					       Arizona Race to the Top - LEA Detailed Scope of Work

       LEA NAME:
                Total RTTT Funding Allocation (over 3 budget periods)                                        $

       Welcome to Arizona Race to the Top .
                                                                                                                                   Race to the Top : Project Timeline
       50% of Arizona’s total RTTT Phase 3 award has been allocated to LEAs that have signed Memoranda of Understanding
       (MOUs) to participate in implementing Arizona’s RTTT Phase 3 plan. The total amount to allocate to eligible participating
       LEAs, based on Arizona’s total award is $12,500,000.                                                                        Year 1: December 22, 2011 - May 31,2012
                                                                                                                                       (SEA Planning Period, LEA Initial Scope of Work Development)
       LEAs that have existing MOUs from Phase 2 will not need to change their MOU, however, a new detailed Scope of Work
       will be required (as defined here), based on the new focus of the Phase 3 plan, and each LEAs new allocation budget
       total.                                                                                                                              LEA Project & Budget Timeline
       The focus of each LEAs Scope of Work and expenditure of grant funds must be aligned to Arizona's RTTT Phase 3               Year 2: June 1, 2012 - May 31, 2013
       application, namely: Implementation of the Arizona 2010 Academic Standards (Common Core) in ELA and Math,
       using STEM as the vehicle; and Completing the Student-Teacher Data Connection for each school within the
       LEA. Regional Education Centers will serve as key implementation service structures for assisting Participating LEAs to     Year 3: June 1, 2013 - May 31, 2014
       meet their Race to the Top goals.

       Participating LEAs must adhere to all Race to the Top program assurances as specified within their signed                   Year 4: June 1, 2014 - December 21, 2015
       MOU, and adhere to all applicable federal, state and grant-specific requirements with respect to use of
       funds, and fiscal and programmatic reporting requirements.

       LEA RTTT allocation amounts have been determined based on each participating LEAs relative share of funding under
       Title I, Part A of the ESEA for FY 2011. LEAs may find their allocation total at www.azed.gov/racetothetop.


       LEA Detailed Scope of Work - Contents
            Tab 1        LEA Scope of Work - Cover Page

                         Standards Implementation Plans
                         This page is an ADE provided resource and reference point for LEAs to take into account during the
            Tab 2
                         Scope of Work development process, relative to the expected timeline for implementation of the
                         Arizona 2010 Academic Standards (Common Core) in English Language Arts and Mathematics.

                         AZ RTTT Activities - Year 2
                         Here is where the LEA will complete their detailed Scope of Work, as aligned to required elements from
            Tab 3
                         Arizona's RTTT Phase 3 Plan. LEAs will identify the 'What', 'How', 'When' and 'Who' of their local
                         implementation plan, including associated budget and performance measures.

                         Plan Justification - Year 2
                         Here is where the LEA will provide a brief narrative describing why the LEA chose the activities
            Tab 4
                         proposed by the Scope of Work, and a brief summary of anticipated challenges the LEA may face in
                         meeting the goals and completing the activities selected for Year 2.

                         Budget Summary
            Tab 5
                         Here is where the LEA will provide an total budget summary for each project year.

                         Implementation Team Contacts
                         Here is where the LEA will provide contact information for the LEA implementation teams responsible
            Tab 6
                         for Standards Implementation and Data Systems, to include the primary program and fiscal points of
                         contact for the LEA for the overall RTTT project.


            Tab 7        AZ RTTT Activities - Year 3
            Tab 8        Plan Justification - Year 3
            Tab 9        AZ RTTT Activities - Year 4
            Tab 10       Plan Justification - Year 4




RTTT Scope of Work - Cover Page                                                                                                                                                                       1
 Arizona Race to the Top - LEA Detailed Scope of Work
    Arizona 2010 Academic Standards (Common Core) English Language Arts & Mathematics
                             Transitional Implementation Plans

 In June 2010, Arizona's State Board of Education adopted the Arizona 2010 Academic Standards (Common Core)
 for English Language Arts and Mathematics. The following DRAFT timelines provide minimum implementation
 parameters, that should be taken into account during the LEA Detailed Scope of Work development process.

 All Participating LEAs must develop local implementation plans for implementing the Arizona 2010 Academic
 Standards (Common Core) for English Language Arts and Mathematics that meets the goals for full K-12
 implemention by 2013-2014.


 English Language Arts (ELA)
                    2011-2012         2012-2013     2013-2014       2014-2015               Transitional Implementation
        K               Full             Full          Full            Full                 Defined by the Arizona Department of Education as transitioning from awareness to scaffolded
        1           Transitional         Full          Full            Full                 implementation which includes: grade level PLC team meetings, curriculum mapping, lesson and
        2           Transitional         Full          Full            Full                 unit design, vertical and horizontal articulation and focused professional development.
        3           Transitional         Full          Full            Full
        4           Transitional       Targeted        Full            Full                 Targeted Implemenation
        5           Transitional       Targeted        Full            Full                 Defined by the Arizona Department of Education's grade-specific guidance. In English Language
        6           Transitional       Targeted        Full            Full                 Arts, "Targeted" refers to instructional shifts, specific content emphasis by strand.
        7           Transitional         Full          Full            Full
        8           Transitional         Full          Full            Full
        9           Transitional         Full          Full            Full                 Full Implementation
        10          Transitional       Targeted        Full            Full                 Defined by the Arizona Department of Education as a complete transition to the Arizona 2010
        11          Transitional       Targeted        Full            Full                 English Language Arts (ELA) Academic Standards (Common Core) with fidelity.
        12          Transitional       Targeted        Full            Full


 Mathematics
                    2011-2012         2012-2013     2013-2014       2014-2015               Transitional Implementation
        K               Full             Full          Full            Full                 Defined by the Arizona Department of Education as transitioning from awareness to scaffolded
        1           Transitional         Full          Full            Full                 implementation which includes: grade level PLC team meetings, curriculum mapping, lesson and
        2           Transitional         Full          Full            Full                 unit design, vertical and horizontal articulation and focused professional development.
        3           Transitional       Targeted        Full            Full
        4           Transitional       Targeted        Full            Full                 Targeted Implemenation
        5           Transitional       Targeted        Full            Full                 Defined by the Arizona Department of Education's grade-specific guidance. In English Language
        6           Transitional       Targeted        Full            Full                 Arts, "Targeted" refers to instructional shifts (Standards for Mathematical Practice), specific
        7           Transitional       Targeted        Full            Full                 content emphasis by domain and fluency expectations.
        8           Transitional       Targeted        Full            Full
        9           Transitional         Full          Full            Full                 Full Implementation *
        10          Transitional         Full          Full            Full                 Defined by the Arizona Department of Education as a complete transition to the Arizona 2010
        11          Transitional       Targeted        Full            Full                 Mathematics Academic Standards (Common Core) with fidelity.
        12          Transitional       Targeted        Full            Full
                                                                                            * Please Note: Full Implementation for 2012-2013 and 2013-2014 is a complete transition to the
                                                                                            Arizona 2010 Mathematics Academic Standards (Common Core) with particular attention given to
                                                                                            the 2008 performance objectives assessed by AIMS.




RTTT Standards Implementation Plans                                                                                                                                                           2
Arizona Race to the Top - LEA Detailed Scope of Work                                                                                                         Guidance for Choosing Activities:
                                                                                                                                                             1. (B)(3) - Standards Implementation: Choose at least one* required activity for both ELA
                                                                                                                                                             Standards Implementation and Math Standards Implementation. This choice should be driven
LEA NAME:                                                                                                                                                    by identified local need and the total Race to the Top LEA Budget Allocation amount. Note: All
                                                                                                                                                             LEAs are required to develop local ELA and Math Standards Implementation Plans.
Required Activities                                                                            YEAR 2 (6/1/2012 - 5/31/2013)                                 2. (C)(2) - Data Systems: All required activities must be addressed.

                                                                                                                                                             * LEAs receiving an allocation of $70,000 or more must address all (B)(3) Elements
                             Total RTTT Funding Allocation (over 3 budget periods)                           $
                                                                                                                                                             within their Scope of Work.

(B)(3) - Standards Implementation
                     Indicate
   Required                                       Required RTTT Elements                         Plan for Implementation of    Timeline for Implementation                                                                                                            Budget
                     Chosen                                                                                                                                      Key Personnel            Performance Measures (Targets)                                                                  Overall Performance Measure (Target)
    GOALS
                  Elements (for
                                                (The Participaing LEA will…)                      Selected RTTT Activities       (Summer, Fall, Spring )                                                                               Budget (RTTT)          (Other - As Applicable)
                                                                                                                                                                    "The Who"                   Aligned to Activities                                                                                Required Goals
  "The Why"       March 2, 2012)                          "The What"                                     "The How"                     "The When"                                                                                                                Indicate Source

                                   Development of A High-Quality LEA ELA Standards
                         X                      Implementation Plan
                                              (Required for ALL LEAs )
                                   Implementation of A High-Quality LEA ELA Standards
                                   Implementation Plan

                                   Examples of Activities in support of this Element
                                   (including, but not limited to):
                                   a. Personnel Expenses or Stipends for Teacher Teams to
                                   support local development and implementation;
                                   b. Development of ELA/STEM instructional resources,
                                   such as: Integrated ELA/STEM Lesson Plans; Curriculum
                                   Maps; Supplemental Instructional Materials and Resources;
                                   and. Professional Development Materials and Modules;
                                   c. Purchase of Supplemental Instructional Materials and
                                   Resources (to include online resources);
Fully Implement                    d. Curriculum Alignment activities;
the Arizona                        e. Providing Coaching, follow-up and feedback;
2010 ELA                           f. Providing Internal Professional Development;
                                   g. Implementing the Science Foundation Arizona (SFAz)                                                                                                                                                                                                 Fully Implement the Arizona 2010 ELA Standards
Standards
                                   STEM Immersion Matrix                                                                                                                                                                                                                                (Common Core) in Grades K-3 and 7-9, and move
(Common
                                   h. Monitoring and evaluating the implementation plan for                                                                                                                                                                                               from transitional to targeted implementation in
Core), using
                                                                                                                                                                                                                                                                                        grades 4-6 and 10-12 by the end of the 2012-2013
STEM as the                        fidelity
                                                                                                                                                                                                                                                                                               school year, using STEM as the vehicle
vehicle, in all
                                   Participate in Professional Development for Educators
grades by 2013-
                                   (teachers, administrators, coaches, instructional
2014.
                                   specialists) in Phase 1, 2 and 3 of the Arizona 2010 ELA
                                   Standards (Common Core) provided by one or more of
                                   the following:
                                   a. ADE
                                   b. Regional Education Center Specialists
                                   c. ADE Certified Trainers
                                   d. LEA Professional Development Cadre Certified by ADE

                                   Participate in Professional Development focused on
                                   Leadership (LEA Leadership team, administrators,
                                   coaches, PLC Data Team) in support of implementing the
                                   Arizona 2010 ELA Standards (Common Core) provided by
                                   one or more of the following:
                                   a. ADE
                                   b. Regional Education Center Specialists
                                   c. ADE Certified Trainers
                                   d. LEA Professional Development Cadre Certified by ADE


                                   Development of A High-Quality LEA Math Standards
                         X                       Implementation Plan
                                               (Required for ALL LEAs )
                                   Development and Implementation of A High-Quality LEA
                                   Math Standards Implementation Plan

                                   Examples of Activities in support of this Element
                                   (including, but not limited to):
                                   a. Personnel Expenses or Stipends for Teacher Teams to
                                   support local development and implementation;
                                   b. Development of Math/STEM instructional resources,
                                   such as: Integrated ELA/STEM Lesson Plans; Curriculum
                                   Maps; Supplemental Instructional Materials and Resources;
    AZ RTTT Activities - Year 2    and. Professional Development Materials and Modules;                                                                                                                                                                                                                                             3
                                   c. Purchase of Supplemental Instructional Materials and
                                   Resources (to include online resources);
                                   Development and Implementation of A High-Quality LEA
                                   Math Standards Implementation Plan

                                   Examples of Activities in support of this Element
                                   (including, but not limited to):
                                   a. Personnel Expenses or Stipends for Teacher Teams to
                                   support local development and implementation;
                                   b. Development of Math/STEM instructional resources,
                                   such as: Integrated ELA/STEM Lesson Plans; Curriculum
                                   Maps; Supplemental Instructional Materials and Resources;
                                   and. Professional Development Materials and Modules;
                                   c. Purchase of Supplemental Instructional Materials and
                                   Resources (to include online resources);
Fully Implement                    d. Curriculum Alignment activities;
the Arizona                        e. Providing Coaching, follow-up and feedback;
2010 Math                          f. Providing Internal Professional Development;
                                   g. Implementing the Science Foundation Arizona (SFAz)                                                                                                                                                                               Fully Implement the Arizona 2010 Math Standards
Standards
                                   STEM Immersion Matrix                                                                                                                                                                                                               (Common Core) in Grades K-3 and 7-9, and move
(Common
                                                                                                                                                                                                                                                                         from transitional to targeted implementation in
Core), using                       h. Monitoring and evaluating the implementation plan for
                                                                                                                                                                                                                                                                       grades 4-6 and 10-12 by the end of the 2012-2013
STEM as the                        fidelity
                                                                                                                                                                                                                                                                             school year, using STEM as the vehicle
vehicle, in all
                                   Participate in Professional Development for Educators
grades by 2013-
                                   (teachers, administrators, coaches, instructional
2014.
                                   specialists) in Phase 1, 2 and 3 of the Arizona 2010 Math
                                   Standards (Common Core) provided by one or more of
                                   the following:
                                   a. ADE
                                   b. Regional Education Center Specialists
                                   c. ADE Certified Trainers
                                   d. LEA Professional Development Cadre Certified by ADE

                                   Participate in Professional Development focused on
                                   Leadership (LEA Leadership team, administrators,
                                   coaches, PLC Data Team) in support of implementing the
                                   Arizona 2010 Math Standards (Common Core) provided
                                   by one or more of the following:
                                   a. ADE
                                   b. Regional Education Center Specialists
                                   c. ADE Certified Trainers
                                   d. LEA Professional Development Cadre Certified by ADE

                                                                                                                                                                                        (B)(3) - Budget Subtotal (Year 2)
                  ALL LEAs ARE REQUIRED TO:
                  Share high-quality and effective ELA/STEM and Math/STEM resources that       Including, but not limited to:
                  are developed as a result of participating in the Arizona Race to the Top    * Integrated ELA/STEM Lesson Plans;
                  grant with the ADE, to populate a statewide repository of resources,         * Integrated Math/STEM Lesson Plans;
                  through partnering with other LEAs, Regional Education Centers and the       * Curriculum Maps;
 NOTE:            ADE.                                                                         * Supplemental Instructional Materials
                                                                                               and Resources;
                                                                                               * Professional Development Materials
                                                                                               and Modules



(C)(2) - Data Systems
                     Indicate
                                                  Required RTTT Elements                           Plan for Implementation of           Timeline for Implementation
  Required           Chosen                                                                                                                                           Key Personnel   Performance Measures (Targets)                                Budget                Overall Performance Measure (Target)
                  Elements (for
                                                (The Participaing LEA will…)                        Selected RTTT Activities              (Fall, Spring, Summer )                                                           Budget (RTTT)
   GOALS                                                                                                                                                                "The Who"           Aligned to Activities                           (Other - As Applicable)                   Required Goal
                  March 2, 2012)                          "The What"                                         "The How"                          "The When"

                                   Complete the Course Mapping Process for all Schools                                                                                                                                                                                Complete the Course Mapping Process for all
                                   within the LEA.                                                                                                                                                                                                                    Schools within the LEA by 12/31/2012
 Complete the            X
     Course
    Mapping                        Complete the Student-Teacher Connection at all Schools                                                                                                                                                                             Complete the Student-Teacher Connection at all
Process and the                    within the LEA, within the LEAs Student Management                                                                                                                                                                                 Schools within the LEA, within the LEAs Student
    Student-
    Teacher
                         X         System (SMS).                                                                                                                                                                                                                      Management System (SMS) by 12/31/2012

 Connection at
  all Schools                      Transmit complete Student-Teacher Connection data for                                                                                                                                                                              Transmit complete Student-Teacher Connection
 within the LEA                    all schools within the LEA to the ADE according to                                                                                                                                                                                 data for all schools within the LEA to the ADE
 by 12/31/2012           X         defined file specifications                                                                                                                                                                                                        according to defined file specifications by 12/31/2012


                                                                                                                                                                                        (C)(2) - Budget Subtotal (Year 2)




    AZ RTTT Activities - Year 2                                                                                                                                                                                                                                                                                       4
                              TOTAL ALL (Year 2)




AZ RTTT Activities - Year 2                        5
Arizona Race to the Top - LEA Detailed Scope of Work
LEA NAME:

LEA Plan Justification                                               YEAR 2 (6/1/2012 - 5/31/2013)

        Total RTTT Funding Allocation (over 3 budget periods)                        $

(B)(3) - Standards Implementation

   Required
                  Briefly describe why your LEA has chosen the activities proposed within this scope of work   Briefly describe the challenges your LEA anticipates in meeting your goals and
    GOALS
                                                        for Year 2.                                                                  completing your activities for Year 2.
  "The Why"


Fully Implement
the Arizona
2010 ELA
Standards
(Common
Core), using
STEM as the
vehicle, in all
grades by 2013-
2014.




Fully Implement
the Arizona
2010 Math
Standards
(Common
Core), using
STEM as the
vehicle, in all
grades by 2013-
2014.


   RTTT LEA Plan Justification - Year 2                                                                                                                                                  6
              ALL LEAs ARE REQUIRED TO:
              Share high-quality and effective ELA/STEM and             Including, but not limited to:
              Math/STEM resources that are developed as a result of     * Integrated ELA/STEM Lesson Plans;
              participating in the Arizona Race to the Top grant with   * Integrated Math/STEM Lesson Plans;
              the ADE, to populate a statewide repository of            * Curriculum Maps;
              resources, through partnering with other LEAs, Regional   * Supplemental Instructional Materials and
              Education Centers and the ADE.                            Resources;
                                                                        * Professional Development Materials and
                                                                        Modules


NOTE:           Briefly describe what kinds of ELA/STEM and Math/STEM resources that your LEA plans to
                                                  develop during Year 2.




RTTT LEA Plan Justification - Year 2                                                                                 7
          Arizona Race to the Top - LEA Detailed Scope of Work
          LEA NAME:

          Budget Summary

            Total RTTT Funding Allocation (over 3 budget periods)        $

          Summary of Four-Year Scope of Work

                                  Year                              Budget (RTTT)   Budget (Other Sources)
                      2    (6/1/2012 - 5/31/2013)
                      3    (6/1/2013 - 5/31/2014)
                      4   (6/1/2014 - 12/22/2015)
                                               Total Budget




RTTT Budget Summary                                                                                          8
  Arizona Race to the Top - LEA Detailed Scope of Work
  LEA NAME:

  LEA Implementation Teams Contacts

  (B)(3) - Standards Implementation
  Implementation Team Contact Name    Title               Email Address         Phone Number




  (C)(2) - Data Systems
  Implementation Team Contact Name    Title               Email Address         Phone Number




  LEA Primary Contact Information - Race to the Top (Overall Program and Fiscal Contacts)
  Contact Name                        Title               Email Address         Phone Number




RTTT Implementation Team Contacts                                                              9
Arizona Race to the Top - LEA Detailed Scope of Work                                                                                      Guidance for Choosing Activities:
                                                                                                                                          1. (B)(3) - Standards Implementation: Choose at least one required activity for both ELA
                                                                                                                                          Standards Implementation and Math Standards Implementation. This choice should be driven
LEA NAME:                                                                                                                                 by identified local need and the total Race to the Top LEA Budget Allocation amount.
                                                                                                                                          2. (C)(2) - Data Systems: All required activities must be addressed.
Required Activities                                                         YEAR 3 (6/1/2013 - 5/31/2014)

         Total RTTT Funding Allocation (over 3 budget periods)                           $

(B)(3) - Standards Implementation

   Required                    Required RTTT Activities                                                     Timeline for Implementation                                                                                                      Budget
                                                                               Plan for Implementation                                        Key Personnel          Performance Measures (Targets)                                                               Overall Performance Measure (Target)
    GOALS                    (The Participaing LEA will…)                                                     (Summer, Fall, Spring )                                                                           Budget (RTTT)        (Other - As Applicable)
                                                                                      "The How"                                                  "The Who"                 Aligned to Activities                                                                             Required Goals
  "The Why"                            "The What"                                                                   "The When"                                                                                                          Indicate Source

                 Development of A High-Quality LEA ELA Standards
                              Implementation Plan
                            (Required for ALL LEAs )
                Development and Implementation of A High-Quality LEA
                ELA Standards Implementation Plan

                Examples of Activities in support of this Activity
                (including, but not limited to):
                a. Personnel Expenses or Stipends for Teacher Teams to
                support local development and implementation;
                b. Development of ELA/STEM instructional resources,
                such as: Integrated ELA/STEM Lesson Plans; Curriculum
                Maps; Supplemental Instructional Materials and Resources;
                and. Professional Development Materials and Modules;
                c. Purchase of Supplemental Instructional Materials and
                Resources (to include online resources);
Fully Implement d. Curriculum Alignment activities;
the Arizona     e. Providing Coaching, follow-up and feedback;
2010 ELA        f. Providing Internal Professional Development;
Standards       g. Implementing the Science Foundation Arizona (SFAz)
                STEM Immersion Matrix                                                                                                                                                                                                                            Fully Implement the Arizona 2010 ELA Standards
(Common
                h. Monitoring and evaluating the implementation plan for                                                                                                                                                                                       (Common Core) in Grades K-12, using STEM as the
Core), using
                fidelity                                                                                                                                                                                                                                                             Vehicle
STEM as the
vehicle, in all
                Participate in Professional Development for Educators
grades by 2013-
                (teachers, administrators, coaches, instructional
2014.
                specialists) in Phase 1, 2 and 3 of the Arizona 2010 ELA
                Standards (Common Core) provided by one or more of
                the following:
                a. ADE
                b. Regional Education Center Specialists
                c. ADE Certified Trainers
                d. LEA Professional Development Cadre Certified by ADE

                Participate in Professional Development focused on
                Leadership (LEA Leadership team, administrators,
                coaches, PLC Data Team) in support of implementing the
                Arizona 2010 ELA Standards (Common Core) provided by
                one or more of the following:
                a. ADE
                b. Regional Education Center Specialists
                c. ADE Certified Trainers
                d. LEA Professional Development Cadre Certified by ADE


                      Development of A High-Quality LEA Math
                          Standards Implementation Plan
                             (Required for ALL LEAs )
                Development and Implementation of A High-Quality LEA
                Math Standards Implementation Plan

               Examples of Activities in support of this Activity
               (including, but not limited to):
               a. Personnel Expenses or Stipends for Teacher Teams to
               support local
   AZ RTTT Activities - Year 3 development and implementation;                                                                                                                                                                                                                                           10
               b. Development of Math/STEM instructional resources,
               such as: Integrated ELA/STEM Lesson Plans; Curriculum
               Maps; Supplemental Instructional Materials and Resources;
                  Development and Implementation of A High-Quality LEA
                  Math Standards Implementation Plan

                Examples of Activities in support of this Activity
                (including, but not limited to):
                a. Personnel Expenses or Stipends for Teacher Teams to
                support local development and implementation;
                b. Development of Math/STEM instructional resources,
                such as: Integrated ELA/STEM Lesson Plans; Curriculum
                Maps; Supplemental Instructional Materials and Resources;
                and. Professional Development Materials and Modules;
                c. Purchase of Supplemental Instructional Materials and
                Resources (to include online resources);
Fully Implement d. Curriculum Alignment activities;
the Arizona     e. Providing Coaching, follow-up and feedback;
2010 Math       f. Providing Internal Professional Development;
Standards       g. Implementing the Science Foundation Arizona (SFAz)
                STEM Immersion Matrix                                                                                                                                                                                                                   Fully Implement the Arizona 2010 Math Standards
(Common
                h. Monitoring and evaluating the implementation plan for                                                                                                                                                                               (Common Core) in Grades K-12, using STEM as the
Core), using
                fidelity                                                                                                                                                                                                                                                     Vehicle
STEM as the
vehicle, in all
                Participate in Professional Development for Educators
grades by 2013-
                (teachers, administrators, coaches, instructional
2014.
                specialists) in Phase 1, 2 and 3 of the Arizona 2010 Math
                Standards (Common Core) provided by one or more of
                the following:
                a. ADE
                b. Regional Education Center Specialists
                c. ADE Certified Trainers
                d. LEA Professional Development Cadre Certified by ADE

                  Participate in Professional Development focused on
                  Leadership (LEA Leadership team, administrators,
                  coaches, PLC Data Team) in support of implementing the
                  Arizona 2010 Math Standards (Common Core) provided
                  by one or more of the following:
                  a. ADE
                  b. Regional Education Center Specialists
                  c. ADE Certified Trainers
                  d. LEA Professional Development Cadre Certified by ADE

                                                                                                                                                                         (B)(3) - Budget Subtotal (Year 3)
                  ALL LEAs ARE REQUIRED TO:
                  Share high-quality and effective ELA/STEM and                 Including, but not limited to:
                  Math/STEM resources that are developed as a result of         * Integrated ELA/STEM Lesson Plans;
                  participating in the Arizona Race to the Top grant with the   * Integrated Math/STEM Lesson Plans;
                  ADE, to populate a statewide repository of resources,         * Curriculum Maps;
 NOTE:            through partnering with other LEAs, Regional Education        * Supplemental Instructional Materials
                                                                                and Resources;
                  Centers and the ADE.
                                                                                * Professional Development Materials
                                                                                and Modules



(C)(2) - Data Systems

                                   Required RTTT Elements                           Plan for Implementation of           Timeline for Implementation
   Required                                                                                                                                            Key Personnel   Performance Measures (Targets)                                Budget               Overall Performance Measure (Target)
                                 (The Participaing LEA will…)                        Selected RTTT Activities              (Fall, Spring, Summer )                                                           Budget (RTTT)
    GOALS                                                                                                                                                "The Who"           Aligned to Activities                           (Other - As Applicable)                  Required Goal
                                          "The What"                                          "The How"                          "The When"

                  Complete the Course Mapping Process for all Schools                                                                                                                                                                                  Complete the Course Mapping Process for all
                  within the LEA.                                                                                                                                                                                                                      Schools within the LEA by 12/31/2012
 Complete the
     Course
    Mapping       Complete the Student-Teacher Connection at all Schools                                                                                                                                                                               Complete the Student-Teacher Connection at all
Process and the   within the LEA, within the LEAs Student Management                                                                                                                                                                                   Schools within the LEA, within the LEAs Student
    Student-      System (SMS).                                                                                                                                                                                                                        Management System (SMS) by 12/31/2012
    Teacher
 Connection at
  all Schools     Transmit complete Student-Teacher Connection data for                                                                                                                                                                                Transmit complete Student-Teacher Connection
 within the LEA   all schools within the LEA to the ADE according to                                                                                                                                                                                   data for all schools within the LEA to the ADE
 by 12/31/2012    defined file specifications                                                                                                                                                                                                          according to defined file specifications by 12/31/2012




   AZ RTTT Activities - Year 3                                                                                                                                                                                                                                                                        11
                              (C)(2) - Budget Subtotal (Year 3)


                                        TOTAL ALL (Year 3)




AZ RTTT Activities - Year 3                                       12
 Arizona Race to the Top - LEA Detailed Scope of Work
 LEA NAME:

 LEA Plan Justification                                               YEAR 3 (6/1/2013 - 5/31/2014)

          Total RTTT Funding Allocation (over 3 budget periods)                      $

 (B)(3) - Standards Implementation

    Required
                   Briefly describe why your LEA has chosen the activities proposed within this scope of work Briefly describe the challenges your LEA anticipates in meeting your goals and
     GOALS
                                                          for Year 3.                                                               completing your activities for Year 3.
   "The Why"


 Fully Implement
 the Arizona
 2010 ELA
 Standards
 (Common
 Core), using
 STEM as the
 vehicle, in all
 grades by 2013-
 2014.




 Fully Implement
 the Arizona
 2010 Math
 Standards
 (Common
 Core), using
 STEM as the
 vehicle, in all
 grades by 2013-
 2014.




RTTT LEA Plan Justification - Year 3                                                                                                                                                       13
                   ALL LEAs ARE REQUIRED TO:
                   Share high-quality and effective ELA/STEM and               Including, but not limited to:
                   Math/STEM resources that are developed as a result of       * Integrated ELA/STEM Lesson Plans;
                   participating in the Arizona Race to the Top grant with     * Integrated Math/STEM Lesson Plans;
                   the ADE, to populate a statewide repository of resources,   * Curriculum Maps;
                   through partnering with other LEAs, Regional Education      * Supplemental Instructional Materials and
                   Centers and the ADE.                                        Resources;
                                                                               * Professional Development Materials and
                                                                               Modules

   NOTE:            Briefly describe what kinds of ELA/STEM and Math/STEM resources that your LEA plans to
                                                      develop during Year 3.




RTTT LEA Plan Justification - Year 3                                                                                        14
Arizona Race to the Top - LEA Detailed Scope of Work                                                                                       Guidance for Choosing Activities:
                                                                                                                                           1. (B)(3) - Standards Implementation: Choose at least one required activity for both ELA
                                                                                                                                           Standards Implementation and Math Standards Implementation. This choice should be driven
LEA NAME:                                                                                                                                  by identified local need and the total Race to the Top LEA Budget Allocation amount.
                                                                                                                                           2. (C)(2) - Data Systems: All required activities must be addressed.
Required Activities                                                         YEAR 4 (6/1/2014 - 12/21/2015)

         Total RTTT Funding Allocation (over 3 budget periods)                            $

(B)(3) - Standards Implementation

   Required                    Required RTTT Elements                                                        Timeline for Implementation                                                                                                      Budget
                                                                                Plan for Implementation                                        Key Personnel          Performance Measures (Targets)                                                               Overall Performance Measure (Target)
    GOALS                    (The Participaing LEA will…)                                                      (Summer, Fall, Spring )                                                                           Budget (RTTT)        (Other - As Applicable)
                                                                                      "The How"                                                   "The Who"                 Aligned to Activities                                                                             Required Goals
  "The Why"                            "The What"                                                                    "The When"                                                                                                          Indicate Source

                 Development of A High-Quality LEA ELA Standards
                              Implementation Plan
                            (Required for ALL LEAs )
                Development and Implementation of A High-Quality LEA
                ELA Standards Implementation Plan

                Examples of Activities in support of this Elements
                (including, but not limited to):
                a. Personnel Expenses or Stipends for Teacher Teams to
                support local development and implementation;
                b. Development of ELA/STEM instructional resources,
                such as: Integrated ELA/STEM Lesson Plans; Curriculum
                Maps; Supplemental Instructional Materials and Resources;
                and. Professional Development Materials and Modules;
                c. Purchase of Supplemental Instructional Materials and
                Resources (to include online resources);
Fully Implement d. Curriculum Alignment activities;
the Arizona     e. Providing Coaching, follow-up and feedback;
2010 ELA        f. Providing Internal Professional Development;
Standards       g. Implementing the Science Foundation Arizona (SFAz)
                STEM Immersion Matrix                                                                                                                                                                                                                             Fully Implement the Arizona 2010 ELA Standards
(Common
                h. Monitoring and evaluating the implementation plan for                                                                                                                                                                                        (Common Core) in Grades K-12, using STEM as the
Core), using
                fidelity                                                                                                                                                                                                                                                              Vehicle
STEM as the
vehicle, in all
                Participate in Professional Development for Educators
grades by 2013-
                (teachers, administrators, coaches, instructional
2014.
                specialists) in Phase 1, 2 and 3 of the Arizona 2010 ELA
                Standards (Common Core) provided by one or more of
                the following:
                a. ADE
                b. Regional Education Center Specialists
                c. ADE Certified Trainers
                d. LEA Professional Development Cadre Certified by ADE

                Participate in Professional Development focused on
                Leadership (LEA Leadership team, administrators,
                coaches, PLC Data Team) in support of implementing the
                Arizona 2010 ELA Standards (Common Core) provided by
                one or more of the following:
                a. ADE
                b. Regional Education Center Specialists
                c. ADE Certified Trainers
                d. LEA Professional Development Cadre Certified by ADE


                      Development of A High-Quality LEA Math
                          Standards Implementation Plan
                             (Required for ALL LEAs )
                Development and Implementation of A High-Quality LEA
                Math Standards Implementation Plan

               Examples of Activities in support of this Elements
   AZ RTTT Activities - Year 4 not limited to):
               (including, but                                                                                                                                                                                                                                                                            15
               a. Personnel Expenses or Stipends for Teacher Teams to
               support local development and implementation;
               b. Development of Math/STEM instructional resources,
               such as: Integrated ELA/STEM Lesson Plans; Curriculum
               Maps; Supplemental Instructional Materials and Resources;
                  Development and Implementation of A High-Quality LEA
                  Math Standards Implementation Plan

                Examples of Activities in support of this Elements
                (including, but not limited to):
                a. Personnel Expenses or Stipends for Teacher Teams to
                support local development and implementation;
                b. Development of Math/STEM instructional resources,
                such as: Integrated ELA/STEM Lesson Plans; Curriculum
                Maps; Supplemental Instructional Materials and Resources;
                and. Professional Development Materials and Modules;
                c. Purchase of Supplemental Instructional Materials and
                Resources (to include online resources);
Fully Implement d. Curriculum Alignment activities;
the Arizona     e. Providing Coaching, follow-up and feedback;
2010 Math       f. Providing Internal Professional Development;
Standards       g. Implementing the Science Foundation Arizona (SFAz)
                STEM Immersion Matrix                                                                                                                                                                                                                   Fully Implement the Arizona 2010 Math Standards
(Common
                h. Monitoring and evaluating the implementation plan for                                                                                                                                                                               (Common Core) in Grades K-12, using STEM as the
Core), using
                fidelity                                                                                                                                                                                                                                                     Vehicle
STEM as the
vehicle, in all
                Participate in Professional Development for Educators
grades by 2013-
                (teachers, administrators, coaches, instructional
2014.
                specialists) in Phase 1, 2 and 3 of the Arizona 2010 Math
                Standards (Common Core) provided by one or more of
                the following:
                a. ADE
                b. Regional Education Center Specialists
                c. ADE Certified Trainers
                d. LEA Professional Development Cadre Certified by ADE

                  Participate in Professional Development focused on
                  Leadership (LEA Leadership team, administrators,
                  coaches, PLC Data Team) in support of implementing the
                  Arizona 2010 Math Standards (Common Core) provided
                  by one or more of the following:
                  a. ADE
                  b. Regional Education Center Specialists
                  c. ADE Certified Trainers
                  d. LEA Professional Development Cadre Certified by ADE

                                                                                                                                                                         (B)(3) - Budget Subtotal (Year 4)
                  ALL LEAs ARE REQUIRED TO:
                  Share high-quality and effective ELA/STEM and                 Including, but not limited to:
                  Math/STEM resources that are developed as a result of         * Integrated ELA/STEM Lesson Plans;
                  participating in the Arizona Race to the Top grant with the   * Integrated Math/STEM Lesson Plans;
                  ADE, to populate a statewide repository of resources,         * Curriculum Maps;
 NOTE:            through partnering with other LEAs, Regional Education        * Supplemental Instructional Materials
                                                                                and Resources;
                  Centers and the ADE.
                                                                                * Professional Development Materials
                                                                                and Modules



(C)(2) - Data Systems

                                   Required RTTT Elements                           Plan for Implementation of           Timeline for Implementation
   Required                                                                                                                                            Key Personnel   Performance Measures (Targets)                                Budget               Overall Performance Measure (Target)
                                 (The Participaing LEA will…)                        Selected RTTT Activities              (Fall, Spring, Summer )                                                           Budget (RTTT)
    GOALS                                                                                                                                                "The Who"           Aligned to Activities                           (Other - As Applicable)                  Required Goal
                                          "The What"                                          "The How"                          "The When"

                  Complete the Course Mapping Process for all Schools                                                                                                                                                                                  Complete the Course Mapping Process for all
 Complete the     within the LEA.                                                                                                                                                                                                                      Schools within the LEA by 12/31/2012
     Course
    Mapping
                  Complete the Student-Teacher Connection at all Schools                                                                                                                                                                               Complete the Student-Teacher Connection at all
Process and the
                  within the LEA, within the LEAs Student Management                                                                                                                                                                                   Schools within the LEA, within the LEAs Student
    Student-
                  System (SMS).                                                                                                                                                                                                                        Management System (SMS) by 12/31/2012
    Teacher
 Connection at
  all Schools     Transmit complete Student-Teacher Connection data for                                                                                                                                                                                Transmit complete Student-Teacher Connection
 within the LEA   all schools within the LEA to the ADE according to                                                                                                                                                                                   data for all schools within the LEA to the ADE
 by 12/31/2012    defined file specifications                                                                                                                                                                                                          according to defined file specifications by 12/31/2012

                                                                                                                                                                         (C)(2) - Budget Subtotal (Year 4)
   AZ RTTT Activities - Year 4                                                                                                                                                                                                                                                                        16
                              TOTAL ALL (Year 4)




AZ RTTT Activities - Year 4                        17
Arizona Race to the Top - LEA Detailed Scope of Work
LEA NAME:

LEA Plan Justification                                               YEAR 4 (6/1/2014 - 12/21/2015)

        Total RTTT Funding Allocation (over 3 budget periods)                        $

(B)(3) - Standards Implementation

   Required
                  Briefly describe why your LEA has chosen the activities proposed within this scope of work   Briefly describe the challenges your LEA anticipates in meeting your goals and
    GOALS
                                                        for Year 4.                                                                  completing your activities for Year 4.
  "The Why"


Fully Implement
the Arizona
2010 ELA
Standards
(Common
Core), using
STEM as the
vehicle, in all
grades by 2013-
2014.




Fully Implement
the Arizona
2010 Math
Standards
(Common
Core), using
STEM as the
vehicle, in all
grades by 2013-
2014.


   RTTT LEA Plan Justification - Year 4                                                                                                                                                 18
              ALL LEAs ARE REQUIRED TO:
              Share high-quality and effective ELA/STEM and             Including, but not limited to:
              Math/STEM resources that are developed as a result of     * Integrated ELA/STEM Lesson Plans;
              participating in the Arizona Race to the Top grant with   * Integrated Math/STEM Lesson Plans;
              the ADE, to populate a statewide repository of            * Curriculum Maps;
              resources, through partnering with other LEAs, Regional   * Supplemental Instructional Materials and
              Education Centers and the ADE.                            Resources;
                                                                        * Professional Development Materials and
                                                                        Modules

NOTE:           Briefly describe what kinds of ELA/STEM and Math/STEM resources that your LEA plans to
                                                  develop during Year 4.




RTTT LEA Plan Justification - Year 4                                                                                 19

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:18
posted:5/27/2012
language:English
pages:19