NORTHUMBERLAND COUNTY COUNCIL - Get as DOC
Document Sample


NORTHUMBERLAND COUNTY COUNCIL
PLANNING & ENVIRONMENT COMMITTEE
CENTRAL DEVELOPMENT MANAGEMENT TEAM
APPLICATIONS ON HAND AS OF 31.12.09
This list is put forward for the information of members. It includes all applications not included
elsewhere on this agenda, received on or before the date identified but upon which processing
is not yet sufficiently advanced to enable a report to be placed before the Committee at this
meeting.
County Matters
09/00055/CCMEIA UK Coal Mining Extraction of 1.01 million
05/03/09 Ltd tonnes of coal and 200,000
tonnes of fireclay with
subsequent restoration to
agriculture, conservation
headlands and woodland at
Butterwell Disposal Point
near Linton, Morpeth.
09/00119/CCM UK Coal Mining Variation to condition 4 to
20/07/09 Ltd allow completion of
restoration to November
2010, variation to condition
71 to delay the submission of
the coal haul road and
Butterwell Disposal Point to
February 2010 and delay
restoration of the “Cockles”
section of the coal haul road
to September 2015 at
Stobswood OCCS.
09/00132/CCMEIA Tarmac Ltd Extension of time until 2028
10/08/09 and vertical extension in
respect of extraction of sand
and gravel with importation of
quarry waste from Harden
Quarry and restoration to
agriculture, woodland and
ecological wetland at Lanton
Sand and Gravel Quarry,
Lanton.
09/00188/CCM D Renton & Construction and demolition
26/10/09 Sons Ltd of recycling and composting
centre at Rock Nab Farm,
Alnwick.
09/00192/CCM Banks Mining Variation to condition 2 in
22/10/09 respect of the relocation of a
subsoil mound, variation to
condition 13 in respect of an
increase in lorry movements
and variation to condition 63
in respect of an increase in
blasts per day at Shotton
OCCS, Blagdon Lane,
Stannington.
09/00200/CCM Northumbrian Upgrade of existing sewage
23/11/09 Water Ltd treatment works including
demolition of existing
pumping station,
refurbishment of garage
building, 2 new primary
settlement tanks, new humus
tank and new sludge tank at
Bellingham Waste Water
Treatment Works.
County Matter Discharge of Conditions
09/00087/CCMDET H J Banks & Co. Submission of details
13/05/09 Ltd pursuant to condition 36 of
planning permission
04/00244/CCMEIA regarding
details of the
Northumberlandia landform
aculpture and landform park
at Shotton OCCS.
09/00118/CCMDET UK Coal Mining Submission of detailed
20/07/09 Ltd restoration scheme for north
of C114 road pursuant to
condition 6 of planning
permission 08/00005/CCM at
Steadsburn OCCS,
Widdrington
09/00142/CCMDET Tarmac Plc Discharge of conditions 85
19/08/09 and 88 pursuant to planning
permission
08/00060/CCMEIA at
Broadoak Quarry, Ebchester.
09/00201/CCMDET UK Coal Mining Discharge of conditions 68.
30/09/09 Ltd 69, 70, 71 and 73 for
opencast coal extraction
pursuant to planning
permission
05/00269/CCMEIA at Potland
Burn OCCS.
Renewable Energy Developments
09/00063/CCMEIA Eon Climate & Construction of a windfarm
09/04/09 Renewables development comprising 8
turbines to 115 metres in
height and ancillary
equipment including
substation, site access,
access tracks, anemometry
mast (70 metres in height),
temporary construction
compound, areas of
hardstanding for an
operational period of 25
years on land to the south
east of Ancroft North Moor, to
the east of Ancroft South
Moor and the south and west
of Allerdean Grange.
09/00083/CCMEIA Novera Energy Erection of 4 wind turbines
04/12/08 Plc and ancillary development
including access tracks,
control building with
substation, underground
cabling, new site access,
power performance mast and
temporary construction
compound on land north of
Pigdon, northwest of
Benridge Moor
09/00084/CCMEIA Novera Energy Erection of 6 no. wind
A/2008/604 plc turbines and ancillary
08/01/09 development including
access tracks, control
building with substation and
underground power cables. 1
no. power performance mast
and temporary construction
compound on land west of
Wingates, Longhorsley.
09/00085/CCMEIA RWE N Power Construction of windfarm
20081063 Renewables development consisting of 8
18/11/08 wind turbines and associated
infrastructure and services on
Land to north east of
Bavington Hill Head Farm
Capheaton and Land to West
of Northside Farm Harle,
09/00092/CCMEIA Wind Prospect Installation and operation of
10/06/09 3x2 MW wind turbines and
foundations. Underground
cable network, anemometer
mast, crane hardstanding,
access tracks, temporary
construction compound,
switch generator house and
ancillary infrastructure on
land at Boundary Lane,
Whittonstall.
09/00138/CCM Kirkheaton Wind Variation of condition 9 of
22/07/09 Farm permission 97/D/551 to
permit of non-operational
turbines for a further 12
month period at Kirkheaton
Wind Farm, West Farm,
Kirkheaton.
09/00154/RENEIA RES UK & Construction of a windfarm
27/08/09 Ireland Ltd comprising 9 turbines 127
metres in height and ancillary
equipment including 1 no. 80
metre anemometry mast,
access tracks, control
building, sub station
compound with 10 metre
communications mast, crane
hardstanding, underground
cables, temporary
construction compound,
borrow pit and 2 no. guyed
monitoring masts for an
operational period of 25
years on land at Rayburn
Lake, north east of Park
Head Farm.
Renewable Energy Discharge of Conditions
09/00102/CCMDET Peel Energy Discharge of condition 11 of
20/04/09 Holdings planning permission
CM/20060877 at Bewick Drift
Farm on land at former
Lynemouth Coal Handling
Store, north of Lynemouth
Power Station.
County Council Developments
09/00136/CCD N.C.C. Construction of a multi-use
21/08/09 games area at Hareside
Primary School, Cramlington.
DECISIONS TO BE ISSUED AS OF 31.12.09
County Matters
07/00171/MRVEIA Determination of new modern working conditions for dormant minerals
permission W/49/44 under the Environment Act 1995 for the extraction
of sandstone, limestone and incidental sand and gravels at Cocklaw
Quarry, Brunton Bank
Awaiting completion of legal agreement
08/00081/CCMEIA Extension and introduction of construction and demolition waste
recycling at Howick Quarry, Longhoughton, Alnwick.
Awaiting further comments
08/00156/CCMEIA Extraction of 2.4 million tonnes of coal and 200,000 tonnes of fireclay
by opencast methods on land north of Brenkley Lane.
Awaiting completion of legal agreement
09/00123/CCM Variation to planning permission 08/00005/CCM in respect of condition
2 restoration strategy; condition 6 extension of time for the restoration
to the north of C114 road to September 2010; condition 7 extension of
time for the submission of a restoration scheme to April 2010 for the
area south of C114 road; condition 8 extension of time for the
submission of details of landscape and art feature to January 2010 at
Steadsburn OCCS, Widdrington, Morpeth.
Awaiting completion of legal agreement
09/00155/CCMEIA Extension to approved site boundary of planning permission
05/00269/CCMEIA Potland Burn OCCS to allow construction of a new
coal conveyor adjacent to Potland Burn. Alterations to the approved rail
loading area and construction of a new coal conveyor, variation to
conditions 2 and 4 of planning permission 05/00269/CCMEIA to allow
revised commencement dates for construction of the coal processing
area and rail loading pad and alterations to the siting and design of the
coal processing area, overburden mound 2 and footpath layout at
Potland Burn OCCS, Ashington.
Awaiting completion of legal agreement
County Council Developments
County 09/00031/CCDDET Emmanuel Submission of details pursuant to
Council 05/02/09 Schools condition 17 of planning permission
Development Foundation 07/00092/CCDEIA in respect of traffic
& N.C.C. management scheme at Bede
th
Secondary Academy, 6 Avenue,
Blyth.
Awaiting amended plans
County 09/00032/CCDDET Emmanuel Submission of details pursuant to
Council 05/02/09 Schools condition 10 of planning permission
Development Foundation 08/00138/CCD in respect of traffic
& N.C.C. management scheme at South Beach
Primary Academy, Shearwater Way,
Blyth.
Awaiting amended plans
Get documents about "