					              1. Information NOC
                         Duly filled-up NOC request form – INFR- FRM-001

                   Required drawings:
                      i. Project Location Plan                                                2 copies A3 size
                      ii. Key Plan.                                                           2 copies A3 size

                Important Points:
                   1. Information NOC should be applied by the project consultant.
                   2. The purpose of this NOC is to obtain information regarding EMPOWER’S existing DC services
                        within the project area.

              2. Trial Pit NOC
                         Duly filled-up NOC request form – INFR- FRM-001

                   Required drawing:
                      i. Project Location Plan                                                2 copies A3 size

                Important Points:
                    1. Trial Pits NOC should be applied by the project consultant if there are existing services within the
                          project area.
                    2. The purpose of this NOC is to obtain clearance to proceed with trial pits for project consultant to
                          find out exact location of EMPOWER’S existing DC services within the project area. Project
                          consultant to incorporate information gathered through Trial Pits on their design.

              3. Design NOC:
                   3.1 Preliminary Design:
                          Duly filled-up NOC request form – INFR- FRM-001

                         Required Drawings:
                          i. Key Plan.                                                        2 copies A3 size
                          ii. Project layout.                                                 2 copies A3 size
                          iii. Scope of work.                                                 2 copies A3 size
                          iv. Services Distribution Cross Section with Section Markers.        2 copies A3 size
                                                      Digital copy in AUTOCAD format of above drawings.

                   3.2 Final Design:
                           Duly filled-up NOC request form – INFR- FRM-001
                           Execution Program.
                          Two (2) copies of Total cooling load (Master Developers only) in A3 size paper.
                          Two (2) copies of Utility calculations (Master Developers only) in A3 size paper.




INFR-GDL-003                                             Page 1 of 3
Rev.1 dated 02/11/2009
Owned by INFR
                          Required Drawings:
                             i. Key Plan.                                                   2 copies A3 size
                            ii. Project layout.                                              2 copies A3 size
                           iii. Scope of work.                                               2 copies A3 size
                          iv. Services Distribution Cross Section with Section Markers.      2 copies A3 size
                            v. DCP’s locations and sizes including affection plan (Master    2 copies A3 size
                                Developers only).
                                                     Digital copy in AUTOCAD format of above drawings.

                Important Points:
                    1. Preliminary and Final Design NOCs should be applied by the project consultant .
                    2. Documents and drawings listed above which are applicable for Master Developers only are
                          required for processing of NOC for District Cooling Works.
                    3. These NOCs serve as approval regarding corridor width allocated for EMPOWER’S District
                          Cooling pipes. For NOCs of District Cooling Plants (DCP), these NOCs serve as approval if
                          design of it is acceptable in accordance with our requirements.

              4. Construction NOC:
                         Duly filled-up NOC request form – INFR- FRM-001
                         Approved Design NOC.
                         Execution Program.

                   Required Drawings:
                     i. Key Plan.                                                         2 copies A3 size
                    ii. Project layout.                                                   2 copies A3 size
                   iii. Scope of work.                                                    2 copies A3 size
                   iv. Services Distribution Cross Section with Section Markers.          2 copies A3 size
                                                    Digital copy in AUTOCAD format of above drawings.

                Important Points:
                   1. Construction NOCs should be applied by the project contractor.
                   2. The purpose of this NOC is to obtain clearance to proceed with execution of works at site.

                5. Final / Handing- Over NOC:
                          Duly filled-up NOC request form – INFR- FRM-001
                          Approved Construction NOC.

                   Required Drawing:
                    i. As-built drawing.                                   2 copies A3 size & digital copy in AUTOCAD format

                Important Points:
                   1. Final/ Handing-over NOCs should be applied by the project contractor.
                   2. The purpose of this NOC is to obtain approval if project is constructed as per Construction NOC.



INFR-GDL-003                                             Page 2 of 3
Rev.1 dated 02/11/2009
Owned by INFR
                6. Revalidation of Road NOCs (Design – Construction – Final/Handing Over):
                         Duly filled-up NOC request form – INFR- FRM-001
                         The original NOC - originally signed letter and stamped drawings.
                         Photo Copy of the original NOC – originally signed letter and stamped drawings.




INFR-GDL-003                                            Page 3 of 3
Rev.1 dated 02/11/2009
Owned by INFR

				
DOCUMENT INFO