					TIA Project Submittals - Atlanta Region

                                                                          Applicant Information




 Number         Project ID                   Project Name                   Location (City if applicable)
                              Regional Employment and Activity
                              Centers Roadways, Sidewalk and Ramp
    1     TIA-AT-001          Preservation Program                          Atlanta
                              Atlanta Beltline Streetcar Circulator and
                              Trail - Northeast Atlanta to Downtown
    4     TIA-AT-004          via Northeast Beltline                        Atlanta

                              Atlanta Beltline Streetcar Circulator and
                              Trail - South Buckhead to Midtown via
    5     TIA-AT-005          Northeast Beltline                            Atlanta

                              Atlanta Beltline Streetcar Circulator and
                              Trail - Southeast Atlanta to Midtown via
    6     TIA-AT-006          Southeast Beltline                            Atlanta
                              Atlanta Beltline Streetcar Circulator and
                              Trail - Southwest Atlanta to Midtown
    7     TIA-AT-007          Circulator                                    Atlanta
                              Campbellton Road from Venetian Drive
    8     TIA-AT-008          to Timothy Drive - Widening                   Atlanta

                              SR 54 (Jonesboro Road) from Thirkeld
                              Avenue to Helena Street - Complete
    11    TIA-AT-011          Street Improvements                           Atlanta

                              Cheshire Bridge Road @ Lindbergh drive
          TIA-AR-038          (Complete Streets Improvements)
          TIA-AR-039

          TIA-CH-005

          TIA-CH-006

          TIA-CH-009
          TIA-CH-010
          TIA-CH-012
          TIA-CH-013

                              Battle Creek Road from Valley Hill Road
    40    TIA-CL-001          to Southlake Parkway - Widening               N/A
                  Conley Road from I-285 to SR 54
43   TIA-CL-004   (Jonesboro Road) - Widening              N/A
                  Jonesboro Connector from US 19/41
                  (Tara Boulevard) to Lake Jodeco Road -
44   TIA-CL-005   New Alignment                            Jonesboro
                  SR 920 (McDonough Road) from SR 54
                  (Jonesboro Road) in Fayette County to US
                  19/41 (Tara Boulevard) in Clayton County
47   TIA-CL-008   - Widening                               N/A

                  Mount Zion Boulevard from Southlake
48   TIA-CL-009   Parkway to Somerton Drive - Widening         N/A
                  US 23 (Moreland Avenue) from Lake
                  Harbin Road to Anvilblock Road -
50   TIA-CL-011   Widening                                     N/A
                  SR 54 (Fayetteville Road) from
                  McDonough Road in Fayette County to
                  US 19/41 (Tara Boulevard) in Clayton
51   TIA-CL-012   County - Widening                            N/A

                  SR 85 from Adams Drive to I-75 South
52   TIA-CL-013   (includes interchange) - Widening            N/A

                  SR 85 from SR 279 (Old National
                  Highway) in Fayette County to Roberts
53   TIA-CL-014   Drive in Clayton County - Widening           N/A
                  US 19/41 (Tara Boulevard) from Upper
                  Riverdale Road to Justice Center
56   TIA-CL-017   Boulevard - Multiuse Path                    N/A
                  US 19/41 (Tara Boulevard) from I-75
                  South to SR 54 (Fayetteville Road) - Super
57   TIA-CL-018   Arterial Concept                             N/A
                  US 19/41 (Tara Boulevard) from SR 81
                  (Upper Woolsey Road) in Henry County
                  to Flint River Road in Clayton County -
58   TIA-CL-019   Widening                                     N/A

                  US 41 (Cobb Parkway) from Paces Mill
66   TIA-CO-007   Road to Akers Mill Road - Widening           N/A
                  Cumberland Boulevard from Akers Mill
                  Road to Spring Road - Corridor
68   TIA-CO-009   Improvements                                 N/A

                  Highlands Ridge Road / Highlands
                  Parkway / Church Road / Plant Atkinson
70   TIA-CO-011   Road - Corridor Improvements                 N/A
                   I-75 North at Windy Hill Road -
72    TIA-CO-013   Interchange Improvements                N/A

                   SR 360 (Macland Road) from Paulding
                   County Line to New Macland Road / Lost
75    TIA-CO-016   Mountain Road - Widening                N/A
                   Main Street at CSX Railroad - Bridge
76    TIA-CO-017   Replacement                             Kennesaw
                   Moon Station Road at CSX Railroad - New
80    TIA-CO-021   Alignment and Overpass                  Kennesaw

81    TIA-CO-022   Old Highway 41 Bridge Over CSX Railroad N/A
                   Riverside Parkway from SR 6 (Thornton
                   Road) to Phillips Drive / Troon Circle -
84    TIA-CO-025   Widening                                 N/A

                   SR 120 (Roswell Road) from Bridgegate
85    TIA-CO-026   Drive to Timber Ridge Road - Widening   N/A
                   SR 280 (South Cobb Drive) Phase 1 from
                   River View Road / Maner Road to Atlanta
86    TIA-CO-027   Road - Widening                         N/A

                   SR 120 (South Marietta Parkway) from
                   US 41 (Cobb Parkway) to Manget Street -
87    TIA-CO-028   Medians and Sidewalks                   N/A

                   SR 92 from Cherokee Street / Glade Road
88    TIA-CO-029   to Cowan Road - Corridor Improvements Acworth
                   Windy Hill Road Widening Phase 1 from
                   SR 5 (Austell Road) to SR 280 (South
94    TIA-CO-036   Cobb Drive)                                N/A
                   Windy Hill Road / Terrell Mill Connector -
95    TIA-CO-037   New Alignment                              N/A

                   US 41 (Cobb Parkway) from Windy Ridge
97    TIA-CO-039   Parkway to Windy Hill Road - Widening N/A

                   US 41 (Cobb Parkway) from Windy Hill
98    TIA-CO-040   Road to Terrell Mill Road - Widening    N/A
                   US 41 (Cobb Parkway) from Terrell Mill
                   Road to SR 120 (South Marietta Parkway)
99    TIA-CO-041   - Widening                              N/A
                   US 41 (Cobb Parkway) from SR 120
                   (South Marietta Parkway) to SR 120
                   Alternate (North Marietta Parkway) -
100   TIA-CO-042   Widening                                N/A
                   SR 280 (South Cobb Drive) Phase 2 from
                   Atlanta Road to US 41 (Cobb Parkway) -
102   TIA-CO-044   Widening                                  N/A
                   SR 92 (Lake Acworth Drive) from US 41
                   (Cobb Parkway) to Cherokee Street -
103   TIA-CO-045   Widening                                  Acworth
                   Windy Hill Road from SR 280 (South Cobb
                   Drive) to US 41 (Cobb Parkway) -
104   TIA-CO-046   Widening                                  Smyrna
                   Dunwoody MARTA Station Area
109   TIA-DK-005   Accessibility Improvements                Dunwoody

                   Decatur to Clifton Corridor - Transit
111   TIA-DK-007   Connectivity and Safety Improvements      Decatur
                   Bouldercrest Road from I-285 South to
                   Linecrest Road Extension (Under
119   TIA-DK-015   Construction) - Widening                  N/A
                   SR 42 (Briarcliff Road) from Henderson
                   Mill Road to Clifton Road - Corridor
120   TIA-DK-016   Improvements                              N/A

                   SR 212 (Browns Mill Road) from SR 155
                   (Snapfinger Road) to Rockdale County
121   TIA-DK-017   Line - Corridor Improvements              N/A
                   SR 13 (Buford Hwy) from Lenox Road to
                   Shallowford Terrace - Pedestrian,
122   TIA-DK-018   Landscape and BRT Improvements            N/A
                   SR 155 (Clairmont Road) from SR 141
                   (Peachtree Industrial Boulevard) to US
                   23/78 (Scott Boulevard) - Corridor
124   TIA-DK-020   Improvements                              N/A
                   Clifton Road at CSX Railroad - Bridge
                   Replacement and Associated
125   TIA-DK-021   Improvements to Haygood Road              N/A
                   US 278 (College Avenue) from Adair
                   Street to North Clarendon Avenue -
126   TIA-DK-022   Corridor Improvements                     N/A
                   Columbia Drive from US 78 (College
                   Avenue) to I-20 East - Corridor
127   TIA-DK-023   Improvements                              N/A
                   Cooledge Road from US 78 (Stone
                   Mountain Freeway) to US 29
                   (Lawrenceville Highway) - Corridor
128   TIA-DK-024   Improvements                              N/A
                   US 278 (Covington Highway) from I-285
                   East to SR 124 (Turner Hill Road) -
129   TIA-DK-025   Corridor Improvements                     N/A
                   East Ponce de Leon Avenue from DeKalb
                   Industrial Way to SR 10 (Memorial Drive) -
131   TIA-DK-027    Corridor Improvements                       N/A
                   Glenwood Road from SR 155 (Candler
                   Road) to US 278 (Covington Highway) -
133   TIA-DK-029   Corridor Improvements                        N/A
                   Hayden Quarry Road / Sigman Road
                   Extension from Turner Hill Road to I-20
134   TIA-DK-030   East - New Alignment                         N/A
                   North Indian Creek Drive from SR 10
                   (Memorial Drive) to Montreal Road -
137   TIA-DK-033   Corridor Improvements                        N/A

                   US 29 (Lawrenceville Highway) from US
                   23/78 (Scott Boulevard) to SR 236 (Hugh
139   TIA-DK-035   Howell Road) - Corridor Improvements         N/A

                   Mercer University Drive at North Fork
142   TIA-DK-038   Peachtree Creek - Bridge Replacement         N/A
                   Montreal Road from SR 236 (LaVista
                   Road) to Simpson Drive - Corridor
                   Improvements (including grade
143   TIA-DK-039   separation at CSX railroad)                  N/A
                   North Druid Hills Road Connector from
                   SR 13 (Buford Highway) to US 29
                   (Lawrenceville Highway) - Corridor
146   TIA-DK-042   Improvements                                 N/A

                   Panola Road from SR 155 (Snapfinger
                   Road) to Redan Road - Widening and
147   TIA-DK-043   Corridor Improvements                        N/A
                   Rainbow Drive from SR 155 (Candler
                   Road) to Wesley Chapel Road - Corridor
149   TIA-DK-045   Improvements                                 N/A

                   Redan Road from South Indian Creek
                   Drive to South Stone Mountain Lithonia
150   TIA-DK-046   Road - Corridor Improvements                 N/A

                   Rockbridge Road from SR 10 (Memorial
                   Drive) to SR 124 (Rock Chapel Road) -
152   TIA-DK-048   Corridor Improvements                        N/A
                   DeKalb County Sidewalk Transit
154   TIA-DK-050   Connectivity Program                         N/A
                   SR 155 (Snapfinger Road) from Flat
                   Shoals Parkway to River Road - Corridor
155   TIA-DK-051   Improvements                                 N/A
                   Stone Mountain Lithonia Road from
                   Rockbridge Road to Main Street in
                   Lithonia - Bicycle and Pedestrian
156   TIA-DK-052   Improvements                                 N/A
                   I-20 East at Panola Road - Interchange
159   TIA-DK-055   Improvements                                 N/A
                   US 23 (Buford Hwy) / SR 141 (Peachtree
                   Industrial Boulevard) Connector - New
161   TIA-DK-057   Alignment                                    Doraville, Chamblee
                   Chamblee Dunwoody Road from I-285
                   North to Spalding Drive - Corridor
167   TIA-DK-063   Improvements                                 Dunwoody
                   Mountain View Road from SR 10
                   (Memorial Drive) to Sheppard Road -
169   TIA-DK-065   Sidewalks                                    Stone Mountain
                   Mt Vernon Road from Fulton County Line
                   to Dunwoody Club Drive - Corridor
171   TIA-DK-069   Improvements                                 Dunwoody

                   SR 92 from Fairburn Road to Dallas
174   TIA-DO-003   Highway - Phases I, II and III Realignment   Douglasville
                   SR 5 from Dorsett Shoals Road / Pool
176   TIA-DO-005   Road to Kings Highway - Widening             N/A
                   Lee Road / South Sweetwater Road from
                   I-20 West to US 78 (Bankhead Highway) -
177   TIA-DO-006   Widening                                     N/A
                   US 78 (Veterans Memorial Highway)
                   from SR 6 (Thornton Road) to SR 92
178   TIA-DO-007   Realignment - Widening                       N/A
                   Dorris Road Multiuse Path Phase 1 -
                   Transportation Center to Prestley Mill
180   TIA-DO-009   Road                                         Douglasville
                   Dorris Road Multiuse Path Phase 2 -
                   Prestley Mill Road from I-20 West to
181   TIA-DO-010   Slater Mill Road                             Douglasville

201   TIA-FA-010   South Industrial Park Path Connection        Peachtree City
                   SR 54 West and Gateway Bridge Path
210   TIA-FA-019   Connections                                  Peachtree City

213   TIA-FA-022   Southeast Industrial Park Path Connection Peachtree City
                   Wilshire Shopping Center / Rite Aid
214   TIA-FA-023   Tunnel Path Connections                   Peachtree City
                   Tyrone Road from SR 74 (Joel Cowan
                   Parkway) to SR 54 (West Lanier Avenue) -
227   TIA-FA-036   Multiuse Path                            Tyrone
                   SR 120 (Kimball Bridge Road) from State
                   Bridge Road to Jones Bridge Road -
230   TIA-FN-002   Widening                                 Johns Creek

                   SR 120 (Old Milton Parkway) from SR 400
231   TIA-FN-003   to Kimball Bridge Road - Widening       Alpharetta

                   Windward Parkway from Westside
232   TIA-FN-004   Parkway to Union Hill Road - Widening       Alpharetta

                   Rucker Road from Hardscrabble Road to
235   TIA-FN-007   Willis Road - Operational Improvements      Alpharetta; Roswell
                   Hammond Drive from SR 400 to Ashford
238   TIA-FN-010   Dunwoody Road - Widening                    Sandy Springs; Dunwoody
                   Hammond Drive from SR 9 (Roswell
241   TIA-FN-013   Road) to SR 400 - Widening                  Sandy Springs
                   Sandy Springs Circle Extension from Allen
                   Road to Northwood Drive - New
243   TIA-FN-015   Alignment                                   Sandy Springs
                   Peachtree Dunwoody Road from
                   Abernathy Road to Spalding Drive -
244   TIA-FN-016   Widening                                    Sandy Springs

                   SR 9 (Roswell Road) from Atlanta City
252   TIA-FN-024   Limits to I-285 North - Streetscape         Sandy Springs
                   Lake Forrest Drive from I-285 North to
                   Atlanta City Limits - Sidewalks and Bike
254   TIA-FN-026   Lanes                                       Sandy Springs
                   Big Creek Bridge Road (Phases 1 and 2)
                   from Old Alabama Road to Warsaw Road
260   TIA-FN-032   - New Alignment                             Roswell
                   SR 400 at SR 140 (Holcomb Bridge Road) -
262   TIA-FN-034    Interchange Improvements                   Roswell

                   SR 9 (Atlanta Street) from Chattahoochee
                   River to SR 120 (Marietta Highway) -
263   TIA-FN-035   Widening and Corridor Improvements       Roswell
                   SR 140 (Houze Road) from Rucker Road
                   to Mansell Road - Operational
264   TIA-FN-036   Improvements                             Roswell

                   SR 6 (Camp Creek Parkway) from I-85
274   TIA-FS-004   South to Welcome All Road - Widening        College Park, East Point, Atlanta
                   Washington Road from I-285 West to US
275   TIA-FS-005   29 (Legion Way) - Widening                  College Park, East Point, Atlanta
                   Beltline Trail Extension from West End
276   TIA-FS-006   Mall Area to College Park                   College Park, East Point, Atlanta

                   Butner Road at SR 6 (Camp Creek
                   Parkway) Intersection Improvements and
                   Butner Road over SR 6 (Camp Creek
286   TIA-FS-016   Parkway) Bridge Replacement                 N/A
                   SR 154/166 (Campbellton Road) at Boat
                   Rock Road / New Hope Road -
287   TIA-FS-017   Intersection Improvements                   N/A
                   SR 70 (Fulton Industrial Blvd) from SR 6
                   (Camp Creek Parkway) to Frederick Drive
                   - Intersection Improvements at Multiple
289   TIA-FS-019   Locations                                   N/A
                   South Fulton Pedestrian Improvements -
                   Boat Rock Road, New Hope Road and
294   TIA-FS-024   Jerome Road                                 N/A
                   SR 92 (Campbellton Fairburn Road) at
                   South Fulton Parkway and Hall Road -
296   TIA-FS-026   Intersection Improvements                   N/A
                   US 23 (Buford Highway) from George
                   Pierce Park to McGinnis Ferry Road -
300   TIA-GW-003   Corridor Improvements                       Suwanee
                   US 23 (Buford Highway) from Old
                   Peachtree Road to Sugarloaf Parkway -
301   TIA-GW-004   Corridor Improvements                       Duluth
                   US 23 (Buford Highway) from Sawnee
                   Avenue to SR 347 in Hall County -
303   TIA-GW-006   Widening                                    N/A

                   US 23 (Buford Highway) at Jimmy Carter
304   TIA-GW-007   Boulevard - Intersection Improvements       Norcross
                   Five Forks Trickum Road from Killian Hill
308   TIA-GW-011   Road to Oak Road - Widening                 N/A
                   Five Forks Trickum Road from
                   Constitution Boulevard to Sugarloaf
309   TIA-GW-012   Parkway - Widening                          Lawrenceville
                   Hamilton Mill Road from US 23
                   (Gainesville Highway) to SR 124 -
313   TIA-GW-016   Widening                                    Buford
                   Hillcrest Road / Satellite Boulevard
                   Connector - New Alignment and
315   TIA-GW-018   Overpass at I-85 North                      Norcross
                   Killian Hill Road from Camp Creek to
326   TIA-GW-029   Arcado Road - Widening                      Lilburn
                   US 29 (Lawrenceville Hwy) from Hood
                   Road to Hillcrest Road - Multiuse Trail
327   TIA-GW-030   and Streetscape                            Lilburn
                   I-85 North Transit Corridor Alternatives
328   TIA-GW-031   Analysis                                   N/A
                   Peachtree Industrial Boulevard at
                   McGinnis Ferry Road, Moore Road and
                   Suwanee Dam Road - Intersection
338   TIA-GW-041   Improvements                               Suwanee

                   Pleasant Hill Road from Howell Ferry
339   TIA-GW-042   Road to Chattahoochee River - Widening N/A
                   Satellite Boulevard / Old Peachtree Road
                   Connector - New Alignment and
344   TIA-GW-047   Overpass at I-85 North                   N/A
                   SR 20 (Nelson Brogdon Boulevard /
                   Cumming Highway) from Peachtree
                   Industrial Boulevard to Chattahoochee
345   TIA-GW-048   River - Widening                         Sugar Hill

                   SR 120 (Duluth Highway) from Langley
                   Drive to SR 317 (Lawrenceville Suwanee
349   TIA-GW-052   Road) - Widening                           Lawrenceville
                   SR 120 (Abbotts Bridge Road) from Hill
                   Street to Proposed Hospital Connector -
350   TIA-GW-053   Corridor Improvements                      Duluth
                   SR 124 (Braselton Highway) from SR 20
                   (Buford Drive) to Barrow County Line -
351   TIA-GW-054   Widening                                   N/A
                   SR 124 (Scenic Highway) from US 78
                   (Main Street) to Ronald Reagan Parkway -
352   TIA-GW-055    Widening                                  Snellville
                   SR 141 (Peachtree Parkway) from
                   Peachtree Industrial Boulevard to
353   TIA-GW-056   Chattahoochee River - Widening             Berkeley Lake

                   US 29 (Winder Highway) from SR 125
361   TIA-GW-064   (Scenic Highway) to SR 316 - Widening      Lawrenceville

                   US 78 (Athens Highway) from SR 84
                   (Grayson Parkway) in Gwinnett County to
362   TIA-GW-065   SR 81 in Walton County - Widening       Loganville
                   US 78 (East Main Street) from SR 124
                   (Scenic Highway) to SR 84 (Grayson
363   TIA-GW-066   Parkway) - Widening                     Snellville
                   US 78 (Main Street) at SR 124 (Scenic
364   TIA-GW-067   Hwy) - Intersection Improvements        Snellville
                   Walther Boulevard North/South
                   Connection - New Alignment and
366   TIA-GW-069   Overpass at SR 316                       Lawrenceville
                   West Liddell Road / Club Drive Connector
                   - New Alignment and Overpass at I-85
367   TIA-GW-070   North                                    N/A
                   Western Parallel Connector from Hudson
                   Bridge Road to SR 920 (Jonesboro Road) -
381   TIA-HE-011   New Alignment                            Stockbridge

                   US 29 (Roosevelt Highway) Sidewalk
                   Improvements and SR 279 (Old National
417   TIA-M-032    Highway) Bus Service Improvements        Multiple
                   MARTA Station Access Enhancement
420   TIA-M-035    Program                                  Multiple

                   Old Covington Highway from Green
                   Street to East of SR 20/138 - Widening
432   TIA-RO-004   and Reestablish Connection               Conyers
ion


                                                                             Asset
          Location (County)          Requesting Agency   Roadway Capital   Management



      Atlanta                   City of Atlanta               N/A             YES


      Atlanta                   City of Atlanta               N/A             N/A




      Atlanta                   City of Atlanta               N/A             N/A




      Atlanta                   City of Atlanta               N/A             N/A


      Atlanta                   City of Atlanta               N/A             N/A

      Atlanta; Fulton (South)   City of Atlanta               YES             N/A




      Atlanta                   City of Atlanta               YES             N/A


                                Roundtable
                                Roundtable

      Cherokee

      Cherokee

      Cherokee
      Cherokee
      Cherokee
      Cherokee


      Clayton                   Clayton County                YES             N/A
Clayton            Clayton County   YES   N/A


Clayton            Clayton County   YES   N/A




Clayton; Fayette   Clayton County   YES   N/A


Clayton            Clayton County   YES   N/A


Clayton            Clayton County   YES   N/A




Clayton; Fayette   Clayton County   YES   N/A


Clayton            Clayton County   YES   N/A




Clayton; Fayette   Clayton County   YES   N/A


Clayton            Clayton County   N/A   N/A


Clayton            Clayton County   YES   N/A




Clayton; Henry     Clayton County   YES   N/A


Cobb               Cobb County      YES   N/A


Cobb               Cobb County      YES   N/A




Cobb               Cobb County      N/A   N/A
Cobb            Cobb County   YES   N/A




Cobb            Cobb County   YES   N/A

Cobb            Cobb County   YES   N/A

Cobb            Cobb County   YES   N/A

Cobb            Cobb County   N/A   YES


Cobb; Douglas   Cobb County   YES   N/A


Cobb            Cobb County   YES   N/A


Cobb            Cobb County   YES   N/A




Cobb            Cobb County   N/A   N/A


Cobb            Cobb County   N/A   N/A


Cobb            Cobb County   YES   N/A

Cobb            Cobb County   YES   N/A


Cobb            Cobb County   YES   N/A


Cobb            Cobb County   YES   N/A


Cobb            Cobb County   YES   N/A




Cobb            Cobb County   YES   N/A
Cobb     Cobb County     YES   N/A


Cobb     Cobb County     YES   N/A


Cobb     Cobb County     YES   N/A

DeKalb   Perimeter CID   N/A   N/A


Dekalb   Decatur         N/A   N/A


Dekalb   Dekalb          YES   YES


Dekalb   Dekalb          YES   YES




Dekalb   Dekalb          YES   YES


Dekalb   Dekalb          N/A   N/A




Dekalb   Dekalb          N/A   YES


Dekalb   Dekalb          YES   YES


DeKalb   Dekalb          N/A   YES


Dekalb   Dekalb          N/A   YES




Dekalb   Dekalb          N/A   YES


Dekalb   Dekalb          N/A   YES
Dekalb   Dekalb   N/A   YES


Dekalb   Dekalb   N/A   YES


Dekalb   Dekalb   YES   N/A


Dekalb   Dekalb   N/A   YES




Dekalb   Dekalb   N/A   YES


Dekalb   Dekalb   N/A   YES




Dekalb   Dekalb   YES   YES




Dekalb   Dekalb   YES   YES




Dekalb   Dekalb   YES   YES


Dekalb   Dekalb   N/A   YES




Dekalb   Dekalb   N/A   YES




Dekalb   Dekalb   N/A   YES

Dekalb   Dekalb   N/A   N/A
Dekalb    Dekalb                 N/A   YES




Dekalb    Dekalb                 N/A   N/A

Dekalb    Dekalb                 YES   N/A


Dekalb    Doraville              YES   N/A


Dekalb    Dunwoody               YES   N/A


Dekalb    Stone Mountain         N/A   N/A


DeKalb    Dunwoody               YES   N/A


Douglas   Douglas County         YES   N/A

Douglas   Douglas County         YES   N/A


Douglas   Douglas County         YES   N/A


Douglas   Douglas County         YES   N/A


Douglas   City of Douglasville   N/A   N/A


Douglas   City of Douglasville   N/A   N/A

Fayette   Fayette County         N/A   N/A

Fayette   Fayette County         N/A   N/A

Fayette   Fayette County         N/A   N/A

Fayette   Fayette County         N/A   N/A
Fayette                  Fayette County                        N/A   N/A


Fulton (North)           City of Alpharetta                    YES   N/A


Fulton (North)           City of Alpharetta                    YES   N/A


Fulton (North)           City of Alpharetta                    YES   N/A


Fulton (North)           City of Alpharetta                    N/A   N/A

Fulton (North); DeKalb   Perimeter CID                         YES   N/A

Fulton (North)           City of Sandy Springs                 YES   N/A


Fulton (North)           City of Sandy Springs                 YES   N/A


Fulton (North)           City of Sandy Springs                 YES   N/A


Fulton (North)           City of Sandy Springs                 N/A   N/A


Fulton (North); Cobb     City of Sandy Springs                 N/A   N/A


Fulton (North)           City of Roswell                       YES   N/A

Fulton (North)           City of Roswell                       YES   YES




Fulton (North)           City of Roswell                       YES   YES


Fulton (North)           City of Roswell                       N/A   N/A


Fulton (South)           Cities of College Park & East Point   YES   N/A
Fulton (South), Clayton   Cities of College Park & East Point   YES   YES

Fulton (South), Clayton   Cities of College Park & East Point   N/A   N/A




Fulton (South)            Fulton                                YES   YES


Fulton (South)            Fulton                                N/A   N/A




Fulton (South)            Fulton                                N/A   N/A


Fulton (South)            Fulton                                N/A   N/A


Fulton (South)            Fulton                                N/A   N/A


Gwinnett                  Gwinnett                              YES   N/A


Gwinnett                  Gwinnett                              YES   N/A


Gwinnett / Hall           Gwinnett                              YES   N/A


Gwinnett                  Gwinnett                              YES   N/A

Gwinnett                  Gwinnett                              YES   N/A


Gwinnett                  Gwinnett                              YES   N/A


Gwinnett                  Gwinnett                              YES   N/A


Gwinnett                  Gwinnett                              YES   N/A

Gwinnett                  Gwinnett                              YES   N/A
Gwinnett           Gwinnett            N/A   N/A

Gwinnett           Gwinnett            N/A   N/A




Gwinnett           Gwinnett            N/A   N/A


Gwinnett           Gwinnett            YES   N/A


Gwinnett           Gwinnett            YES   N/A




Gwinnett           Gwinnett, Forsyth   YES   YES




Gwinnett           Gwinnett            YES   N/A


Gwinnett           Gwinnett            N/A   YES


Gwinnett           Gwinnett            YES   N/A


Gwinnett           Gwinnett            YES   N/A


Gwinnett, Fulton   Gwinnett            YES   N/A


Gwinnett           Gwinnett            YES   N/A




Gwinnett           Gwinnett            YES   N/A


Gwinnett           Gwinnett            YES   N/A

Gwinnett           Gwinnett            YES   N/A
Gwinnett                    Gwinnett              YES   N/A


Gwinnett                    Gwinnett              YES   N/A


Henry                       Henry                 YES   N/A




Fulton (South)              MARTA                 N/A   N/A

                             MARTA
Atlanta; Fulton (South); Fulton (North); DeKalb   N/A   N/A




Rockdale                    Rockdale              YES   N/A
                             Program Area


Safety / Traffic                                     Bicycle /                     Transit Ops /
  Operations       Freight / Logistics   Aviation   Pedestrian   Transit Capital   Maintenance



      YES                 N/A               N/A        YES            N/A              N/A


      N/A                 N/A               N/A        YES            YES              YES




      N/A                 N/A               N/A        YES            YES              YES




      N/A                 N/A               N/A        YES            YES              YES


      N/A                 N/A               N/A        YES            YES              YES

      N/A                 N/A               N/A        YES            N/A              N/A




      N/A                 N/A                n         YES            N/A              N/A


                                                       YES
                                                       YES

                                                       YES

                                                       YES

                                                       YES
                                                       YES
                                                       YES
                                                       YES


      YES                 YES               N/A        YES            N/A              N/A
YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A
YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   N/A   N/A

YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A
YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   YES   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A
YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A




N/A   YES   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A

N/A   N/A   N/A   YES   N/A   N/A
YES   N/A   N/A   YES   N/A   N/A




N/A   N/A   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A

N/A   N/A   N/A   YES   N/A   N/A

N/A   N/A   N/A   YES   N/A   N/A

N/A   N/A   N/A   YES   N/A   N/A

N/A   N/A   N/A   YES   N/A   N/A
N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   N/A   N/A

YES   N/A   N/A   YES   YES   N/A


N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A

YES   YES   N/A   YES   N/A   YES




YES   YES   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   YES   YES   YES   N/A   N/A
YES   N/A   N/A   YES   YES   N/A

N/A   N/A   N/A   YES   N/A   YES




N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A

YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A

YES   YES   N/A   YES   N/A   N/A
N/A   N/A   N/A   YES   N/A   N/A

YES   YES   N/A   YES   YES   YES




YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A


YES   N/A   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   YES


YES   YES   N/A   YES   N/A   N/A




YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A

YES   YES   N/A   YES   N/A   N/A
YES   YES   N/A   YES   N/A   N/A


YES   YES   N/A   YES   N/A   N/A


N/A   N/A   N/A   YES   N/A   N/A




N/A   N/A   N/A   YES   YES   YES

N/A   N/A   N/A   YES   N/A   N/A




YES   N/A   N/A   YES   N/A   N/A
                                                                                             Public Benefit


                                                                                              Economic
                 Project Purpose                     Enhance Safety    Congestion Relief     Development



                                                         YES                N/A               YES
Provide for safe and efficient movement between regional destinations and the regional employment and activity centers loc


                                                             meet            YES                YES
The City of Atlanta and the Atlanta Region are challenged toYES their mobility, housing and economic development needs b




                                                             meet            YES                YES
The City of Atlanta and the Atlanta Region are challenged toYES their mobility, housing and economic development needs b




                                                             meet            YES                YES
The City of Atlanta and the Atlanta Region are challenged toYES their mobility, housing and economic development needs b


                                                             meet            YES                YES
The City of Atlanta and the Atlanta Region are challenged toYES their mobility, housing and economic development needs b

                                                        N/A                N/A               YES
Provide roadway capacity improvements and bicycle and pedestrian safety improvements along the Campbellton Road corrid




                                                        YES                N/A                YES
Provide pedestrian safety improvements along the Jonesboro Road (SR 54) corridor between Thirkeld Avenue and Helena Str




                                                           YES                 YES                YES
The purpose of the Battle Creek Road project is to widen Battle Creek Road to four lanes from Valley Hill Road to Southlake P
                                                         YES               to               YES
The Conley Road/CR 171 project will extend and widen Conley Road from I-285YESSR 54/Jonesboro Road from two to four lan


                                                            YES                YES               YES
This project would create a bypass at the southern edge of the City of Jonesboro extending from Tara Boulevard/US 19/41/SR




                                                        Road/SR 920 project is to widen SR 920/McDonough Road to four
The purpose of the Metro Arterial Connector - McDonough YES               YES                YES


                                                          YES              YES                 YES
The purpose of the Mount Zion Boulevard project is to widen Mount Zion Boulevard to a consistent width of four lanes from


                                                        YES                YES                  YES
The purpose of the US 23/SR 42/Moreland Avenue project is to improve mobility, safety, freight movement, and operations b




                                                           to                 YES              YES
The SR 54/Fayetteville Road project will widen the roadway YESfour lanes from north of McDonough Road in Fayette County t


                                                            YES              YES                 YES
The SR 85 project will widen the roadway from four to six lanes from Adams Drive to I-75 South and include an interchange m




                                                            YES               YES                in Fayette County to Robe
The SR 85 project will widen the roadway from four to six lanes from SR 279/Old National HighwayYES


                                                          YES               N/A                  YES
The US 19/41/SR 3/Tara Boulevard would add shared-use bicycle and pedestrian facilities to Tara Boulevard from Upper Rive
The Tara Boulevard/US 19/41/SR 3 project would create a limited-access highway from I-75 to SR 54 with grade separations a

                                                            YES                 YES                YES




                                                          YES                six               YES
The Tara Boulevard/US 19/41/SR 3 project will widen the roadway from four toYES lanes from SR 81/Upper Woolsey Road in


                                                             YES                YES                YES
Widen to 6 lanes divided to provide additional traffic capacity, improve access and to improve traffic safety. A secondary purp


                                                             YES                 YES               YES
This project will reduce traffic congestion and improve the level of service along Cumberland Boulevard between Akers Mill R




                                                           YES                 YES                  and
To safely and efficiently accommodate truck and other traffic on a corridor with extensive existing YES future freight generati
                                                            YES                  YES                   YES
The purpose of the project is to improve traffic flow and operational efficiency of the existing interchange and to improve traf




                                                            SR                 YES               YES
The purpose of this project is to enhance mobility along theYES360 corridor to accommodate traffic generated by residential

                                                            YES                 YES                 YES
Improve mobility and safe operations for traffic, pedestrians, and bicycles. Upgrade bridge to three lanes for turn lanes. This b

                                                             YES                 YES               YES
Improve mobility and safety operations for traffic, pedestrians, and bicycles. New overpass over CSX Railroad will connect Ma

                                                           YES               N/A                 YES
Replacement of the existing bridge structure on Old 41 Highway over the CSX Railroad. The existing 2010 rating is 6.0. This pr


                                                            YES                   corridor with extensive adjacent existing and
This project will safely and efficiently accommodate truck and other traffic on aYES                YES


                                                           YES                YES                (SR
Roswell Road/SR 120 is a major regional state route. The section from the North Marietta ParkwayYES 120 Loop) to the Fulto


                                                              YES                efficiency, enhance the corridor for transport
The purpose of the project is to create additional capacity, improve operationalYES                YES




                                                           YES                  YES               N/A
The project includes the addition of median, sidewalk and multi-use trail on South Marietta Parkway/SR 120 from CobbParkw


                                                          state            metro           YES
To provide safety and operational improvements to a majorYES route for the YES region. Currently, there are sight distan


                                                       YES                YES                South
The implementation of the Windy Hill Road improvement project between, Austell Road/SR 5 and YES Cobb Drive/SR 280,

                                                         between Windy Hill Road and Terrell Mill Road, including possible
Provides a new connecting 4-lane median divided roadway, YES              YES                 YES


                                                             YES                YES                YES
Widen to 6 lanes divided to provide additional traffic capacity, improve access and to improve traffic safety. A secondary purp


                                                             YES                YES                YES
Widen to 6 lanes divided to provide additional traffic capacity, improve access and to improve traffic safety. A secondary purp


                                                             YES                YES                YES
Widen to 6 lanes divided to provide additional traffic capacity, improve access and to improve traffic safety. A secondary purp




                                                             YES                YES                YES
Widen to 6 lanes divided to provide additional traffic capacity, improve access and to improve traffic safety. A secondary purp
                                                              YES                YES                YES
The purpose of the project is to create additional capacity, improve efficiency, enhance the corridor for transportation, espec


                                                           YES                 YES               YES
The project purpose is to increase capacity and provide operational and safety improvements to Lake Acworth Drive/SR 92, a


                                                           YES                 YES               YES
Boulevard concept includes 2 local lanes and 4 express lanes, all median separated, between South Cobb Drive/SR280 and Co

                                                            YES                YES              YES
This project will build on the Perimeter Area Multi-Modal Transportation Plan to implement multi-modal and operational im


                                                            YES                 YES                YES
The purpose of this project is to provide safety upgrades and bicycle, pedestrian and transit supportive facilities on Clairemon


                                                          YES                YES               YES
Improve from 2 lanes to 4 divided lanes with landscaped median, sidewalks and bike lanes. Improve traffic flow, relieve cong


                                                           YES                 YES                   YES
Improve existing 2 lane road to multi-use divided parkway to include bike lanes, sidewalks, traffic signal/ITS upgrades and res




                                                             YES                lanes,          N/A
Relieve congestion at key intersections and improve traffic flow by adding turn YES bike/ped and signalization upgrades. Sn


                                                            limits          YES               N/A
Add BRT design into existing project (PI 731770) and extendYES of streeetscaping and BRT to Shallowford Terrace




                                                             lanes,             updgrades and resurfacing. PIB to Scott Blvd
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A


                                                          YES                   add              YES
Rebuild and expand bridge over CSX RR, relieve congestion at key intersections,YES sidewalks, bike lanes, traffic signal upgra


                                                             lanes,             upgrades and resurfacing. Clarendon to Adair
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A


                                                             lanes,             upgrades, and resurfacing. I-20 to E College A
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A




                                                             lanes,             upgrades, and resurfacing. Lawrenceville High
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A


                                                             lanes,             upgrades and resurfacing. Evans Hill Rd to SR
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A
                                                             lanes,             updgrades and resurfacing. DeKalb Industrial
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A


                                                             lanes,             updgrades and resurfacing. SR 155 (Candler R
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A


                                                        N/A                   YES
New 4-lane divided parkway with bike/ped features. Turner Hill Rd to I-20 @ Sigman interchange. YES


                                                             lanes,             updgrades and resurfacing. Memorial to Mon
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A




                                                             lanes,             updgrades and resurfacing. LaVista Rd, from S
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A


                                                             lanes,          N/A                N/A
Relieve congestion at key intersections, add sidewalks, bike N/A and resurfacing. At North Fork Peachtree.




                                                          SR                 and              N/A
New bridge over CSX RR main tracker and switching tracks. YES236 (LaVista Rd)YES Montreal Rd at CSX $$.




                                                             lanes,             updgrades and resurfacing. Buford Hwy to La
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               YES




                                                             YES               YES                (Snapfinger Rd); Covington
Convert a 2-lane to a 4-lane divided with sidewalks, bike lanes. US 278 (Covington Hwy) to SR 155 N/A


                                                             lanes,             updgrades and resurfacing. Candler Rd to We
Relieve congestion at key intersections, add sidewalks, bike YES traffic signal YES               N/A




                                                             YES                   YES                N/A
To relieve congestion at key intersections, add sidewalks, bike lanes, traffic signal upgrades, and resurfacing. From Stone Lith




                                                             YES                 YES                 N/A
To relieve congestion at key intersections, add sidewalks, traffic signal upgrades, and resurfacing. From Memorial Drive (SR10

                                                          YES                N/A                  N/A
Construct sidewalks on County collectors, major and minor throughfares (See attached list for locations.)
                                                             YES                   YES                N/A
To relieve congestion at key intersections, add sidewalks, bike lanes, traffic signal upgrades, and resurfacing. From Flat Shoa




                                                           YES                N/A
Project will add bike lanes and sidewalks to connect from Rockbridge Road to Lithonia               N/A

Construct interchange upgrades at Panola Road               YES                 YES                 N/A


                                                            YES                 YES                 YES


                                                              N/A               YES                 YES
To improve the level of level of service, relieve congestion and provide multi-modal travel alternatives along a regional corrid


                                                             YES                N/A                  N/A
The proposed project will create safe access for pedistrain and bicycle connection for residents in the City of Stone Mountain


                                                           currently operates YES lvel of service F in the City of Dunwoody.
The Mount Vernon Road corridor is a two lane corridor thatYES                 at a                YES


                                                             YES                Paulding County commuters as well as major f
This project provides a direct connection for Douglasville, Douglas County, and YES               YES

                                                              YES                YES                 YES
This project will extend the existing 4-lane divided section of SR 5 approximately 4.1 miles further south providing Carroll and


                                                         provides a vital commute link between US Hwy 78 and I-20 that w
This project, recommended in the Connect6 Corridor Study,YES                YES              YES


                                                              YES               YES                 YES
This project connects City of Douglasville, Lithia Springs community, Douglas County, City of Austell, and Cobb County to Dou


                                                            the               Center          N/A
The project would be Phase I of 10' multi-use path going to N/ATransportation N/A then to Prestley Mill Road. The propos


                                                            N/A                N/A                  N/A
The project would be Phase II of 10' multi-use path on Prestley Mill Road from I-20 to Slater Mill Road. The proposed multi-u

                                                           YES                   YES                entice
This project would serve to enhance pedestrian/bicyclist/golf cart safety, relieve SR 74 congestion,YES international indust

                                                           YES                   YES               YES
This project would serve to enhance pedestrian/bicyclist/golf cart safety, relieve SR 54 West congestion, connect a regional a

                                                           YES                   YES                connect international indu
This project would serve to enhance pedestrian/bicyclist/golf cart safety, relieve SR 74 congestion,YES

                                                           YES                   YES                connect a regional activity
This project would serve to enhance pedestrian/bicyclist/golf cart safety, relieve SR 74 congestion,YES
                                                         YES               YES                N/A
Fayette County's 2010 CTP recommends a trail/multi-use path along Tyrone Road from SR 54 to Senoia Road. The path, locat


                                                         YES               YES                 YES
Enhance safety, provide congestion relief, improve economic development opportunities, and increase modal options along t


                                                         YES               YES                 YES
Enhance safety, provide congestion relief, improve economic development opportunities, and increase modal options along t


                                                         YES               YES                 YES
Enhance safety, provide congestion relief, improve economic development opportunities, and increase modal options along t


Operational improvements                                      YES                  YES                 N/A

                                                      YES               N/A
Widening and Reconstruction of Hammond Drive from SR 400 to Ashford Dunwoody Road                      N/A

                                                       YES
Improve both the capacity and operational needs of Hammond Drive                   YES                 YES


                                                            N/A
Provide congestion relief and improve mobility and local circulation               YES                 N/A


Improve the capacity and operational needs .                  YES                  YES                 YES

The purpose of this project is to provide clean, functional, aesthetic sidewalks meeting ADA requirements that will encourage
                                                              YES                N/A               N/A

The purpose of this project is to provide continuous pedestrian and bicycle connectivity along Lake Forrest Drive from I-285 t
                                                            YES                N/A                 N/A

This project will provide an alternate to the congested interchange of SR 140 and SR 400/US 19 by providing a new bridge cro
                                                             N/A                YES               YES
This project will implement the recommendations that come out of the Holcomb Bridge Road Corridor Study currently under
                                                        YES                YES               YES


This project will address four specific safety and operational issues on this principal arterial that acts as the only north-south a
                                                              YES                  YES                 YES

Working with the roadway capacity project on Arnold Mill Road (submitted by the City of Milton as "Capacity Improvements t
                                                          YES                YES                 N/A


                                                        N/A              YES                   from
Increase capacity by 50%. Automated transportation management system extension of fiber opticsYES Herschel Road west
                                                         YES               YES               YES
Increase capacity by 100%. Bridge repair over Camp Creek south of Camp Creek Marketplace. Bicycle and Pedestrian facilitie

                                                          YES             redevelopment site through East Point and Co
Beltline extension from the West End Mall area to Fort McPherson MARTA andYES              YES




                                                           YES                  YES                 YES
The primary purpose of the proposed project is to replace the deficient bridge (sufficiency rate of 19) at the crossing of Butne


                                                              YES                YES                Regional Commission (Pro
This project is included as part of the Regional Transportation Plan (RTP) developed by the Atlanta N/A




                                                              YES                YES                Regional Commission (Pro
This project is included as part of the Regional Transportation Plan (RTP) developed by the Atlanta YES


                                                           safety          N/A                 YES
To connect to existing or planned sidewalks and to improve YES for pedestrians by providing a continuous pedestrian facil


                                                           intersection of SR 92 and South FultonYES
The proposed project is an intersection improvement of theYES                 YES                 Parkway and Hall Road. T


                                                          YES                N/A                  is sensitive to the existing
The project is intended to convert Buford Highway into a multi-modal transportation corridor that YES


                                                             roadway was initially designed to be a YES facility, not intended
The project will relieve congestion and improve safety. This YES                YES                 rural


                                                            YES              YES                 YES
Project is included in the ARC’s FY 2008-13 Transportation Improvement Program (TIP) to provide improvements in the Bufor


                                                           YES                crashes and improve operations at the Jimmy
The purpose of the proposed project is to reduce the frequency and severity ofYES              YES

                                                             regionally significant corridor was initially designed to be a rural f
The project will relieve congestion and improve safety. This YES                  YES                 YES


                                                             regionally significant corridor was initially designed to be a rural f
The project will relieve congestion and improve safety. This YES                  YES                 YES


                                                             regionally significant corridor was initially designed to be a rural f
The project will relieve congestion and improve safety. This YES                  YES                 YES


                                                     YES               YES                 YES
A major recommendation of the 2001 Gwinnett County Comprehensive Transportation Plan and the 2006 Jimmy Carter Boul

                                                                 YES                YES                 YES
This portion of Killian Hill Road lies entirely within the City of Lilburn and Gwinnett County and is truly a regional corridor. In t
                                                          N/A
The purpose of the project is to improve mobility and economic activity.          N/A                  YES

                                                          YES                  sponsors refine the design of the proposal, ta
During the preliminary engineering phase of project development, local projectYES                YES




                                                           YES                N/A                current intersections are l
The project is intended to improve pedestrian mobility across Peachtree Industrial Boulevard. TheYES


                                                            N/A                  YES                 YES
The purpose of the project is to meet existing and projected traffic needs. The resulting reduction in traffic congestion will sa


                                                             traffic needs. The resulting reduction in traffic congestion will sa
The purpose of the project is to meet existing and projectedYES                  YES                 YES




                                                            along            is classified as an urban principal arterial. With
The purpose of the project is to improve east-west mobility YES SR 20, which YES                  YES




                                                            N/A                  YES                 YES
The purpose of the project is to meet existing and projected traffic needs. The resulting reduction in traffic congestion will sa


                                                              YES               proposed Hospital Connector. Additional lane
To move traffic more safely and efficiently from Hill Street in downtown to the YES               N/A


                                                             regionally significant corridor was initially designed to be a rural f
The project will relieve congestion and improve safety. This YES                  YES                 YES


                                                         YES                  YES                the
Project was identified in the 2001 Comprehensive Transportation Plan Project and was included in YES ARC’s FY 2008-13 Tran


                                                            N/A                  YES                 YES
The purpose of the project is to meet existing and projected traffic needs. The resulting reduction in traffic congestion will sa


                                                             regionally significant corridor was initially designed to be a rural f
The project will relieve congestion and improve safety. This YES                  YES                 YES




                                                            N/A                  YES                 YES
The purpose of the project is to meet existing and projected traffic needs. The resulting reduction in traffic congestion will sa


                                                            N/A                  YES                 YES
The purpose of the project is to meet existing and projected traffic needs. The resulting reduction in traffic congestion will sa

                                                         YES                  YES                 YES
Project was identified in the 2001 Comprehensive Transportation Plan Project and is included in the ARC’s FY 2008-13 Transp
                                                           N/A                 YES                  YES
The purpose of the project is to provide Georgia Gwinnett College an alternative vehicle, bicycle and pedestrian access across


                                                             traffic needs. The resulting reduction in traffic congestion will sa
The purpose of the project is to meet existing and projectedYES                  YES                 YES


                                                                YES                  proposed new roadway. Thisnew roadway wi
This project, will consist of a 2-lane with a median the full length of the 3.0 mileYES              YES




                                                            YES                 YES               YES
This program of projects will put in motion service and pedestrian upgrades in the South Fulton area that were recommended

                                                                projects that wereN/A
This is a project to implement Livable Centers Initiative (LCI)YES                                  N/A
                                                                                  determined to be the responsibility of MARTA




                                                           YES                 YES                 YES
Widen road from 2 to 4 lanes, construct bicycle path to provide connectivity and direct access to the main shopping activity c
c Benefit                                          Cost




            Modal Options   Other Benefit   All Phases (Request)                         Project ID



                 YES            N/A         $      452,986,796     1   452986796 TIA-AT-001


                 YES            YES         $      234,294,534     1   234294534 TIA-AT-004




                 YES            YES         $      430,332,485     1   430332485 TIA-AT-005




                 YES            YES         $      407,492,936     1   407492936 TIA-AT-006


                 YES            YES         $      508,453,428     1   508453428 TIA-AT-007

                 YES            N/A         $       20,000,000     1    20000000 TIA-AT-008




                 YES            N/A         $       10,000,000     1    10000000 TIA-AT-011


                                            $        3,000,000     1     3000000 TIA-AR-038
                                            $        4,200,000     1     4200000 TIA-AR-039

                                            $       89,000,000     1    89000000 TIA-CH-005

                                            $       90,000,000     1    90000000 TIA-CH-006

                                            $       77,000,000     1    77000000   TIA-CH-009
                                            $        4,700,000     1     4700000   TIA-CH-010
                                            $       86,688,856     1    86688856   TIA-CH-012
                                            $      124,856,122     1   124856122   TIA-CH-013


                 YES            YES         $       16,045,730     1    16045730 TIA-CL-001
YES   YES   $    28,205,000   1    28205000 TIA-CL-004


YES   YES   $     8,020,000   1     8020000 TIA-CL-005




YES   YES   $    70,579,770   1    70579770 TIA-CL-008


YES   YES   $    19,549,562   1    19549562 TIA-CL-009


YES   YES   $    53,031,000   1    53031000 TIA-CL-011




YES   YES   $    40,088,373   1    40088373 TIA-CL-012


YES   YES   $    33,900,000   1    33900000 TIA-CL-013




YES   YES   $    28,426,000   1    28426000 TIA-CL-014


YES   YES   $    10,900,000   1    10900000 TIA-CL-017


YES   YES   $   254,200,000   1   254200000 TIA-CL-018




YES   YES   $    36,474,770   1    36474770 TIA-CL-019


N/A   YES   $    25,700,000   1    25700000 TIA-CO-007


N/A   YES   $     2,200,000   1     2200000 TIA-CO-009




YES   N/A   $    22,000,000   1    22000000 TIA-CO-011
N/A   YES   $   120,000,000   1   120000000 TIA-CO-013




N/A   N/A   $    31,027,000   1    31027000 TIA-CO-016

YES   YES   $     1,900,000   1     1900000 TIA-CO-017

YES   YES   $     4,500,000   1     4500000 TIA-CO-021

YES   YES   $     5,000,000   1     5000000 TIA-CO-022


YES   N/A   $     8,655,000   1     8655000 TIA-CO-025


YES   N/A   $    72,000,000   1    72000000 TIA-CO-026


YES   YES   $    60,000,000   1    60000000 TIA-CO-027




N/A   N/A   $    13,647,000   1    13647000 TIA-CO-028


YES   N/A   $     5,975,000   1     5975000 TIA-CO-029


YES   N/A   $    25,000,000   1    25000000 TIA-CO-036

YES   N/A   $    26,000,000   1    26000000 TIA-CO-037


N/A   YES   $     5,250,000   1     5250000 TIA-CO-039


N/A   YES   $     2,500,000   1     2500000 TIA-CO-040


N/A   YES   $    14,395,000   1    14395000 TIA-CO-041




N/A   YES   $    12,426,000   1    12426000 TIA-CO-042
YES   YES   $    22,000,000   1    22000000 TIA-CO-044


YES   YES   $    29,050,000   1    29050000 TIA-CO-045


YES   N/A   $   142,000,000   1   142000000 TIA-CO-046

YES   N/A   $     5,350,000   1     5350000 TIA-DK-005


YES   YES   $    10,000,000   1    10000000 TIA-DK-007


N/A   N/A   $    34,190,000   1    34190000 TIA-DK-015


YES   N/A   $    41,500,000   1    41500000 TIA-DK-016




N/A   YES   $    21,320,000   1    21320000 TIA-DK-017


YES   N/A   $    21,884,000   1    21884000 TIA-DK-018




N/A   N/A   $    15,600,000   1    15600000 TIA-DK-020


YES   N/A   $    39,000,000   1    39000000 TIA-DK-021


YES   N/A   $     8,281,000   1     8281000 TIA-DK-022


N/A   N/A   $     1,319,344   1     1319344 TIA-DK-023




N/A   N/A   $     9,100,000   1     9100000 TIA-DK-024


N/A   N/A   $    76,634,610   1    76634610 TIA-DK-025
N/A   N/A   $   17,745,000   1   17745000 TIA-DK-027


N/A   N/A   $   14,820,000   1   14820000 TIA-DK-029


N/A   N/A   $   14,300,000   1   14300000 TIA-DK-030


N/A   N/A   $    6,500,000   1    6500000 TIA-DK-033




N/A   N/A   $   24,570,000   1   24570000 TIA-DK-035


N/A   YES   $    2,430,000   1    2430000 TIA-DK-038




YES   N/A   $   19,500,000   1   19500000 TIA-DK-039




YES   N/A   $   57,850,000   1   57850000 TIA-DK-042




N/A   N/A   $   70,400,000   1   70400000 TIA-DK-043


N/A   N/A   $   11,050,000   1   11050000 TIA-DK-045




N/A   N/A   $   13,000,000   1   13000000 TIA-DK-046




N/A   N/A   $   21,909,680   1   21909680 TIA-DK-048

N/A   N/A   $   41,600,000   1   41600000 TIA-DK-050
N/A   N/A   $   20,020,000   1   20020000 TIA-DK-051




N/A   N/A   $   23,269,220   1   23269220 TIA-DK-052

N/A   N/A   $   21,200,000   1   21200000 TIA-DK-055


YES   YES   $   48,492,000   1   48492000 TIA-DK-057


YES   N/A   $   14,400,000   1   14400000 TIA-DK-063


N/A   N/A   $    1,285,000   1    1285000 TIA-DK-065


YES   N/A   $   20,000,000   1   20000000 TIA-DK-069


YES   YES   $   44,641,410   1   44641410 TIA-DO-003

YES   YES   $   38,399,998   1   38399998 TIA-DO-005


YES   YES   $   18,900,000   1   18900000 TIA-DO-006


YES   YES   $   96,938,521   1   96938521 TIA-DO-007


YES   N/A   $     650,000    1     650000 TIA-DO-009


YES   N/A   $    2,212,700   1    2212700 TIA-DO-010

YES   N/A   $    1,207,701   1    1207701 TIA-FA-010

YES   N/A   $    1,881,762   1    1881762 TIA-FA-019

YES   N/A   $    1,147,181   1    1147181 TIA-FA-022

YES   N/A   $     600,000    1     600000 TIA-FA-023
YES   N/A   $    2,020,000   1    2020000 TIA-FA-036


YES   N/A   $   21,000,000   1   21000000 TIA-FN-002


YES   N/A   $   37,000,000   1   37000000 TIA-FN-003


YES   N/A   $   40,000,000   1   40000000 TIA-FN-004


YES   N/A   $   19,000,000   1   19000000 TIA-FN-007

YES   N/A   $    8,100,000   1    8100000 TIA-FN-010

YES   N/A   $   60,000,000   1   60000000 TIA-FN-013


YES   N/A   $   40,000,000   1   40000000 TIA-FN-015


YES   N/A   $   10,500,000   1   10500000 TIA-FN-016


YES   N/A   $   11,000,000   1   11000000 TIA-FN-024


YES   N/A   $    4,300,000   1    4300000 TIA-FN-026


YES   N/A   $   43,000,000   1   43000000 TIA-FN-032

YES   YES   $   50,000,000   1   50000000 TIA-FN-034




YES   YES   $   20,400,000   1   20400000 TIA-FN-035


YES   N/A   $   19,600,000   1   19600000 TIA-FN-036


N/A   N/A   $   13,200,000   1   13200000 TIA-FS-004
YES   N/A   $   34,894,208   1   34894208 TIA-FS-005

YES   N/A   $    2,125,920   1    2125920 TIA-FS-006




YES   YES   $    8,600,000   1    8600000 TIA-FS-016


YES   YES   $    4,300,000   1    4300000 TIA-FS-017




YES   YES   $   12,800,000   1   12800000 TIA-FS-019


YES   N/A   $   11,800,000   1   11800000 TIA-FS-024


YES   N/A   $    7,500,000   1    7500000 TIA-FS-026


YES   YES   $    5,445,000   1    5445000 TIA-GW-003


YES   N/A   $   14,000,000   1   14000000 TIA-GW-004


YES   N/A   $   28,000,000   1   28000000 TIA-GW-006


N/A   N/A   $   15,000,000   1   15000000 TIA-GW-007

YES   N/A   $   10,350,000   1   10350000 TIA-GW-011


YES   N/A   $   14,625,000   1   14625000 TIA-GW-012


YES   N/A   $   50,700,000   1   50700000 TIA-GW-016


YES   N/A   $   19,864,000   1   19864000 TIA-GW-018

YES   N/A   $   14,900,000   1   14900000 TIA-GW-029
YES   N/A   $     1,849,840   1     1849840 TIA-GW-030

N/A   N/A   $   100,000,000   1   100000000 TIA-GW-031




YES   YES   $      940,000    1      940000 TIA-GW-041


YES   N/A   $     6,600,000   1     6600000 TIA-GW-042


YES   N/A   $    27,000,000   1    27000000 TIA-GW-047




YES   N/A   $    40,000,000   1    40000000 TIA-GW-048




YES   N/A   $    38,400,000   1    38400000 TIA-GW-052


YES   N/A   $     2,900,000   1     2900000 TIA-GW-053


YES   N/A   $   160,200,000   1   160200000 TIA-GW-054


YES   N/A   $    10,000,000   1    10000000 TIA-GW-055


YES   N/A   $    35,700,000   1    35700000 TIA-GW-056


YES   N/A   $    45,800,000   1    45800000 TIA-GW-064




YES   N/A   $    29,100,000   1    29100000 TIA-GW-065


YES   N/A   $    33,700,000   1    33700000 TIA-GW-066

YES   N/A   $    19,088,028   1    19088028 TIA-GW-067
YES   N/A   $     10,600,000     1    10600000 TIA-GW-069


YES   N/A   $     39,300,000     1    39300000 TIA-GW-070


N/A   N/A   $     17,200,000     1    17200000 TIA-HE-011




YES   N/A   $     26,790,000     1    26790000 TIA-M-032

N/A   YES   $     29,598,999     1    29598999 TIA-M-035




YES   N/A   $      4,895,935     1     4895935 TIA-RO-004

            $   6,082,436,419   144 6082436419
               Unconstrained List of Projects - 6/1/11



In              Bike/Ped
Unconstrained Component Bike/Ped            Bike/Ped Focus                       Bike
List? (1 = Yes) ($)      Focus              ($)                                  Focus?



           1    452986796               1        452986796       452986796   1


           1    234294534                                    0   234294534   1




           1    430332485                                    0   430332485   1




           1    407492936                                    0   407492936   1


           1    508453428                                    0   508453428   1

           1      20000000                                   0    20000000   1




           1      10000000              1          10000000       10000000   1


           1       3000000                                         3000000   1
           1       4200000                                         4200000   1

           1      89000000                                        89000000   1

           1      90000000                                        90000000   1

           1     77000000                                         77000000   1
           1      4700000                                          4700000   1
           1     86688856                                         86688856   1
           1    124856122                                        124856122   1


           1      16045730                                   0    16045730   1
1    28205000              0    28205000   1


1     8020000              0     8020000   1




1    70579770              0    70579770   1


1    19549562              0    19549562   1


1    53031000              0    53031000   1




1    40088373              0    40088373   1


1    33900000              0    33900000   1




1    28426000              0    28426000   1


1    10900000   1   10900000    10900000   1   1


1   254200000              0   254200000   1




1    36474770              0    36474770   1


1    25700000              0    25700000   1


1     2200000              0     2200000   1




1    22000000              0    22000000   1
1   120000000              0   120000000   1




1    31027000              0    31027000   1

1     1900000              0     1900000   1

1     4500000              0     4500000   1

1     5000000              0     5000000   1


1     8655000              0     8655000   1


1    72000000              0    72000000   1


1    60000000              0    60000000   1




1    13647000   1   13647000    13647000   1


1     5975000              0     5975000   1


1    25000000              0    25000000   1

1    26000000              0    26000000   1


1     5250000              0     5250000   1


1     2500000              0     2500000   1


1    14395000              0    14395000   1




1    12426000              0    12426000   1
1    22000000              0    22000000   1


1    29050000              0    29050000   1


1   142000000              0   142000000   1

1     5350000              0     5350000   1


1    10000000   1   10000000    10000000   1   1


1    34190000              0    34190000   1


1    41500000              0    41500000   1




1    21320000              0    21320000   1


1    21884000   1   21884000    21884000   1




1    15600000              0    15600000   1


1    39000000              0    39000000   1


1     8281000              0     8281000   1


1     1319344              0     1319344   1




1     9100000              0     9100000   1


1    76634610              0    76634610   1
1   17745000              0   17745000   1


1   14820000              0   14820000   1


1   14300000              0   14300000   1


1    6500000              0    6500000   1




1   24570000              0   24570000   1


1    2430000              0    2430000   1




1   19500000              0   19500000   1




1   57850000              1   57850000   1




1   70400000              0   70400000   1


1   11050000              0   11050000   1




1   13000000              0   13000000   1




1   21909680              0   21909680   1

1   41600000   1   41600000   41600000   1
1   20020000              0   20020000   1




1   23269220   1   23269220   23269220   1   1

1   21200000              0   21200000   1


1   48492000              0   48492000   1


1   14400000              0   14400000   1


1    1285000   1    1285000    1285000   1


1   20000000              0   20000000   1


1   44641410              0   44641410   1

1   38399998              0   38399998   1


1   18900000              0   18900000   1


1   96938521              0   96938521   1


1     650000   1     650000     650000   1   1


1    2212700   1    2212700    2212700   1   1

1    1207701   1    1207701    1207701   1   1

1    1881762   1    1881762    1881762   1   1

1    1147181   1    1147181    1147181   1   1

1     600000   1     600000     600000   1   1
1    2020000   1   2020000    2020000   1   1


1   21000000             0   21000000   1


1   37000000             0   37000000   1


1   40000000             0   40000000   1


1   19000000             0   19000000   1

1    8100000             0    8100000   1

1   60000000             0   60000000   1


1   40000000             0   40000000   1


1   10500000             0   10500000   1


1   11000000             0   11000000   1


1    4300000   1   4300000    4300000   1   1


1   43000000             0   43000000   1

1   50000000             0   50000000   1




1   20400000             0   20400000   1


1   19600000             0   19600000   1


1   13200000             0   13200000   1
1   34894208              0   34894208   1

1    2125920   1    2125920    2125920   1   1




1    8600000              0    8600000   1


1    4300000              0    4300000   1




1   12800000              0   12800000   1


1   11800000   1   11800000   11800000   1


1    7500000              0    7500000   1


1    5445000              0    5445000   1


1   14000000              0   14000000   1


1   28000000              0   28000000   1


1   15000000              0   15000000   1

1   10350000              0   10350000   1


1   14625000              0   14625000   1


1   50700000              0   50700000   1


1   19864000              0   19864000   1

1   14900000              0   14900000   1
1     1849840   1   1849840     1849840   1   1

1   100000000             0   100000000   1




1      940000             0      940000   1


1     6600000             0     6600000   1


1    27000000             0    27000000   1




1    40000000             0    40000000   1




1    38400000             0    38400000   1


1     2900000             0     2900000   1


1   160200000             0   160200000   1


1    10000000             0    10000000   1


1    35700000             0    35700000   1


1    45800000             0    45800000   1




1    29100000             0    29100000   1


1    33700000             0    33700000   1

1    19088028             0    19088028   1
            1   10600000                                0     10600000       1


            1   39300000                                0     39300000       1


            1   17200000                                0     17200000       1




            1   26790000             1          26790000      26790000       1

            1   29598999             1          29598999      29598999       1    1




             1    4895935                               0      4895935       1
           144                      22                                     144   14
Includes B/P   6082436419 Focuses on B/P      671756120      6082436419
                                                           6,082,436,419
                                                           ############
                                         Total Unconstrained $
                 Description/Analysis




Bike Focus                                                                                            Bike
$                                                                                                     Component

               Bridge Improvements throughout area; they include sidewalk improvements,
             0 ADA ramps, no evidence of bicycle improvements.

               Atlanta Beltline Streetcar Circulator from approved route northeast to Piedmont
             0 Park. Includes a multi-use trail component parallel to the transit.                            1

                 Atlanta Beltline Streetcar Circulator along North Ave to MARTA, east to Highland,
                 North along roadway to farthest Northeast corner of Beltline (Lindbergh).
             0   Includes a multi-use trail component parallel to the transit. 4.5 mile route.                1
                 Atlanta Beltline Streetcar Circulator from Arts Center, down to 10th, along 10th
                 past Piedmont, south along Beltline to Euclid, loop around Euclid/Edgewood, as
                 well as loop along North Ave. Includes a multi-use trail component parallel to the
             0   transit. 5.4 mile route.                                                                     1
                 Atlanta Beltline Streetcar Circulator from Midtown MARTA west through Tech,
                 south along existing rail line to SW Atlanta. Includes a multi-use trail component
             0   parallel to the transit. 7.9 mile route.                                                     1
                 Road widening with bicycle and pedestrian facilities (?) between Venetian Drive
             0   and Timothy Drive (along north side of Fort McPherson)

               Complete Streets on Jonesboro from Thirkeld to Helena; not specific as to
               whether project will be avenue (with bike facilities) or street (without)
             0 [according to Connect Atlanta Plan Livable Street Design Guide]                                1


                 Cheshire Bridge Road @ Lindbergh drive (Complete Streets Improvements)                       1
                 US78 (Ponce) at Moreland/Briarcliff (Complete Streets Improvements)                          1
                 SR140 from East Cherokee Drive to Mountain Road (Widening, includes
                 sidewalks and bike lanes)                                                                    1
                 SR 140 from I-575 to East Cherokee Drive (Widening, includes sidewalks and bike
                 lanes)                                                                                       1
                 SR 140 from Mountain Road to Fulton County Line (Widening, includes sidewalks
                 and bike lanes)                                                                              1
                 SR20 from I-575 to Scott Road (Widening, includes bike lanes)                                1
                 SR20 from Scott Road to SR 369 (Widening, includes bike lanes)                               1
                 SR20 from SR 369 to Post Road (Widening, includes bike lanes)                                1

               Roadway widening on Battle Creek Road from Valley Hill Road to Southlake
             0 Parkway (includes sidewalk)
          Roadway widening on Conley Road from I-285 to Jonesboro Road (includes
        0 sidewalk)
          New alignment of Jonesboro Connector from Tara to Lake Jodeco; routes traffic
          out of Jonesboro city center, thus improving bicycle and pedestrian conditions in
        0 the downtown area.


          Widening of SR920 (McDonough Road) from Jonesboro road to Tara Boulevard.
        0 Includes sidewalk and bike lanes.                                                   1

          Widening of Mount Zion Boulevard from Southlake Parkway to Somerton Drive
        0 (Includes sidewalks)


        0 Widening of Moreland from Lake Harbin Road to Anvilblock (includes sidewalks)


          Widening of Fayatteville (SR54) from McDonough to Tara (includes sidwalks and
        0 bike lanes).                                                                        1


        0 Widening of SR85 from Adams Drive to I-75 South (includes sidewalks).




        0 Widening of SR85 from SR279 to Roberts Drive (includes sidewalks).


10900000 Multiuse path along Tara Boulevard from Upper Riverdale to Justice Center            1


        0 Super Arterial Concept, unsure what bike/ped component is present.


          Widening of Tara from SR81 to Flint River Road (includes sidewalks and bikable
        0 shoulders)                                                                          1

          Cobb Parkway from Paces Mill to Akers Mill (widening, includes sidewalks and
        0 multiuse path)                                                                      1

          Corridor Improvements on Cumberland Boulevard from Akers Mill to Spring
        0 Road (improved pedestrian access)


          Trust route Corridor Improvements (includes adding sidewalks where none
        0 currently exist)
0 I-75 at Windy Hill Interchange (includes sidewalk improvements).




0 Widening of Macland road from Paulding to New Macland (includes sidewalks)

0 Bridge replacement (Main street in Kennesaw); includes sidewalks and bike lanes   1

0 New allignment: Moon station road (includes sidewalks and bike lanes)             1

0 Bridge replacement (includes sidewalks)

  Widening of Riverside Parkway from SR6 to Phillips Drive (generic "pedestrian
0 improvements" are proposed)

  Widening of Roswell road from Bridgegate Drive to Timber Ridge (includes
0 sidewalks and a parallel shared-use trail along South side)                       1

  Widening of South Cobb Drive from River View to Atlanta Road (includes adding
0 sidewalks where they don't currently exist)


  South Marietta Parkway from US 41 to Manget Street (sidewalks and multiuse
0 trail construction).                                                              1


0 Corridor Improvements on SR92 (adds pedestrian access to CCT park and ride)

  Corridor Improvements on Windy Hill Road from Austell rd to South Cobb Drive
0 (includes sidewalks and "multi-use trails")                                       1

0 New alignment of Windy Hill Road/Terrell Mill Connector


0 Widening of Cobb Parkway from Windy Ridge to Windy Hill (includes sidewalks)


0 Widening of Cobb Parkway from Windy Hill to Terrell Mill (includes sidewalks)

  Widening of Cobb Parkway from Terrell Mill to South Marietta Parkway (includes
0 sidwalks)


  Widening of Cobb Parkway from South Marietta to North Marietta (includes
0 sidewalks)
          Widening of South Cobb Drive from Atlanta Road to Cobb Parkway (includes
        0 sidewalks where none currently exist)

          Widening of SR92 from Cobb Parkway to Cherokee Street (includes sidewalks
        0 and multiuse trail)                                                                 1

          Widening of Windy Hill from South Cobb Drive to Cobb Parkway (includes
        0 "enhanced opportunities for pedestrian and bicycle travel")

        0 MARTA station accessibility improvements


10000000 Decatur to Clifton Corridor Improvements (sidewalks, bike lanes)                     1

          Widening of Bouldercrest Road from I-285 to Linecrest Road Extension (includes
        0 bike lanes and sidewalks)                                                           1

          Corridor Improvements on Briarcliff from Henderson Mill to Clifton (includes bike
        0 lanes, sidewalks, resurfacing, etc)                                                 1


          Corridor Improvements on Browns Mill from Snapfinger to Rockdale County
        0 (includes "bike/ped improvements")
          Buford Highway from Lenox Road to Shallowford Terrace Pedestrian, landscape,
          and BRT improvements (includes sidewalks and pedestrian lightning, possibly
        0 more)


          Corridor Improvements on Clairmont Road from SR 141 to Scott Boulevard
        0 (includes adding sidewalks and bike lanes)                                          1


        0 Clifton road bridge replacement (add sidewalks and bike lanes)                      1

          College Avenue from Adair to North Clarendon (in Decatur), includes sidewalks
        0 and bike lanes.                                                                     1

          Corridor Improvements on Columbia Drive from College Avenue to I-20 East
        0 (includes sidewalks, bike lanes)                                                    1


          Corridor Improvements on Cooledge Road from US78 to Lawrenceville Highway
        0 (includes sidewalks and bike lanes)                                                 1

          Corridor Improvements on Covington Highway from I-285 to Turner Hill Road
        0 (includes sidewalks and bike lanes)                                                 1
  East Ponce from DeKalb industrial to Memorial Drive, Corridor Improvements
0 (includes sidewalks and bike lanes)                                               1

  Glenwood from Candler road to Covington Highway: Corridor Improvements
0 (includes sidewalks and bike lanes)                                               1


0 New alignment of Hayden Quarry Road (unsure of bike/ped component)

  Corridor Improvements (includes sidewalks and bike lanes) on North Indian
0 Creek Drive from Memorial Drive to Montreal road                                  1


  Corridor Improvements (includes sidewalks and bike lanes) on Lawrenceville hwy
0 from Scott to Hugh Howell.                                                        1


0 Bridge Replacement (includes bike lanes and sidewalks)                            1




0 Corridor Improvements on Montreal Road (unsure of bike/ped components)


  Corridor Improvements (includes sidewalks and bike lanes) on North Druids Hills
0 Road from Buford Highway to Lawrenceville Highway.                                1




0 Corridor Improvements (includes sidewalks and bike lanes) on Panola Road          1


0 Corridor Improvements (includes sidewalks and bike lanes) on Rainbow Drive        1




0 Corridor Improvements (includes sidewalks and bike lanes) on Redan Road           1




0 Corridor Improvements (includes sidewalks and bike lanes) on Rockbridge Road      1
  Pedestrian Improvements (add sidewalks and improve shoulders) (26 different
0 locations)
          Corridor Improvements (includes sidewalks and bike lanes) on Snapfinger from
        0 Flat Shoals to River Road                                                          1


         Stone Mountain Lithonia Road from Rockbridge Road to Lithonia (add lanes and
23269220 sidewalks to connect to multi-use trails)
         I-20 at Panola Road Interchance improvements (unsure of bike/ped
       0 improvements)


        0 Buford Highway new alignment (includes cycle tracks, sidewalks)                    1

          Corridor Improvements (includes sidewalks and bike lanes) on Chamblee
        0 Dunwoody Road from I-285 to Spalding Drive                                         1


        0 Pedestrian access (no sidewalk currently exists)

          Corridor Improvements (includes sidewalks and bike lanes) on Mt. Vernon Road
        0 from Fulton County to Dunwoody Club Drive                                          1


        0 SR92 Road realignment (includes "bicycle and pedestrian accomodations")

        0 Widening of SR5 from Shoals Road to Kings highway (adds sidewalks)


        0 Widening of Lee Road from I-20 to US78 (includes a multi-use trail and sidewalk)   1

          US78 from SR6 to SR92 realignment (includes "bicycle and pedestrian
        0 accomodations")


  650000 Multiuse Path along Dorris Road from Transportation Center to Prestley Mill         1


 2212700 Multiuse Path along Prestley Millfrom I-20 to Slater Mill                           1

 1207701 South Industrial Park Path Connection                                               1

 1881762 SR54 West and Gateway Bridge Path Connections                                       1

 1147181 Southeast Industrial Park Path Connection                                           1

  600000 Wilshire Shopping Center/Rite Aid Tunnel Path Connections                           1
2020000 Multiuse Path along Tyrone Road from SR74 to SR54 (6.2 mile stretch)            1


       0 Road widening and multi-use trail alongside.                                   1


       0 Road widening (unsure of bike/ped component)


       0 Road widening (unsure of bike/ped component)


       0 Rucker Road ("operational improvements")
         Widening of Hammond Drive from 400 to Ashford Dunwoody rd (unsure
       0 bike/ped component)
         Widening of Hammond Drive from Roswell Road to SR400 (possibly includes
       0 multi-use paths along both sides)                                              1

         New Alignment of Sandy Springs Circle Extension from Allen to Northwood
       0 (unsure of bike/ped component)


       0 Widening of Peachtree Dunwoody (includes sidewalks)


       0 Pedestrian improvements (sidewalks along eastern side of Roswell Road)


4300000 Sidewalks and bike lanes along Lake Forrest Drive                               1


       0 Big Creek Bridge Road New Alignment (includes sidewalks and bike lanes)
         Interchange Improvements (SR400 at Holcomb Bridge Road) (not specific on
       0 bike/ped component)


         Corridor Improvements on Atlanta Street from Chattahoochee River to Marietta
       0 Highway (not specific on bike/ped component)

         Operational Improvements to Houze Road from Rucker to Mansell (not specific
       0 on bike/ped component)

         Widening of SR6 from I-85 South to Welcome All Road (unsure of bike/ped
       0 component)
         Widening of Washington Road from I-285 to Legion Way (indicates general
       0 "bicycle and pedestrian facilities"

2125920 Beltline Trail extension from West End Mall to College Park                         1




       0 Butner Road improvements (sidewalk improvements)

         Campbellton Road at Boat Rock Road Intersection improvements (unsure of
       0 bike/ped component)


         SR70 Intersection improvements at multiple locations (unsure of bike/ped
       0 components)

         South Fulton Pedestrian Improvements (install sidewalks where none currently
       0 exist)


       0 Intersection Improvements (SR92), unsure of bike/ped components

         Buford Highway from George Pierce Park to McGinnis Ferry Road Corridor
       0 Improvements (general "Bicycle and pedestrian improvements")

         Buford Highway from Old Peachtree Road to Sugarloaf Parkway Corridor
       0 Improvements (general "Bicycle and pedestrian improvements")

         Widening of Buford Highway from Sawnee Ave to SR347 (unsure of bike/ped
       0 improvements)

         Buford Highway at Jimmy Carter Boulevard Intersection Improvements (unsure
       0 of bike/ped components)
         Widening of Five Forks Trickum Road from Killian Hill Road to Oak Road (includes
       0 sidewalks)

         Widening of Five Forks Trickum Road from Constitution Boulevard to Sugarloaf
       0 Parkway (includes sidewalks)


       0 Hamilton Mill Road Widening (unsure of bike/ped component)


       0 Hillcrest Road (new alignment) (unsure of bike/ped component)
         Killian Hill Road from Camp Creek to Arcado Road Widening (unsure of bike/ped
       0 component)
        Lawrenceville Highway from Hood Road to Hillcrest Road Multiuse Trail and
1849840 Pedestrian Improvements                                                             1

       0 Generic transit project? (No info about location, mode, anything).




       0 Pedestrian Intersection Improvements on Peachtree Industrial Boulevard

         Widening of Pleasant Hill Road from Howell Ferry Road to Chattahoochee River
       0 (not specific about bike/ped component)


       0 Satellite Boulevard New Alignment at 1-85 (unsure of bike/ped component)


         SR20 Widening from Peachtree Industrial Boulevard to Chattahoochee River
       0 (sidewalk improvements)


         SR120 from Langley Drive to SR317 Road widening (not specific about bike/ped
       0 component)

         SR120 from Hill Street to Hospital Connector Corridor Improvements (not
       0 specific about bike/ped components)

         SR124 from Buford Highway to Barrow County Line roadway widening (not
       0 specific about bike/ped component)

         SR124 from US78 to Reagan parkway roadway widening (not specific about
       0 bike/ped component)


       0 SR141 Roadway widening (not specific about bike/ped components)


       0 US29 widening from SR125 to SR316 (upgraded sidewalks)




       0 US78 widening from SR84 to SR81 (unsure of bike/ped component)


       0 US78 widening from SR124 to SR84 (not specific about bike/ped component)

       0 Main Street (Snellville) at SR 124 intersection improvement (upgraded sidewalks)
        0 Walther Boulevard New alignment (upgraded sidewalks)


        0 West Liddell Road New alignment (improved "bicycle and pedestrian mobility")

          Western Parallel Connector from Hudson Bridge Road to SR920 realignment (not
        0 specific about bike/ped component)




        0 Roosevelt Highway sidewalk improvements and SR279 Bus service improvements

29598999 MARTA station access enhancements


         Old Convington highway from Green street to East of SR20 road Widening (bike
       0 "route"?)
91763323                                                                                 60
        0


234294534




430332485




407492936


508453428

        0




 10000000


  3000000
        0

 89000000

 90000000

 77000000
  4700000
 86688856
124856122


        0
       0


       0




70579770


       0


       0




40088373


       0




       0


10900000


       0




36474770


25700000


       0




       0
       0




       0

 1900000

 4500000

       0


       0


72000000


       0




13647000


       0


25000000

       0


       0


       0


       0




       0
       0


29050000


       0

       0


10000000


34190000


41500000




       0


       0




15600000


39000000


 8281000


 1319344




 9100000


76634610
17745000


14820000


       0


 6500000




24570000


 2430000




       0




57850000




70400000


11050000




13000000




21909680

       0
20020000




       0

       0


48492000


14400000


       0


20000000


       0

       0


18900000


       0


  650000


 2212700

 1207701

 1881762

 1147181

  600000
 2020000


21000000


       0


       0


       0

       0

60000000


       0


       0


       0


 4300000


       0

       0




       0


       0


       0
      0

2125920




      0


      0




      0


      0


      0


      0


      0


      0


      0

      0


      0


      0


      0

      0
1849840

      0




      0


      0


      0




      0




      0


      0


      0


      0


      0


      0




      0


      0

      0
           0


           0


           0




           0

           0




            0
  3092365012
3,092,365,012
                                                       Bike
     Project ID       Cost (Request)    Bike/Ped Focus Component



TIA-AT-001        $      452,986,796




TIA-AT-004        $      234,294,534                  YES




TIA-AT-005        $      430,332,485                  YES




TIA-AT-006        $      407,492,936                  YES




TIA-AT-007        $      508,453,428                  YES




TIA-AT-008        $        20,000,000




TIA-AT-011        $        10,000,000                 YES

TIA-AR-038        $         3,000,000 YES             YES

TIA-AR-039        $         4,200,000 YES             YES


TIA-CH-005        $        89,000,000                 YES

TIA-CH-006        $        90,000,000                 YES
TIA-CH-009   $   77,000,000       YES

TIA-CH-010   $    4,700,000       YES

TIA-CH-012   $   86,688,856       YES

TIA-CH-013   $   124,856,122      YES


TIA-CL-001   $   16,045,730

TIA-CL-004   $   28,205,000




TIA-CL-005   $    8,020,000


TIA-CL-008   $   70,579,770       YES


TIA-CL-009   $   19,549,562

TIA-CL-011   $   53,031,000


TIA-CL-012   $   40,088,373       YES

TIA-CL-013   $   33,900,000

TIA-CL-014   $   28,426,000

TIA-CL-017   $   10,900,000 YES   YES

TIA-CL-018   $   254,200,000

TIA-CL-019   $   36,474,770       YES


TIA-CO-007   $   25,700,000       YES


TIA-CO-009   $    2,200,000 YES
TIA-CO-011   $   22,000,000

TIA-CO-013   $   120,000,000

TIA-CO-016   $   31,027,000

TIA-CO-017   $    1,900,000       YES

TIA-CO-021   $    4,500,000       YES
TIA-CO-022   $    5,000,000


TIA-CO-025   $    8,655,000


TIA-CO-026   $   72,000,000       YES


TIA-CO-027   $   60,000,000


TIA-CO-028   $   13,647,000 YES   YES

TIA-CO-029   $    5,975,000


TIA-CO-036   $   25,000,000       YES

TIA-CO-037   $   26,000,000

TIA-CO-039   $    5,250,000

TIA-CO-040   $    2,500,000

TIA-CO-041   $   14,395,000


TIA-CO-042   $   12,426,000


TIA-CO-044   $   22,000,000


TIA-CO-045   $   29,050,000       YES
TIA-CO-046   $   142,000,000
TIA-DK-005   $     5,350,000 YES

TIA-DK-007   $   10,000,000 YES    YES


TIA-DK-015   $   34,190,000        YES


TIA-DK-016   $   41,500,000        YES


TIA-DK-017   $   21,320,000




TIA-DK-018   $   21,884,000 YES


TIA-DK-020   $   15,600,000        YES

TIA-DK-021   $   39,000,000        YES


TIA-DK-022   $    8,281,000        YES


TIA-DK-023   $    1,319,344        YES


TIA-DK-024   $    9,100,000        YES


TIA-DK-025   $   76,634,610        YES


TIA-DK-027   $   17,745,000        YES


TIA-DK-029   $   14,820,000        YES

TIA-DK-030   $   14,300,000
TIA-DK-033   $   6,500,000        YES


TIA-DK-035   $   24,570,000       YES

TIA-DK-038   $   2,430,000        YES

TIA-DK-039   $   19,500,000




TIA-DK-042   $   57,850,000       YES

TIA-DK-043   $   70,400,000       YES

TIA-DK-045   $   11,050,000       YES

TIA-DK-046   $   13,000,000       YES

TIA-DK-048   $   21,909,680       YES

TIA-DK-050   $   41,600,000 YES


TIA-DK-051   $   20,020,000       YES


TIA-DK-052   $   23,269,220 YES


TIA-DK-055   $   21,200,000

TIA-DK-057   $   48,492,000       YES


TIA-DK-063   $   14,400,000       YES

TIA-DK-065   $   1,285,000 YES


TIA-DK-069   $   20,000,000       YES

TIA-DO-003   $   44,641,410

TIA-DO-005   $   38,399,998
TIA-DO-006   $   18,900,000       YES

TIA-DO-007   $   96,938,521

TIA-DO-009   $     650,000 YES    YES

TIA-DO-010   $   2,212,700 YES    YES

TIA-FA-010   $   1,207,701 YES    YES

TIA-FA-019   $   1,881,762 YES    YES

TIA-FA-022   $   1,147,181 YES    YES

TIA-FA-023   $     600,000 YES    YES

TIA-FA-036   $   2,020,000 YES    YES

TIA-FN-002   $   21,000,000       YES

TIA-FN-003   $   37,000,000

TIA-FN-004   $   40,000,000

TIA-FN-007   $   19,000,000


TIA-FN-010   $   8,100,000


TIA-FN-013   $   60,000,000       YES


TIA-FN-015   $   40,000,000

TIA-FN-016   $   10,500,000

TIA-FN-024   $   11,000,000 YES

TIA-FN-026   $   4,300,000 YES    YES

TIA-FN-032   $   43,000,000


TIA-FN-034   $   50,000,000
TIA-FN-035   $   20,400,000


TIA-FN-036   $   19,600,000


TIA-FS-004   $   13,200,000


TIA-FS-005   $   34,894,208


TIA-FS-006   $   2,125,920 YES    YES

TIA-FS-016   $   8,600,000


TIA-FS-017   $   4,300,000

TIA-FS-019   $   12,800,000

TIA-FS-024   $   11,800,000 YES

TIA-FS-026   $   7,500,000




TIA-GW-003   $   5,445,000




TIA-GW-004   $   14,000,000


TIA-GW-006   $   28,000,000


TIA-GW-007   $   15,000,000


TIA-GW-011   $   10,350,000


TIA-GW-012   $   14,625,000
TIA-GW-016   $   50,700,000

TIA-GW-018   $   19,864,000


TIA-GW-029   $   14,900,000


TIA-GW-030   $    1,849,840 YES   YES

TIA-GW-031   $   100,000,000

TIA-GW-041   $      940,000 YES


TIA-GW-042   $    6,600,000

TIA-GW-047   $   27,000,000


TIA-GW-048   $   40,000,000


TIA-GW-052   $   38,400,000


TIA-GW-053   $    2,900,000


TIA-GW-054   $   160,200,000


TIA-GW-055   $   10,000,000

TIA-GW-056   $   35,700,000

TIA-GW-064   $   45,800,000

TIA-GW-065   $   29,100,000

TIA-GW-066   $   33,700,000

TIA-GW-067   $   19,088,028

TIA-GW-069   $   10,600,000
TIA-GW-070   $     39,300,000


TIA-HE-011   $     17,200,000

TIA-M-032    $     26,790,000 YES




TIA-M-035    $     29,598,999 YES

TIA-RO-004   $      4,895,935


TOTAL:       $   6,082,436,419      26   60
                                                           Location        Requesting
Description/Analysis                                       (County)          Agency
Bridge Improvements throughout area; they include
sidewalk improvements, ADA ramps, no evidence of
bicycle improvements.                                  Atlanta           City of Atlanta

Atlanta Beltline Streetcar Circulator from approved
route northeast to Piedmont Park. Includes a multi-
use trail component parallel to the transit.           Atlanta           City of Atlanta

Atlanta Beltline Streetcar Circulator along North Ave
to MARTA, east to Highland, North along roadway to
farthest Northeast corner of Beltline (Lindbergh).
Includes a multi-use trail component parallel to the
transit. 4.5 mile route.                              Atlanta            City of Atlanta

Atlanta Beltline Streetcar Circulator from Arts
Center, down to 10th, along 10th past Piedmont,
south along Beltline to Euclid, loop around
Euclid/Edgewood, as well as loop along North Ave.
Includes a multi-use trail component parallel to the
transit. 5.4 mile route.                               Atlanta           City of Atlanta

Atlanta Beltline Streetcar Circulator from Midtown
MARTA west through Tech, south along existing rail
line to SW Atlanta. Includes a multi-use trail
component parallel to the transit. 7.9 mile route.     Atlanta           City of Atlanta

Road widening with bicycle and pedestrian facilities
(?) between Venetian Drive and Timothy Drive           Atlanta; Fulton
(along north side of Fort McPherson)                   (South)           City of Atlanta
Complete Streets on Jonesboro from Thirkeld to
Helena; not specific as to whether project will be
avenue (with bike facilities) or street (without)
[according to Connect Atlanta Plan Livable Street
Design Guide]                                          Atlanta           City of Atlanta
Cheshire Bridge Road @ Lindbergh drive (Complete
Streets Improvements)                                                    Roundtable
US78 (Ponce) at Moreland/Briarcliff (Complete
Streets Improvements)                                                    Roundtable
SR140 from East Cherokee Drive to Mountain Road
(Widening, includes sidewalks and bike lanes)
                                                       Cherokee
SR 140 from I-575 to East Cherokee Drive (Widening,
includes sidewalks and bike lanes)                  Cherokee
SR 140 from Mountain Road to Fulton County Line
(Widening, includes sidewalks and bike lanes)        Cherokee
SR20 from I-575 to Scott Road (Widening, includes
bike lanes)                                          Cherokee
SR20 from Scott Road to SR 369 (Widening, includes
bike lanes)                                          Cherokee
SR20 from SR 369 to Post Road (Widening, includes
bike lanes)                                          Cherokee

Roadway widening on Battle Creek Road from Valley
Hill Road to Southlake Parkway (includes sidewalk) Clayton            Clayton County
Roadway widening on Conley Road from I-285 to
Jonesboro Road (includes sidewalk)                 Clayton            Clayton County

New alignment of Jonesboro Connector from Tara to
Lake Jodeco; routes traffic out of Jonesboro city
center, thus improving bicycle and pedestrian
conditions in the downtown area.                    Clayton          Clayton County
Widening of SR920 (McDonough Road) from
Jonesboro road to Tara Boulevard. Includes sidewalk
and bike lanes.                                     Clayton; Fayette Clayton County

Widening of Mount Zion Boulevard from Southlake
Parkway to Somerton Drive (Includes sidewalks)       Clayton          Clayton County
Widening of Moreland from Lake Harbin Road to
Anvilblock (includes sidewalks)                      Clayton          Clayton County

Widening of Fayatteville (SR54) from McDonough to
Tara (includes sidwalks and bike lanes).             Clayton; Fayette Clayton County
Widening of SR85 from Adams Drive to I-75 South
(includes sidewalks).                                Clayton          Clayton County
Widening of SR85 from SR279 to Roberts Drive
(includes sidewalks).                                Clayton; Fayette Clayton County
Multiuse path along Tara Boulevard from Upper
Riverdale to Justice Center                          Clayton          Clayton County
Super Arterial Concept, unsure what bike/ped
component is present.                                Clayton          Clayton County
Widening of Tara from SR81 to Flint River Road
(includes sidewalks and bikable shoulders)           Clayton; Henry   Clayton County

Cobb Parkway from Paces Mill to Akers Mill
(widening, includes sidewalks and multiuse path)    Cobb              Cobb County
Corridor Improvements on Cumberland Boulevard
from Akers Mill to Spring Road (improved pedestrian
access)                                             Cobb              Cobb County
Trust route Corridor Improvements (includes adding
sidewalks where none currently exist)                 Cobb            Cobb County
I-75 at Windy Hill Interchange (includes sidewalk
improvements).                                        Cobb            Cobb County
Widening of Macland road from Paulding to New
Macland (includes sidewalks)                          Cobb            Cobb County
Bridge replacement (Main street in Kennesaw);
includes sidewalks and bike lanes                     Cobb            Cobb County
New allignment: Moon station road (includes
sidewalks and bike lanes)                             Cobb            Cobb County
Bridge replacement (includes sidewalks)               Cobb            Cobb County
Widening of Riverside Parkway from SR6 to Phillips
Drive (generic "pedestrian improvements" are
proposed)                                             Cobb; Douglas   Cobb County
Widening of Roswell road from Bridgegate Drive to
Timber Ridge (includes sidewalks and a parallel
shared-use trail along South side)                    Cobb            Cobb County
Widening of South Cobb Drive from River View to
Atlanta Road (includes adding sidewalks where they
don't currently exist)                                Cobb            Cobb County

South Marietta Parkway from US 41 to Manget
Street (sidewalks and multiuse trail construction).   Cobb            Cobb County
Corridor Improvements on SR92 (adds pedestrian
access to CCT park and ride)                          Cobb            Cobb County
Corridor Improvements on Windy Hill Road from
Austell rd to South Cobb Drive (includes sidewalks
and "multi-use trails")                               Cobb            Cobb County
New alignment of Windy Hill Road/Terrell Mill
Connector                                             Cobb            Cobb County
Widening of Cobb Parkway from Windy Ridge to
Windy Hill (includes sidewalks)                       Cobb            Cobb County
Widening of Cobb Parkway from Windy Hill to Terrell
Mill (includes sidewalks)                             Cobb            Cobb County
Widening of Cobb Parkway from Terrell Mill to South
Marietta Parkway (includes sidwalks)                  Cobb            Cobb County

Widening of Cobb Parkway from South Marietta to
North Marietta (includes sidewalks)                   Cobb            Cobb County
Widening of South Cobb Drive from Atlanta Road to
Cobb Parkway (includes sidewalks where none
currently exist)                                      Cobb            Cobb County

Widening of SR92 from Cobb Parkway to Cherokee
Street (includes sidewalks and multiuse trail)        Cobb            Cobb County
Widening of Windy Hill from South Cobb Drive to
Cobb Parkway (includes "enhanced opportunities for
pedestrian and bicycle travel")                         Cobb     Cobb County
MARTA station accessibility improvements                DeKalb   Perimeter CID
Decatur to Clifton Corridor Improvements
(sidewalks, bike lanes)                                 Dekalb   Decatur
Widening of Bouldercrest Road from I-285 to
Linecrest Road Extension (includes bike lanes and
sidewalks)                                              Dekalb   Dekalb
Corridor Improvements on Briarcliff from Henderson
Mill to Clifton (includes bike lanes, sidewalks,
resurfacing, etc)                                       Dekalb   Dekalb
Corridor Improvements on Browns Mill from
Snapfinger to Rockdale County (includes "bike/ped
improvements")                                          Dekalb   Dekalb
Buford Highway from Lenox Road to Shallowford
Terrace Pedestrian, landscape, and BRT
improvements (includes sidewalks and pedestrian
lightning, possibly more)                               Dekalb   Dekalb
Corridor Improvements on Clairmont Road from SR
141 to Scott Boulevard (includes adding sidewalks
and bike lanes)                                         Dekalb   Dekalb
Clifton road bridge replacement (add sidewalks and
bike lanes)                                             Dekalb   Dekalb

College Avenue from Adair to North Clarendon (in
Decatur), includes sidewalks and bike lanes.            DeKalb   Dekalb
Corridor Improvements on Columbia Drive from
College Avenue to I-20 East (includes sidewalks, bike
lanes)                                                  Dekalb   Dekalb
Corridor Improvements on Cooledge Road from
US78 to Lawrenceville Highway (includes sidewalks
and bike lanes)                                         Dekalb   Dekalb
Corridor Improvements on Covington Highway from
I-285 to Turner Hill Road (includes sidewalks and
bike lanes)                                             Dekalb   Dekalb
East Ponce from DeKalb industrial to Memorial
Drive, Corridor Improvements (includes sidewalks
and bike lanes)                                         Dekalb   Dekalb
Glenwood from Candler road to Covington Highway:
Corridor Improvements (includes sidewalks and bike
lanes)                                                  Dekalb   Dekalb
New alignment of Hayden Quarry Road (unsure of
bike/ped component)                                     Dekalb   Dekalb
Corridor Improvements (includes sidewalks and bike
lanes) on North Indian Creek Drive from Memorial
Drive to Montreal road                               Dekalb    Dekalb
Corridor Improvements (includes sidewalks and bike
lanes) on Lawrenceville hwy from Scott to Hugh
Howell.                                              Dekalb    Dekalb
Bridge Replacement (includes bike lanes and
sidewalks)                                           Dekalb    Dekalb
Corridor Improvements on Montreal Road (unsure of
bike/ped components)                                 Dekalb    Dekalb

Corridor Improvements (includes sidewalks and bike
lanes) on North Druids Hills Road from Buford
Highway to Lawrenceville Highway.                    Dekalb    Dekalb
Corridor Improvements (includes sidewalks and bike
lanes) on Panola Road                                Dekalb    Dekalb
Corridor Improvements (includes sidewalks and bike
lanes) on Rainbow Drive                              Dekalb    Dekalb
Corridor Improvements (includes sidewalks and bike
lanes) on Redan Road                                 Dekalb    Dekalb
Corridor Improvements (includes sidewalks and bike
lanes) on Rockbridge Road                            Dekalb    Dekalb
Pedestrian Improvements (add sidewalks and
improve shoulders) (26 different locations)          Dekalb    Dekalb

Corridor Improvements (includes sidewalks and bike
lanes) on Snapfinger from Flat Shoals to River Road Dekalb     Dekalb
Stone Mountain Lithonia Road from Rockbridge
Road to Lithonia (add lanes and sidewalks to connect
to multi-use trails)                                 Dekalb    Dekalb

I-20 at Panola Road Interchance improvements
(unsure of bike/ped improvements)                  Dekalb      Dekalb
Buford Highway new alignment (includes cycle
tracks, sidewalks)                                 Dekalb      Doraville
Corridor Improvements (includes sidewalks and bike
lanes) on Chamblee Dunwoody Road from I-285 to
Spalding Drive                                     Dekalb      Dunwoody

Pedestrian access (no sidewalk currently exists)     Dekalb    Stone Mountain
Corridor Improvements (includes sidewalks and bike
lanes) on Mt. Vernon Road from Fulton County to
Dunwoody Club Drive                                  DeKalb    Dunwoody
SR92 Road realignment (includes "bicycle and
pedestrian accomodations")                           Douglas   Douglas County
Widening of SR5 from Shoals Road to Kings highway
(adds sidewalks)                                     Douglas   Douglas County
Widening of Lee Road from I-20 to US78 (includes a
multi-use trail and sidewalk)                          Douglas           Douglas County
US78 from SR6 to SR92 realignment (includes
"bicycle and pedestrian accomodations")                Douglas           Douglas County
Multiuse Path along Dorris Road from                                     City of
Transportation Center to Prestley Mill                 Douglas           Douglasville
Multiuse Path along Prestley Millfrom I-20 to Slater                     City of
Mill                                                   Douglas           Douglasville

South Industrial Park Path Connection                  Fayette           Fayette County

SR54 West and Gateway Bridge Path Connections          Fayette           Fayette County

Southeast Industrial Park Path Connection         Fayette                Fayette County
Wilshire Shopping Center/Rite Aid Tunnel Path
Connections                                       Fayette                Fayette County
Multiuse Path along Tyrone Road from SR74 to SR54
(6.2 mile stretch)                                Fayette                Fayette County
                                                                         City of
Road widening and multi-use trail alongside.           Fulton (North)    Alpharetta
                                                                         City of
Road widening (unsure of bike/ped component)           Fulton (North)    Alpharetta
                                                                         City of
Road widening (unsure of bike/ped component)           Fulton (North)    Alpharetta
                                                                         City of
Rucker Road ("operational improvements")               Fulton (North)    Alpharetta

Widening of Hammond Drive from 400 to Ashford          Fulton (North);
Dunwoody rd (unsure bike/ped component)                DeKalb            Perimeter CID
Widening of Hammond Drive from Roswell Road to
SR400 (possibly includes multi-use paths along both                      City of Sandy
sides)                                                 Fulton (North)    Springs
New Alignment of Sandy Springs Circle Extension
from Allen to Northwood (unsure of bike/ped                              City of Sandy
component)                                             Fulton (North)    Springs
Widening of Peachtree Dunwoody (includes                                 City of Sandy
sidewalks)                                             Fulton (North)    Springs
Pedestrian improvements (sidewalks along eastern                         City of Sandy
side of Roswell Road)                                  Fulton (North)    Springs
                                                       Fulton (North);   City of Sandy
Sidewalks and bike lanes along Lake Forrest Drive      Cobb              Springs
Big Creek Bridge Road New Alignment (includes
sidewalks and bike lanes)                              Fulton (North)    City of Roswell

Interchange Improvements (SR400 at Holcomb
Bridge Road) (not specific on bike/ped component)      Fulton (North)    City of Roswell
Corridor Improvements on Atlanta Street from
Chattahoochee River to Marietta Highway (not
specific on bike/ped component)                     Fulton (North)    City of Roswell
Operational Improvements to Houze Road from
Rucker to Mansell (not specific on bike/ped
component)                                          Fulton (North)    City of Roswell

Widening of SR6 from I-85 South to Welcome All                        Cities of College
Road (unsure of bike/ped component)                 Fulton (South)    Park & East Point
Widening of Washington Road from I-285 to Legion
Way (indicates general "bicycle and pedestrian      Fulton (South),   Cities of College
facilities"                                         Clayton           Park & East Point

Beltline Trail extension from West End Mall to      Fulton (South),   Cities of College
College Park                                        Clayton           Park & East Point

Butner Road improvements (sidewalk improvements) Fulton (South)       Fulton

Campbellton Road at Boat Rock Road Intersection
improvements (unsure of bike/ped component)         Fulton (South)    Fulton
SR70 Intersection improvements at multiple
locations (unsure of bike/ped components)           Fulton (South)    Fulton
South Fulton Pedestrian Improvements (install
sidewalks where none currently exist)               Fulton (South)    Fulton
Intersection Improvements (SR92), unsure of
bike/ped components                                 Fulton (South)    Fulton

Buford Highway from George Pierce Park to
McGinnis Ferry Road Corridor Improvements
(general "Bicycle and pedestrian improvements")     Gwinnett          Gwinnett

Buford Highway from Old Peachtree Road to
Sugarloaf Parkway Corridor Improvements (general
"Bicycle and pedestrian improvements")              Gwinnett          Gwinnett

Widening of Buford Highway from Sawnee Ave to
SR347 (unsure of bike/ped improvements)             Gwinnett / Hall   Gwinnett
Buford Highway at Jimmy Carter Boulevard
Intersection Improvements (unsure of bike/ped
components)                                         Gwinnett          Gwinnett

Widening of Five Forks Trickum Road from Killian Hill
Road to Oak Road (includes sidewalks)                 Gwinnett        Gwinnett
Widening of Five Forks Trickum Road from
Constitution Boulevard to Sugarloaf Parkway
(includes sidewalks)                                  Gwinnett        Gwinnett
Hamilton Mill Road Widening (unsure of bike/ped
component)                                           Gwinnett        Gwinnett
Hillcrest Road (new alignment) (unsure of bike/ped
component)                                           Gwinnett        Gwinnett

Killian Hill Road from Camp Creek to Arcado Road
Widening (unsure of bike/ped component)              Gwinnett        Gwinnett

Lawrenceville Highway from Hood Road to Hillcrest
Road Multiuse Trail and Pedestrian Improvements      Gwinnett        Gwinnett
Generic transit project? (No info about location,
mode, anything).                                     Gwinnett        Gwinnett
Pedestrian Intersection Improvements on Peachtree
Industrial Boulevard                                 Gwinnett        Gwinnett
Widening of Pleasant Hill Road from Howell Ferry
Road to Chattahoochee River (not specific about
bike/ped component)                                  Gwinnett        Gwinnett
Satellite Boulevard New Alignment at 1-85 (unsure
of bike/ped component)                               Gwinnett        Gwinnett

SR20 Widening from Peachtree Industrial Boulevard                    Gwinnett,
to Chattahoochee River (sidewalk improvements)       Gwinnett        Forsyth

SR120 from Langley Drive to SR317 Road widening
(not specific about bike/ped component)            Gwinnett          Gwinnett
SR120 from Hill Street to Hospital Connector
Corridor Improvements (not specific about bike/ped
components)                                        Gwinnett          Gwinnett
SR124 from Buford Highway to Barrow County Line
roadway widening (not specific about bike/ped
component)                                         Gwinnett          Gwinnett

SR124 from US78 to Reagan parkway roadway
widening (not specific about bike/ped component)     Gwinnett        Gwinnett
SR141 Roadway widening (not specific about
bike/ped components)                                 Gwinnett, Fulton Gwinnett
US29 widening from SR125 to SR316 (upgraded
sidewalks)                                           Gwinnett        Gwinnett
US78 widening from SR84 to SR81 (unsure of
bike/ped component)                                  Gwinnett        Gwinnett
US78 widening from SR124 to SR84 (not specific
about bike/ped component)                            Gwinnett        Gwinnett
Main Street (Snellville) at SR 124 intersection
improvement (upgraded sidewalks)                     Gwinnett        Gwinnett
Walther Boulevard New alignment (upgraded
sidewalks)                                           Gwinnett        Gwinnett
West Liddell Road New alignment (improved "bicycle
and pedestrian mobility")                          Gwinnett          Gwinnett
Western Parallel Connector from Hudson Bridge
Road to SR920 realignment (not specific about
bike/ped component)                                Henry             Henry
Roosevelt Highway sidewalk improvements and
SR279 Bus service improvements                     Fulton (South)    MARTA

                                                   Atlanta; Fulton
                                                   (South); Fulton
MARTA station access enhancements                  (North); DeKalb   MARTA
Old Convington highway from Green street to East of
SR20 road Widening (bike "route"?)                  Rockdale         Rockdale
NOTES:
Light Green signifies that a project's bike/ped
component is unclear.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:2
posted:5/21/2012
language:
pages:98
censhunay censhunay http://
About