtracting the Total Days Lost from the number of
calendar days between the Notice to Proceed Date to the end of the current reporting period.
Days Remaining to Complete are figured by subtracting the Total Days Used Through This Period from
the Total Days Allotted and adding the difference between the Additional Days Allotted and the Total
Days Lost.
The Current Estimated Completion Date is figured by adding the Days Remaining to Complete to the
date of the current reporting period. If this date does not agree with the Revised Contract Completion
Date, the consultant should discuss in the comment section.
Consultant comments can reflect comments in regard to possible problems with the contract time,
dollars, or other pertinent information.
R-1175 Job Order Engineering
EXHIBIT B-3
CONSULTANT'S MONTHLY TIME COUNT REPORT
Project No.: Date:
Project Title:
Consultant:
Time Period From: to
Notice to Proceed Date:
Original Contract Days:
Original Completion Date:
Additional Days Allotted CO# through :
Total Days Allotted:
Revised Contract Completion Date:
DESCRIPTION OF LOST TIME Days Lost
Lost Time From Previous Periods:
Total Days Lost
Days Used Through This Period:
Days Remaining to Complete:
Current Estimated Completion Date:
R-1175 Job Order Engineering
EXHIBIT B-1
MONTHLY STATUS OF WORK REPORT
CONSULTANT:
PROJECT DESCRIPTION: P.O. # COA PROJECT #
REPORT DATES: Page:
from to
MAN-HOURS FEE
Budgeted Hours Previous Total % of $ $ This Previous Total $ % % Work Estimated
Hours This Mo. Hours To Date Budget Budgeted Month $ Budget Complete Completion
Task Description Date
Contract Amount: *
Prior Invoices: *
This period: *
Total Billed to date: *
Balance of Contract: * *(Show on last sheet each month)
R-1175 Job Order Engineering
SECTION III
SPECIAL CONDITIONS
GENERAL INFORMATION
Proposals will be considered only from those firms who are financially responsible and have the capability
to provide those services as noted herein.
SAMPLE PROFESSIONAL SERVICES CONTRACT
Included in this package is a sample of the standard "Professional Services Contract", used by the City.
Prospective firms are requested to review this document and comment on any areas of objections in their
technical proposals.
INSURANCE REQUIREMENTS
Attached to the sample "Professional Services Contract" is a copy of the City's current insurance
requirements (Form 410-33).
If prospective firms do not have insurance coverage in any of the identified areas, the reason for lack of
coverage should be clearly stated in the technical proposal.
INDEPENDENT CONTRACTOR AFFIDAVIT
The successful firm is required to sign and notarize an affidavit stating that it is an independent contractor.
A sample affidavit is attached for your review. THE INDEPENDENT CONTRACTOR IS NOT
ENTITLED TO WORKERS' COMPENSATION BENEFITS. AN INDEPENDENT
CONTRACTOR IS OBLIGATED TO PAY FEDERAL AND STATE INCOME TAX ON ANY
MONIES EARNED PURSUANT TO THE CONTRACT RELATIONSHIP. ADDITIONALLY, IT
IS UNDERSTOOD THAT THE INDEPENDENT CONTRACTOR IS NOT ENTITLED TO
UNEMPLOYMENT INSURANCE BENEFITS UNLESS UNEMPLOYMENT COMPENSATION
COVERAGE IS PROVIDED BY THE INDEPENDENT CONTRACTOR OR SOME ENTITY
OTHER THAN THE CITY OF AURORA, COLORADO.
SUBLETTING OF CONTRACT
The firm will agree not to assign or sublet the whole or any part of the contract without the prior written
consent of the City.
AMENDMENTS TO THE REQUEST FOR PROPOSAL
The City of Aurora reserves the right to amend this Request for Proposal by an addendum at any time
prior to the date set for receipt of proposals. Addenda or amendments will be posted to the City of
Aurora web site as soon as available and shall be the responsibility of the vendor to obtain all addenda.
Vendors registered for the paid service shall be notified either by fax or email depending on the service
that they have subscribed to. If revisions are of such a magnitude to warrant, in the City of Aurora’s
opinion, the postponement of the date for receipt of bids, an addendum will be issued announcing the
new date.
32
R-1175 Job Order Engineering
SECTION IV
SAMPLE PROFESSIONAL SERVICE AGREEMENT
PROFESSIONAL SERVICE AGREEMENT
CITY OF AURORA
AURORA, COLORADO
TITLE:
FILE NO.: R-1175
P.O. NO.:
Professional Services Agreement (REV. 12/01)
33
R-1175 Job Order Engineering
TABLE OF CONTENTS
Section I CONSULTANT Responsibilities and Basic Services
Section II The City's Responsibilities
Section III Mutual Obligations of the City and Consultant
Section IV Payment and Fee Schedule
Section V Charter, Laws and Ordinances
Section VI Termination of Contract
Section VII Change Orders or Extensions
Section VIII Equal Employment Opportunity
Section IX Special Conditions
Section X Insurance Requirements
Section XI Examination of Records
Section XII Indemnification
Attachment 1: City of Aurora Insurance Requirements
Attachment 2: Independent Contractor Affidavit
34
R-1175 Job Order Engineering
AGREEMENT
THIS AGREEMENT, made as of the day of in the year Two
Thousand and Two by and between the CITY OF AURORA, COLORADO, hereinafter called the CITY,
and ,a corporation with its principal place of
business at , hereinafter called the CONSULTANT, WITNESSETH,
that whereas the CITY intends that the CONSULTANT, upon written authorization as hereinafter specified,
shall perform services as hereinafter provided; which are in accordance with the project scope and any
addenda thereto, which scope of services by this CONSULTANT together with addenda, if any, shall become
a part of this Agreement.
NOW, THEREFORE, the CITY and the CONSULTANT for the consideration hereinafter set forth agree
as follows:
SECTION I – CONSULTANT RESPONSIBILITIES AND BASIC SERVICES
A. The CONSULTANT agrees to perform services in connection with projects as hereinafter
stated. Refer to Special Conditions where applicable.
B. All work to be performed by the CONSULTANT shall be authorized in writing through the
office of Purchasing and Contract Services subject to award as provided by Ordinance.
Said award shall set forth all special conditions and requirements not otherwise provided for
in this Agreement, but included in the Purchase Order.
C. Time of performance. The services to be performed under this Agreement shall be
commenced immediately upon issuance of a Professional Service Agreement and a
Purchase Order from the CITY and shall be completed no later than unless
extended by the CITY in writing.
D. The CONSULTANT shall inform the CITY in writing of any additional firms it intends to hire
to perform work in connection with this Agreement and shall keep the CITY informed on any
changes or additions to this information. The CITY will approve any additional firms prior to
commencement of work per this Agreement. The CONSULTANT shall be responsible for
the performance of the additional firm(s). Nothing contained herein shall create any
contractual relationship between any additional firm(s) and the CITY.
E. Scope of Work:
F. The CONSULTANT shall be responsible for any injury to persons or damage to property to
the extent arising from negligent or otherwise wrongful acts or errors and omissions of the
CONSULTANT, its agents and employees. If the CONSULTANT knows of the damage the
CONSULTANT shall notify the City immediately. If the City discovers the damage, City will
notify CONSULTANT immediately. Repair shall be accomplished under City direction and
to City specifications so property is in as good or better condition then before damage. The
CONSULTANT shall provide the CITY with a certificate of liability coverage in accordance
per the attached form 410-33.
35
R-1175 Job Order Engineering
SECTION II - THE CITY'S RESPONSIBILITIES
The CITY shall:
A. Provide full information including detailed scope as to its requirements for the services.
B. Give prompt notice to the CONSULTANT whenever the CITY observes or otherwise
becomes aware of any discrepancies in the services provided.
C. Furnish, or direct the CONSULTANT to provide at the CITY'S expense, any necessary
additional services.
D. The CONSULTANT is not liable for delays in performance which are caused by the CITY,
the CITY’S Consultants, or events which are outside the control of the parties and could not
be avoided by the exercise of due care.
SECTION III - MUTUAL OBLIGATIONS OF THE CITY AND CONSULTANT
A. This Agreement does not guarantee to the CONSULTANT any work except as authorized in
accordance with Section I above, or create an exclusive contract.
B. The services and any and all interests contemplated under this Agreement shall not be
assigned, sublet or transferred without the written consent of the CITY.
C. The CONSULTANT and any and all of its personnel utilized by the CONSULTANT under the
terms of this Agreement shall remain the agents and employees of the CONSULTANT and
are not, nor shall be construed to be, agents or employees of the CITY.
D. All data collected by the CONSULTANT and all originals, or reproductions at the option of
the CITY provided that in no event shall the CITY be responsible for the costs of such
reproduction, of documents, notes, drawings, tracings, databases, and files collected or
prepared in connection with these services, except the CONSULTANT’S personnel and
administrative files, shall become and be the property of the City. However, the
CONSULTANT shall retain the right to freely use, publish and apply to other projects the
information, data, results, and materials developed by the CONSULTANT in the course of
performing under this Agreement.
The CITY recognizes that all-technical data, evaluations, reports and other work products
are instruments of the CONSULTANT’S services and not designed for use other than what
is intended by or reasonably foreseeable to the parties to this Agreement. The CITY shall
make no other use of the CONSULTANT’S work product without the prior approval of the
CONSULTANT.
36
R-1175 Job Order Engineering
SECTION IV - PAYMENT AND FEE SCHEDULE
It is understood and agreed by and between the parties hereto, that the CITY shall pay the CONSULTANT
for services furnished, and the CONSULTANT shall accept as full payment for such services, amounts of
money computed as follows:
A. Total Compensation: The CITY agrees to pay and the CONSULTANT agrees to accept for
the services contained in Section I contracted herein a sum not to exceed
dollars. This amount shall include all services rendered by the CONSULTANT under this
Agreement including all travel, living and overhead expenses incurred in connection with
performing the services herein except for special services authorized in writing by the CITY.
The sum above stipulated shall be considered a "Not to Exceed" cost to the CITY.
CONSULTANT shall submit an invoicing schedule to be approved by the Project Manager.
Upon submission of CONSULTANT invoicing to the CITY, payment shall be issued. It is to
be understood and agreed that the CITY may require up to 21 days to process payment
after date of receipt of invoicing.
SECTION V - CHARTER, LAWS AND ORDINANCES
The CONSULTANT, at all times, agrees to observe all applicable Federal and State Laws, Ordinances and
Charter Provisions of the City of Aurora, and all rules and regulations issued pursuant thereto, which in any
manner affect or govern the services contemplated under this Agreement.
SECTION VI - TERMINATION OF CONTRACT
A. TERMINATION FOR CAUSE
In the event a material breach of this Agreement remains uncured following reasonable notice of said breach,
the non-breaching Party may terminate this Agreement upon written notice specifying the effective date
thereof, provided the CITY shall have at least thirty (30) days to cure any such alleged breach. In the event
CONSULTANT illegally discriminates among or against any person or persons, no opportunity to cure such
breach need be provided by the CITY.
B. TERMINATION FOR GOVERNMENTAL CONVENIENCE
1. Change in CITY Policy. The CITY may terminate this Agreement at any time upon
reasonable notice specifying the date thereof, provided the CONSULTANT shall be
compensated in accordance with this Agreement for all work performed up to the effective
date of termination.
2. Non-Appropriation of Funds. The expenditure by the CITY of any funds or other resources
in any future fiscal year, regardless of the stated term of this Agreement, is subject to the lawful
appropriation of sufficient funds therefor in the sole and unfettered discretion of the CITY’S
governing body. In the event sufficient funds are not appropriated, the CITY may terminate this
Agreement upon thirty (30) days prior notice.
37
R-1175 Job Order Engineering
C. EFFECT OF TERMINATION
1. Ownership of Work Product. In the event of termination, all finished and unfinished work
product(s) prepared by the CONSULTANT pursuant to this Agreement shall become the sole
property of the CITY, provided the CONSULTANT is compensated in accordance with this
Agreement for all work performed in accordance with this Agreement up to the effective date
of termination. CONSULTANT shall not be liable with respect to the CITY’S subsequent use
of any incomplete work product, provided CONSULTANT has notified the CITY in writing of
the incomplete status of such work product.
2. CITY’S Right to Set-Off and other Remedies. Termination shall not relieve
CONSULTANT from liability to the CITY for damages sustained as the result of
CONSULTANT’S breach of this Agreement; and the CITY may withhold funds otherwise due
under this Agreement in lieu of such damages, until such time as the exact amount of
damages, if any, has been determined.
SECTION VII - CHANGE ORDERS OR EXTENSIONS
The CITY, may from time to time, require changes in the scope of the services of the CONSULTANT to be
performed herein. Such changes, including any increase or decrease in the amount of the CONSULTANT'S
compensation, which are mutually agreed upon by and between the CITY and the CONSULTANT, shall be
incorporated in written Change Orders or Extensions to this Contract.
SECTION VIII - EQUAL EMPLOYMENT OPPORTUNITY
A. The CONSULTANT will not discriminate against any employee or applicant for employment
on the basis of race, color, national origin, ancestry, age, sex (gender), religion, creed, or
physical or mental disability. The CONSULTANT may adhere to lawful equal opportunity
guidelines in selecting employees, provided that no person is illegally discriminated against
on any of the preceding bases. This provision shall govern, but shall not be limited to,
recruitment, employment, promotion, demotion, and transfer, and advertising therefor; layoff
or termination; rates of pay or other compensation; and selection for training, including
apprenticeship. The CONSULTANT shall post, in all places conspicuous to employees and
applicants for employment, notices provided by the State of Colorado setting forth the
provisions of this nondiscrimination clause.
B. All solicitations and advertisements for employees placed by or on behalf of the
CONSULTANT, shall state that CONSULTANT is an equal opportunity employer.
C. The CONSULTANT shall cause the foregoing provisions to be inserted in all subcontracts
for any work contemplated by this Agreement or deemed necessary by CONSULTANT, so
that such provisions are binding upon each sub-Consultant.
D. The CONSULTANT shall keep such records and submit such reports concerning the racial
and ethnic origin of employees and of applicants for employment as the U.S., the State of
Colorado, the City of Aurora, or their respective agencies may require.
E. The CONSULTANT shall comply with such rules, regulations and guidelines as the United
States, the State of Colorado, the City of Aurora, or their respective agencies may issue to
implement these requirements.
38
R-1175 Job Order Engineering
SECTION IX - SPECIAL CONDITIONS
SECTION X - INSURANCE REQUIREMENTS
The CONSULTANT shall provide the appropriate certificates of insurance and Worker Compensation
documents, at no cost to the City, as described on Attachment #1. The CONSULTANT further agrees and
understands that they are to maintain and keep in force the appropriate insurance certificates throughout the
term of this Agreement.
SECTION XI - EXAMINATION OF RECORDS
This clause applies if this contract agreement exceeds $10,000.00.
The Internal Auditor of the City of Aurora, or a duly authorized representative from the City of Aurora shall
until three (3) years after final payment under this contract agreement have access to and the right to
examine any of the Consultant/Consultant's directly pertinent books, documents, papers, or other records
involving transactions related to this contract agreement.
The CONSULTANT agrees to include in first-tier subcontracts under this contract agreement a clause to the
effect that the City's Internal Auditor, or a duly authorized representative from the City of Aurora shall, until 3
years after final payment under the subcontract have access to and the right to examine any of the
Consultant's directly pertinent books, documents, papers, or other records involving transactions related to
the subcontract. "Subcontract," as used in this clause, excludes (1) purchase orders not exceeding
$10,000.00 and (2) subcontracts or purchase orders from public utility services at rates established to apply
uniformly to the public, plus any applicable reasonable connection charge.
The periods of access and examination as noted above for records relating to (1) litigation or settlement of
claims arising from the performance of this contract agreement, or (2) costs and expenses of this contract
agreement to which the City's Internal Auditor, or duly authorized representative from the City of Aurora has
taken exception, shall continue until such appeals, litigation, claims, or exceptions are disposed of.
SECTION XII – INDEMNIFICATION
The CONSULTANT shall indemnify, defend, and hold harmless the City, its officers, agents, and
employees, from and against all claims, damages, liabilities, and court awards, including costs, expenses,
and reasonable attorney fees, to the extent caused by any negligent or otherwise wrongful act, error, or
omission of the CONSULTANT, its officers, agents, and employees. The CONSULTANT shall provide the
City with prompt notice of any claim for which CONSULTANT may be liable. Likewise, the City agrees to
provide the CONSULTANT with prompt notice of any claim for which indemnification may be sought
hereunder and, further, to cooperate with the CONSULTANT in the resolution of such claim. Nothing
herein is intended to be or shall be construed to be a waiver of the City’s governmental immunity under
C.R.S. Section 24-10-101, et. Seq., as amended. In WITNESS WHEREOF, the parties hereto have
executed this Agreement as of the day and year first above written.
39
R-1175 Job Order Engineering
ATTEST: CITY OF AURORA, COLORADO
By:
City Clerk Robert E. Cook, Manager
Purchasing Services
Date:
APPROVED AS TO FORM:
Assistant City Attorney
Risk Manager
Consultant
By:
Signature
Name (Type or Print)
Title
Date
40
R-1175 Job Order Engineering
ATTACHMENT 1
INSURANCE REQUIREMENTS
The vendor or contractor providing services under this agreement will be required to procure and maintain,
at their own expense and without cost to the City of Aurora, until final acceptance by the City of all work
covered by the Purchase Order or contract the following types of insurance. The policy limits required are
to be considered minimum amounts:
Commercial General Liability Insurance policy with minimum limits of $600,000 combined single limit
for each occurrence. This policy should have a Broad Form Endorsement and include the
following coverages: Blanket Contractual Liability, Broad Form Property Damage, Completed
Operations and Personal Injury.
Comprehensive Automobile Liability Insurance which includes coverage for all owned, non-owned
and rented vehicles with a minimum limit of $600,000 combined single limit for each occurrence.
Worker Compensation and Employers Liability Insurance shall cover the obligations of the
vendor/contractor accordance with the provisions of the Workers Compensation Act, as
amended, by the State of Colorado.
Subcontractor's Insurance shall be the responsibility of the vendor/contractor to ensure that
subcontractors are properly insured to meet the above requirements before they are permitted to
commence work on the project.
In the event that the contract involves professional or consulting services, in addition to the
aforementioned insurance requirements, the contract shall also be protected by a Professional Liability
Insurance policy. The following policy limit is to be considered a minimum amount.
Professional Liability Insurance policy with a minimum limit of $1,000,000 per claim. The policy shall
provide coverage to protect the contractor against liability incurred as a result of the professional services
performed under this contract.
The contractor shall provide Certificates of Insurance to the City of Aurora demonstrating that the
aforementioned insurance requirements have been met prior to the commencement of work under this
contract. The Comprehensive General Liability and Automobile Liability Certificates of Insurance shall
have the City of Aurora, its elected and appointed officials, officers, employees, agents, representatives
and the title of the contract as additional insured. These Certificates of Insurance shall also contain a
valid provision or endorsement that these policies may not be canceled, terminated, changed or
modified to the extent such change or modification would cause the City's mandatory coverage
requirements as stated herein to be violated without a forty-five (45) day written notice prior to
expiration of same to the City of Aurora. Such notice to be forwarded to the Purchasing and Contract
Services Division of the City of Aurora, 1470 South Havana, Aurora, Colorado. The insurance
coverages enumerated above constitute the minimum requirements and said enumerations shall in no
way lessen or limit the liability of the contractor under the terms of the Contract. The contractor may
procure and maintain at their own expense, any additional kinds and amounts of insurance, that in their
own judgment, may be necessary for their proper protection in the performance of the work. Any of the
minimum limits of insurance set out herein may be raised or lowered at the sole discretion of the Risk
Manager for the City of Aurora in response to the particular circumstances giving rise to the contract.
Form No. 410-33
1
R-1175 Job Order Engineering
ATTACHMENT 2
It is hereby understood by the City of Aurora, Colorado and the Contractor that all work
performed on Request for Proposal Number R-1175 is that of an independent contractor. An
independent contractor is NOT a City of Aurora Employee and as such IS NOT ENTITLED TO WORKERS'
COMPENSATION BENEFITS. THE INDEPENDENT CONSULTANTIS OBLIGATED TO PAY FEDERAL
AND STATE INCOME TAX ON ANY MONIES EARNED PURSUANT TO THE CONTRACT
RELATIONSHIP. ADDITIONAL, IT IS UNDERSTOOD THAT INDEPENDENT CONTRACTOR IS NOT
ENTITLED TO UNEMPLOYMENT INSURANCE BENEFITS UNLESS UNEMPLOYMENT
COMPENSATION COVERAGE IS PROVIDED BY THE INDEPENDENT CONSULTANTOR SOME
OTHER ENTITY THAN THE CITY OF AURORA, COLORADO.
The parties hereto are in agreement.
Consultant Title
Signature Date
Name (type or print)
Notary
My Commission Expires