Docstoc

GS1_MO_Global_Agenda_Apr_24_2008xls - GS1 Community Room.xls

Document Sample
GS1_MO_Global_Agenda_Apr_24_2008xls - GS1 Community Room.xls Powered By Docstoc
					                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links

COMPLEX
SIMPLE




         GSMP Local Community Network - Global Agenda                              Page 1 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 2 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 3 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 4 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 5 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 6 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 7 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 8 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                              Page 9 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                             Page 10 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                             Page 11 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                             Page 12 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                             Page 13 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                             Page 14 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                             Page 15 of 313                                           Data Accuracy BRG
                                                         GSMP Local Community Network - Global Agenda - April 2008

Data         Accuracy                  BRG
CR # and Title     CR Summary                           Status            GSMP CR Feedback Question           CR Feedback Results   Additional Comments/Links




         GSMP Local Community Network - Global Agenda                             Page 16 of 313                                           Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 17 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 18 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 19 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 20 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 21 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 22 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 23 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 24 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 25 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 26 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 27 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 28 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 29 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 30 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 31 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 32 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 33 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 34 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 35 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 36 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 37 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 38 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 39 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 40 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 41 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 42 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 43 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 44 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 45 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 46 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 47 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 48 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 49 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 50 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 51 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 52 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 53 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 54 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 55 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 56 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 57 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 58 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 59 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 60 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 61 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 62 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 63 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 64 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 65 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 66 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 67 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 68 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 69 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 70 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 71 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 72 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 73 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 74 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 75 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 76 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 77 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 78 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 79 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 80 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 81 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 82 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 83 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 84 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 85 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 86 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 87 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 88 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 89 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 90 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 91 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 92 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 93 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 94 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 95 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 96 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 97 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 98 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 99 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 100 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 101 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 102 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 103 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 104 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 105 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 106 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 107 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 108 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 109 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 110 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 111 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 112 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 113 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 114 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 115 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 116 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 117 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 118 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 119 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 120 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 121 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 122 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 123 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 124 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 125 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 126 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 127 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 128 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 129 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 130 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 131 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 132 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 133 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 134 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 135 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 136 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 137 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 138 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 139 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 140 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 141 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 142 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 143 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 144 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 145 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 146 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 147 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 148 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 149 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 150 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 151 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 152 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 153 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 154 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 155 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 156 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 157 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 158 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 159 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 160 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 161 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 162 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 163 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 164 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 165 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 166 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 167 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 168 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 169 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 170 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 171 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 172 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 173 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 174 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 175 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 176 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 177 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 178 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 179 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 180 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 181 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 182 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 183 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 184 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 185 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 186 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 187 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 188 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 189 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 190 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 191 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 192 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 193 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 194 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 195 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 196 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 197 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 198 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 199 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 200 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 201 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 202 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 203 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 204 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 205 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 206 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 207 of 313   Data Accuracy BRG
GSMP Local Community Network - Global Agenda   Page 208 of 313   Data Accuracy BRG
  GSMP Local Community Network - Global Agenda - April 2008
GD S N B R G
CR # and Title      CR Summary                                           Status                       GSMP CR Feedback Question                                 CR Feedback Results                    Additional Comments &
                                                                                                                                                                                                       Links
C O MPL EX
07-000050 Modular    The main purpose of this Change Request is          CRs entered for simple       No LCN Feedback needed. This is an                        None                                   None
Item W ork Group    to improve the infrastructure of the GDSN by         changes to the trade item.   informational update.
                    developing a more flexible trade item easier to      Being processed by
                    implement and maintain for the users of the          GDSN BRG
                    network.
07-000223 GDSN      Build a permanent solution (in the core trade        Modular Item Work Group      January LCN Question: Please choose the option you        January Global Agenda Feedback -       January Survey Results
Maintenance         item or one of its extensions) for the current       for Attributes associated    feel best represents your thoughts towards the            Result - 15 Responses received. Next
Release W ork       fast track attributes being supported within         with Duties/Fees:in          proposed solution to replace the GDD Fast Track           Step a- BRG Manager and Liaisons
Group (Permanent    GDSN. This work will enable the use of               Review                       Attributes. Recall FastTrack attributes were put in       will align responses with Core
Solution for GDD    dependencies and GDSN validations to be              A) Phase One eBallot         place as an interim solution until a more
                    performed on the attributes.
FastTrack)                                                               approved                     robust/permanent solution could be found.
                    Attribute Name                                       B) Phase Two eBallot
                    Attribute Definition                                 ends Mar-11-2008

07-000226, Trade    Proposal
                    Development of Phase 3 of the Trade Item             Work Group Formed            Space Planning Guidelines for GDSN : The GDSN             New Question:                          Link to Survey in CR Feedback
Item                Implementation Guide. Currently working on                                        Trade Item Implementation Guide workgroup is                                                     Questions Tab
Implementation      the following Topics:                                                             currently developing a recommended set of best            April Global Agenda Feedback Needed
Guide Phase 3       1. Fresh Foods                                                                    practices and guidelines around Item Space Planning
                    2. Broker / Distributor Model                                                     and the use of Nesting Dimensions for the optimal
                    3. Food & Beverage                                                                allocation of shelf space. In many instances the space
                                                                                                      planning dimensions of an Item (which are not always
                    We have identified the following new topics in                                    available in GDSN) might differ from its “standard”
                    the latest Call-To-Action, but we need content                                    dimensions, thereby causing possible confusion
                    leaders:                                                                          during implementation.
                    1. Mergers / Acquisition
                    2. Product Specific Implementation Procedures                                     We are looking for any existing information or best
                    (Lumber, Gypsum)                                                                  practices with regards to Space Planning in GDSN.
                    3. CIC Response
                    4. Date Fields (Product Life Span Fields)
                    5. Description Fields
                    6. Tax Fields
                    7. BarCodes Related Attributes
                    8. Creating and Implementing extended
                    Attributes
                    9. Alcoholic Beverages Attributes
                    10. Office Products Attributes
                    11. Hazmat Attributes


07-000332 Party     The Party Synchronisation Attributes for Party       BR Requested                  If you have any changes, deletions or additions to       New Question:                          Link to Survey in CR Feedback
Sync W ork Group    Contacts currently listed in the draft Party                                      these contact attributes, please provide them and their                                          Questions Tab
                    Synchronisation Business Requirement are:                                         definitions in the Comments Box. Be sure to respond       April Global Agenda Feedback Needed
                    Website, Fax, Email, Phone.                                                       only with attributes that are relevant, useful and have
                                                                                                      clear definitions.




07-000332 Party     The Electronic Product Code (EPC) is an              BR Requested                 March LCN Question: Should EPC identifiers be      March Global Agenda Feedback -                                                Party   BR Requested
Sync W ork Group    identiication scheme for universally identifying                                  transmitted in GDSN Enhanced Party Synchronisation Result - 19Responses received: 1 yes,
                    physical objects via Radio Frequency                                              messages?                                          exchange it; 17 Don't exchange now but
                    Identification (RFID) tags and other means.                                                                                                  ay
                                                                                                                                                         needs m change. 13 other responses:
                                                                                                                                                         architecture around GLNe and sGLN
                                                                                                                                                           ust
                                                                                                                                                         m be resolved before com    panies use
                                                                                                                                                         the formats.
                                                                                                                                                                                                       March Survey Results
07-000332 Party     Enhanced Party Sync Work Group - Draft Party         BR Requested                 February LCN Question (repeated from January): The February Global Agenda Feedback -             February Survey Results         Party   BR Requested
Sync W ork Group    Roles are:                                                                        current draft list of party roles for GDSN Enhanced    Result - 3 Responses received: ok as
                    BILL_TO Party which receives goods and                                            Party Sync is provided here. If you have any additions is; 2 with additions to Party Roles.
                    invoice.                                                                          or changes to the list, please provide the role name   Work Group will discuss at GSMP
                    BROKER_AGENT A person who buys or sells                                                                                                  Brussels event
                                                                                                      and role definition in the text box.
                    for another entity without having title to the
07-000430 Complex   property. is to form the work group and build
                    This CR                                              BSD phase                    * Moved into a class in core item                         None                                   None
                    the related solution standards for the price
                    sync requirement approved by the GDSN BRG
                    (see Maintenance Release Methodology).


07-000456 GDSN      The GDSN Trade Item Implementation Guide             LCN February Global          February LCN Question: The GDSN Trade Item              February Global Agenda Feedback -        February Survey Results
Trade Item          Workgroup is developing GDSN                         Agenda Feedback              Implementation Guide Workgroup is developing            Result - 3 Reconnaissance Type
                    Implementation Guidelines for the                    provided                     GDSN Implementation Guidelines for the                  Responses received. Scenarios will be
Implementation
                    Broker/Distributor model. A Broker/Distributor                                    Broker/Distributor model. A Broker/Distributor model    considered in GDSN Implementation
Guide                                                                                                                                                         Guide
                    model supports a supplier making strategic                                        supports a supplier making strategic decisions to
                    decisions to differentiate the flow of information                                differentiate the flow of information and goods between
                    and goods between several companies to the                                        several companies to the Retailer. Our group is
                    Retailer. Our group is trying to develop                                          trying to develop recommendations as to how Data
                    recommendations as to how Data                                                    Synchronisation can be leveraged to enhance the
                    Synchronisation can be leveraged to enhance                                       Broker/Distributor model in a complex supply chain.
                    the Broker/Distributor model in a complex
                    supply chain.                                                                     We are requesting any information or scenarios on
                                                                                                      how your trading partners might be using GDSN in a
                    We are requesting any information or                                              Multi-National/Multi-Distributor Network. The
                    scenarios on how your trading partners might                                      scenario should assume that the Brand Owner does
                    be using GDSN in a Multi-National/Multi-                                          not manufacture nor distribute the product that is
                    Distributor Network. The scenario should                                          being traded within the supply chain.
                    assume that the Brand Owner does not
                    manufacture nor distribute the product that is
                    being traded within the supply chain.


08-000013 Complex   CR to form the GDSN Code List Improvement BR in Progress WG                       No LCN Feedback needed. This is an                        None                                   None
                    Work Group. The purpose of the group is to       active meets on Mondays          informational update.
                    Harmonise and update the PackagingMaterial at 8:30 AM ET
                    and PackagingType Code Lists with other
                    applicable packaging material and packaging
                    types. Create clear definitions for the existing
                    values in these lists. Additonal data attributes
                    are required to those existing in the current
                    standard/sxtentions to express the complete set
                    of Television Features in todays busienss
                    environment.



08-000025 Complex    Currently there are two ways to send                Assessment Completed         No LCN Feedback needed. This is an                        None                                   None                                    BR Requested
                     information on multiple trade items                 sent to GDSN Inc. for        informational update.
                     within one hierarchical structure (i.e a            review and next steps
                     pallet and all its child items). Option A
                     One is to create a separate CIN
                     message for each Trade Item. In this
                     case the hierarchy is linked by the
                     GTIN and quantity provided in the
                     ChildTradeItem class. In this case it is
                     possible to indicate the status of each
                     GTIN in a hierarchy separately (ADD,
                     CHANGE_BY_REFRESH, CORRECT,
                     DELETE) since the Document
                     Command is at the CIN level. Option
                     B The alternate option is to enter
                     information about the hierarchy's all
                     Trade Items into one CIN message
                     using the
                     CatalogueItemChildItemLink class. It
                     is still mandatory to use the
                     ChildTradeItem class within the Trade
                     Item. In this case it is not possible to
                     specify the status for each GTIN, and
                     the information in ChildTradeItem is
                     duplicated. This Change Request is to
SI MPL E             have only one way to specify the
08-000001           Additional attributes are required to do             eBallot ends 2 weeks after   No LCN Feedback needed. This is an                        None                                   None
                    business in the Hardlines and Consumer                errata already added by     informational update.
                    Electronics verticals, specifically associated        Donna Liotta is checked
                    with clothing drying machines. These are                  by Robin & Eric
                    attributes that are not part of core or other
                    extension, however are necessary to provide
                    information to the end consumer.

08-000014 Simple    This CR has been submitted on behalf of the     BRAD in progress                  No LCN Feedback needed. This is an                        None                                   None
                    GS1 UK Electrical Group part of the multi-                                        informational update.
                    industry Data Synchronisation Group.
                    Companies include Comet, John Lewis
                    Partnership,DSGi, Panasonic, Sony, Philips,
                    Toshiba, Electrolux, Indesit, LG, CNET, GfK.
                    Additonal data attributes are required to those
                    existing in the current standard/sxtentions to
                    express the complete set of Television
                    Features in todays busienss environment.
                    Manufacturers to be able to fully express the
                    features of their productz for Retailers to use
                    to best advantage when interacting with end
                    consumers through shop floor and internet
                    channels. For internet channel providers to use
                    the braodes set of available data to allow
                    consumers best possible comparisen
                    opportunities. Adequate review of existing TV
                    Data Attributes in the e'Best Buy' extention.
                    Continuing development of Television products
                    means that the list of data attributes will
                    continue to evolve.




08-000017 Simple    Attribute Name: isTradeItemADisplayUnit -            Motioned to 30 day Public    No LCN Feedback needed. This is an                        None                                   None
Level 2             Type: Boolean. Definition: An indication               Review April 1, 2008       informational update.
                    whether a trade item is or could be used as a        Review begins April 3rd
                                                                          2008 and ends May 3rd
                    display unit. A display unit is intended to be
                                                                                   2008
                    shipped to a store without being split at a
                    distribution centre or similar party and is
                    intended to be displayed in a retail store either
                    on a shelf or on the shop floor. A display unit
                    is an orderable unit. A display unit has one or
                    multiple child items that are consumer units
                    and may be at any level in a trade item
                    hierarchy except BASE_UNIT_OR_EACH.




08-000021           Additional attributes are required to                Public review ends April     No LCN Feedback needed. This is an                        None                                   None
                    do business in the Hardlines and                     28th 2008                    informational update.
                    Consumer Electronics verticals,
                    specifically associated with cookers,
                    ovens, warmers, ranges and
                    microwaqves. These are attributes
                    that are not part of core or other
                    extension, however are necessary to
                    provide information to the end
                    consumer. By taking this approach
                    the Hardlines and Consumer
                    Electronics communities will benefit
                    from the establishment of a GDSN
                    compliant method of sending
                    marketing and other attributes
                    through the network and securing
                    global support for our standards. This
                    would lower the cost of doing
                    business, eliminate the need for
                    proprietary data communications
08-000024 Simple    Enable users to indicate stacking links                Approved April 8,2008      No LCN Feedback needed. This is an                        None                                   None
Level 3             factor during transport storage                           Approved = 27,          informational update.
                    separately (separate attributes).                        Dissapprove = 0
                    Enables actors in a supply chain to
                    optimize tranports and storage. The
                    definition of the current attribute
                    stackingFactor does not indicate if the
                    information is for storage or
                    transport, so users may have
                    interpreted this information
                    differently. That may lead to a minor
                    migration issue. For transport
                    optimization in distribution it is
                    important to know if pallets can be
                    stacked in trucks or not. Currently a
                    pallet may have a stacking factor 3
08-000034 Simple    Enhance the ability to extend the                     eBallot began April 9th     No LCN Feedback needed. This is an                        None                                   None
Level 2             price message. This allows an                        2008 and ends 11 AM ET       informational update.
                    implementation and flexibility similar                   April 28th 2008.
                    to Item. Provides flexibility to extend
                    the price message at the individual
                    price record level (price type,
                    relationship and condition) as
                    additional attributes are required by
                    the community. These attribute
                    needs include specific requirements
                    by region, sector, or process (such as
                    New Item attributes) This will allow
                    organizations to implement
                    functionality at the appropriate level
                    of the price data via the extension
                    capability and framework. Allows
                    attributes to be added to the price
                    message that may relate to a specific
                    segment (relationship, condition, or
                    price type), rather than the entire
                    document. This is important to be
                    able to relate and synchronize
                    attribute values at an individual price
08-000043 Simple    Create 2 new GDD Fast Track attributes being         Refinement in progress. -    No LCN Feedback needed. This is an                        None                                   None
Level 2             handled as a simple CR under our new                 No Country of settlement     informational update.
                    process : "countryOfSettlement" (Country             info from Casino yet.
                    where the invoice is getting paid) and               Benjamin is checking with
                                                                         Casino to see if this CR
                    "isTradeItemAFreeItem" (This item is free.
                                                                         should be a Price Sync
                    Mainly related to non food item (Ex buy a
                                                                         CR. NOT ES: Neither
                    computer, get the case free)) [We will be            attribute should be
                    using the simple CR process targeting next           implemented as
                    maintenance release if motioned on to public         mandatory, both are
                    review] - Both attributes will be changed to be      repeatable.
                    optional and scope issues for the second
                    attribute will be defined (e.g., Does this CR
                    apply to Gift with purchase, Free Goods, or
                    other items)


08-000060 Being     Enable users to indicate that the                    08-000060 Being              No LCN Feedback needed. This is an                        None                                   None
assessed by GDSN    Trade Item information for a new                     assessed by GDSN             informational update.
Maintenance         item that is passed to the data                      Maintenance Release
Release W G         recipient is preliminary and will be                 WG April 14th 2008
                    updated to its final values at a later
                    stage. There is no requirement to
                    change any other validations,
                    business rules or cardinalities.

                     Retailers often ask their suppliers for
                     Item Data for a new item a certain
                     time before the item is introduced. In
                     many cases the supplier does not
                     have all the final attribute values for
                     the item until the first batch is
                     produced. Attribute values that often
                     needs change at a late stage include
                     measurements, weights and
08-000061 Simple    An ability to synchronise data via GS1 Poland        Public Review ends April     No LCN Feedback needed. This is an                        None                                   None
Level 1             Since GS1 Poland will get a new product              28th 2008 5PM ET             informational update.
                    classification schema with the Release FnF
                    4.4 it is of utmost importance to get GSMP
                    approval for GS1 Poland as authorised Code
                    Agency organisation
                    "additionalClassificationAgencyName" to
                    submit and maintain the related code lists. This
                    is not the case today but from now on a
                    prerequisite to synchronise data via GDSN.


08-000062 Simple    Since GS1Russia will get a new product           Public Review ends April         No LCN Feedback needed. This is an                        None                                   None
Level 1             classification schema with the Release FnF       28th 2008 5PM ET                 informational update.
                    4.4 it is of utmost importance to get GSMP
                    approval for Federal Agency on Technical
                    Regulating and Metrology of the Russia
                    Federation as authorised Code Agency
                    organisation
                    "additionalClassificationAgencyName" to
                    submit and maintain the related code lists. This
                    is not the case today but from now on a
                    prerequisite to synchronise data via GDSN.
                    1Sync suppliers for example wouldn't be able to
                    synchronise data via GS1 Russia.


08-000063 Simple    To add TN_VED value to Import Classification         Public Review ends April     No LCN Feedback needed. This is an                        None                                   None
Level 1             Type code list to provide an ability to              28th 2008 5PM ET             informational update.
                    synchronise data via GS1 Russia. Since
                    SINFOS Russia will get a new product
                    classification schema with the Release FnF
                    4.4 it is of utmost importance to get GSMP
                    approval for adding TN_VED value to Import
                    Classification Type code list. This is not the
                    case today but from now on a prerequisite to
                    synchronise data via GDSN. 1Sync suppliers
                    for example wouldn't be able to synchronise
                    data via GS1 Russia.


08-000065 Simple    Additional attributes are required to do             Teleconference held on       No LCN Feedback needed. This is an                        None                                   None
Level 2             business in the Hardlines and Consumer               Alternate Monday             informational update.
                    Electronics verticals, associated with               mornings at 9:30 AM ET
                    Refrigeration Appliances [10003694-                  to join this group please
                    Refrigerators, 10003695-                             contact Melanie Kudela &
                    Refrigerator/Freezer Combo, and 10003698-            Donna Liotta
                    Freezers]. These are attributes that are not
                    part of core or other extension, however are
                    necessary to provide information to the end
                    consumer.

08-000066 Simple    Requesting sustainable packaging Attributes          Public Review on             No LCN Feedback needed. This is an                        None                                   None
Level 2             and Codes to be added to GDSN Trade Item.            Attributes Only ends April   informational update.
                    Suppliers will be able to provide Wal-Mart with      17th 2008. The Code
                    their sustainable packaging attributes via           additions have been
                    GDSN and other Retailers will have the ability       moved to a new CR.
                    to leverage these attributes also.




08-000070 Simple    CR 08-070 Add Nomenclador Mercosur to           Public Review ends May            No LCN Feedback needed. This is an                        None                                   None
Level 1             import classification types. The MERCOSUR       3rd 2008                          informational update.
                    is a regional trade agreement created in 1991,
                    and it is integrated by Brazil, Argentina,
                    Uruguay, Paraguay and Venezuela. Having
                    this code value will allow users to pass
                    information that isd otherwise required through
                    GDS.



08-000077 Simple    Proposal : Additional attributes are required to Simple Level 2 Present as        No LCN Feedback needed. This is an                        None                                   None
Level 2             do business in the Hardlines and Consumer        Informational April 22,          informational update.
                    Electronics verticals, specifically associated   2008
                    with Major Domestic Appliances and
                    Computer/Video Games & Software. These are
                    attributes that are not part of core or other
                    extension, however are necessary to provide
                    information to the end consumer.




                                                                                  GSMP Local Community Network - Global Agenda                                                                                                                                Page 209 of 313   GDSN BRG
  GSMP Local Community Network - Global Agenda - April 2008
GD S N B R G
CR # and Title   CR Summary             Status                      GSMP CR Feedback Question   CR Feedback Results   Additional Comments &
                                                                                                                      Links




                                                 GSMP Local Community Network - Global Agenda                                                 Page 210 of 313   GDSN BRG
GSMP Local Community Network - Global Agenda   Page 211 of 313   GDSN BRG
GSMP Local Community Network - Global Agenda   Page 212 of 313   GDSN BRG
                  GSMP Local Community Network - Global Agenda - April 2008
BARCO DES                BRG
CR # and Title    CR Summary                                     Status                       GSMP CR Feedback Question            CR Feedback Results   Additional Comments &
                                                                                                                                                         Links
C O MPL EX
07-000394 GSMP    Solid oral form requirements are documented    Business Requirements        No LCN Feedback needed. This is an   None                  None
Healthcare        in a Phase 1 draft (Business Requirements      Analysis Phase               informational update.
                  Analysis Document) BRAD. Version 2 of this
Dispensing Unit
                  draft has been created. It incorporates
W ork Group       comments from GS1 Canada. This version is
                  in internal review. Once finalized,
                  requirements for gels, creams, sprays, etc.
                  will be documented in Phase 2 BRAD.


08-0000076        This request is to bring members of BarCodes   NEW CR                       No LCN Feedback needed. This is an   None                  None
                  and EPC global together to align the           Being evaluated in step 1.   informational update.
                  standards for Extended GLN and SGLN. This
                  source of this request was the 60 day public
                  review.

SI MPL E
07-000415         Wording changes to 6.3.1                       This WO failed a motion      No LCN Feedback needed. This is an   None                  None
                                                                 to progress to eBallot and   informational update.
                                                                 will be sent back to
                                                                 BarCodes TDT for
                                                                 additional evaluations.
07-000452         Direct Marking - GS1 128                       BTG will be conducting a     No LCN Feedback needed. This is an   None                  None
                                                                 study on printing GS1 128    informational update.
                                                                 and other symbols on
                                                                 cartons. The study will
                                                                 take about 6 months.
08-000012         Update system logic for databar and datamatrix The DTPs are now posted No LCN Feedback needed. This is an        None                  None
                                                                 for a 30 day public review informational update.

08-000029         Best Before Data human readable format         A global solution, ISO       No LCN Feedback needed. This is an   None                  None
                                                                 8601, provides a format      informational update.
                                                                 for dates. This change
                                                                 request is closed.
08-000036         Amend Sections 5.6 and 8.1                     The DTPs are now posted No LCN Feedback needed. This is an        None                  None
                                                                 for a 30 day public review. informational update.

08-000059         Clarify GRAI and GIAI                          NEW CR                       No LCN Feedback needed. This is an   None                  None
                                                                 Being evaluated in step 1.   informational update.

08-000073         Update AI 401 and AI 402                       NEW CR                       No LCN Feedback needed. This is an   None                  None
                                                                 Being evaluated in step 1.   informational update.

08-0000075        ISBN - 14 digit GTIN                           NEW CR                       No LCN Feedback needed. This is an   None                  None
                                                                 Being evaluated in step 1.   informational update.

08-000085         Wording changes to AI 703                      NEW CR                       No LCN Feedback needed. This is an   None                  None
                                                                 Being evaluated in step 1.   informational update.




                                                                          GSMP Local Community Network - Global Agenda                                                           Page 213 of 313   BarCodes BRG
GSMP Local Community Network - Global Agenda   Page 214 of 313   BarCodes BRG
GSMP Local Community Network - Global Agenda - April 2008
eCOM             BRG
CR # and Title     CR Summary                            Status                   GSMP CR Feedback Question                            CR Feedback Results              Additional Comments & Links

COMPLEX
CR 07-420          New code for INVOIC BGM DE1001 (67:   eBallot open - 20080416 February LCN Question: The industry needs to         February Global Agenda Feedback   Link to February Survey
                   Commercial Dispute)                   - 20080430              reference GTIN, product description, extra           Results - Agreement               Results
                                                                                 product information, pack qty, prices, received
                                                                                 and ordered qty etc. New type of the invoice will
                                                                                 allow the buyer to make a request for credit from
                                                                                 the supplier using INVOIC (using structure of LIN
                                                                                 segment), i.e. with greater level of product details
                                                                                 than COMDIS message offers. COMDIS has the
                                                                                 ability to reference original invoice line number
                                                                                 through DLI segment. However, to link INVOIC's
                                                                                 line through DLI of COMDIS would be an
                                                                                 extremely advanced implementation, and this
                                                                                 cannot be accepted by the industry.

                                                                                  Proposed solution:
                                                                                  Introduce new code to DE1001 in BGM of
                                                                                  INVOIC. This code will signify new type of invoice
                                                                                  message. This new type of the invoice message
                                                                                  can be sent from the buyer back to the supplier
                                                                                  indicating problems with the original invoice
                                                                                  received by the buyer.
                                                                                  3 Questions to LCN:
                                                                                  1 Do you or your trading partners have users
                                                                                  implementing the COMDIS message and if so,
                                                                                  how many in total?
                                                                                  2 What processes/messages do you use to
                                                                                  signal a request for credit (due to damaged
                                                                                  goods, returns, short supply, etc) from a retailer
                                                                                  to a supplier?
                                                                                  3 Of the two solutions – addition of code 67 to
                                                                                  the INVOIC or development of the COMDIS
                                                                                  (potentially to include a LIN segment) - which is
                                                                                  the preferred solution?




         GSMP Local Community Network - Global Agenda                                       Page 215 of 313                                                                          eCom BRG
GSMP Local Community Network - Global Agenda - April 2008
eCOM             BRG
CR # and Title     CR Summary                                          Status                  GSMP CR Feedback Question                          CR Feedback Results            Additional Comments & Links

CR 07-422          Extend DE 1004 in BGM from 17 to 35                 eBallot open - 20080416 January LCN Question: GS1 Russia, GS1       January Global Agenda Feedback        January Survey Results
                   Char. For use of Global Document Type               - 20080430              Ireland, GS1 GO, GS1 Sweden, GS1 Spain, GS1 Results - 12 Yes; 9 No Responses
                   Identifier to be enabled in all EANCOM                                      France, and GS1 Switzerland were discussing
                   message.                                                                    the proposal from GS1 Sweden to remove the
                                                                                               recommendation “It is recommended that the
                                                                                               length of the document number be restricted to a
                                                                                               maximum of 17 characters” which is to be found
                                                                                               in the element C106/1004 of the BGM segment
                                                                                               in all EANCOM messages . The EDIFACT
                                                                                               segment requires up to 35 an characters.

                                                                                               The group agreed on the fact that the removal of
                                                                                               the recommendation should be accompanied by
                                                                                               strong business cases. In the document
                                                                                               enclosed, GS1 Sweden gives some examples,
                                                                                               amongst which figures the use of the GDTI,
                                                                                               which makes the removal necessary.

                                                                                               But the need from one country only is not
                                                                                               deemed enough to make the change to the
                                                                                               system.

                                                                                               Therefore the group wishes to question the
                                                                                               GSMP LCN on whether the participating
                                                                                               countries have business needs to remove the
                                                                                               recommendation.


07-439, 440,       (GS1 France) Invoice CR’s                           Public Review Started   No LCN Feedback needed. This is an informational None                             None
441, 442, 443,                                                         20080403.               update.
444, 445, 446,
447, 448, 449
CR 07-455          Develop and realise Business Message                PDD to be prepared by                                                      New Question:                  Link to Survey in CR
                                                                       GS1 NL
                                                                                               3 Questions asked of LCN. See
                   Standards for the quotation process, i.e.                                                                                                                     Feedback Questions Tab
                   request for quote and quote (EANCOM                                         CR Feedback Question Tab for                       April Global Agenda Feedback
                   messages REQUOTE and QUOTES).                                               this CR.                                           Needed
CR 08-004, 005,    New CR's from GS1 Australia on behalf of            Public Review Started   No LCN Feedback needed. This is an informational None                             None
006, 007, 008, 009 NEHTA.                                              20080424.               update.

CR 08-019          Inclusion of optional netPrice & netAmount          Public Review Started   No LCN Feedback needed. This is an informational   None                           None
                   in consumptionReport                                20080424.               update.
CR 08-033          Effective Start & End Date & Time in                Public Review Started   No LCN Feedback needed. This is an informational   None                           None
                   Purchase Conditions                                 20080424.               update.
CR 08-039          Address details in Ship-To when no GLN              Public Review Started   No LCN Feedback needed. This is an informational   None                           None
                   (Despatch Advice)                                   20080424.               update.
CR 08-040          Possibility to make it clear if a supplier may/or   Public Review Started   No LCN Feedback needed. This is an informational   None                           None
                   may not do a partial delivery.                      20080424.               update.
CR 08-042          Address details for Ultimate Consignee when no      Public Review Started   No LCN Feedback needed. This is an informational   None                           None
                   GLN (Orders)                                        20080424.               update.
         GSMP Local Community Network - Global Agenda                                                   Page 216 of 313                                                                       eCom BRG
GSMP Local Community Network - Global Agenda - April 2008
eCOM             BRG
CR # and Title     CR Summary                                          Status                  GSMP CR Feedback Question                            CR Feedback Results               Additional Comments & Links
CR 08-044          SSCC in IFCSUM                                      First Assessment        No LCN Feedback needed. This is an informational None                                  None
                                                                                               update.
CR 08-045          Party reference in RFF - IFCSUM                     First Assessment        No LCN Feedback needed. This is an informational None                                  None
                                                                                               update.
CR 08-046          Open use of DE9012 in STS - IFTSTA                  First Assessment        No LCN Feedback needed. This is an informational None                                  None
                                                                                               update.
CR 08-049          free-text comments field at the invoiceLineItem     Public Review Started   No LCN Feedback needed. This is an informational None                                  None
                   level of the invoice message                        20080424.               update.

CR 08-053          Addition of shipmentDetail type to the line level   Public Review Started   No LCN Feedback needed. This is an informational None                                  None
                   of the Order Response message                       20080424.               update.
CR 08-054          addition of a new field(delivery date for           Public Review Started   No LCN Feedback needed. This is an informational None                                  None
                   variances) at the line level of Despatch message    20080424.               update.

CR 08-055          add a new code ‘ABN’ to                             Public Review Started   No LCN Feedback needed. This is an informational None                                  None
                   ‘AdditionalPartyIdentificationListType’ (Multi      20080424.               update.
                   Shipment Order)
eCom Code lists Codelists                                              LCN Feedback            November LCN Question: Should EANCOM and GS1         November Global Agenda Feedback   November Survey Results
Update                                                                 Received                XML code values be systematically aligned? If yes,   Results - Agreement
                                                                                               which one should be the driver - EANCOM or GS1
                                                                                               XML?


EANCOM2008                                                             under discussion        October LCN Question: Is there a business need October Global Agenda Feedback -        October Survey Results
CD                                                                                             to produce an updated EANCOM2002CD with all Final Result - Agreement
                                                                                               approved CR by 2008?




         GSMP Local Community Network - Global Agenda                                                    Page 217 of 313                                                                           eCom BRG
GSMP Local Community Network - Global Agenda - April 2008
eCOM             BRG
CR # and Title     CR Summary                           Status   GSMP CR Feedback Question   CR Feedback Results   Additional Comments & Links




         GSMP Local Community Network - Global Agenda                    Page 218 of 313                                        eCom BRG
GSMP Local Community Network - Global Agenda - April 2008
eCOM             BRG
CR # and Title     CR Summary                           Status   GSMP CR Feedback Question   CR Feedback Results   Additional Comments & Links




         GSMP Local Community Network - Global Agenda                    Page 219 of 313                                        eCom BRG
GSMP Local Community Network - Global Agenda - April 2008
eCOM             BRG
CR # and Title     CR Summary                           Status   GSMP CR Feedback Question   CR Feedback Results   Additional Comments & Links




         GSMP Local Community Network - Global Agenda                    Page 220 of 313                                        eCom BRG
GSMP Local Community Network - Global Agenda   Page 221 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 222 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 223 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 224 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 225 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 226 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 227 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 228 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 229 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 230 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 231 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 232 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 233 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 234 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 235 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 236 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 237 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 238 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 239 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 240 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 241 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 242 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 243 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 244 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 245 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 246 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 247 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 248 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 249 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 250 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 251 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 252 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 253 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 254 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 255 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 256 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 257 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 258 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 259 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 260 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 261 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 262 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 263 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 264 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 265 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 266 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 267 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 268 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 269 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 270 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 271 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 272 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 273 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 274 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 275 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 276 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 277 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 278 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 279 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 280 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 281 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 282 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 283 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 284 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 285 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 286 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 287 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 288 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 289 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 290 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 291 of 313   eCom BRG
GSMP Local Community Network - Global Agenda   Page 292 of 313   eCom BRG
                                                      GSMP Local Community Network - Global Agenda - April 2008
                                                                         Other Topics
CR # and Title                    CR Summary                   Status          GSMP CR Feedback Question     CR Feedback Results   Additional Comments & Links




       GSMP Local Community Network - Global Agenda                            Page 293 of 313                                                 Other Topics
GSMP Local Community Network - Global Agenda   Page 294 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 295 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 296 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 297 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 298 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 299 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 300 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 301 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 302 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 303 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 304 of 313   Other Topics
GSMP Local Community Network - Global Agenda   Page 305 of 313   Other Topics
GSMP Local Community Netw ork - Global Agenda - April 2008

C R Fe e d b a c k Q u e s t i o n s
CR # and Title               GSMP CR Feedback Question                                                         CR Feedback Results and        Additional Comments/Links
                                                                                                               Resolutions
Data Accuracy
BARCODES
eC OM
07-000455                    This CR is submitted to develop Business Message Standards and realise GS1        BR Requested                   New Question
                             XML Schemas for the quotation process, i.e. request for quote and quote
                             (EANCOM messages REQUOTE and QUOTES).

                             Question 1: Are Request for Quote and Quote part of your Business Processes
                             in general?

                             Question 2: If yes, do you already exchange them electronically?

                             Question 3: In any case, are you willing to participate in development of GS1
                             XML standards for this process?



GD SN
07-000226, Trade Item        Space Planning Guidelines for GDSN : The GDSN Trade Item Implementation           New Question:                  New Question
Implementation Guide         Guide workgroup is currently developing a recommended set of best practices
Phase 3                      and guidelines around Item Space Planning and the use of Nesting Dimensions       April Global Agenda Feedback
                             for the optimal allocation of shelf space. In many instances the space planning   Needed
                             dimensions of an Item (which are not always available in GDSN) might differ
                             from its “standard” dimensions, thereby causing possible confusion during
                             implementation.

                             W e are looking for any existing information or best practices with
                             regards to Space Planning in GDSN.



07-000332 Party Sync W ork   The Party Synchronisation Attributes for Party Contacts currently listed in the   New Question:                  New Question
Group                        draft Party Synchronisation Business Requirement are: Website, Fax, Email,
                             Phone. If you have any changes, deletions or additions to these contact           April Global Agenda Feedback
                             attributes, please provide them and their definitions in the Comments Box. Be     Needed
                             sure to respond only with attributes that are relevant, useful and have clear
                             definitions.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:5/21/2012
language:
pages:313
wangnuanzg wangnuanzg http://
About