; Primavera P6 EPPM Administrator Training (R8.1+)
Documents
Resources
Learning Center
Upload
Plans & pricing Sign in
Sign Out
Your Federal Quarterly Tax Payments are due April 15th Get Help Now >>

Primavera P6 EPPM Administrator Training (R8.1+)

VIEWS: 80 PAGES: 3

This class is an instructor lead course offered on-site or online. You are also provided with a comprehensive training manual that will also function as a reference guide and aide memoir as you begin to work with your P6 EPPM production system.

More Info
  • pg 1
										
  




                               Primavera P6 EPPM Administrator


       Primavera P6 EPPM Administrator Training (R8.1+)

       Duration: 1-day (on-site or on-line)

       Prerequisite: Previous experience with any version of Primavera P6 EPPM or Professional
       (as an administrator) an advantage but not essential.

       Course Description

       With the release of Oracle Primavera P6 EPPM 8.1, the administrative functionality for the
       system moved out of the P6 Professional client and into the web based EPPM system.

       If you’re new to P6 EPPM or are migrating from a Professional client P6 system to EPPM
       8.1+, this course is ideal for getting up and running fast using the new web based
       administration tools.

       This class is an instructor lead course offered on-site or online. Whatever delivery method
       you choose, you are provided with access to a Primavera P6 EPPM R8.2 training
       environment to use as a sandbox for safely practicing the techniques of P6 administration.
       You are also provided with a comprehensive training manual that will also function as a
       reference guide and aide memoir as you begin to work with your P6 EPPM production
       system.


       Course	
  Outline	
  
       Chapter 1 - Introduction

         • About this training

       Chapter 2 - Working with Data Structures

         •   Working with the OBS
         •   Understanding the Enterprise Project Structure (EPS)
         •   Modifying the EPS
         •   Creating a New EPS Node
         •   Responsible Manager Assignment
         •   Managing and using Project Templates
	
  




       Chapter 3 - Working with Enterprise Data

         •   The Enterprise Data Page
         •   Categories of Enterprise Data
         •   Global Settings
         •   Timesheet Periods
         •   Project, Activity and Resource Codes
         •   Working with Project User Defined Fields (UDFs)

       Chapter 4 – Adding Users

         • P6 EPPM User Overview
         • Adding a New User to P6
         • User Interface Views

       Chapter 5 - Resource Administration

         •   Working with Roles
         •   Role Teams
         •   Adding Resources
         •   Resource Teams (Global or User)
         •   Setting Resources for Progress Reporter Timesheets

       Chapter 6 - Global Dashboards and Views

         • Creating and Managing Dashboards
         • Modifying Existing Dashboards

       Chapter 7 - Understanding the Data Date

         • The P6 Data Date

       Chapter 8 - Managing Services

         •   Global Scheduled Services
         •   Application Settings Page Services
         •   Project Preferences
         •   Project Scheduled Services
         •   Apply Actuals
         •   Schedule Service
         •   Summarize Service
         •   Leveling Service
	
  




       Chapter 9 - Application Settings

         •   Data Limits
         •   Earned value
         •   General
         •   ID Lengths
         •   Services
         •   Timesheets
         •   Time Periods

       Chapter 10 – Project Portfolios

         • Creating a Portfolio
         • Filtered Portfolios
         • Assigning a Portfolio to the Dashboard

       Chapter 11 – Common Maintenance Items

         •   Environmental Issues
         •   Web Browser Settings
         •   Java Issues
         •   Virus Protection Software
         •   Users Locked out of P6
         •   Progress Reporter and Timesheet Issues
         •   Other common items that generate helpdesk requests

       Chapter 12 – Appendix A – Portlets Index

         • A guide to configuring the Dashboard portlets (bonus chapter reference material)




       To learn more about this class, please contact Ten Six Consulting (703) 910-2600 or email
       us at training@tensixconsulting.com

								
To top