									                  WEEKLY DECLARATION FOR KERR & PHILPOTT                  COMPUTED BY
                  WILMINGTON DISTRICT CORPS OF ENGINEERS                  ____gap____
                  CESAW-EP-EC   RESERVOIR REGULATION                      CHECKED BY
                                                                          ____may____
                         DAY=25 MONTH=3 YEAR=2009
                             30
                                                       KERR               PHILPOTT

TOTAL WEEKLY OUTFLOW (CFS-DAYS)                       37900 52500                 510
EQUIVALENT 7-DAY MEAN DAILY OUTFLOW (CFS)              5400 7500
TOTAL WEEKLY INFLOW (CFS-DAYS)                        26000 38000                 820

FORECASTED STARTING ELEVATION (FT.,MSL)              302.63                    973.14
FORECASTED ENDING ELEVATION (FT., MSL)               302.18 302.67             973.35
ENDING GUIDE CURVE ELEV (FT., MSL)                   301.20                    973.50

                         PERIOD 28Mar – 03Apr 2009

-----------------------------------------------------------------------------

              ENERGY DECLARATION (ENERGY AMOUNTS ARE IN MWH)


                                  FIRM                 2250                      225
                             SECONDARY                 3300 4500                   0
                     FISH AUGMENTATION                    0                        0
                              TRANSFER                  150                     -150
                                 TOTAL                 5700 6900                  75

          WATER EQUIVALENCY (ACRE-FEET)               76000                   XXXXXX

-----------------------------------------------------------------------------

                           KERR-VPCO                          PHILPOTT-VPCO
      CAP.                       MW
      ENER.                1275 MWH          ENER.                    225 MWH

                           KERR-CP&L                          PHILPOTT-APCO
      CAP.                       MW          CAP.                         MW
      ENER.                 975 MWH          ENER.                      0 MWH

      TOTAL KERR CAP.       200   MW         TOTAL PHIL. CAP.         15 MW
      TOTAL KERR ENER.     2250   MWH        TOTAL PHIL. ENER.       225 MWH

-----------------------------------------------------------------------------
REMARKS:
1. Philpott capacity = 15 MW (3/28-29); 7.5 MW (3/30-4/3) Unit 1 OS AS
Minimum generation at Philpott (Mon-Fri) will be 2 hr/day at 7.5 MW
Philpott Generation Limits (MWH)    Minimum    Desired     Maximum
Weekly (7 day total)                   75        75           75
2. Kerr cap = 200 MW (Unit 1 out UFN; Unit 7 OS AS)
Kerr Generation Limits (MWH)                   Desired     Maximum
Weekly (7 day total)                             5700        5700

								