MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 129 TO NC 143 SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009B US 74 NORTH OF CHEOAH EE,GRAHAM N RIGHT-OF-WAY 2014 2014 $11,000 $11,000
NC 143 NORTH OF
CHEOAH TO NC 28 AT
STECOAH - RIGHT OF SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009C US 74 WAY ONLY. EE,GRAHAM N RIGHT-OF-WAY 2014 2014 $14,500 $14,500
US 129 TO NC 143 SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009B US 74 NORTH OF CHEOAH EE,GRAHAM N MITIGATION 2015 2015 $2,487 $2,487
GRADING AND
STRUCTURES ( EXCEPT
TUNNELS), NC 143
NORTH OF CHEOAH TO SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009CA US 74 NC 28. EE,GRAHAM N MITIGATION 2015 2015 $3,919 $3,919
US 129 TO NC 143 SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009B US 74 NORTH OF CHEOAH EE,GRAHAM N CONSTRUCTION 2016 2019 $56,600 $14,150 $14,150 $14,150 $14,150
GRADING AND
STRUCTURES ( EXCEPT
TUNNELS), NC 143
NORTH OF CHEOAH TO SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009CA US 74 NC 28. EE,GRAHAM N CONSTRUCTION 2016 2019 $101,000 $25,250 $25,250 $25,250 $25,250
TUNNELS AT SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009CB US 74 APPALACHIAN TRAIL. EE,GRAHAM N CONSTRUCTION 2016 2019 $157,000 $39,250 $39,250 $39,250 $39,250
PAVING, NC 143 NORTH
OF CHEOAH TO NC 28 AT SWAIN,CHEROK SOUTHWESTER
HIGHWAY A-0009 A-0009CC US 74 STECOAH. EE,GRAHAM N CONSTRUCTION 2020 2020 $19,000 $19,000
CORRIDOR "K", US 19-74-
129 AT
ANDREWS TO NC 28
EAST OF
ALMOND. FOUR LANE
DIVIDED
FACILITY, PRIMARILY ON
NEW SWAIN,CHEROK SOUTHWESTER BEFORE
HIGHWAY A-0009 A-0009 US 74 LOCATION. EE,GRAHAM N 2011 $80,579 $80,579
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
US 19 BUSINESS IN SWAIN,CHEROK SOUTHWESTER ON IN ON IN
HIGHWAY A-0009 A-0009A US 74 ANDREWS TO US 129. EE,GRAHAM N CONSTRUCTION 2012 2012 $366,000 366,000.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
US 19 BUSINESS IN SWAIN,CHEROK SOUTHWESTER ON IN ON IN
HIGHWAY A-0009 A-0009A US 74 ANDREWS TO US 129. EE,GRAHAM N RIGHT-OF-WAY 2012 2012 $5,000 5,000.00
I-26 (US NORTH OF I-240 IN MADISON,BUNC ASHEVILLE,LAN
HIGHWAY A-0010 A-0010AA 19-23) ASHEVILLE TO US 25. OMBE D OF SKY RIGHT-OF-WAY 2018 2018 $1,000 $1,000
I-26 (US MADISON,BUNC ASHEVILLE,LAN
HIGHWAY A-0010 A-0010AB 19-23) US 25 TO SR 2207. OMBE D OF SKY RIGHT-OF-WAY 2020 2020 $500 $500
I-240 IN ASHEVILLE TO
TENNESSEE
STATE LINE AT SAMS
GAP. MULTI-
LANE FREEWAY, PART
I-26 (US ON NEW MADISON,BUNC ASHEVILLE,LAN BEFORE
HIGHWAY A-0010 A-0010 19-23) LOCATION. OMBE D OF SKY 2011 $303,188 $303,188
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
I-26 (US NORTH OF I-240 IN MADISON,BUNC ASHEVILLE,LAN AFTER
HIGHWAY A-0010 A-0010AA 19-23) ASHEVILLE TO US 25. OMBE D OF SKY CONSTRUCTION 2020 2020 $54,300 $13,575 40,725.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
I-26 (US MADISON,BUNC ASHEVILLE,LAN ON IN ON IN
HIGHWAY A-0010 A-0010AB 19-23) US 25 TO SR 2207. OMBE D OF SKY CONSTRUCTION 2012 2012 $58,600 58,600.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
I-26 (US SR 2207 TO SOUTH OF MADISON,BUNC ASHEVILLE,LAN ON IN ON IN
HIGHWAY A-0010 A-0010AC 19-23) SR 2148 OMBE D OF SKY CONSTRUCTION 2012 2012 $23,000 23,000.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
I-26 (US SR 2207 TO SOUTH OF MADISON,BUNC ASHEVILLE,LAN ON IN ON IN
HIGHWAY A-0010 A-0010AC 19-23) SR 2148 OMBE D OF SKY RIGHT-OF-WAY 2012 2012 $500 500.00
NC 69, GEORGIA STATE
LINE TO US 64.
WIDEN TO FOUR LANES
DIVIDED. US 64,
NC 69 TO EAST OF NC
175. UPGRADE
ROADWAY WITH SOME
US 64- WIDENING TO SOUTHWESTER BEFORE
HIGHWAY A-0011 A-0011 NC 69 FIVE LANES. CLAY N 2011 $29,641 $29,641
SCHEDU SCHEDU
LED FOR LED FOR
GEORGIA STATE LINE REPRIO REPRIO
TO US 64 (HAYESVILLE RITIZATI RITIZATI
US 64- BYPASS). WIDEN TO SOUTHWESTER ON IN ON IN
HIGHWAY A-0011 A-0011C NC 69 FOUR-LANES. CLAY N CONSTRUCTION 2012 2012 $29,000 29,000.00
SCHEDU SCHEDU
LED FOR LED FOR
GEORGIA STATE LINE REPRIO REPRIO
TO US 64 (HAYESVILLE RITIZATI RITIZATI
US 64- BYPASS). WIDEN TO SOUTHWESTER ON IN ON IN
HIGHWAY A-0011 A-0011C NC 69 FOUR-LANES. CLAY N RIGHT-OF-WAY 2012 2012 $14,700 14,700.00
INTRACOASTAL
WATERWAY TO SUNSET
BEACH. REPLACE BEFORE
HIGHWAY B-0682 B-0682 SR 1172 BRIDGE NO. 198 BRUNSWICK CAPE FEAR 2011 $44,100 $44,100
SOUTH FORK NEW
RIVER.
REPLACE BRIDGE NO. 39
(COORDINATE WITH R- BEFORE
HIGHWAY B-1037 B-1037 US 221 2310) ASHE HIGH COUNTRY 2011 $3,412 $3,412
BEAVERDAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-1135 B-1135 SR 1314 139 CLEVELAND LAKE NORMAN CONSTRUCTION 2011 2011 $295 $295
BEAVERDAM CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-1135 B-1135 SR 1314 139 CLEVELAND LAKE NORMAN 2011 $75 $75
NORTH ELLIS STREET
OVER SOUTHERN
SALISBU RAILWAY. REPLACE BEFORE
HIGHWAY B-2085 B-2085 RY BRIDGE NO. 393 ROWAN CONCORD 2011 $332 $332
EAST FISHER STREET
OVER SOUTHERN
SALISBU RAILWAY. REPLACE BEFORE
HIGHWAY B-2086 B-2086 RY BRIDGE NO. 138 ROWAN CONCORD 2011 $0
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
OREGON INLET.
HIGHWAY B-2500 B-2500 NC 12 REPLACE BRIDGE NO. 11 DARE ALBEMARLE MITIGATION 2011 2011 $1,260 $1,260
OREGON INLET.
HIGHWAY B-2500 B-2500 NC 12 REPLACE BRIDGE NO. 11 DARE ALBEMARLE CONSTRUCTION 2011 2014 $234,000 $58,500 $58,500 $58,500 $58,500
OREGON INLET. BEFORE
HIGHWAY B-2500 B-2500 NC 12 REPLACE BRIDGE NO. 11 DARE ALBEMARLE 2011 $16,267 $16,267
OREGON INLET. GARVEE AFTER
HIGHWAY B-2500 B-2500 NC 12 REPLACE BRIDGE NO. 11 DARE ALBEMARLE CONSTRUCTION 2011 2020 $88,285 $3,838 $7,677 $7,677 $7,677 $7,677 $7,677 $7,677 $7,677 $7,677 $7,677 15,354.00
BROWN CREEK.
HIGHWAY B-2506 B-2506 SR 1627 REPLACE BRIDGE NO. 8 ANSON ROCKY RIVER CONSTRUCTION 2016 2016 $1,200 $1,200
BROWN CREEK. BEFORE
HIGHWAY B-2506 B-2506 SR 1627 REPLACE BRIDGE NO. 8 ANSON ROCKY RIVER 2011 $247 $247
SWANNANOA RIVER. BEFORE
HIGHWAY B-2515 B-2515 NC 81 REPLACE BRIDGE NO. 39 BUNCOMBE ASHEVILLE 2011 $5,021 $5,021
ALEXANDER RAILROAD.
REPLACE BRIDGE NO.
513
SOUTHERN RAILROAD.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-2576 B-2576 SR 1421 514 IREDELL LAKE NORMAN 2011 $6,119 $6,119
GLADE STREET OVER
PETERS CREEK.
WINSTO REPLACE BRIDGE NO. WINSTON- BEFORE
HIGHWAY B-2882 B-2882 N-SALEM 387 FORSYTH SALEM 2011 $0
LITTLE ROCKFISH
CREEK.
HIGHWAY B-2948 B-2948 SR 1104 REPLACE BRIDGE NO. 78 CUMBERLAND FAYETTEVILLE MITIGATION 2012 2012 $33 $33
LITTLE ROCKFISH
CREEK.
HIGHWAY B-2948 B-2948 SR 1104 REPLACE BRIDGE NO. 78 CUMBERLAND FAYETTEVILLE RIGHT-OF-WAY 2012 2012 $80 $80
LITTLE ROCKFISH
CREEK.
HIGHWAY B-2948 B-2948 SR 1104 REPLACE BRIDGE NO. 78 CUMBERLAND FAYETTEVILLE UTILITIES 2012 2012 $44 $44
LITTLE ROCKFISH
CREEK.
HIGHWAY B-2948 B-2948 SR 1104 REPLACE BRIDGE NO. 78 CUMBERLAND FAYETTEVILLE CONSTRUCTION 2013 2013 $1,850 $1,850
LITTLE ROCKFISH
CREEK. BEFORE
HIGHWAY B-2948 B-2948 SR 1104 REPLACE BRIDGE NO. 78 CUMBERLAND FAYETTEVILLE 2011 $120 $120
US 64-
NC 33
MAIN TAR RIVER. REPLACE UPPER BEFORE
HIGHWAY B-2965 B-2965 STREET BRIDGE NO. 24 EDGECOMBE COASTAL PLAIN 2011 $11,495 $11,495
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
EAST FORK OF PIGEON
RIVER. SOUTHWESTER BEFORE
HIGHWAY B-2988 B-2988 SR 1890 REPLACE BRIDGE NO. 13 HAYWOOD N 2011 $1,248 $1,248
US 29-64-70/I-85
BUSINESS LOOP.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-3159 B-3159 NC 8 27 DAVIDSON TRIAD RIGHT-OF-WAY 2014 2014 $550 $550
US 29-64-70/I-85
BUSINESS LOOP.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-3159 B-3159 NC 8 27 DAVIDSON TRIAD CONSTRUCTION 2015 2015 $5,500 $5,500
US 23-74 RICHLAND CREEK.
NORTHB REPLACE BRIDGE
OUND NO. 155 AND BRIDGE NO.
HIGHWAY B-3186 B-3186 LANE 158 HAYWOOD ASHEVILLE RIGHT-OF-WAY 2018 2018 $800 $800
US 23-74 RICHLAND CREEK.
NORTHB REPLACE BRIDGE
OUND NO. 155 AND BRIDGE NO.
HIGHWAY B-3186 B-3186 LANE 158 HAYWOOD ASHEVILLE CONSTRUCTION 2019 2020 $7,900 $3,950 $3,950
WEST FORK PIGEON
RIVER.
HIGHWAY B-3187 B-3187 SR 1112 REPLACE BRIDGE NO. 79 HAYWOOD ASHEVILLE CONSTRUCTION 2011 2011 $1,850 $1,850
WEST FORK PIGEON
RIVER. BEFORE
HIGHWAY B-3187 B-3187 SR 1112 REPLACE BRIDGE NO. 79 HAYWOOD ASHEVILLE 2011 $898 $898
SOUTHERN RAILROAD.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3189 B-3189 SR 1643 272 HAYWOOD ASHEVILLE 2011 $3,995 $3,995
DUCK CREEK. REPLACE
HIGHWAY B-3315 B-3315 SR 1356 BRIDGE NO. 333 CALDWELL UNIFOUR RIGHT-OF-WAY 2019 2019 $50 $50
DUCK CREEK. REPLACE
HIGHWAY B-3315 B-3315 SR 1356 BRIDGE NO. 333 CALDWELL UNIFOUR CONSTRUCTION 2020 2020 $500 $500
CHEOAH RIVER. SOUTHWESTER BEFORE
HIGHWAY B-3335 B-3335 SR 1134 REPLACE BRIDGE NO. 70 GRAHAM N 2011 $1,704 $1,704
HEMPHILL CREEK. SOUTHWESTER BEFORE
HIGHWAY B-3343 B-3343 SR 1318 REPLACE BRIDGE NO. 48 HAYWOOD N 2011 $1,543 $1,543
SACONON CREEK.
HIGHWAY B-3346 B-3346 SR 1734 REPLACE BRIDGE NO. 42 HENDERSON ASHEVILLE RIGHT-OF-WAY 2012 2012 $410 $410
SACONON CREEK.
HIGHWAY B-3346 B-3346 SR 1734 REPLACE BRIDGE NO. 42 HENDERSON ASHEVILLE UTILITIES 2012 2012 $45 $45
SACONON CREEK.
HIGHWAY B-3346 B-3346 SR 1734 REPLACE BRIDGE NO. 42 HENDERSON ASHEVILLE CONSTRUCTION 2013 2013 $650 $650
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SACONON CREEK.
HIGHWAY B-3346 B-3346 SR 1734 REPLACE BRIDGE NO. 42 HENDERSON ASHEVILLE MITIGATION 2013 2013 $138 $138
SACONON CREEK. BEFORE
HIGHWAY B-3346 B-3346 SR 1734 REPLACE BRIDGE NO. 42 HENDERSON ASHEVILLE 2011 $75 $75
SOUTH FORK JONES
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3404 B-3404 SR 1127 314 ANSON ROCKY RIVER 2011 $1,220 $1,220
SOUTHERN RAILWAY.
REPLACE BRIDGE NO.
HIGHWAY B-3421 B-3421 SR 1002 266 CABARRUS CONCORD CONSTRUCTION 2012 2012 $4,100 $4,100
SOUTHERN RAILWAY.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3421 B-3421 SR 1002 266 CABARRUS CONCORD 2011 $4,844 $4,844
SR 1331 NANTAHALA FOREST,
BEAVER PFH 1331(6).
DAM HANGING DOG CREEK,
ROAD FH REPLACE SOUTHWESTER BEFORE
HIGHWAY B-3430 B-3430 60 BRIDGE NO. 43 CHEROKEE N 2011 $708 $708
NEW HOPE CREEK.
REPLACE
BRIDGE NO. 217,
SANDY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3450 B-3450 SR 1116 122. DURHAM DURHAM 2011 $4,986 $4,986
PANTHER CREEK. SOUTHWESTER
HIGHWAY B-3457 B-3457 SR 1232 REPLACE BRIDGE NO. 68 GRAHAM N CONSTRUCTION 2011 2011 $400 $400
PANTHER CREEK. SOUTHWESTER BEFORE
HIGHWAY B-3457 B-3457 SR 1232 REPLACE BRIDGE NO. 68 GRAHAM N 2011 $106 $106
STECOAH CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-3458 B-3458 SR 1237 114 GRAHAM N CONSTRUCTION 2011 2011 $435 $435
STECOAH CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-3458 B-3458 SR 1237 114 GRAHAM N 2011 $188 $188
EAST FORK
TUCKASEGEE RIVER. SOUTHWESTER
HIGHWAY B-3480 B-3480 NC 107 REPLACE BRIDGE NO. 39 JACKSON N CONSTRUCTION 2011 2011 $3,250 $3,250
EAST FORK
TUCKASEGEE RIVER. SOUTHWESTER BEFORE
HIGHWAY B-3480 B-3480 NC 107 REPLACE BRIDGE NO. 39 JACKSON N 2011 $1,408 $1,408
BIG PINE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3488 B-3488 SR 1151 142 MADISON LAND OF SKY 2011 $825 $825
SWIFT CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3523 B-3523 SR 1300 525 WAKE RALEIGH 2011 $880 $880
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MOUNT OLIVET ROAD
OVER THREE MILE
KANNAP BRANCH. REPLACE BEFORE
HIGHWAY B-3540 B-3540 OLIS BRIDGE NO. 44 CABARRUS CONCORD 2011 $946 $946
FAIRVIEW STREET OVER
CHAMBERS BRANCH.
KANNAP REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3541 B-3541 OLIS 234 CABARRUS CONCORD 2011 $694 $694
PUMP STATION ROAD
OVER BAKERS
CREEK BRANCH.
KANNAP REPLACE BRIDGE BEFORE
HIGHWAY B-3542 B-3542 OLIS NO. 277 ROWAN CONCORD 2011 $676 $676
PINCH GUT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-3545 B-3545 SR 1880 127 CATAWBA HICKORY CONSTRUCTION 2011 2011 $575 $575
PINCH GUT CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3545 B-3545 SR 1880 127 CATAWBA HICKORY 2011 $153 $153
NORTH TOE RIVER. BEFORE
HIGHWAY B-3608 B-3608 US 19E REPLACE BRIDGE NO. 44 AVERY HIGH COUNTRY 2011 $1,573 $1,573
PANTEGO CREEK.
HIGHWAY B-3611 B-3611 NC 99 REPLACE BRIDGE NO. 77 BEAUFORT MID-EAST CONSTRUCTION 2011 2011 $22,100 $22,100
PANTEGO CREEK. BEFORE
HIGHWAY B-3611 B-3611 NC 99 REPLACE BRIDGE NO. 77 BEAUFORT MID-EAST 2011 $1,351 $1,351
SOUTH RIVER. BEFORE
HIGHWAY B-3613 B-3613 NC 41 REPLACE BRIDGE NO. 44 BLADEN MID-CAROLINA 2011 $2,871 $2,871
BILL MOORE CREEK.
HIGHWAY B-3619 B-3619 SR 3439 REPLACE BRIDGE NO. 56 BUNCOMBE ASHEVILLE CONSTRUCTION 2011 2011 $1,000 $1,000
BILL MOORE CREEK. BEFORE
HIGHWAY B-3619 B-3619 SR 3439 REPLACE BRIDGE NO. 56 BUNCOMBE ASHEVILLE 2011 $356 $356
JUNALUSKA CREEK. SOUTHWESTER BEFORE
HIGHWAY B-3635 B-3635 SR 1505 REPLACE BRIDGE NO. 26 CHEROKEE N 2011 $859 $859
I-40. REPLACE BRIDGE
NO. 37
AND REVISE WINSTON- GARVEE
HIGHWAY B-3637 B-3637 NC 801 INTERCHANGE. DAVIE SALEM CONSTRUCTION 2011 2018 $10,656 $1,332 $1,332 $1,332 $1,332 $1,332 $1,332 $1,332 $1,332
I-40. REPLACE BRIDGE
NO. 37
AND REVISE WINSTON- BEFORE
HIGHWAY B-3637 B-3637 NC 801 INTERCHANGE. DAVIE SALEM 2011 $16,230 $16,230
US 70 CAMPUS DRIVE.
BUSINES REPLACE BRIDGE NO.
HIGHWAY B-3638 B-3638 S 316 DURHAM DURHAM CONSTRUCTION 2012 2012 $1,300 $1,300
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 70 CAMPUS DRIVE.
BUSINES REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3638 B-3638 S 316 DURHAM DURHAM 2011 $380 $380
MINGO SWAMP.
REPLACE BRIDGE NO. 29 BEFORE
HIGHWAY B-3654 B-3654 NC 55 AND BRIDGE NO. 53 HARNETT MID-CAROLINA 2011 $2,739 $2,739
JUMPING RUN CREEK. BEFORE
HIGHWAY B-3655 B-3655 SR 1120 REPLACE BRIDGE NO. 59 HARNETT FAYETTEVILLE 2011 $1,412 $1,412
PIGEON RIVER.
REPLACE BRIDGE
NO. 419. (COORDINATE
US 19-23- WITH PROJECT
HIGHWAY B-3656 B-3656 74 R-4406) HAYWOOD ASHEVILLE CONSTRUCTION 2011 2011 $2,400 $2,400
PIGEON RIVER.
REPLACE BRIDGE
NO. 419. (COORDINATE
US 19-23- WITH PROJECT BEFORE
HIGHWAY B-3656 B-3656 74 R-4406) HAYWOOD ASHEVILLE 2011 $802 $802
CRAWFORD CREEK. SOUTHWESTER BEFORE
HIGHWAY B-3657 B-3657 SR 1100 REPLACE BRIDGE NO. 9 HAYWOOD N 2011 $520 $520
CRABTREE CREEK. SOUTHWESTER BEFORE
HIGHWAY B-3661 B-3661 SR 1503 REPLACE BRIDGE NO. 36 HAYWOOD N 2011 $1,690 $1,690
NORTH BRANCH
HUNGRY RIVER. BEFORE
HIGHWAY B-3666 B-3666 SR 1799 REPLACE BRIDGE NO. 53 HENDERSON ASHEVILLE 2011 $1,240 $1,240
SECOND BROAD RIVER.
HIGHWAY B-3673 B-3673 US 221 REPLACE BRIDGE NO. 17 MCDOWELL ISOTHERMAL RIGHT-OF-WAY 2013 2013 $450 $450
SECOND BROAD RIVER.
HIGHWAY B-3673 B-3673 US 221 REPLACE BRIDGE NO. 17 MCDOWELL ISOTHERMAL MITIGATION 2014 2014 $54 $54
SECOND BROAD RIVER.
HIGHWAY B-3673 B-3673 US 221 REPLACE BRIDGE NO. 17 MCDOWELL ISOTHERMAL CONSTRUCTION 2015 2016 $6,300 $3,150 $3,150
SECOND BROAD RIVER. BEFORE
HIGHWAY B-3673 B-3673 US 221 REPLACE BRIDGE NO. 17 MCDOWELL ISOTHERMAL 2011 $130 $130
IRVINS CREEK. BEFORE
HIGHWAY B-3677 B-3677 SR 3135 REPLACE BRIDGE NO. 36 MECKLENBURG CHARLOTTE 2011 $3,129 $3,129
US 15- CSX TRANSPORTATION. TRIANGLE
HIGHWAY B-3680 B-3680 501 REPLACE BRIDGE NO. 2 MOORE AREA MITIGATION 2011 2011 $237 $237
US 15- CSX TRANSPORTATION. TRIANGLE
HIGHWAY B-3680 B-3680 501 REPLACE BRIDGE NO. 2 MOORE AREA CONSTRUCTION 2012 2013 $9,200 $4,600 $4,600
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 15- CSX TRANSPORTATION. TRIANGLE BEFORE
HIGHWAY B-3680 B-3680 501 REPLACE BRIDGE NO. 2 MOORE AREA 2011 $598 $598
TAR RIVER. REPLACE
BRIDGE NO. 129
TAR RIVER OVERFLOW.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3684 B-3684 SR 1565 127 PITT MID-EAST 2011 $16,179 $16,179
RAFT SWAMP. REPLACE
BRIDGE
NO. 211. HOLLY SWAMP
REPLACE BRIDGE NO.
207.
SADDLETREE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-3693 B-3693 SR 1527 210 ROBESON LUMBER RIVER CONSTRUCTION 2011 2012 $4,300 $2,150 $2,150
RAFT SWAMP. REPLACE
BRIDGE
NO. 211. HOLLY SWAMP
REPLACE BRIDGE NO.
207.
SADDLETREE SWAMP.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3693 B-3693 SR 1527 210 ROBESON LUMBER RIVER 2011 $446 $446
FISHING CREEK. BEFORE
HIGHWAY B-3706 B-3706 SR 1100 REPLACE BRIDGE NO. 20 WARREN KERR TAR 2011 $1,018 $1,018
POND CREEK. REPLACE BEFORE
HIGHWAY B-3707 B-3707 SR 1507 BRIDGE NO. 67 WARREN KERR TAR 2011 $1,062 $1,062
WEST FORK PINE
SWAMP CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3802 B-3802 SR 1169 229 ASHE HIGH COUNTRY 2011 $865 $865
LITTLE PHOENIX CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3806 B-3806 SR 1573 456 ASHE HIGH COUNTRY 2011 $1,545 $1,545
PUNGO CREEK. BEFORE
HIGHWAY B-3809 B-3809 NC 99 REPLACE BRIDGE NO. 64 BEAUFORT MID-EAST 2011 $6,385 $6,385
INDIAN CREEK. BEFORE
HIGHWAY B-3811 B-3811 SR 1108 REPLACE BRIDGE NO. 85 BERTIE PEANUT BELT 2011 $525 $525
JOHNS RIVER. REPLACE
HIGHWAY B-3819 B-3819 SR 1356 BRIDGE NO. 184 CALDWELL UNIFOUR RIGHT-OF-WAY 2011 2011 $60 $60
JOHNS RIVER. REPLACE
HIGHWAY B-3819 B-3819 SR 1356 BRIDGE NO. 184 CALDWELL UNIFOUR UTILITIES 2011 2011 $15 $15
JOHNS RIVER. REPLACE
HIGHWAY B-3819 B-3819 SR 1356 BRIDGE NO. 184 CALDWELL UNIFOUR CONSTRUCTION 2012 2012 $650 $650
JOHNS RIVER. REPLACE BEFORE
HIGHWAY B-3819 B-3819 SR 1356 BRIDGE NO. 184 CALDWELL UNIFOUR 2011 $150 $150
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
FRIAR SWAMP.
REPLACE BRIDGE
NO. 363 AND BRIDGE NO. BEFORE
HIGHWAY B-3830 B-3830 SR 1947 364 COLUMBUS CAPE FEAR 2011 $5,227 $5,227
SOUTHERN RAILWAY. PIEDMONT BEFORE
HIGHWAY B-3833 B-3833 I-85 SBL REPLACE BRIDGE NO. 22 DAVIDSON TRIAD 2011 $0
YADKIN RIVER. WINSTON- BEFORE
HIGHWAY B-3835 B-3835 US 158 REPLACE BRIDGE NO. 35 DAVIE SALEM 2011 $18,073 $18,073
TAR RIVER. REPLACE
HIGHWAY B-3841 B-3841 SR 1138 BRIDGE NO. 83 GRANVILLE KERR TAR MITIGATION 2012 2012 $33 $33
CAPE FEAR RIVER AND
OVERFLOW. REPLACE
BRIDGE NO.12 , BRIDGE
NO. 18 AND BRIDGE NO.
HIGHWAY B-4028 B-4028 NC 11 42 BLADEN MID-CAROLINA MITIGATION 2011 2011 $371 $371
CAPE FEAR RIVER AND
OVERFLOW. REPLACE
BRIDGE NO.12 , BRIDGE
NO. 18 AND BRIDGE NO.
HIGHWAY B-4028 B-4028 NC 11 42 BLADEN MID-CAROLINA RIGHT-OF-WAY 2011 2011 $900 $900
CAPE FEAR RIVER AND
OVERFLOW. REPLACE
BRIDGE NO.12 , BRIDGE
NO. 18 AND BRIDGE NO.
HIGHWAY B-4028 B-4028 NC 11 42 BLADEN MID-CAROLINA UTILITIES 2011 2011 $600 $600
CAPE FEAR RIVER AND
OVERFLOW. REPLACE
BRIDGE NO.12 , BRIDGE
NO. 18 AND BRIDGE NO.
HIGHWAY B-4028 B-4028 NC 11 42 BLADEN MID-CAROLINA CONSTRUCTION 2012 2014 $12,600 $4,200 $4,200 $4,200
CAPE FEAR RIVER AND
OVERFLOW. REPLACE
BRIDGE NO.12 , BRIDGE
NO. 18 AND BRIDGE NO. BEFORE
HIGHWAY B-4028 B-4028 NC 11 42 BLADEN MID-CAROLINA 2011 $502 $502
CANAL. REPLACE BEFORE
HIGHWAY B-4029 B-4029 NC 210 BRIDGE NO. 8 BLADEN MID-CAROLINA 2011 $2,279 $2,279
BEAR BRANCH. BEFORE
HIGHWAY B-4030 B-4030 NC 130 REPLACE BRIDGE NO. 9 BRUNSWICK CAPE FEAR 2011 $1,622 $1,622
BROAD RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4032 B-4032 NC 9 130 BUNCOMBE LAND OF SKY 2011 $2,400 $2,400
HOMINY CREEK. BEFORE
HIGHWAY B-4033 B-4033 NC 112 REPLACE BRIDGE NO. 85 BUNCOMBE ASHEVILLE 2011 $4,771 $4,771
STONY FORK CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4034 B-4034 NC 151 134 BUNCOMBE LAND OF SKY 2011 $1,272 $1,272
SOUTH HOMINY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4037 B-4037 SR 3452 262 BUNCOMBE ASHEVILLE 2011 $2,728 $2,728
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LINVILLE RIVER. BEFORE
HIGHWAY B-4038 B-4038 NC 183 REPLACE BRIDGE NO. 26 BURKE UNIFOUR 2011 $2,936 $2,936
PARKS CREEK. BEFORE
HIGHWAY B-4043 B-4043 SR 1424 REPLACE BRIDGE NO. 51 BURKE UNIFOUR 2011 $1,000 $1,000
CREEK. REPLACE BEFORE
HIGHWAY B-4045 B-4045 SR 1736 BRIDGE NO. 19 BURKE UNIFOUR 2011 $691 $691
WHITE OAK CREEK.
REPLACE BRIDGE
NO. 175, JACOB FORK.
HIGHWAY B-4046 B-4046 SR 1901 REPLACE BRIDGE NO. 38 BURKE UNIFOUR RIGHT-OF-WAY 2011 2011 $40 $40
WHITE OAK CREEK.
REPLACE BRIDGE
NO. 175, JACOB FORK.
HIGHWAY B-4046 B-4046 SR 1901 REPLACE BRIDGE NO. 38 BURKE UNIFOUR UTILITIES 2011 2011 $60 $60
WHITE OAK CREEK.
REPLACE BRIDGE
NO. 175, JACOB FORK.
HIGHWAY B-4046 B-4046 SR 1901 REPLACE BRIDGE NO. 38 BURKE UNIFOUR CONSTRUCTION 2012 2012 $1,500 $1,500
WHITE OAK CREEK.
REPLACE BRIDGE
NO. 175, JACOB FORK. BEFORE
HIGHWAY B-4046 B-4046 SR 1901 REPLACE BRIDGE NO. 38 BURKE UNIFOUR 2011 $100 $100
RIGHT PRONG MUD
CREEK.
REPLACE BRIDGE NO. 75
LEFT PRONG MUD
CREEK.
HIGHWAY B-4147 B-4147 SR 1123 REPLACE BRIDGE NO. 76 HENDERSON ASHEVILLE CONSTRUCTION 2012 2012 $900 $900
RIGHT PRONG MUD
CREEK.
REPLACE BRIDGE NO. 75
LEFT PRONG MUD
CREEK. BEFORE
HIGHWAY B-4147 B-4147 SR 1123 REPLACE BRIDGE NO. 76 HENDERSON ASHEVILLE 2011 $250 $250
THIRD CREEK. REPLACE BEFORE
HIGHWAY B-4156 B-4156 SR 1537 BRIDGE NO. 95 IREDELL LAKE NORMAN 2011 $489 $489
ROCKY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4158 B-4158 SR 1854 228 IREDELL LAKE NORMAN 2011 $1,186 $1,186
TUCKESEGEA RIVER.
REPLACE DECK ON SOUTHWESTER
HIGHWAY B-4159 B-4159 SR 1002 BRIDGE NO. 108 JACKSON N RIGHT-OF-WAY 2011 2011 $40 $40
TUCKESEGEA RIVER.
REPLACE DECK ON SOUTHWESTER
HIGHWAY B-4159 B-4159 SR 1002 BRIDGE NO. 108 JACKSON N CONSTRUCTION 2012 2012 $400 $400
TUCKESEGEA RIVER.
REPLACE DECK ON SOUTHWESTER BEFORE
HIGHWAY B-4159 B-4159 SR 1002 BRIDGE NO. 108 JACKSON N 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
TUCKASEGEE RIVER.
REPLACE DECK BRIDGE SOUTHWESTER
HIGHWAY B-4160 B-4160 SR 1002 NO. 82 JACKSON N RIGHT-OF-WAY 2011 2011 $52 $52
TUCKASEGEE RIVER.
REPLACE DECK BRIDGE SOUTHWESTER
HIGHWAY B-4160 B-4160 SR 1002 NO. 82 JACKSON N CONSTRUCTION 2012 2012 $2,000 $2,000
TUCKASEGEE RIVER.
REPLACE DECK BRIDGE SOUTHWESTER BEFORE
HIGHWAY B-4160 B-4160 SR 1002 NO. 82 JACKSON N 2011 $100 $100
TUCKASEGEE RIVER.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4161 B-4161 SR 1132 211 JACKSON N 2011 $1,406 $1,406
SOUTHERN RAILWAY.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4162 B-4162 SR 1432 320 JACKSON N MITIGATION 2011 2011 $8 $8
SOUTHERN RAILWAY.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4162 B-4162 SR 1432 320 JACKSON N RIGHT-OF-WAY 2011 2011 $70 $70
SOUTHERN RAILWAY.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4162 B-4162 SR 1432 320 JACKSON N CONSTRUCTION 2012 2012 $700 $700
SOUTHERN RAILWAY.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4162 B-4162 SR 1432 320 JACKSON N 2011 $200 $200
SCOTTS CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4163 B-4163 SR 1437 123 JACKSON N 2011 $1,810 $1,810
CLARK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4176 B-4176 SR 1008 118 LINCOLN LAKE NORMAN CONSTRUCTION 2011 2011 $3,500 $3,500
CLARK CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4176 B-4176 SR 1008 118 LINCOLN LAKE NORMAN 2011 $350 $350
RABBIT CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4179 B-4179 SR 1513 REPLACE BRIDGE NO. 65 MACON N 2011 $1,358 $1,358
LAUREL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4182 B-4182 SR 1503 246 MADISON LAND OF SKY RIGHT-OF-WAY 2012 2012 $45 $45
LAUREL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4182 B-4182 SR 1503 246 MADISON LAND OF SKY CONSTRUCTION 2013 2013 $475 $475
LAUREL CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4182 B-4182 SR 1503 246 MADISON LAND OF SKY 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MIDDLE FORK CREEK.
REPLACE BRIDGE NO. 29
WITH CULVERT.
CROOKED CREEK.
HIGHWAY B-4183 B-4183 SR 1526 REPLACE BRIDGE NO. 28 MADISON LAND OF SKY CONSTRUCTION 2011 2011 $700 $700
MIDDLE FORK CREEK.
REPLACE BRIDGE NO. 29
WITH CULVERT.
CROOKED CREEK. BEFORE
HIGHWAY B-4183 B-4183 SR 1526 REPLACE BRIDGE NO. 28 MADISON LAND OF SKY 2011 $136 $136
HARDISON MILL CREEK.
HIGHWAY B-4185 B-4185 NC 171 REPLACE BRIDGE NO. 16 MARTIN MID-EAST MITIGATION 2012 2012 $8 $8
HARDISON MILL CREEK.
HIGHWAY B-4185 B-4185 NC 171 REPLACE BRIDGE NO. 16 MARTIN MID-EAST RIGHT-OF-WAY 2012 2012 $60 $60
HARDISON MILL CREEK.
HIGHWAY B-4185 B-4185 NC 171 REPLACE BRIDGE NO. 16 MARTIN MID-EAST CONSTRUCTION 2013 2013 $600 $600
HARDISON MILL CREEK. BEFORE
HIGHWAY B-4185 B-4185 NC 171 REPLACE BRIDGE NO. 16 MARTIN MID-EAST 2011 $150 $150
SOUTH MUDDY CREEK. BEFORE
HIGHWAY B-4189 B-4189 NC 226 REPLACE BRIDGE NO. 49 MCDOWELL ISOTHERMAL 2011 $2,083 $2,083
HOPPER CREEK. BEFORE
HIGHWAY B-4190 B-4190 NC 226 REPLACE BRIDGE NO. 37 MCDOWELL ISOTHERMAL 2011 $1,337 $1,337
CREEK. REPLACE BEFORE
HIGHWAY B-4191 B-4191 NC 226 BRIDGE NO. 82 MCDOWELL ISOTHERMAL 2011 $1,319 $1,319
CROOKED CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4194 B-4194 SR 1129 103 MCDOWELL ISOTHERMAL 2011 $1,669 $1,669
SOUTH MUDDY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4198 B-4198 SR 1771 223 MCDOWELL ISOTHERMAL 2011 $750 $750
GAR CREEK. REPLACE
HIGHWAY B-4200 B-4200 SR 2120 BRIDGE NO. 100 MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2011 2011 $40 $40
GAR CREEK. REPLACE
HIGHWAY B-4200 B-4200 SR 2120 BRIDGE NO. 100 MECKLENBURG CHARLOTTE UTILITIES 2011 2011 $31 $31
GAR CREEK. REPLACE
HIGHWAY B-4200 B-4200 SR 2120 BRIDGE NO. 100 MECKLENBURG CHARLOTTE CONSTRUCTION 2012 2012 $800 $800
GAR CREEK. REPLACE BEFORE
HIGHWAY B-4200 B-4200 SR 2120 BRIDGE NO. 100 MECKLENBURG CHARLOTTE 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
GREASY CREEK.
HIGHWAY B-4201 B-4201 SR 3168 REPLACE BRIDGE NO. 38 MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2011 2011 $50 $50
GREASY CREEK.
HIGHWAY B-4201 B-4201 SR 3168 REPLACE BRIDGE NO. 38 MECKLENBURG CHARLOTTE UTILITIES 2011 2011 $15 $15
GREASY CREEK.
HIGHWAY B-4201 B-4201 SR 3168 REPLACE BRIDGE NO. 38 MECKLENBURG CHARLOTTE CONSTRUCTION 2012 2012 $1,400 $1,400
GREASY CREEK. BEFORE
HIGHWAY B-4201 B-4201 SR 3168 REPLACE BRIDGE NO. 38 MECKLENBURG CHARLOTTE 2011 $100 $100
CRABTREE CREEK.
REPLACE BRIDGE
NO. 109 AND BRIDGE NO. BEFORE
HIGHWAY B-4202 B-4202 SR 1002 110 MITCHELL HIGH COUNTRY 2011 $2,354 $2,354
ROCK CREEK. REPLACE PIEDMONT BEFORE
HIGHWAY B-4204 B-4204 NC 109 BRIDGE NO. 28 MONTGOMERY TRIAD 2011 $2,222 $2,222
DENSONS CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4206 B-4206 SR 1315 128 MONTGOMERY TRIAD RIGHT-OF-WAY 2011 2011 $80 $80
DENSONS CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4206 B-4206 SR 1315 128 MONTGOMERY TRIAD CONSTRUCTION 2012 2012 $875 $875
DENSONS CREEK.
REPLACE BRIDGE NO. PIEDMONT BEFORE
HIGHWAY B-4206 B-4206 SR 1315 128 MONTGOMERY TRIAD 2011 $100 $100
NC 22-24- MCLENDONS CREEK. TRIANGLE BEFORE
HIGHWAY B-4207 B-4207 27 REPLACE BRIDGE NO. 43 MOORE AREA 2011 $2,336 $2,336
TAR RIVER. REPLACE
HIGHWAY B-4211 B-4211 SR 1544 BRIDGE NO. 56 NASH ROCKY MOUNT RIGHT-OF-WAY 2011 2011 $160 $160
TAR RIVER. REPLACE
HIGHWAY B-4211 B-4211 SR 1544 BRIDGE NO. 56 NASH ROCKY MOUNT UTILITIES 2011 2011 $136 $136
TAR RIVER. REPLACE
HIGHWAY B-4211 B-4211 SR 1544 BRIDGE NO. 56 NASH ROCKY MOUNT CONSTRUCTION 2012 2012 $3,500 $3,500
TAR RIVER. REPLACE BEFORE
HIGHWAY B-4211 B-4211 SR 1544 BRIDGE NO. 56 NASH ROCKY MOUNT 2011 $200 $200
US 17
BUSINES NEW RIVER. REPLACE
HIGHWAY B-4214 B-4214 S BRIDGE NO. 24 ONSLOW JACKSONVILLE CONSTRUCTION 2011 2011 $7,650 $7,650
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 17
BUSINES NEW RIVER. REPLACE BEFORE
HIGHWAY B-4214 B-4214 S BRIDGE NO. 24 ONSLOW JACKSONVILLE 2011 $13,859 $13,859
STROUDS CREEK. BEFORE
HIGHWAY B-4216 B-4216 SR 1002 REPLACE BRIDGE NO. 66 ORANGE DURHAM 2011 $1,054 $1,054
SWIFT CREEK.
HIGHWAY B-4232 B-4232 NC 903 REPLACE BRIDGE NO. 9 PITT GREENVILLE CONSTRUCTION 2011 2011 $525 $525
SWIFT CREEK. BEFORE
HIGHWAY B-4232 B-4232 NC 903 REPLACE BRIDGE NO. 9 PITT GREENVILLE 2011 $257 $257
PINELOG BRANCH. BEFORE
HIGHWAY B-4233 B-4233 SR 1200 REPLACE BRIDGE NO. 65 PITT GREENVILLE 2011 $1,170 $1,170
CONETOE CREEK.
HIGHWAY B-4234 B-4234 SR 1407 REPLACE BRIDGE NO. 98 PITT MID-EAST CONSTRUCTION 2011 2011 $525 $525
CONETOE CREEK. BEFORE
HIGHWAY B-4234 B-4234 SR 1407 REPLACE BRIDGE NO. 98 PITT MID-EAST 2011 $225 $225
GRINDLE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4236 B-4236 SR 1541 121 PITT MID-EAST 2011 $755 $755
FORK SWAMP. BEFORE
HIGHWAY B-4237 B-4237 SR 1723 REPLACE BRIDGE NO. 25 PITT GREENVILLE 2011 $993 $993
HARDEE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4238 B-4238 SR 1726 219 PITT GREENVILLE 2011 $2,103 $2,103
PACOLET RIVER. BEFORE
HIGHWAY B-4239 B-4239 SR 1102 REPLACE BRIDGE NO. 2 POLK ISOTHERMAL 2011 $1,200 $1,200
HOOPER CREEK.
HIGHWAY B-4241 B-4241 SR 1520 REPLACE BRIDGE NO. 24 POLK ISOTHERMAL CONSTRUCTION 2011 2011 $475 $475
HOOPER CREEK. BEFORE
HIGHWAY B-4241 B-4241 SR 1520 REPLACE BRIDGE NO. 24 POLK ISOTHERMAL 2011 $149 $149
ASHPOLE SWAMP.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4249 B-4249 SR 1146 143 ROBESON LUMBER RIVER 2011 $555 $555
BIG MARSH SWAMP. BEFORE
HIGHWAY B-4250 B-4250 SR 1750 REPLACE BRIDGE NO. 35 ROBESON LUMBER RIVER 2011 $116 $116
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
OLD FIELD SWAMP.
HIGHWAY B-4251 B-4251 SR 2237 REPLACE BRIDGE NO. 94 ROBESON LUMBER RIVER CONSTRUCTION 2011 2011 $475 $475
OLD FIELD SWAMP. BEFORE
HIGHWAY B-4251 B-4251 SR 2237 REPLACE BRIDGE NO. 94 ROBESON LUMBER RIVER 2011 $150 $150
BIG BEAVER ISLAND
CREEK. REPLACE
BRIDGE NO. 95. LITTLE
BEAVER ISLAND
CREEK. REPLACE PIEDMONT BEFORE
HIGHWAY B-4252 B-4252 US 311 BRIDGE NO. 67 ROCKINGHAM TRIAD 2011 $6,644 $6,644
CHURCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4257 B-4257 SR 1004 143 ROWAN CONCORD RIGHT-OF-WAY 2011 2011 $425 $425
CHURCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4257 B-4257 SR 1004 143 ROWAN CONCORD UTILITIES 2011 2011 $37 $37
CHURCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4257 B-4257 SR 1004 143 ROWAN CONCORD CONSTRUCTION 2012 2012 $700 $700
CHURCH CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4257 B-4257 SR 1004 143 ROWAN CONCORD 2011 $200 $200
BROAD RIVER. BEFORE
HIGHWAY B-4258 B-4258 US 64 REPLACE BRIDGE NO. 7 RUTHERFORD ISOTHERMAL 2011 $5,551 $5,551
FORK OF CATHY'S
CREEK.
REPLACE BRIDGE NO.
39.
CATHY'S CREEK. BEFORE
HIGHWAY B-4261 B-4261 SR 1520 REPLACE BRIDGE NO. 37 RUTHERFORD ISOTHERMAL 2011 $1,772 $1,772
CREEK. REPLACE BEFORE
HIGHWAY B-4262 B-4262 SR 1520 BRIDGE NO. 217 RUTHERFORD ISOTHERMAL 2011 $891 $891
WEBB CREEK. REPLACE BEFORE
HIGHWAY B-4264 B-4264 SR 1596 BRIDGE NO. 351 RUTHERFORD ISOTHERMAL 2011 $781 $781
LUMBER RIVER.
HIGHWAY B-4273 B-4273 US 401 REPLACE BRIDGE NO. 47 SCOTLAND LUMBER RIVER MITIGATION 2012 2012 $330 $330
LUMBER RIVER.
HIGHWAY B-4273 B-4273 US 401 REPLACE BRIDGE NO. 47 SCOTLAND LUMBER RIVER RIGHT-OF-WAY 2012 2012 $100 $100
LUMBER RIVER.
HIGHWAY B-4273 B-4273 US 401 REPLACE BRIDGE NO. 47 SCOTLAND LUMBER RIVER CONSTRUCTION 2013 2013 $3,600 $3,600
LUMBER RIVER. BEFORE
HIGHWAY B-4273 B-4273 US 401 REPLACE BRIDGE NO. 47 SCOTLAND LUMBER RIVER 2011 $300 $300
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LONG CREEK. BEFORE
HIGHWAY B-4276 B-4276 NC 73 REPLACE BRIDGE NO. 33 STANLY ROCKY RIVER 2011 $3,528 $3,528
ISLAND CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4278 B-4278 SR 1136 209 STANLY ROCKY RIVER 2011 $1,190 $1,190
MILL CREEK. REPLACE NORTHWEST
HIGHWAY B-4284 B-4284 SR 1322 BRIDGE NO. 29 SURRY PIEDMONT CONSTRUCTION 2011 2011 $400 $400
MILL CREEK. REPLACE NORTHWEST BEFORE
HIGHWAY B-4284 B-4284 SR 1322 BRIDGE NO. 29 SURRY PIEDMONT 2011 $150 $150
NANTAHALA RIVER. SOUTHWESTER BEFORE
HIGHWAY B-4286 B-4286 US 19-74 REPLACE BRIDGE NO. 3 SWAIN N 2011 $2,614 $2,614
NANTAHALA RIVER.
REHABILITATE BRIDGE
NO. 99 AND BRIDGE NO. SOUTHWESTER
HIGHWAY B-4287 B-4287 SR 1100 100 SWAIN N CONSTRUCTION 2011 2011 $450 $450
NANTAHALA RIVER.
REHABILITATE BRIDGE
NO. 99 AND BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4287 B-4287 SR 1100 100 SWAIN N 2011 $197 $197
EAST FORK FRENCH
BROAD RIVER.
HIGHWAY B-4288 B-4288 SR 1107 REPLACE BRIDGE NO. 85 TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2011 2011 $65 $65
EAST FORK FRENCH
BROAD RIVER.
HIGHWAY B-4288 B-4288 SR 1107 REPLACE BRIDGE NO. 85 TRANSYLVANIA LAND OF SKY UTILITIES 2011 2011 $31 $31
EAST FORK FRENCH
BROAD RIVER.
HIGHWAY B-4288 B-4288 SR 1107 REPLACE BRIDGE NO. 85 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2012 2012 $750 $750
EAST FORK FRENCH
BROAD RIVER. BEFORE
HIGHWAY B-4288 B-4288 SR 1107 REPLACE BRIDGE NO. 85 TRANSYLVANIA LAND OF SKY 2011 $75 $75
NORTH FORK FRENCH
BROAD RIVER.
HIGHWAY B-4289 B-4289 SR 1324 REPLACE BRIDGE NO. 93 TRANSYLVANIA LAND OF SKY MITIGATION 2011 2011 $171 $171
NORTH FORK FRENCH
BROAD RIVER.
HIGHWAY B-4289 B-4289 SR 1324 REPLACE BRIDGE NO. 93 TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2011 2011 $225 $225
NORTH FORK FRENCH
BROAD RIVER.
HIGHWAY B-4289 B-4289 SR 1324 REPLACE BRIDGE NO. 93 TRANSYLVANIA LAND OF SKY UTILITIES 2011 2011 $20 $20
NORTH FORK FRENCH
BROAD RIVER.
HIGHWAY B-4289 B-4289 SR 1324 REPLACE BRIDGE NO. 93 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2012 2012 $1,100 $1,100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTH FORK FRENCH
BROAD RIVER. BEFORE
HIGHWAY B-4289 B-4289 SR 1324 REPLACE BRIDGE NO. 93 TRANSYLVANIA LAND OF SKY 2011 $150 $150
DAVIDSON RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4291 B-4291 SR 1504 193 TRANSYLVANIA LAND OF SKY MITIGATION 2011 2011 $35 $35
DAVIDSON RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4291 B-4291 SR 1504 193 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2012 2012 $1,600 $1,600
DAVIDSON RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4291 B-4291 SR 1504 193 TRANSYLVANIA LAND OF SKY 2011 $462 $462
CREEK. REPLACE
HIGHWAY B-4293 B-4293 SR 1008 BRIDGE NO. 219 UNION CHARLOTTE CONSTRUCTION 2012 2012 $1,250 $1,250
CREEK. REPLACE BEFORE
HIGHWAY B-4293 B-4293 SR 1008 BRIDGE NO. 219 UNION CHARLOTTE 2011 $216 $216
WAXHAW CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4294 B-4294 SR 1113 184 UNION CHARLOTTE MITIGATION 2011 2011 $1 $1
WAXHAW CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4294 B-4294 SR 1113 184 UNION CHARLOTTE RIGHT-OF-WAY 2011 2011 $64 $64
WAXHAW CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4294 B-4294 SR 1113 184 UNION CHARLOTTE CONSTRUCTION 2012 2012 $850 $850
WAXHAW CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4294 B-4294 SR 1113 184 UNION CHARLOTTE 2011 $350 $350
PUNGO CREEK. BEFORE
HIGHWAY B-4415 B-4415 NC 32 REPLACE BRIDGE NO. 21 BEAUFORT MID-EAST 2011 $200 $200
CAROLINA AND
NORTHWEST RAILROAD.
HIGHWAY B-4416 B-4416 NC 33 REPLACE BRIDGE NO. 76 BEAUFORT MID-EAST CONSTRUCTION 2012 2012 $5,200 $5,200
CAROLINA AND
NORTHWEST RAILROAD. BEFORE
HIGHWAY B-4416 B-4416 NC 33 REPLACE BRIDGE NO. 76 BEAUFORT MID-EAST 2011 $837 $837
JACK CREEK. REPLACE
HIGHWAY B-4417 B-4417 NC 99 BRIDGE NO. 59 BEAUFORT MID-EAST CONSTRUCTION 2011 2011 $1,850 $1,850
JACK CREEK. REPLACE BEFORE
HIGHWAY B-4417 B-4417 NC 99 BRIDGE NO. 59 BEAUFORT MID-EAST 2011 $157 $157
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ST. CLAIR CREEK.
HIGHWAY B-4418 B-4418 NC 99 REPLACE BRIDGE NO. 54 BEAUFORT MID-EAST MITIGATION 2011 2011 $1 $1
ST. CLAIR CREEK.
HIGHWAY B-4418 B-4418 NC 99 REPLACE BRIDGE NO. 54 BEAUFORT MID-EAST RIGHT-OF-WAY 2011 2011 $80 $80
ST. CLAIR CREEK.
HIGHWAY B-4418 B-4418 NC 99 REPLACE BRIDGE NO. 54 BEAUFORT MID-EAST UTILITIES 2011 2011 $20 $20
ST. CLAIR CREEK.
HIGHWAY B-4418 B-4418 NC 99 REPLACE BRIDGE NO. 54 BEAUFORT MID-EAST CONSTRUCTION 2012 2012 $850 $850
ST. CLAIR CREEK. BEFORE
HIGHWAY B-4418 B-4418 NC 99 REPLACE BRIDGE NO. 54 BEAUFORT MID-EAST 2011 $60 $60
DURHAM CREEK.
HIGHWAY B-4421 B-4421 SR 1003 REPLACE BRIDGE NO. 42 BEAUFORT MID-EAST RIGHT-OF-WAY 2011 2011 $50 $50
DURHAM CREEK.
HIGHWAY B-4421 B-4421 SR 1003 REPLACE BRIDGE NO. 42 BEAUFORT MID-EAST CONSTRUCTION 2012 2012 $775 $775
DURHAM CREEK. BEFORE
HIGHWAY B-4421 B-4421 SR 1003 REPLACE BRIDGE NO. 42 BEAUFORT MID-EAST 2011 $26 $26
BLOUNTS CREEK.
HIGHWAY B-4422 B-4422 SR 1106 REPLACE BRIDGE NO. 81 BEAUFORT MID-EAST CONSTRUCTION 2011 2011 $1,475 $1,475
BLOUNTS CREEK.
HIGHWAY B-4422 B-4422 SR 1106 REPLACE BRIDGE NO. 81 BEAUFORT MID-EAST RIGHT-OF-WAY 2011 2011 $150 $150
BLOUNTS CREEK. BEFORE
HIGHWAY B-4422 B-4422 SR 1106 REPLACE BRIDGE NO. 81 BEAUFORT MID-EAST 2011 $34 $34
HORSE BRANCH CREEK. BEFORE
HIGHWAY B-4423 B-4423 SR 1136 REPLACE BRIDGE NO. 67 BEAUFORT MID-EAST 2011 $710 $710
BRANCH OF
CHOCOWINITY CREEK. BEFORE
HIGHWAY B-4424 B-4424 SR 1136 REPLACE BRIDGE NO. 68 BEAUFORT MID-EAST 2011 $912 $912
CANAL. REPLACE BEFORE
HIGHWAY B-4428 B-4428 SR 1626 BRIDGE NO. 140 BEAUFORT MID-EAST 2011 $1,171 $1,171
US 17- CASHIE RIVER. BEFORE
HIGHWAY B-4434 B-4434 NC 308 REPLACE BRIDGE NO. 14 BERTIE PEANUT BELT 2011 $2,930 $2,930
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ROQUIST CREEK. BEFORE
HIGHWAY B-4435 B-4435 SR 1100 REPLACE BRIDGE NO. 44 BERTIE PEANUT BELT 2011 $1,153 $1,153
BROWNS CREEK.
HIGHWAY B-4436 B-4436 SR 1700 REPLACE BRIDGE NO. 31 BLADEN MID-CAROLINA MITIGATION 2014 2014 $2 $2
BROWNS CREEK.
HIGHWAY B-4436 B-4436 SR 1700 REPLACE BRIDGE NO. 31 BLADEN MID-CAROLINA RIGHT-OF-WAY 2014 2014 $80 $80
BROWNS CREEK.
HIGHWAY B-4436 B-4436 SR 1700 REPLACE BRIDGE NO. 31 BLADEN MID-CAROLINA CONSTRUCTION 2015 2015 $760 $760
BROWNS CREEK. BEFORE
HIGHWAY B-4436 B-4436 SR 1700 REPLACE BRIDGE NO. 31 BLADEN MID-CAROLINA 2011 $60 $60
BRANCH JUNIPER
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4439 B-4439 SR 1342 100 BRUNSWICK CAPE FEAR RIGHT-OF-WAY 2019 2019 $135 $135
BRANCH JUNIPER
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4439 B-4439 SR 1342 100 BRUNSWICK CAPE FEAR CONSTRUCTION 2020 2020 $1,350 $1,350
BRANCH JUNIPER
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4439 B-4439 SR 1342 100 BRUNSWICK CAPE FEAR 2011 $5 $5
MULBERRY SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4440 B-4440 SR 1349 163 BRUNSWICK CAPE FEAR RIGHT-OF-WAY 2016 2016 $60 $60
MULBERRY SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4440 B-4440 SR 1349 163 BRUNSWICK CAPE FEAR CONSTRUCTION 2017 2017 $600 $600
MULBERRY SWAMP.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4440 B-4440 SR 1349 163 BRUNSWICK CAPE FEAR 2011 $60 $60
REEMS CREEK.
REHABILITATE DECK
US 19-23- ON BRIDGE NO. 370 AND
HIGHWAY B-4442 B-4442 25-70 BRIDGE NO. 373 BUNCOMBE ASHEVILLE CONSTRUCTION 2020 2020 $1,000 $1,000
REEMS CREEK.
REHABILITATE DECK
US 19-23- ON BRIDGE NO. 370 AND BEFORE
HIGHWAY B-4442 B-4442 25-70 BRIDGE NO. 373 BUNCOMBE ASHEVILLE 2011 $22 $22
SR 1839. REPLACE
US 19-23- BRIDGE NO. 345 AND
HIGHWAY B-4443 B-4443 25-70 BRIDGE NO. 346 BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2019 2019 $720 $720
SR 1839. REPLACE
US 19-23- BRIDGE NO. 345 AND BEFORE
HIGHWAY B-4443 B-4443 25-70 BRIDGE NO. 346 BUNCOMBE ASHEVILLE 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 1839. REPLACE
US 19-23- BRIDGE NO. 345 AND AFTER
HIGHWAY B-4443 B-4443 25-70 BRIDGE NO. 346 BUNCOMBE ASHEVILLE CONSTRUCTION 2020 2020 $7,200 $3,600 3,600.00
NORTH HOMINY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4445 B-4445 SR 1123 256 BUNCOMBE ASHEVILLE 2011 $631 $631
REEMS CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4446 B-4446 SR 2105 227 BUNCOMBE ASHEVILLE 2011 $1,042 $1,042
SR 1758. REHABILITATE
HIGHWAY B-4447 B-4447 I-40 BRIDGE NO. 160 BURKE HICKORY CONSTRUCTION 2018 2018 $3,000 $3,000
SR 1758. REHABILITATE BEFORE
HIGHWAY B-4447 B-4447 I-40 BRIDGE NO. 160 BURKE HICKORY 2011 $150 $150
SR 1744. REHABILITATE
HIGHWAY B-4448 B-4448 I-40 BRIDGE NO. 149 BURKE HICKORY CONSTRUCTION 2019 2019 $2,700 $2,700
SR 1744. REHABILITATE BEFORE
HIGHWAY B-4448 B-4448 I-40 BRIDGE NO. 149 BURKE HICKORY 2011 $150 $150
CODDLE CREEK. BEFORE
HIGHWAY B-4449 B-4449 SR 1394 REPLACE BRIDGE NO. 2 CABARRUS CONCORD 2011 $3,325 $3,325
CATAWBA RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4450 B-4450 US 321 367 CALDWELL HICKORY RIGHT-OF-WAY 2014 2014 $250 $250
CATAWBA RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4450 B-4450 US 321 367 CALDWELL HICKORY CONSTRUCTION 2017 2019 $18,180 $6,060 $6,060 $6,060
CATAWBA RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4450 B-4450 US 321 367 CALDWELL HICKORY 2011 $200 $200
JOYCE CREEK. BEFORE
HIGHWAY B-4451 B-4451 NC 343 REPLACE BRIDGE NO. 21 CAMDEN ALBEMARLE 2011 $1,065 $1,065
SAWYER CREEK. BEFORE
HIGHWAY B-4452 B-4452 NC 343 REPLACE BRIDGE NO. 20 CAMDEN ALBEMARLE 2011 $1,297 $1,297
DEEP CREEK. REPLACE BEFORE
HIGHWAY B-4454 B-4454 SR 1133 BRIDGE NO. 43 CARTERET DOWN EAST 2011 $615 $615
I-40. REPLACE BRIDGE
HIGHWAY B-4456 B-4456 NC 16 NO. 49 CATAWBA HICKORY RIGHT-OF-WAY 2011 2011 $285 $285
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
I-40. REPLACE BRIDGE
HIGHWAY B-4456 B-4456 NC 16 NO. 49 CATAWBA HICKORY UTILITIES 2011 2011 $30 $30
I-40. REPLACE BRIDGE
HIGHWAY B-4456 B-4456 NC 16 NO. 49 CATAWBA HICKORY CONSTRUCTION 2012 2012 $2,850 $2,850
I-40. REPLACE BRIDGE BEFORE
HIGHWAY B-4456 B-4456 NC 16 NO. 49 CATAWBA HICKORY 2011 $600 $600
SOUTH FORK CATAWBA
RIVER.
HIGHWAY B-4458 B-4458 SR 2019 REPLACE BRIDGE NO. 95 CATAWBA HICKORY RIGHT-OF-WAY 2012 2012 $50 $50
SOUTH FORK CATAWBA
RIVER.
HIGHWAY B-4458 B-4458 SR 2019 REPLACE BRIDGE NO. 95 CATAWBA HICKORY CONSTRUCTION 2013 2013 $2,400 $2,400
SOUTH FORK CATAWBA
RIVER. BEFORE
HIGHWAY B-4458 B-4458 SR 2019 REPLACE BRIDGE NO. 95 CATAWBA HICKORY 2011 $60 $60
BUCKHORN CREEK. TRIANGLE BEFORE
HIGHWAY B-4459 B-4459 NC 42 REPLACE BRIDGE NO. 56 CHATHAM AREA 2011 $1,738 $1,738
SHADDOX CREEK. TRIANGLE
HIGHWAY B-4461 B-4461 SR 1916 REPLACE BRIDGE NO. 10 CHATHAM AREA RIGHT-OF-WAY 2015 2015 $120 $120
SHADDOX CREEK. TRIANGLE
HIGHWAY B-4461 B-4461 SR 1916 REPLACE BRIDGE NO. 10 CHATHAM AREA CONSTRUCTION 2016 2016 $1,200 $1,200
SHADDOX CREEK. TRIANGLE BEFORE
HIGHWAY B-4461 B-4461 SR 1916 REPLACE BRIDGE NO. 10 CHATHAM AREA 2011 $200 $200
PERSIMMON CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4462 B-4462 SR 1127 148 CHEROKEE N RIGHT-OF-WAY 2018 2018 $50 $50
PERSIMMON CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4462 B-4462 SR 1127 148 CHEROKEE N CONSTRUCTION 2019 2019 $500 $500
PERSIMMON CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4462 B-4462 SR 1127 148 CHEROKEE N 2011 $13 $13
QUEEN ANNE CREEK.
HIGHWAY B-4463 B-4463 NC 32 REPLACE BRIDGE NO. 12 CHOWAN ALBEMARLE MITIGATION 2011 2011 $8 $8
QUEEN ANNE CREEK.
HIGHWAY B-4463 B-4463 NC 32 REPLACE BRIDGE NO. 12 CHOWAN ALBEMARLE RIGHT-OF-WAY 2011 2011 $80 $80
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
QUEEN ANNE CREEK.
HIGHWAY B-4463 B-4463 NC 32 REPLACE BRIDGE NO. 12 CHOWAN ALBEMARLE UTILITIES 2011 2011 $80 $80
QUEEN ANNE CREEK.
HIGHWAY B-4463 B-4463 NC 32 REPLACE BRIDGE NO. 12 CHOWAN ALBEMARLE CONSTRUCTION 2012 2012 $650 $650
QUEEN ANNE CREEK. BEFORE
HIGHWAY B-4463 B-4463 NC 32 REPLACE BRIDGE NO. 12 CHOWAN ALBEMARLE 2011 $277 $277
CANAL. REPLACE
HIGHWAY B-4464 B-4464 SR 1170 BRIDGE NO. 35 CHOWAN ALBEMARLE MITIGATION 2015 2015 $1 $1
CANAL. REPLACE
HIGHWAY B-4464 B-4464 SR 1170 BRIDGE NO. 35 CHOWAN ALBEMARLE RIGHT-OF-WAY 2015 2015 $60 $60
CANAL. REPLACE
HIGHWAY B-4464 B-4464 SR 1170 BRIDGE NO. 35 CHOWAN ALBEMARLE CONSTRUCTION 2016 2016 $600 $600
CANAL. REPLACE BEFORE
HIGHWAY B-4464 B-4464 SR 1170 BRIDGE NO. 35 CHOWAN ALBEMARLE 2011 $60 $60
PEMBROKE CREEK. BEFORE
HIGHWAY B-4465 B-4465 SR 1208 REPLACE BRIDGE NO. 5 CHOWAN ALBEMARLE 2011 $2,237 $2,237
BRASSTOWN CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4466 B-4466 SR 1104 REPLACE BRIDGE NO. 4 CLAY N 2011 $1,633 $1,633
BRASSTOWN CREEK. SOUTHWESTER
HIGHWAY B-4467 B-4467 SR 1111 REPLACE BRIDGE NO. 3 CLAY N CONSTRUCTION 2011 2011 $650 $650
BRASSTOWN CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4467 B-4467 SR 1111 REPLACE BRIDGE NO. 3 CLAY N 2011 $293 $293
SANDY RUN CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4468 B-4468 SR 1327 144 CLEVELAND LAKE NORMAN 2011 $1,300 $1,300
BRUSHY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4469 B-4469 SR 1350 219 CLEVELAND LAKE NORMAN 2011 $912 $912
JUNIPER SWAMP.
HIGHWAY B-4471 B-4471 NC 904 REPLACE BRIDGE NO. 44 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2011 2011 $120 $120
JUNIPER SWAMP.
HIGHWAY B-4471 B-4471 NC 904 REPLACE BRIDGE NO. 44 COLUMBUS CAPE FEAR UTILITIES 2011 2011 $16 $16
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
JUNIPER SWAMP.
HIGHWAY B-4471 B-4471 NC 904 REPLACE BRIDGE NO. 44 COLUMBUS CAPE FEAR CONSTRUCTION 2012 2012 $1,300 $1,300
JUNIPER SWAMP. BEFORE
HIGHWAY B-4471 B-4471 NC 904 REPLACE BRIDGE NO. 44 COLUMBUS CAPE FEAR 2011 $100 $100
NANTAHALA NATIONAL
FOREST,
PFH 102-1(1), CANEY
SR 1737 CREEK. SOUTHWESTER
HIGHWAY B-4472 B-4472 FH 102 REPLACE BRIDGE NO. 80 JACKSON N CONSTRUCTION 2011 2011 $1,300 $1,300
NANTAHALA NATIONAL
FOREST,
PFH 102-1(1), CANEY
SR 1737 CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4472 B-4472 FH 102 REPLACE BRIDGE NO. 80 JACKSON N 2011 $70 $70
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 76 AND BRIDGE NO.
HIGHWAY B-4473 B-4473 SR 1006 78 COLUMBUS CAPE FEAR MITIGATION 2011 2011 $1 $1
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 76 AND BRIDGE NO.
HIGHWAY B-4473 B-4473 SR 1006 78 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2011 2011 $10 $10
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 76 AND BRIDGE NO.
HIGHWAY B-4473 B-4473 SR 1006 78 COLUMBUS CAPE FEAR UTILITIES 2011 2011 $31 $31
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 76 AND BRIDGE NO.
HIGHWAY B-4473 B-4473 SR 1006 78 COLUMBUS CAPE FEAR CONSTRUCTION 2012 2012 $1,000 $1,000
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 76 AND BRIDGE NO. BEFORE
HIGHWAY B-4473 B-4473 SR 1006 78 COLUMBUS CAPE FEAR 2011 $321 $321
JUNIPER SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4474 B-4474 SR 1118 320 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2019 2019 $80 $80
JUNIPER SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4474 B-4474 SR 1118 320 COLUMBUS CAPE FEAR CONSTRUCTION 2020 2020 $830 $830
JUNIPER SWAMP.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4474 B-4474 SR 1118 320 COLUMBUS CAPE FEAR 2011 $5 $5
TOM'S FORK CREEK.
HIGHWAY B-4475 B-4475 SR 1119 REPLACE BRIDGE NO. 85 COLUMBUS CAPE FEAR MITIGATION 2017 2017 $1 $1
TOM'S FORK CREEK.
HIGHWAY B-4475 B-4475 SR 1119 REPLACE BRIDGE NO. 85 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2017 2017 $80 $80
TOM'S FORK CREEK.
HIGHWAY B-4475 B-4475 SR 1119 REPLACE BRIDGE NO. 85 COLUMBUS CAPE FEAR CONSTRUCTION 2018 2018 $785 $785
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
TOM'S FORK CREEK. BEFORE
HIGHWAY B-4475 B-4475 SR 1119 REPLACE BRIDGE NO. 85 COLUMBUS CAPE FEAR 2011 $60 $60
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 289, BRIDGE NO.
290, BRIDGE NO. 291
HIGHWAY B-4477 B-4477 SR 1141 AND BRIDGE NO. 294 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2019 2019 $330 $330
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 289, BRIDGE NO.
290, BRIDGE NO. 291
HIGHWAY B-4477 B-4477 SR 1141 AND BRIDGE NO. 294 COLUMBUS CAPE FEAR CONSTRUCTION 2020 2020 $3,300 $3,300
GRISSETT SWAMP.
REPLACE BRIDGE
NO. 289, BRIDGE NO.
290, BRIDGE NO. 291 BEFORE
HIGHWAY B-4477 B-4477 SR 1141 AND BRIDGE NO. 294 COLUMBUS CAPE FEAR 2011 $15 $15
WELCHES CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4478 B-4478 SR 1700 216 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2015 2015 $100 $100
WELCHES CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4478 B-4478 SR 1700 216 COLUMBUS CAPE FEAR CONSTRUCTION 2016 2016 $1,050 $1,050
WELCHES CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4478 B-4478 SR 1700 216 COLUMBUS CAPE FEAR 2011 $65 $65
RED HILL SWAMP.
REPLACE BRIDGE
NO. 222, BRIDGE NO.
226, BRIDGE NO. 228
HIGHWAY B-4479 B-4479 SR 1700 AND BRIDGE NO. 230 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2018 2018 $400 $400
RED HILL SWAMP.
REPLACE BRIDGE
NO. 222, BRIDGE NO.
226, BRIDGE NO. 228
HIGHWAY B-4479 B-4479 SR 1700 AND BRIDGE NO. 230 COLUMBUS CAPE FEAR CONSTRUCTION 2019 2019 $4,000 $4,000
RED HILL SWAMP.
REPLACE BRIDGE
NO. 222, BRIDGE NO.
226, BRIDGE NO. 228 BEFORE
HIGHWAY B-4479 B-4479 SR 1700 AND BRIDGE NO. 230 COLUMBUS CAPE FEAR 2011 $10 $10
LIVINGSTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4480 B-4480 SR 1824 275 AND BRIDGE NO. 278 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2016 2016 $140 $140
LIVINGSTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4480 B-4480 SR 1824 275 AND BRIDGE NO. 278 COLUMBUS CAPE FEAR CONSTRUCTION 2017 2017 $1,400 $1,400
LIVINGSTON CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4480 B-4480 SR 1824 275 AND BRIDGE NO. 278 COLUMBUS CAPE FEAR 2011 $50 $50
SR 2377
OLD
GREENS SALEM CREEK.
BORO REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4509 B-4509 ROAD 210 FORSYTH SALEM CONSTRUCTION 2020 2020 $775 $775
SR 2377
OLD
GREENS SALEM CREEK.
BORO REPLACE BRIDGE NO. WINSTON- BEFORE
HIGHWAY B-4509 B-4509 ROAD 210 FORSYTH SALEM 2011 $70 $70
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
I-40 BUSINESS.
REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4510 B-4510 SR 2643 368 FORSYTH SALEM CONSTRUCTION 2011 2011 $3,950 $3,950
I-40 BUSINESS.
REPLACE BRIDGE NO. WINSTON- BEFORE
HIGHWAY B-4510 B-4510 SR 2643 368 FORSYTH SALEM 2011 $2,235 $2,235
TRIBUTARY OF SALEM
CREEK.
REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4511 B-4511 SR 2667 201 FORSYTH SALEM MITIGATION 2015 2015 $9 $9
TRIBUTARY OF SALEM
CREEK.
REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4511 B-4511 SR 2667 201 FORSYTH SALEM RIGHT-OF-WAY 2015 2015 $90 $90
TRIBUTARY OF SALEM
CREEK.
REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4511 B-4511 SR 2667 201 FORSYTH SALEM CONSTRUCTION 2016 2016 $900 $900
TRIBUTARY OF SALEM
CREEK.
REPLACE BRIDGE NO. WINSTON- BEFORE
HIGHWAY B-4511 B-4511 SR 2667 201 FORSYTH SALEM 2011 $70 $70
PRONG CYPRESS
CREEK.
HIGHWAY B-4513 B-4513 SR 1002 REPLACE BRIDGE NO. 73 FRANKLIN KERR TAR MITIGATION 2012 2012 $12 $12
PRONG CYPRESS
CREEK.
HIGHWAY B-4513 B-4513 SR 1002 REPLACE BRIDGE NO. 73 FRANKLIN KERR TAR RIGHT-OF-WAY 2012 2012 $30 $30
PRONG CYPRESS
CREEK.
HIGHWAY B-4513 B-4513 SR 1002 REPLACE BRIDGE NO. 73 FRANKLIN KERR TAR UTILITIES 2012 2012 $7 $7
PRONG CYPRESS
CREEK.
HIGHWAY B-4513 B-4513 SR 1002 REPLACE BRIDGE NO. 73 FRANKLIN KERR TAR CONSTRUCTION 2013 2013 $875 $875
PRONG CYPRESS
CREEK. BEFORE
HIGHWAY B-4513 B-4513 SR 1002 REPLACE BRIDGE NO. 73 FRANKLIN KERR TAR 2011 $100 $100
TAR RIVER. REPLACE
HIGHWAY B-4514 B-4514 SR 1003 BRIDGE NO. 36 FRANKLIN RALEIGH MITIGATION 2011 2011 $47 $47
TAR RIVER. REPLACE
HIGHWAY B-4514 B-4514 SR 1003 BRIDGE NO. 36 FRANKLIN RALEIGH CONSTRUCTION 2012 2012 $1,750 $1,750
TAR RIVER. REPLACE BEFORE
HIGHWAY B-4514 B-4514 SR 1003 BRIDGE NO. 36 FRANKLIN RALEIGH 2011 $465 $465
SANDY CREEK.
HIGHWAY B-4516 B-4516 SR 1433 REPLACE BRIDGE NO. 52 FRANKLIN KERR TAR RIGHT-OF-WAY 2019 2019 $200 $200
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SANDY CREEK.
HIGHWAY B-4516 B-4516 SR 1433 REPLACE BRIDGE NO. 52 FRANKLIN KERR TAR CONSTRUCTION 2020 2020 $2,000 $2,000
SANDY CREEK. BEFORE
HIGHWAY B-4516 B-4516 SR 1433 REPLACE BRIDGE NO. 52 FRANKLIN KERR TAR 2011 $75 $75
CROWDER'S CREEK. BEFORE
HIGHWAY B-4517 B-4517 SR 1103 REPLACE BRIDGE NO. 49 GASTON GASTONIA 2011 $1,900 $1,900
CREEK. REPLACE BEFORE
HIGHWAY B-4518 B-4518 SR 1620 BRIDGE NO. 110 GASTON LAKE NORMAN 2011 $834 $834
LITTLE LONG CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4519 B-4519 SR 1800 155 GASTON GASTONIA 2011 $872 $872
TROTMAN CREEK. BEFORE
HIGHWAY B-4520 B-4520 SR 1100 REPLACE BRIDGE NO. 32 GATES ALBEMARLE 2011 $1,120 $1,120
DUKE SWAMP. REPLACE BEFORE
HIGHWAY B-4521 B-4521 SR 1320 BRIDGE NO. 26 GATES ALBEMARLE 2011 $910 $910
TAR RIVER. REPLACE
HIGHWAY B-4522 B-4522 SR 1150 BRIDGE NO. 102 GRANVILLE KERR TAR RIGHT-OF-WAY 2011 2011 $80 $80
TAR RIVER. REPLACE
HIGHWAY B-4522 B-4522 SR 1150 BRIDGE NO. 102 GRANVILLE KERR TAR CONSTRUCTION 2012 2012 $1,900 $1,900
TAR RIVER. REPLACE BEFORE
HIGHWAY B-4522 B-4522 SR 1150 BRIDGE NO. 102 GRANVILLE KERR TAR 2011 $250 $250
FOX CREEK. REPLACE BEFORE
HIGHWAY B-4523 B-4523 SR 1307 BRIDGE NO. 164 GRANVILLE KERR TAR 2011 $991 $991
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO.
36, LITTLE
CONTENTNEA CREEK
OVERFLOW.
HIGHWAY B-4531 B-4531 SR 1343 REPLACE BRIDGE NO. 35 GREENE MID-EAST MITIGATION 2011 2011 $1 $1
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO.
36, LITTLE
CONTENTNEA CREEK
OVERFLOW.
HIGHWAY B-4531 B-4531 SR 1343 REPLACE BRIDGE NO. 35 GREENE MID-EAST RIGHT-OF-WAY 2011 2011 $200 $200
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO.
36, LITTLE
CONTENTNEA CREEK
OVERFLOW.
HIGHWAY B-4531 B-4531 SR 1343 REPLACE BRIDGE NO. 35 GREENE MID-EAST UTILITIES 2011 2011 $51 $51
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO.
36, LITTLE
CONTENTNEA CREEK
OVERFLOW.
HIGHWAY B-4531 B-4531 SR 1343 REPLACE BRIDGE NO. 35 GREENE MID-EAST CONSTRUCTION 2012 2012 $1,900 $1,900
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO.
36, LITTLE
CONTENTNEA CREEK
OVERFLOW. BEFORE
HIGHWAY B-4531 B-4531 SR 1343 REPLACE BRIDGE NO. 35 GREENE MID-EAST 2011 $150 $150
WHEAT SWAMP CREEK. EASTERN
HIGHWAY B-4533 B-4533 SR 1432 REPLACE BRIDGE NO. 48 GREENE CAROLINA RIGHT-OF-WAY 2011 2011 $5 $5
WHEAT SWAMP CREEK. EASTERN
HIGHWAY B-4533 B-4533 SR 1432 REPLACE BRIDGE NO. 48 GREENE CAROLINA UTILITIES 2011 2011 $40 $40
WHEAT SWAMP CREEK. EASTERN
HIGHWAY B-4533 B-4533 SR 1432 REPLACE BRIDGE NO. 48 GREENE CAROLINA CONSTRUCTION 2012 2012 $750 $750
WHEAT SWAMP CREEK. EASTERN BEFORE
HIGHWAY B-4533 B-4533 SR 1432 REPLACE BRIDGE NO. 48 GREENE CAROLINA 2011 $150 $150
I-40/US I-85. REPLACE BRIDGE BEFORE
HIGHWAY B-4534 B-4534 220 NO. 336 GUILFORD GREENSBORO 2011 $6,200 $6,200
JACKET SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4537 B-4537 SR 1002 127 HALIFAX PEANUT BELT MITIGATION 2019 2019 $1 $1
JACKET SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4537 B-4537 SR 1002 127 HALIFAX PEANUT BELT RIGHT-OF-WAY 2019 2019 $100 $100
JACKET SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4537 B-4537 SR 1002 127 HALIFAX PEANUT BELT CONSTRUCTION 2020 2020 $1,000 $1,000
JACKET SWAMP.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4537 B-4537 SR 1002 127 HALIFAX PEANUT BELT 2011 $11 $11
QUANKEY CREEK. BEFORE
HIGHWAY B-4541 B-4541 SR 1434 REPLACE BRIDGE NO. 24 HALIFAX PEANUT BELT 2011 $947 $947
BARBEQUE CREEK.
HIGHWAY B-4542 B-4542 SR 1213 REPLACE BRIDGE NO. 40 HARNETT MID-CAROLINA MITIGATION 2011 2011 $51 $51
BARBEQUE CREEK.
HIGHWAY B-4542 B-4542 SR 1213 REPLACE BRIDGE NO. 40 HARNETT MID-CAROLINA RIGHT-OF-WAY 2011 2011 $50 $50
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BARBEQUE CREEK.
HIGHWAY B-4542 B-4542 SR 1213 REPLACE BRIDGE NO. 40 HARNETT MID-CAROLINA CONSTRUCTION 2012 2012 $1,250 $1,250
BARBEQUE CREEK. BEFORE
HIGHWAY B-4542 B-4542 SR 1213 REPLACE BRIDGE NO. 40 HARNETT MID-CAROLINA 2011 $150 $150
BLACK RIVER. REPLACE
HIGHWAY B-4543 B-4543 SR 1558 BRIDGE NO. 120 HARNETT MID-CAROLINA MITIGATION 2012 2012 $4 $4
BLACK RIVER. REPLACE
HIGHWAY B-4543 B-4543 SR 1558 BRIDGE NO. 120 HARNETT MID-CAROLINA RIGHT-OF-WAY 2012 2012 $60 $60
BLACK RIVER. REPLACE
HIGHWAY B-4543 B-4543 SR 1558 BRIDGE NO. 120 HARNETT MID-CAROLINA UTILITIES 2012 2012 $10 $10
BLACK RIVER. REPLACE
HIGHWAY B-4543 B-4543 SR 1558 BRIDGE NO. 120 HARNETT MID-CAROLINA CONSTRUCTION 2013 2013 $700 $700
BLACK RIVER. REPLACE BEFORE
HIGHWAY B-4543 B-4543 SR 1558 BRIDGE NO. 120 HARNETT MID-CAROLINA 2011 $215 $215
BLACK RIVER. REPLACE
BRIDGE NO. 133
BLACK RIVER
OVERFLOW. REPLACE
HIGHWAY B-4544 B-4544 SR 1722 BRIDGE NO. 134 HARNETT MID-CAROLINA RIGHT-OF-WAY 2018 2018 $160 $160
BLACK RIVER. REPLACE
BRIDGE NO. 133
BLACK RIVER
OVERFLOW. REPLACE
HIGHWAY B-4544 B-4544 SR 1722 BRIDGE NO. 134 HARNETT MID-CAROLINA CONSTRUCTION 2019 2019 $1,600 $1,600
BLACK RIVER. REPLACE
BRIDGE NO. 133
BLACK RIVER
OVERFLOW. REPLACE BEFORE
HIGHWAY B-4544 B-4544 SR 1722 BRIDGE NO. 134 HARNETT MID-CAROLINA 2011 $25 $25
MUD CREEK. REPLACE BEFORE
HIGHWAY B-4545 B-4545 SR 1137 BRIDGE NO. 72 HENDERSON ASHEVILLE 2011 $505 $505
DEVILS FORK CREEK.
HIGHWAY B-4547 B-4547 SR 1525 REPLACE BRIDGE NO. 45 HENDERSON ASHEVILLE MITIGATION 2012 2012 $34 $34
DEVILS FORK CREEK.
HIGHWAY B-4547 B-4547 SR 1525 REPLACE BRIDGE NO. 45 HENDERSON ASHEVILLE RIGHT-OF-WAY 2012 2012 $90 $90
DEVILS FORK CREEK.
HIGHWAY B-4547 B-4547 SR 1525 REPLACE BRIDGE NO. 45 HENDERSON ASHEVILLE CONSTRUCTION 2013 2013 $925 $925
DEVILS FORK CREEK. BEFORE
HIGHWAY B-4547 B-4547 SR 1525 REPLACE BRIDGE NO. 45 HENDERSON ASHEVILLE 2011 $50 $50
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LIVERMAN CREEK.
HIGHWAY B-4548 B-4548 SR 1308 REPLACE BRIDGE NO. 2 HERTFORD PEANUT BELT CONSTRUCTION 2011 2011 $550 $550
LIVERMAN CREEK. BEFORE
HIGHWAY B-4548 B-4548 SR 1308 REPLACE BRIDGE NO. 2 HERTFORD PEANUT BELT 2011 $170 $170
TAYLOR POND. BEFORE
HIGHWAY B-4549 B-4549 SR 1441 REPLACE BRIDGE NO. 42 HERTFORD PEANUT BELT 2011 $882 $882
ROCKFISH CREEK.
REPLACE BRIDGE
NO. 41 AND BRIDGE NO.
HIGHWAY B-4550 B-4550 SR 1432 42 HOKE FAYETTEVILLE MITIGATION 2018 2018 $6 $6
ROCKFISH CREEK.
REPLACE BRIDGE
NO. 41 AND BRIDGE NO.
HIGHWAY B-4550 B-4550 SR 1432 42 HOKE FAYETTEVILLE RIGHT-OF-WAY 2018 2018 $200 $200
ROCKFISH CREEK.
REPLACE BRIDGE
NO. 41 AND BRIDGE NO.
HIGHWAY B-4550 B-4550 SR 1432 42 HOKE FAYETTEVILLE CONSTRUCTION 2019 2019 $2,100 $2,100
ROCKFISH CREEK.
REPLACE BRIDGE
NO. 41 AND BRIDGE NO. BEFORE
HIGHWAY B-4550 B-4550 SR 1432 42 HOKE FAYETTEVILLE 2011 $150 $150
CANAL. REPLACE
HIGHWAY B-4551 B-4551 US 264 BRIDGE NO. 45 HYDE ALBEMARLE MITIGATION 2011 2011 $60 $60
CANAL. REPLACE
HIGHWAY B-4551 B-4551 US 264 BRIDGE NO. 45 HYDE ALBEMARLE RIGHT-OF-WAY 2011 2011 $390 $390
CANAL. REPLACE
HIGHWAY B-4551 B-4551 US 264 BRIDGE NO. 45 HYDE ALBEMARLE UTILITIES 2011 2011 $115 $115
CANAL. REPLACE
HIGHWAY B-4551 B-4551 US 264 BRIDGE NO. 45 HYDE ALBEMARLE CONSTRUCTION 2012 2012 $1,800 $1,800
CANAL. REPLACE BEFORE
HIGHWAY B-4551 B-4551 US 264 BRIDGE NO. 45 HYDE ALBEMARLE 2011 $200 $200
FOURTH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4553 B-4553 SR 2308 312 IREDELL LAKE NORMAN MITIGATION 2011 2011 $16 $16
FOURTH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4553 B-4553 SR 2308 312 IREDELL LAKE NORMAN RIGHT-OF-WAY 2011 2011 $100 $100
FOURTH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4553 B-4553 SR 2308 312 IREDELL LAKE NORMAN CONSTRUCTION 2012 2012 $1,000 $1,000
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
FOURTH CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4553 B-4553 SR 2308 312 IREDELL LAKE NORMAN 2011 $200 $200
SR 1705, SOUTHERN
RAILROAD, SCOTT
CREEK. REHABILITATE SOUTHWESTER
HIGHWAY B-4554 B-4554 US 23-74 BRIDGE NO. 145 JACKSON N RIGHT-OF-WAY 2015 2015 $500 $500
SR 1705, SOUTHERN
RAILROAD, SCOTT
CREEK. REHABILITATE SOUTHWESTER
HIGHWAY B-4554 B-4554 US 23-74 BRIDGE NO. 145 JACKSON N CONSTRUCTION 2017 2019 $17,800 $5,934 $5,933 $5,933
SR 1705, SOUTHERN
RAILROAD, SCOTT
CREEK. REHABILITATE SOUTHWESTER BEFORE
HIGHWAY B-4554 B-4554 US 23-74 BRIDGE NO. 145 JACKSON N 2011 $300 $300
SOUTHERN RAILWAY. UPPER
HIGHWAY B-4555 B-4555 US 70 REPLACE BRIDGE NO. 97 JOHNSTON COASTAL PLAIN CONSTRUCTION 2012 2012 $3,600 $3,600
SOUTHERN RAILWAY. UPPER BEFORE
HIGHWAY B-4555 B-4555 US 70 REPLACE BRIDGE NO. 97 JOHNSTON COASTAL PLAIN 2011 $635 $635
BLACK CREEK.
HIGHWAY B-4556 B-4556 NC 50 REPLACE BRIDGE NO. 74 JOHNSTON RALEIGH MITIGATION 2017 2017 $59 $59
BLACK CREEK.
HIGHWAY B-4556 B-4556 NC 50 REPLACE BRIDGE NO. 74 JOHNSTON RALEIGH RIGHT-OF-WAY 2017 2017 $150 $150
BLACK CREEK.
HIGHWAY B-4556 B-4556 NC 50 REPLACE BRIDGE NO. 74 JOHNSTON RALEIGH UTILITIES 2017 2017 $36 $36
BLACK CREEK.
HIGHWAY B-4556 B-4556 NC 50 REPLACE BRIDGE NO. 74 JOHNSTON RALEIGH CONSTRUCTION 2018 2018 $1,500 $1,500
BLACK CREEK. BEFORE
HIGHWAY B-4556 B-4556 NC 50 REPLACE BRIDGE NO. 74 JOHNSTON RALEIGH 2011 $390 $390
MCCULLENS BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-4557 B-4557 SR 1309 113 JOHNSTON RALEIGH RIGHT-OF-WAY 2015 2015 $60 $60
MCCULLENS BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-4557 B-4557 SR 1309 113 JOHNSTON RALEIGH CONSTRUCTION 2016 2016 $600 $600
MCCULLENS BRANCH.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4557 B-4557 SR 1309 113 JOHNSTON RALEIGH 2011 $30 $30
STONEY FORK CREEK.
HIGHWAY B-4558 B-4558 SR 1330 REPLACE BRIDGE NO. 86 JOHNSTON RALEIGH MITIGATION 2012 2012 $11 $11
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
STONEY FORK CREEK.
HIGHWAY B-4558 B-4558 SR 1330 REPLACE BRIDGE NO. 86 JOHNSTON RALEIGH RIGHT-OF-WAY 2012 2012 $70 $70
STONEY FORK CREEK.
HIGHWAY B-4558 B-4558 SR 1330 REPLACE BRIDGE NO. 86 JOHNSTON RALEIGH UTILITIES 2012 2012 $52 $52
STONEY FORK CREEK.
HIGHWAY B-4558 B-4558 SR 1330 REPLACE BRIDGE NO. 86 JOHNSTON RALEIGH CONSTRUCTION 2013 2013 $700 $700
STONEY FORK CREEK. BEFORE
HIGHWAY B-4558 B-4558 SR 1330 REPLACE BRIDGE NO. 86 JOHNSTON RALEIGH 2011 $100 $100
BLACK CREEK. BEFORE
HIGHWAY B-4559 B-4559 SR 1330 REPLACE BRIDGE NO. 84 JOHNSTON RALEIGH 2011 $1,505 $1,505
BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4560 B-4560 SR 1331 102 JOHNSTON RALEIGH RIGHT-OF-WAY 2011 2011 $35 $35
BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4560 B-4560 SR 1331 102 JOHNSTON RALEIGH CONSTRUCTION 2012 2012 $1,100 $1,100
BLACK CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4560 B-4560 SR 1331 102 JOHNSTON RALEIGH 2011 $200 $200
SWIFT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4561 B-4561 SR 1525 147 JOHNSTON RALEIGH MITIGATION 2012 2012 $52 $52
SWIFT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4561 B-4561 SR 1525 147 JOHNSTON RALEIGH RIGHT-OF-WAY 2012 2012 $250 $250
SWIFT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4561 B-4561 SR 1525 147 JOHNSTON RALEIGH UTILITIES 2012 2012 $34 $34
SWIFT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4561 B-4561 SR 1525 147 JOHNSTON RALEIGH CONSTRUCTION 2013 2013 $1,450 $1,450
SWIFT CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4561 B-4561 SR 1525 147 JOHNSTON RALEIGH 2011 $200 $200
LITTLE BUFFALO CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4562 B-4562 SR 2143 216 JOHNSTON COASTAL PLAIN MITIGATION 2019 2019 $1 $1
LITTLE BUFFALO CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4562 B-4562 SR 2143 216 JOHNSTON COASTAL PLAIN RIGHT-OF-WAY 2019 2019 $125 $125
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE BUFFALO CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4562 B-4562 SR 2143 216 JOHNSTON COASTAL PLAIN CONSTRUCTION 2020 2020 $1,250 $1,250
US 70 NEUSE RIVER. REPLACE
BUSINES BRIDGE NO. 42 EASTERN
HIGHWAY B-4565 B-4565 S AND BRIDGE NO. 43 LENOIR CAROLINA RIGHT-OF-WAY 2012 2012 $450 $450
US 70 NEUSE RIVER. REPLACE
BUSINES BRIDGE NO. 42 EASTERN
HIGHWAY B-4565 B-4565 S AND BRIDGE NO. 43 LENOIR CAROLINA UTILITIES 2012 2012 $193 $193
US 70 NEUSE RIVER. REPLACE
BUSINES BRIDGE NO. 42 EASTERN
HIGHWAY B-4565 B-4565 S AND BRIDGE NO. 43 LENOIR CAROLINA CONSTRUCTION 2013 2014 $12,400 $6,200 $6,200
US 70 NEUSE RIVER. REPLACE
BUSINES BRIDGE NO. 42 EASTERN BEFORE
HIGHWAY B-4565 B-4565 S AND BRIDGE NO. 43 LENOIR CAROLINA 2011 $500 $500
WEST BEAR CREEK. EASTERN
HIGHWAY B-4567 B-4567 SR 1501 REPLACE BRIDGE NO. 69 LENOIR CAROLINA RIGHT-OF-WAY 2011 2011 $80 $80
WEST BEAR CREEK. EASTERN
HIGHWAY B-4567 B-4567 SR 1501 REPLACE BRIDGE NO. 69 LENOIR CAROLINA CONSTRUCTION 2012 2012 $725 $725
WEST BEAR CREEK. EASTERN BEFORE
HIGHWAY B-4567 B-4567 SR 1501 REPLACE BRIDGE NO. 69 LENOIR CAROLINA 2011 $150 $150
FALLING CREEK. EASTERN BEFORE
HIGHWAY B-4568 B-4568 SR 1515 REPLACE BRIDGE NO. 67 LENOIR CAROLINA 2011 $963 $963
GUM SWAMP CREEK. EASTERN BEFORE
HIGHWAY B-4570 B-4570 SR 1544 REPLACE BRIDGE NO. 79 LENOIR CAROLINA 2011 $714 $714
LIPPARD CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4573 B-4573 SR 1346 183 LINCOLN LAKE NORMAN CONSTRUCTION 2011 2011 $625 $625
LIPPARD CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4573 B-4573 SR 1346 183 LINCOLN LAKE NORMAN 2011 $237 $237
CULLASAJA RIVER. SOUTHWESTER
HIGHWAY B-4574 B-4574 SR 1551 REPLACE BRIDGE NO. 58 MACON N CONSTRUCTION 2011 2011 $700 $700
CULLASAJA RIVER. SOUTHWESTER BEFORE
HIGHWAY B-4574 B-4574 SR 1551 REPLACE BRIDGE NO. 58 MACON N 2011 $465 $465
MICKLEY AVENUE OVER
NORFOLK
SOUTHERN RAILROAD.
BESSEM REPLACE
HIGHWAY B-4575 B-4575 ER CITY BRIDGE NO. 165 GASTON GASTONIA CONSTRUCTION 2012 2012 $2,500 $2,500
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MICKLEY AVENUE OVER
NORFOLK
SOUTHERN RAILROAD.
BESSEM REPLACE BEFORE
HIGHWAY B-4575 B-4575 ER CITY BRIDGE NO. 165 GASTON GASTONIA 2011 $675 $675
READY BRANCH. BEFORE
HIGHWAY B-4576 B-4576 US 17 REPLACE BRIDGE NO. 6 MARTIN MID-EAST 2011 $1,169 $1,169
MCINTYRE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4579 B-4579 SR 2025 134 MECKLENBURG CHARLOTTE CONSTRUCTION 2011 2011 $300 $300
MCINTYRE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4579 B-4579 SR 2025 134 MECKLENBURG CHARLOTTE 2011 $35 $35
REEDY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4580 B-4580 SR 2804 177 MECKLENBURG CHARLOTTE 2011 $4,670 $4,670
DENSONS CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4582 B-4582 SR 1323 121 MONTGOMERY TRIAD CONSTRUCTION 2011 2011 $875 $875
DENSONS CREEK.
REPLACE BRIDGE NO. PIEDMONT BEFORE
HIGHWAY B-4582 B-4582 SR 1323 121 MONTGOMERY TRIAD 2011 $270 $270
ABERDEEN CREEK.
REPLACE BRIDGE NO. TRIANGLE BEFORE
HIGHWAY B-4583 B-4583 SR 1105 176 MOORE AREA 2011 $1,039 $1,039
LITTLE RIVER. REPLACE TRIANGLE BEFORE
HIGHWAY B-4584 B-4584 SR 1864 BRIDGE NO. 11 MOORE AREA 2011 $1,371 $1,371
STONEY CREEK.
HIGHWAY B-4588 B-4588 SR 1670 REPLACE BRIDGE NO. 1 NASH ROCKY MOUNT MITIGATION 2011 2011 $35 $35
STONEY CREEK.
HIGHWAY B-4588 B-4588 SR 1670 REPLACE BRIDGE NO. 1 NASH ROCKY MOUNT RIGHT-OF-WAY 2011 2011 $70 $70
STONEY CREEK.
HIGHWAY B-4588 B-4588 SR 1670 REPLACE BRIDGE NO. 1 NASH ROCKY MOUNT UTILITIES 2011 2011 $25 $25
STONEY CREEK.
HIGHWAY B-4588 B-4588 SR 1670 REPLACE BRIDGE NO. 1 NASH ROCKY MOUNT CONSTRUCTION 2012 2012 $1,350 $1,350
STONEY CREEK. BEFORE
HIGHWAY B-4588 B-4588 SR 1670 REPLACE BRIDGE NO. 1 NASH ROCKY MOUNT 2011 $200 $200
SMITH CREEK. REPLACE
HIGHWAY B-4590 B-4590 NC 133 BRIDGE NO. 29 NEW HANOVER WILMINGTON RIGHT-OF-WAY 2019 2019 $410 $410
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SMITH CREEK. REPLACE
HIGHWAY B-4590 B-4590 NC 133 BRIDGE NO. 29 NEW HANOVER WILMINGTON CONSTRUCTION 2020 2020 $4,100 $4,100
SMITH CREEK. REPLACE BEFORE
HIGHWAY B-4590 B-4590 NC 133 BRIDGE NO. 29 NEW HANOVER WILMINGTON 2011 $9 $9
ISLAND CREEK.
HIGHWAY B-4591 B-4591 SR 1002 REPLACE BRIDGE NO. 4 NEW HANOVER WILMINGTON MITIGATION 2013 2013 $16 $16
ISLAND CREEK.
HIGHWAY B-4591 B-4591 SR 1002 REPLACE BRIDGE NO. 4 NEW HANOVER WILMINGTON RIGHT-OF-WAY 2013 2013 $50 $50
ISLAND CREEK.
HIGHWAY B-4591 B-4591 SR 1002 REPLACE BRIDGE NO. 4 NEW HANOVER WILMINGTON UTILITIES 2013 2013 $31 $31
ISLAND CREEK.
HIGHWAY B-4591 B-4591 SR 1002 REPLACE BRIDGE NO. 4 NEW HANOVER WILMINGTON CONSTRUCTION 2014 2014 $500 $500
ISLAND CREEK. BEFORE
HIGHWAY B-4591 B-4591 SR 1002 REPLACE BRIDGE NO. 4 NEW HANOVER WILMINGTON 2011 $60 $60
CANAL. REPLACE BEFORE
HIGHWAY B-4594 B-4594 NC 304 BRIDGE NO. 44 PAMLICO DOWN EAST 2011 $150 $150
KNOBBS CREEK.
US 17- REPLACE BRIDGE
HIGHWAY B-4599 B-4599 158 NO. 1 AND BRIDGE NO. 2 PASQUOTANK ALBEMARLE MITIGATION 2011 2011 $100 $100
KNOBBS CREEK.
US 17- REPLACE BRIDGE
HIGHWAY B-4599 B-4599 158 NO. 1 AND BRIDGE NO. 2 PASQUOTANK ALBEMARLE RIGHT-OF-WAY 2011 2011 $700 $700
KNOBBS CREEK.
US 17- REPLACE BRIDGE
HIGHWAY B-4599 B-4599 158 NO. 1 AND BRIDGE NO. 2 PASQUOTANK ALBEMARLE UTILITIES 2011 2011 $750 $750
KNOBBS CREEK.
US 17- REPLACE BRIDGE
HIGHWAY B-4599 B-4599 158 NO. 1 AND BRIDGE NO. 2 PASQUOTANK ALBEMARLE CONSTRUCTION 2012 2013 $11,800 $5,900 $5,900
KNOBBS CREEK.
US 17- REPLACE BRIDGE BEFORE
HIGHWAY B-4599 B-4599 158 NO. 1 AND BRIDGE NO. 2 PASQUOTANK ALBEMARLE 2011 $2,950 $2,950
SOUTH FLAT RIVER. BEFORE
HIGHWAY B-4600 B-4600 SR 1112 REPLACE BRIDGE NO. 43 PERSON KERR TAR 2011 $943 $943
INDIAN WELLS SWAMP. BEFORE
HIGHWAY B-4604 B-4604 SR 1753 REPLACE BRIDGE NO. 13 PITT MID-EAST 2011 $976 $976
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
FORK CREEK. REPLACE PIEDMONT
HIGHWAY B-4608 B-4608 SR 1003 BRIDGE NO. 208 RANDOLPH TRIAD RIGHT-OF-WAY 2017 2017 $180 $180
FORK CREEK. REPLACE PIEDMONT
HIGHWAY B-4608 B-4608 SR 1003 BRIDGE NO. 208 RANDOLPH TRIAD CONSTRUCTION 2018 2018 $1,800 $1,800
FORK CREEK. REPLACE PIEDMONT BEFORE
HIGHWAY B-4608 B-4608 SR 1003 BRIDGE NO. 208 RANDOLPH TRIAD 2011 $85 $85
TAYLOR CREEK. PIEDMONT
HIGHWAY B-4609 B-4609 SR 1163 REPLACE BRIDGE NO. 16 RANDOLPH TRIAD RIGHT-OF-WAY 2015 2015 $60 $60
TAYLOR CREEK. PIEDMONT
HIGHWAY B-4609 B-4609 SR 1163 REPLACE BRIDGE NO. 16 RANDOLPH TRIAD CONSTRUCTION 2016 2016 $575 $575
TAYLOR CREEK. PIEDMONT BEFORE
HIGHWAY B-4609 B-4609 SR 1163 REPLACE BRIDGE NO. 16 RANDOLPH TRIAD 2011 $60 $60
LAKE LUCAS. REPLACE PIEDMONT BEFORE
HIGHWAY B-4610 B-4610 SR 1518 BRIDGE NO. 73 RANDOLPH TRIAD 2011 $2,088 $2,088
NANTAHALA NATIONAL
FOREST,
PFH 102-1(1), CANEY
SR 1737 CREEK. SOUTHWESTER
HIGHWAY B-4612 B-4612 FH 102 REPLACE BRIDGE NO. 79 JACKSON N CONSTRUCTION 2011 2011 $1,300 $1,300
NANTAHALA NATIONAL
FOREST,
PFH 102-1(1), CANEY
SR 1737 CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4612 B-4612 FH 102 REPLACE BRIDGE NO. 79 JACKSON N 2011 $70 $70
NAKED CREEK. BEFORE
HIGHWAY B-4614 B-4614 NC 73 REPLACE BRIDGE NO. 41 RICHMOND LUMBER RIVER 2011 $1,220 $1,220
HITCHCOCK CREEK.
HIGHWAY B-4615 B-4615 SR 1419 REPLACE BRIDGE NO. 46 RICHMOND LUMBER RIVER RIGHT-OF-WAY 2012 2012 $110 $110
HITCHCOCK CREEK.
HIGHWAY B-4615 B-4615 SR 1419 REPLACE BRIDGE NO. 46 RICHMOND LUMBER RIVER UTILITIES 2012 2012 $71 $71
HITCHCOCK CREEK.
HIGHWAY B-4615 B-4615 SR 1419 REPLACE BRIDGE NO. 46 RICHMOND LUMBER RIVER CONSTRUCTION 2013 2013 $1,100 $1,100
HITCHCOCK CREEK. BEFORE
HIGHWAY B-4615 B-4615 SR 1419 REPLACE BRIDGE NO. 46 RICHMOND LUMBER RIVER 2011 $75 $75
CSX RAILROAD.
HIGHWAY B-4616 B-4616 NC 211 REPLACE BRIDGE NO. 18 ROBESON LUMBER RIVER RIGHT-OF-WAY 2015 2015 $550 $550
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CSX RAILROAD.
HIGHWAY B-4616 B-4616 NC 211 REPLACE BRIDGE NO. 18 ROBESON LUMBER RIVER CONSTRUCTION 2017 2018 $5,500 $2,750 $2,750
CSX RAILROAD. BEFORE
HIGHWAY B-4616 B-4616 NC 211 REPLACE BRIDGE NO. 18 ROBESON LUMBER RIVER 2011 $200 $200
COLD CAMP CREEK.
HIGHWAY B-4617 B-4617 SR 1005 REPLACE BRIDGE NO. 30 ROBESON LUMBER RIVER RIGHT-OF-WAY 2016 2016 $180 $180
COLD CAMP CREEK.
HIGHWAY B-4617 B-4617 SR 1005 REPLACE BRIDGE NO. 30 ROBESON LUMBER RIVER CONSTRUCTION 2017 2017 $1,800 $1,800
COLD CAMP CREEK. BEFORE
HIGHWAY B-4617 B-4617 SR 1005 REPLACE BRIDGE NO. 30 ROBESON LUMBER RIVER 2011 $60 $60
WOODLAND FARM
POND. REPLACE
BRIDGE NO. 161 AND BEFORE
HIGHWAY B-4618 B-4618 SR 1108 BRIDGE NO. 445 ROBESON LUMBER RIVER 2011 $1,700 $1,700
HOG SWAMP. REPLACE
BRIDGE
NO. 116 AND BRIDGE NO.
HIGHWAY B-4619 B-4619 SR 2262 117 ROBESON LUMBER RIVER MITIGATION 2016 2016 $38 $38
HOG SWAMP. REPLACE
BRIDGE
NO. 116 AND BRIDGE NO.
HIGHWAY B-4619 B-4619 SR 2262 117 ROBESON LUMBER RIVER RIGHT-OF-WAY 2016 2016 $330 $330
HOG SWAMP. REPLACE
BRIDGE
NO. 116 AND BRIDGE NO.
HIGHWAY B-4619 B-4619 SR 2262 117 ROBESON LUMBER RIVER UTILITIES 2016 2016 $51 $51
HOG SWAMP. REPLACE
BRIDGE
NO. 116 AND BRIDGE NO.
HIGHWAY B-4619 B-4619 SR 2262 117 ROBESON LUMBER RIVER CONSTRUCTION 2017 2017 $3,300 $3,300
HOG SWAMP. REPLACE
BRIDGE
NO. 116 AND BRIDGE NO. BEFORE
HIGHWAY B-4619 B-4619 SR 2262 117 ROBESON LUMBER RIVER 2011 $350 $350
ASHPOLE SWAMP.
REPLACE BRIDGE
NO. 121 AND BRIDGE NO.
HIGHWAY B-4620 B-4620 SR 2455 123 ROBESON LUMBER RIVER RIGHT-OF-WAY 2018 2018 $270 $270
ASHPOLE SWAMP.
REPLACE BRIDGE
NO. 121 AND BRIDGE NO.
HIGHWAY B-4620 B-4620 SR 2455 123 ROBESON LUMBER RIVER CONSTRUCTION 2019 2019 $2,700 $2,700
ASHPOLE SWAMP.
REPLACE BRIDGE
NO. 121 AND BRIDGE NO. BEFORE
HIGHWAY B-4620 B-4620 SR 2455 123 ROBESON LUMBER RIVER 2011 $60 $60
US 220 BUSINESS.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4621 B-4621 US 220 150 ROCKINGHAM TRIAD RIGHT-OF-WAY 2017 2017 $550 $550
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 220 BUSINESS.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4621 B-4621 US 220 150 ROCKINGHAM TRIAD CONSTRUCTION 2018 2019 $5,860 $2,930 $2,930
US 220 BUSINESS.
REPLACE BRIDGE NO. PIEDMONT BEFORE
HIGHWAY B-4621 B-4621 US 220 150 ROCKINGHAM TRIAD 2011 $300 $300
ROCK HOUSE CREEK. PIEDMONT BEFORE
HIGHWAY B-4622 B-4622 NC 65 REPLACE BRIDGE NO. 54 ROCKINGHAM TRIAD 2011 $2,761 $2,761
HOGANS CREEK. PIEDMONT
HIGHWAY B-4623 B-4623 SR 1128 REPLACE BRIDGE NO. 47 ROCKINGHAM TRIAD RIGHT-OF-WAY 2016 2016 $135 $135
HOGANS CREEK. PIEDMONT
HIGHWAY B-4623 B-4623 SR 1128 REPLACE BRIDGE NO. 47 ROCKINGHAM TRIAD CONSTRUCTION 2017 2017 $1,350 $1,350
HOGANS CREEK. PIEDMONT BEFORE
HIGHWAY B-4623 B-4623 SR 1128 REPLACE BRIDGE NO. 47 ROCKINGHAM TRIAD 2011 $70 $70
WOLF ISLAND CREEK. PIEDMONT
HIGHWAY B-4624 B-4624 SR 1929 REPLACE BRIDGE NO. 80 ROCKINGHAM TRIAD MITIGATION 2018 2018 $1 $1
WOLF ISLAND CREEK. PIEDMONT
HIGHWAY B-4624 B-4624 SR 1929 REPLACE BRIDGE NO. 80 ROCKINGHAM TRIAD RIGHT-OF-WAY 2018 2018 $220 $220
WOLF ISLAND CREEK. PIEDMONT
HIGHWAY B-4624 B-4624 SR 1929 REPLACE BRIDGE NO. 80 ROCKINGHAM TRIAD CONSTRUCTION 2019 2019 $2,225 $2,225
WOLF ISLAND CREEK. PIEDMONT BEFORE
HIGHWAY B-4624 B-4624 SR 1929 REPLACE BRIDGE NO. 80 ROCKINGHAM TRIAD 2011 $85 $85
MASSY CREEK.
REPLACE BRIDGE NO. PIEDMONT BEFORE
HIGHWAY B-4625 B-4625 SR 2192 118 ROCKINGHAM TRIAD 2011 $987 $987
THIRD CREEK. REPLACE BEFORE
HIGHWAY B-4627 B-4627 SR 1003 BRIDGE NO. 26 ROWAN CONCORD 2011 $2,507 $2,507
BACK CREEK. REPLACE
HIGHWAY B-4628 B-4628 SR 1759 BRIDGE NO. 6 ROWAN CONCORD RIGHT-OF-WAY 2017 2017 $110 $110
BACK CREEK. REPLACE
HIGHWAY B-4628 B-4628 SR 1759 BRIDGE NO. 6 ROWAN CONCORD CONSTRUCTION 2018 2018 $1,185 $1,185
BACK CREEK. REPLACE BEFORE
HIGHWAY B-4628 B-4628 SR 1759 BRIDGE NO. 6 ROWAN CONCORD 2011 $150 $150
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SECOND CREEK.
HIGHWAY B-4629 B-4629 SR 2048 REPLACE BRIDGE NO. 25 ROWAN CONCORD RIGHT-OF-WAY 2011 2011 $150 $150
SECOND CREEK.
HIGHWAY B-4629 B-4629 SR 2048 REPLACE BRIDGE NO. 25 ROWAN CONCORD UTILITIES 2011 2011 $36 $36
SECOND CREEK.
HIGHWAY B-4629 B-4629 SR 2048 REPLACE BRIDGE NO. 25 ROWAN CONCORD CONSTRUCTION 2012 2012 $1,800 $1,800
SECOND CREEK. BEFORE
HIGHWAY B-4629 B-4629 SR 2048 REPLACE BRIDGE NO. 25 ROWAN CONCORD 2011 $300 $300
CLINCHFIELD RAILROAD.
HIGHWAY B-4632 B-4632 SR 1576 REPLACE BRIDGE NO. 69 RUTHERFORD ISOTHERMAL RIGHT-OF-WAY 2011 2011 $50 $50
CLINCHFIELD RAILROAD.
HIGHWAY B-4632 B-4632 SR 1576 REPLACE BRIDGE NO. 69 RUTHERFORD ISOTHERMAL UTILITIES 2011 2011 $80 $80
CLINCHFIELD RAILROAD.
HIGHWAY B-4632 B-4632 SR 1576 REPLACE BRIDGE NO. 69 RUTHERFORD ISOTHERMAL CONSTRUCTION 2013 2013 $1,350 $1,350
CLINCHFIELD RAILROAD. BEFORE
HIGHWAY B-4632 B-4632 SR 1576 REPLACE BRIDGE NO. 69 RUTHERFORD ISOTHERMAL 2011 $150 $150
CREEK. REPLACE BEFORE
HIGHWAY B-4633 B-4633 SR 1913 BRIDGE NO. 32 RUTHERFORD ISOTHERMAL 2011 $1,221 $1,221
FLOYDS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4634 B-4634 SR 2215 144 RUTHERFORD ISOTHERMAL RIGHT-OF-WAY 2014 2014 $160 $160
FLOYDS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4634 B-4634 SR 2215 144 RUTHERFORD ISOTHERMAL CONSTRUCTION 2015 2015 $1,600 $1,600
FLOYDS CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4634 B-4634 SR 2215 144 RUTHERFORD ISOTHERMAL 2011 $60 $60
SOUTH RIVER
OVERFLOW.
HIGHWAY B-4635 B-4635 US 13 REPLACE BRIDGE NO. 9 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2018 2018 $300 $300
SOUTH RIVER
OVERFLOW.
HIGHWAY B-4635 B-4635 US 13 REPLACE BRIDGE NO. 9 SAMPSON MID-CAROLINA CONSTRUCTION 2019 2019 $3,025 $3,025
SOUTH RIVER
OVERFLOW. BEFORE
HIGHWAY B-4635 B-4635 US 13 REPLACE BRIDGE NO. 9 SAMPSON MID-CAROLINA 2011 $10 $10
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SIX RUNS CREEK.
HIGHWAY B-4636 B-4636 NC 24 REPLACE BRIDGE NO. 56 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2019 2019 $390 $390
SIX RUNS CREEK.
HIGHWAY B-4636 B-4636 NC 24 REPLACE BRIDGE NO. 56 SAMPSON MID-CAROLINA CONSTRUCTION 2020 2020 $3,900 $3,900
SIX RUNS CREEK. BEFORE
HIGHWAY B-4636 B-4636 NC 24 REPLACE BRIDGE NO. 56 SAMPSON MID-CAROLINA 2011 $200 $200
LITTLE COHARIE CREEK.
REPLACE
BRIDGE NO. 326 AND
BRIDGE NO. 327. LITTLE
COHARIE CREEK
OVERFLOW. REPLACE
HIGHWAY B-4637 B-4637 SR 1409 BRIDGE NO. 325 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2018 2018 $220 $220
LITTLE COHARIE CREEK.
REPLACE
BRIDGE NO. 326 AND
BRIDGE NO. 327. LITTLE
COHARIE CREEK
OVERFLOW. REPLACE
HIGHWAY B-4637 B-4637 SR 1409 BRIDGE NO. 325 SAMPSON MID-CAROLINA CONSTRUCTION 2019 2019 $2,200 $2,200
STATEWIDE SURVEY OF BEFORE
HIGHWAY B-4693 B-4693 VARIOUS HISTORICAL BRIDGES. STATEWIDE 2011 $1,000 $1,000
SR 1445
(OLD
MILL
FARM REEDY CREEK. PIEDMONT
HIGHWAY B-4694 B-4694 ROAD) REPLACE BRIDGE NO. 52 DAVIDSON TRIAD CONSTRUCTION 2011 2011 $675 $675
SR 1445
(OLD
MILL
FARM REEDY CREEK. PIEDMONT BEFORE
HIGHWAY B-4694 B-4694 ROAD) REPLACE BRIDGE NO. 52 DAVIDSON TRIAD 2011 $78 $78
BALLINGER ROAD OVER
HORSEPEN
GREENS CREEK. REPLACE
HIGHWAY B-4695 B-4695 BORO BRIDGE NO. 97 GUILFORD GREENSBORO CONSTRUCTION 2011 2011 $2,100 $2,100
BALLINGER ROAD OVER
HORSEPEN
GREENS CREEK. REPLACE BEFORE
HIGHWAY B-4695 B-4695 BORO BRIDGE NO. 97 GUILFORD GREENSBORO 2011 $292 $292
US 19- OCONALUFTEE RIVER. SOUTHWESTER BEFORE
HIGHWAY B-4696 B-4696 441 BUS. REPLACE BRIDGE NO. 24 SWAIN N 2011 $6,742 $6,742
WHITE OAK CREEK.
HIGHWAY B-4697 B-4697 SR 1600 REPLACE BRIDGE NO. 55 WAKE RALEIGH MITIGATION 2011 2011 $30 $30
WHITE OAK CREEK.
HIGHWAY B-4697 B-4697 SR 1600 REPLACE BRIDGE NO. 55 WAKE RALEIGH RIGHT-OF-WAY 2011 2011 $60 $60
WHITE OAK CREEK.
HIGHWAY B-4697 B-4697 SR 1600 REPLACE BRIDGE NO. 55 WAKE RALEIGH CONSTRUCTION 2012 2012 $1,400 $1,400
WHITE OAK CREEK. BEFORE
HIGHWAY B-4697 B-4697 SR 1600 REPLACE BRIDGE NO. 55 WAKE RALEIGH 2011 $90 $90
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRIDGE PRESERVATION
ISSUES AT SELECTED
HIGHWAY B-4700 B-4700 VARIOUS SITES. STATEWIDE CONSTRUCTION 2011 2020 $80,000 $5,000 $5,000 $5,000 $5,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000
BRIDGE PRESERVATION
ISSUES AT SELECTED BEFORE
HIGHWAY B-4700 B-4700 VARIOUS SITES. STATEWIDE 2011 $49,316 $49,316
ELK CREEK. REPLACE
HIGHWAY B-4701 B-4701 SR 1341 BRIDGE NO. 15 ALLEGHANY HIGH COUNTRY RIGHT-OF-WAY 2016 2016 $120 $120
ELK CREEK. REPLACE
HIGHWAY B-4701 B-4701 SR 1341 BRIDGE NO. 15 ALLEGHANY HIGH COUNTRY CONSTRUCTION 2017 2017 $1,200 $1,200
ELK CREEK. REPLACE BEFORE
HIGHWAY B-4701 B-4701 SR 1341 BRIDGE NO. 15 ALLEGHANY HIGH COUNTRY 2011 $100 $100
BUFFALO CREEK.
HIGHWAY B-4704 B-4704 NC 88 REPLACE BRIDGE NO. 49 ASHE HIGH COUNTRY RIGHT-OF-WAY 2018 2018 $245 $245
BUFFALO CREEK.
HIGHWAY B-4704 B-4704 NC 88 REPLACE BRIDGE NO. 49 ASHE HIGH COUNTRY CONSTRUCTION 2019 2019 $2,450 $2,450
BUFFALO CREEK. BEFORE
HIGHWAY B-4704 B-4704 NC 88 REPLACE BRIDGE NO. 49 ASHE HIGH COUNTRY 2011 $100 $100
LITTLE HELTON CREEK.
HIGHWAY B-4705 B-4705 SR 1376 REPLACE BRIDGE NO. 69 ASHE HIGH COUNTRY MITIGATION 2013 2013 $28 $28
LITTLE HELTON CREEK.
HIGHWAY B-4705 B-4705 SR 1376 REPLACE BRIDGE NO. 69 ASHE HIGH COUNTRY RIGHT-OF-WAY 2013 2013 $70 $70
LITTLE HELTON CREEK.
HIGHWAY B-4705 B-4705 SR 1376 REPLACE BRIDGE NO. 69 ASHE HIGH COUNTRY CONSTRUCTION 2014 2014 $700 $700
LITTLE HELTON CREEK. BEFORE
HIGHWAY B-4705 B-4705 SR 1376 REPLACE BRIDGE NO. 69 ASHE HIGH COUNTRY 2011 $60 $60
CREEK. REPLACE
HIGHWAY B-4707 B-4707 SR 1324 BRIDGE NO. 29 AVERY HIGH COUNTRY RIGHT-OF-WAY 2015 2015 $40 $40
CREEK. REPLACE
HIGHWAY B-4707 B-4707 SR 1324 BRIDGE NO. 29 AVERY HIGH COUNTRY CONSTRUCTION 2016 2016 $425 $425
CREEK. REPLACE BEFORE
HIGHWAY B-4707 B-4707 SR 1324 BRIDGE NO. 29 AVERY HIGH COUNTRY 2011 $60 $60
AGGIE RUN. REPLACE
HIGHWAY B-4708 B-4708 SR 1001 BRIDGE NO. 5 BEAUFORT MID-EAST MITIGATION 2015 2015 $1 $1
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
AGGIE RUN. REPLACE
HIGHWAY B-4708 B-4708 SR 1001 BRIDGE NO. 5 BEAUFORT MID-EAST RIGHT-OF-WAY 2015 2015 $185 $185
AGGIE RUN. REPLACE
HIGHWAY B-4708 B-4708 SR 1001 BRIDGE NO. 5 BEAUFORT MID-EAST CONSTRUCTION 2016 2016 $1,850 $1,850
AGGIE RUN. REPLACE BEFORE
HIGHWAY B-4708 B-4708 SR 1001 BRIDGE NO. 5 BEAUFORT MID-EAST 2011 $109 $109
SINGLETARY MILL
BRANCH.
HIGHWAY B-4711 B-4711 NC 242 REPLACE BRIDGE NO. 5 BLADEN MID-CAROLINA MITIGATION 2012 2012 $2 $2
SINGLETARY MILL
BRANCH.
HIGHWAY B-4711 B-4711 NC 242 REPLACE BRIDGE NO. 5 BLADEN MID-CAROLINA RIGHT-OF-WAY 2012 2012 $100 $100
SINGLETARY MILL
BRANCH.
HIGHWAY B-4711 B-4711 NC 242 REPLACE BRIDGE NO. 5 BLADEN MID-CAROLINA UTILITIES 2012 2012 $31 $31
SINGLETARY MILL
BRANCH.
HIGHWAY B-4711 B-4711 NC 242 REPLACE BRIDGE NO. 5 BLADEN MID-CAROLINA CONSTRUCTION 2013 2013 $1,000 $1,000
SINGLETARY MILL
BRANCH. BEFORE
HIGHWAY B-4711 B-4711 NC 242 REPLACE BRIDGE NO. 5 BLADEN MID-CAROLINA 2011 $60 $60
CAPE FEAR RIVER.
REPLACE BRIDGE NO.
188.
CAPE FEAR RIVER
OVERFLOW.
REPLACE BRIDGE NO.
HIGHWAY B-4712 B-4712 SR 1316 189. BLADEN MID-CAROLINA MITIGATION 2012 2012 $86 $86
CAPE FEAR RIVER.
REPLACE BRIDGE NO.
188.
CAPE FEAR RIVER
OVERFLOW.
REPLACE BRIDGE NO.
HIGHWAY B-4712 B-4712 SR 1316 189. BLADEN MID-CAROLINA RIGHT-OF-WAY 2012 2012 $1,000 $1,000
CAPE FEAR RIVER.
REPLACE BRIDGE NO.
188.
CAPE FEAR RIVER
OVERFLOW.
REPLACE BRIDGE NO.
HIGHWAY B-4712 B-4712 SR 1316 189. BLADEN MID-CAROLINA CONSTRUCTION 2013 2014 $12,300 $6,150 $6,150
CAPE FEAR RIVER.
REPLACE BRIDGE NO.
188.
CAPE FEAR RIVER
OVERFLOW.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4712 B-4712 SR 1316 189. BLADEN MID-CAROLINA 2011 $1,060 $1,060
NEWFOUND CREEK.
HIGHWAY B-4713 B-4713 SR 1381 REPLACE BRIDGE NO. 30 BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2019 2019 $45 $45
NEWFOUND CREEK.
HIGHWAY B-4713 B-4713 SR 1381 REPLACE BRIDGE NO. 30 BUNCOMBE ASHEVILLE CONSTRUCTION 2020 2020 $450 $450
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BROAD RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4715 B-4715 SR 2797 655 BUNCOMBE LAND OF SKY RIGHT-OF-WAY 2012 2012 $80 $80
BROAD RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4715 B-4715 SR 2797 655 BUNCOMBE LAND OF SKY CONSTRUCTION 2013 2013 $800 $800
BROAD RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4715 B-4715 SR 2797 655 BUNCOMBE LAND OF SKY 2011 $85 $85
ROSE CREEK. REPLACE
HIGHWAY B-4717 B-4717 SR 1258 BRIDGE NO. 58 BURKE UNIFOUR RIGHT-OF-WAY 2016 2016 $60 $60
ROSE CREEK. REPLACE
HIGHWAY B-4717 B-4717 SR 1258 BRIDGE NO. 58 BURKE UNIFOUR CONSTRUCTION 2017 2017 $600 $600
ROSE CREEK. REPLACE BEFORE
HIGHWAY B-4717 B-4717 SR 1258 BRIDGE NO. 58 BURKE UNIFOUR 2011 $60 $60
REEDY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4719 B-4719 SR 1138 163 CABARRUS CONCORD MITIGATION 2012 2012 $29 $29
REEDY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4719 B-4719 SR 1138 163 CABARRUS CONCORD RIGHT-OF-WAY 2012 2012 $50 $50
REEDY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4719 B-4719 SR 1138 163 CABARRUS CONCORD UTILITIES 2012 2012 $80 $80
REEDY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4719 B-4719 SR 1138 163 CABARRUS CONCORD CONSTRUCTION 2013 2013 $550 $550
REEDY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4719 B-4719 SR 1138 163 CABARRUS CONCORD 2011 $70 $70
DUTCH BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4720 B-4720 SR 2610 113 CABARRUS CONCORD RIGHT-OF-WAY 2015 2015 $90 $90
DUTCH BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4720 B-4720 SR 2610 113 CABARRUS CONCORD CONSTRUCTION 2016 2016 $950 $950
DUTCH BUFFALO CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4720 B-4720 SR 2610 113 CABARRUS CONCORD 2011 $60 $60
MIDDLE LITTLE RIVER.
HIGHWAY B-4721 B-4721 SR 1732 REPLACE BRIDGE NO. 57 CALDWELL UNIFOUR RIGHT-OF-WAY 2012 2012 $60 $60
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MIDDLE LITTLE RIVER.
HIGHWAY B-4721 B-4721 SR 1732 REPLACE BRIDGE NO. 57 CALDWELL UNIFOUR CONSTRUCTION 2013 2013 $550 $550
MIDDLE LITTLE RIVER. BEFORE
HIGHWAY B-4721 B-4721 SR 1732 REPLACE BRIDGE NO. 57 CALDWELL UNIFOUR 2011 $60 $60
REPLACEMENT OF
HIGHWAY B-4722 B-4722B US 70 BRIDGE NO. 33. CARTERET DOWN EAST RIGHT-OF-WAY 2012 2012 $2,150 $2,150
REPLACEMENT OF
HIGHWAY B-4722 B-4722B US 70 BRIDGE NO. 33. CARTERET DOWN EAST CONSTRUCTION 2018 2020 $21,500 $7,167 $7,167 $7,166
NORTH RIVER. BEFORE
HIGHWAY B-4722 B-4722 US 70 REPLACE BRIDGE NO. 33 CARTERET DOWN EAST 2011 $3,200 $3,200
COUNTRY LINE CREEK. PIEDMONT
HIGHWAY B-4725 B-4725 SR 1554 REPLACE BRIDGE NO. 12 CASWELL TRIAD RIGHT-OF-WAY 2015 2015 $130 $130
COUNTRY LINE CREEK. PIEDMONT
HIGHWAY B-4725 B-4725 SR 1554 REPLACE BRIDGE NO. 12 CASWELL TRIAD CONSTRUCTION 2016 2016 $1,300 $1,300
COUNTRY LINE CREEK. PIEDMONT BEFORE
HIGHWAY B-4725 B-4725 SR 1554 REPLACE BRIDGE NO. 12 CASWELL TRIAD 2011 $250 $250
PANTHER BRANCH
CREEK. PIEDMONT
HIGHWAY B-4726 B-4726 SR 1723 REPLACE BRIDGE NO. 5 CASWELL TRIAD RIGHT-OF-WAY 2012 2012 $15 $15
PANTHER BRANCH
CREEK. PIEDMONT
HIGHWAY B-4726 B-4726 SR 1723 REPLACE BRIDGE NO. 5 CASWELL TRIAD UTILITIES 2012 2012 $45 $45
PANTHER BRANCH
CREEK. PIEDMONT
HIGHWAY B-4726 B-4726 SR 1723 REPLACE BRIDGE NO. 5 CASWELL TRIAD CONSTRUCTION 2013 2013 $500 $500
PANTHER BRANCH
CREEK. PIEDMONT BEFORE
HIGHWAY B-4726 B-4726 SR 1723 REPLACE BRIDGE NO. 5 CASWELL TRIAD 2011 $50 $50
BRUSH CREEK.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4728 B-4728 SR 1102 251 CHATHAM AREA RIGHT-OF-WAY 2012 2012 $50 $50
BRUSH CREEK.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4728 B-4728 SR 1102 251 CHATHAM AREA UTILITIES 2012 2012 $9 $9
BRUSH CREEK.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4728 B-4728 SR 1102 251 CHATHAM AREA CONSTRUCTION 2013 2013 $625 $625
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRUSH CREEK.
REPLACE BRIDGE NO. TRIANGLE BEFORE
HIGHWAY B-4728 B-4728 SR 1102 251 CHATHAM AREA 2011 $60 $60
PRONG OF ROCKY
RIVER.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4729 B-4729 SR 1303 306 CHATHAM AREA RIGHT-OF-WAY 2018 2018 $150 $150
PRONG OF ROCKY
RIVER.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4729 B-4729 SR 1303 306 CHATHAM AREA CONSTRUCTION 2019 2019 $1,450 $1,450
TERRELL CREEK.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4730 B-4730 SR 1549 108 CHATHAM AREA RIGHT-OF-WAY 2016 2016 $110 $110
TERRELL CREEK.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4730 B-4730 SR 1549 108 CHATHAM AREA CONSTRUCTION 2017 2017 $1,200 $1,200
TERRELL CREEK.
REPLACE BRIDGE NO. TRIANGLE BEFORE
HIGHWAY B-4730 B-4730 SR 1549 108 CHATHAM AREA 2011 $85 $85
BRANCH OF ROCKY
RIVER.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4731 B-4731 SR 2159 129 CHATHAM AREA RIGHT-OF-WAY 2015 2015 $80 $80
BRANCH OF ROCKY
RIVER.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-4731 B-4731 SR 2159 129 CHATHAM AREA CONSTRUCTION 2016 2016 $750 $750
BRANCH OF ROCKY
RIVER.
REPLACE BRIDGE NO. TRIANGLE BEFORE
HIGHWAY B-4731 B-4731 SR 2159 129 CHATHAM AREA 2011 $60 $60
CHATUGE LAKE. SOUTHWESTER
HIGHWAY B-4733 B-4733 NC 175 REPLACE BRIDGE NO. 11 CLAY N RIGHT-OF-WAY 2012 2012 $200 $200
TRIBUTARY OF TOWN
CREEK. UPPER BEFORE
HIGHWAY B-4743 B-4743 SR 1003 REPLACE BRIDGE NO. 63 EDGECOMBE COASTAL PLAIN 2011 $100 $100
LITTLE YADKIN RIVER. WINSTON-
HIGHWAY B-4744 B-4744 SR 1604 REPLACE BRIDGE NO. 15 FORSYTH SALEM RIGHT-OF-WAY 2012 2012 $100 $100
LITTLE YADKIN RIVER. WINSTON-
HIGHWAY B-4744 B-4744 SR 1604 REPLACE BRIDGE NO. 15 FORSYTH SALEM CONSTRUCTION 2013 2013 $1,750 $1,750
LITTLE YADKIN RIVER. WINSTON- BEFORE
HIGHWAY B-4744 B-4744 SR 1604 REPLACE BRIDGE NO. 15 FORSYTH SALEM 2011 $120 $120
20 TH. STREET.
REPLACE BRIDGE NO. WINSTON- BEFORE
HIGHWAY B-4745 B-4745 SR 1725 322 FORSYTH SALEM 2011 $1,425 $1,425
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORFOLK SOUTHERN
RAILROAD.
REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4746 B-4746 SR 2264 229 FORSYTH SALEM RIGHT-OF-WAY 2015 2015 $300 $300
NORFOLK SOUTHERN
RAILROAD.
REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4746 B-4746 SR 2264 229 FORSYTH SALEM CONSTRUCTION 2017 2019 $6,330 $2,110 $2,110 $2,110
WINSTO SWAIM ROAD. REPLACE WINSTON- BEFORE
HIGHWAY B-4747 B-4747 N-SALEM BRIDGE NO. 83. FORSYTH SALEM 2011 $40 $40
HORSE CREEK.
HIGHWAY B-4748 B-4748 SR 1147 REPLACE BRIDGE NO. 2 FRANKLIN RALEIGH MITIGATION 2014 2014 $5 $5
HORSE CREEK.
HIGHWAY B-4748 B-4748 SR 1147 REPLACE BRIDGE NO. 2 FRANKLIN RALEIGH RIGHT-OF-WAY 2014 2014 $50 $50
HORSE CREEK.
HIGHWAY B-4748 B-4748 SR 1147 REPLACE BRIDGE NO. 2 FRANKLIN RALEIGH CONSTRUCTION 2015 2015 $600 $600
HORSE CREEK. BEFORE
HIGHWAY B-4748 B-4748 SR 1147 REPLACE BRIDGE NO. 2 FRANKLIN RALEIGH 2011 $60 $60
MIDDLE CREEK.
HIGHWAY B-4749 B-4749 SR 1200 REPLACE BRIDGE NO. 27 FRANKLIN RALEIGH MITIGATION 2016 2016 $16 $16
MIDDLE CREEK.
HIGHWAY B-4749 B-4749 SR 1200 REPLACE BRIDGE NO. 27 FRANKLIN RALEIGH RIGHT-OF-WAY 2016 2016 $80 $80
MIDDLE CREEK.
HIGHWAY B-4749 B-4749 SR 1200 REPLACE BRIDGE NO. 27 FRANKLIN RALEIGH UTILITIES 2016 2016 $41 $41
MIDDLE CREEK.
HIGHWAY B-4749 B-4749 SR 1200 REPLACE BRIDGE NO. 27 FRANKLIN RALEIGH CONSTRUCTION 2017 2017 $1,570 $1,570
MIDDLE CREEK. BEFORE
HIGHWAY B-4749 B-4749 SR 1200 REPLACE BRIDGE NO. 27 FRANKLIN RALEIGH 2011 $120 $120
STANLEY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4751 B-4751 SR 1935 203 GASTON GASTONIA RIGHT-OF-WAY 2016 2016 $100 $100
STANLEY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4751 B-4751 SR 1935 203 GASTON GASTONIA CONSTRUCTION 2017 2017 $1,050 $1,050
STANLEY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4751 B-4751 SR 1935 203 GASTON GASTONIA 2011 $8 $8
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SOUTH FORK CATAWBA
RIVER.
HIGHWAY B-4752 B-4752 SR 2014 REPLACE BRIDGE NO. 6 GASTON GASTONIA RIGHT-OF-WAY 2012 2012 $265 $265
SOUTH FORK CATAWBA
RIVER.
HIGHWAY B-4752 B-4752 SR 2014 REPLACE BRIDGE NO. 6 GASTON GASTONIA CONSTRUCTION 2013 2013 $2,650 $2,650
SOUTH FORK CATAWBA
RIVER. BEFORE
HIGHWAY B-4752 B-4752 SR 2014 REPLACE BRIDGE NO. 6 GASTON GASTONIA 2011 $600 $600
DUHART'S CREEK.
HIGHWAY B-4753 B-4753 SR 2439 REPLACE BRIDGE NO. 15 GASTON GASTONIA RIGHT-OF-WAY 2011 2011 $120 $120
DUHART'S CREEK.
HIGHWAY B-4753 B-4753 SR 2439 REPLACE BRIDGE NO. 15 GASTON GASTONIA UTILITIES 2011 2011 $190 $190
DUHART'S CREEK.
HIGHWAY B-4753 B-4753 SR 2439 REPLACE BRIDGE NO. 15 GASTON GASTONIA CONSTRUCTION 2012 2012 $875 $875
DUHART'S CREEK. BEFORE
HIGHWAY B-4753 B-4753 SR 2439 REPLACE BRIDGE NO. 15 GASTON GASTONIA 2011 $160 $160
APPLETREE CREEK. EASTERN
HIGHWAY B-4755 B-4755 SR 1215 REPLACE BRIDGE NO. 65 GREENE CAROLINA RIGHT-OF-WAY 2017 2017 $50 $50
APPLETREE CREEK. EASTERN
HIGHWAY B-4755 B-4755 SR 1215 REPLACE BRIDGE NO. 65 GREENE CAROLINA CONSTRUCTION 2018 2018 $500 $500
APPLETREE CREEK. EASTERN BEFORE
HIGHWAY B-4755 B-4755 SR 1215 REPLACE BRIDGE NO. 65 GREENE CAROLINA 2011 $60 $60
REEDY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4756 B-4756 SR 2128 120 GUILFORD GREENSBORO MITIGATION 2015 2015 $33 $33
REEDY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4756 B-4756 SR 2128 120 GUILFORD GREENSBORO RIGHT-OF-WAY 2015 2015 $150 $150
REEDY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4756 B-4756 SR 2128 120 GUILFORD GREENSBORO CONSTRUCTION 2016 2016 $1,570 $1,570
BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4757 B-4757 SR 2795 175 GUILFORD GREENSBORO RIGHT-OF-WAY 2012 2012 $130 $130
BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4757 B-4757 SR 2795 175 GUILFORD GREENSBORO CONSTRUCTION 2013 2013 $1,275 $1,275
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTH BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4758 B-4758 SR 2824 159 GUILFORD GREENSBORO RIGHT-OF-WAY 2013 2013 $65 $65
NORTH BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4758 B-4758 SR 2824 159 GUILFORD GREENSBORO UTILITIES 2013 2013 $15 $15
NORTH BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4758 B-4758 SR 2824 159 GUILFORD GREENSBORO CONSTRUCTION 2014 2014 $650 $650
NORTH BUFFALO
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4758 B-4758 SR 2824 159 GUILFORD GREENSBORO 2011 $120 $120
US 29/US 70/I-85
SURRET BUSINESS.
HIGHWAY B-4760 B-4760 T DRIVE REPLACE BRIDGE NO. 77 GUILFORD HIGH POINT RIGHT-OF-WAY 2011 2011 $300 $300
US 29/US 70/I-85
SURRET BUSINESS.
HIGHWAY B-4760 B-4760 T DRIVE REPLACE BRIDGE NO. 77 GUILFORD HIGH POINT CONSTRUCTION 2012 2012 $2,950 $2,950
US 29/US 70/I-85
SURRET BUSINESS. BEFORE
HIGHWAY B-4760 B-4760 T DRIVE REPLACE BRIDGE NO. 77 GUILFORD HIGH POINT 2011 $240 $240
LITTLE FISHING CREEK.
HIGHWAY B-4761 B-4761 NC 561 REPLACE BRIDGE NO. 29 HALIFAX PEANUT BELT MITIGATION 2016 2016 $1 $1
LITTLE FISHING CREEK.
HIGHWAY B-4761 B-4761 NC 561 REPLACE BRIDGE NO. 29 HALIFAX PEANUT BELT RIGHT-OF-WAY 2016 2016 $160 $160
LITTLE FISHING CREEK.
HIGHWAY B-4761 B-4761 NC 561 REPLACE BRIDGE NO. 29 HALIFAX PEANUT BELT CONSTRUCTION 2017 2017 $1,550 $1,550
LITTLE FISHING CREEK. BEFORE
HIGHWAY B-4761 B-4761 NC 561 REPLACE BRIDGE NO. 29 HALIFAX PEANUT BELT 2011 $240 $240
JONATHAN CREEK. SOUTHWESTER
HIGHWAY B-4762 B-4762 SR 1407 REPLACE BRIDGE NO. 72 HAYWOOD N RIGHT-OF-WAY 2014 2014 $100 $100
JONATHAN CREEK. SOUTHWESTER
HIGHWAY B-4762 B-4762 SR 1407 REPLACE BRIDGE NO. 72 HAYWOOD N CONSTRUCTION 2015 2015 $1,000 $1,000
JONATHAN CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4762 B-4762 SR 1407 REPLACE BRIDGE NO. 72 HAYWOOD N 2011 $100 $100
BALD CREEK. REPLACE SOUTHWESTER
HIGHWAY B-4763 B-4763 SR 1503 BRIDGE NO. 35 HAYWOOD N RIGHT-OF-WAY 2015 2015 $75 $75
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BALD CREEK. REPLACE SOUTHWESTER
HIGHWAY B-4763 B-4763 SR 1503 BRIDGE NO. 35 HAYWOOD N CONSTRUCTION 2016 2016 $750 $750
BALD CREEK. REPLACE SOUTHWESTER BEFORE
HIGHWAY B-4763 B-4763 SR 1503 BRIDGE NO. 35 HAYWOOD N 2011 $80 $80
KYLES CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4765 B-4765 SR 1574 113 HENDERSON ASHEVILLE RIGHT-OF-WAY 2014 2014 $75 $75
KYLES CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4765 B-4765 SR 1574 113 HENDERSON ASHEVILLE CONSTRUCTION 2015 2015 $750 $750
KYLES CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4765 B-4765 SR 1574 113 HENDERSON ASHEVILLE 2011 $107 $107
ROCKY CREEK.
HIGHWAY B-4766 B-4766 NC 115 REPLACE BRIDGE NO. 69 IREDELL LAKE NORMAN RIGHT-OF-WAY 2017 2017 $250 $250
ROCKY CREEK.
HIGHWAY B-4766 B-4766 NC 115 REPLACE BRIDGE NO. 69 IREDELL LAKE NORMAN CONSTRUCTION 2018 2018 $2,500 $2,500
ROCKY CREEK. BEFORE
HIGHWAY B-4766 B-4766 NC 115 REPLACE BRIDGE NO. 69 IREDELL LAKE NORMAN 2011 $6 $6
HANNAH CREEK. UPPER
HIGHWAY B-4770 B-4770 SR 1185 REPLACE BRIDGE NO. 32 JOHNSTON COASTAL PLAIN MITIGATION 2018 2018 $1 $1
HANNAH CREEK. UPPER
HIGHWAY B-4770 B-4770 SR 1185 REPLACE BRIDGE NO. 32 JOHNSTON COASTAL PLAIN RIGHT-OF-WAY 2018 2018 $220 $220
HANNAH CREEK. UPPER
HIGHWAY B-4770 B-4770 SR 1185 REPLACE BRIDGE NO. 32 JOHNSTON COASTAL PLAIN CONSTRUCTION 2019 2019 $2,225 $2,225
MILL CREEK. REPLACE UPPER
HIGHWAY B-4771 B-4771 SR 1200 BRIDGE NO. 11 JOHNSTON COASTAL PLAIN MITIGATION 2018 2018 $1 $1
MILL CREEK. REPLACE UPPER
HIGHWAY B-4771 B-4771 SR 1200 BRIDGE NO. 11 JOHNSTON COASTAL PLAIN RIGHT-OF-WAY 2018 2018 $240 $240
MILL CREEK. REPLACE UPPER
HIGHWAY B-4771 B-4771 SR 1200 BRIDGE NO. 11 JOHNSTON COASTAL PLAIN CONSTRUCTION 2019 2019 $2,400 $2,400
MILL BRANCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4772 B-4772 SR 1525 326 JOHNSTON RALEIGH RIGHT-OF-WAY 2012 2012 $80 $80
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MILL BRANCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4772 B-4772 SR 1525 326 JOHNSTON RALEIGH UTILITIES 2012 2012 $40 $40
MILL BRANCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4772 B-4772 SR 1525 326 JOHNSTON RALEIGH CONSTRUCTION 2013 2013 $800 $800
MILL BRANCH CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4772 B-4772 SR 1525 326 JOHNSTON RALEIGH 2011 $75 $75
LITTLE CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4773 B-4773 SR 2320 222 JOHNSTON COASTAL PLAIN MITIGATION 2017 2017 $1 $1
LITTLE CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4773 B-4773 SR 2320 222 JOHNSTON COASTAL PLAIN RIGHT-OF-WAY 2017 2017 $105 $105
LITTLE CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4773 B-4773 SR 2320 222 JOHNSTON COASTAL PLAIN CONSTRUCTION 2018 2018 $1,050 $1,050
LITTLE CREEK.
REPLACE BRIDGE NO. UPPER BEFORE
HIGHWAY B-4773 B-4773 SR 2320 222 JOHNSTON COASTAL PLAIN 2011 $100 $100
WAYAH CREEK. SOUTHWESTER
HIGHWAY B-4775 B-4775 SR 1309 REPLACE BRIDGE NO. 17 MACON N RIGHT-OF-WAY 2016 2016 $50 $50
WAYAH CREEK. SOUTHWESTER
HIGHWAY B-4775 B-4775 SR 1309 REPLACE BRIDGE NO. 17 MACON N CONSTRUCTION 2017 2017 $450 $450
WAYAH CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4775 B-4775 SR 1309 REPLACE BRIDGE NO. 17 MACON N 2011 $60 $60
IVY RIVER. REPLACE
HIGHWAY B-4777 B-4777 NC 251 BRIDGE NO. 8 MADISON LAND OF SKY RIGHT-OF-WAY 2018 2018 $460 $460
IVY RIVER. REPLACE
HIGHWAY B-4777 B-4777 NC 251 BRIDGE NO. 8 MADISON LAND OF SKY CONSTRUCTION 2019 2019 $4,600 $4,600
IVY RIVER. REPLACE BEFORE
HIGHWAY B-4777 B-4777 NC 251 BRIDGE NO. 8 MADISON LAND OF SKY 2011 $600 $600
BRANCH SOUTH MUDDY
CREEK.
HIGHWAY B-4778 B-4778 SR 1769 REPLACE BRIDGE NO. 8 MCDOWELL ISOTHERMAL RIGHT-OF-WAY 2016 2016 $140 $140
BRANCH SOUTH MUDDY
CREEK.
HIGHWAY B-4778 B-4778 SR 1769 REPLACE BRIDGE NO. 8 MCDOWELL ISOTHERMAL CONSTRUCTION 2017 2017 $1,375 $1,375
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRANCH OF NEW RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4781 B-4781 SR 1557 226 ONSLOW DOWN EAST 2011 $80 $80
BRANCH OF FATTY
CREEK.
HIGHWAY B-4783 B-4783 SR 1103 REPLACE BRIDGE NO. 5 PASQUOTANK ALBEMARLE MITIGATION 2019 2019 $1 $1
BRANCH OF FATTY
CREEK.
HIGHWAY B-4783 B-4783 SR 1103 REPLACE BRIDGE NO. 5 PASQUOTANK ALBEMARLE RIGHT-OF-WAY 2019 2019 $75 $75
BRANCH OF FATTY
CREEK.
HIGHWAY B-4783 B-4783 SR 1103 REPLACE BRIDGE NO. 5 PASQUOTANK ALBEMARLE CONSTRUCTION 2020 2020 $750 $750
BRANCH OF FATTY
CREEK. BEFORE
HIGHWAY B-4783 B-4783 SR 1103 REPLACE BRIDGE NO. 5 PASQUOTANK ALBEMARLE 2011 $1 $1
ALDRIDGE CREEK.
HIGHWAY B-4784 B-4784 SR 1134 REPLACE BRIDGE NO. 31 PERSON KERR TAR MITIGATION 2016 2016 $10 $10
ALDRIDGE CREEK.
HIGHWAY B-4784 B-4784 SR 1134 REPLACE BRIDGE NO. 31 PERSON KERR TAR RIGHT-OF-WAY 2016 2016 $55 $55
ALDRIDGE CREEK.
HIGHWAY B-4784 B-4784 SR 1134 REPLACE BRIDGE NO. 31 PERSON KERR TAR CONSTRUCTION 2017 2017 $550 $550
ALDRIDGE CREEK. BEFORE
HIGHWAY B-4784 B-4784 SR 1134 REPLACE BRIDGE NO. 31 PERSON KERR TAR 2011 $60 $60
NORTH FLAT RIVER.
HIGHWAY B-4785 B-4785 SR 1142 REPLACE BRIDGE NO. 24 PERSON KERR TAR MITIGATION 2015 2015 $8 $8
NORTH FLAT RIVER.
HIGHWAY B-4785 B-4785 SR 1142 REPLACE BRIDGE NO. 24 PERSON KERR TAR RIGHT-OF-WAY 2015 2015 $50 $50
NORTH FLAT RIVER.
HIGHWAY B-4785 B-4785 SR 1142 REPLACE BRIDGE NO. 24 PERSON KERR TAR CONSTRUCTION 2016 2016 $500 $500
NORTH FLAT RIVER. BEFORE
HIGHWAY B-4785 B-4785 SR 1142 REPLACE BRIDGE NO. 24 PERSON KERR TAR 2011 $60 $60
TAR RIVER. REPLACE
HIGHWAY B-4786 B-4786 US 13 BRIDGE NO. 38 PITT GREENVILLE RIGHT-OF-WAY 2018 2018 $1,000 $1,000
TAR RIVER. REPLACE
HIGHWAY B-4786 B-4786 US 13 BRIDGE NO. 38 PITT GREENVILLE CONSTRUCTION 2019 2020 $10,660 $5,330 $5,330
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
TAR RIVER. REPLACE BEFORE
HIGHWAY B-4786 B-4786 US 13 BRIDGE NO. 38 PITT GREENVILLE 2011 $230 $230
JOHNSON'S MILL RUN.
HIGHWAY B-4787 B-4787 SR 1401 REPLACE BRIDGE NO. 95 PITT GREENVILLE RIGHT-OF-WAY 2012 2012 $200 $200
JOHNSON'S MILL RUN.
HIGHWAY B-4787 B-4787 SR 1401 REPLACE BRIDGE NO. 95 PITT GREENVILLE UTILITIES 2012 2012 $82 $82
JOHNSON'S MILL RUN.
HIGHWAY B-4787 B-4787 SR 1401 REPLACE BRIDGE NO. 95 PITT GREENVILLE CONSTRUCTION 2013 2013 $875 $875
JOHNSON'S MILL RUN. BEFORE
HIGHWAY B-4787 B-4787 SR 1401 REPLACE BRIDGE NO. 95 PITT GREENVILLE 2011 $40 $40
GRINDLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4789 B-4789 SR 1424 164 PITT MID-EAST RIGHT-OF-WAY 2018 2018 $90 $90
GRINDLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4789 B-4789 SR 1424 164 PITT MID-EAST CONSTRUCTION 2019 2019 $900 $900
FORK OF SWIFT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4791 B-4791 SR 1900 154 PITT GREENVILLE MITIGATION 2011 2011 $1 $1
FORK OF SWIFT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4791 B-4791 SR 1900 154 PITT GREENVILLE RIGHT-OF-WAY 2011 2011 $80 $80
FORK OF SWIFT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4791 B-4791 SR 1900 154 PITT GREENVILLE CONSTRUCTION 2012 2012 $800 $800
FORK OF SWIFT CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4791 B-4791 SR 1900 154 PITT GREENVILLE 2011 $100 $100
SMALL BRANCH OF
PACOLET RIVER.
HIGHWAY B-4792 B-4792 SR 1102 REPLACE BRIDGE NO. 4 POLK ISOTHERMAL RIGHT-OF-WAY 2015 2015 $40 $40
SMALL BRANCH OF
PACOLET RIVER.
HIGHWAY B-4792 B-4792 SR 1102 REPLACE BRIDGE NO. 4 POLK ISOTHERMAL CONSTRUCTION 2016 2016 $400 $400
SMALL BRANCH OF
PACOLET RIVER. BEFORE
HIGHWAY B-4792 B-4792 SR 1102 REPLACE BRIDGE NO. 4 POLK ISOTHERMAL 2011 $60 $60
BETTIE MCGEES CREEK. PIEDMONT
HIGHWAY B-4794 B-4794 SR 1107 REPLACE BRIDGE NO. 18 RANDOLPH TRIAD RIGHT-OF-WAY 2017 2017 $110 $110
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BETTIE MCGEES CREEK. PIEDMONT
HIGHWAY B-4794 B-4794 SR 1107 REPLACE BRIDGE NO. 18 RANDOLPH TRIAD CONSTRUCTION 2018 2018 $1,125 $1,125
CREEK. REPLACE PIEDMONT
HIGHWAY B-4796 B-4796 SR 1114 BRIDGE NO. 24 RANDOLPH TRIAD RIGHT-OF-WAY 2012 2012 $100 $100
CREEK. REPLACE PIEDMONT
HIGHWAY B-4796 B-4796 SR 1114 BRIDGE NO. 24 RANDOLPH TRIAD UTILITIES 2012 2012 $6 $6
CREEK. REPLACE PIEDMONT
HIGHWAY B-4796 B-4796 SR 1114 BRIDGE NO. 24 RANDOLPH TRIAD CONSTRUCTION 2013 2013 $1,100 $1,100
CREEK. REPLACE PIEDMONT BEFORE
HIGHWAY B-4796 B-4796 SR 1114 BRIDGE NO. 24 RANDOLPH TRIAD 2011 $80 $80
JACKSON'S CREEK.
HIGHWAY B-4799 B-4799 SR 1311 REPLACE BRIDGE NO. 37 RANDOLPH HIGH POINT RIGHT-OF-WAY 2015 2015 $130 $130
JACKSON'S CREEK.
HIGHWAY B-4799 B-4799 SR 1311 REPLACE BRIDGE NO. 37 RANDOLPH HIGH POINT CONSTRUCTION 2016 2016 $1,350 $1,350
COLD CAMP CREEK.
HIGHWAY B-4801 B-4801 SR 1907 REPLACE BRIDGE NO. 7 ROBESON LUMBER RIVER RIGHT-OF-WAY 2018 2018 $100 $100
COLD CAMP CREEK.
HIGHWAY B-4801 B-4801 SR 1907 REPLACE BRIDGE NO. 7 ROBESON LUMBER RIVER CONSTRUCTION 2019 2019 $1,025 $1,025
HAW RIVER. REPLACE PIEDMONT
HIGHWAY B-4802 B-4802 SR 1002 BRIDGE NO. 18 ROCKINGHAM TRIAD MITIGATION 2018 2018 $19 $19
HAW RIVER. REPLACE PIEDMONT
HIGHWAY B-4802 B-4802 SR 1002 BRIDGE NO. 18 ROCKINGHAM TRIAD RIGHT-OF-WAY 2018 2018 $110 $110
HAW RIVER. REPLACE PIEDMONT
HIGHWAY B-4802 B-4802 SR 1002 BRIDGE NO. 18 ROCKINGHAM TRIAD CONSTRUCTION 2019 2019 $1,125 $1,125
WOLF ISLAND CREEK. PIEDMONT
HIGHWAY B-4803 B-4803 SR 1925 REPLACE BRIDGE NO. 97 ROCKINGHAM TRIAD RIGHT-OF-WAY 2015 2015 $250 $250
WOLF ISLAND CREEK. PIEDMONT
HIGHWAY B-4803 B-4803 SR 1925 REPLACE BRIDGE NO. 97 ROCKINGHAM TRIAD CONSTRUCTION 2016 2016 $2,525 $2,525
WOLF ISLAND CREEK. PIEDMONT BEFORE
HIGHWAY B-4803 B-4803 SR 1925 REPLACE BRIDGE NO. 97 ROCKINGHAM TRIAD 2011 $300 $300
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4804 B-4804 SR 2343 REPLACE BRIDGE NO. 12 ROCKINGHAM TRIAD MITIGATION 2012 2012 $8 $8
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4804 B-4804 SR 2343 REPLACE BRIDGE NO. 12 ROCKINGHAM TRIAD RIGHT-OF-WAY 2012 2012 $50 $50
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4804 B-4804 SR 2343 REPLACE BRIDGE NO. 12 ROCKINGHAM TRIAD UTILITIES 2012 2012 $115 $115
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4804 B-4804 SR 2343 REPLACE BRIDGE NO. 12 ROCKINGHAM TRIAD CONSTRUCTION 2013 2013 $425 $425
TROUBLESOME CREEK. PIEDMONT BEFORE
HIGHWAY B-4804 B-4804 SR 2343 REPLACE BRIDGE NO. 12 ROCKINGHAM TRIAD 2011 $50 $50
PRONG TROUBLESOME
CREEK. PIEDMONT
HIGHWAY B-4805 B-4805 SR 2406 REPLACE BRIDGE NO. 9 ROCKINGHAM TRIAD RIGHT-OF-WAY 2018 2018 $75 $75
PRONG TROUBLESOME
CREEK. PIEDMONT
HIGHWAY B-4805 B-4805 SR 2406 REPLACE BRIDGE NO. 9 ROCKINGHAM TRIAD CONSTRUCTION 2019 2019 $785 $785
CREEK. REPLACE PIEDMONT
HIGHWAY B-4806 B-4806 SR 2409 BRIDGE NO. 3 ROCKINGHAM TRIAD RIGHT-OF-WAY 2017 2017 $50 $50
CREEK. REPLACE PIEDMONT
HIGHWAY B-4806 B-4806 SR 2409 BRIDGE NO. 3 ROCKINGHAM TRIAD CONSTRUCTION 2018 2018 $525 $525
HAW RIVER. REPLACE PIEDMONT
HIGHWAY B-4807 B-4807 SR 2426 BRIDGE NO. 6 ROCKINGHAM TRIAD MITIGATION 2016 2016 $21 $21
HAW RIVER. REPLACE PIEDMONT
HIGHWAY B-4807 B-4807 SR 2426 BRIDGE NO. 6 ROCKINGHAM TRIAD RIGHT-OF-WAY 2016 2016 $140 $140
HAW RIVER. REPLACE PIEDMONT
HIGHWAY B-4807 B-4807 SR 2426 BRIDGE NO. 6 ROCKINGHAM TRIAD CONSTRUCTION 2017 2017 $1,400 $1,400
SOUTH SECOND CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4808 B-4808 SR 1004 141 ROWAN CONCORD RIGHT-OF-WAY 2014 2014 $300 $300
SOUTH SECOND CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4808 B-4808 SR 1004 141 ROWAN CONCORD CONSTRUCTION 2015 2015 $3,075 $3,075
SOUTH SECOND CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4808 B-4808 SR 1004 141 ROWAN CONCORD 2011 $300 $300
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LAKE FISHER. REPLACE
HIGHWAY B-4809 B-4809 SR 1308 BRIDGE NO. 221 ROWAN CONCORD RIGHT-OF-WAY 2012 2012 $200 $200
LAKE FISHER. REPLACE
HIGHWAY B-4809 B-4809 SR 1308 BRIDGE NO. 221 ROWAN CONCORD UTILITIES 2012 2012 $25 $25
LAKE FISHER. REPLACE
HIGHWAY B-4809 B-4809 SR 1308 BRIDGE NO. 221 ROWAN CONCORD CONSTRUCTION 2013 2013 $2,000 $2,000
LAKE FISHER. REPLACE BEFORE
HIGHWAY B-4809 B-4809 SR 1308 BRIDGE NO. 221 ROWAN CONCORD 2011 $75 $75
BACK CREEK. REPLACE
HIGHWAY B-4810 B-4810 SR 1547 BRIDGE NO. 12 ROWAN CONCORD RIGHT-OF-WAY 2012 2012 $75 $75
BACK CREEK. REPLACE
HIGHWAY B-4810 B-4810 SR 1547 BRIDGE NO. 12 ROWAN CONCORD UTILITIES 2012 2012 $120 $120
BACK CREEK. REPLACE
HIGHWAY B-4810 B-4810 SR 1547 BRIDGE NO. 12 ROWAN CONCORD CONSTRUCTION 2013 2013 $750 $750
BACK CREEK. REPLACE BEFORE
HIGHWAY B-4810 B-4810 SR 1547 BRIDGE NO. 12 ROWAN CONCORD 2011 $75 $75
BROAD RIVER.
HIGHWAY B-4811 B-4811 US 64 REPLACE BRIDGE NO. 87 RUTHERFORD ISOTHERMAL RIGHT-OF-WAY 2016 2016 $470 $470
BROAD RIVER.
HIGHWAY B-4811 B-4811 US 64 REPLACE BRIDGE NO. 87 RUTHERFORD ISOTHERMAL CONSTRUCTION 2017 2017 $4,700 $4,700
BROAD RIVER. BEFORE
HIGHWAY B-4811 B-4811 US 64 REPLACE BRIDGE NO. 87 RUTHERFORD ISOTHERMAL 2011 $400 $400
CRANE CREEK.
HIGHWAY B-4813 B-4813 SR 1004 REPLACE BRIDGE NO. 18 SAMPSON MID-CAROLINA MITIGATION 2019 2019 $1 $1
CRANE CREEK.
HIGHWAY B-4813 B-4813 SR 1004 REPLACE BRIDGE NO. 18 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2019 2019 $100 $100
CRANE CREEK.
HIGHWAY B-4813 B-4813 SR 1004 REPLACE BRIDGE NO. 18 SAMPSON MID-CAROLINA CONSTRUCTION 2020 2020 $1,000 $1,000
LITTLE COHARIE CREEK.
REPLACE
BRIDGE NO. 102, BRIDGE
NO. 103
HIGHWAY B-4814 B-4814 SR 1233 AND BRIDGE NO. 104 SAMPSON MID-CAROLINA MITIGATION 2017 2017 $1 $1
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE COHARIE CREEK.
REPLACE
BRIDGE NO. 102, BRIDGE
NO. 103
HIGHWAY B-4814 B-4814 SR 1233 AND BRIDGE NO. 104 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2017 2017 $210 $210
LITTLE COHARIE CREEK.
REPLACE
BRIDGE NO. 102, BRIDGE
NO. 103
HIGHWAY B-4814 B-4814 SR 1233 AND BRIDGE NO. 104 SAMPSON MID-CAROLINA CONSTRUCTION 2018 2018 $2,100 $2,100
LITTLE COHARIE CREEK.
REPLACE
BRIDGE NO. 102, BRIDGE
NO. 103 BEFORE
HIGHWAY B-4814 B-4814 SR 1233 AND BRIDGE NO. 104 SAMPSON MID-CAROLINA 2011 $1 $1
US 15- JUNIPER CREEK.
HIGHWAY B-4816 B-4816 501 REPLACE BRIDGE NO. 65 SCOTLAND LUMBER RIVER MITIGATION 2014 2014 $14 $14
US 15- JUNIPER CREEK.
HIGHWAY B-4816 B-4816 501 REPLACE BRIDGE NO. 65 SCOTLAND LUMBER RIVER RIGHT-OF-WAY 2014 2014 $140 $140
US 15- JUNIPER CREEK.
HIGHWAY B-4816 B-4816 501 REPLACE BRIDGE NO. 65 SCOTLAND LUMBER RIVER CONSTRUCTION 2015 2015 $1,500 $1,500
GUM SWAMP CREEK.
HIGHWAY B-4817 B-4817 US 74 REPLACE BRIDGE NO. 23 SCOTLAND LUMBER RIVER MITIGATION 2012 2012 $12 $12
GUM SWAMP CREEK.
HIGHWAY B-4817 B-4817 US 74 REPLACE BRIDGE NO. 23 SCOTLAND LUMBER RIVER RIGHT-OF-WAY 2012 2012 $150 $150
GUM SWAMP CREEK.
HIGHWAY B-4817 B-4817 US 74 REPLACE BRIDGE NO. 23 SCOTLAND LUMBER RIVER UTILITIES 2012 2012 $20 $20
GUM SWAMP CREEK.
HIGHWAY B-4817 B-4817 US 74 REPLACE BRIDGE NO. 23 SCOTLAND LUMBER RIVER CONSTRUCTION 2013 2013 $2,300 $2,300
GUM SWAMP CREEK. BEFORE
HIGHWAY B-4817 B-4817 US 74 REPLACE BRIDGE NO. 23 SCOTLAND LUMBER RIVER 2011 $200 $200
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4864 B-4864 SR 2344 REPLACE BRIDGE NO. 13 ROCKINGHAM TRIAD RIGHT-OF-WAY 2012 2012 $50 $50
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4864 B-4864 SR 2344 REPLACE BRIDGE NO. 13 ROCKINGHAM TRIAD UTILITIES 2012 2012 $75 $75
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4864 B-4864 SR 2344 REPLACE BRIDGE NO. 13 ROCKINGHAM TRIAD CONSTRUCTION 2013 2013 $475 $475
QUIOCCOSION SWAMP.
HIGHWAY B-4916 B-4916 US 13 REPLACE BRIDGE NO. 57 BERTIE PEANUT BELT RIGHT-OF-WAY 2019 2019 $90 $90
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
QUIOCCOSION SWAMP.
HIGHWAY B-4916 B-4916 US 13 REPLACE BRIDGE NO. 57 BERTIE PEANUT BELT CONSTRUCTION 2020 2020 $900 $900
QUIOCCOSION SWAMP. BEFORE
HIGHWAY B-4916 B-4916 US 13 REPLACE BRIDGE NO. 57 BERTIE PEANUT BELT 2011 $100 $100
POTECASI CREEK.
HIGHWAY B-4919 B-4919 SR 1500 REPLACE BRIDGE NO. 14 NORTHAMPTON PEANUT BELT RIGHT-OF-WAY 2019 2019 $70 $70
POTECASI CREEK.
HIGHWAY B-4919 B-4919 SR 1500 REPLACE BRIDGE NO. 14 NORTHAMPTON PEANUT BELT CONSTRUCTION 2020 2020 $700 $700
WILDCAT SWAMP.
HIGHWAY B-4920 B-4920 SR 1505 REPLACE BRIDGE NO. 15 NORTHAMPTON PEANUT BELT RIGHT-OF-WAY 2019 2019 $90 $90
WILDCAT SWAMP.
HIGHWAY B-4920 B-4920 SR 1505 REPLACE BRIDGE NO. 15 NORTHAMPTON PEANUT BELT CONSTRUCTION 2020 2020 $900 $900
WILDCAT SWAMP. BEFORE
HIGHWAY B-4920 B-4920 SR 1505 REPLACE BRIDGE NO. 15 NORTHAMPTON PEANUT BELT 2011 $100 $100
KNOBB'S CREEK.
HIGHWAY B-4922 B-4922 SR 1308 REPLACE BRIDGE NO. 23 PASQUOTANK ALBEMARLE MITIGATION 2011 2011 $46 $46
KNOBB'S CREEK.
HIGHWAY B-4922 B-4922 SR 1308 REPLACE BRIDGE NO. 23 PASQUOTANK ALBEMARLE RIGHT-OF-WAY 2011 2011 $100 $100
KNOBB'S CREEK.
HIGHWAY B-4922 B-4922 SR 1308 REPLACE BRIDGE NO. 23 PASQUOTANK ALBEMARLE UTILITIES 2011 2011 $52 $52
KNOBB'S CREEK.
HIGHWAY B-4922 B-4922 SR 1308 REPLACE BRIDGE NO. 23 PASQUOTANK ALBEMARLE CONSTRUCTION 2012 2012 $1,000 $1,000
KNOBB'S CREEK. BEFORE
HIGHWAY B-4922 B-4922 SR 1308 REPLACE BRIDGE NO. 23 PASQUOTANK ALBEMARLE 2011 $75 $75
FORK OF LITTLE SWIFT
CREEK.
HIGHWAY B-4924 B-4924 SR 1003 REPLACE BRIDGE NO. 19 CRAVEN DOWN EAST MITIGATION 2019 2019 $1 $1
FORK OF LITTLE SWIFT
CREEK.
HIGHWAY B-4924 B-4924 SR 1003 REPLACE BRIDGE NO. 19 CRAVEN DOWN EAST RIGHT-OF-WAY 2019 2019 $50 $50
FORK OF LITTLE SWIFT
CREEK.
HIGHWAY B-4924 B-4924 SR 1003 REPLACE BRIDGE NO. 19 CRAVEN DOWN EAST CONSTRUCTION 2020 2020 $525 $525
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
FORK OF LITTLE SWIFT
CREEK. BEFORE
HIGHWAY B-4924 B-4924 SR 1003 REPLACE BRIDGE NO. 19 CRAVEN DOWN EAST 2011 $100 $100
BRIERY RUN. REPLACE EASTERN
HIGHWAY B-4925 B-4925 SR 1732 BRIDGE NO. 2 LENOIR CAROLINA RIGHT-OF-WAY 2018 2018 $90 $90
BRIERY RUN. REPLACE EASTERN
HIGHWAY B-4925 B-4925 SR 1732 BRIDGE NO. 2 LENOIR CAROLINA CONSTRUCTION 2019 2019 $900 $900
NEUSE RIVER. REPLACE
BRIDGE NO. 20. NEUSE
RIVER OVERFLOW. EASTERN
HIGHWAY B-4926 B-4926 NC 55 REPLACE BRIDGE 34. LENOIR CAROLINA RIGHT-OF-WAY 2016 2016 $1,275 $1,275
NEUSE RIVER. REPLACE
BRIDGE NO. 20. NEUSE
RIVER OVERFLOW. EASTERN
HIGHWAY B-4926 B-4926 NC 55 REPLACE BRIDGE 34. LENOIR CAROLINA CONSTRUCTION 2018 2020 $12,675 $4,225 $4,225 $4,225
NEUSE RIVER. REPLACE
BRIDGE NO. 20. NEUSE
RIVER OVERFLOW. EASTERN BEFORE
HIGHWAY B-4926 B-4926 NC 55 REPLACE BRIDGE 34. LENOIR CAROLINA 2011 $100 $100
MILL CREEK. REPLACE
HIGHWAY B-4928 B-4928 SR 1432 BRIDGE NO. 28 BRUNSWICK WILMINGTON MITIGATION 2019 2019 $1 $1
MILL CREEK. REPLACE
HIGHWAY B-4928 B-4928 SR 1432 BRIDGE NO. 28 BRUNSWICK WILMINGTON RIGHT-OF-WAY 2019 2019 $105 $105
MILL CREEK. REPLACE
HIGHWAY B-4928 B-4928 SR 1432 BRIDGE NO. 28 BRUNSWICK WILMINGTON CONSTRUCTION 2020 2020 $1,050 $1,050
INTRACOASTAL
NC 50- WATERWAY.
HIGHWAY B-4929 B-4929 210 REPLACE BRIDGE NO. 16 PENDER CAPE FEAR RIGHT-OF-WAY 2014 2014 $3,070 $3,070
INTRACOASTAL
NC 50- WATERWAY.
HIGHWAY B-4929 B-4929 210 REPLACE BRIDGE NO. 16 PENDER CAPE FEAR UTILITIES 2014 2014 $403 $403
INTRACOASTAL
NC 50- WATERWAY.
HIGHWAY B-4929 B-4929 210 REPLACE BRIDGE NO. 16 PENDER CAPE FEAR CONSTRUCTION 2016 2018 $30,700 $10,234 $10,233 $10,233
INTRACOASTAL
NC 50- WATERWAY. BEFORE
HIGHWAY B-4929 B-4929 210 REPLACE BRIDGE NO. 16 PENDER CAPE FEAR 2011 $1,200 $1,200
SIX RUNS CREEK.
HIGHWAY B-4930 B-4930 NC 903 REPLACE BRIDGE NO. 66 SAMPSON MID-CAROLINA MITIGATION 2019 2019 $1 $1
SIX RUNS CREEK.
HIGHWAY B-4930 B-4930 NC 903 REPLACE BRIDGE NO. 66 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2019 2019 $230 $230
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SIX RUNS CREEK.
HIGHWAY B-4930 B-4930 NC 903 REPLACE BRIDGE NO. 66 SAMPSON MID-CAROLINA CONSTRUCTION 2020 2020 $2,300 $2,300
TAR RIVER. REPLACE UPPER
HIGHWAY B-4932 B-4932 NC 42 BRIDGE NO. 28 EDGECOMBE COASTAL PLAIN MITIGATION 2017 2017 $2 $2
TAR RIVER. REPLACE UPPER
HIGHWAY B-4932 B-4932 NC 42 BRIDGE NO. 28 EDGECOMBE COASTAL PLAIN RIGHT-OF-WAY 2017 2017 $1,000 $1,000
TAR RIVER. REPLACE UPPER
HIGHWAY B-4932 B-4932 NC 42 BRIDGE NO. 28 EDGECOMBE COASTAL PLAIN CONSTRUCTION 2018 2020 $11,450 $3,817 $3,817 $3,816
TAR RIVER. REPLACE UPPER BEFORE
HIGHWAY B-4932 B-4932 NC 42 BRIDGE NO. 28 EDGECOMBE COASTAL PLAIN 2011 $100 $100
TAR RIVER. REPLACE UPPER
HIGHWAY B-4933 B-4933 NC 33 BRIDGE NO. 80 EDGECOMBE COASTAL PLAIN RIGHT-OF-WAY 2017 2017 $860 $860
TAR RIVER. REPLACE UPPER
HIGHWAY B-4933 B-4933 NC 33 BRIDGE NO. 80 EDGECOMBE COASTAL PLAIN CONSTRUCTION 2018 2018 $8,600 $8,600
TAR RIVER. REPLACE UPPER BEFORE
HIGHWAY B-4933 B-4933 NC 33 BRIDGE NO. 80 EDGECOMBE COASTAL PLAIN 2011 $100 $100
BRANCH OF DEEP
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4935 B-4935 SR 1003 120 HALIFAX PEANUT BELT RIGHT-OF-WAY 2019 2019 $50 $50
BRANCH OF DEEP
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4935 B-4935 SR 1003 120 HALIFAX PEANUT BELT CONSTRUCTION 2020 2020 $525 $525
MILL CREEK. REPLACE
BRIDGE NO. 41
MILL CREEK OVERFLOW.
REPLACE UPPER
HIGHWAY B-4936 B-4936 SR 1136 BRIDGE NO. 39 JOHNSTON COASTAL PLAIN MITIGATION 2013 2013 $6 $6
MILL CREEK. REPLACE
BRIDGE NO. 41
MILL CREEK OVERFLOW.
REPLACE UPPER
HIGHWAY B-4936 B-4936 SR 1136 BRIDGE NO. 39 JOHNSTON COASTAL PLAIN RIGHT-OF-WAY 2013 2013 $200 $200
MILL CREEK. REPLACE
BRIDGE NO. 41
MILL CREEK OVERFLOW.
REPLACE UPPER
HIGHWAY B-4936 B-4936 SR 1136 BRIDGE NO. 39 JOHNSTON COASTAL PLAIN CONSTRUCTION 2015 2015 $2,050 $2,050
MILL CREEK. REPLACE
BRIDGE NO. 41
MILL CREEK OVERFLOW.
REPLACE UPPER BEFORE
HIGHWAY B-4936 B-4936 SR 1136 BRIDGE NO. 39 JOHNSTON COASTAL PLAIN 2011 $100 $100
LITTLE SAPONY CREEK. UPPER
HIGHWAY B-4938 B-4938 SR 1145 REPLACE BRIDGE NO. 25 NASH COASTAL PLAIN RIGHT-OF-WAY 2014 2014 $80 $80
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE SAPONY CREEK. UPPER
HIGHWAY B-4938 B-4938 SR 1145 REPLACE BRIDGE NO. 25 NASH COASTAL PLAIN CONSTRUCTION 2015 2015 $785 $785
LITTLE SAPONY CREEK. UPPER BEFORE
HIGHWAY B-4938 B-4938 SR 1145 REPLACE BRIDGE NO. 25 NASH COASTAL PLAIN 2011 $100 $100
EXUM MILL BRANCH. EASTERN
HIGHWAY B-4940 B-4940 SR 1575 REPLACE BRIDGE NO. 25 WAYNE CAROLINA RIGHT-OF-WAY 2018 2018 $150 $150
EXUM MILL BRANCH. EASTERN
HIGHWAY B-4940 B-4940 SR 1575 REPLACE BRIDGE NO. 25 WAYNE CAROLINA CONSTRUCTION 2019 2019 $1,475 $1,475
DIAL CREEK (LAKE
MICHIE).
REPLACE BRIDGE NO.
HIGHWAY B-4943 B-4943 SR 1616 20. DURHAM DURHAM RIGHT-OF-WAY 2019 2019 $40 $40
DIAL CREEK (LAKE
MICHIE).
REPLACE BRIDGE NO.
HIGHWAY B-4943 B-4943 SR 1616 20. DURHAM DURHAM UTILITIES 2019 2019 $52 $52
DIAL CREEK (LAKE
MICHIE).
REPLACE BRIDGE NO.
HIGHWAY B-4943 B-4943 SR 1616 20. DURHAM DURHAM CONSTRUCTION 2020 2020 $385 $385
KNAPP REEDS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4944 B-4944 SR 1140 225 GRANVILLE KERR TAR MITIGATION 2012 2012 $10 $10
KNAPP REEDS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4944 B-4944 SR 1140 225 GRANVILLE KERR TAR RIGHT-OF-WAY 2012 2012 $50 $50
KNAPP REEDS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4944 B-4944 SR 1140 225 GRANVILLE KERR TAR CONSTRUCTION 2013 2013 $500 $500
KNAPP REEDS CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4944 B-4944 SR 1140 225 GRANVILLE KERR TAR 2011 $50 $50
KERR LAKE. REPLACE
HIGHWAY B-4945 B-4945 SR 1374 BRIDGE NO. 36 VANCE KERR TAR MITIGATION 2017 2017 $13 $13
KERR LAKE. REPLACE
HIGHWAY B-4945 B-4945 SR 1374 BRIDGE NO. 36 VANCE KERR TAR RIGHT-OF-WAY 2017 2017 $120 $120
KERR LAKE. REPLACE
HIGHWAY B-4945 B-4945 SR 1374 BRIDGE NO. 36 VANCE KERR TAR CONSTRUCTION 2018 2018 $1,225 $1,225
US 70- US 401. REPLACE
HIGHWAY B-4946 B-4946 NC 50 BRIDGE NO. 251 WAKE RALEIGH RIGHT-OF-WAY 2012 2012 $500 $500
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 70- US 401. REPLACE
HIGHWAY B-4946 B-4946 NC 50 BRIDGE NO. 251 WAKE RALEIGH CONSTRUCTION 2013 2013 $2,500 $2,500
US 70- US 401. REPLACE BEFORE
HIGHWAY B-4946 B-4946 NC 50 BRIDGE NO. 251 WAKE RALEIGH 2011 $100 $100
CEDAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4948 B-4948 SR 1429 144 COLUMBUS CAPE FEAR MITIGATION 2015 2015 $1 $1
CEDAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4948 B-4948 SR 1429 144 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2015 2015 $80 $80
CEDAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4948 B-4948 SR 1429 144 COLUMBUS CAPE FEAR CONSTRUCTION 2016 2016 $825 $825
I-95
BUSINES
S- US CROSS CREEK.
HIGHWAY B-4949 B-4949 301 REPLACE BRIDGE NO. 61 CUMBERLAND FAYETTEVILLE RIGHT-OF-WAY 2011 2011 $1,200 $1,200
I-95
BUSINES
S- US CROSS CREEK.
HIGHWAY B-4949 B-4949 301 REPLACE BRIDGE NO. 61 CUMBERLAND FAYETTEVILLE UTILITIES 2011 2011 $31 $31
I-95
BUSINES
S- US CROSS CREEK.
HIGHWAY B-4949 B-4949 301 REPLACE BRIDGE NO. 61 CUMBERLAND FAYETTEVILLE CONSTRUCTION 2012 2014 $12,000 $4,000 $4,000 $4,000
I-95
BUSINES
S- US CROSS CREEK. BEFORE
HIGHWAY B-4949 B-4949 301 REPLACE BRIDGE NO. 61 CUMBERLAND FAYETTEVILLE 2011 $100 $100
SOUTH RIVER. REPLACE
BRIDGE NO. 171
HIGHWAY B-4950 B-4950 SR 1851 AND BRIDGE NO. 172 CUMBERLAND FAYETTEVILLE RIGHT-OF-WAY 2018 2018 $360 $360
SOUTH RIVER. REPLACE
BRIDGE NO. 171
HIGHWAY B-4950 B-4950 SR 1851 AND BRIDGE NO. 172 CUMBERLAND FAYETTEVILLE CONSTRUCTION 2019 2019 $3,600 $3,600
SOUTH RIVER. REPLACE
BRIDGE NO. 171 BEFORE
HIGHWAY B-4950 B-4950 SR 1851 AND BRIDGE NO. 172 CUMBERLAND FAYETTEVILLE 2011 $100 $100
ASHPOLE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4952 B-4952 SR 2519 142 ROBESON LUMBER RIVER RIGHT-OF-WAY 2018 2018 $180 $180
ASHPOLE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4952 B-4952 SR 2519 142 ROBESON LUMBER RIVER CONSTRUCTION 2019 2019 $1,800 $1,800
QUAKER CREEK.
HIGHWAY B-4953 B-4953 SR 1912 REPLACE BRIDGE NO. 64 ALAMANCE BURLINGTON RIGHT-OF-WAY 2014 2014 $90 $90
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
QUAKER CREEK.
HIGHWAY B-4953 B-4953 SR 1912 REPLACE BRIDGE NO. 64 ALAMANCE BURLINGTON CONSTRUCTION 2015 2015 $900 $900
SOUTH PRONG
STINKING QUARTER
CREEK. REPLACE
HIGHWAY B-4955 B-4955 SR 1113 BRIDGE NO. 162 ALAMANCE BURLINGTON MITIGATION 2012 2012 $9 $9
SOUTH PRONG
STINKING QUARTER
CREEK. REPLACE
HIGHWAY B-4955 B-4955 SR 1113 BRIDGE NO. 162 ALAMANCE BURLINGTON RIGHT-OF-WAY 2012 2012 $100 $100
SOUTH PRONG
STINKING QUARTER
CREEK. REPLACE
HIGHWAY B-4955 B-4955 SR 1113 BRIDGE NO. 162 ALAMANCE BURLINGTON CONSTRUCTION 2013 2013 $750 $750
POLE CAT CREEK.
HIGHWAY B-4956 B-4956 SR 1105 REPLACE BRIDGE NO. 25 GUILFORD GREENSBORO RIGHT-OF-WAY 2018 2018 $100 $100
POLE CAT CREEK.
HIGHWAY B-4956 B-4956 SR 1105 REPLACE BRIDGE NO. 25 GUILFORD GREENSBORO CONSTRUCTION 2019 2019 $1,050 $1,050
TWO MILE CREEK.
HIGHWAY B-4957 B-4957 SR 1193 REPLACE BRIDGE NO. 56 GUILFORD HIGH POINT RIGHT-OF-WAY 2012 2012 $70 $70
TWO MILE CREEK.
HIGHWAY B-4957 B-4957 SR 1193 REPLACE BRIDGE NO. 56 GUILFORD HIGH POINT CONSTRUCTION 2013 2013 $725 $725
REEDY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4958 B-4958 SR 2128 106 GUILFORD GREENSBORO MITIGATION 2019 2019 $7 $7
REEDY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4958 B-4958 SR 2128 106 GUILFORD GREENSBORO RIGHT-OF-WAY 2019 2019 $170 $170
REEDY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4958 B-4958 SR 2128 106 GUILFORD GREENSBORO CONSTRUCTION 2020 2020 $1,700 $1,700
BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4959 B-4959 SR 2719 193 GUILFORD GREENSBORO RIGHT-OF-WAY 2015 2015 $130 $130
BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4959 B-4959 SR 2719 193 GUILFORD GREENSBORO CONSTRUCTION 2016 2016 $1,350 $1,350
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO. BURLINGTON,G
HIGHWAY B-4960 B-4960 SR 3058 214 GUILFORD REENSBORO MITIGATION 2013 2013 $25 $25
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO. BURLINGTON,G
HIGHWAY B-4960 B-4960 SR 3058 214 GUILFORD REENSBORO RIGHT-OF-WAY 2013 2013 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO. BURLINGTON,G
HIGHWAY B-4960 B-4960 SR 3058 214 GUILFORD REENSBORO UTILITIES 2013 2013 $125 $125
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO. BURLINGTON,G
HIGHWAY B-4960 B-4960 SR 3058 214 GUILFORD REENSBORO CONSTRUCTION 2014 2014 $1,000 $1,000
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO. BURLINGTON,G BEFORE
HIGHWAY B-4960 B-4960 SR 3058 214 GUILFORD REENSBORO 2011 $75 $75
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4961 B-4961 SR 3051 208 GUILFORD GREENSBORO RIGHT-OF-WAY 2017 2017 $100 $100
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4961 B-4961 SR 3051 208 GUILFORD GREENSBORO CONSTRUCTION 2018 2018 $1,000 $1,000
US 70 ENO RIVER. REPLACE
HIGHWAY B-4962 B-4962 BYPASS BRIDGE NO. 46 ORANGE DURHAM RIGHT-OF-WAY 2017 2017 $600 $600
US 70 ENO RIVER. REPLACE
HIGHWAY B-4962 B-4962 BYPASS BRIDGE NO. 46 ORANGE DURHAM CONSTRUCTION 2018 2018 $6,000 $6,000
JACOB'S CREEK. PIEDMONT
HIGHWAY B-4963 B-4963 SR 2361 REPLACE BRIDGE NO. 32 ROCKINGHAM TRIAD RIGHT-OF-WAY 2012 2012 $65 $65
TAR RIVER. REPLACE
HIGHWAY B-3841 B-3841 SR 1138 BRIDGE NO. 83 GRANVILLE KERR TAR RIGHT-OF-WAY 2012 2012 $72 $72
TAR RIVER. REPLACE
HIGHWAY B-3841 B-3841 SR 1138 BRIDGE NO. 83 GRANVILLE KERR TAR CONSTRUCTION 2013 2013 $1,150 $1,150
TAR RIVER. REPLACE BEFORE
HIGHWAY B-3841 B-3841 SR 1138 BRIDGE NO. 83 GRANVILLE KERR TAR 2011 $150 $150
TUCKASEGEE RIVER.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-3861 B-3861 SR 1731 107 JACKSON N RIGHT-OF-WAY 2011 2011 $55 $55
TUCKASEGEE RIVER.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-3861 B-3861 SR 1731 107 JACKSON N CONSTRUCTION 2012 2012 $750 $750
TUCKASEGEE RIVER.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-3861 B-3861 SR 1731 107 JACKSON N 2011 $150 $150
US 70
BUSINES NEUSE RIVER. REPLACE UPPER
HIGHWAY B-3864 B-3864 S BRIDGE NO. 40 JOHNSTON COASTAL PLAIN MITIGATION 2012 2012 $41 $41
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 70
BUSINES NEUSE RIVER. REPLACE UPPER
HIGHWAY B-3864 B-3864 S BRIDGE NO. 40 JOHNSTON COASTAL PLAIN RIGHT-OF-WAY 2012 2012 $250 $250
US 70
BUSINES NEUSE RIVER. REPLACE UPPER
HIGHWAY B-3864 B-3864 S BRIDGE NO. 40 JOHNSTON COASTAL PLAIN CONSTRUCTION 2013 2013 $5,600 $5,600
US 70
BUSINES NEUSE RIVER. REPLACE UPPER BEFORE
HIGHWAY B-3864 B-3864 S BRIDGE NO. 40 JOHNSTON COASTAL PLAIN 2011 $420 $420
LITTLE TENNESSEE
RIVER.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-3868 B-3868 SR 1456 172 MACON N RIGHT-OF-WAY 2014 2014 $410 $410
LITTLE TENNESSEE
RIVER.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-3868 B-3868 SR 1456 172 MACON N CONSTRUCTION 2015 2015 $4,100 $4,100
LITTLE TENNESSEE
RIVER.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-3868 B-3868 SR 1456 172 MACON N 2011 $225 $225
BIG PINE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3869 B-3869 SR 1151 146 MADISON LAND OF SKY 2011 $939 $939
CREEK. REPLACE BEFORE
HIGHWAY B-3874 B-3874 SR 1747 BRIDGE NO. 68 MCDOWELL ISOTHERMAL 2011 $648 $648
CORNELI
US
HARNET
DRIVE
(OLD NC CSX TRANSPORTATION. BEFORE
HIGHWAY B-3881 B-3881 133) REPLACE BRIDGE NO. 26 NEW HANOVER WILMINGTON 2011 $4,819 $4,819
SWAMP. REPLACE BEFORE
HIGHWAY B-3898 B-3898 SR 2115 BRIDGE NO. 41 ROBESON LUMBER RIVER 2011 $1,007 $1,007
LONG CREEK. BEFORE
HIGHWAY B-3909 B-3909 SR 1968 REPLACE BRIDGE NO. 99 STANLY ROCKY RIVER 2011 $2,631 $2,631
AUSTIN CREEK.
REPLACE BRIDGE
NO. 448, SMITHS
CREEK. REPLACE BEFORE
HIGHWAY B-3919 B-3919 SR 2053 BRIDGE NO. 140 WAKE RALEIGH 2011 $5,319 $5,319
FISHING CREEK. BEFORE
HIGHWAY B-3921 B-3921 SR 1600 REPLACE BRIDGE NO. 45 WARREN KERR TAR 2011 $1,673 $1,673
MEAT CAMP CREEK.
HIGHWAY B-3924 B-3924 SR 1335 REPLACE BRIDGE NO. 33 WATAUGA HIGH COUNTRY CONSTRUCTION 2011 2011 $1,250 $1,250
MEAT CAMP CREEK. BEFORE
HIGHWAY B-3924 B-3924 SR 1335 REPLACE BRIDGE NO. 33 WATAUGA HIGH COUNTRY 2011 $225 $225
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SOUTH FORK NEW
RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-3928 B-3928 SR 1351 334 WATAUGA HIGH COUNTRY 2011 $2,274 $2,274
RIVERSIDE AVENUE
ELIZABE OVER CHARLES CREEK. BEFORE
HIGHWAY B-3929 B-3929 TH CITY REPLACE BRIDGE NO. 28 PASQUOTANK ALBEMARLE 2011 $1,862 $1,862
MULBERRY STREET
OVER LOWER CREEK. BEFORE
HIGHWAY B-3932 B-3932 LENOIR REPLACE BRIDGE NO. 68 CALDWELL HICKORY 2011 $978 $978
BROADWAY STREET
OVER BLAIRS FORK
CREEK. REPLACE BEFORE
HIGHWAY B-3933 B-3933 LENOIR BRIDGE NO. 75 CALDWELL HICKORY 2011 $794 $794
WELLS CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4004 B-4004 SR 2363 149 ALAMANCE BURLINGTON 2011 $740 $740
CREEK. REPLACE BEFORE
HIGHWAY B-4011 B-4011 SR 1106 BRIDGE NO. 85 ASHE HIGH COUNTRY 2011 $1,186 $1,186
NORTH FORK NEW
RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4012 B-4012 SR 1118 117 ASHE HIGH COUNTRY 2011 $1,593 $1,593
BIG HORSE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4015 B-4015 SR 1362 165 ASHE HIGH COUNTRY 2011 $1,233 $1,233
BIG HORSE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4016 B-4016 SR 1347 273 ASHE HIGH COUNTRY RIGHT-OF-WAY 2019 2019 $60 $60
BIG HORSE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4016 B-4016 SR 1347 273 ASHE HIGH COUNTRY CONSTRUCTION 2020 2020 $600 $600
BIG HORSE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4016 B-4016 SR 1347 273 ASHE HIGH COUNTRY 2011 $100 $100
RUNYON CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4019 B-4019 NC 32 103 BEAUFORT MID-EAST 2011 $4,424 $4,424
CREEK. REPLACE BEFORE
HIGHWAY B-4025 B-4025 SR 1925 BRIDGE NO. 39 BEAUFORT MID-EAST 2011 $865 $865
WILEY BRANCH CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4048 B-4048 SR 1121 145 CABARRUS CONCORD 2011 $1,070 $1,070
BLACK CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4049 B-4049 SR 1138 165 CABARRUS CONCORD 2011 $974 $974
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
IRISH BUFFALO CREEK.
HIGHWAY B-4050 B-4050 SR 1778 REPLACE BRIDGE NO. 30 CABARRUS CONCORD RIGHT-OF-WAY 2011 2011 $125 $125
IRISH BUFFALO CREEK.
HIGHWAY B-4050 B-4050 SR 1778 REPLACE BRIDGE NO. 30 CABARRUS CONCORD UTILITIES 2011 2011 $58 $58
IRISH BUFFALO CREEK.
HIGHWAY B-4050 B-4050 SR 1778 REPLACE BRIDGE NO. 30 CABARRUS CONCORD CONSTRUCTION 2012 2012 $1,555 $1,555
IRISH BUFFALO CREEK. BEFORE
HIGHWAY B-4050 B-4050 SR 1778 REPLACE BRIDGE NO. 30 CABARRUS CONCORD 2011 $200 $200
BLACK RUN CREEK. BEFORE
HIGHWAY B-4051 B-4051 SR 2408 REPLACE BRIDGE NO. 90 CABARRUS CONCORD 2011 $485 $485
HAGAN CREEK.
HIGHWAY B-4061 B-4061 SR 1727 REPLACE BRIDGE NO. 90 CATAWBA HICKORY RIGHT-OF-WAY 2011 2011 $140 $140
HAGAN CREEK.
HIGHWAY B-4061 B-4061 SR 1727 REPLACE BRIDGE NO. 90 CATAWBA HICKORY UTILITIES 2011 2011 $40 $40
HAGAN CREEK.
HIGHWAY B-4061 B-4061 SR 1727 REPLACE BRIDGE NO. 90 CATAWBA HICKORY CONSTRUCTION 2012 2012 $1,400 $1,400
HAGAN CREEK. BEFORE
HIGHWAY B-4061 B-4061 SR 1727 REPLACE BRIDGE NO. 90 CATAWBA HICKORY 2011 $100 $100
BROOKS CREEK. TRIANGLE
HIGHWAY B-4064 B-4064 SR 1520 REPLACE BRIDGE NO. 95 CHATHAM AREA CONSTRUCTION 2011 2011 $1,100 $1,100
BROOKS CREEK. TRIANGLE BEFORE
HIGHWAY B-4064 B-4064 SR 1520 REPLACE BRIDGE NO. 95 CHATHAM AREA 2011 $180 $180
HANGING DOG CREEK.
SR 1326 REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4069 B-4069 FH 59 159 CHEROKEE N RIGHT-OF-WAY 2016 2016 $65 $65
HANGING DOG CREEK.
SR 1326 REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4069 B-4069 FH 59 159 CHEROKEE N CONSTRUCTION 2017 2017 $2,950 $2,950
HANGING DOG CREEK.
SR 1326 REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4069 B-4069 FH 59 159 CHEROKEE N 2011 $3 $3
SR 1393
(ROCKY
CREEK-
WAKEFI JUNALUSKA CREEK.
ELD REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4071 B-4071 ROADS) 32 CHEROKEE N 2011 $662 $662
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRASSTOWN CREEK
OVERFLOW. SOUTHWESTER BEFORE
HIGHWAY B-4072 B-4072 SR 1564 REPLACE BRIDGE NO. 98 CHEROKEE N 2011 $919 $919
GROG CREEK. REPLACE
HIGHWAY B-4075 B-4075 SR 1184 BRIDGE NO. 129 CLEVELAND LAKE NORMAN CONSTRUCTION 2011 2011 $725 $725
GROG CREEK. REPLACE BEFORE
HIGHWAY B-4075 B-4075 SR 1184 BRIDGE NO. 129 CLEVELAND LAKE NORMAN 2011 $230 $230
WACCAMAW RIVER
OVERFLOW. BEFORE
HIGHWAY B-4077 B-4077 NC 130 REPLACE BRIDGE NO. 25 COLUMBUS CAPE FEAR 2011 $4,408 $4,408
WACCAMAW RIVER
OVERFLOW. BEFORE
HIGHWAY B-4078 B-4078 NC 130 REPLACE BRIDGE NO. 10 COLUMBUS CAPE FEAR 2011 $2,350 $2,350
BRICE CREEK. REPLACE BEFORE
HIGHWAY B-4086 B-4086 SR 1997 BRIDGE NO. 10 CRAVEN DOWN EAST 2011 $530 $530
CROSS CREEK.
NC 24- REPLACE BRIDGE NO.
HIGHWAY B-4090 B-4090 210 125 CUMBERLAND FAYETTEVILLE MITIGATION 2011 2011 $1 $1
CROSS CREEK.
NC 24- REPLACE BRIDGE NO.
HIGHWAY B-4090 B-4090 210 125 CUMBERLAND FAYETTEVILLE RIGHT-OF-WAY 2011 2011 $600 $600
CROSS CREEK.
NC 24- REPLACE BRIDGE NO.
HIGHWAY B-4090 B-4090 210 125 CUMBERLAND FAYETTEVILLE UTILITIES 2011 2011 $111 $111
CROSS CREEK.
NC 24- REPLACE BRIDGE NO.
HIGHWAY B-4090 B-4090 210 125 CUMBERLAND FAYETTEVILLE CONSTRUCTION 2012 2012 $6,000 $6,000
CROSS CREEK.
NC 24- REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4090 B-4090 210 125 CUMBERLAND FAYETTEVILLE 2011 $500 $500
I-95 US 301, SR 1738, SR
BUSINES 1741, CAPE FEAR
S- US RIVER. REPLACE
HIGHWAY B-4091 B-4091 301 BRIDGE NO. 85 CUMBERLAND FAYETTEVILLE RIGHT-OF-WAY 2011 2011 $100 $100
I-95 US 301, SR 1738, SR
BUSINES 1741, CAPE FEAR
S- US RIVER. REPLACE
HIGHWAY B-4091 B-4091 301 BRIDGE NO. 85 CUMBERLAND FAYETTEVILLE UTILITIES 2011 2011 $208 $208
I-95 US 301, SR 1738, SR
BUSINES 1741, CAPE FEAR
S- US RIVER. REPLACE
HIGHWAY B-4091 B-4091 301 BRIDGE NO. 85 CUMBERLAND FAYETTEVILLE CONSTRUCTION 2012 2014 $12,300 $4,100 $4,100 $4,100
I-95 US 301, SR 1738, SR
BUSINES 1741, CAPE FEAR
S- US RIVER. REPLACE BEFORE
HIGHWAY B-4091 B-4091 301 BRIDGE NO. 85 CUMBERLAND FAYETTEVILLE 2011 $301 $301
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTH POTTS CREEK.
REPLACE BRIDGE NO. PIEDMONT BEFORE
HIGHWAY B-4097 B-4097 SR 1147 405 DAVIDSON TRIAD 2011 $2,181 $2,181
CAMPING CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4114 B-4114 SR 1146 151 FRANKLIN RALEIGH 2011 $992 $992
CREEK. REPLACE BEFORE
HIGHWAY B-4117 B-4117 SR 1820 BRIDGE NO. 173 GASTON GASTONIA 2011 $701 $701
STANLEY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4118 B-4118 SR 1905 200 GASTON GASTONIA RIGHT-OF-WAY 2011 2011 $40 $40
STANLEY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4118 B-4118 SR 1905 200 GASTON GASTONIA UTILITIES 2011 2011 $30 $30
STANLEY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4118 B-4118 SR 1905 200 GASTON GASTONIA CONSTRUCTION 2012 2012 $600 $600
STANLEY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4118 B-4118 SR 1905 200 GASTON GASTONIA 2011 $100 $100
LONG CREEK. SOUTHWESTER
HIGHWAY B-4122 B-4122 SR 1117 REPLACE BRIDGE NO. 81 GRAHAM N CONSTRUCTION 2012 2012 $925 $925
LONG CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4122 B-4122 SR 1117 REPLACE BRIDGE NO. 81 GRAHAM N 2011 $748 $748
WEST BUFFALO CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4123 B-4123 SR 1123 117 GRAHAM N 2011 $684 $684
WHEAT SWAMP CREEK. EASTERN BEFORE
HIGHWAY B-4125 B-4125 SR 1091 REPLACE BRIDGE NO. 46 GREENE CAROLINA 2011 $1,350 $1,350
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4129 B-4129 SR 3000 226 GUILFORD GREENSBORO 2011 $2,290 $2,290
JACKET SWAMP.
HIGHWAY B-4133 B-4133 SR 1001 REPLACE BRIDGE NO. 11 HALIFAX PEANUT BELT CONSTRUCTION 2011 2011 $1,000 $1,000
JACKET SWAMP. BEFORE
HIGHWAY B-4133 B-4133 SR 1001 REPLACE BRIDGE NO. 11 HALIFAX PEANUT BELT 2011 $130 $130
NORFOLK AND
SOUTHERN RAILWAY. BEFORE
HIGHWAY B-4137 B-4137 NC 42 REPLACE BRIDGE NO. 35 HARNETT RALEIGH 2011 $1,974 $1,974
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CAPE FEAR RIVER. BEFORE
HIGHWAY B-4138 B-4138 US 401 REPLACE BRIDGE NO. 46 HARNETT MID-CAROLINA 2011 $11,774 $11,774
RICHLAND CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4144 B-4144 SR 1519 211 HAYWOOD ASHEVILLE 2011 $2,187 $2,187
DUNN CREEK. REPLACE BEFORE
HIGHWAY B-4145 B-4145 SR 1006 BRIDGE NO. 56 HENDERSON ASHEVILLE 2011 $865 $865
RIGHT PRONG MUD
CREEK.
REPLACE BRIDGE NO. 75
LEFT PRONG MUD
CREEK.
HIGHWAY B-4147 B-4147 SR 1123 REPLACE BRIDGE NO. 76 HENDERSON ASHEVILLE RIGHT-OF-WAY 2011 2011 $33 $33
RIGHT PRONG MUD
CREEK.
REPLACE BRIDGE NO. 75
LEFT PRONG MUD
CREEK.
HIGHWAY B-4147 B-4147 SR 1123 REPLACE BRIDGE NO. 76 HENDERSON ASHEVILLE UTILITIES 2011 2011 $25 $25
POPLAR CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4301 B-4301 SR 1007 229 WAKE RALEIGH 2011 $1,842 $1,842
TERRIBLE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4302 B-4302 SR 1301 336 WAKE RALEIGH 2011 $2,303 $2,303
BEAVER DAM CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4304 B-4304 SR 2217 143 WAKE RALEIGH 2011 $1,537 $1,537
SHOCCO CREEK. BEFORE
HIGHWAY B-4307 B-4307 US 401 REPLACE BRIDGE NO. 4 WARREN KERR TAR 2011 $1,864 $1,864
SMITH CREEK. REPLACE BEFORE
HIGHWAY B-4308 B-4308 SR 1224 BRIDGE NO. 107 WARREN KERR TAR 2011 $553 $553
MAUL CREEK. REPLACE BEFORE
HIGHWAY B-4314 B-4314 SR 1163 BRIDGE NO. 29 WASHINGTON ALBEMARLE 2011 $735 $735
BAIRD CREEK. REPLACE
BRIDGE NO. 62, BRIDGE
NO. 68 AND BRIDGE NO.
HIGHWAY B-4315 B-4315 NC 194 70 WATAUGA HIGH COUNTRY CONSTRUCTION 2011 2011 $650 $650
BAIRD CREEK. REPLACE
BRIDGE NO. 62, BRIDGE
NO. 68 AND BRIDGE NO. BEFORE
HIGHWAY B-4315 B-4315 NC 194 70 WATAUGA HIGH COUNTRY 2011 $350 $350
NORTH PRONG LEWIS
FORK CREEK. REPLACE
HIGHWAY B-4323 B-4323 SR 1353 BRIDGE NO. 104 WILKES HIGH COUNTRY CONSTRUCTION 2011 2011 $850 $850
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTH PRONG LEWIS
FORK CREEK. REPLACE BEFORE
HIGHWAY B-4323 B-4323 SR 1353 BRIDGE NO. 104 WILKES HIGH COUNTRY 2011 $180 $180
MIDDLE FORK REDDIES
RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4325 B-4325 SR 1580 718 WILKES HIGH COUNTRY RIGHT-OF-WAY 2011 2011 $95 $95
MIDDLE FORK REDDIES
RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4325 B-4325 SR 1580 718 WILKES HIGH COUNTRY CONSTRUCTION 2012 2012 $575 $575
MIDDLE FORK REDDIES
RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4325 B-4325 SR 1580 718 WILKES HIGH COUNTRY 2011 $150 $150
GREAT SWAMP. UPPER
HIGHWAY B-4328 B-4328 SR 1634 REPLACE BRIDGE NO. 3 WILSON COASTAL PLAIN MITIGATION 2011 2011 $1 $1
GREAT SWAMP. UPPER
HIGHWAY B-4328 B-4328 SR 1634 REPLACE BRIDGE NO. 3 WILSON COASTAL PLAIN RIGHT-OF-WAY 2011 2011 $5 $5
GREAT SWAMP. UPPER
HIGHWAY B-4328 B-4328 SR 1634 REPLACE BRIDGE NO. 3 WILSON COASTAL PLAIN CONSTRUCTION 2012 2012 $725 $725
GREAT SWAMP. UPPER BEFORE
HIGHWAY B-4328 B-4328 SR 1634 REPLACE BRIDGE NO. 3 WILSON COASTAL PLAIN 2011 $100 $100
EAST OAKVIEW ROAD
ASHEVIL OVER HOMINY CREEK. BEFORE
HIGHWAY B-4343 B-4343 LE REPLACE BRIDGE NO. 52 BUNCOMBE ASHEVILLE 2011 $699 $699
TULIP DRIVE OVER
KAYLOR BRANCH.
GASTONI REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4344 B-4344 A 167 GASTON GASTONIA 2011 $1,226 $1,226
NANTAHALA NATIONAL
FOREST,
PFH 1107(7), NORTON
SR 1107 MILL CREEK. SOUTHWESTER
HIGHWAY B-4347 B-4347 FH 82 REPLACE BRIDGE NO. 3 JACKSON N CONSTRUCTION 2011 2011 $250 $250
NANTAHALA NATIONAL
FOREST,
PFH 1107(7), NORTON
SR 1107 MILL CREEK. SOUTHWESTER
HIGHWAY B-4347 B-4347 FH 82 REPLACE BRIDGE NO. 3 JACKSON N RIGHT-OF-WAY 2011 2011 $20 $20
NANTAHALA NATIONAL
FOREST,
PFH 1107(7), NORTON
SR 1107 MILL CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4347 B-4347 FH 82 REPLACE BRIDGE NO. 3 JACKSON N 2011 $60 $60
PRONG OF STINKING
QUARTER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4400 B-4400 SR 1122 160 ALAMANCE BURLINGTON MITIGATION 2016 2016 $7 $7
PRONG OF STINKING
QUARTER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4400 B-4400 SR 1122 160 ALAMANCE BURLINGTON RIGHT-OF-WAY 2016 2016 $80 $80
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
PRONG OF STINKING
QUARTER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4400 B-4400 SR 1122 160 ALAMANCE BURLINGTON UTILITIES 2016 2016 $52 $52
PRONG OF STINKING
QUARTER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4400 B-4400 SR 1122 160 ALAMANCE BURLINGTON CONSTRUCTION 2017 2017 $825 $825
PRONG OF STINKING
QUARTER CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4400 B-4400 SR 1122 160 ALAMANCE BURLINGTON 2011 $150 $150
NORTH PRONG
STINKING QUARTER
CREEK. REPLACE
HIGHWAY B-4401 B-4401 SR 1124 BRIDGE NO. 161 ALAMANCE BURLINGTON MITIGATION 2015 2015 $12 $12
NORTH PRONG
STINKING QUARTER
CREEK. REPLACE
HIGHWAY B-4401 B-4401 SR 1124 BRIDGE NO. 161 ALAMANCE BURLINGTON RIGHT-OF-WAY 2015 2015 $75 $75
NORTH PRONG
STINKING QUARTER
CREEK. REPLACE
HIGHWAY B-4401 B-4401 SR 1124 BRIDGE NO. 161 ALAMANCE BURLINGTON CONSTRUCTION 2016 2016 $750 $750
NORTH PRONG
STINKING QUARTER
CREEK. REPLACE BEFORE
HIGHWAY B-4401 B-4401 SR 1124 BRIDGE NO. 161 ALAMANCE BURLINGTON 2011 $200 $200
SOUTH FORK CANE
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4404 B-4404 SR 2181 102 ALAMANCE BURLINGTON 2011 $1,075 $1,075
CREEK. REPLACE
HIGHWAY B-4406 B-4406 US 221 BRIDGE NO. 9 ALLEGHANY HIGH COUNTRY MITIGATION 2011 2011 $52 $52
CREEK. REPLACE
HIGHWAY B-4406 B-4406 US 221 BRIDGE NO. 9 ALLEGHANY HIGH COUNTRY RIGHT-OF-WAY 2011 2011 $100 $100
CREEK. REPLACE
HIGHWAY B-4406 B-4406 US 221 BRIDGE NO. 9 ALLEGHANY HIGH COUNTRY UTILITIES 2011 2011 $10 $10
CREEK. REPLACE
HIGHWAY B-4406 B-4406 US 221 BRIDGE NO. 9 ALLEGHANY HIGH COUNTRY CONSTRUCTION 2012 2012 $1,100 $1,100
CREEK. REPLACE BEFORE
HIGHWAY B-4406 B-4406 US 221 BRIDGE NO. 9 ALLEGHANY HIGH COUNTRY 2011 $100 $100
ROCKY RIVER.
HIGHWAY B-4407 B-4407 US 52 REPLACE BRIDGE NO. 70 ANSON ROCKY RIVER RIGHT-OF-WAY 2018 2018 $500 $500
ROCKY RIVER. BEFORE
HIGHWAY B-4407 B-4407 US 52 REPLACE BRIDGE NO. 70 ANSON ROCKY RIVER 2011 $500 $500
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ROCKY RIVER. AFTER
HIGHWAY B-4407 B-4407 US 52 REPLACE BRIDGE NO. 70 ANSON ROCKY RIVER CONSTRUCTION 2020 2020 $11,200 $3,734 7,466.00
WINSTON-SALEM
SOUTHBOUND
RAILROAD. REPLACE BEFORE
HIGHWAY B-4409 B-4409 SR 1627 BRIDGE NO. 308 ANSON ROCKY RIVER 2011 $2,751 $2,751
WINSTON-SALEM
SOUTHBOUND
RAILROAD. REPLACE BEFORE
HIGHWAY B-4410 B-4410 SR 1627 BRIDGE NO. 307 ANSON ROCKY RIVER 2011 $297 $297
BROAD CREEK.
HIGHWAY B-4413 B-4413 US 264 REPLACE BRIDGE NO. 51 BEAUFORT MID-EAST MITIGATION 2011 2011 $143 $143
BROAD CREEK.
HIGHWAY B-4413 B-4413 US 264 REPLACE BRIDGE NO. 51 BEAUFORT MID-EAST RIGHT-OF-WAY 2011 2011 $12 $12
BROAD CREEK.
HIGHWAY B-4413 B-4413 US 264 REPLACE BRIDGE NO. 51 BEAUFORT MID-EAST UTILITIES 2011 2011 $31 $31
BROAD CREEK.
HIGHWAY B-4413 B-4413 US 264 REPLACE BRIDGE NO. 51 BEAUFORT MID-EAST CONSTRUCTION 2012 2012 $1,300 $1,300
BROAD CREEK. BEFORE
HIGHWAY B-4413 B-4413 US 264 REPLACE BRIDGE NO. 51 BEAUFORT MID-EAST 2011 $150 $150
PUNGO CREEK.
HIGHWAY B-4414 B-4414 US 264 REPLACE BRIDGE NO. 43 BEAUFORT MID-EAST RIGHT-OF-WAY 2019 2019 $250 $250
PUNGO CREEK.
HIGHWAY B-4414 B-4414 US 264 REPLACE BRIDGE NO. 43 BEAUFORT MID-EAST CONSTRUCTION 2020 2020 $2,550 $2,550
PUNGO CREEK. BEFORE
HIGHWAY B-4414 B-4414 US 264 REPLACE BRIDGE NO. 43 BEAUFORT MID-EAST 2011 $2 $2
PUNGO CREEK.
HIGHWAY B-4415 B-4415 NC 32 REPLACE BRIDGE NO. 21 BEAUFORT MID-EAST RIGHT-OF-WAY 2011 2011 $12 $12
PUNGO CREEK.
HIGHWAY B-4415 B-4415 NC 32 REPLACE BRIDGE NO. 21 BEAUFORT MID-EAST UTILITIES 2011 2011 $19 $19
PUNGO CREEK.
HIGHWAY B-4415 B-4415 NC 32 REPLACE BRIDGE NO. 21 BEAUFORT MID-EAST CONSTRUCTION 2012 2012 $1,600 $1,600
LIVINGSTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4481 B-4481 SR 1831 279 COLUMBUS CAPE FEAR MITIGATION 2016 2016 $19 $19
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LIVINGSTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4481 B-4481 SR 1831 279 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2016 2016 $150 $150
LIVINGSTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4481 B-4481 SR 1831 279 COLUMBUS CAPE FEAR CONSTRUCTION 2017 2017 $1,525 $1,525
LIVINGSTON CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4481 B-4481 SR 1831 279 COLUMBUS CAPE FEAR 2011 $60 $60
CREEK. REPLACE
HIGHWAY B-4483 B-4483 SR 1232 BRIDGE NO. 66 CRAVEN DOWN EAST RIGHT-OF-WAY 2019 2019 $135 $135
CREEK. REPLACE
HIGHWAY B-4483 B-4483 SR 1232 BRIDGE NO. 66 CRAVEN DOWN EAST CONSTRUCTION 2020 2020 $1,350 $1,350
CREEK. REPLACE BEFORE
HIGHWAY B-4483 B-4483 SR 1232 BRIDGE NO. 66 CRAVEN DOWN EAST 2011 $20 $20
NEUSE RIVER. REPLACE
HIGHWAY B-4484 B-4484 SR 1470 BRIDGE NO. 138 CRAVEN DOWN EAST MITIGATION 2016 2016 $7 $7
NEUSE RIVER. REPLACE
HIGHWAY B-4484 B-4484 SR 1470 BRIDGE NO. 138 CRAVEN DOWN EAST RIGHT-OF-WAY 2016 2016 $800 $800
NEUSE RIVER. REPLACE
HIGHWAY B-4484 B-4484 SR 1470 BRIDGE NO. 138 CRAVEN DOWN EAST CONSTRUCTION 2017 2019 $10,800 $3,600 $3,600 $3,600
NEUSE RIVER. REPLACE BEFORE
HIGHWAY B-4484 B-4484 SR 1470 BRIDGE NO. 138 CRAVEN DOWN EAST 2011 $400 $400
FORK CLUBFOOT
CREEK.
HIGHWAY B-4487 B-4487 SR 1715 REPLACE BRIDGE NO. 2 CRAVEN DOWN EAST RIGHT-OF-WAY 2018 2018 $145 $145
FORK CLUBFOOT
CREEK.
HIGHWAY B-4487 B-4487 SR 1715 REPLACE BRIDGE NO. 2 CRAVEN DOWN EAST CONSTRUCTION 2019 2019 $1,450 $1,450
FORK CLUBFOOT
CREEK. BEFORE
HIGHWAY B-4487 B-4487 SR 1715 REPLACE BRIDGE NO. 2 CRAVEN DOWN EAST 2011 $14 $14
SLOCUM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4488 B-4488 SR 1763 176 CRAVEN DOWN EAST RIGHT-OF-WAY 2019 2019 $170 $170
SLOCUM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4488 B-4488 SR 1763 176 CRAVEN DOWN EAST CONSTRUCTION 2020 2020 $1,725 $1,725
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SLOCUM CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4488 B-4488 SR 1763 176 CRAVEN DOWN EAST 2011 $120 $120
CSX RAILROAD, NORTH
SOUTH RAILROAD, AND
HILLSBORO STREET.
NC 24- REPLACE BRIDGE NO.
HIGHWAY B-4490 B-4490 210 116 CUMBERLAND FAYETTEVILLE RIGHT-OF-WAY 2015 2015 $60 $60
CSX RAILROAD, NORTH
SOUTH RAILROAD, AND
HILLSBORO STREET.
NC 24- REPLACE BRIDGE NO.
HIGHWAY B-4490 B-4490 210 116 CUMBERLAND FAYETTEVILLE CONSTRUCTION 2017 2019 $16,000 $5,334 $5,333 $5,333
CSX RAILROAD, NORTH
SOUTH RAILROAD, AND
HILLSBORO STREET.
NC 24- REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4490 B-4490 210 116 CUMBERLAND FAYETTEVILLE 2011 $500 $500
I-95 BUSINESS/US 301.
REHABILITATE BRIDGE
HIGHWAY B-4491 B-4491 NC 59 NO. 22 CUMBERLAND FAYETTEVILLE RIGHT-OF-WAY 2017 2017 $500 $500
I-95 BUSINESS/US 301.
REHABILITATE BRIDGE
HIGHWAY B-4491 B-4491 NC 59 NO. 22 CUMBERLAND FAYETTEVILLE CONSTRUCTION 2018 2019 $5,400 $2,700 $2,700
I-95 BUSINESS/US 301.
REHABILITATE BRIDGE BEFORE
HIGHWAY B-4491 B-4491 NC 59 NO. 22 CUMBERLAND FAYETTEVILLE 2011 $20 $20
REESE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4492 B-4492 SR 1838 212 CUMBERLAND FAYETTEVILLE 2011 $781 $781
BIG CREEK. BEFORE
HIGHWAY B-4493 B-4493 SR 1851 REPLACE BRIDGE NO. 48 CUMBERLAND MID-CAROLINA 2011 $821 $821
TULLS CREEK. REPLACE
HIGHWAY B-4494 B-4494 SR 1232 BRIDGE NO. 3 CURRITUCK ALBEMARLE MITIGATION 2011 2011 $213 $213
TULLS CREEK. REPLACE
HIGHWAY B-4494 B-4494 SR 1232 BRIDGE NO. 3 CURRITUCK ALBEMARLE RIGHT-OF-WAY 2011 2011 $80 $80
TULLS CREEK. REPLACE
HIGHWAY B-4494 B-4494 SR 1232 BRIDGE NO. 3 CURRITUCK ALBEMARLE CONSTRUCTION 2012 2012 $800 $800
TULLS CREEK. REPLACE BEFORE
HIGHWAY B-4494 B-4494 SR 1232 BRIDGE NO. 3 CURRITUCK ALBEMARLE 2011 $200 $200
DEEP CREEK. REPLACE
HIGHWAY B-4496 B-4496 US 264 BRIDGE NO. 3 DARE ALBEMARLE RIGHT-OF-WAY 2019 2019 $200 $200
DEEP CREEK. REPLACE
HIGHWAY B-4496 B-4496 US 264 BRIDGE NO. 3 DARE ALBEMARLE CONSTRUCTION 2020 2020 $2,050 $2,050
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
DEEP CREEK. REPLACE BEFORE
HIGHWAY B-4496 B-4496 US 264 BRIDGE NO. 3 DARE ALBEMARLE 2011 $75 $75
US 29-70/I-85 BUSINESS.
REHABILITATE BRIDGE PIEDMONT
HIGHWAY B-4497 B-4497 US 64 NO. 39 DAVIDSON TRIAD RIGHT-OF-WAY 2012 2012 $100 $100
US 29-70/I-85 BUSINESS.
REHABILITATE BRIDGE PIEDMONT
HIGHWAY B-4497 B-4497 US 64 NO. 39 DAVIDSON TRIAD CONSTRUCTION 2013 2013 $3,700 $3,700
US 29-70/I-85 BUSINESS.
REHABILITATE BRIDGE PIEDMONT BEFORE
HIGHWAY B-4497 B-4497 US 64 NO. 39 DAVIDSON TRIAD 2011 $200 $200
ABBOTTS CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4498 B-4498 SR 1243 199 DAVIDSON TRIAD RIGHT-OF-WAY 2011 2011 $150 $150
ABBOTTS CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4498 B-4498 SR 1243 199 DAVIDSON TRIAD CONSTRUCTION 2012 2012 $2,300 $2,300
ABBOTTS CREEK.
REPLACE BRIDGE NO. PIEDMONT BEFORE
HIGHWAY B-4498 B-4498 SR 1243 199 DAVIDSON TRIAD 2011 $300 $300
US 29/70/I-85. REPLACE
HIGHWAY B-4499 B-4499 SR 1792 BRIDGE NO. 158 DAVIDSON HIGH POINT CONSTRUCTION 2011 2011 $1,700 $1,700
US 29/70/I-85. REPLACE BEFORE
HIGHWAY B-4499 B-4499 SR 1792 BRIDGE NO. 158 DAVIDSON HIGH POINT 2011 $720 $720
WATERS STREET OVER
TRIBUTARY OF PUNGO
BELHAV RIVER. REPLACE
HIGHWAY B-4500 B-4500 EN BRIDGE NO. 324 BEAUFORT MID-EAST CONSTRUCTION 2011 2011 $500 $500
WATERS STREET OVER
TRIBUTARY OF PUNGO
BELHAV RIVER. REPLACE BEFORE
HIGHWAY B-4500 B-4500 EN BRIDGE NO. 324 BEAUFORT MID-EAST 2011 $274 $274
BRANCH OF NE CAPE
FEAR RIVER. REPLACE EASTERN
HIGHWAY B-4501 B-4501 SR 1004 BRIDGE NO. 325 DUPLIN CAROLINA MITIGATION 2019 2019 $1 $1
BRANCH OF NE CAPE
FEAR RIVER. REPLACE EASTERN
HIGHWAY B-4501 B-4501 SR 1004 BRIDGE NO. 325 DUPLIN CAROLINA RIGHT-OF-WAY 2019 2019 $100 $100
BRANCH OF NE CAPE
FEAR RIVER. REPLACE EASTERN
HIGHWAY B-4501 B-4501 SR 1004 BRIDGE NO. 325 DUPLIN CAROLINA CONSTRUCTION 2020 2020 $920 $920
BRANCH OF NE CAPE
FEAR RIVER. REPLACE EASTERN BEFORE
HIGHWAY B-4501 B-4501 SR 1004 BRIDGE NO. 325 DUPLIN CAROLINA 2011 $8 $8
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
PANTHER CREEK.
REPLACE BRIDGE NO. EASTERN
HIGHWAY B-4502 B-4502 SR 1704 144 DUPLIN CAROLINA RIGHT-OF-WAY 2019 2019 $75 $75
PANTHER CREEK.
REPLACE BRIDGE NO. EASTERN
HIGHWAY B-4502 B-4502 SR 1704 144 DUPLIN CAROLINA CONSTRUCTION 2020 2020 $775 $775
PANTHER CREEK.
REPLACE BRIDGE NO. EASTERN BEFORE
HIGHWAY B-4502 B-4502 SR 1704 144 DUPLIN CAROLINA 2011 $6 $6
TAR RIVER. REPLACE
HIGHWAY B-4503 B-4503 SR 1250 BRIDGE NO. 7 EDGECOMBE ROCKY MOUNT MITIGATION 2011 2011 $24 $24
TAR RIVER. REPLACE
HIGHWAY B-4503 B-4503 SR 1250 BRIDGE NO. 7 EDGECOMBE ROCKY MOUNT RIGHT-OF-WAY 2011 2011 $100 $100
TAR RIVER. REPLACE
HIGHWAY B-4503 B-4503 SR 1250 BRIDGE NO. 7 EDGECOMBE ROCKY MOUNT UTILITIES 2011 2011 $115 $115
TAR RIVER. REPLACE
HIGHWAY B-4503 B-4503 SR 1250 BRIDGE NO. 7 EDGECOMBE ROCKY MOUNT CONSTRUCTION 2012 2012 $2,300 $2,300
TAR RIVER. REPLACE BEFORE
HIGHWAY B-4503 B-4503 SR 1250 BRIDGE NO. 7 EDGECOMBE ROCKY MOUNT 2011 $300 $300
SR 1620. REHABILITATE
BRIDGE NO. 319 AND WINSTON-
HIGHWAY B-4506 B-4506 US 52 BRIDGE NO. 335 FORSYTH SALEM RIGHT-OF-WAY 2011 2011 $100 $100
SR 1620. REHABILITATE
BRIDGE NO. 319 AND WINSTON-
HIGHWAY B-4506 B-4506 US 52 BRIDGE NO. 335 FORSYTH SALEM UTILITIES 2011 2011 $23 $23
SR 1620. REHABILITATE
BRIDGE NO. 319 AND WINSTON-
HIGHWAY B-4506 B-4506 US 52 BRIDGE NO. 335 FORSYTH SALEM CONSTRUCTION 2012 2012 $5,700 $5,700
SR 1620. REHABILITATE
BRIDGE NO. 319 AND WINSTON- BEFORE
HIGHWAY B-4506 B-4506 US 52 BRIDGE NO. 335 FORSYTH SALEM 2011 $200 $200
MUDDY CREEK.
REPLACE BRIDGE NO.
221 AND BRIDGE NO. WINSTON-
HIGHWAY B-4507 B-4507 US 421 222. FORSYTH SALEM CONSTRUCTION 2011 2011 $4,653 $4,653
MUDDY CREEK.
REPLACE BRIDGE NO.
221 AND BRIDGE NO. WINSTON- BEFORE
HIGHWAY B-4507 B-4507 US 421 222. FORSYTH SALEM 2011 $4,114 $4,114
SR 2377
OLD
GREENS SALEM CREEK.
BORO REPLACE BRIDGE NO. WINSTON-
HIGHWAY B-4509 B-4509 ROAD 210 FORSYTH SALEM RIGHT-OF-WAY 2019 2019 $80 $80
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE COHARIE CREEK.
REPLACE
BRIDGE NO. 326 AND
BRIDGE NO. 327. LITTLE
COHARIE CREEK
OVERFLOW. REPLACE BEFORE
HIGHWAY B-4637 B-4637 SR 1409 BRIDGE NO. 325 SAMPSON MID-CAROLINA 2011 $11 $11
MERKLE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4638 B-4638 SR 1703 195 SAMPSON MID-CAROLINA MITIGATION 2019 2019 $1 $1
MERKLE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4638 B-4638 SR 1703 195 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2019 2019 $80 $80
MERKLE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4638 B-4638 SR 1703 195 SAMPSON MID-CAROLINA CONSTRUCTION 2020 2020 $775 $775
MERKLE SWAMP.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4638 B-4638 SR 1703 195 SAMPSON MID-CAROLINA 2011 $10 $10
US 15- GUM SWAMP. REPLACE
HIGHWAY B-4639 B-4639 401 BRIDGE NO. 17 SCOTLAND LUMBER RIVER MITIGATION 2016 2016 $19 $19
US 15- GUM SWAMP. REPLACE
HIGHWAY B-4639 B-4639 401 BRIDGE NO. 17 SCOTLAND LUMBER RIVER RIGHT-OF-WAY 2016 2016 $400 $400
US 15- GUM SWAMP. REPLACE
HIGHWAY B-4639 B-4639 401 BRIDGE NO. 17 SCOTLAND LUMBER RIVER CONSTRUCTION 2017 2018 $4,200 $2,100 $2,100
US 15- GUM SWAMP. REPLACE BEFORE
HIGHWAY B-4639 B-4639 401 BRIDGE NO. 17 SCOTLAND LUMBER RIVER 2011 $100 $100
US 15- US 74 BUSINESS-NC 79.
HIGHWAY B-4640 B-4640 401-501 REPLACE BRIDGE NO. 39 SCOTLAND LUMBER RIVER CONSTRUCTION 2012 2012 $1,750 $1,750
US 15- US 74 BUSINESS-NC 79. BEFORE
HIGHWAY B-4640 B-4640 401-501 REPLACE BRIDGE NO. 39 SCOTLAND LUMBER RIVER 2011 $100 $100
US 74
BUSINES BIG SHOE HEEL CREEK. BEFORE
HIGHWAY B-4641 B-4641 S REPLACE BRIDGE NO. 75 SCOTLAND LUMBER RIVER 2011 $2,044 $2,044
JUNIPER CREEK. BEFORE
HIGHWAY B-4642 B-4642 SR 1433 REPLACE BRIDGE NO. 28 SCOTLAND LUMBER RIVER 2011 $1,183 $1,183
CURL TAIL CREEK.
HIGHWAY B-4643 B-4643 NC 49 REPLACE BRIDGE NO. 24 STANLY ROCKY RIVER MITIGATION 2012 2012 $45 $45
CURL TAIL CREEK.
HIGHWAY B-4643 B-4643 NC 49 REPLACE BRIDGE NO. 24 STANLY ROCKY RIVER RIGHT-OF-WAY 2012 2012 $275 $275
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CURL TAIL CREEK.
HIGHWAY B-4643 B-4643 NC 49 REPLACE BRIDGE NO. 24 STANLY ROCKY RIVER UTILITIES 2012 2012 $25 $25
CURL TAIL CREEK.
HIGHWAY B-4643 B-4643 NC 49 REPLACE BRIDGE NO. 24 STANLY ROCKY RIVER CONSTRUCTION 2013 2013 $2,750 $2,750
CURL TAIL CREEK. BEFORE
HIGHWAY B-4643 B-4643 NC 49 REPLACE BRIDGE NO. 24 STANLY ROCKY RIVER 2011 $70 $70
HARDY CREEK.
HIGHWAY B-4644 B-4644 SR 1934 REPLACE BRIDGE NO. 57 STANLY ROCKY RIVER CONSTRUCTION 2011 2011 $650 $650
HARDY CREEK. BEFORE
HIGHWAY B-4644 B-4644 SR 1934 REPLACE BRIDGE NO. 57 STANLY ROCKY RIVER 2011 $180 $180
LITTLE YADKIN RIVER. WINSTON-
REHABILITATE BRIDGE SALEM,NORTH
NO. 29 AND BRIDGE NO. WEST
HIGHWAY B-4645 B-4645 US 52 30 STOKES PIEDMONT CONSTRUCTION 2013 2013 $5,100 $5,100
LITTLE YADKIN RIVER. WINSTON-
REHABILITATE BRIDGE SALEM,NORTH
NO. 29 AND BRIDGE NO. WEST BEFORE
HIGHWAY B-4645 B-4645 US 52 30 STOKES PIEDMONT 2011 $350 $350
NORTHWEST FORK.
HIGHWAY B-4647 B-4647 NC 94 REPLACE BRIDGE NO. 6 TYRRELL ALBEMARLE MITIGATION 2011 2011 $70 $70
NORTHWEST FORK.
HIGHWAY B-4647 B-4647 NC 94 REPLACE BRIDGE NO. 6 TYRRELL ALBEMARLE RIGHT-OF-WAY 2011 2011 $21 $21
NORTHWEST FORK.
HIGHWAY B-4647 B-4647 NC 94 REPLACE BRIDGE NO. 6 TYRRELL ALBEMARLE UTILITIES 2011 2011 $50 $50
NORTHWEST FORK.
HIGHWAY B-4647 B-4647 NC 94 REPLACE BRIDGE NO. 6 TYRRELL ALBEMARLE CONSTRUCTION 2012 2012 $2,800 $2,800
NORTHWEST FORK. BEFORE
HIGHWAY B-4647 B-4647 NC 94 REPLACE BRIDGE NO. 6 TYRRELL ALBEMARLE 2011 $350 $350
WEST FORK TWELVE
MILE CREEK. REPLACE BEFORE
HIGHWAY B-4650 B-4650 SR 1315 BRIDGE NO. 221 UNION CHARLOTTE 2011 $1,890 $1,890
SOUTH FORK CROOKED
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4651 B-4651 SR 1508 251 UNION CHARLOTTE CONSTRUCTION 2011 2011 $450 $450
SOUTH FORK CROOKED
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4651 B-4651 SR 1508 251 UNION CHARLOTTE 2011 $173 $173
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LANES CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4652 B-4652 SR 1937 118 UNION ROCKY RIVER RIGHT-OF-WAY 2012 2012 $100 $100
LANES CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4652 B-4652 SR 1937 118 UNION ROCKY RIVER CONSTRUCTION 2013 2013 $1,100 $1,100
LANES CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4652 B-4652 SR 1937 118 UNION ROCKY RIVER 2011 $150 $150
US 70. REPLACE
HIGHWAY B-4654 B-4654 NC 50 BRIDGE NO. 69 WAKE RALEIGH RIGHT-OF-WAY 2018 2018 $720 $720
US 70. REPLACE
HIGHWAY B-4654 B-4654 NC 50 BRIDGE NO. 69 WAKE RALEIGH CONSTRUCTION 2019 2019 $7,200 $7,200
US 70. REPLACE BEFORE
HIGHWAY B-4654 B-4654 NC 50 BRIDGE NO. 69 WAKE RALEIGH 2011 $300 $300
BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4655 B-4655 SR 1006 277 WAKE RALEIGH MITIGATION 2017 2017 $12 $12
BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4655 B-4655 SR 1006 277 WAKE RALEIGH RIGHT-OF-WAY 2017 2017 $90 $90
BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4655 B-4655 SR 1006 277 WAKE RALEIGH CONSTRUCTION 2018 2018 $900 $900
BLACK CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4655 B-4655 SR 1006 277 WAKE RALEIGH 2011 $70 $70
SR 1012 (WESTERN
BOULEVARD). REMOVE
BRIDGE NO. 492 AND
RECONSTRUCT
HIGHWAY B-4656 B-4656 SR 1011 INTERSECTIONS. WAKE RALEIGH RIGHT-OF-WAY 2011 2011 $60 $60
SR 1012 (WESTERN
BOULEVARD). REMOVE
BRIDGE NO. 492 AND
RECONSTRUCT
HIGHWAY B-4656 B-4656 SR 1011 INTERSECTIONS. WAKE RALEIGH CONSTRUCTION 2013 2013 $2,500 $2,500
SR 1012 (WESTERN
BOULEVARD). REMOVE
BRIDGE NO. 492 AND
RECONSTRUCT BEFORE
HIGHWAY B-4656 B-4656 SR 1011 INTERSECTIONS. WAKE RALEIGH 2011 $300 $300
NORFOLK AND
SOUTHERN RAILROAD.
REPLACE BRIDGE NO.
HIGHWAY B-4657 B-4657 SR 1101 340 WAKE RALEIGH MITIGATION 2011 2011 $6 $6
NORFOLK AND
SOUTHERN RAILROAD.
REPLACE BRIDGE NO.
HIGHWAY B-4657 B-4657 SR 1101 340 WAKE RALEIGH CONSTRUCTION 2012 2012 $3,350 $3,350
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORFOLK AND
SOUTHERN RAILROAD.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4657 B-4657 SR 1101 340 WAKE RALEIGH 2011 $700 $700
BASSAL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4659 B-4659 SR 1393 373 WAKE RALEIGH MITIGATION 2014 2014 $7 $7
BASSAL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4659 B-4659 SR 1393 373 WAKE RALEIGH RIGHT-OF-WAY 2014 2014 $100 $100
BASSAL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4659 B-4659 SR 1393 373 WAKE RALEIGH CONSTRUCTION 2015 2015 $1,200 $1,200
BASSAL CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4659 B-4659 SR 1393 373 WAKE RALEIGH 2011 $85 $85
NEUSE RIVER. REPLACE
HIGHWAY B-4660 B-4660 SR 2000 BRIDGE NO. 19 WAKE RALEIGH CONSTRUCTION 2011 2011 $5,200 $5,200
NEUSE RIVER. REPLACE BEFORE
HIGHWAY B-4660 B-4660 SR 2000 BRIDGE NO. 19 WAKE RALEIGH 2011 $800 $800
POWELL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4661 B-4661 SR 2227 151 WAKE RALEIGH MITIGATION 2011 2011 $1 $1
POWELL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4661 B-4661 SR 2227 151 WAKE RALEIGH RIGHT-OF-WAY 2011 2011 $50 $50
POWELL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4661 B-4661 SR 2227 151 WAKE RALEIGH UTILITIES 2011 2011 $35 $35
POWELL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4661 B-4661 SR 2227 151 WAKE RALEIGH CONSTRUCTION 2012 2012 $1,450 $1,450
POWELL CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4661 B-4661 SR 2227 151 WAKE RALEIGH 2011 $150 $150
MOCCASIN CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4662 B-4662 SR 2308 196 WAKE RALEIGH MITIGATION 2017 2017 $9 $9
MOCCASIN CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4662 B-4662 SR 2308 196 WAKE RALEIGH RIGHT-OF-WAY 2017 2017 $60 $60
MOCCASIN CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4662 B-4662 SR 2308 196 WAKE RALEIGH CONSTRUCTION 2018 2018 $600 $600
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MOCCASIN CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4662 B-4662 SR 2308 196 WAKE RALEIGH 2011 $60 $60
MARKS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4663 B-4663 SR 2507 225 WAKE RALEIGH MITIGATION 2012 2012 $35 $35
MARKS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4663 B-4663 SR 2507 225 WAKE RALEIGH RIGHT-OF-WAY 2012 2012 $50 $50
MARKS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4663 B-4663 SR 2507 225 WAKE RALEIGH CONSTRUCTION 2013 2013 $725 $725
MARKS CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4663 B-4663 SR 2507 225 WAKE RALEIGH 2011 $60 $60
HAWTREE CREEK.
HIGHWAY B-4666 B-4666 SR 1314 REPLACE BRIDGE NO. 80 WARREN KERR TAR MITIGATION 2018 2018 $15 $15
HAWTREE CREEK.
HIGHWAY B-4666 B-4666 SR 1314 REPLACE BRIDGE NO. 80 WARREN KERR TAR RIGHT-OF-WAY 2018 2018 $60 $60
HAWTREE CREEK.
HIGHWAY B-4666 B-4666 SR 1314 REPLACE BRIDGE NO. 80 WARREN KERR TAR UTILITIES 2018 2018 $6 $6
HAWTREE CREEK.
HIGHWAY B-4666 B-4666 SR 1314 REPLACE BRIDGE NO. 80 WARREN KERR TAR CONSTRUCTION 2019 2019 $575 $575
HAWTREE CREEK. BEFORE
HIGHWAY B-4666 B-4666 SR 1314 REPLACE BRIDGE NO. 80 WARREN KERR TAR 2011 $70 $70
LONG BRANCH.
HIGHWAY B-4667 B-4667 SR 1641 REPLACE BRIDGE NO. 74 WARREN KERR TAR MITIGATION 2015 2015 $6 $6
LONG BRANCH.
HIGHWAY B-4667 B-4667 SR 1641 REPLACE BRIDGE NO. 74 WARREN KERR TAR RIGHT-OF-WAY 2015 2015 $50 $50
LONG BRANCH.
HIGHWAY B-4667 B-4667 SR 1641 REPLACE BRIDGE NO. 74 WARREN KERR TAR CONSTRUCTION 2016 2016 $500 $500
LONG BRANCH. BEFORE
HIGHWAY B-4667 B-4667 SR 1641 REPLACE BRIDGE NO. 74 WARREN KERR TAR 2011 $45 $45
COVE CREEK. REPLACE
HIGHWAY B-4668 B-4668 US 321 BRIDGE NO. 29 WATAUGA HIGH COUNTRY RIGHT-OF-WAY 2011 2011 $80 $80
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
COVE CREEK. REPLACE
HIGHWAY B-4668 B-4668 US 321 BRIDGE NO. 29 WATAUGA HIGH COUNTRY UTILITIES 2011 2011 $117 $117
COVE CREEK. REPLACE
HIGHWAY B-4668 B-4668 US 321 BRIDGE NO. 29 WATAUGA HIGH COUNTRY CONSTRUCTION 2012 2012 $2,450 $2,450
COVE CREEK. REPLACE BEFORE
HIGHWAY B-4668 B-4668 US 321 BRIDGE NO. 29 WATAUGA HIGH COUNTRY 2011 $90 $90
CREEK. REPLACE
HIGHWAY B-4670 B-4670 SR 1130 BRIDGE NO. 200 WATAUGA HIGH COUNTRY RIGHT-OF-WAY 2019 2019 $35 $35
CREEK. REPLACE
HIGHWAY B-4670 B-4670 SR 1130 BRIDGE NO. 200 WATAUGA HIGH COUNTRY CONSTRUCTION 2020 2020 $350 $350
CREEK. REPLACE BEFORE
HIGHWAY B-4670 B-4670 SR 1130 BRIDGE NO. 200 WATAUGA HIGH COUNTRY 2011 $30 $30
NAHUNTA SWAMP. EASTERN BEFORE
HIGHWAY B-4672 B-4672 SR 1537 REPLACE BRIDGE NO. 37 WAYNE CAROLINA 2011 $1,160 $1,160
WALNUT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4673 B-4673 SR 1728 120 WAYNE GOLDSBORO MITIGATION 2011 2011 $23 $23
WALNUT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4673 B-4673 SR 1728 120 WAYNE GOLDSBORO RIGHT-OF-WAY 2011 2011 $60 $60
WALNUT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4673 B-4673 SR 1728 120 WAYNE GOLDSBORO UTILITIES 2011 2011 $33 $33
WALNUT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4673 B-4673 SR 1728 120 WAYNE GOLDSBORO CONSTRUCTION 2012 2012 $800 $800
WALNUT CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4673 B-4673 SR 1728 120 WAYNE GOLDSBORO 2011 $150 $150
HENDRIX STREET OVER
ALLENS CREEK.
WAYNES REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4674 B-4674 VILLE 267 HAYWOOD ASHEVILLE 2011 $994 $994
CUB CREEK. REPLACE
HIGHWAY B-4676 B-4676 SR 1001 BRIDGE NO. 29 WILKES HIGH COUNTRY RIGHT-OF-WAY 2013 2013 $130 $130
CUB CREEK. REPLACE
HIGHWAY B-4676 B-4676 SR 1001 BRIDGE NO. 29 WILKES HIGH COUNTRY UTILITIES 2013 2013 $40 $40
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CUB CREEK. REPLACE
HIGHWAY B-4676 B-4676 SR 1001 BRIDGE NO. 29 WILKES HIGH COUNTRY CONSTRUCTION 2014 2014 $1,325 $1,325
CUB CREEK. REPLACE BEFORE
HIGHWAY B-4676 B-4676 SR 1001 BRIDGE NO. 29 WILKES HIGH COUNTRY 2011 $200 $200
CREEK. REPLACE BEFORE
HIGHWAY B-4677 B-4677 SR 1317 BRIDGE NO. 99 WILKES HIGH COUNTRY 2011 $648 $648
SWAMP. REPLACE UPPER
HIGHWAY B-4679 B-4679 SR 1163 BRIDGE NO. 66 WILSON COASTAL PLAIN MITIGATION 2014 2014 $4 $4
SWAMP. REPLACE UPPER
HIGHWAY B-4679 B-4679 SR 1163 BRIDGE NO. 66 WILSON COASTAL PLAIN RIGHT-OF-WAY 2014 2014 $80 $80
SWAMP. REPLACE UPPER
HIGHWAY B-4679 B-4679 SR 1163 BRIDGE NO. 66 WILSON COASTAL PLAIN CONSTRUCTION 2015 2015 $785 $785
SWAMP. REPLACE UPPER BEFORE
HIGHWAY B-4679 B-4679 SR 1163 BRIDGE NO. 66 WILSON COASTAL PLAIN 2011 $100 $100
WHITEOAK SWAMP.
REPLACE BRIDGE NO. UPPER BEFORE
HIGHWAY B-4680 B-4680 SR 1507 122 WILSON COASTAL PLAIN 2011 $1,120 $1,120
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4681 B-4681 SR 1531 119 WILSON COASTAL PLAIN RIGHT-OF-WAY 2015 2015 $50 $50
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO. UPPER
HIGHWAY B-4681 B-4681 SR 1531 119 WILSON COASTAL PLAIN CONSTRUCTION 2016 2016 $500 $500
LITTLE CONTENTNEA
CREEK.
REPLACE BRIDGE NO. UPPER BEFORE
HIGHWAY B-4681 B-4681 SR 1531 119 WILSON COASTAL PLAIN 2011 $45 $45
CONTENTNEA CREEK. UPPER BEFORE
HIGHWAY B-4682 B-4682 SR 1628 REPLACE BRIDGE NO. 2 WILSON COASTAL PLAIN 2011 $1,219 $1,219
SOUTH DEEP CREEK. NORTHWEST
HIGHWAY B-4686 B-4686 SR 1710 REPLACE BRIDGE NO. 10 YADKIN PIEDMONT RIGHT-OF-WAY 2018 2018 $220 $220
SOUTH DEEP CREEK. NORTHWEST
HIGHWAY B-4686 B-4686 SR 1710 REPLACE BRIDGE NO. 10 YADKIN PIEDMONT CONSTRUCTION 2019 2019 $2,200 $2,200
SOUTH DEEP CREEK. NORTHWEST BEFORE
HIGHWAY B-4686 B-4686 SR 1710 REPLACE BRIDGE NO. 10 YADKIN PIEDMONT 2011 $140 $140
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4687 B-4687 SR 1411 105 YANCEY HIGH COUNTRY MITIGATION 2013 2013 $21 $21
LITTLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4687 B-4687 SR 1411 105 YANCEY HIGH COUNTRY RIGHT-OF-WAY 2013 2013 $30 $30
LITTLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4687 B-4687 SR 1411 105 YANCEY HIGH COUNTRY CONSTRUCTION 2014 2014 $650 $650
LITTLE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4687 B-4687 SR 1411 105 YANCEY HIGH COUNTRY 2011 $45 $45
LAWRENCE RUN.
REPLACE BRIDGE NO.
HIGHWAY B-4688 B-4688 SR 1255 157 PITT MID-EAST RIGHT-OF-WAY 2019 2019 $50 $50
LAWRENCE RUN.
REPLACE BRIDGE NO.
HIGHWAY B-4688 B-4688 SR 1255 157 PITT MID-EAST CONSTRUCTION 2020 2020 $525 $525
PISGAH NATIONAL
FOREST, PFH-150(1),
SR 1324 TUCKER CREEK. BEFORE
HIGHWAY B-4690 B-4690 FH 150 REPLACE BRIDGE NO. 55 TRANSYLVANIA LAND OF SKY 2011 $525 $525
PISGAH NATIONAL
FOREST, PFH-150(2),
SR 1324 TUCKER CREEK. BEFORE
HIGHWAY B-4691 B-4691 FH 150 REPLACE BRIDGE NO. 59 TRANSYLVANIA LAND OF SKY 2011 $713 $713
PISGAH NATIONAL
FOREST,
PFH-12(1) WESTLEYS
CREEK.
SR 1334 REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-4692 B-4692 FH 12 283 HAYWOOD N CONSTRUCTION 2011 2011 $250 $250
PISGAH NATIONAL
FOREST,
PFH-12(1) WESTLEYS
CREEK.
SR 1334 REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-4692 B-4692 FH 12 283 HAYWOOD N 2011 $210 $210
CHATUGE LAKE. SOUTHWESTER
HIGHWAY B-4733 B-4733 NC 175 REPLACE BRIDGE NO. 11 CLAY N CONSTRUCTION 2013 2013 $1,600 $1,600
CHATUGE LAKE. SOUTHWESTER BEFORE
HIGHWAY B-4733 B-4733 NC 175 REPLACE BRIDGE NO. 11 CLAY N 2011 $400 $400
TUSQUITEE CREEK. SOUTHWESTER
HIGHWAY B-4734 B-4734 SR 1300 REPLACE BRIDGE NO. 9 CLAY N RIGHT-OF-WAY 2014 2014 $120 $120
TUSQUITEE CREEK. SOUTHWESTER
HIGHWAY B-4734 B-4734 SR 1300 REPLACE BRIDGE NO. 9 CLAY N CONSTRUCTION 2015 2015 $1,200 $1,200
TUSQUITEE CREEK. SOUTHWESTER BEFORE
HIGHWAY B-4734 B-4734 SR 1300 REPLACE BRIDGE NO. 9 CLAY N 2011 $60 $60
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SLADES SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4736 B-4736 SR 1001 233 COLUMBUS MID-CAROLINA MITIGATION 2012 2012 $1 $1
SLADES SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4736 B-4736 SR 1001 233 COLUMBUS MID-CAROLINA RIGHT-OF-WAY 2012 2012 $50 $50
SLADES SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4736 B-4736 SR 1001 233 COLUMBUS MID-CAROLINA UTILITIES 2012 2012 $26 $26
SLADES SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-4736 B-4736 SR 1001 233 COLUMBUS MID-CAROLINA CONSTRUCTION 2013 2013 $775 $775
SLADES SWAMP.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4736 B-4736 SR 1001 233 COLUMBUS MID-CAROLINA 2011 $60 $60
DYKERS CREEK. PIEDMONT
HIGHWAY B-4740 B-4740 SR 1194 REPLACE BRIDGE NO. 7 DAVIDSON TRIAD RIGHT-OF-WAY 2015 2015 $100 $100
DYKERS CREEK. PIEDMONT
HIGHWAY B-4740 B-4740 SR 1194 REPLACE BRIDGE NO. 7 DAVIDSON TRIAD CONSTRUCTION 2016 2016 $1,050 $1,050
DYKERS CREEK. PIEDMONT BEFORE
HIGHWAY B-4740 B-4740 SR 1194 REPLACE BRIDGE NO. 7 DAVIDSON TRIAD 2011 $60 $60
MUDDY CREEK. WINSTON-
HIGHWAY B-4741 B-4741 SR 1493 REPLACE BRIDGE NO. 38 DAVIDSON SALEM RIGHT-OF-WAY 2014 2014 $400 $400
MUDDY CREEK. WINSTON-
HIGHWAY B-4741 B-4741 SR 1493 REPLACE BRIDGE NO. 38 DAVIDSON SALEM CONSTRUCTION 2015 2015 $4,000 $4,000
MUDDY CREEK. WINSTON- BEFORE
HIGHWAY B-4741 B-4741 SR 1493 REPLACE BRIDGE NO. 38 DAVIDSON SALEM 2011 $400 $400
TRIBUTARY OF TOWN
CREEK. UPPER
HIGHWAY B-4743 B-4743 SR 1003 REPLACE BRIDGE NO. 63 EDGECOMBE COASTAL PLAIN RIGHT-OF-WAY 2018 2018 $80 $80
TRIBUTARY OF TOWN
CREEK. UPPER
HIGHWAY B-4743 B-4743 SR 1003 REPLACE BRIDGE NO. 63 EDGECOMBE COASTAL PLAIN CONSTRUCTION 2019 2019 $785 $785
BRANCH SOUTH MUDDY
CREEK. BEFORE
HIGHWAY B-4778 B-4778 SR 1769 REPLACE BRIDGE NO. 8 MCDOWELL ISOTHERMAL 2011 $1 $1
US 29
SOUTHB MALLARD CREEK.
OUND REPLACE BRIDGE NO.
HIGHWAY B-4779 B-4779 LANE 147 MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2013 2013 $60 $60
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 29
SOUTHB MALLARD CREEK.
OUND REPLACE BRIDGE NO.
HIGHWAY B-4779 B-4779 LANE 147 MECKLENBURG CHARLOTTE CONSTRUCTION 2014 2014 $2,450 $2,450
US 29
SOUTHB MALLARD CREEK.
OUND REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4779 B-4779 LANE 147 MECKLENBURG CHARLOTTE 2011 $400 $400
RICHLAND CREEK. PIEDMONT
HIGHWAY B-4780 B-4780 SR 1111 REPLACE BRIDGE NO. 22 MONTGOMERY TRIAD RIGHT-OF-WAY 2014 2014 $40 $40
RICHLAND CREEK. PIEDMONT
HIGHWAY B-4780 B-4780 SR 1111 REPLACE BRIDGE NO. 22 MONTGOMERY TRIAD CONSTRUCTION 2015 2015 $430 $430
BRANCH OF NEW RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4781 B-4781 SR 1557 226 ONSLOW DOWN EAST RIGHT-OF-WAY 2016 2016 $80 $80
BRANCH OF NEW RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4781 B-4781 SR 1557 226 ONSLOW DOWN EAST CONSTRUCTION 2017 2017 $785 $785
ISLAND CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4818 B-4818 SR 1109 138 STANLY ROCKY RIVER RIGHT-OF-WAY 2014 2014 $90 $90
ISLAND CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4818 B-4818 SR 1109 138 STANLY ROCKY RIVER CONSTRUCTION 2016 2016 $900 $900
ISLAND CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4818 B-4818 SR 1109 138 STANLY ROCKY RIVER 2011 $60 $60
SNOW CREEK.
REPLACE BRIDGE NO. NORTHWEST
HIGHWAY B-4819 B-4819 SR 1697 105 STOKES PIEDMONT RIGHT-OF-WAY 2019 2019 $170 $170
SNOW CREEK.
REPLACE BRIDGE NO. NORTHWEST
HIGHWAY B-4819 B-4819 SR 1697 105 STOKES PIEDMONT CONSTRUCTION 2020 2020 $1,700 $1,700
YADKIN RIVER,
RAILROAD.
REMOVE BRIDGE NO. NORTHWEST BEFORE
HIGHWAY B-4820 B-4820 SR 1190 338 SURRY PIEDMONT 2011 $3,460 $3,460
PAUL'S CREEK. NORTHWEST
HIGHWAY B-4821 B-4821 SR 1621 REPLACE BRIDGE NO. 88 SURRY PIEDMONT RIGHT-OF-WAY 2016 2016 $200 $200
PAUL'S CREEK. NORTHWEST
HIGHWAY B-4821 B-4821 SR 1621 REPLACE BRIDGE NO. 88 SURRY PIEDMONT CONSTRUCTION 2017 2017 $2,000 $2,000
PAUL'S CREEK. NORTHWEST BEFORE
HIGHWAY B-4821 B-4821 SR 1621 REPLACE BRIDGE NO. 88 SURRY PIEDMONT 2011 $120 $120
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
TUCKER CREEK.
HIGHWAY B-4822 B-4822 SR 1119 REPLACE BRIDGE NO. 13 TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2015 2015 $45 $45
TUCKER CREEK.
HIGHWAY B-4822 B-4822 SR 1119 REPLACE BRIDGE NO. 13 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2016 2016 $450 $450
TUCKER CREEK. BEFORE
HIGHWAY B-4822 B-4822 SR 1119 REPLACE BRIDGE NO. 13 TRANSYLVANIA LAND OF SKY 2011 $60 $60
EAST BRANCH FRENCH
BROAD RIVER.
HIGHWAY B-4823 B-4823 SR 1538 REPLACE BRIDGE NO. 12 TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2017 2017 $40 $40
EAST BRANCH FRENCH
BROAD RIVER.
HIGHWAY B-4823 B-4823 SR 1538 REPLACE BRIDGE NO. 12 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2018 2018 $400 $400
NORKETT BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-4824 B-4824 SR 1003 453 UNION ROCKY RIVER MITIGATION 2012 2012 $21 $21
NORKETT BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-4824 B-4824 SR 1003 453 UNION ROCKY RIVER RIGHT-OF-WAY 2012 2012 $50 $50
NORKETT BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-4824 B-4824 SR 1003 453 UNION ROCKY RIVER UTILITIES 2012 2012 $20 $20
NORKETT BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-4824 B-4824 SR 1003 453 UNION ROCKY RIVER CONSTRUCTION 2013 2013 $500 $500
NORKETT BRANCH.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4824 B-4824 SR 1003 453 UNION ROCKY RIVER 2011 $60 $60
SANDY CREEK. REPLACE
HIGHWAY B-4827 B-4827 SR 1523 BRIDGE NO. 53 VANCE KERR TAR RIGHT-OF-WAY 2015 2015 $80 $80
SANDY CREEK. REPLACE
HIGHWAY B-4827 B-4827 SR 1523 BRIDGE NO. 53 VANCE KERR TAR CONSTRUCTION 2016 2016 $775 $775
SANDY CREEK.
HIGHWAY B-4828 B-4828 SR 1526 REPLACE BRIDGE NO. 56 VANCE KERR TAR RIGHT-OF-WAY 2017 2017 $110 $110
SANDY CREEK.
HIGHWAY B-4828 B-4828 SR 1526 REPLACE BRIDGE NO. 56 VANCE KERR TAR CONSTRUCTION 2018 2018 $1,200 $1,200
SANDY CREEK. BEFORE
HIGHWAY B-4828 B-4828 SR 1526 REPLACE BRIDGE NO. 56 VANCE KERR TAR 2011 $80 $80
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MOCASSIN CREEK.
HIGHWAY B-4830 B-4830 NC 97 REPLACE BRIDGE NO. 20 WAKE RALEIGH MITIGATION 2017 2017 $11 $11
MOCASSIN CREEK.
HIGHWAY B-4830 B-4830 NC 97 REPLACE BRIDGE NO. 20 WAKE RALEIGH RIGHT-OF-WAY 2017 2017 $155 $155
MOCASSIN CREEK.
HIGHWAY B-4830 B-4830 NC 97 REPLACE BRIDGE NO. 20 WAKE RALEIGH CONSTRUCTION 2018 2018 $1,550 $1,550
WHITE OAK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4831 B-4831 SR 1152 371 WAKE RALEIGH MITIGATION 2018 2018 $11 $11
WHITE OAK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4831 B-4831 SR 1152 371 WAKE RALEIGH RIGHT-OF-WAY 2018 2018 $90 $90
WHITE OAK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4831 B-4831 SR 1152 371 WAKE RALEIGH CONSTRUCTION 2019 2019 $900 $900
POPLAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4832 B-4832 SR 2511 230 WAKE RALEIGH MITIGATION 2012 2012 $10 $10
POPLAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4832 B-4832 SR 2511 230 WAKE RALEIGH RIGHT-OF-WAY 2012 2012 $80 $80
POPLAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4832 B-4832 SR 2511 230 WAKE RALEIGH CONSTRUCTION 2013 2013 $800 $800
POPLAR CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4832 B-4832 SR 2511 230 WAKE RALEIGH 2011 $120 $120
LITTLE BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4833 B-4833 SR 2761 376 WAKE RALEIGH MITIGATION 2018 2018 $3 $3
LITTLE BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4833 B-4833 SR 2761 376 WAKE RALEIGH RIGHT-OF-WAY 2018 2018 $80 $80
LITTLE BLACK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4833 B-4833 SR 2761 376 WAKE RALEIGH CONSTRUCTION 2019 2019 $785 $785
NEWMAN'S CREEK.
HIGHWAY B-4834 B-4834 SR 1218 REPLACE BRIDGE NO. 23 WARREN KERR TAR MITIGATION 2012 2012 $13 $13
NEWMAN'S CREEK.
HIGHWAY B-4834 B-4834 SR 1218 REPLACE BRIDGE NO. 23 WARREN KERR TAR RIGHT-OF-WAY 2012 2012 $50 $50
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NEWMAN'S CREEK.
HIGHWAY B-4834 B-4834 SR 1218 REPLACE BRIDGE NO. 23 WARREN KERR TAR CONSTRUCTION 2013 2013 $500 $500
NEWMAN'S CREEK. BEFORE
HIGHWAY B-4834 B-4834 SR 1218 REPLACE BRIDGE NO. 23 WARREN KERR TAR 2011 $80 $80
REEDY POND CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4835 B-4835 SR 1510 124 WARREN KERR TAR MITIGATION 2012 2012 $9 $9
REEDY POND CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4835 B-4835 SR 1510 124 WARREN KERR TAR RIGHT-OF-WAY 2012 2012 $40 $40
REEDY POND CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4835 B-4835 SR 1510 124 WARREN KERR TAR CONSTRUCTION 2013 2013 $400 $400
REEDY POND CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4835 B-4835 SR 1510 124 WARREN KERR TAR 2011 $60 $60
SOUTH FORK NEW
RIVER.
HIGHWAY B-4836 B-4836 SR 1331 REPLACE BRIDGE NO. 59 WATAUGA HIGH COUNTRY MITIGATION 2012 2012 $25 $25
SOUTH FORK NEW
RIVER.
HIGHWAY B-4836 B-4836 SR 1331 REPLACE BRIDGE NO. 59 WATAUGA HIGH COUNTRY RIGHT-OF-WAY 2012 2012 $200 $200
SOUTH FORK NEW
RIVER.
HIGHWAY B-4836 B-4836 SR 1331 REPLACE BRIDGE NO. 59 WATAUGA HIGH COUNTRY CONSTRUCTION 2013 2013 $1,000 $1,000
SOUTH FORK NEW
RIVER. BEFORE
HIGHWAY B-4836 B-4836 SR 1331 REPLACE BRIDGE NO. 59 WATAUGA HIGH COUNTRY 2011 $7 $7
US 70
BUSINES SCL RAILROAD.
HIGHWAY B-4838 B-4838 S REPLACE BRIDGE NO. 20 WAYNE GOLDSBORO RIGHT-OF-WAY 2019 2019 $540 $540
US 70
BUSINES SCL RAILROAD.
HIGHWAY B-4838 B-4838 S REPLACE BRIDGE NO. 20 WAYNE GOLDSBORO CONSTRUCTION 2020 2020 $5,400 $5,400
THOROUGHFARE
SWAMP. EASTERN
HIGHWAY B-4839 B-4839 SR 1006 REPLACE BRIDGE NO. 96 WAYNE CAROLINA RIGHT-OF-WAY 2018 2018 $105 $105
THOROUGHFARE
SWAMP. EASTERN
HIGHWAY B-4839 B-4839 SR 1006 REPLACE BRIDGE NO. 96 WAYNE CAROLINA CONSTRUCTION 2019 2019 $1,050 $1,050
BEAVERDAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4841 B-4841 SR 1227 215 WAYNE GOLDSBORO MITIGATION 2012 2012 $2 $2
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BEAVERDAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4841 B-4841 SR 1227 215 WAYNE GOLDSBORO RIGHT-OF-WAY 2012 2012 $60 $60
BEAVERDAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4841 B-4841 SR 1227 215 WAYNE GOLDSBORO UTILITIES 2012 2012 $20 $20
BEAVERDAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4841 B-4841 SR 1227 215 WAYNE GOLDSBORO CONSTRUCTION 2013 2013 $600 $600
BEAVERDAM CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4841 B-4841 SR 1227 215 WAYNE GOLDSBORO 2011 $60 $60
GREAT SWAMP. EASTERN
HIGHWAY B-4842 B-4842 SR 1353 REPLACE BRIDGE NO. 45 WAYNE CAROLINA MITIGATION 2019 2019 $1 $1
GREAT SWAMP. EASTERN
HIGHWAY B-4842 B-4842 SR 1353 REPLACE BRIDGE NO. 45 WAYNE CAROLINA RIGHT-OF-WAY 2019 2019 $130 $130
GREAT SWAMP. EASTERN
HIGHWAY B-4842 B-4842 SR 1353 REPLACE BRIDGE NO. 45 WAYNE CAROLINA CONSTRUCTION 2020 2020 $1,300 $1,300
LITTLE HUNTING CREEK.
HIGHWAY B-4846 B-4846 SR 2418 REPLACE BRIDGE NO. 5 WILKES HIGH COUNTRY RIGHT-OF-WAY 2016 2016 $85 $85
LITTLE HUNTING CREEK.
HIGHWAY B-4846 B-4846 SR 2418 REPLACE BRIDGE NO. 5 WILKES HIGH COUNTRY UTILITIES 2016 2016 $30 $30
LITTLE HUNTING CREEK.
HIGHWAY B-4846 B-4846 SR 2418 REPLACE BRIDGE NO. 5 WILKES HIGH COUNTRY CONSTRUCTION 2017 2017 $900 $900
LITTLE HUNTING CREEK. BEFORE
HIGHWAY B-4846 B-4846 SR 2418 REPLACE BRIDGE NO. 5 WILKES HIGH COUNTRY 2011 $80 $80
MORAVIAN CREEK.
HIGHWAY B-4847 B-4847 SR 2486 REPLACE BRIDGE NO. 42 WILKES HIGH COUNTRY MITIGATION 2012 2012 $26 $26
MORAVIAN CREEK.
HIGHWAY B-4847 B-4847 SR 2486 REPLACE BRIDGE NO. 42 WILKES HIGH COUNTRY RIGHT-OF-WAY 2012 2012 $65 $65
MORAVIAN CREEK.
HIGHWAY B-4847 B-4847 SR 2486 REPLACE BRIDGE NO. 42 WILKES HIGH COUNTRY CONSTRUCTION 2013 2013 $650 $650
MORAVIAN CREEK. BEFORE
HIGHWAY B-4847 B-4847 SR 2486 REPLACE BRIDGE NO. 42 WILKES HIGH COUNTRY 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
POSSUM TROT CREEK.
HIGHWAY B-4848 B-4848 SR 1128 REPLACE BRIDGE NO. 3 YANCEY HIGH COUNTRY RIGHT-OF-WAY 2017 2017 $40 $40
POSSUM TROT CREEK.
HIGHWAY B-4848 B-4848 SR 1128 REPLACE BRIDGE NO. 3 YANCEY HIGH COUNTRY CONSTRUCTION 2018 2018 $400 $400
POSSUM TROT CREEK. BEFORE
HIGHWAY B-4848 B-4848 SR 1128 REPLACE BRIDGE NO. 3 YANCEY HIGH COUNTRY 2011 $60 $60
CREEK. REPLACE
HIGHWAY B-4851 B-4851 SR 1308 BRIDGE NO. 31 YANCEY HIGH COUNTRY RIGHT-OF-WAY 2011 2011 $50 $50
CREEK. REPLACE
HIGHWAY B-4851 B-4851 SR 1308 BRIDGE NO. 31 YANCEY HIGH COUNTRY UTILITIES 2011 2011 $21 $21
CREEK. REPLACE
HIGHWAY B-4851 B-4851 SR 1308 BRIDGE NO. 31 YANCEY HIGH COUNTRY CONSTRUCTION 2012 2012 $1,400 $1,400
CREEK. REPLACE BEFORE
HIGHWAY B-4851 B-4851 SR 1308 BRIDGE NO. 31 YANCEY HIGH COUNTRY 2011 $60 $60
NANTAHALA NATIONAL
FOREST.
SR 1311 TUNI CREEK, REPLACE SOUTHWESTER
HIGHWAY B-4854 B-4854 FH 66 BRIDGE NO. 81. CLAY N CONSTRUCTION 2011 2011 $100 $100
NANTAHALA NATIONAL
FOREST.
SR 1311 TUNI CREEK, REPLACE SOUTHWESTER
HIGHWAY B-4854 B-4854 FH 66 BRIDGE NO. 81. CLAY N RIGHT-OF-WAY 2011 2011 $5 $5
NANTAHALA NATIONAL
FOREST.
SR 1311 TUNI CREEK, REPLACE SOUTHWESTER BEFORE
HIGHWAY B-4854 B-4854 FH 66 BRIDGE NO. 81. CLAY N 2011 $100 $100
US 29- RICH FORK CREEK.
70/I-85 REPLACE BRIDGE NO.
HIGHWAY B-4859 B-4859 BUS. 138 DAVIDSON HIGH POINT RIGHT-OF-WAY 2012 2012 $130 $130
US 29- RICH FORK CREEK.
70/I-85 REPLACE BRIDGE NO.
HIGHWAY B-4859 B-4859 BUS. 138 DAVIDSON HIGH POINT CONSTRUCTION 2013 2013 $2,250 $2,250
US 29- RICH FORK CREEK.
70/I-85 REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4859 B-4859 BUS. 138 DAVIDSON HIGH POINT 2011 $150 $150
WEST DAVIDSON
AVENUE. REPLACE
GASTONI BRIDGE NO. 421 OVER BEFORE
HIGHWAY B-4860 B-4860 A KAYLOR BRANCH GASTON GASTONIA 2011 $918 $918
RIDGE STREET.
REPLACE BRIDGE NO. 88
OVER WINSTON-SALEM
ANSONVI SOUTHBOUND
HIGHWAY B-4861 B-4861 LLE RAILROAD. ANSON ROCKY RIVER CONSTRUCTION 2011 2011 $600 $600
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
RIDGE STREET.
REPLACE BRIDGE NO. 88
OVER WINSTON-SALEM
ANSONVI SOUTHBOUND BEFORE
HIGHWAY B-4861 B-4861 LLE RAILROAD. ANSON ROCKY RIVER 2011 $244 $244
THE STRAITS AT
HARKERS ISLAND.
REPLACE LIFT SPAN ON
HIGHWAY B-4863 B-4863 SR 1335 BRIDGE NO. 73 CARTERET DOWN EAST RIGHT-OF-WAY 2017 2017 $3,825 $3,825
THE STRAITS AT
HARKERS ISLAND.
REPLACE LIFT SPAN ON BEFORE
HIGHWAY B-4863 B-4863 SR 1335 BRIDGE NO. 73 CARTERET DOWN EAST 2011 $100 $100
THE STRAITS AT
HARKERS ISLAND.
REPLACE LIFT SPAN ON AFTER
HIGHWAY B-4863 B-4863 SR 1335 BRIDGE NO. 73 CARTERET DOWN EAST CONSTRUCTION 2019 2020 $38,250 $12,750 $12,750 12,750.00
TROUBLESOME CREEK. PIEDMONT
HIGHWAY B-4864 B-4864 SR 2344 REPLACE BRIDGE NO. 13 ROCKINGHAM TRIAD MITIGATION 2012 2012 $5 $5
JACOB'S CREEK. PIEDMONT
HIGHWAY B-4963 B-4963 SR 2361 REPLACE BRIDGE NO. 32 ROCKINGHAM TRIAD CONSTRUCTION 2013 2013 $650 $650
JACOB'S CREEK. PIEDMONT BEFORE
HIGHWAY B-4963 B-4963 SR 2361 REPLACE BRIDGE NO. 32 ROCKINGHAM TRIAD 2011 $75 $75
SOUTHERN RAILROAD. PIEDMONT
HIGHWAY B-4964 B-4964 SR 2600 REPLACE BRIDGE NO. 85 ROCKINGHAM TRIAD RIGHT-OF-WAY 2017 2017 $95 $95
SOUTHERN RAILROAD. PIEDMONT
HIGHWAY B-4964 B-4964 SR 2600 REPLACE BRIDGE NO. 85 ROCKINGHAM TRIAD CONSTRUCTION 2019 2019 $925 $925
CREEK. REPLACE PIEDMONT
HIGHWAY B-4965 B-4965 SR 1165 BRIDGE NO. 249 ROCKINGHAM TRIAD RIGHT-OF-WAY 2014 2014 $85 $85
CREEK. REPLACE PIEDMONT
HIGHWAY B-4965 B-4965 SR 1165 BRIDGE NO. 249 ROCKINGHAM TRIAD CONSTRUCTION 2015 2015 $850 $850
LUMBER RIVER.
HIGHWAY B-4967 B-4967 SR 1203 REPLACE BRIDGE NO. 8 HOKE LUMBER RIVER MITIGATION 2015 2015 $29 $29
LUMBER RIVER.
HIGHWAY B-4967 B-4967 SR 1203 REPLACE BRIDGE NO. 8 HOKE LUMBER RIVER RIGHT-OF-WAY 2015 2015 $300 $300
LUMBER RIVER.
HIGHWAY B-4967 B-4967 SR 1203 REPLACE BRIDGE NO. 8 HOKE LUMBER RIVER CONSTRUCTION 2016 2016 $3,125 $3,125
US 15-
501- NC DEEP RIVER. REPLACE TRIANGLE
HIGHWAY B-4968 B-4968 87 BRIDGE NO. 10 LEE AREA RIGHT-OF-WAY 2019 2019 $1,100 $1,100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 15-
501- NC DEEP RIVER. REPLACE TRIANGLE AFTER
HIGHWAY B-4968 B-4968 87 BRIDGE NO. 10 LEE AREA CONSTRUCTION 2020 2020 $11,100 $5,550 5,550.00
SANDY CREEK BRANCH.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4969 B-4969 SR 2440 154 RANDOLPH TRIAD RIGHT-OF-WAY 2017 2017 $50 $50
SANDY CREEK BRANCH.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-4969 B-4969 SR 2440 154 RANDOLPH TRIAD CONSTRUCTION 2018 2018 $500 $500
ROCKY RIVER. REPLACE
HIGHWAY B-4972 B-4972 SR 1006 BRIDGE NO. 227 CABARRUS CONCORD RIGHT-OF-WAY 2014 2014 $110 $110
ROCKY RIVER. REPLACE
HIGHWAY B-4972 B-4972 SR 1006 BRIDGE NO. 227 CABARRUS CONCORD CONSTRUCTION 2015 2015 $1,100 $1,100
ROCKY RIVER. REPLACE BEFORE
HIGHWAY B-4972 B-4972 SR 1006 BRIDGE NO. 227 CABARRUS CONCORD 2011 $100 $100
IRISH BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4973 B-4973 SR 1157 271 CABARRUS CONCORD RIGHT-OF-WAY 2013 2013 $180 $180
IRISH BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4973 B-4973 SR 1157 271 CABARRUS CONCORD CONSTRUCTION 2014 2014 $1,800 $1,800
IRISH BUFFALO CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4973 B-4973 SR 1157 271 CABARRUS CONCORD 2011 $100 $100
PEE DEE RIVER.
REPLACE BRIDGE
NC 24-27- NO. 51 (COORDINATE
HIGHWAY B-4974 B-4974 73 WITH R-2530) STANLY ROCKY RIVER RIGHT-OF-WAY 2014 2014 $1,800 $1,800
PEE DEE RIVER.
REPLACE BRIDGE
NC 24-27- NO. 51 (COORDINATE
HIGHWAY B-4974 B-4974 73 WITH R-2530) STANLY ROCKY RIVER CONSTRUCTION 2016 2018 $18,200 $6,067 $6,067 $6,066
BEAVER DAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4975 B-4975 SR 1158 204 UNION CHARLOTTE MITIGATION 2012 2012 $34 $34
BEAVER DAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4975 B-4975 SR 1158 204 UNION CHARLOTTE RIGHT-OF-WAY 2012 2012 $50 $50
BEAVER DAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4975 B-4975 SR 1158 204 UNION CHARLOTTE UTILITIES 2012 2012 $10 $10
BEAVER DAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4975 B-4975 SR 1158 204 UNION CHARLOTTE CONSTRUCTION 2013 2013 $375 $375
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BEAVER DAM CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4975 B-4975 SR 1158 204 UNION CHARLOTTE 2011 $50 $50
FISH DAM CREEK.
HIGHWAY B-4977 B-4977 SR 1313 REPLACE BRIDGE NO. 75 WILKES HIGH COUNTRY RIGHT-OF-WAY 2017 2017 $50 $50
FISH DAM CREEK.
HIGHWAY B-4977 B-4977 SR 1313 REPLACE BRIDGE NO. 75 WILKES HIGH COUNTRY CONSTRUCTION 2018 2018 $500 $500
FISH DAM CREEK. BEFORE
HIGHWAY B-4977 B-4977 SR 1313 REPLACE BRIDGE NO. 75 WILKES HIGH COUNTRY 2011 $100 $100
SOUTH PRONG LEWIS
FORK CREEK. REPLACE
HIGHWAY B-4978 B-4978 SR 1154 BRIDGE NO. 82 WILKES HIGH COUNTRY RIGHT-OF-WAY 2018 2018 $140 $140
SOUTH PRONG LEWIS
FORK CREEK. REPLACE
HIGHWAY B-4978 B-4978 SR 1154 BRIDGE NO. 82 WILKES HIGH COUNTRY CONSTRUCTION 2019 2019 $1,400 $1,400
MIDDLE LITTLE RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4980 B-4980 SR 1348 291 ALEXANDER UNIFOUR RIGHT-OF-WAY 2019 2019 $140 $140
MIDDLE LITTLE RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-4980 B-4980 SR 1348 291 ALEXANDER UNIFOUR CONSTRUCTION 2020 2020 $1,400 $1,400
HOYLE'S CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4981 B-4981 SR 1819 172 GASTON LAKE NORMAN RIGHT-OF-WAY 2019 2019 $130 $130
HOYLE'S CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4981 B-4981 SR 1819 172 GASTON LAKE NORMAN CONSTRUCTION 2020 2020 $1,300 $1,300
HOYLE'S CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4981 B-4981 SR 1819 172 GASTON LAKE NORMAN 2011 $100 $100
US 21- THIRD CREEK. REPLACE
HIGHWAY B-4982 B-4982 NC 115 BRIDGE NO. 38 IREDELL LAKE NORMAN RIGHT-OF-WAY 2016 2016 $300 $300
US 21- THIRD CREEK. REPLACE
HIGHWAY B-4982 B-4982 NC 115 BRIDGE NO. 38 IREDELL LAKE NORMAN CONSTRUCTION 2017 2018 $3,000 $1,500 $1,500
US 21- THIRD CREEK. REPLACE BEFORE
HIGHWAY B-4982 B-4982 NC 115 BRIDGE NO. 38 IREDELL LAKE NORMAN 2011 $100 $100
SOUTHERN RAILROAD.
REPLACE BRIDGE NO.
HIGHWAY B-4983 B-4983 SR 1618 313 BURKE HICKORY RIGHT-OF-WAY 2012 2012 $300 $300
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SOUTHERN RAILROAD.
REPLACE BRIDGE NO.
HIGHWAY B-4983 B-4983 SR 1618 313 BURKE HICKORY CONSTRUCTION 2014 2014 $3,000 $3,000
SOUTHERN RAILROAD.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4983 B-4983 SR 1618 313 BURKE HICKORY 2011 $100 $100
BIG PINE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4984 B-4984 SR 1151 138 MADISON LAND OF SKY RIGHT-OF-WAY 2013 2013 $75 $75
BIG PINE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-4984 B-4984 SR 1151 138 MADISON LAND OF SKY CONSTRUCTION 2014 2014 $650 $650
BIG PINE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4984 B-4984 SR 1151 138 MADISON LAND OF SKY 2011 $75 $75
PUZZLE CREEK.
HIGHWAY B-4986 B-4986 SR 1576 REPLACE BRIDGE NO. 76 RUTHERFORD ISOTHERMAL RIGHT-OF-WAY 2019 2019 $180 $180
PUZZLE CREEK.
HIGHWAY B-4986 B-4986 SR 1576 REPLACE BRIDGE NO. 76 RUTHERFORD ISOTHERMAL CONSTRUCTION 2020 2020 $1,800 $1,800
PUZZLE CREEK. BEFORE
HIGHWAY B-4986 B-4986 SR 1576 REPLACE BRIDGE NO. 76 RUTHERFORD ISOTHERMAL 2011 $100 $100
CLEAR CREEK.
HIGHWAY B-4987 B-4987 SR 1572 REPLACE BRIDGE NO. 35 HENDERSON ASHEVILLE RIGHT-OF-WAY 2012 2012 $60 $60
CLEAR CREEK.
HIGHWAY B-4987 B-4987 SR 1572 REPLACE BRIDGE NO. 35 HENDERSON ASHEVILLE CONSTRUCTION 2013 2013 $675 $675
CLEAR CREEK. BEFORE
HIGHWAY B-4987 B-4987 SR 1572 REPLACE BRIDGE NO. 35 HENDERSON ASHEVILLE 2011 $60 $60
CREEK. REPLACE
HIGHWAY B-4988 B-4988 SR 1528 BRIDGE NO. 309 HENDERSON ASHEVILLE RIGHT-OF-WAY 2013 2013 $50 $50
CREEK. REPLACE
HIGHWAY B-4988 B-4988 SR 1528 BRIDGE NO. 309 HENDERSON ASHEVILLE CONSTRUCTION 2014 2014 $500 $500
CREEK. REPLACE BEFORE
HIGHWAY B-4988 B-4988 SR 1528 BRIDGE NO. 309 HENDERSON ASHEVILLE 2011 $60 $60
CREEK. REPLACE
HIGHWAY B-4989 B-4989 SR 1326 BRIDGE NO. 148 TRANSYLVANIA LAND OF SKY MITIGATION 2011 2011 $41 $41
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CREEK. REPLACE
HIGHWAY B-4989 B-4989 SR 1326 BRIDGE NO. 148 TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2011 2011 $40 $40
CREEK. REPLACE
HIGHWAY B-4989 B-4989 SR 1326 BRIDGE NO. 148 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2012 2012 $400 $400
CREEK. REPLACE BEFORE
HIGHWAY B-4989 B-4989 SR 1326 BRIDGE NO. 148 TRANSYLVANIA LAND OF SKY 2011 $50 $50
SR 1163 BEAVER CREEK.
KELLY REPLACE BRIDGE NO.
HIGHWAY B-4991 B-4991 ROAD 359 WAKE RALEIGH CONSTRUCTION 2011 2011 $1,850 $1,850
SR 1163 BEAVER CREEK.
KELLY REPLACE BRIDGE NO. BEFORE
HIGHWAY B-4991 B-4991 ROAD 359 WAKE RALEIGH 2011 $165 $165
SWAMP. REPLACE UPPER BEFORE
HIGHWAY B-4992 B-4992 SR 1628 BRIDGE NO. 1 WILSON COASTAL PLAIN 2011 $1,001 $1,001
BURRAGE ROAD.
REPLACE BRIDGE
CONCOR NO. 151 OVER THREE
HIGHWAY B-5000 B-5000 D MILE BRANCH CABARRUS CONCORD RIGHT-OF-WAY 2011 2011 $100 $100
BURRAGE ROAD.
REPLACE BRIDGE
CONCOR NO. 151 OVER THREE
HIGHWAY B-5000 B-5000 D MILE BRANCH CABARRUS CONCORD CONSTRUCTION 2012 2012 $900 $900
BURRAGE ROAD.
REPLACE BRIDGE
CONCOR NO. 151 OVER THREE BEFORE
HIGHWAY B-5000 B-5000 D MILE BRANCH CABARRUS CONCORD 2011 $86 $86
MIMOSA BOULEVARD.
PINE REPLACE BRIDGE NO. 47
KNOLL OVER PINE KNOLL
HIGHWAY B-5001 B-5001 SHORES WATERWAY CARTERET DOWN EAST CONSTRUCTION 2011 2011 $500 $500
MIMOSA BOULEVARD.
PINE REPLACE BRIDGE NO. 47
KNOLL OVER PINE KNOLL
HIGHWAY B-5001 B-5001 SHORES WATERWAY CARTERET DOWN EAST RIGHT-OF-WAY 2011 2011 $50 $50
MIMOSA BOULEVARD.
PINE REPLACE BRIDGE NO. 47
KNOLL OVER PINE KNOLL BEFORE
HIGHWAY B-5001 B-5001 SHORES WATERWAY CARTERET DOWN EAST 2011 $229 $229
VALLEY ROAD.
REPLACE BRIDGE NO.
THOMAS 187 OVER HUNTS FORK BEFORE
HIGHWAY B-5002 B-5002 VILLE CREEK DAVIDSON HIGH POINT 2011 $0
COMMONWEALTH
AVENUE. REPLACE
BRIDGE NO. 81 OVER
LAURINB LEITH CREEK WITH
HIGHWAY B-5003 B-5003 URG CULVERT. SCOTLAND LUMBER RIVER RIGHT-OF-WAY 2011 2011 $30 $30
SR 1001 MOCASSIN CREEK.
PEARCE REPLACE BRIDGE NO.
HIGHWAY B-5140 B-5140 S ROAD 195 WAKE RALEIGH RIGHT-OF-WAY 2019 2019 $70 $70
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 1001 MOCASSIN CREEK.
PEARCE REPLACE BRIDGE NO.
HIGHWAY B-5140 B-5140 S ROAD 195 WAKE RALEIGH UTILITIES 2019 2019 $80 $80
SR 1001 MOCASSIN CREEK.
PEARCE REPLACE BRIDGE NO.
HIGHWAY B-5140 B-5140 S ROAD 195 WAKE RALEIGH CONSTRUCTION 2020 2020 $690 $690
WHITE OAK SWAMP.
HIGHWAY B-5141 B-5141 US 13 REPLACE BRIDGE NO. 53 BERTIE PEANUT BELT RIGHT-OF-WAY 2015 2015 $150 $150
WHITE OAK SWAMP.
HIGHWAY B-5141 B-5141 US 13 REPLACE BRIDGE NO. 53 BERTIE PEANUT BELT CONSTRUCTION 2016 2016 $1,550 $1,550
WHITE OAK SWAMP. BEFORE
HIGHWAY B-5141 B-5141 US 13 REPLACE BRIDGE NO. 53 BERTIE PEANUT BELT 2011 $100 $100
CORNELIUS CREEK.
HIGHWAY B-5142 B-5142 SR 1302 REPLACE BRIDGE NO. 57 IREDELL LAKE NORMAN RIGHT-OF-WAY 2015 2015 $300 $300
CORNELIUS CREEK.
HIGHWAY B-5142 B-5142 SR 1302 REPLACE BRIDGE NO. 57 IREDELL LAKE NORMAN CONSTRUCTION 2016 2016 $2,950 $2,950
CORNELIUS CREEK. BEFORE
HIGHWAY B-5142 B-5142 SR 1302 REPLACE BRIDGE NO. 57 IREDELL LAKE NORMAN 2011 $100 $100
STEWARTS CREEK.
REPLACE BRIDGE NO. EASTERN
HIGHWAY B-5143 B-5143 SR 1105 408 DUPLIN CAROLINA RIGHT-OF-WAY 2015 2015 $80 $80
STEWARTS CREEK.
REPLACE BRIDGE NO. EASTERN
HIGHWAY B-5143 B-5143 SR 1105 408 DUPLIN CAROLINA CONSTRUCTION 2016 2016 $775 $775
STEWARTS CREEK.
REPLACE BRIDGE NO. EASTERN BEFORE
HIGHWAY B-5143 B-5143 SR 1105 408 DUPLIN CAROLINA 2011 $100 $100
SOUTH HYCO CREEK.
HIGHWAY B-5145 B-5145 SR 1343 REPLACE BRIDGE NO. 50 PERSON KERR TAR RIGHT-OF-WAY 2019 2019 $300 $300
SOUTH HYCO CREEK.
HIGHWAY B-5145 B-5145 SR 1343 REPLACE BRIDGE NO. 50 PERSON KERR TAR CONSTRUCTION 2020 2020 $3,000 $3,000
NORTH FORK REDDIES
RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5146 B-5146 SR 1562 302 WILKES HIGH COUNTRY MITIGATION 2013 2013 $21 $21
NORTH FORK REDDIES
RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5146 B-5146 SR 1562 302 WILKES HIGH COUNTRY RIGHT-OF-WAY 2013 2013 $140 $140
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTH FORK REDDIES
RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5146 B-5146 SR 1562 302 WILKES HIGH COUNTRY CONSTRUCTION 2014 2014 $1,400 $1,400
NORTH FORK REDDIES
RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5146 B-5146 SR 1562 302 WILKES HIGH COUNTRY 2011 $100 $100
US 29-70,
I-85
BUSINES DEEP RIVER. REPLACE AFTER
HIGHWAY B-5351 B-5351 S LOOP BRIDGE NO. 242 GUILFORD GREENSBORO CONSTRUCTION 2020 2020 $3,940 $1,970 1,970.00
NORFOLK SOUTHERN
RAILROAD.
US 29 REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5352 B-5352 NBL 131 ROCKINGHAM TRIAD RIGHT-OF-WAY 2018 2018 $240 $240
NORFOLK SOUTHERN
RAILROAD.
US 29 REPLACE BRIDGE NO. PIEDMONT AFTER
HIGHWAY B-5352 B-5352 NBL 131 ROCKINGHAM TRIAD CONSTRUCTION 2020 2020 $2,390 $1,195 1,195.00
US 27-70,
I-85
BUSINES US 311. REPLACE
HIGHWAY B-5353 B-5353 S BRIDGE NO. 147 GUILFORD GREENSBORO RIGHT-OF-WAY 2019 2019 $660 $660
US 27-70,
I-85
BUSINES US 311. REPLACE AFTER
HIGHWAY B-5353 B-5353 S BRIDGE NO. 147 GUILFORD GREENSBORO CONSTRUCTION 2020 2020 $6,584 $2,195 4,389.00
US 29. REPLACE
HIGHWAY B-5354 B-5354 SR 4771 BRIDGE NO. 360 GUILFORD GREENSBORO RIGHT-OF-WAY 2019 2019 $420 $420
US 29. REPLACE AFTER
HIGHWAY B-5354 B-5354 SR 4771 BRIDGE NO. 360 GUILFORD GREENSBORO CONSTRUCTION 2020 2020 $4,200 $2,100 2,100.00
WOLF ISLAND CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5355 B-5355 SR 1902 106 ROCKINGHAM TRIAD RIGHT-OF-WAY 2019 2019 $268 $268
WOLF ISLAND CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5355 B-5355 SR 1902 106 ROCKINGHAM TRIAD CONSTRUCTION 2020 2020 $2,681 $2,681
SOUTH BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5356 B-5356 I-40/85 299 GUILFORD GREENSBORO RIGHT-OF-WAY 2019 2019 $820 $820
SOUTH BUFFALO
CREEK.
REPLACE BRIDGE NO. AFTER
HIGHWAY B-5356 B-5356 I-40/85 299 GUILFORD GREENSBORO CONSTRUCTION 2020 2020 $8,200 $4,100 4,100.00
CREEK. REPLACE PIEDMONT
HIGHWAY B-5357 B-5357 SR 2715 BRIDGE NO. 78 ROCKINGHAM TRIAD RIGHT-OF-WAY 2019 2019 $61 $61
CREEK. REPLACE PIEDMONT
HIGHWAY B-5357 B-5357 SR 2715 BRIDGE NO. 78 ROCKINGHAM TRIAD CONSTRUCTION 2020 2020 $607 $607
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MODEL FARM ROAD
OVER BRANCH
OF RICHLAND CREEK.
HIGH REPLACE BEFORE
HIGHWAY B-5358 B-5358 POINT BRIDGE NO. 428 GUILFORD HIGH POINT 2011 $0
ROTARY DRIVE OVER
BOULDING BRANCH.
HIGH REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5359 B-5359 POINT 415 GUILFORD HIGH POINT 2011 $0
SANDY CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5360 B-5360 SR 2481 374 RANDOLPH TRIAD RIGHT-OF-WAY 2017 2017 $116 $116
SANDY CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5360 B-5360 SR 2481 374 RANDOLPH TRIAD CONSTRUCTION 2018 2018 $1,155 $1,155
BEAR CREEK. REPLACE TRIANGLE
HIGHWAY B-5361 B-5361 SR 1405 BRIDGE NO. 92 MOORE AREA RIGHT-OF-WAY 2018 2018 $200 $200
BEAR CREEK. REPLACE TRIANGLE
HIGHWAY B-5361 B-5361 SR 1405 BRIDGE NO. 92 MOORE AREA CONSTRUCTION 2019 2019 $2,175 $2,175
DROWNING CREEK. PIEDMONT
HIGHWAY B-5362 B-5362 NC 73 REPLACE BRIDGE NO. 53 MONTGOMERY TRIAD RIGHT-OF-WAY 2018 2018 $180 $180
DROWNING CREEK. PIEDMONT
HIGHWAY B-5362 B-5362 NC 73 REPLACE BRIDGE NO. 53 MONTGOMERY TRIAD CONSTRUCTION 2019 2019 $1,803 $1,803
US 64 AND NC 49.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5363 B-5363 SR 1713 171 RANDOLPH TRIAD RIGHT-OF-WAY 2019 2019 $326 $326
US 64 AND NC 49.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5363 B-5363 SR 1713 171 RANDOLPH TRIAD CONSTRUCTION 2020 2020 $3,264 $3,264
FORK CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5364 B-5364 SR 1002 206 RANDOLPH TRIAD RIGHT-OF-WAY 2017 2017 $110 $110
FORK CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5364 B-5364 SR 1002 206 RANDOLPH TRIAD CONSTRUCTION 2018 2018 $1,125 $1,125
NORFOLK SOUTHERN
RAILROAD AND
US 29. REPLACE
US 29 NC BRIDGE NO. 21 AND
HIGHWAY B-5365 B-5365 152 BRIDGE NO. 34 ROWAN CONCORD RIGHT-OF-WAY 2017 2017 $1,400 $1,400
NORFOLK SOUTHERN
RAILROAD AND
US 29. REPLACE
US 29 NC BRIDGE NO. 21 AND
HIGHWAY B-5365 B-5365 152 BRIDGE NO. 34 ROWAN CONCORD CONSTRUCTION 2019 2020 $14,000 $7,000 $7,000
SLOANS CREEK.
HIGHWAY B-5366 B-5366 SR 1735 REPLACE BRIDGE NO. 19 ROWAN CONCORD RIGHT-OF-WAY 2018 2018 $135 $135
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SLOANS CREEK.
HIGHWAY B-5366 B-5366 SR 1735 REPLACE BRIDGE NO. 19 ROWAN CONCORD CONSTRUCTION 2019 2019 $1,348 $1,348
BRANCH OF ROCKY
RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5367 B-5367 SR 1520 235. CABARRUS CONCORD RIGHT-OF-WAY 2017 2017 $30 $30
BRANCH OF ROCKY
RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5367 B-5367 SR 1520 235. CABARRUS CONCORD CONSTRUCTION 2018 2018 $300 $300
COLD WATER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5369 B-5369 SR 2114 53. CABARRUS CONCORD RIGHT-OF-WAY 2017 2017 $180 $180
COLD WATER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5369 B-5369 SR 2114 53. CABARRUS CONCORD CONSTRUCTION 2018 2018 $1,800 $1,800
EAST FORK STEWARTS
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5370 B-5370 SR 1506 444. UNION ROCKY RIVER RIGHT-OF-WAY 2017 2017 $45 $45
EAST FORK STEWARTS
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5370 B-5370 SR 1506 444. UNION ROCKY RIVER CONSTRUCTION 2018 2018 $450 $450
CLEAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5371 B-5371 US 601 71. UNION CHARLOTTE RIGHT-OF-WAY 2017 2017 $230 $230
CLEAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5371 B-5371 US 601 71. UNION CHARLOTTE CONSTRUCTION 2018 2018 $2,300 $2,300
US 29. REPLACE
HIGHWAY B-5372 B-5372 SR 1706 BRIDGE NO. 109 CABARRUS CONCORD RIGHT-OF-WAY 2018 2018 $385 $385
US 29. REPLACE
HIGHWAY B-5372 B-5372 SR 1706 BRIDGE NO. 109 CABARRUS CONCORD CONSTRUCTION 2019 2019 $3,850 $3,850
LONG CREEK. REPLACE
HIGHWAY B-5373 B-5373 SR 1435 BRIDGE NO. 44 STANLY ROCKY RIVER RIGHT-OF-WAY 2018 2018 $60 $60
LONG CREEK. REPLACE
HIGHWAY B-5373 B-5373 SR 1435 BRIDGE NO. 44 STANLY ROCKY RIVER CONSTRUCTION 2019 2019 $600 $600
BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5374 B-5374 SR 2154 448 UNION CHARLOTTE RIGHT-OF-WAY 2018 2018 $60 $60
BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5374 B-5374 SR 2154 448 UNION CHARLOTTE CONSTRUCTION 2019 2019 $600 $600
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
COMMONWEALTH
AVENUE. REPLACE
BRIDGE NO. 81 OVER
LAURINB LEITH CREEK WITH
HIGHWAY B-5003 B-5003 URG CULVERT. SCOTLAND LUMBER RIVER CONSTRUCTION 2012 2012 $335 $335
REYNOLDS PARK ROAD.
REPLACE
BRIDGE NO. 86 OVER
SALEM CREEK
AND BRIDGE NO. 87
WINSTO OVER BUSHY WINSTON-
HIGHWAY B-5004 B-5004 N-SALEM FORK CREEK. FORSYTH SALEM RIGHT-OF-WAY 2011 2011 $445 $445
REYNOLDS PARK ROAD.
REPLACE
BRIDGE NO. 86 OVER
SALEM CREEK
AND BRIDGE NO. 87
WINSTO OVER BUSHY WINSTON-
HIGHWAY B-5004 B-5004 N-SALEM FORK CREEK. FORSYTH SALEM CONSTRUCTION 2012 2012 $4,450 $4,450
SPRAGUE STREET.
REPLACE BRIDGE
WINSTO NO. 134 OVER WINSTON- BEFORE
HIGHWAY B-5005 B-5005 N-SALEM SOUTHERN RAILROAD. FORSYTH SALEM 2011 $0
NOVACK STREET.
REPLACE BRIDGE
WINSTO NO. 285 OVER MILL WINSTON- BEFORE
HIGHWAY B-5006 B-5006 N-SALEM CREEK. FORSYTH SALEM 2011 $0
WEST FIRST STREET.
REPLACE
BRIDGE NO. 296 OVER
WINSTO NORFOLK WINSTON- BEFORE
HIGHWAY B-5007 B-5007 N-SALEM SOUTHERN RAILWAY. FORSYTH SALEM 2011 $0
BROAD STREET.
WINSTO REPLACE BRIDGE WINSTON- BEFORE
HIGHWAY B-5008 B-5008 N-SALEM NO. 375 SALEM CREEK FORSYTH SALEM 2011 $0
EAST WADE STREET.
REPLACE BRIDGE
WADESB NO. 90 OVER MOSS BEFORE
HIGHWAY B-5009 B-5009 ORO CREEK ANSON ROCKY RIVER 2011 $100 $100
US 64. REPLACE BRIDGE
NO. 27 OVER ROCKY
HIGHWAY B-5010 B-5010 US 64 CREEK TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2012 2012 $100 $100
US 64. REPLACE BRIDGE
NO. 27 OVER ROCKY
HIGHWAY B-5010 B-5010 US 64 CREEK TRANSYLVANIA LAND OF SKY CONSTRUCTION 2013 2013 $1,500 $1,500
US 64. REPLACE BRIDGE
NO. 27 OVER ROCKY BEFORE
HIGHWAY B-5010 B-5010 US 64 CREEK TRANSYLVANIA LAND OF SKY 2011 $100 $100
FAIRVIEW DRIVE.
REPLACE BRIDGE
NO. 74 OVER LOWER
HIGHWAY B-5011 B-5011 LENOIR CREEK CALDWELL UNIFOUR RIGHT-OF-WAY 2012 2012 $100 $100
FAIRVIEW DRIVE.
REPLACE BRIDGE
NO. 74 OVER LOWER
HIGHWAY B-5011 B-5011 LENOIR CREEK CALDWELL UNIFOUR CONSTRUCTION 2013 2013 $750 $750
FAIRVIEW DRIVE.
REPLACE BRIDGE
NO. 74 OVER LOWER BEFORE
HIGHWAY B-5011 B-5011 LENOIR CREEK CALDWELL UNIFOUR 2011 $148 $148
DEPOT STREET.
REPLACE BRIDGE
WAYNES NO. 262 OVER RICHLAND SOUTHWESTER BEFORE
HIGHWAY B-5013 B-5013 VILLE CREEK HAYWOOD N 2011 $0
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
UNDER CONSTRUCTION -
REPAIR BRIDGE NO. 11,
GARVEE BOND FUNDING
$13.5 MILLION;
PAYBACK FY 2008 - FY GARVEE
HIGHWAY B-5014 B-5014A NC 12 2019 DARE ALBEMARLE CONSTRUCTION 2011 2019 $13,329 $1,481 $1,481 $1,481 $1,481 $1,481 $1,481 $1,481 $1,481 $1,481
OREGON INLET. REPAIR BEFORE
HIGHWAY B-5014 B-5014 NC 12 BRIDGE NO. 11 DARE ALBEMARLE 2011 $5,473 $5,473
US 13-NC 42, HERTFORD
COUNTY.
REPLACE BRIDGE NO. 12
OVER
AHOSKIE CREEK AND
BRIDGE NO. 25
US 13- OVER AHOSKIE CREEK BEFORE
HIGHWAY B-5018 B-5018 NC 42 OVERFLOW. HERTFORD PEANUT BELT 2011 $3,259 $3,259
SR 1726 (BRIDGE NO.
162), SR 1723
(BRIDGE NO. 167), SR
1718 (BRIDGE
NO. 169), US 301
(BRIDGE NO. 100),
US 301 (BRIDGE NO. 54)
AND SR 1529
(BRIDGE NO. 151).
ELEVATE STRUCTURES
TO PROVIDE 16 FEET
MINIMUM ROADWAY BEFORE
HIGHWAY B-5021 B-5021 I-95 CLEARANCE. ROBESON LUMBER RIVER 2011 $5,610 $5,610
SR 1005 (BRIDGE NO.
153), SR 1815
(BRIDGE NO. 154), SR
1813 (BRIDGE
NO. 155) AND SR 1709
(BRIDGE NO. 81).
ELEVATE STRUCTURES
TO PROVIDE 16'
MINIMUN CLEARANCE
AND INSTALL OVER
HEIGHT DETECTION ON
SOUTHBOUND I-95
BETWEEN EXIT 77 AND CUMBERLAND,H BEFORE
HIGHWAY B-5022 B-5022 I-95 75 IN HARNETT COUNTY ARNETT MID-CAROLINA 2011 $4,610 $4,610
SHEEHAN CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-5023 B-5023 SR 1122 313 MACON N 2011 $603 $603
KING GEORGE ROAD
OVER MEETING
HOUSE BRANCH.
GREENVI REPLACE BRIDGE BEFORE
HIGHWAY B-5100 B-5100 LLE NO. 421 PITT GREENVILLE 2011 $40 $40
CLARK CREEK.
HIGHWAY B-5101 B-5101 SR 1149 REPLACE BRIDGE NO. 83 CATAWBA HICKORY RIGHT-OF-WAY 2014 2014 $95 $95
CLARK CREEK.
HIGHWAY B-5101 B-5101 SR 1149 REPLACE BRIDGE NO. 83 CATAWBA HICKORY CONSTRUCTION 2015 2015 $950 $950
CLARK CREEK. BEFORE
HIGHWAY B-5101 B-5101 SR 1149 REPLACE BRIDGE NO. 83 CATAWBA HICKORY 2011 $100 $100
SOUTH HYCO CREEK.
HIGHWAY B-5102 B-5102 US 158 REPLACE BRIDGE NO. 11 PERSON KERR TAR RIGHT-OF-WAY 2014 2014 $290 $290
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SOUTH HYCO CREEK.
HIGHWAY B-5102 B-5102 US 158 REPLACE BRIDGE NO. 11 PERSON KERR TAR UTILITIES 2014 2014 $52 $52
SOUTH HYCO CREEK.
HIGHWAY B-5102 B-5102 US 158 REPLACE BRIDGE NO. 11 PERSON KERR TAR CONSTRUCTION 2015 2015 $2,900 $2,900
ABANDON RAILROAD.
REMOVE
SR 1627 BRIDGE NO. 35 AND
3RD. REPLACE
HIGHWAY B-5103 B-5103 AVENUE WITH FILL. NEW HANOVER WILMINGTON CONSTRUCTION 2015 2015 $5,000 $5,000
LITTLE SUGAR CREEK.
HIGHWAY B-5105 B-5105 SR 4982 REPLACE BRIDGE NO. 49 MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2014 2014 $365 $365
LITTLE SUGAR CREEK.
HIGHWAY B-5105 B-5105 SR 4982 REPLACE BRIDGE NO. 49 MECKLENBURG CHARLOTTE UTILITIES 2014 2014 $52 $52
LITTLE SUGAR CREEK.
HIGHWAY B-5105 B-5105 SR 4982 REPLACE BRIDGE NO. 49 MECKLENBURG CHARLOTTE CONSTRUCTION 2015 2015 $3,650 $3,650
LITTLE SUGAR CREEK. BEFORE
HIGHWAY B-5105 B-5105 SR 4982 REPLACE BRIDGE NO. 49 MECKLENBURG CHARLOTTE 2011 $100 $100
WAHTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5106 B-5106 SR 1200 148 BERTIE PEANUT BELT RIGHT-OF-WAY 2015 2015 $60 $60
WAHTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5106 B-5106 SR 1200 148 BERTIE PEANUT BELT CONSTRUCTION 2016 2016 $650 $650
WAHTON CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5106 B-5106 SR 1200 148 BERTIE PEANUT BELT 2011 $100 $100
ABBOTTS CREEK. WINSTON-
HIGHWAY B-5107 B-5107 SR 1003 REPLACE BRIDGE NO. 34 FORSYTH SALEM RIGHT-OF-WAY 2014 2014 $230 $230
ABBOTTS CREEK. WINSTON-
HIGHWAY B-5107 B-5107 SR 1003 REPLACE BRIDGE NO. 34 FORSYTH SALEM CONSTRUCTION 2015 2015 $2,875 $2,875
SAPONY CREEK. UPPER
HIGHWAY B-5108 B-5108 SR 1145 REPLACE BRIDGE NO. 26 NASH COASTAL PLAIN RIGHT-OF-WAY 2016 2016 $70 $70
SAPONY CREEK. UPPER
HIGHWAY B-5108 B-5108 SR 1145 REPLACE BRIDGE NO. 26 NASH COASTAL PLAIN CONSTRUCTION 2017 2017 $675 $675
SAPONY CREEK. UPPER BEFORE
HIGHWAY B-5108 B-5108 SR 1145 REPLACE BRIDGE NO. 26 NASH COASTAL PLAIN 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
GOOSE CREEK.
HIGHWAY B-5109 B-5109 NC 218 REPLACE BRIDGE NO. 29 UNION CHARLOTTE RIGHT-OF-WAY 2014 2014 $200 $200
GOOSE CREEK.
HIGHWAY B-5109 B-5109 NC 218 REPLACE BRIDGE NO. 29 UNION CHARLOTTE UTILITIES 2014 2014 $20 $20
GOOSE CREEK.
HIGHWAY B-5109 B-5109 NC 218 REPLACE BRIDGE NO. 29 UNION CHARLOTTE CONSTRUCTION 2015 2015 $2,100 $2,100
GOOSE CREEK. BEFORE
HIGHWAY B-5109 B-5109 NC 218 REPLACE BRIDGE NO. 29 UNION CHARLOTTE 2011 $100 $100
BIG BRANCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5110 B-5110 SR 1626 129 ALEXANDER UNIFOUR RIGHT-OF-WAY 2014 2014 $50 $50
BIG BRANCH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5110 B-5110 SR 1626 129 ALEXANDER UNIFOUR CONSTRUCTION 2015 2015 $525 $525
BIG BRANCH CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5110 B-5110 SR 1626 129 ALEXANDER UNIFOUR 2011 $100 $100
BRIERY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5111 B-5111 SR 1588 111 PITT MID-EAST RIGHT-OF-WAY 2014 2014 $150 $150
BRIERY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5111 B-5111 SR 1588 111 PITT MID-EAST CONSTRUCTION 2015 2015 $1,540 $1,540
BRIERY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5111 B-5111 SR 1588 111 PITT MID-EAST 2011 $100 $100
SMITHS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5113 B-5113 SR 1942 157 WAKE RALEIGH RIGHT-OF-WAY 2014 2014 $55 $55
SMITHS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5113 B-5113 SR 1942 157 WAKE RALEIGH CONSTRUCTION 2015 2015 $550 $550
US 29-70/I-85 BUSINESS.
REPLACE BRIDGE NO.
HIGHWAY B-5114 B-5114 SR 1619 136 RANDOLPH HIGH POINT RIGHT-OF-WAY 2015 2015 $330 $330
US 29-70/I-85 BUSINESS.
REPLACE BRIDGE NO.
HIGHWAY B-5114 B-5114 SR 1619 136 RANDOLPH HIGH POINT CONSTRUCTION 2016 2016 $3,300 $3,300
GRISSETT CREEK.
REPLACE BRIDGE
NO. 94 AND BRIDGE NO.
HIGHWAY B-5115 B-5115 SR 1005 95 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2014 2014 $105 $105
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
GRISSETT CREEK.
REPLACE BRIDGE
NO. 94 AND BRIDGE NO.
HIGHWAY B-5115 B-5115 SR 1005 95 COLUMBUS CAPE FEAR CONSTRUCTION 2015 2015 $1,050 $1,050
SOUTH RIVER
OVERFLOW.
REPLACE BRIDGE NO.
HIGHWAY B-5116 B-5116 SR 1502 150 BLADEN MID-CAROLINA MITIGATION 2011 2011 $3 $3
SOUTH RIVER
OVERFLOW.
REPLACE BRIDGE NO.
HIGHWAY B-5116 B-5116 SR 1502 150 BLADEN MID-CAROLINA RIGHT-OF-WAY 2011 2011 $115 $115
SOUTH RIVER
OVERFLOW.
REPLACE BRIDGE NO.
HIGHWAY B-5116 B-5116 SR 1502 150 BLADEN MID-CAROLINA UTILITIES 2011 2011 $41 $41
SOUTH RIVER
OVERFLOW.
REPLACE BRIDGE NO.
HIGHWAY B-5116 B-5116 SR 1502 150 BLADEN MID-CAROLINA CONSTRUCTION 2012 2012 $1,150 $1,150
SOUTH RIVER
OVERFLOW.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5116 B-5116 SR 1502 150 BLADEN MID-CAROLINA 2011 $100 $100
LAKE CREEK. REPLACE
HIGHWAY B-5117 B-5117 NC 210 BRIDGE NO. 47 BLADEN MID-CAROLINA RIGHT-OF-WAY 2014 2014 $135 $135
LAKE CREEK. REPLACE
HIGHWAY B-5117 B-5117 NC 210 BRIDGE NO. 47 BLADEN MID-CAROLINA CONSTRUCTION 2015 2015 $1,350 $1,350
LAKE CREEK. REPLACE BEFORE
HIGHWAY B-5117 B-5117 NC 210 BRIDGE NO. 47 BLADEN MID-CAROLINA 2011 $100 $100
CREEK. REPLACE
HIGHWAY B-5118 B-5118 SR 1557 BRIDGE NO. 55 WATAUGA HIGH COUNTRY RIGHT-OF-WAY 2015 2015 $40 $40
CREEK. REPLACE
HIGHWAY B-5118 B-5118 SR 1557 BRIDGE NO. 55 WATAUGA HIGH COUNTRY CONSTRUCTION 2016 2016 $385 $385
CREEK. REPLACE BEFORE
HIGHWAY B-5118 B-5118 SR 1557 BRIDGE NO. 55 WATAUGA HIGH COUNTRY 2011 $100 $100
I-40 AND
I-85 US 29-70-220. REPLACE
BUSINES BRIDGE NO. 291
HIGHWAY B-5119 B-5119 S AND BRIDGE NO. 349 GUILFORD GREENSBORO RIGHT-OF-WAY 2014 2014 $550 $550
I-40 AND
I-85 US 29-70-220. REPLACE
BUSINES BRIDGE NO. 291
HIGHWAY B-5119 B-5119 S AND BRIDGE NO. 349 GUILFORD GREENSBORO CONSTRUCTION 2015 2016 $5,500 $2,750 $2,750
LITTLE RICHARDSON
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5120 B-5120 SR 2102 146 UNION CHARLOTTE RIGHT-OF-WAY 2014 2014 $60 $60
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE RICHARDSON
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5120 B-5120 SR 2102 146 UNION CHARLOTTE CONSTRUCTION 2015 2015 $625 $625
LITTLE RICHARDSON
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5120 B-5120 SR 2102 146 UNION CHARLOTTE 2011 $100 $100
PEACE STREET.
REPLACE BRIDGE NO.
HIGHWAY B-5121 B-5121 US 70 227 WAKE RALEIGH RIGHT-OF-WAY 2014 2014 $2,000 $2,000
PEACE STREET.
REPLACE BRIDGE NO.
HIGHWAY B-5121 B-5121 US 70 227 WAKE RALEIGH CONSTRUCTION 2015 2016 $10,000 $5,000 $5,000
CASHIE RIVER.
HIGHWAY B-5122 B-5122 US 13 REPLACE BRIDGE NO. 51 BERTIE PEANUT BELT RIGHT-OF-WAY 2012 2012 $300 $300
CASHIE RIVER.
HIGHWAY B-5122 B-5122 US 13 REPLACE BRIDGE NO. 51 BERTIE PEANUT BELT CONSTRUCTION 2013 2014 $2,975 $1,488 $1,487
CASHIE RIVER. BEFORE
HIGHWAY B-5122 B-5122 US 13 REPLACE BRIDGE NO. 51 BERTIE PEANUT BELT 2011 $100 $100
ROCKY RIVER AND
ACCESS
ROAD. REPLACE
BRIDGE
NO. 14 AND BRIDGE NO. CHARLOTTE,CO
HIGHWAY B-5123 B-5123 US 29 19 CABARRUS NCORD RIGHT-OF-WAY 2014 2014 $1,000 $1,000
ROCKY RIVER AND
ACCESS
ROAD. REPLACE
BRIDGE
NO. 14 AND BRIDGE NO. CHARLOTTE,CO
HIGHWAY B-5123 B-5123 US 29 19 CABARRUS NCORD CONSTRUCTION 2016 2017 $8,200 $4,100 $4,100
ROCKY RIVER AND
ACCESS
ROAD. REPLACE
BRIDGE
NO. 14 AND BRIDGE NO. CHARLOTTE,CO BEFORE
HIGHWAY B-5123 B-5123 US 29 19 CABARRUS NCORD 2011 $100 $100
SWIFT CREEK.
REPLACE BRIDGE
NO. 141 AND BRIDGE NO.
HIGHWAY B-5124 B-5124 US 301 151 NASH ROCKY MOUNT RIGHT-OF-WAY 2013 2013 $220 $220
SWIFT CREEK.
REPLACE BRIDGE
NO. 141 AND BRIDGE NO.
HIGHWAY B-5124 B-5124 US 301 151 NASH ROCKY MOUNT CONSTRUCTION 2015 2016 $4,550 $2,275 $2,275
SWIFT CREEK.
REPLACE BRIDGE
NO. 141 AND BRIDGE NO. BEFORE
HIGHWAY B-5124 B-5124 US 301 151 NASH ROCKY MOUNT 2011 $100 $100
US 441 LITTLE TENNESSEE
BUSINES RIVER. SOUTHWESTER
HIGHWAY B-5125 B-5125 S REPLACE BRIDGE NO. 22 MACON N RIGHT-OF-WAY 2014 2014 $400 $400
US 441 LITTLE TENNESSEE
BUSINES RIVER. SOUTHWESTER
HIGHWAY B-5125 B-5125 S REPLACE BRIDGE NO. 22 MACON N CONSTRUCTION 2016 2016 $4,150 $4,150
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 441 LITTLE TENNESSEE
BUSINES RIVER. SOUTHWESTER BEFORE
HIGHWAY B-5125 B-5125 S REPLACE BRIDGE NO. 22 MACON N 2011 $100 $100
SWAMP. REPLACE UPPER
HIGHWAY B-5126 B-5126 SR 1163 BRIDGE NO. 65 WILSON COASTAL PLAIN RIGHT-OF-WAY 2014 2014 $50 $50
SWAMP. REPLACE UPPER
HIGHWAY B-5126 B-5126 SR 1163 BRIDGE NO. 65 WILSON COASTAL PLAIN CONSTRUCTION 2015 2015 $500 $500
SWAMP. REPLACE UPPER BEFORE
HIGHWAY B-5126 B-5126 SR 1163 BRIDGE NO. 65 WILSON COASTAL PLAIN 2011 $100 $100
RAFT SWAMP. REPLACE
HIGHWAY B-5127 B-5127 NC 211 BRIDGE NO. 4 HOKE LUMBER RIVER RIGHT-OF-WAY 2014 2014 $70 $70
RAFT SWAMP. REPLACE
HIGHWAY B-5127 B-5127 NC 211 BRIDGE NO. 4 HOKE LUMBER RIVER CONSTRUCTION 2015 2015 $675 $675
CREEK. REPLACE
HIGHWAY B-5128 B-5128 SR 1404 BRIDGE NO. 58 RANDOLPH HIGH POINT RIGHT-OF-WAY 2015 2015 $50 $50
CREEK. REPLACE
HIGHWAY B-5128 B-5128 SR 1404 BRIDGE NO. 58 RANDOLPH HIGH POINT CONSTRUCTION 2016 2016 $500 $500
NORTH PRONG OF BAY
RIVER. REPLACE
HIGHWAY B-5129 B-5129A NC 304 BRIDGE NO. 24 PAMLICO DOWN EAST CONSTRUCTION 2014 2014 $1,600 $1,600
NORTH PRONG OF BAY
RIVER. REPLACE
HIGHWAY B-5129 B-5129A NC 304 BRIDGE NO. 24 PAMLICO DOWN EAST RIGHT-OF-WAY 2014 2014 $160 $160
REPLACEMENT OF FIVE
STRUCTURES
ON NC 304 AS A PILOT BEFORE
HIGHWAY B-5129 B-5129 NC 304 PROJECT. PAMLICO DOWN EAST 2011 $4,825 $4,825
LAKE JOHNSON.
REPLACE BRIDGE NO.
HIGHWAY B-5130 B-5130 SR 1321 318 WAKE RALEIGH RIGHT-OF-WAY 2015 2015 $75 $75
LAKE JOHNSON.
REPLACE BRIDGE NO.
HIGHWAY B-5130 B-5130 SR 1321 318 WAKE RALEIGH CONSTRUCTION 2016 2016 $600 $600
JOES CREEK. REPLACE
HIGHWAY B-5131 B-5131 SR 1128 BRIDGE NO. 63 SCOTLAND LUMBER RIVER RIGHT-OF-WAY 2014 2014 $70 $70
JOES CREEK. REPLACE
HIGHWAY B-5131 B-5131 SR 1128 BRIDGE NO. 63 SCOTLAND LUMBER RIVER CONSTRUCTION 2015 2015 $770 $770
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
RAFT SWAMP. REPLACE
HIGHWAY B-5132 B-5132 SR 1436 BRIDGE NO. 37 HOKE LUMBER RIVER RIGHT-OF-WAY 2015 2015 $60 $60
RAFT SWAMP. REPLACE
HIGHWAY B-5132 B-5132 SR 1436 BRIDGE NO. 37 HOKE LUMBER RIVER CONSTRUCTION 2016 2016 $575 $575
BRANCH OF BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5133 B-5133 SR 2125 139 UNION ROCKY RIVER RIGHT-OF-WAY 2015 2015 $30 $30
BRANCH OF BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5133 B-5133 SR 2125 139 UNION ROCKY RIVER CONSTRUCTION 2016 2016 $300 $300
BRANCH OF BUFFALO
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5133 B-5133 SR 2125 139 UNION ROCKY RIVER 2011 $100 $100
CHINKAPIN CREEK.
HIGHWAY B-5134 B-5134 NC 200 REPLACE BRIDGE NO. 72 UNION CHARLOTTE RIGHT-OF-WAY 2014 2014 $85 $85
CHINKAPIN CREEK.
HIGHWAY B-5134 B-5134 NC 200 REPLACE BRIDGE NO. 72 UNION CHARLOTTE CONSTRUCTION 2015 2015 $875 $875
CHINKAPIN CREEK. BEFORE
HIGHWAY B-5134 B-5134 NC 200 REPLACE BRIDGE NO. 72 UNION CHARLOTTE 2011 $100 $100
HUNTING CREEK.
HIGHWAY B-5135 B-5135 SR 1512 REPLACE BRIDGE NO. 1 BURKE HICKORY RIGHT-OF-WAY 2015 2015 $210 $210
HUNTING CREEK.
HIGHWAY B-5135 B-5135 SR 1512 REPLACE BRIDGE NO. 1 BURKE HICKORY CONSTRUCTION 2016 2016 $2,100 $2,100
HUNTING CREEK. BEFORE
HIGHWAY B-5135 B-5135 SR 1512 REPLACE BRIDGE NO. 1 BURKE HICKORY 2011 $100 $100
SOUTHERN RAILROAD.
REPLACE
US 29- BRIDGE NO. 66 AND
HIGHWAY B-5136 B-5136 601 BRIDGE NO. 69 CABARRUS CONCORD RIGHT-OF-WAY 2013 2013 $740 $740
SOUTHERN RAILROAD.
REPLACE
US 29- BRIDGE NO. 66 AND
HIGHWAY B-5136 B-5136 601 BRIDGE NO. 69 CABARRUS CONCORD CONSTRUCTION 2015 2016 $7,850 $3,925 $3,925
SOUTHERN RAILROAD.
REPLACE
US 29- BRIDGE NO. 66 AND BEFORE
HIGHWAY B-5136 B-5136 601 BRIDGE NO. 69 CABARRUS CONCORD 2011 $100 $100
LITTLE MOUNTAIN
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5137 B-5137 SR 1542 215 STANLY ROCKY RIVER RIGHT-OF-WAY 2014 2014 $60 $60
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE MOUNTAIN
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5137 B-5137 SR 1542 215 STANLY ROCKY RIVER CONSTRUCTION 2016 2016 $675 $675
LITTLE MOUNTAIN
CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5137 B-5137 SR 1542 215 STANLY ROCKY RIVER 2011 $100 $100
GUNPOWDER CREEK.
HIGHWAY B-5138 B-5138 US 321A REPLACE BRIDGE NO. 6 CALDWELL HICKORY MITIGATION 2013 2013 $9 $9
GUNPOWDER CREEK.
HIGHWAY B-5138 B-5138 US 321A REPLACE BRIDGE NO. 6 CALDWELL HICKORY RIGHT-OF-WAY 2013 2013 $90 $90
GUNPOWDER CREEK.
HIGHWAY B-5138 B-5138 US 321A REPLACE BRIDGE NO. 6 CALDWELL HICKORY CONSTRUCTION 2014 2014 $925 $925
GUNPOWDER CREEK. BEFORE
HIGHWAY B-5138 B-5138 US 321A REPLACE BRIDGE NO. 6 CALDWELL HICKORY 2011 $100 $100
KNOBB'S CREEK.
HIGHWAY B-5139 B-5139 SR 1332 REPLACE BRIDGE NO. 21 PASQUOTANK ALBEMARLE RIGHT-OF-WAY 2014 2014 $50 $50
KNOBB'S CREEK.
HIGHWAY B-5139 B-5139 SR 1332 REPLACE BRIDGE NO. 21 PASQUOTANK ALBEMARLE CONSTRUCTION 2015 2015 $500 $500
KNOBB'S CREEK. BEFORE
HIGHWAY B-5139 B-5139 SR 1332 REPLACE BRIDGE NO. 21 PASQUOTANK ALBEMARLE 2011 $100 $100
CREEK. REPLACE
HIGHWAY B-5147 B-5147 SR 1509 BRIDGE NO. 327 ASHE HIGH COUNTRY RIGHT-OF-WAY 2017 2017 $40 $40
CREEK. REPLACE
HIGHWAY B-5147 B-5147 SR 1509 BRIDGE NO. 327 ASHE HIGH COUNTRY CONSTRUCTION 2018 2018 $385 $385
CREEK. REPLACE BEFORE
HIGHWAY B-5147 B-5147 SR 1509 BRIDGE NO. 327 ASHE HIGH COUNTRY 2011 $100 $100
CLEAR CREEK.
HIGHWAY B-5149 B-5149 SR 1574 REPLACE BRIDGE NO. 38 HENDERSON ASHEVILLE RIGHT-OF-WAY 2015 2015 $50 $50
CLEAR CREEK.
HIGHWAY B-5149 B-5149 SR 1574 REPLACE BRIDGE NO. 38 HENDERSON ASHEVILLE CONSTRUCTION 2016 2016 $500 $500
CLEAR CREEK. BEFORE
HIGHWAY B-5149 B-5149 SR 1574 REPLACE BRIDGE NO. 38 HENDERSON ASHEVILLE 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
FALLING CREEK.
HIGHWAY B-5150 B-5150 SR 1404 REPLACE BRIDGE NO. 34 CATAWBA HICKORY RIGHT-OF-WAY 2014 2014 $150 $150
FALLING CREEK.
HIGHWAY B-5150 B-5150 SR 1404 REPLACE BRIDGE NO. 34 CATAWBA HICKORY CONSTRUCTION 2015 2015 $1,500 $1,500
FALLING CREEK. BEFORE
HIGHWAY B-5150 B-5150 SR 1404 REPLACE BRIDGE NO. 34 CATAWBA HICKORY 2011 $100 $100
LITTLE GRASSY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5151 B-5151 SR 1432 215 GRANVILLE KERR TAR RIGHT-OF-WAY 2015 2015 $80 $80
LITTLE GRASSY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5151 B-5151 SR 1432 215 GRANVILLE KERR TAR CONSTRUCTION 2016 2016 $800 $800
BLANKET CREEK. WINSTON-
HIGHWAY B-5152 B-5152 SR 1100 REPLACE BRIDGE NO. 95 FORSYTH SALEM RIGHT-OF-WAY 2016 2016 $60 $60
BLANKET CREEK. WINSTON-
HIGHWAY B-5152 B-5152 SR 1100 REPLACE BRIDGE NO. 95 FORSYTH SALEM CONSTRUCTION 2017 2017 $600 $600
HOYLE CREEK.
HIGHWAY B-5155 B-5155 SR 1314 REPLACE BRIDGE NO. 37 LINCOLN LAKE NORMAN RIGHT-OF-WAY 2016 2016 $70 $70
HOYLE CREEK.
HIGHWAY B-5155 B-5155 SR 1314 REPLACE BRIDGE NO. 37 LINCOLN LAKE NORMAN CONSTRUCTION 2017 2017 $750 $750
HOYLE CREEK. BEFORE
HIGHWAY B-5155 B-5155 SR 1314 REPLACE BRIDGE NO. 37 LINCOLN LAKE NORMAN 2011 $100 $100
FOX CREEK. REPLACE
HIGHWAY B-5157 B-5157 SR 1304 BRIDGE NO. 178 GRANVILLE KERR TAR RIGHT-OF-WAY 2015 2015 $100 $100
FOX CREEK. REPLACE
HIGHWAY B-5157 B-5157 SR 1304 BRIDGE NO. 178 GRANVILLE KERR TAR CONSTRUCTION 2016 2016 $1,050 $1,050
CRABTREE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5158 B-5158 SR 1002 101 MITCHELL HIGH COUNTRY RIGHT-OF-WAY 2018 2018 $90 $90
CRABTREE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5158 B-5158 SR 1002 101 MITCHELL HIGH COUNTRY CONSTRUCTION 2019 2019 $975 $975
CRABTREE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5158 B-5158 SR 1002 101 MITCHELL HIGH COUNTRY 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CANEY CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-5159 B-5159 SR 1740 101 JACKSON N RIGHT-OF-WAY 2017 2017 $135 $135
CANEY CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-5159 B-5159 SR 1740 101 JACKSON N CONSTRUCTION 2018 2018 $1,350 $1,350
CANEY CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-5159 B-5159 SR 1740 101 JACKSON N 2011 $100 $100
NAILS BRANCH.
HIGHWAY B-5160 B-5160 SR 1986 REPLACE BRIDGE NO. 50 ROWAN CONCORD RIGHT-OF-WAY 2015 2015 $45 $45
NAILS BRANCH.
HIGHWAY B-5160 B-5160 SR 1986 REPLACE BRIDGE NO. 50 ROWAN CONCORD CONSTRUCTION 2016 2016 $450 $450
BEAVER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5161 B-5161 SR 1162 362 WAKE RALEIGH RIGHT-OF-WAY 2015 2015 $70 $70
BEAVER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5161 B-5161 SR 1162 362 WAKE RALEIGH CONSTRUCTION 2016 2016 $700 $700
NORTH FORK
RATTLESNAKE CREEK. PIEDMONT
HIGHWAY B-5162 B-5162 SR 1523 REPLACE BRIDGE NO. 35 CASWELL TRIAD RIGHT-OF-WAY 2014 2014 $170 $170
NORTH FORK
RATTLESNAKE CREEK. PIEDMONT
HIGHWAY B-5162 B-5162 SR 1523 REPLACE BRIDGE NO. 35 CASWELL TRIAD CONSTRUCTION 2015 2015 $1,775 $1,775
BUFFALO CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5163 B-5163 SR 1354 160 ROCKINGHAM TRIAD RIGHT-OF-WAY 2016 2016 $100 $100
BUFFALO CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5163 B-5163 SR 1354 160 ROCKINGHAM TRIAD CONSTRUCTION 2017 2017 $1,000 $1,000
BUFFALO CREEK.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-5164 B-5164 SR 1484 178 MOORE AREA RIGHT-OF-WAY 2016 2016 $130 $130
BUFFALO CREEK.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-5164 B-5164 SR 1484 178 MOORE AREA CONSTRUCTION 2017 2017 $1,275 $1,275
MUDDY CREEK. PIEDMONT
HIGHWAY B-5165 B-5165 SR 1485 REPLACE BRIDGE NO. 42 DAVIDSON TRIAD RIGHT-OF-WAY 2016 2016 $180 $180
MUDDY CREEK. PIEDMONT
HIGHWAY B-5165 B-5165 SR 1485 REPLACE BRIDGE NO. 42 DAVIDSON TRIAD CONSTRUCTION 2017 2017 $1,800 $1,800
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
GRASSY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5166 B-5166 SR 1300 138 GRANVILLE KERR TAR RIGHT-OF-WAY 2016 2016 $150 $150
GRASSY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5166 B-5166 SR 1300 138 GRANVILLE KERR TAR CONSTRUCTION 2017 2017 $1,570 $1,570
UPPER FLAT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5167 B-5167 SR 2806 108 BUNCOMBE LAND OF SKY RIGHT-OF-WAY 2016 2016 $40 $40
UPPER FLAT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5167 B-5167 SR 2806 108 BUNCOMBE LAND OF SKY CONSTRUCTION 2017 2017 $400 $400
UPPER FLAT CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5167 B-5167 SR 2806 108 BUNCOMBE LAND OF SKY 2011 $100 $100
NORTH FORK JONES
CREEK.
REMOVE BRIDGE NO.
HIGHWAY B-5169 B-5169 SR 1127 309 ANSON ROCKY RIVER CONSTRUCTION 2017 2017 $100 $100
NORTH FORK JONES
CREEK.
REMOVE BRIDGE NO. BEFORE
HIGHWAY B-5169 B-5169 SR 1127 309 ANSON ROCKY RIVER 2011 $100 $100
ROCK CREEK. REPLACE
HIGHWAY B-5170 B-5170 NC 226 BRIDGE NO. 29 MITCHELL HIGH COUNTRY RIGHT-OF-WAY 2018 2018 $100 $100
ROCK CREEK. REPLACE
HIGHWAY B-5170 B-5170 NC 226 BRIDGE NO. 29 MITCHELL HIGH COUNTRY CONSTRUCTION 2019 2019 $1,000 $1,000
ROCK CREEK. REPLACE BEFORE
HIGHWAY B-5170 B-5170 NC 226 BRIDGE NO. 29 MITCHELL HIGH COUNTRY 2011 $100 $100
CROOKED FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5171 B-5171 SR 1400 125 GRANVILLE KERR TAR RIGHT-OF-WAY 2016 2016 $150 $150
CROOKED FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5171 B-5171 SR 1400 125 GRANVILLE KERR TAR CONSTRUCTION 2017 2017 $1,500 $1,500
EAST PRONG CREEK. NORTHWEST
HIGHWAY B-5172 B-5172 SR 1166 REPLACE BRIDGE NO. 11 STOKES PIEDMONT RIGHT-OF-WAY 2016 2016 $75 $75
EAST PRONG CREEK. NORTHWEST
HIGHWAY B-5172 B-5172 SR 1166 REPLACE BRIDGE NO. 11 STOKES PIEDMONT CONSTRUCTION 2017 2017 $750 $750
MITCHELL RIVER. NORTHWEST
HIGHWAY B-5173 B-5173 SR 1328 REPLACE BRIDGE NO. 39 SURRY PIEDMONT RIGHT-OF-WAY 2016 2016 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MITCHELL RIVER. NORTHWEST
HIGHWAY B-5173 B-5173 SR 1328 REPLACE BRIDGE NO. 39 SURRY PIEDMONT CONSTRUCTION 2017 2017 $1,150 $1,150
MITCHELL RIVER. NORTHWEST BEFORE
HIGHWAY B-5173 B-5173 SR 1328 REPLACE BRIDGE NO. 39 SURRY PIEDMONT 2011 $100 $100
BROWN STREET.
REPLACE BRIDGE
WASHIN NO. 80 OVER JACKS BEFORE
HIGHWAY B-5174 B-5174 GTON CREEK BEAUFORT MID-EAST 2011 $0
MIDDLE FORK CREEK.
REPLACE BRIDGE NO.
278 AND REALIGN
INTERSECTIONS
OF US 321 WITH SR 1540
HIGHWAY B-5177 B-5177 SR 1540 AND SR 1531. WATAUGA HIGH COUNTRY RIGHT-OF-WAY 2019 2019 $500 $500
MIDDLE FORK CREEK.
REPLACE BRIDGE NO.
278 AND REALIGN
INTERSECTIONS
OF US 321 WITH SR 1540
HIGHWAY B-5177 B-5177 SR 1540 AND SR 1531. WATAUGA HIGH COUNTRY CONSTRUCTION 2020 2020 $2,500 $2,500
MIDDLE FORK CREEK.
REPLACE BRIDGE NO.
278 AND REALIGN
INTERSECTIONS
OF US 321 WITH SR 1540 BEFORE
HIGHWAY B-5177 B-5177 SR 1540 AND SR 1531. WATAUGA HIGH COUNTRY 2011 $100 $100
SR 3431 (POND ROAD)
AND HOMINY
CREEK. REPLACE
ASHEVIL BRIDGE NO. 235
HIGHWAY B-5178 B-5178 LE I-26 AND BRIDGE NO. 238 BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2011 2011 $200 $200
SR 3431 (POND ROAD)
AND HOMINY
CREEK. REPLACE
ASHEVIL BRIDGE NO. 235
HIGHWAY B-5178 B-5178 LE I-26 AND BRIDGE NO. 238 BUNCOMBE ASHEVILLE UTILITIES 2011 2011 $60 $60
SR 3431 (POND ROAD)
AND HOMINY
CREEK. REPLACE
ASHEVIL BRIDGE NO. 235
HIGHWAY B-5178 B-5178 LE I-26 AND BRIDGE NO. 238 BUNCOMBE ASHEVILLE CONSTRUCTION 2012 2014 $11,100 $3,700 $3,700 $3,700
SR 3431 (POND ROAD)
AND HOMINY
CREEK. REPLACE
ASHEVIL BRIDGE NO. 235 BEFORE
HIGHWAY B-5178 B-5178 LE I-26 AND BRIDGE NO. 238 BUNCOMBE ASHEVILLE 2011 $100 $100
I-26, I-40, I-240, US 19, US
25,
AND SR 1001. BRIDGE BUNCOMBE,MAD ASHEVILLE,LAN BEFORE
HIGHWAY B-5179 B-5179 VARIOUS DECKS PRESERVATION. ISON D OF SKY 2011 $11,545 $11,545
MUD CREEK. REPLACE BEFORE
HIGHWAY B-5180 B-5180 SR 1764 BRIDGE NO. 205. HENDERSON ASHEVILLE 2011 $1,600 $1,600
BRIDGE NO. 9. PAINT BEFORE
HIGHWAY B-5181 B-5181 US 64 BRIDGE. DARE ALBEMARLE 2011 $3,530 $3,530
CULVERT NO. 6 OVER
BURNT MILL CREEK. BEFORE
HIGHWAY B-5182 B-5182 NC 37 REPLACE CULVERT. PERQUIMANS ALBEMARLE 2011 $313 $313
BRIDGE NO. 1. REPLACE BEFORE
HIGHWAY B-5183 B-5183 NC 45-99 BRIDGE. WASHINGTON ALBEMARLE 2011 $307 $307
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 1234,
SR 1319, BRIDGE NO. 26, NO. 28,
US 17 NO. 27, NO. 30. BEFORE
HIGHWAY B-5184 B-5184 BYPASS PAINT BRIDGES. CHOWAN ALBEMARLE 2011 $556 $556
PAINT BRIDGE GIRDERS
ON BRIDGE NO. 210 ON
SR 1396, BRIDGE NO. 211
ON SR 1602 AND BRIDGE
NO. 214 ON SR 1649. ALL
SR 1602 STRUCTURES ARE OVER NORTHWEST BEFORE
HIGHWAY B-5185 B-5185 SR 1649 I-77. SURRY PIEDMONT 2011 $386 $386
PAINT BRIDGE GIRDERS
ON BRIDGE NO. 87 ON
SR 1138, BRIDGE NO. 120
ON SR 1131, BRIDGE NO.
147 AND BRIDGE NO. 167
ON
SR 1122, BRIDGE NO. 168
ON SR 1001 AND BRIDGE
NO. 187 ON SR 1345. ALL
STRUCTURES ARE OVER NORTHWEST BEFORE
HIGHWAY B-5186 B-5186 VARIOUS I-77. SURRY PIEDMONT 2011 $1,072 $1,072
I-77, PAINT BRIDGE
GIRDERS ON BRIDGE
NO. 198 AND BRIDGE NO.
204 OVER
NC 89 AND BRIDGE NO.
208 OVER I-74 NORTHWEST BEFORE
HIGHWAY B-5187 B-5187 I-77 EASTBOUND LANE. SURRY PIEDMONT 2011 $686 $686
BRIDGE EXPANSION
JOINT REPAIRS AT BEFORE
HIGHWAY B-5188 B-5188 VARIOUS SELECTED LOCATIONS. ALAMANCE BURLINGTON 2011 $160 $160
BRIDGE EXPANSION
JOINT REPAIRS AT BEFORE
HIGHWAY B-5190 B-5190 VARIOUS SELECTED LOCATIONS. GUILFORD GREENSBORO 2011 $160 $160
BRIDGE EXPANSION TRIANGLE
JOINT REPAIRS AT AREA,DURHAM, BEFORE
HIGHWAY B-5191 B-5191 VARIOUS SELECTED LOCATIONS. ORANGE BURLINGTON 2011 $160 $160
BRIDGE EXPANSION
JOINT REPAIRS AT PIEDMONT BEFORE
HIGHWAY B-5192 B-5192 VARIOUS SELECTED LOCATIONS. ROCKINGHAM TRIAD 2011 $160 $160
ROANOKE RIVER.
REHABILITATE BEFORE
HIGHWAY B-5194 B-5194 NC 45 BRIDGE NO. 7 BERTIE PEANUT BELT 2011 $2,000 $2,000
ALLIGATOR RIVER.
REHABILITATE BEFORE
HIGHWAY B-5195 B-5195 US 64 BRIDGE NO. 7 TYRRELL ALBEMARLE 2011 $1,356 $1,356
REPLACE BRIDGE NO.
MONTRE 528 ON TEXAS ROAD BEFORE
HIGHWAY B-5196 B-5196 AT OVER FLAT CREEK. BUNCOMBE ASHEVILLE 2011 $0
CONNARITSA SWAMP. BEFORE
HIGHWAY B-5197 B-5197 SR 1221 REPLACE BRIDGE NO. 36 BERTIE PEANUT BELT 2011 $810 $810
CASHIE RIVER. BEFORE
HIGHWAY B-5198 B-5198 SR 1260 REPLACE BRIDGE NO. 16 BERTIE PEANUT BELT 2011 $980 $980
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ROANOKE RIVER. BEFORE
HIGHWAY B-5199 B-5199 NC 11 REPLACE BRIDGE NO. 39 MARTIN MID-EAST 2011 $390 $390
BLOUNTS CREEK.
HIGHWAY B-5200 B-5200 NC 33 REPLACE BRIDGE NO. 60 BEAUFORT MID-EAST CONSTRUCTION 2011 2011 $2,100 $2,100
BLOUNTS CREEK.
HIGHWAY B-5200 B-5200 NC 33 REPLACE BRIDGE NO. 60 BEAUFORT MID-EAST RIGHT-OF-WAY 2011 2011 $210 $210
BLOUNTS CREEK. BEFORE
HIGHWAY B-5200 B-5200 NC 33 REPLACE BRIDGE NO. 60 BEAUFORT MID-EAST 2011 $50 $50
CANAL. REPLACE
HIGHWAY B-5201 B-5201 NC 99 BRIDGE NO. 33 BEAUFORT MID-EAST RIGHT-OF-WAY 2019 2019 $75 $75
CANAL. REPLACE
HIGHWAY B-5201 B-5201 NC 99 BRIDGE NO. 33 BEAUFORT MID-EAST CONSTRUCTION 2020 2020 $750 $750
CANAL. REPLACE BEFORE
HIGHWAY B-5201 B-5201 NC 99 BRIDGE NO. 33 BEAUFORT MID-EAST 2011 $50 $50
CANAL. REPLACE
HIGHWAY B-5202 B-5202 NC 99 BRIDGE NO. 18 BEAUFORT MID-EAST RIGHT-OF-WAY 2019 2019 $220 $220
CANAL. REPLACE
HIGHWAY B-5202 B-5202 NC 99 BRIDGE NO. 18 BEAUFORT MID-EAST CONSTRUCTION 2020 2020 $2,200 $2,200
PUNGO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5203 B-5203 SR 1532 157 BEAUFORT MID-EAST RIGHT-OF-WAY 2019 2019 $80 $80
PUNGO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5203 B-5203 SR 1532 157 BEAUFORT MID-EAST CONSTRUCTION 2020 2020 $775 $775
PUNGO CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5203 B-5203 SR 1532 157 BEAUFORT MID-EAST 2011 $50 $50
CREEK. REPLACE
HIGHWAY B-5204 B-5204 SR 1625 BRIDGE NO. 141 BEAUFORT MID-EAST RIGHT-OF-WAY 2019 2019 $80 $80
CREEK. REPLACE
HIGHWAY B-5204 B-5204 SR 1625 BRIDGE NO. 141 BEAUFORT MID-EAST CONSTRUCTION 2020 2020 $785 $785
CREEK. REPLACE BEFORE
HIGHWAY B-5204 B-5204 SR 1625 BRIDGE NO. 141 BEAUFORT MID-EAST 2011 $50 $50
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRIDGE NO. 142 OVER
PIEGON RIVER.
REHABILITATE DECK
USING HYDRO-
DEMOLITION AND EARLY
STRENGTH
LATEX MODIFIED BEFORE
HIGHWAY B-5206 B-5206 I-40 CONCRETE. HAYWOOD LAND OF SKY 2011 $0
BRIDGE NO. 124 OVER
SR 1338. REHABILITATE
DECK USING HYDRO-
DEMOLITION AND EARLY
STRENGTH
LATEX MODIFIED BEFORE
HIGHWAY B-5207 B-5207 I-40 CONCRETE. HAYWOOD LAND OF SKY 2011 $450 $450
BRIDGE NO. 205 OVER
SR 1364. REHABILITATE
DECK USING HYDRO-
DEMOLITION AND EARLY
STRENGTH
LATEX MODIFIED BEFORE
HIGHWAY B-5208 B-5208 I-40 CONCRETE. HAYWOOD LAND OF SKY 2011 $300 $300
BRIDGE NO. 10 OVER
EAST BUFFALO CREEK.
REHABILITATE DECK
USING HYDRO-
DEMOLITION AND EARLY
STRENGTH LATEX SOUTHWESTER BEFORE
HIGHWAY B-5209 B-5209 US 129 MODIFIED CONCRETE. GRAHAM N 2011 $800 $800
SYCAMORE CREEK. BEFORE
HIGHWAY B-5210 B-5210 SR 1600 REPLACE BRIDGE NO. 76 FRANKLIN KERR TAR 2011 $600 $600
LYNCH CREEK.
REPLACE BRIDGE4 NO. BEFORE
HIGHWAY B-5211 B-5211 SR 1239 38 FRANKLIN KERR TAR 2011 $600 $600
CEDAR CREEK. BEFORE
HIGHWAY B-5212 B-5212 SR 1109 REPLACE BRIDGE NO. 17 FRANKLIN KERR TAR 2011 $600 $600
TABBS CREEK. BEFORE
HIGHWAY B-5213 B-5213 SR 1110 REPLACE BRIDGE NO. 5 VANCE KERR TAR 2011 $600 $600
EAST BRANCH OF SWIFT
CREEK.
HIGHWAY B-5214 B-5214 SR 1724 REPLACE BRIDGE NO. 37 PITT GREENVILLE CONSTRUCTION 2011 2011 $550 $550
EAST BRANCH OF SWIFT
CREEK. BEFORE
HIGHWAY B-5214 B-5214 SR 1724 REPLACE BRIDGE NO. 37 PITT GREENVILLE 2011 $90 $90
BRANCH OF LOCKWOOD
FOLLY RIVER. BEFORE
HIGHWAY B-5215 B-5215 SR 1115 REPLACE BRIDGE NO. 49 BRUNSWICK CAPE FEAR 2011 $640 $640
BRANCH OF LOCKWOOD
FOLLY RIVER. BEFORE
HIGHWAY B-5216 B-5216 SR 1115 REPLACE BRIDGE NO. 58 BRUNSWICK CAPE FEAR 2011 $590 $590
BRANCH OF LOCKWOOD
FOLLY RIVER. BEFORE
HIGHWAY B-5217 B-5217 SR 1115 REPLACE BRIDGE NO. 59 BRUNSWICK CAPE FEAR 2011 $590 $590
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SANDY CREEK. BEFORE
HIGHWAY B-5218 B-5218 SR 1451 REPLACE BRIDGE NO. 61 FRANKLIN KERR TAR 2011 $1,390 $1,390
GRASSY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5219 B-5219 SR 1413 139 GRANVILLE KERR TAR CONSTRUCTION 2011 2011 $550 $550
GRASSY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5219 B-5219 SR 1413 139 GRANVILLE KERR TAR RIGHT-OF-WAY 2011 2011 $5 $5
GRASSY CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5219 B-5219 SR 1413 139 GRANVILLE KERR TAR 2011 $80 $80
BRANCH. REPLACE
HIGHWAY B-5220 B-5220 SR 1536 BRIDGE NO. 93 PERSON KERR TAR CONSTRUCTION 2011 2011 $850 $850
BRANCH. REPLACE BEFORE
HIGHWAY B-5220 B-5220 SR 1536 BRIDGE NO. 93 PERSON KERR TAR 2011 $9 $9
TOWN CREEK. REPLACE BEFORE
HIGHWAY B-5221 B-5221 SR 2114 BRIDGE NO. 95 ROWAN CONCORD 2011 $555 $555
GRANTS CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5222 B-5222 SR 1506 210 ROWAN CONCORD 2011 $555 $555
WOLF MEADOW CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5223 B-5223 SR 1304 191 CABARRUS CONCORD CONSTRUCTION 2011 2011 $700 $700
WOLF MEADOW CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5223 B-5223 SR 1304 191 CABARRUS CONCORD 2011 $85 $85
MEAT CAMP CREEK. BEFORE
HIGHWAY B-5226 B-5226 SR 1340 REPLACE BRIDGE NO. 37 WATAUGA HIGH COUNTRY 2011 $383 $383
HUNTING CREEK. BEFORE
HIGHWAY B-5227 B-5227 SR 2428 REPLACE BRIDGE NO. 24 WILKES HIGH COUNTRY 2011 $535 $535
CREEK. REPLACE NORTHWEST BEFORE
HIGHWAY B-5228 B-5228 SR 1538 BRIDGE NO. 99 YADKIN PIEDMONT 2011 $735 $735
BRANCH OF SOUTH
YADKIN RIVER.
HIGHWAY B-5229 B-5229 SR 1001 REPLACE BRIDGE NO. 48 ALEXANDER HIGH COUNTRY CONSTRUCTION 2011 2011 $450 $450
BRANCH OF SOUTH
YADKIN RIVER. BEFORE
HIGHWAY B-5229 B-5229 SR 1001 REPLACE BRIDGE NO. 48 ALEXANDER HIGH COUNTRY 2011 $85 $85
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LEONARD FORK CREEK.
HIGHWAY B-5230 B-5230 NC 182 REPLACE BRIDGE NO. 29 LINCOLN LAKE NORMAN CONSTRUCTION 2011 2011 $700 $700
LEONARD FORK CREEK. BEFORE
HIGHWAY B-5230 B-5230 NC 182 REPLACE BRIDGE NO. 29 LINCOLN LAKE NORMAN 2011 $75 $75
CREEK. REPLACE BEFORE
HIGHWAY B-5231 B-5231 SR 1121 BRIDGE NO. 162 YANCEY HIGH COUNTRY 2011 $499 $499
JACOB FORK RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5232 B-5232 SR 1907 118 BURKE HICKORY CONSTRUCTION 2011 2011 $700 $700
JACOB FORK RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5232 B-5232 SR 1907 118 BURKE HICKORY 2011 $85 $85
MARTIN CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-5233 B-5233 SR 1556 173 CHEROKEE N 2011 $605 $605
TROUT COVE CREEK.
REPLACE BRIDGE NO. SOUTHWESTER BEFORE
HIGHWAY B-5234 B-5234 SR 1100 100 CLAY N 2011 $535 $535
GLADE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5235 B-5235 SR 1504 194 TRANSYLVANIA LAND OF SKY 2011 $785 $785
LORDS CREEK.
HIGHWAY B-5236 B-5236 SR 1100 REPLACE BRIDGE NO. 19 NEW HANOVER WILMINGTON RIGHT-OF-WAY 2015 2015 $175 $175
LORDS CREEK.
HIGHWAY B-5236 B-5236 SR 1100 REPLACE BRIDGE NO. 19 NEW HANOVER WILMINGTON CONSTRUCTION 2016 2016 $1,750 $1,750
MAHLER'S CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5237 B-5237 SR 2703 248 WAKE RALEIGH RIGHT-OF-WAY 2015 2015 $78 $78
MAHLER'S CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5237 B-5237 SR 2703 248 WAKE RALEIGH CONSTRUCTION 2016 2016 $785 $785
MILL RACE. REPLACE
HIGHWAY B-5239 B-5239 NC 87 BRIDGE NO. 126 ALAMANCE BURLINGTON RIGHT-OF-WAY 2015 2015 $95 $95
MILL RACE. REPLACE
HIGHWAY B-5239 B-5239 NC 87 BRIDGE NO. 126 ALAMANCE BURLINGTON CONSTRUCTION 2016 2016 $948 $948
LITTLE YADKIN CREEK. NORTHWEST
HIGHWAY B-5240 B-5240 SR 1136 REPLACE BRIDGE NO. 13 STOKES PIEDMONT RIGHT-OF-WAY 2015 2015 $90 $90
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
LITTLE YADKIN CREEK. NORTHWEST
HIGHWAY B-5240 B-5240 SR 1136 REPLACE BRIDGE NO. 13 STOKES PIEDMONT CONSTRUCTION 2016 2016 $900 $900
SOUTHERN RAILROAD.
HIGHWAY B-5241 B-5241 NC 160 REPLACE BRIDGE NO. 54 MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2014 2014 $480 $480
SOUTHERN RAILROAD.
HIGHWAY B-5241 B-5241 NC 160 REPLACE BRIDGE NO. 54 MECKLENBURG CHARLOTTE CONSTRUCTION 2015 2016 $4,800 $2,400 $2,400
BARRINGER DRIVE
OVER IRWIN CREEK.
CHARLO REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5242 B-5242 TTE 376. MECKLENBURG CHARLOTTE 2011 $0
SOUTH FORK CROOKED
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5243 B-5243 SR 1008 258. UNION CHARLOTTE RIGHT-OF-WAY 2015 2015 $60 $60
SOUTH FORK CROOKED
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5243 B-5243 SR 1008 258. UNION CHARLOTTE CONSTRUCTION 2016 2016 $575 $575
ROBINSON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5244 B-5244 SR 3197 363 BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2015 2015 $50 $50
ROBINSON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5244 B-5244 SR 3197 363 BUNCOMBE ASHEVILLE CONSTRUCTION 2016 2016 $500 $500
FISHER RIVER.
REPLACE BRIDGE NO. NORTHWEST
HIGHWAY B-5245 B-5245 SR 2222 326 SURRY PIEDMONT CONSTRUCTION 2011 2011 $1,500 $1,500
FISHER RIVER.
REPLACE BRIDGE NO. NORTHWEST
HIGHWAY B-5245 B-5245 SR 2222 326 SURRY PIEDMONT RIGHT-OF-WAY 2011 2011 $25 $25
PANTEGO CREEK.
HIGHWAY B-5300 B-5300 US 264 REPLACE BRIDGE NO. 55 BEAUFORT MID-EAST RIGHT-OF-WAY 2017 2017 $150 $150
PANTEGO CREEK.
HIGHWAY B-5300 B-5300 US 264 REPLACE BRIDGE NO. 55 BEAUFORT MID-EAST CONSTRUCTION 2018 2018 $1,475 $1,475
NORFOLK SOUTHERN
RAILROAD.
HIGHWAY B-5301 B-5301 NC 33 REPLACE BRIDGE NO. 87 PITT MID-EAST RIGHT-OF-WAY 2016 2016 $460 $460
NORFOLK SOUTHERN
RAILROAD.
HIGHWAY B-5301 B-5301 NC 33 REPLACE BRIDGE NO. 87 PITT MID-EAST CONSTRUCTION 2018 2019 $4,600 $2,300 $2,300
NORFOLK SOUTHERN
RAILROAD.
HIGHWAY B-5302 B-5302 US 17 REPLACE BRIDGE NO. 3 BEAUFORT MID-EAST RIGHT-OF-WAY 2017 2017 $590 $590
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORFOLK SOUTHERN
RAILROAD.
HIGHWAY B-5302 B-5302 US 17 REPLACE BRIDGE NO. 3 BEAUFORT MID-EAST CONSTRUCTION 2019 2020 $5,900 $2,950 $2,950
ISLAND CREEK. EASTERN
HIGHWAY B-5303 B-5303 SR 1162 REPLACE BRIDGE NO. 45 DUPLIN CAROLINA RIGHT-OF-WAY 2018 2018 $130 $130
ISLAND CREEK. EASTERN
HIGHWAY B-5303 B-5303 SR 1162 REPLACE BRIDGE NO. 45 DUPLIN CAROLINA CONSTRUCTION 2019 2019 $1,275 $1,275
SILL'S CREEK. REPLACE
HIGHWAY B-5304 B-5304 SR 1324 BRIDGE NO. 203 PENDER CAPE FEAR RIGHT-OF-WAY 2018 2018 $100 $100
SILL'S CREEK. REPLACE
HIGHWAY B-5304 B-5304 SR 1324 BRIDGE NO. 203 PENDER CAPE FEAR CONSTRUCTION 2019 2019 $1,025 $1,025
BIG SWAMP. REPLACE
HIGHWAY B-5305 B-5305 SR 1430 BRIDGE NO. 123 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2018 2018 $105 $105
BIG SWAMP. REPLACE
HIGHWAY B-5305 B-5305 SR 1430 BRIDGE NO. 123 SAMPSON MID-CAROLINA CONSTRUCTION 2019 2019 $1,050 $1,050
GREAT COHARIE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5306 B-5306 SR 1414 122 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2018 2018 $105 $105
GREAT COHARIE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5306 B-5306 SR 1414 122 SAMPSON MID-CAROLINA CONSTRUCTION 2019 2019 $1,050 $1,050
BEAVERDAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5307 B-5307 SR 1838 376 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2018 2018 $60 $60
BEAVERDAM CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5307 B-5307 SR 1838 376 SAMPSON MID-CAROLINA CONSTRUCTION 2019 2019 $600 $600
CAESAR SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-5308 B-5308 SR 1455 152 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2019 2019 $105 $105
CAESAR SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-5308 B-5308 SR 1455 152 SAMPSON MID-CAROLINA CONSTRUCTION 2020 2020 $1,050 $1,050
WHITE OAK RIVER.
HIGHWAY B-5309 B-5309 SR 1333 REPLACE BRIDGE NO. 10 ONSLOW DOWN EAST RIGHT-OF-WAY 2019 2019 $1,800 $1,800
WHITE OAK RIVER.
HIGHWAY B-5309 B-5309 SR 1333 REPLACE BRIDGE NO. 10 ONSLOW DOWN EAST CONSTRUCTION 2020 2020 $180 $180
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
WARD SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-5310 B-5310 SR 1817 188 SAMPSON MID-CAROLINA RIGHT-OF-WAY 2019 2019 $150 $150
WARD SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-5310 B-5310 SR 1817 188 SAMPSON MID-CAROLINA CONSTRUCTION 2020 2020 $1,500 $1,500
MIDDLE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-5311 B-5311 SR 1500 104 BRUNSWICK CAPE FEAR RIGHT-OF-WAY 2019 2019 $80 $80
MIDDLE SWAMP.
REPLACE BRIDGE NO.
HIGHWAY B-5311 B-5311 SR 1500 104 BRUNSWICK CAPE FEAR CONSTRUCTION 2020 2020 $815 $815
HOLLY SHELTER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5312 B-5312 SR 1520 117 PENDER CAPE FEAR RIGHT-OF-WAY 2019 2019 $100 $100
HOLLY SHELTER CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5312 B-5312 SR 1520 117 PENDER CAPE FEAR CONSTRUCTION 2020 2020 $1,000 $1,000
TOWN CREEK. REPLACE UPPER
HIGHWAY B-5313 B-5313 SR 1002 BRIDGE NO. 109 WILSON COASTAL PLAIN RIGHT-OF-WAY 2017 2017 $135 $135
TOWN CREEK. REPLACE UPPER
HIGHWAY B-5313 B-5313 SR 1002 BRIDGE NO. 109 WILSON COASTAL PLAIN CONSTRUCTION 2018 2018 $1,350 $1,350
BUTTERWOOD CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5314 B-5314 SR 1304 133 HALIFAX PEANUT BELT RIGHT-OF-WAY 2017 2017 $60 $60
BUTTERWOOD CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5314 B-5314 SR 1304 133 HALIFAX PEANUT BELT CONSTRUCTION 2018 2018 $600 $600
KEEHUKEE SWAMP.
HIGHWAY B-5315 B-5315 SR 1804 REPLACE BRIDGE NO. 71 HALIFAX PEANUT BELT RIGHT-OF-WAY 2018 2018 $80 $80
KEEHUKEE SWAMP.
HIGHWAY B-5315 B-5315 SR 1804 REPLACE BRIDGE NO. 71 HALIFAX PEANUT BELT CONSTRUCTION 2019 2019 $785 $785
TRIBUTARY OF COKEY
SWAMP. UPPER
HIGHWAY B-5316 B-5316 SR 1006 REPLACE BRIDGE NO. 59 EDGECOMBE COASTAL PLAIN RIGHT-OF-WAY 2019 2019 $70 $70
TRIBUTARY OF COKEY
SWAMP. UPPER
HIGHWAY B-5316 B-5316 SR 1006 REPLACE BRIDGE NO. 59 EDGECOMBE COASTAL PLAIN CONSTRUCTION 2020 2020 $770 $770
US 401 (CAPITAL
BOULEVARD).
US 70- REPLACE BRIDGE NO.
HIGHWAY B-5317 B-5317 NC 50 213 WAKE RALEIGH RIGHT-OF-WAY 2016 2016 $593 $593
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
US 401 (CAPITAL
BOULEVARD).
US 70- REPLACE BRIDGE NO.
HIGHWAY B-5317 B-5317 NC 50 213 WAKE RALEIGH CONSTRUCTION 2017 2019 $6,285 $2,095 $2,095 $2,095
SMITHS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5318 B-5318 SR 2044 126 WAKE RALEIGH RIGHT-OF-WAY 2016 2016 $179 $179
SMITHS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5318 B-5318 SR 2044 126 WAKE RALEIGH CONSTRUCTION 2017 2017 $1,792 $1,792
BED BUD CREEK.
HIGHWAY B-5319 B-5319 SR 1120 REPLACE BRIDGE NO. 67 VANCE KERR TAR RIGHT-OF-WAY 2016 2016 $144 $144
BED BUD CREEK.
HIGHWAY B-5319 B-5319 SR 1120 REPLACE BRIDGE NO. 67 VANCE KERR TAR CONSTRUCTION 2017 2017 $1,440 $1,440
TAR RIVER. REPLACE
HIGHWAY B-5320 B-5320 SR 1139 BRIDGE NO. 96 GRANVILLE KERR TAR RIGHT-OF-WAY 2017 2017 $298 $298
TAR RIVER. REPLACE
HIGHWAY B-5320 B-5320 SR 1139 BRIDGE NO. 96 GRANVILLE KERR TAR CONSTRUCTION 2018 2018 $2,977 $2,977
LITTLE BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-5321 B-5321 SR 1153 374 WAKE RALEIGH RIGHT-OF-WAY 2017 2017 $61 $61
LITTLE BRANCH.
REPLACE BRIDGE NO.
HIGHWAY B-5321 B-5321 SR 1153 374 WAKE RALEIGH CONSTRUCTION 2018 2018 $607 $607
RICHLAND CREEK.
HIGHWAY B-5322 B-5322 SR 1343 REPLACE BRIDGE NO. 51 PERSON KERR TAR RIGHT-OF-WAY 2018 2018 $136 $136
RICHLAND CREEK.
HIGHWAY B-5322 B-5322 SR 1343 REPLACE BRIDGE NO. 51 PERSON KERR TAR CONSTRUCTION 2019 2019 $1,360 $1,360
JOHNSTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5323 B-5323 SR 1442 143 GRANVILLE KERR TAR RIGHT-OF-WAY 2018 2018 $238 $238
JOHNSTON CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5323 B-5323 SR 1442 143 GRANVILLE KERR TAR CONSTRUCTION 2019 2019 $2,379 $2,379
TRIBUTARY OF HORSE
CREEK.
HIGHWAY B-5324 B-5324 SR 1147 REPLACE BRIDGE NO. 3 FRANKLIN KERR TAR RIGHT-OF-WAY 2018 2018 $55 $55
TRIBUTARY OF HORSE
CREEK.
HIGHWAY B-5324 B-5324 SR 1147 REPLACE BRIDGE NO. 3 FRANKLIN KERR TAR CONSTRUCTION 2019 2019 $550 $550
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CEDAR CREEK.
HIGHWAY B-5325 B-5325 SR 1116 REPLACE BRIDGE NO. 12 FRANKLIN KERR TAR RIGHT-OF-WAY 2018 2018 $180 $180
CEDAR CREEK.
HIGHWAY B-5325 B-5325 SR 1116 REPLACE BRIDGE NO. 12 FRANKLIN KERR TAR CONSTRUCTION 2019 2019 $1,800 $1,800
WHITE OAK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5326 B-5326 SR 2555 247 WAKE RALEIGH RIGHT-OF-WAY 2018 2018 $53 $53
WHITE OAK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5326 B-5326 SR 2555 247 WAKE RALEIGH CONSTRUCTION 2019 2019 $533 $533
SOUTH HYCO CREEK.
HIGHWAY B-5327 B-5327 SR 1300 REPLACE BRIDGE NO. 49 PERSON KERR TAR RIGHT-OF-WAY 2017 2017 $299 $299
SOUTH HYCO CREEK.
HIGHWAY B-5327 B-5327 SR 1300 REPLACE BRIDGE NO. 49 PERSON KERR TAR CONSTRUCTION 2018 2018 $2,986 $2,986
SANDY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5328 B-5328 SR 1406 129 FRANKLIN KERR TAR RIGHT-OF-WAY 2019 2019 $49 $49
SANDY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5328 B-5328 SR 1406 129 FRANKLIN KERR TAR CONSTRUCTION 2020 2020 $489 $489
SYCAMORE CREEK AND
TRIBUTARY OF
TAR RIVER. REPLACE
BRIDGE NO. 75
HIGHWAY B-5329 B-5329 SR 1600 AND BRIDGE NO. 76 FRANKLIN KERR TAR RIGHT-OF-WAY 2019 2019 $255 $255
SYCAMORE CREEK AND
TRIBUTARY OF
TAR RIVER. REPLACE
BRIDGE NO. 75
HIGHWAY B-5329 B-5329 SR 1600 AND BRIDGE NO. 76 FRANKLIN KERR TAR CONSTRUCTION 2020 2020 $2,550 $2,550
DEVIL CRADLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5330 B-5330 SR 1413 107 FRANKLIN KERR TAR RIGHT-OF-WAY 2019 2019 $135 $135
DEVIL CRADLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5330 B-5330 SR 1413 107 FRANKLIN KERR TAR CONSTRUCTION 2020 2020 $1,348 $1,348
BIG BRANCH. REPLACE
HIGHWAY B-5331 B-5331 SR 1849 BRIDGE NO. 269 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2016 2016 $80 $80
BIG BRANCH. REPLACE
HIGHWAY B-5331 B-5331 SR 1849 BRIDGE NO. 269 COLUMBUS CAPE FEAR CONSTRUCTION 2017 2017 $830 $830
CEDAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5332 B-5332 SR 1005 130 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2017 2017 $50 $50
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CEDAR CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5332 B-5332 SR 1005 130 COLUMBUS CAPE FEAR CONSTRUCTION 2018 2018 $550 $550
LUMBER RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5333 B-5333 SR 1550 173 ROBESON LUMBER RIVER RIGHT-OF-WAY 2017 2017 $300 $300
LUMBER RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5333 B-5333 SR 1550 173 ROBESON LUMBER RIVER CONSTRUCTION 2018 2019 $3,125 $1,562 $1,563
MILL SWAMP CREEK.
HIGHWAY B-5334 B-5334 SR 2220 REPLACE BRIDGE NO. 78 ROBESON LUMBER RIVER RIGHT-OF-WAY 2017 2017 $50 $50
MILL SWAMP CREEK.
HIGHWAY B-5334 B-5334 SR 2220 REPLACE BRIDGE NO. 78 ROBESON LUMBER RIVER CONSTRUCTION 2018 2018 $475 $475
CREEK. REPLACE
HIGHWAY B-5335 B-5335 SR 1713 BRIDGE NO. 168 BLADEN MID-CAROLINA RIGHT-OF-WAY 2018 2018 $50 $50
CREEK. REPLACE
HIGHWAY B-5335 B-5335 SR 1713 BRIDGE NO. 168 BLADEN MID-CAROLINA CONSTRUCTION 2019 2019 $530 $530
CREEK. REPLACE
HIGHWAY B-5336 B-5336 SR 1314 BRIDGE NO. 103 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2018 2018 $60 $60
CREEK. REPLACE
HIGHWAY B-5336 B-5336 SR 1314 BRIDGE NO. 103 COLUMBUS CAPE FEAR CONSTRUCTION 2019 2019 $550 $550
COLD SWAMP CREEK.
HIGHWAY B-5337 B-5337 SR 1723 REPLACE BRIDGE NO. 6 ROBESON LUMBER RIVER RIGHT-OF-WAY 2018 2018 $105 $105
COLD SWAMP CREEK.
HIGHWAY B-5337 B-5337 SR 1723 REPLACE BRIDGE NO. 6 ROBESON LUMBER RIVER CONSTRUCTION 2019 2019 $1,050 $1,050
FLOOD CONTROL
CANAL.
HIGHWAY B-5338 B-5338 NC 904 REPLACE BRIDGE NO. 79 COLUMBUS CAPE FEAR RIGHT-OF-WAY 2019 2019 $80 $80
FLOOD CONTROL
CANAL.
HIGHWAY B-5338 B-5338 NC 904 REPLACE BRIDGE NO. 79 COLUMBUS CAPE FEAR CONSTRUCTION 2020 2020 $800 $800
BLACK RIVER
TRIBUTARY.
REPLACE BRIDGE NO.
HIGHWAY B-5339 B-5339 SR 1544 233 HARNETT RALEIGH RIGHT-OF-WAY 2019 2019 $80 $80
BLACK RIVER
TRIBUTARY.
REPLACE BRIDGE NO.
HIGHWAY B-5339 B-5339 SR 1544 233 HARNETT RALEIGH CONSTRUCTION 2020 2020 $770 $770
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
PRONG LITTLE RIVER.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-5340 B-5340 SR 1581 234 ORANGE AREA RIGHT-OF-WAY 2016 2016 $31 $31
PRONG LITTLE RIVER.
REPLACE BRIDGE NO. TRIANGLE
HIGHWAY B-5340 B-5340 SR 1581 234 ORANGE AREA CONSTRUCTION 2017 2017 $311 $311
WOLF ISLAND CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5341 B-5341 SR 1767 110 ROCKINGHAM TRIAD RIGHT-OF-WAY 2016 2016 $259 $259
WOLF ISLAND CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5341 B-5341 SR 1767 110 ROCKINGHAM TRIAD CONSTRUCTION 2017 2017 $2,592 $2,592
GUM CREEK. REPLACE
HIGHWAY B-5342 B-5342 SR 1148 BRIDGE NO. 169 ALAMANCE BURLINGTON RIGHT-OF-WAY 2016 2016 $75 $75
GUM CREEK. REPLACE
HIGHWAY B-5342 B-5342 SR 1148 BRIDGE NO. 169 ALAMANCE BURLINGTON CONSTRUCTION 2017 2017 $750 $750
CASCADE CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5343 B-5343 NC 770 169 ROCKINGHAM TRIAD RIGHT-OF-WAY 2017 2017 $93 $93
CASCADE CREEK.
REPLACE BRIDGE NO. PIEDMONT
HIGHWAY B-5343 B-5343 NC 770 169 ROCKINGHAM TRIAD CONSTRUCTION 2018 2018 $930 $930
SOUTH BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5344 B-5344 SR 2821 161 GUILFORD GREENSBORO RIGHT-OF-WAY 2017 2017 $123 $123
SOUTH BUFFALO
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5344 B-5344 SR 2821 161 GUILFORD GREENSBORO CONSTRUCTION 2018 2018 $1,232 $1,232
BRUSH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5345 B-5345 SR 2136 456 GUILFORD GREENSBORO RIGHT-OF-WAY 2017 2017 $113 $113
BRUSH CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5345 B-5345 SR 2136 456 GUILFORD GREENSBORO CONSTRUCTION 2018 2018 $1,126 $1,126
CREEK. REPLACE
HIGHWAY B-5346 B-5346 SR 1529 BRIDGE NO. 3 ALAMANCE BURLINGTON RIGHT-OF-WAY 2017 2017 $77 $77
CREEK. REPLACE
HIGHWAY B-5346 B-5346 SR 1529 BRIDGE NO. 3 ALAMANCE BURLINGTON CONSTRUCTION 2018 2018 $770 $770
PRONG OF ALAMANCE
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5347 B-5347 SR 1145 170 ALAMANCE BURLINGTON RIGHT-OF-WAY 2018 2018 $52 $52
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
PRONG OF ALAMANCE
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5347 B-5347 SR 1145 170 ALAMANCE BURLINGTON CONSTRUCTION 2019 2019 $518 $518
PHIL'S CREEK. REPLACE
HIGHWAY B-5348 B-5348 SR 1005 BRIDGE NO. 85 ORANGE DURHAM RIGHT-OF-WAY 2018 2018 $97 $97
PHIL'S CREEK. REPLACE
HIGHWAY B-5348 B-5348 SR 1005 BRIDGE NO. 85 ORANGE DURHAM CONSTRUCTION 2019 2019 $966 $966
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5349 B-5349 SR 1149 173 ALAMANCE BURLINGTON RIGHT-OF-WAY 2018 2018 $179 $179
LITTLE ALAMANCE
CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5349 B-5349 SR 1149 173 ALAMANCE BURLINGTON CONSTRUCTION 2019 2019 $1,792 $1,792
JORDAN'S CREEK.
HIGHWAY B-5350 B-5350 SR 1768 REPLACE BRIDGE NO. 44 ALAMANCE BURLINGTON RIGHT-OF-WAY 2018 2018 $53 $53
JORDAN'S CREEK.
HIGHWAY B-5350 B-5350 SR 1768 REPLACE BRIDGE NO. 44 ALAMANCE BURLINGTON CONSTRUCTION 2019 2019 $533 $533
US 29-70,
I-85
BUSINES DEEP RIVER. REPLACE
HIGHWAY B-5351 B-5351 S LOOP BRIDGE NO. 242 GUILFORD GREENSBORO RIGHT-OF-WAY 2019 2019 $390 $390
DUTCH BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5375 B-5375 SR 1132 137 CABARRUS CONCORD RIGHT-OF-WAY 2018 2018 $210 $210
DUTCH BUFFALO CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5375 B-5375 SR 1132 137 CABARRUS CONCORD CONSTRUCTION 2019 2019 $2,100 $2,100
STEWART'S CREEK.
HIGHWAY B-5376 B-5376 SR 1681 REPLACE BRIDGE NO. 21 UNION CHARLOTTE RIGHT-OF-WAY 2019 2019 $220 $220
STEWART'S CREEK.
HIGHWAY B-5376 B-5376 SR 1681 REPLACE BRIDGE NO. 21 UNION CHARLOTTE CONSTRUCTION 2020 2020 $2,200 $2,200
POLE CAT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5377 B-5377 SR 2170 157 UNION ROCKY RIVER RIGHT-OF-WAY 2019 2019 $45 $45
POLE CAT CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5377 B-5377 SR 2170 157 UNION ROCKY RIVER CONSTRUCTION 2020 2020 $450 $450
MICHAEL BAKER ROAD
OVER BRIAR CREEK.
CHARLO REPLACE BRIDGE NO. BEFORE
HIGHWAY B-5378 B-5378 TTE 210 MECKLENBURG CHARLOTTE 2011 $0
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CREEK. REPLACE
HIGHWAY B-5379 B-5379 SR 1310 BRIDGE NO. 99 AVERY HIGH COUNTRY RIGHT-OF-WAY 2016 2016 $30 $30
CREEK. REPLACE
HIGHWAY B-5379 B-5379 SR 1310 BRIDGE NO. 99 AVERY HIGH COUNTRY CONSTRUCTION 2017 2017 $300 $300
CREEK. REPLACE
HIGHWAY B-5380 B-5380 SR 1114 BRIDGE NO. 141 AVERY HIGH COUNTRY RIGHT-OF-WAY 2017 2017 $55 $55
CREEK. REPLACE
HIGHWAY B-5380 B-5380 SR 1114 BRIDGE NO. 141 AVERY HIGH COUNTRY CONSTRUCTION 2018 2018 $550 $550
HARLEY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5381 B-5381 SR 1302 403 WILKES HIGH COUNTRY RIGHT-OF-WAY 2017 2017 $40 $40
HARLEY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5381 B-5381 SR 1302 403 WILKES HIGH COUNTRY CONSTRUCTION 2018 2018 $385 $385
CREEK. REPLACE
HIGHWAY B-5382 B-5382 SR 1167 BRIDGE NO. 100 AVERY HIGH COUNTRY RIGHT-OF-WAY 2017 2017 $30 $30
CREEK. REPLACE
HIGHWAY B-5382 B-5382 SR 1167 BRIDGE NO. 100 AVERY HIGH COUNTRY CONSTRUCTION 2018 2018 $300 $300
LINVILLE RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5383 B-5383 SR 1536 143 AVERY HIGH COUNTRY RIGHT-OF-WAY 2017 2017 $100 $100
LINVILLE RIVER.
REPLACE BRIDGE NO.
HIGHWAY B-5383 B-5383 SR 1536 143 AVERY HIGH COUNTRY CONSTRUCTION 2018 2018 $1,000 $1,000
CREEK. REPLACE
HIGHWAY B-5384 B-5384 SR 1557 BRIDGE NO. 464 ASHE HIGH COUNTRY RIGHT-OF-WAY 2018 2018 $30 $30
CREEK. REPLACE
HIGHWAY B-5384 B-5384 SR 1557 BRIDGE NO. 464 ASHE HIGH COUNTRY CONSTRUCTION 2019 2019 $300 $300
ESTES MILL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5385 B-5385 SR1356 123 CALDWELL UNIFOUR RIGHT-OF-WAY 2019 2019 $40 $40
ESTES MILL CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5385 B-5385 SR1356 123 CALDWELL UNIFOUR CONSTRUCTION 2020 2020 $400 $400
NORTH FORK CREEK.
HIGHWAY B-5386 B-5386 SR 1227 REPLACE BRIDGE NO. 87 WATAUGA HIGH COUNTRY RIGHT-OF-WAY 2019 2019 $40 $40
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTH FORK CREEK.
HIGHWAY B-5386 B-5386 SR 1227 REPLACE BRIDGE NO. 87 WATAUGA HIGH COUNTRY CONSTRUCTION 2020 2020 $400 $400
ELK CREEK. REPLACE
HIGHWAY B-5387 B-5387 SR 1332 BRIDGE NO. 47 ALLEGHANY HIGH COUNTRY RIGHT-OF-WAY 2019 2019 $135 $135
ELK CREEK. REPLACE
HIGHWAY B-5387 B-5387 SR 1332 BRIDGE NO. 47 ALLEGHANY HIGH COUNTRY CONSTRUCTION 2020 2020 $1,350 $1,350
LITTLE RIVER. REPLACE
HIGHWAY B-5388 B-5388 NC 18 BRIDGE NO. 21 ALLEGHANY HIGH COUNTRY RIGHT-OF-WAY 2019 2019 $190 $190
LITTLE RIVER. REPLACE BEFORE
HIGHWAY B-5388 B-5388 NC 18 BRIDGE NO. 21 ALLEGHANY HIGH COUNTRY 2011 $0
LITTLE RIVER. REPLACE AFTER
HIGHWAY B-5388 B-5388 NC 18 BRIDGE NO. 21 ALLEGHANY HIGH COUNTRY CONSTRUCTION 2020 2020 $5,900 $1,967 3,933.00
YADKIN RIVER
OVERFLOW.
US 421 REPLACE BRIDGE NO. NORTHWEST
HIGHWAY B-5389 B-5389 NBL 105 YADKIN PIEDMONT RIGHT-OF-WAY 2019 2019 $1,000 $1,000
YADKIN RIVER
OVERFLOW.
US 421 REPLACE BRIDGE NO. NORTHWEST AFTER
HIGHWAY B-5389 B-5389 NBL 105 YADKIN PIEDMONT CONSTRUCTION 2020 2020 $10,000 $3,334 6,666.00
MUDDY FORK CREEK.
HIGHWAY B-5390 B-5390 SR 2002 REPLACE BRIDGE NO. 31 CLEVELAND LAKE NORMAN RIGHT-OF-WAY 2017 2017 $200 $200
MUDDY FORK CREEK.
HIGHWAY B-5390 B-5390 SR 2002 REPLACE BRIDGE NO. 31 CLEVELAND LAKE NORMAN CONSTRUCTION 2018 2018 $2,000 $2,000
GLADE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5391 B-5391 SR 1609 139 ALEXANDER UNIFOUR RIGHT-OF-WAY 2017 2017 $50 $50
GLADE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5391 B-5391 SR 1609 139 ALEXANDER UNIFOUR CONSTRUCTION 2018 2018 $500 $500
KNOB CREEK. REPLACE
HIGHWAY B-5392 B-5392 SR 1641 BRIDGE NO. 201 CLEVELAND LAKE NORMAN RIGHT-OF-WAY 2017 2017 $240 $240
KNOB CREEK. REPLACE
HIGHWAY B-5392 B-5392 SR 1641 BRIDGE NO. 201 CLEVELAND LAKE NORMAN CONSTRUCTION 2018 2018 $2,400 $2,400
MAPLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5393 B-5393 SR 1662 192 CLEVELAND LAKE NORMAN RIGHT-OF-WAY 2017 2017 $130 $130
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MAPLE CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5393 B-5393 SR 1662 192 CLEVELAND LAKE NORMAN CONSTRUCTION 2018 2018 $1,300 $1,300
SOUTH HUNTING CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5394 B-5394 SR 1832 279 IREDELL LAKE NORMAN RIGHT-OF-WAY 2019 2019 $225 $225
SOUTH HUNTING CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5394 B-5394 SR 1832 279 IREDELL LAKE NORMAN CONSTRUCTION 2020 2020 $2,250 $2,250
HUNTING CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5395 B-5395 SR 1538 577 RUTHERFORD ISOTHERMAL RIGHT-OF-WAY 2016 2016 $150 $150
HUNTING CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5395 B-5395 SR 1538 577 RUTHERFORD ISOTHERMAL CONSTRUCTION 2017 2017 $1,500 $1,500
STONY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5396 B-5396 SR 1103 416 BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2016 2016 $60 $60
STONY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5396 B-5396 SR 1103 416 BUNCOMBE ASHEVILLE CONSTRUCTION 2017 2017 $600 $600
FLOYDS CREEK.
HIGHWAY B-5397 B-5397 SR 2213 REPLACE BRIDGE NO. 51 RUTHERFORD ISOTHERMAL RIGHT-OF-WAY 2017 2017 $110 $110
FLOYDS CREEK.
HIGHWAY B-5397 B-5397 SR 2213 REPLACE BRIDGE NO. 51 RUTHERFORD ISOTHERMAL CONSTRUCTION 2018 2018 $1,100 $1,100
HENRY FORK RIVER.
HIGHWAY B-5398 B-5398 SR 1803 REPLACE BRIDGE NO. 21 BURKE UNIFOUR RIGHT-OF-WAY 2017 2017 $300 $300
HENRY FORK RIVER.
HIGHWAY B-5398 B-5398 SR 1803 REPLACE BRIDGE NO. 21 BURKE UNIFOUR CONSTRUCTION 2018 2018 $3,000 $3,000
GROG CREEK. REPLACE
HIGHWAY B-5399 B-5399 SR 1926 BRIDGE NO. 109 RUTHERFORD ISOTHERMAL RIGHT-OF-WAY 2017 2017 $30 $30
GROG CREEK. REPLACE
HIGHWAY B-5399 B-5399 SR 1926 BRIDGE NO. 109 RUTHERFORD ISOTHERMAL CONSTRUCTION 2018 2018 $300 $300
SOUTH HOMINY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5400 B-5400 SR 3466 259 BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2018 2018 $60 $60
SOUTH HOMINY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5400 B-5400 SR 3466 259 BUNCOMBE ASHEVILLE CONSTRUCTION 2019 2019 $600 $600
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CREEK. REPLACE
HIGHWAY B-5401 B-5401 SR 1102 BRIDGE NO. 184 YANCEY HIGH COUNTRY RIGHT-OF-WAY 2018 2018 $120 $120
CREEK. REPLACE
HIGHWAY B-5401 B-5401 SR 1102 BRIDGE NO. 184 YANCEY HIGH COUNTRY CONSTRUCTION 2019 2019 $1,200 $1,200
GLADY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5402 B-5402 SR 3464 433 BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2018 2018 $30 $30
GLADY FORK CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5402 B-5402 SR 3464 433 BUNCOMBE ASHEVILLE CONSTRUCTION 2019 2019 $300 $300
CRAB CREEK. REPLACE
HIGHWAY B-5403 B-5403 SR 1532 BRIDGE NO. 196 TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2016 2016 $40 $40
CRAB CREEK. REPLACE
HIGHWAY B-5403 B-5403 SR 1532 BRIDGE NO. 196 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2017 2017 $400 $400
BIG PINE CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-5404 B-5404 SR 1163 136 JACKSON N RIGHT-OF-WAY 2016 2016 $50 $50
GAS CAP REPLACEMENT
PROGRAM TO
PRODUCE
QUANTIFIABLE
REDUCTIONS IN
VOLATILE ORGANIC
COMPOUNDS. MCAQ
WILL RECRUIT
INSPECTION STATIONS
TO
INCLUDE A GAS CAP
TEST AS PART OF
COUNTY THE REGULAR STATE BEFORE
CMAQ C-4964 C-4964 WIDE EMISSIONS TEST. MECKLENBURG CHARLOTTE 2011 $90 $90
PART A: UPGRADE
NATURAL GAS
FUELING STATION TO
PERMIT BOTH
3000 AND 3600 PSI
VEHICLES TO BE
FUELED AT EXISTING
STATION.
PART B: PURCHASE
TWO NATURAL
GAS VEHICLES TO
REPLACE GASOLINE
COUNTY FUELED FLEET PIEDMONT BEFORE
CMAQ C-4966 C-4966 WIDE VEHICLES. DAVIDSON TRIAD 2011 $47 $47
PURCHASE TWO
NATURAL GAS VEHICLES
TO REPLACE GASOLINE
FUELED FLEET
VEHICLES AND
LEXINGT APPROPRIATE FUELING PIEDMONT BEFORE
CMAQ C-4967 C-4967 ON SYSTEM EQUIPMENT DAVIDSON TRIAD 2011 $40 $40
CONSTRUCT
SIDEWALKS AT VARIOUS
ROCKY LOCATIONS IN ROCKY EDGECOMBE,NA BEFORE
CMAQ C-4969 C-4969 MOUNT MOUNT. SH ROCKY MOUNT 2011 $749 $749
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
INTERSECTION
IMPROVEMENTS AT
ROCKY VARIOUS LOCATIONS IN EDGECOMBE,NA BEFORE
CMAQ C-4970 C-4970 MOUNT ROCKY MOUNT. SH ROCKY MOUNT 2011 $332 $332
ROCKY RIVER RPO TO
PROVIDE FUNDING
FOR TWO-YEARS FOR
OUTREACH AND
MARKETING TO
SUPPORT EXPANDED
74X CATS EXPRESS BUS
SERVICE TO
MARSHVILLE. CMAQ
MARSHVI FUNDS BEFORE
CMAQ C-4973 C-4973 LLE TRANSFERRED TO FTA UNION ROCKY RIVER 2011 $4 $4
MIDDLEBROOK DRIVE,
US 158
(CLEMMONS ROAD) TO
AMBERLY
CLEMMO LANE. CONSTRUCT WINSTON- BEFORE
CMAQ C-4977 C-4977 NS SIDEWALK. FORSYTH SALEM 2011 $166 $166
INSTALL INTELLIGENT
TRANSPORTATION
SYSTEM (ITS) DEVICES
WINSTO AT SELECTED WINSTON- BEFORE
CMAQ C-4981 C-4981 N-SALEM LOCATIONS. FORSYTH SALEM 2011 $750 $750
TRANSPORTATION
OPERATIONS CENTER
TO ALLOW
COORDINATED STATE
AND
REGIONAL
TRANSPORTATION
FUNCTIONS
IN CONJUNCTION WITH
THE STATE
HIGHWAY PATROL
COMMUNICATIONS
CENTER AND OTHER
EMERGENCY BEFORE
CMAQ C-4982 C-4982 VARIOUS SERVICES PROVIDERS. STATEWIDE 2011 $6,900 $6,900
BIG PINE CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-5404 B-5404 SR 1163 136 JACKSON N CONSTRUCTION 2017 2017 $500 $500
EAST BRANCH
TOXAWAY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5405 B-5405 SR 1139 139 TRANSYLVANIA LAND OF SKY RIGHT-OF-WAY 2017 2017 $50 $50
EAST BRANCH
TOXAWAY CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5405 B-5405 SR 1139 139 TRANSYLVANIA LAND OF SKY CONSTRUCTION 2018 2018 $500 $500
RABBIT CREEK. SOUTHWESTER
HIGHWAY B-5406 B-5406 SR 1513 REPLACE BRIDGE NO. 67 MACON N RIGHT-OF-WAY 2017 2017 $90 $90
RABBIT CREEK. SOUTHWESTER
HIGHWAY B-5406 B-5406 SR 1513 REPLACE BRIDGE NO. 67 MACON N CONSTRUCTION 2018 2018 $900 $900
WALNUT CREEK.
HIGHWAY B-5407 B-5407 SR 1311 REPLACE BRIDGE NO. 34 POLK ISOTHERMAL RIGHT-OF-WAY 2018 2018 $150 $150
WALNUT CREEK.
HIGHWAY B-5407 B-5407 SR 1311 REPLACE BRIDGE NO. 34 POLK ISOTHERMAL CONSTRUCTION 2019 2019 $1,500 $1,500
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ALLENS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5408 B-5408 SR 1148 386 HAYWOOD ASHEVILLE RIGHT-OF-WAY 2018 2018 $70 $70
ALLENS CREEK.
REPLACE BRIDGE NO.
HIGHWAY B-5408 B-5408 SR 1148 386 HAYWOOD ASHEVILLE CONSTRUCTION 2019 2019 $700 $700
DEVILS FORK CREEK.
HIGHWAY B-5409 B-5409 SR 1893 REPLACE BRIDGE NO. 58 HENDERSON ASHEVILLE RIGHT-OF-WAY 2018 2018 $60 $60
DEVILS FORK CREEK.
HIGHWAY B-5409 B-5409 SR 1893 REPLACE BRIDGE NO. 58 HENDERSON ASHEVILLE CONSTRUCTION 2019 2019 $600 $600
LITTLE SAVANNAH
CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-5410 B-5410 SR 1367 221 JACKSON N RIGHT-OF-WAY 2018 2018 $80 $80
LITTLE SAVANNAH
CREEK.
REPLACE BRIDGE NO. SOUTHWESTER
HIGHWAY B-5410 B-5410 SR 1367 221 JACKSON N CONSTRUCTION 2019 2019 $800 $800
REPLACE BRIDGE NO.
SR 1318 124 OVER JOHNSON
RIVER POND SPILLWAY WITH A
HIGHWAY B-5411 B-5411 ROAD CULVERT. BLADEN MID-CAROLINA RIGHT-OF-WAY 2011 2011 $70 $70
REPLACE BRIDGE NO.
SR 1318 124 OVER JOHNSON
RIVER POND SPILLWAY WITH A
HIGHWAY B-5411 B-5411 ROAD CULVERT. BLADEN MID-CAROLINA CONSTRUCTION 2012 2012 $675 $675
BRIDGE INSPECTION
HIGHWAY B-9999 B-9999 VARIOUS PROGRAM. STATEWIDE INSPECTION 2011 2020 $110,000 $11,000 $11,000 $11,000 $11,000 $11,000 $11,000 $11,000 $11,000 $11,000 $11,000
BRIDGE INSPECTION BEFORE
HIGHWAY B-9999 B-9999 VARIOUS PROGRAM. STATEWIDE 2011 $128,572 $128,572
BERTIE,CHOWA
N,CURRITUCK,G
ATES,MARTIN,N
ORTHAMPTON,D
ARE,PASQUOTA
DIVISION 1 PURCHASE NK,PERQUIMANS
ORDER CONTRACT ,CAMDEN,TYRRE
BRIDGE REPLACEMENT LL,HYDE,HERTF ALBEMARLE,PE
PROJECTS AT ORD,WASHINGT ANUT BELT,MID-
HIGHWAY BD-5101 BD-5101 VARIOUS SELECTED LOCATIONS. ON EAST CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
BERTIE,CHOWA
N,CURRITUCK,G
ATES,MARTIN,N
ORTHAMPTON,D
ARE,PASQUOTA
DIVISION 1 PURCHASE NK,PERQUIMANS
ORDER CONTRACT ,CAMDEN,TYRRE
BRIDGE REPLACEMENT LL,HYDE,HERTF ALBEMARLE,PE
PROJECTS AT ORD,WASHINGT ANUT BELT,MID-
HIGHWAY BD-5101 BD-5101 VARIOUS SELECTED LOCATIONS. ON EAST RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
BERTIE,CHOWA
N,CURRITUCK,G
ATES,MARTIN,N
ORTHAMPTON,D
ARE,PASQUOTA
DIVISION 1 PURCHASE NK,PERQUIMANS
ORDER CONTRACT ,CAMDEN,TYRRE
BRIDGE REPLACEMENT LL,HYDE,HERTF ALBEMARLE,PE
PROJECTS AT ORD,WASHINGT ANUT BELT,MID- BEFORE
HIGHWAY BD-5101 BD-5101 VARIOUS SELECTED LOCATIONS. ON EAST 2011 $2,250 $2,250
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
DIVISION 2 PURCHASE JONES,PITT,GRE DOWN
ORDER CONTRACT ENE,PAMLICO,LE EAST,EASTERN
BRIDGE REPLACEMENT NOIR,BEAUFORT CAROLINA,MID-
PROJECTS AT ,CARTERET,CRA EAST,GREENVI
HIGHWAY BD-5102 BD-5102 VARIOUS SELECTED LOCATIONS. VEN LLE CONSTRUCTION 2011 2020 $27,025 $1,825 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
DIVISION 2 PURCHASE JONES,PITT,GRE DOWN
ORDER CONTRACT ENE,PAMLICO,LE EAST,EASTERN
BRIDGE REPLACEMENT NOIR,BEAUFORT CAROLINA,MID-
PROJECTS AT ,CARTERET,CRA EAST,GREENVI
HIGHWAY BD-5102 BD-5102 VARIOUS SELECTED LOCATIONS. VEN LLE RIGHT-OF-WAY 2011 2020 $3,040 $240 $200 $200 $200 $200 $300 $400 $400 $400 $500
DIVISION 2 PURCHASE JONES,PITT,GRE DOWN
ORDER CONTRACT ENE,PAMLICO,LE EAST,EASTERN
BRIDGE REPLACEMENT NOIR,BEAUFORT CAROLINA,MID-
PROJECTS AT ,CARTERET,CRA EAST,GREENVI BEFORE
HIGHWAY BD-5102 BD-5102 VARIOUS SELECTED LOCATIONS. VEN LLE 2011 $2,000 $2,000
WILMINGTON,J
ACKSONVILLE,
DIVISION 3 PURCHASE DUPLIN,BRUNS CAPE
ORDER CONTRACT WICK,ONSLOW, FEAR,EASTERN
BRIDGE REPLACEMENT PENDER,SAMPS CAROLINA,DO
PROJECTS AT ON,NEW WN EAST,MID-
HIGHWAY BD-5103 BD-5103 VARIOUS SELECTED LOCATIONS. HANOVER CAROLINA CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
WILMINGTON,J
ACKSONVILLE,
DIVISION 3 PURCHASE DUPLIN,BRUNS CAPE
ORDER CONTRACT WICK,ONSLOW, FEAR,EASTERN
BRIDGE REPLACEMENT PENDER,SAMPS CAROLINA,DO
PROJECTS AT ON,NEW WN EAST,MID-
HIGHWAY BD-5103 BD-5103 VARIOUS SELECTED LOCATIONS. HANOVER CAROLINA RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
WILMINGTON,J
ACKSONVILLE,
DIVISION 3 PURCHASE DUPLIN,BRUNS CAPE
ORDER CONTRACT WICK,ONSLOW, FEAR,EASTERN
BRIDGE REPLACEMENT PENDER,SAMPS CAROLINA,DO
PROJECTS AT ON,NEW WN EAST,MID- BEFORE
HIGHWAY BD-5103 BD-5103 VARIOUS SELECTED LOCATIONS. HANOVER CAROLINA 2011 $2,000 $2,000
UPPER
COASTAL
PLAIN,ROCKY
DIVISION 4 PURCHASE MOUNT,GOLDS
ORDER CONTRACT JOHNSTON,EDG BORO,EASTER
BRIDGE REPLACEMENT ECOMBE,WAYNE N
PROJECTS AT ,NASH,HALIFAX, CAROLINA,PEA
HIGHWAY BD-5104 BD-5104 VARIOUS SELECTED LOCATIONS. WILSON NUT BELT CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
UPPER
COASTAL
PLAIN,ROCKY
DIVISION 4 PURCHASE MOUNT,GOLDS
ORDER CONTRACT JOHNSTON,EDG BORO,EASTER
BRIDGE REPLACEMENT ECOMBE,WAYNE N
PROJECTS AT ,NASH,HALIFAX, CAROLINA,PEA
HIGHWAY BD-5104 BD-5104 VARIOUS SELECTED LOCATIONS. WILSON NUT BELT RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
UPPER
COASTAL
PLAIN,ROCKY
DIVISION 4 PURCHASE MOUNT,GOLDS
ORDER CONTRACT JOHNSTON,EDG BORO,EASTER
BRIDGE REPLACEMENT ECOMBE,WAYNE N
PROJECTS AT ,NASH,HALIFAX, CAROLINA,PEA BEFORE
HIGHWAY BD-5104 BD-5104 VARIOUS SELECTED LOCATIONS. WILSON NUT BELT 2011 $2,000 $2,000
DIVISION 5 PURCHASE
ORDER CONTRACT FRANKLIN,GRAN
BRIDGE REPLACEMENT VILLE,PERSON,V KERR
PROJECTS AT ANCE,WAKE,WA TAR,RALEIGH,D
HIGHWAY BD-5105 BD-5105 VARIOUS SELECTED LOCATIONS. RREN,DURHAM URHAM CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
DIVISION 5 PURCHASE
ORDER CONTRACT FRANKLIN,GRAN
BRIDGE REPLACEMENT VILLE,PERSON,V KERR
PROJECTS AT ANCE,WAKE,WA TAR,RALEIGH,D
HIGHWAY BD-5105 BD-5105 VARIOUS SELECTED LOCATIONS. RREN,DURHAM URHAM RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
DIVISION 5 PURCHASE
ORDER CONTRACT FRANKLIN,GRAN
BRIDGE REPLACEMENT VILLE,PERSON,V KERR
PROJECTS AT ANCE,WAKE,WA TAR,RALEIGH,D BEFORE
HIGHWAY BD-5105 BD-5105 VARIOUS SELECTED LOCATIONS. RREN,DURHAM URHAM 2011 $2,000 $2,000
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MID-
DIVISION 6 PURCHASE CAROLINA,CAP
ORDER CONTRACT ROBESON,HARN E
BRIDGE REPLACEMENT ETT,CUMBERLA FEAR,LUMBER
PROJECTS AT ND,COLUMBUS,B RIVER,FAYETTE
HIGHWAY BD-5106 BD-5106 VARIOUS SELECTED LOCATIONS. LADEN VILLE CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
MID-
DIVISION 6 PURCHASE CAROLINA,CAP
ORDER CONTRACT ROBESON,HARN E
BRIDGE REPLACEMENT ETT,CUMBERLA FEAR,LUMBER
PROJECTS AT ND,COLUMBUS,B RIVER,FAYETTE
HIGHWAY BD-5106 BD-5106 VARIOUS SELECTED LOCATIONS. LADEN VILLE RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
MID-
DIVISION 6 PURCHASE CAROLINA,CAP
ORDER CONTRACT ROBESON,HARN E
BRIDGE REPLACEMENT ETT,CUMBERLA FEAR,LUMBER
PROJECTS AT ND,COLUMBUS,B RIVER,FAYETTE BEFORE
HIGHWAY BD-5106 BD-5106 VARIOUS SELECTED LOCATIONS. LADEN VILLE 2011 $2,000 $2,000
BURLINGTON,HI
GH
POINT,PIEDMO
DIVISION 7 PURCHASE NT
ORDER CONTRACT CASWELL,ORAN TRIAD,DURHAM
BRIDGE REPLACEMENT GE,ALAMANCE,G ,GREENSBORO,
PROJECTS AT UILFORD,ROCKI TRIANGLE
HIGHWAY BD-5107 BD-5107 VARIOUS SELECTED LOCATIONS. NGHAM AREA CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
BURLINGTON,HI
GH
POINT,PIEDMO
DIVISION 7 PURCHASE NT
ORDER CONTRACT CASWELL,ORAN TRIAD,DURHAM
BRIDGE REPLACEMENT GE,ALAMANCE,G ,GREENSBORO,
PROJECTS AT UILFORD,ROCKI TRIANGLE
HIGHWAY BD-5107 BD-5107 VARIOUS SELECTED LOCATIONS. NGHAM AREA RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
BURLINGTON,HI
GH
POINT,PIEDMO
DIVISION 7 PURCHASE NT
ORDER CONTRACT CASWELL,ORAN TRIAD,DURHAM
BRIDGE REPLACEMENT GE,ALAMANCE,G ,GREENSBORO,
PROJECTS AT UILFORD,ROCKI TRIANGLE BEFORE
HIGHWAY BD-5107 BD-5107 VARIOUS SELECTED LOCATIONS. NGHAM AREA 2011 $2,000 $2,000
DURHAM,TRIAN
DIVISION 8 PURCHASE MONTGOMERY, GLE
ORDER CONTRACT RICHMOND,CHA AREA,LUMBER
BRIDGE REPLACEMENT THAM,HOKE,LEE RIVER,PIEDMO
PROJECTS AT ,RANDOLPH,MO NT TRIAD,HIGH
HIGHWAY BD-5108 BD-5108 VARIOUS SELECTED LOCATIONS. ORE,SCOTLAND POINT CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
DURHAM,TRIAN
DIVISION 8 PURCHASE MONTGOMERY, GLE
ORDER CONTRACT RICHMOND,CHA AREA,LUMBER
BRIDGE REPLACEMENT THAM,HOKE,LEE RIVER,PIEDMO
PROJECTS AT ,RANDOLPH,MO NT TRIAD,HIGH
HIGHWAY BD-5108 BD-5108 VARIOUS SELECTED LOCATIONS. ORE,SCOTLAND POINT RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
DURHAM,TRIAN
DIVISION 8 PURCHASE MONTGOMERY, GLE
ORDER CONTRACT RICHMOND,CHA AREA,LUMBER
BRIDGE REPLACEMENT THAM,HOKE,LEE RIVER,PIEDMO
PROJECTS AT ,RANDOLPH,MO NT TRIAD,HIGH BEFORE
HIGHWAY BD-5108 BD-5108 VARIOUS SELECTED LOCATIONS. ORE,SCOTLAND POINT 2011 $2,000 $2,000
PIEDMONT
DIVISION 9 PURCHASE TRIAD,WINSTO
ORDER CONTRACT N-
BRIDGE REPLACEMENT DAVIDSON,STOK SALEM,CONCO
PROJECTS AT ES,DAVIE,ROWA RD,NORTHWES
HIGHWAY BD-5109 BD-5109 VARIOUS SELECTED LOCATIONS. N,FORSYTH T PIEDMONT CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
PIEDMONT
DIVISION 9 PURCHASE TRIAD,WINSTO
ORDER CONTRACT N-
BRIDGE REPLACEMENT DAVIDSON,STOK SALEM,CONCO
PROJECTS AT ES,DAVIE,ROWA RD,NORTHWES
HIGHWAY BD-5109 BD-5109 VARIOUS SELECTED LOCATIONS. N,FORSYTH T PIEDMONT RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
PIEDMONT
DIVISION 9 PURCHASE TRIAD,WINSTO
ORDER CONTRACT N-
BRIDGE REPLACEMENT DAVIDSON,STOK SALEM,CONCO
PROJECTS AT ES,DAVIE,ROWA RD,NORTHWES BEFORE
HIGHWAY BD-5109 BD-5109 VARIOUS SELECTED LOCATIONS. N,FORSYTH T PIEDMONT 2011 $2,000 $2,000
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
DIVISION 10 PURCHASE
ORDER CONTRACT CABARRUS,ANS
BRIDGE REPLACEMENT ON,UNION,MECK ROCKY
PROJECTS AT LENBURG,STANL RIVER,CHARLO
HIGHWAY BD-5110 BD-5110 VARIOUS SELECTED LOCATIONS. Y TTE,CONCORD CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
DIVISION 10 PURCHASE
ORDER CONTRACT CABARRUS,ANS
BRIDGE REPLACEMENT ON,UNION,MECK ROCKY
PROJECTS AT LENBURG,STANL RIVER,CHARLO
HIGHWAY BD-5110 BD-5110 VARIOUS SELECTED LOCATIONS. Y TTE,CONCORD RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
DIVISION 10 PURCHASE
ORDER CONTRACT CABARRUS,ANS
BRIDGE REPLACEMENT ON,UNION,MECK ROCKY
PROJECTS AT LENBURG,STANL RIVER,CHARLO BEFORE
HIGHWAY BD-5110 BD-5110 VARIOUS SELECTED LOCATIONS. Y TTE,CONCORD 2011 $2,000 $2,000
DIVISION 11 PURCHASE CALDWELL,SUR
ORDER CONTRACT RY,WATAUGA,WI HIGH
BRIDGE REPLACEMENT LKES,ASHE,ALLE COUNTRY,HICK
PROJECTS AT GHANY,YADKIN, ORY,NORTHWE
HIGHWAY BD-5111 BD-5111 VARIOUS SELECTED LOCATIONS. AVERY ST PIEDMONT CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
DIVISION 11 PURCHASE CALDWELL,SUR
ORDER CONTRACT RY,WATAUGA,WI HIGH
BRIDGE REPLACEMENT LKES,ASHE,ALLE COUNTRY,HICK
PROJECTS AT GHANY,YADKIN, ORY,NORTHWE
HIGHWAY BD-5111 BD-5111 VARIOUS SELECTED LOCATIONS. AVERY ST PIEDMONT RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
DIVISION 11 PURCHASE CALDWELL,SUR
ORDER CONTRACT RY,WATAUGA,WI HIGH
BRIDGE REPLACEMENT LKES,ASHE,ALLE COUNTRY,HICK
PROJECTS AT GHANY,YADKIN, ORY,NORTHWE BEFORE
HIGHWAY BD-5111 BD-5111 VARIOUS SELECTED LOCATIONS. AVERY ST PIEDMONT 2011 $2,000 $2,000
DIVISION 12 PURCHASE
ORDER CONTRACT CATAWBA,GAST UNIFOUR,HICK
BRIDGE REPLACEMENT ON,LINCOLN,ALE ORY,LAKE
PROJECTS AT XANDER,IREDEL NORMAN,GAST
HIGHWAY BD-5112 BD-5112 VARIOUS SELECTED LOCATIONS. L,CLEVELAND ONIA CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
DIVISION 12 PURCHASE
ORDER CONTRACT CATAWBA,GAST UNIFOUR,HICK
BRIDGE REPLACEMENT ON,LINCOLN,ALE ORY,LAKE
PROJECTS AT XANDER,IREDEL NORMAN,GAST
HIGHWAY BD-5112 BD-5112 VARIOUS SELECTED LOCATIONS. L,CLEVELAND ONIA RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
DIVISION 12 PURCHASE
ORDER CONTRACT CATAWBA,GAST UNIFOUR,HICK
BRIDGE REPLACEMENT ON,LINCOLN,ALE ORY,LAKE
PROJECTS AT XANDER,IREDEL NORMAN,GAST BEFORE
HIGHWAY BD-5112 BD-5112 VARIOUS SELECTED LOCATIONS. L,CLEVELAND ONIA 2011 $2,000 $2,000
ASHEVILLE,HIG
H
DIVISION 13 PURCHASE MCDOWELL,MAD COUNTRY,ISOT
ORDER CONTRACT ISON,BUNCOMB HERMAL,LAND
BRIDGE REPLACEMENT E,MITCHELL,BUR OF
PROJECTS AT KE,RUTHERFOR SKY,UNIFOUR,H
HIGHWAY BD-5113 BD-5113 VARIOUS SELECTED LOCATIONS. D,YANCEY ICKORY CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
ASHEVILLE,HIG
H
DIVISION 13 PURCHASE MCDOWELL,MAD COUNTRY,ISOT
ORDER CONTRACT ISON,BUNCOMB HERMAL,LAND
BRIDGE REPLACEMENT E,MITCHELL,BUR OF
PROJECTS AT KE,RUTHERFOR SKY,UNIFOUR,H
HIGHWAY BD-5113 BD-5113 VARIOUS SELECTED LOCATIONS. D,YANCEY ICKORY RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
ASHEVILLE,HIG
H
DIVISION 13 PURCHASE MCDOWELL,MAD COUNTRY,ISOT
ORDER CONTRACT ISON,BUNCOMB HERMAL,LAND
BRIDGE REPLACEMENT E,MITCHELL,BUR OF
PROJECTS AT KE,RUTHERFOR SKY,UNIFOUR,H BEFORE
HIGHWAY BD-5113 BD-5113 VARIOUS SELECTED LOCATIONS. D,YANCEY ICKORY 2011 $2,000 $2,000
HAYWOOD,HEN
DERSON,CLAY,C
DIVISION 14 PURCHASE HEROKEE,TRAN
ORDER CONTRACT SYLVANIA,JACKS SOUTHWESTER
BRIDGE REPLACEMENT ON,MACON,POL N,LAND OF
PROJECTS AT K,SWAIN,GRAHA SKY,ISOTHERM
HIGHWAY BD-5114 BD-5114 VARIOUS SELECTED LOCATIONS. M AL,ASHEVILLE CONSTRUCTION 2011 2020 $30,600 $5,400 $1,800 $1,800 $1,800 $1,800 $2,700 $3,600 $3,600 $3,600 $4,500
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
HAYWOOD,HEN
DERSON,CLAY,C
DIVISION 14 PURCHASE HEROKEE,TRAN
ORDER CONTRACT SYLVANIA,JACKS SOUTHWESTER
BRIDGE REPLACEMENT ON,MACON,POL N,LAND OF
PROJECTS AT K,SWAIN,GRAHA SKY,ISOTHERM
HIGHWAY BD-5114 BD-5114 VARIOUS SELECTED LOCATIONS. M AL,ASHEVILLE RIGHT-OF-WAY 2011 2020 $3,400 $600 $200 $200 $200 $200 $300 $400 $400 $400 $500
HAYWOOD,HEN
DERSON,CLAY,C
DIVISION 14 PURCHASE HEROKEE,TRAN
ORDER CONTRACT SYLVANIA,JACKS SOUTHWESTER
BRIDGE REPLACEMENT ON,MACON,POL N,LAND OF
PROJECTS AT K,SWAIN,GRAHA SKY,ISOTHERM BEFORE
HIGHWAY BD-5114 BD-5114 VARIOUS SELECTED LOCATIONS. M AL,ASHEVILLE 2011 $2,000 $2,000
ESTABLISH BRIDGE BEFORE
HIGHWAY BK-5100 BK-5100 VARIOUS MANAGEMENT SYSTEM. STATEWIDE 2011 $5,000 $5,000
DECK PRESERVATION
AT 15 SELECTED BEFORE
HIGHWAY BK-5101 BK-5101 VARIOUS LOCATIONS. STATEWIDE 2011 $7,747 $7,747
BRIDGE PAINTING AT 19 BEFORE
HIGHWAY BK-5102 BK-5102 VARIOUS SELECTED LOCATIONS. STATEWIDE 2011 $2,027 $2,027
BRANCH OF NEWPORT
RIVER. BEFORE
HIGHWAY BK-5103 BK-5103 SR 1140 REPLACE BRIDGE NO. 40 CARTERET DOWN EAST 2011 $775 $775
STOCKINGHEAD CREEK.
REPLACE BRIDGE NO. EASTERN BEFORE
HIGHWAY BK-5104 BK-5104 SR 1141 196 DUPLIN CAROLINA 2011 $773 $773
CORKEY CREEK. UPPER BEFORE
HIGHWAY BK-5105 BK-5105 SR 1141 REPLACE BRIDGE NO. 56 EDGECOMBE COASTAL PLAIN 2011 $500 $500
BASKET CREEK.
REPLACE BRIDGE NO. UPPER BEFORE
HIGHWAY BK-5107 BK-5107 SR 1425 120 NASH COASTAL PLAIN 2011 $710 $710
CREEK. UPPER BEFORE
HIGHWAY BK-5108 BK-5108 SR 1002 REPLACE BRIDGE NO. 97 WILSON COASTAL PLAIN 2011 $710 $710
GRISSETT CREEK.
REPLACE BRIDGE
NO. 97 AND BRIDGE NO. BEFORE
HIGHWAY BK-5109 BK-5109 SR 1173 98 COLUMBUS CAPE FEAR 2011 $1,158 $1,158
WILKINSON CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY BK-5111 BK-5111 SR 1183 380 ROBESON LUMBER RIVER 2011 $600 $600
MOUNTAIN CREEK. PIEDMONT BEFORE
HIGHWAY BK-5112 BK-5112 SR 1533 REPLACE BRIDGE NO. 90 MONTGOMERY TRIAD 2011 $760 $760
NORTH FORK JONES
CREEK. BEFORE
HIGHWAY BK-5113 BK-5113 NC 742 REPLACE BRIDGE NO. 22 ANSON ROCKY RIVER 2011 $600 $600
REEDY CREEK. BEFORE
HIGHWAY BK-5114 BK-5114 SR 2826 REPLACE BRIDGE NO. 59 MECKLENBURG CHARLOTTE 2011 $600 $600
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRANCH BIG BEAR
CREEK. BEFORE
HIGHWAY BK-5115 BK-5115 SR 1433 REPLACE BRIDGE NO. 34 STANLY ROCKY RIVER 2011 $650 $650
KINGS CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY BK-5116 BK-5116 SR 1166 115 ALLEGHANY HIGH COUNTRY 2011 $560 $560
HORSE CREEK. BEFORE
HIGHWAY BK-5117 BK-5117 SR 1166 REPLACE BRIDGE NO. 16 AVERY HIGH COUNTRY 2011 $875 $875
ROCK CREEK. BEFORE
HIGHWAY BK-5118 BK-5118 SR 1746 REPLACE BRIDGE NO. 65 CALDWELL UNIFOUR 2011 $565 $565
CREEK. REPLACE BEFORE
HIGHWAY BK-5119 BK-5119 SR 1225 BRIDGE NO. 25 WATAUGA HIGH COUNTRY 2011 $555 $555
CREEK. REPLACE BEFORE
HIGHWAY BK-5120 BK-5120 SR 1802 BRIDGE NO. 170 GASTON GASTONIA 2011 $600 $600
LONG BRANCH.
REPLACE BRIDGE NO. BEFORE
HIGHWAY BK-5121 BK-5121 SR 2120 350 IREDELL LAKE NORMAN 2011 $560 $560
SECOND BROAD RIVER.
REPLACE BRIDGE NO. BEFORE
HIGHWAY BK-5123 BK-5123 SR 1907 192 RUTHERFORD ISOTHERMAL 2011 $924 $924
CREEK. REPLACE BEFORE
HIGHWAY BK-5124 BK-5124 SR 1924 BRIDGE NO. 307 BURKE UNIFOUR 2011 $460 $460
CANE CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY BK-5125 BK-5125 SR 1189 177 MITCHELL HIGH COUNTRY 2011 $760 $760
BALD MOUNTAIN CREEK.
REPLACE BRIDGE NO. BEFORE
HIGHWAY BK-5126 BK-5126 SR 1395 119 YANCEY HIGH COUNTRY 2011 $600 $600
PRESERVATION OF
BRIDGE NO. 33 BEFORE
HIGHWAY BK-5127 BK-5127 US 70 OVER NORTH RIVER. CARTERET DOWN EAST 2011 $1,500 $1,500
REMOVE AND REPLACE
FENDER
SYSTEM ON BRIDGE NO.
6 OVER
THE INTRACOASTAL BEFORE
HIGHWAY BK-5128 BK-5128 NC 58 WATERWAY. CARTERET DOWN EAST 2011 $1,600 $1,600
REMOVE AND REPLACE
FENDER
SYSTEM ON BRIDGE NO.
14 OVER BEFORE
HIGHWAY BK-5129 BK-5129 NC 133 THE INTRACOASTAL. BRUNSWICK CAPE FEAR 2011 $1,600 $1,600
PRESERVATION OF
BRIDGE NO. 16
OVER CLINCHFIELD
RAILROAD AND BEFORE
HIGHWAY BK-5130 BK-5130 US 19E NORTH TOE RIVER. MITCHELL HIGH COUNTRY 2011 $800 $800
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRIDGE PRESERVATION
AT SELECTED BEFORE
HIGHWAY BK-5131 BK-5131 VARIOUS LOCATIONS. STATEWIDE 2011 $1,500 $1,500
IN-DEPTH ENGINEERING
EVALUATION OF
WEIGHT RESTRICTIONS
ON LOAD POSTED
BRIDGES ON US AND NC BEFORE
HIGHWAY BK-5132 BK-5132 VARIOUS DESIGNATED ROUTES. STATEWIDE 2011 $1,000 $1,000
REHABILITATE BRIDGES
AT SELECTED
HIGHWAY BR-5100 BR-5100 VARIOUS LOCATIONS. STATEWIDE CONSTRUCTION 2015 2020 $150,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000
DEPARTMENT OF
MOTOR VEHICLES
(DMV), VEHICLE
EMISSION COMPLIANCE
SYSTEM. UPGRADE
NORTH CAROLINA'S
MOTOR VEHICLE
EMISSIONS INSPECTION
AND MAINTENANCE (I/M) BEFORE
CMAQ C-3600 C-3600 VARIOUS PROGRAM. STATEWIDE 2011 $6,702 $6,702
INDEPENDENCE
BOULEVARD AND
HARRIS BOULEVARD.
CHARLO INTERSECTION BEFORE
CMAQ C-4405 C-4405 TTE IMPROVEMENTS. MECKLENBURG CHARLOTTE 2011 $400 $400
FOURTEEN (14), CLEAN
DIESEL AND
PARTICULATE AFV BEFORE
CMAQ C-4700 C-4700 RALEIGH TRANSIT BUSES WAKE RALEIGH 2011 $2,000 $2,000
TEN (10) - BEFORE
CMAQ C-4702 C-4702 DURHAM REPLACEMENT BUSES. DURHAM DURHAM 2011 $3,000 $3,000
RAIL DIVISION,
CONSTRUCT A SECOND
MAIN LINE BETWEEN
NC THOMASVILLE
RAILROA AND LEXINGTON IN
CMAQ C-4901 C-4901 D DAVIDSON COUNTY. STATEWIDE CONSTRUCTION 2011 2013 $26,559 $5,225 $12,795 $8,539
RAIL DIVISION,
CONSTRUCT A SECOND
MAIN LINE BETWEEN
NC THOMASVILLE
RAILROA AND LEXINGTON IN
CMAQ C-4901 C-4901 D DAVIDSON COUNTY. STATEWIDE ENGINEERING 2011 2013 $3,408 $1,119 $1,135 $1,154
RAIL DIVISION,
CONSTRUCT A SECOND
MAIN LINE BETWEEN
NC THOMASVILLE
RAILROA AND LEXINGTON IN
CMAQ C-4901 C-4901 D DAVIDSON COUNTY. STATEWIDE RIGHT-OF-WAY 2011 2013 $14,552 $2,749 $5,852 $5,951
RAIL DIVISION,
CONSTRUCT A SECOND
MAIN LINE BETWEEN
NC THOMASVILLE
RAILROA AND LEXINGTON IN BEFORE
CMAQ C-4901 C-4901 D DAVIDSON COUNTY. STATEWIDE 2011 $7,776 $7,776
NCSU, NORTH CAROLINA
SOLAR
CENTER CLEAN
TRANSPORTATION
PROGRAM. DEVELOP
AND ADMINISTER
A SEVEN YEAR CLEAN
FUEL-ADVANCED
NORTH TECHNOLOGY REBATE
CAROLIN PROGRAM IN ALL
A STATE CMAQ ELIGIBLE
UNIVERS COUNTIES TO REDUCE IMPLEMENTATI
CMAQ C-4902 C-4902 ITY EMISSIONS. STATEWIDE ON 2013 2017 $8,778 $1,730 $1,733 $1,764 $1,766 $1,785
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NCSU, NORTH CAROLINA
SOLAR
CENTER CLEAN
TRANSPORTATION
PROGRAM. DEVELOP
AND ADMINISTER
A SEVEN YEAR CLEAN
FUEL-ADVANCED
NORTH TECHNOLOGY REBATE
CAROLIN PROGRAM IN ALL
A STATE CMAQ ELIGIBLE
UNIVERS COUNTIES TO REDUCE BEFORE
CMAQ C-4902 C-4902 ITY EMISSIONS. STATEWIDE 2011 $1,600 $1,600
NORTH CAROLINA AIR
NORTH AWARENESS
CAROLIN OUTREACH PROGRAM
A TO PROVIDE
DIVISION EDUCATION AND
OF AIR PRODUCE DAILY IMPLEMENTATI
CMAQ C-4903 C-4903 QUALITY AIR QUALITY FORECAST. STATEWIDE ON 2011 2020 $1,000 $100 $100 $100 $100 $100 $100 $100 $100 $100 $100
NORTH CAROLINA AIR
NORTH AWARENESS
CAROLIN OUTREACH PROGRAM
A TO PROVIDE
DIVISION EDUCATION AND
OF AIR PRODUCE DAILY BEFORE
CMAQ C-4903 C-4903 QUALITY AIR QUALITY FORECAST. STATEWIDE 2011 $500 $500
ROWAN COUNTY,
ELECTRIFICATION OF
FIFTY SPACES AT BEFORE
CMAQ C-4904 C-4904 VARIOUS DERRICK TRUCK STOP. ROWAN CONCORD 2011 $500 $500
TRAFFIC SIGNAL
SYSTEM. IMPROVE
SALISBU OPERATION AND
CMAQ C-4907 C-4907 RY UPGRADE EQUIPMENT. ROWAN CONCORD CONSTRUCTION 2011 2011 $392 $392
SALISBU
CMAQ C-4908 C-4908G RY ROWAN CONCORD CONSTRUCTION 2013 2013 $450 $450
BRINGLE FERRY ROAD,
SALISBU LONG STREET TO
CMAQ C-4908 C-4908E RY NEWSOME ROAD. ROWAN CONCORD CONSTRUCTION 2014 2014 $299 $299
MAIN STREET, "D"
SALISBU AVENUE TO SUNSET
CMAQ C-4908 C-4908H RY DRIVE. ROWAN CONCORD CONSTRUCTION 2015 2015 $134 $134
CONSTRUCT
SALISBU SIDEWALKS AT BEFORE
CMAQ C-4908 C-4908 RY SELECTED LOCATIONS. ROWAN CONCORD 2011 $374 $374
STATESVILLE
BOULEVARD, JAKE
ALEXANDER
BOULEVARD WEST TO
WEST
SALISBU INNES STREET. BEFORE
CMAQ C-4909 C-4909 RY CONSTRUCT SIDEWALK. ROWAN LAKE NORMAN 2011 $283 $283
CONSTRUCT
CHINA SIDEWALKS AT BEFORE
CMAQ C-4910 C-4910 GROVE SELECTED LOCATIONS. ROWAN CONCORD 2011 $559 $559
CATAWB EXPANSION OF AIR
A QUALITY OUTREACH
COLLEG PROGRAM TO REDUCE IMPLEMENTATI
CMAQ C-4911 C-4911 E OZONE AIR POLLUTION. ROWAN CONCORD ON 2011 2012 $612 $306 $306
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CATAWB EXPANSION OF AIR
A QUALITY OUTREACH
COLLEG PROGRAM TO REDUCE BEFORE
CMAQ C-4911 C-4911 E OZONE AIR POLLUTION. ROWAN CONCORD 2011 $544 $544
OAKWOOD AVENUE,
KANNAP WINDSOR DRIVE TO
CMAQ C-4916 C-4916C OLIS ROGERS LAKE ROAD. ROWAN CONCORD CONSTRUCTION 2011 2011 $320 $320
CONSTRUCT
KANNAP SIDEWALKS AT BEFORE
CMAQ C-4916 C-4916 OLIS SELECTED LOCATIONS. ROWAN CONCORD 2011 $774 $774
INTERSECTION
IMPROVEMENTS AT
CONCOR POPULAR TENT ROAD
CMAQ C-4918 C-4918A D AND US 29. CABARRUS CONCORD CONSTRUCTION 2011 2011 $772 $772
ADDITIONAL TURN
CONCOR LANES AT US 601 AND
CMAQ C-4918 C-4918B D NC 3. CABARRUS CONCORD CONSTRUCTION 2011 2011 $665 $665
INTERSECTION
IMPROVEMENTS AT
CONCOR POPULAR TENT ROAD
CMAQ C-4918 C-4918A D AND US 29. CABARRUS CONCORD RIGHT-OF-WAY 2011 2011 $125 $125
INTERSECTION
IMPROVEMENTS AND
ADDITIONAL TURN
CONCOR LANES AT SELECTED BEFORE
CMAQ C-4918 C-4918 D LOCATIONS. CABARRUS CONCORD 2011 $818 $818
CONSTRUCT A
MCEACHERN
GREENWAY
CONNECTOR TO
CONCOR DOWNTOWN CORBAN
CMAQ C-4919 C-4919 D PARK. CABARRUS CONCORD CONSTRUCTION 2011 2011 $391 $391
MT. CONSTRUCT
PLEASA SIDEWALKS AT BEFORE
CMAQ C-4920 C-4920 NT SELECTED LOCATIONS. CABARRUS CONCORD 2011 $253 $253
CONSTRUCT
SIDEWALKS TO
CONNECT
HARRISB NEIGHBORHOODS AND
CMAQ C-4921 C-4921 URG TOWN CENTER. CABARRUS CONCORD CONSTRUCTION 2011 2011 $375 $375
CONSTRUCT TURN
KANNAP LANES ON MT OLIVET
CMAQ C-4922 C-4922 OLIS ROAD AT NC 3. CABARRUS CONCORD CONSTRUCTION 2011 2011 $280 $280
CONSTRUCT TURN
KANNAP LANES ON MT OLIVET BEFORE
CMAQ C-4922 C-4922 OLIS ROAD AT NC 3. CABARRUS CONCORD 2011 $62 $62
CITYWIDE UPGRADE OF
CMAQ C-4923 C-4923 RALEIGH SIGNAL SYSTEM. WAKE RALEIGH CONSTRUCTION 2011 2011 $6,936 $6,936
CITYWIDE UPGRADE OF BEFORE
CMAQ C-4923 C-4923 RALEIGH SIGNAL SYSTEM. WAKE RALEIGH 2011 $12,270 $12,270
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
TRIANGLE J COUNCIL OF
GOVERNMENTS (COG).
DEVELOP A FLEXIBLE
TRIANGL WORK SCHEDULE FOR
EJ EMPLOYEES AND
COUNCIL ORGANIZATIONS IN
OF TRIANGLE OZONE NON-
GOVERN ATTAINMENT AREA FOR WAKE,DURHAM, RALEIGH,DURH IMPLEMENTATI
CMAQ C-4924 C-4924 MENTS THREE YEARS. ORANGE AM ON 2013 2017 $5,326 $904 $912 $1,068 $1,199 $1,243
TRIANGLE J COUNCIL OF
GOVERNMENTS (COG).
DEVELOP A FLEXIBLE
TRIANGL WORK SCHEDULE FOR
EJ EMPLOYEES AND
COUNCIL ORGANIZATIONS IN
OF TRIANGLE OZONE NON-
GOVERN ATTAINMENT AREA FOR WAKE,DURHAM, RALEIGH,DURH BEFORE
CMAQ C-4924 C-4924 MENTS THREE YEARS. ORANGE AM 2011 $300 $300
NC 55 (MAIN STREET).
HOLLY CONSTRUCT
CMAQ C-4925 C-4925 SPRINGS SIDEWALKS. WAKE RALEIGH CONSTRUCTION 2011 2011 $464 $464
MORREENE ROAD, NEAL
ROAD TO
ERWIN ROAD.
CONSTRUCT BIKE
CMAQ C-4928 C-4928 DURHAM LANES AND SIDEWALKS. DURHAM DURHAM CONSTRUCTION 2011 2011 $1,441 $1,441
BICYCLE PARKING
PROGRAM. INSTALL
BIKE RACKS AT VARIOUS BEFORE
CMAQ C-4929 C-4929 DURHAM LOCATIONS. DURHAM DURHAM 2011 $48 $48
CONSTRUCT A PARK
AND RIDE SHELTER
AND INSTALL BIKE
RACKS ON BUSES.
SECTION A: DURHAM-
CHAPEL HILL-
CARRBORO (DCHC) MPO
TO PARTICIPATE IN
CONSTRUCTION AND
COUNTY OPERATING
WIDE ASSISTANCE FOR ONE
HILLSBO YEAR FOR A NEW BEFORE
CMAQ C-4932A C-4932A ROUGH TRANSIT SERVICE. ORANGE DURHAM 2011 $93 $93
CONSTRUCT A PARK
AND RIDE SHELTER
AND INSTALL BIKE
RACKS ON BUSES.
SECTION B: TRIANGLE
AREA RPO
(TARPO) TO
PARTICIPATE IN
CONSTRUCTION AND
OPERATING
COUNTY ASSISTANCE FOR THREE
WIDE YEARS
HILLSBO FOR A NEW TRANSIT TRIANGLE
CMAQ C-4932B C-4932B ROUGH SERVICE. ORANGE AREA OPERATIONS 2011 2011 $198 $198
CONSTRUCT A PARK
AND RIDE SHELTER
AND INSTALL BIKE
RACKS ON BUSES.
SECTION B: TRIANGLE
AREA RPO
(TARPO) TO
PARTICIPATE IN
CONSTRUCTION AND
OPERATING
COUNTY ASSISTANCE FOR THREE
WIDE YEARS
HILLSBO FOR A NEW TRANSIT TRIANGLE BEFORE
CMAQ C-4932B C-4932B ROUGH SERVICE. ORANGE AREA 2011 $324 $324
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NC 279 (NEW HOPE
ROAD),
BURTONWOOD DRIVE
TO SR 2466
(GARRISON
GASTONI BOULEVARD). WIDEN
CMAQ C-4934 C-4934 A TO MULTI-LANES. GASTON GASTONIA CONSTRUCTION 2011 2011 $3,501 $3,501
NC 279 (NEW HOPE
ROAD),
BURTONWOOD DRIVE
TO SR 2466
(GARRISON
GASTONI BOULEVARD). WIDEN
CMAQ C-4934 C-4934 A TO MULTI-LANES. GASTON GASTONIA RIGHT-OF-WAY 2011 2011 $950 $950
NC 279 (NEW HOPE
ROAD),
BURTONWOOD DRIVE
TO SR 2466
(GARRISON
GASTONI BOULEVARD). WIDEN
CMAQ C-4934 C-4934 A TO MULTI-LANES. GASTON GASTONIA UTILITIES 2011 2011 $1,400 $1,400
PIEDMONT AUTHORITY
FOR REGIONAL FORSYTH,DAVID
TRANSPORTATION SON,ROCKINGH
(PART). IMPLEMENT AM,CASWELL,G NORTHWEST
A REGIONAL AIR UILFORD,MONT PIEDMONT,GRE
QUALITY AWARENESS GOMERY,RANDO ENSBORO,WIN IMPLEMENTATI
CMAQ C-4936 C-4936 VARIOUS PROGRAM. LPH STON-SALEM ON 2011 2015 $329 $79 $63 $62 $63 $62
PIEDMONT AUTHORITY
FOR REGIONAL FORSYTH,DAVID
TRANSPORTATION SON,ROCKINGH
(PART). IMPLEMENT AM,CASWELL,G NORTHWEST
A REGIONAL AIR UILFORD,MONT PIEDMONT,GRE
QUALITY AWARENESS GOMERY,RANDO ENSBORO,WIN BEFORE
CMAQ C-4936 C-4936 VARIOUS PROGRAM. LPH STON-SALEM 2011 $175 $175
CONDUCT SIGNAL
TIMING STUDIES ON
SELECTED CORRIDORS
HIGH IN HIGH POINT GUILFORD,DAVI BEFORE
CMAQ C-4937 C-4937 POINT AND THOMASVILLE. DSON HIGH POINT 2011 $230 $230
CONSTRUCT BICYCLE-
PEDESTRIAN PATHS AT
CMAQ C-4940 C-4940 VARIOUS VARIOUS LOCATIONS. GRANVILLE KERR TAR CONSTRUCTION 2011 2012 $674 $337 $337
CONSTRUCT BICYCLE-
PEDESTRIAN PATHS AT BEFORE
CMAQ C-4940 C-4940 VARIOUS VARIOUS LOCATIONS. GRANVILLE KERR TAR 2011 $337 $337
US 501 SOUTH
(GARRETT STREET),
SOUTH MAIN STREET,
AND ROXBORO
COMMONS SHOPPING
ROXBOR CENTER. CONSTRUCT BEFORE
CMAQ C-4942 C-4942 O SIDEWALK. PERSON KERR TAR 2011 $81 $81
RIDGE ROAD AT CHUB
LAKE STREET.
ROXBOR CONSTRUCT TURN BEFORE
CMAQ C-4943 C-4943 O LANE. PERSON KERR TAR 2011 $178 $178
CONSTRUCT
MOORES SIDEWALKS AT BEFORE
CMAQ C-4944 C-4944 VILLE SELECTED LOCATIONS. IREDELL LAKE NORMAN 2011 $163 $163
RAIL TO TRAIL
EXPANSION ALONG
ABANDONED CAROLINA
NORTHWESTERN RAIL
CORRIDOR BETWEEN
LINCOLN CONGRESS STREET AND BEFORE
CMAQ C-4946 C-4946 TON MOTZ AVENUE. LINCOLN LAKE NORMAN 2011 $54 $54
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
EASTERN BAND OF
CHEROKEE INDIANS.
IMPLEMENT SHUTTLE
SERVICE BETWEEN
CHEROKEE, NORTH
CAROLINA AND
CHEROK GATLINBURG, SOUTHWESTER BEFORE
CMAQ C-4947 C-4947 EE TENNESSEE. SWAIN N 2011 $514 $514
LAND OF SKY RPO TO
WORK WITH
REGIONAL CLEAN AIR
CAMPAIGN
AND CLEAN VEHICLE
COALITION
TO IMPLEMENT AN
EDUCATION AND
OUTREACH PROGRAM IN
COMMUNITIES
ADJACENT TO GREAT
SMOKY TRANSYLVANIA,
MOUNTAINS NATIONAL MADISON,HAYW BEFORE
CMAQ C-4948 C-4948 VARIOUS PARK. OOD,BUNCOMBE LAND OF SKY 2011 $128 $128
INTEGRATE CAT'S
AUTOMATIC VEHICLE
LOCATION (AVL) SYSTEM
AND CITY OF
CHARLOTT'S DOT
SIGNAL SYSTEM. CMAQ
CHARLO FUNDS TRANSFERRED BEFORE
CMAQ C-4951 C-4951 TTE TO FTA. MECKLENBURG CHARLOTTE 2011 $1,750 $1,750
CENTER CITY PARKING
AND WAYFINDING
CHARLO SYSTEM. TRAFFIC- BEFORE
CMAQ C-4955 C-4955 TTE FLOW IMPROVEMENT. MECKLENBURG CHARLOTTE 2011 $3,033 $3,033
WEST CATAWBA AND
CORNELI WESTMORELAND
CMAQ C-4956 C-4956A US AVENUES. MECKLENBURG CHARLOTTE CONSTRUCTION 2011 2011 $250 $250
INTERSECTION
CORNELI IMPROVEMENTS AT BEFORE
CMAQ C-4956 C-4956 US SELECTED LOCATIONS. MECKLENBURG CHARLOTTE 2011 $408 $408
SUN VALLEY HIGH
INDIAN SCHOOL AND MIDDLE
CMAQ C-4957 C-4957A TRAIL SCHOOL. UNION CHARLOTTE CONSTRUCTION 2011 2011 $690 $690
SOUTH SIDE OF UNION-
INDIAN TRAIL ROAD AND
INDIAN ON THE NORTH SIDE OF
CMAQ C-4957 C-4957B TRAIL SARDIS ROAD. UNION CHARLOTTE CONSTRUCTION 2011 2011 $637 $637
BICYCLE
CHARLO IMPROVEMENTS AT OLD
CMAQ C-4958 C-4958 TTE CONCORD ROAD. MECKLENBURG CHARLOTTE CONSTRUCTION 2011 2011 $500 $500
PILOT
TRANSPORTATION
CHARLO DEMAND MANAGEMENT BEFORE
CMAQ C-4959 C-4959 TTE PROGRAM. MECKLENBURG CHARLOTTE 2011 $1,000 $1,000
INTERSECTION
IMPROVEMENTS AT
INDIAN INDIAN TRAIL AND OLD
CMAQ C-4960 C-4960 TRAIL MONROE ROAD. UNION CHARLOTTE CONSTRUCTION 2011 2012 $1,138 $500 $638
INTERSECTION
CHARLO IMPROVEMENTS AT BEFORE
CMAQ C-4961 C-4961 TTE SELECTED LOCATIONS. MECKLENBURG CHARLOTTE 2011 $540 $540
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ESTABLISH BIKE-
PEDESTRIAN
CONNECTION BETWEEN
IVERSON
CHARLO WAY AND MARION
CMAQ C-4962 C-4962 TTE PLACE. MECKLENBURG CHARLOTTE CONSTRUCTION 2011 2011 $200 $200
INSTALL PARTICULATE
FILTERS ON 90
BUSES. CMAQ FUNDS
CHARLO TRANSFERRED BEFORE
CMAQ C-4963 C-4963 TTE TO FTA. MECKLENBURG CHARLOTTE 2011 $800 $800
NON-
ATTAINM SCHOOL BUS DIESEL
ENT AND PARTICULATE
MAINTEN FILTER AND CLOSED
ANCE CASE VENTILATION BEFORE
CMAQ C-5100 C-5100 AREAS SYSTEM RETROFITS. STATEWIDE 2011 $2,000 $2,000
TRIANGL
EJ CAPITAL AREA MPO ORANGE,WAKE,
COUNCIL PARTICIPATION - IN CHATHAM,FRAN
OF PROGRESS BY KLIN,DURHAM,H
GOVERN TRIANGLE J COUNCIL OF ARNETT,JOHNST DURHAM,RALEI IMPLEMENTATI
CMAQ C-5102 C-5102A MENTS GOVERNMENT. ON,GRANVILLE GH ON 2011 2012 $893 $429 $464
TRIANGL DURHAM-CHAPEL HILL-
EJ CARRBORO MPO ORANGE,WAKE,
COUNCIL PARTICIPATION - IN CHATHAM,FRAN
OF PROGRESS BY KLIN,DURHAM,H
GOVERN TRIANGLE J COUNCIL OF ARNETT,JOHNST DURHAM,RALEI IMPLEMENTATI
CMAQ C-5102 C-5102B MENTS GOVERNMENT. ON,GRANVILLE GH ON 2011 2017 $5,508 $349 $374 $805 $816 $954 $1,084 $1,126
TRIANGLE
TRANSPORTATION
DEMAND
MANAGEMENT
PROGRAM SERVICES
FOR
TRIANGL EMPLOYERS AND
EJ ORGANIZATIONS IN ORANGE,WAKE,
COUNCIL THE TRIANGLE OZONE CHATHAM,FRAN
OF NON-ATTAINMENT KLIN,DURHAM,H
GOVERN REGION. MARKETING ARNETT,JOHNST DURHAM,RALEI BEFORE
CMAQ C-5102 C-5102 MENTS AND OUTREACH. ON,GRANVILLE GH 2011 $1,627 $1,627
PURCHASE TWO (2)
HYBRID ELECTRIC
BUSES AND PROVIDE
PORTION OF
OPERATING
ASSISTANCE FOR TWO BEFORE
CMAQ C-5103 C-5103 DURHAM YEARS. DURHAM DURHAM 2011 $1,686 $1,686
PURCHASE TWO (2)
HYBRID ELECTRIC
BUSES AND PROVIDE
PORTION OF
CHAPEL OPERATING EXPENSE DURHAM,ORANG
CMAQ C-5104 C-5104 HILL FOR THREE YEARS. E DURHAM OPERATIONS 2011 2011 $121 $121
PURCHASE TWO (2)
HYBRID ELECTRIC
BUSES AND PROVIDE
PORTION OF
CHAPEL OPERATING EXPENSE DURHAM,ORANG BEFORE
CMAQ C-5104 C-5104 HILL FOR THREE YEARS. E DURHAM 2011 $1,979 $1,979
GREENSBORO TRANSIT
AUTHORITY (GTA)
EXPANDED EVENING
GREENS SERVICE ROUTES FROM
CMAQ C-5105 C-5105 BORO SEVEN TO FIFTEEN. GUILFORD GREENSBORO INSPECTION 2011 2011 $863 $863
GREENSBORO TRANSIT
AUTHORITY (GTA)
EXPANDED EVENING
GREENS SERVICE ROUTES FROM BEFORE
CMAQ C-5105 C-5105 BORO SEVEN TO FIFTEEN. GUILFORD GREENSBORO 2011 $1,727 $1,727
US 521-BALLANTYNE
COMMONS PARKWAY.
CHARLO INTERSECTION BEFORE
CMAQ C-5108 C-5108 TTE IMPROVEMENTS. MECKLENBURG CHARLOTTE 2011 $582 $582
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CHARLOTTE-
MECKLENBURG
COUNTY SCHOOLS, CLEAN UNION,MECKLEN CHARLOTTE,RO BEFORE
CMAQ C-5109 C-5109 WIDE SCHOOL BUS INITIATIVE. BURG CKY RIVER 2011 $536 $536
COUNTY MECKLENBURG EPA, BEFORE
CMAQ C-5110 C-5110 WIDE CLEAN AIR WORKS. MECKLENBURG CHARLOTTE 2011 $200 $200
CHARLO
TTE INSTALL TWO STATE
HILLSBO MAINTAINED E-85 ORANGE,MECKL CHARLOTTE,DU BEFORE
CMAQ C-5111 C-5111 ROUGH FUELING SITES. ENBURG RHAM 2011 $250 $250
EXPANSION AND
ROCKY UPGRADE OF TRAFFIC NASH,EDGECOM
CMAQ C-5112 C-5112 MOUNT SIGNAL SYSTEM. BE ROCKY MOUNT CONSTRUCTION 2011 2011 $6,750 $6,750
EXPANSION AND
ROCKY UPGRADE OF TRAFFIC NASH,EDGECOM BEFORE
CMAQ C-5112 C-5112 MOUNT SIGNAL SYSTEM. BE ROCKY MOUNT 2011 $1,125 $1,125
TARBOR MAIN STREET SIGNAL UPPER BEFORE
CMAQ C-5113 C-5113 O SYNCHRONIZATION. EDGECOMBE COASTAL PLAIN 2011 $418 $418
GREENWAY - SPUR OF
"HIKE AND BIKE" BEFORE
CMAQ C-5114 C-5114 VARIOUS PROJECT. GRANVILLE KERR TAR 2011 $516 $516
EAST LYON STATION
CMAQ C-5115 C-5115 BUTNER ROAD CONNECTOR. GRANVILLE KERR TAR CONSTRUCTION 2011 2011 $491 $491
EAST LYON STATION
CMAQ C-5115 C-5115 BUTNER ROAD CONNECTOR. GRANVILLE KERR TAR RIGHT-OF-WAY 2011 2011 $60 $60
PEDESTRIAN
CONVEYANCE SYSTEM
PITTSBO TO COMMUNITY TRIANGLE BEFORE
CMAQ C-5116 C-5116 RO COLLEGE-LIBRARY. CHATHAM AREA 2011 $193 $193
INSTALLATION OF
COORDINATED
SIGNALTIMING SYSTEM
ON SOUTH STATE
STREET AT WEST 3RD.
AVENUE, WEST 2ND.
LEXINGT STREET AND WEST 1ST. PIEDMONT BEFORE
CMAQ C-5117 C-5117 ON AVENUE. DAVIDSON TRIAD 2011 $375 $375
INSTALLATION OF
SIDEWALKS AT VARIOUS
LEXINGT LOCATIONS ALONG PIEDMONT BEFORE
CMAQ C-5118 C-5118 ON RALEIGH ROAD. DAVIDSON TRIAD 2011 $260 $260
REPLACEMENT OF TWO
GASOLINE PASSENGER
FLEET VEHICLES WITH
LEXINGT HYBRID PASSENGER PIEDMONT BEFORE
CMAQ C-5119 C-5119 ON VEHICLES. DAVIDSON TRIAD 2011 $46 $46
CNG RETROFIT FOR A
CHEVROLET 3500
SILVERADO TO REPLACE
A SIMULAR GASOLINE
COUNTY FUELED LIGHT-DUTY PIEDMONT BEFORE
CMAQ C-5122 C-5122 WIDE TRUCK. DAVIDSON TRIAD 2011 $44 $44
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
REPLACEMENT OF FOUR
GASOLINE POWERED
PASSENGER FLEET
COUNTY VEHICLES WITH HYBRID PIEDMONT BEFORE
CMAQ C-5124 C-5124 WIDE PASSENGER VEHICLES. DAVIDSON TRIAD 2011 $90 $90
WEST SALISBURY
STREET, BROAD
STREET AND EAST FIRST
STREET. PIEDMONT BEFORE
CMAQ C-5126 C-5126 DENTON INSTALL SIDEWALKS. DAVIDSON TRIAD 2011 $50 $50
MARSHVI CONSTRUCT BEFORE
CMAQ C-5128 C-5128 LLE SIDEWALKS. UNION ROCKY RIVER 2011 $260 $260
DEEP RIVER GREENWAY
EXTENSION.
GREENWAY TRAIL
CONNECTING
UNIVERSITY PARK WITH
PIEDMONT
BICYCLE & HIGH ENVIRONMENTAL BEFORE
PEDESTRIAN EL-5104 EL-5104 POINT CENTER. GUILFORD HIGH POINT 2011 $0
SR 1373 (NORTH MAIN
STREET).
SIDEWALK EXTENSION
FROM
EXISTING SIDEWALK TO
BICYCLE & BURNSVI RAY BEFORE
PEDESTRIAN EL-5105 EL-5105 LLE CORT PARK ENTRANCE. YANCEY HIGH COUNTRY 2011 $167 $167
SR 1001 (SUGAR HILL
ROAD), SR 1168 (REID
ST5REET) TO
WILHEMENIA STREET.
BICYCLE & CONSTRUCT A FIVE BEFORE
PEDESTRIAN EL-5106 EL-5106 MARION FOOT SIDEWALK. MCDOWELL ISOTHERMAL 2011 $200 $200
SR 1260 (SOUTH
MITCHELL AVENUE-
NC 226 (CRIMSON
LAUREL WAY), ALONG
SR 1260 FROM BOWMAN
MIDDLE SCHOOL
TO NC 226 AND ALONG
NC 226 FROM
SR 1260 TO SR 1211
(CANE CREEK
ROAD). CONSTRUCT A
BICYCLE & BAKERS FIVE FOOR BEFORE
PEDESTRIAN EL-5107 EL-5107 VILLE SIDEWALK. MITCHELL HIGH COUNTRY 2011 $200 $200
STREETSCAPE
IMPROVEMENTS IN THE DAVIDSON,DAVI
ENHANCEME WINSTON-SALEM MPO E,FORSYTH,STO WINSTON-
NT EL-5108 EL-5108 VARIOUS AREA. KES SALEM CONSTRUCTION 2011 2012 $1,250 $625 $625
SIDEWALK PROGRAM IN
BICYCLE & ALL FOURTEEN
PEDESTRIAN ER-2971 ER-2971 VARIOUS HIGHWAY DIVISIONS. STATEWIDE CONSTRUCTION 2011 2020 $14,000 $1,400 $1,400 $1,400 $1,400 $1,400 $1,400 $1,400 $1,400 $1,400 $1,400
SIDEWALK PROGRAM IN
BICYCLE & ALL FOURTEEN BEFORE
PEDESTRIAN ER-2971 ER-2971 VARIOUS HIGHWAY DIVISIONS. STATEWIDE 2011 $13,358 $13,358
ROADSIDE
BEAUTIFICATION
PROJECTS
ENHANCEME IN ALL FOURTEEN
NT ER-2973 ER-2973 VARIOUS HIGHWAY DIVISIONS. STATEWIDE LANDSCAPING 2011 2020 $30,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000
ROADSIDE
BEAUTIFICATION
PROJECTS
ENHANCEME IN ALL FOURTEEN BEFORE
NT ER-2973 ER-2973 VARIOUS HIGHWAY DIVISIONS. STATEWIDE 2011 $32,993 $32,993
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
PLANTING OF
WILDFLOWERS AND
ENHANCEME PERENNIAL BULBS ON
NT ER-3100 ER-3100 VARIOUS FEDERAL-AID SYSTEM. STATEWIDE LANDSCAPING 2011 2020 $6,000 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600
PLANTING OF
WILDFLOWERS AND
ENHANCEME PERENNIAL BULBS ON BEFORE
NT ER-3100 ER-3100 VARIOUS FEDERAL-AID SYSTEM. STATEWIDE 2011 $11,849 $11,849
ENHANCEME SPECIAL EVENTS
NT ER-3101 ER-3101 VARIOUS PLANTING STATEWIDE. STATEWIDE LANDSCAPING 2011 2020 $4,000 $400 $400 $400 $400 $400 $400 $400 $400 $400 $400
ENHANCEME SPECIAL EVENTS BEFORE
NT ER-3101 ER-3101 VARIOUS PLANTING STATEWIDE. STATEWIDE 2011 $9,429 $9,429
IMPLEMENTATION OF
STATEWIDE
ENHANCEME SCENIC BYWAYS IMPLEMENTATI
NT ER-3102 ER-3102 VARIOUS PROGRAM. STATEWIDE ON 2011 2020 $750 $75 $75 $75 $75 $75 $75 $75 $75 $75 $75
IMPLEMENTATION OF
STATEWIDE
ENHANCEME SCENIC BYWAYS BEFORE
NT ER-3102 ER-3102 VARIOUS PROGRAM. STATEWIDE 2011 $1,031 $1,031
NORTH CAROLINA
STATE BYWAYS BEFORE
ER-3419 ER-3419 VARIOUS BOOKLET PRINTING. STATEWIDE 2011 $50 $50
COLOR CANOPY AND
ENHANCEME TREE PLANTING
NT ER-3611 ER-3611 VARIOUS STATEWIDE. STATEWIDE LANDSCAPING 2011 2020 $2,500 $250 $250 $250 $250 $250 $250 $250 $250 $250 $250
COLOR CANOPY AND
ENHANCEME TREE PLANTING BEFORE
NT ER-3611 ER-3611 VARIOUS STATEWIDE. STATEWIDE 2011 $3,227 $3,227
BLUE
RIDGE SCENIC ENHANCEMENT
ENHANCEME PARKWA AND VIEWSHED BEFORE
NT ER-3817 ER-3817 Y PROTECTION. STATEWIDE 2011 $2,200 $2,200
ROADSIDE
ENVIRONMENTAL
PROJECTS BEFORE
ER-5100 ER-5100 VARIOUS AND TREE PLANTINGS. STATEWIDE 2011 $7,605 $7,605
SOUND CLASS FERRY
FOR CEDAR ISLAND- CARTERET,HYD ALBEMARLE,DO BEFORE
FERRY F-4004 F-4004 NC 12 OCRACOKE. E WN EAST 2011 $29,874 $29,874
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
ONE SOUND CLASS CARTERET,HYD ALBEMARLE,DO ON IN ON IN
FERRY F-4004 F-4004B NC 12 FERRY. E WN EAST CONSTRUCTION 2012 2012 $20,000 20,000.00
CEDAR ISLAND,
PARKING AND BEFORE
FERRY F-4405 F-4405 NC 12 ROADWORK. CARTERET DOWN EAST 2011 $1,125 $1,125
OCRACOKE VISITORS BEFORE
FERRY F-4703B F-4703B NC 12 CENTER. REFURBISH. HYDE ALBEMARLE 2011 $1,936 $1,936
CHERRY BRANCH
VISITOR'S CENTER. BEFORE
FERRY F-5000 F-5000 NC 306 REPLACEMENT. CRAVEN DOWN EAST 2011 $800 $800
HATTERAS SOUTH DOCK
FERRY F-5001 F-5001 NC 12 BASIN REFURBISHMENT. DARE ALBEMARLE CONSTRUCTION 2011 2011 $850 $850
SWAN QUARTER
VISITORS CENTER. BEFORE
FERRY F-5003 F-5003 NC 45 REPLACEMENT. HYDE ALBEMARLE 2011 $800 $800
OCRACOKE GANTRY.
FERRY F-5004 F-5004 NC 12 REPAIR AND REPLACE. HYDE ALBEMARLE CONSTRUCTION 2011 2011 $250 $250
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
OCRACOKE SOUTH
DOCK GANTRY. REPAIR
FERRY F-5005 F-5005 NC 12 AND REPLACE. HYDE ALBEMARLE CONSTRUCTION 2011 2011 $375 $375
CEDAR ISLAND RAMPS
AND GANTRY. REPAIR
FERRY F-5006 F-5006 NC 12 AND REPLACE. CARTERET DOWN EAST CONSTRUCTION 2011 2011 $750 $750
HATTERAS BULKHEAD BEFORE
FERRY F-5100 F-5100 NC 12 REPLACEMENT. DARE ALBEMARLE 2011 $120 $120
CEDAR ISLAND, BRUNSWICK,NE
SOUTHPORT AND FORT W
FISHER DOCKS. HANOVER,CART WILMINGTON,D
FERRY F-5301 F-5301 VARIOUS REPLACE DOLPHINS. ERET OWN EAST CONSTRUCTION 2017 2017 $1,150 $1,150
REPLACE M/V
KINNAKEET.
CONSTRUCT A
HATTERAS CLASS
FERRY F-5302 F-5302 NC 12 FERRY. DARE,HYDE ALBEMARLE CONSTRUCTION 2017 2018 $17,600 $8,800 $8,800
REPLACE M/V FRISCO.
CONSTRUCT A
HATTERAS CLASS
FERRY F-5303 F-5303 NC 12 FERRY. DARE,HYDE ALBEMARLE CONSTRUCTION 2018 2018 $18,000 $18,000
REPLACE M/V
CHICAMACOMICO.
CONSTRUCT HATTERAS
FERRY F-5304 F-5304 NC 12 CLASS FERRY. DARE,HYDE ALBEMARLE CONSTRUCTION 2019 2020 $18,000 $9,000 $9,000
REPLACE M/V CAPE
POINT. CONSTRUCT
HATTERAS CLASS
FERRY F-5305 F-5305 NC 12 FERRY. DARE ALBEMARLE CONSTRUCTION 2019 2020 $18,000 $9,000 $9,000
SOUTH FORK RIVER
BRIDGE TO EXIT 27.
PAVEMENT BEFORE
HIGHWAY I-5007 I-5007 I-85 REHABILITATION. GASTON GASTONIA 2011 $3,882 $3,882
NC 55/US 421,
RECONFIGURE BEFORE
HIGHWAY I-5010 I-5010 I-95 INTERCHANGE RAMP. HARNETT MID-CAROLINA 2011 $1,749 $1,749
CHARLOTTE, US 74
I-277 (INDEPENDENCE
BROOKS BOULEVARD TO I-77.
HIRE REPLACE
FREEWA INTERSTATE LIGHTING BEFORE
HIGHWAY I-5014 I-5014 Y SYSTEM. MECKLENBURG CHARLOTTE 2011 $1,209 $1,209
NORTH OF US 70 (MILE
POST 99.8) TO NORTH
OF SR 2130 (MILE POST UPPER BEFORE
HIGHWAY I-5016 I-5016 I-95 107.1). RESURFACE. JOHNSTON COASTAL PLAIN 2011 $2,385 $2,385
I-26, MILE MARKER 61.75
TO MILE MARKER 71
(SOUTH CAROLINA
STATE LINE).
PAVEMENT BEFORE
HIGHWAY I-5100 I-5100 I-26 REHABILITATION. POLK ISOTHERMAL 2011 $10,719 $10,719
I-77, US 21 (EXIT 79) TO
MILE MARKER 84.
PAVEMENT NORTHWEST BEFORE
HIGHWAY I-5103 I-5103 I-77 REHABILITATION. SURRY,YADKIN PIEDMONT 2011 $4,033 $4,033
I-77, MILE MARKER 57.83
TO MILE POST 61.74.
PAVEMENT GARVEE
HIGHWAY I-5106 I-5106 I-77 REHABILITATION. IREDELL LAKE NORMAN CONSTRUCTION 2011 2020 $4,390 $439 $439 $439 $439 $439 $439 $439 $439 $439 $439
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
I-77, MILE MARKER 57.83
TO MILE POST 61.74.
PAVEMENT BEFORE
HIGHWAY I-5106 I-5106 I-77 REHABILITATION. IREDELL LAKE NORMAN 2011 $2,086 $2,086
I-77, MILE MARKER 56 TO
MILE MARKER
57.83 AND MILE MARKER
61.74 TO
MILE MARKER 68.74.
PAVEMENT BEFORE
HIGHWAY I-5107 I-5107 I-77 REHABILITATION. IREDELL LAKE NORMAN 2011 $3,973 $3,973
HICHOR UPGRADE TRAFFIC BEFORE
CMAQ C-5129 C-5129 Y SIGNAL SYSTEM. CATAWBA UNIFOUR 2011 $2,500 $2,500
MULTI-MODAL TRANSIT
FACILITY
CONOVE REHABILITATION
CMAQ C-5130 C-5130 R ASSISTANCE. CATAWBA UNIFOUR CONSTRUCTION 2013 2013 $1,384 $1,384
MULTI-MODAL TRANSIT
FACILITY
CONOVE REHABILITATION BEFORE
CMAQ C-5130 C-5130 R ASSISTANCE. CATAWBA UNIFOUR 2011 $2,146 $2,146
WESTERN PIEDMONT
REGIONAL TRANSIT
AUTHORITY (WPRTA).
HICKOR PURCHASE HYBRID BEFORE
CMAQ C-5131 C-5131 Y BUSES. CATAWBA UNIFOUR 2011 $600 $600
NC 150-TALBERT ROAD.
MOORES INTERSECTION BEFORE
CMAQ C-5132 C-5132 VILLE IMPROVEMENT. IREDELL LAKE NORMAN 2011 $756 $756
MOORES BEFORE
CMAQ C-5133 C-5133 VILLE PARK AND RIDE LOT. IREDELL LAKE NORMAN 2011 $2,028 $2,028
GREAT
SMOKY
MOUNTA
INS UPGRADE PARK
NATIONA VEHICLES TO CLEAN HAYWOOD,SWAI SOUTHWESTER BEFORE
CMAQ C-5134 C-5134 L PARK HYBRIDS. N N,LAND OF SKY 2011 $198 $198
REPLACE A GASOLINE
POWERED FLEET
LEXINGT VEHICLE WITH A CNG PIEDMONT BEFORE
CMAQ C-5139 C-5139 ON PASSENGER VEHICLE. DAVIDSON TRIAD 2011 $25 $25
INSTALL A 10000
GALLON E-85 TANK AND
CREDIT CARD READER
DAVIDSO FOR CNG STATION WITH
N 24 HOUR PUBLIC PIEDMONT BEFORE
CMAQ C-5140 C-5140 COUNTY ACCESS. DAVIDSON TRIAD 2011 $94 $94
REPLACE TWO
GASOLINE POWERED
FLEET VEHICLES WITH
WINSTO CNG PASSENGER WINSTON- BEFORE
CMAQ C-5141 C-5141 N-SALEM VEHICLES. FORSYTH SALEM 2011 $50 $50
INTERIM TRAFFIC
WINSTO SYSTEM UPGRADES IN WINSTON- BEFORE
CMAQ C-5142 C-5142 N-SALEM TWO PHASES. FORSYTH SALEM 2011 $3,812 $3,812
CROSS-TOWN
PEDESTRIAN-BICYCLE
SIDEWALK AND TRAIL.
CREEDM CONSTRUCT A MULTI-
CMAQ C-5144 C-5144 OOR USE TRAIL. GRANVILLE KERR TAR CONSTRUCTION 2011 2011 $405 $405
CROSS-TOWN
PEDESTRIAN-BICYCLE
SIDEWALK AND TRAIL.
CREEDM CONSTRUCT A MULTI-
CMAQ C-5144 C-5144 OOR USE TRAIL. GRANVILLE KERR TAR RIGHT-OF-WAY 2011 2011 $24 $24
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ROXBOR NORTH MAIN STREET. BEFORE
CMAQ C-5145 C-5145 O CONSTRUCT SIDEWALK. PERSON KERR TAR 2011 $244 $244
KINGS TRUCK STOP
MOUNTA ELECTRIFICATION
CMAQ C-5146 C-5146 IN AT I-85 (EXIT 5). CLEVELAND LAKE NORMAN CONSTRUCTION 2011 2011 $840 $840
CHERRY SIDEWALKS ALONG NC
CMAQ C-5147 C-5147 VILLE 150. GASTON LAKE NORMAN CONSTRUCTION 2011 2011 $225 $225
CHERRY SIDEWALKS ALONG
CMAQ C-5148 C-5148 VILLE MOUNTAIN STREET. GASTON LAKE NORMAN CONSTRUCTION 2011 2011 $125 $125
LINCOLN CLONINGER RAIL TRAIL
CMAQ C-5149 C-5149 TON EXTENSION. LINCOLN LAKE NORMAN CONSTRUCTION 2011 2011 $585 $585
EASTER OCONALUFTEE
N BAND VISITORS CENTER IN
OF NORTH CAROLINA TO
CHEROK SUGARLAND VISITORS
EE CENTER IN TENNESSEE. LAND OF
INDIAND PARK SHUTTLE SWAIN,HAYWOO SKY,SOUTHWE IMPLEMENTATI
CMAQ C-5150 C-5150 (EBCI) SERVICE. D STERN ON 2011 2011 $545 $545
EASTER
N BAND
OF
CHEROK GREAT SMOKIES
EE NATIONAL PARK. LAND OF
INDIANS CONSTRUCT A MIXED- SWAIN,HAYWOO SKY,SOUTHWE
CMAQ C-5151 C-5151 (EBCI) USE PATHWAY. D STERN CONSTRUCTION 2011 2011 $242 $242
TRANSPORTATION
NATIONA CHOICE. PUBLIC LAND OF
L PARK EDUCATION CAMPAIGN SWAIN,HAYWOO SKY,SOUTHWE BEFORE
CMAQ C-5152 C-5152 SERVICE IN THE SMOKIES. D STERN 2011 $100 $100
MAGNOLIA AVENUE-
FIELDSTONE
NEIGHBORHOOD.
MOORES CONSTRUCT
CMAQ C-5153 C-5153 VILLE SIDEWALK NETWORK. IREDELL LAKE NORMAN CONSTRUCTION 2011 2011 $799 $799
SALISBURY TRANSIT
SALISBU ROUTE OPERATING
CMAQ C-5154 C-5154 RY ASSISTANCE. ROWAN CONCORD OPERATIONS 2013 2013 $1,311 $1,311
RIDER TRANSIT -
OPERATIONAL
CONCOR ASSISTANCE FOR
CMAQ C-5155 C-5155 D SUNDAY SERVICE. CABARRUS CONCORD OPERATIONS 2013 2013 $1,049 $1,049
BURTON SMITH
BOULEVARD. INSTALL
DUAL LEFT TURN LANES
AT WEDDINGTON ROAD
AND ASSOCIATED
CONCOR SIGNAL AND PAVEMENT
CMAQ C-5156 C-5156 D MARKINGS. CABARRUS CONCORD CONSTRUCTION 2013 2013 $725 $725
BURTON SMITH
BOULEVARD. INSTALL
DUAL LEFT TURN LANES
AT WEDDINGTON ROAD
AND ASSOCIATED
CONCOR SIGNAL AND PAVEMENT
CMAQ C-5156 C-5156 D MARKINGS. CABARRUS CONCORD ENGINEERING 2013 2013 $75 $75
CONSTRUCT
SIDEWALKS ON TOM
QUERY ROAD,
ROBINSON CHURCH
HARRISB ROAD AND STALLINGS
CMAQ C-5157 C-5157 URG ROAD. CABARRUS CONCORD CONSTRUCTION 2014 2014 $473 $473
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CONSTRUCT
SIDEWALKS ON TOM
QUERY ROAD,
ROBINSON CHURCH
HARRISB ROAD AND STALLINGS
CMAQ C-5157 C-5157 URG ROAD. CABARRUS CONCORD ENGINEERING 2014 2014 $91 $91
CONSTRUCT
SIDEWALKS ON KERNS
STREET, SALISBURY
GRANITE AVENUE AND CHURCH
CMAQ C-5158 C-5158 QUARRY STREET. ROWAN CONCORD CONSTRUCTION 2014 2014 $406 $406
CONSTRUCT
SIDEWALKS ON KERNS
STREET, SALISBURY
GRANITE AVENUE AND CHURCH
CMAQ C-5158 C-5158 QUARRY STREET. ROWAN CONCORD ENGINEERING 2014 2014 $36 $36
CONSTRUCT
SIDEWALKS ON KERNS
STREET, SALISBURY
GRANITE AVENUE AND CHURCH
CMAQ C-5158 C-5158 QUARRY STREET. ROWAN CONCORD RIGHT-OF-WAY 2014 2014 $5 $5
ROXIE STREET, NC 3
AND DALE EARNHARDT
KANNAP BOULEVARD. STREET
CMAQ C-5159 C-5159 OLIS IMPROVEMENTS. CABARRUS CONCORD CONSTRUCTION 2015 2015 $540 $540
ROXIE STREET, NC 3
AND DALE EARNHARDT
KANNAP BOULEVARD. STREET
CMAQ C-5159 C-5159 OLIS IMPROVEMENTS. CABARRUS CONCORD ENGINEERING 2015 2015 $135 $135
NEWSOME ROAD.
SALISBU CONSTRUCT BIKE
CMAQ C-5160 C-5160 RY LANES. ROWAN CONCORD CONSTRUCTION 2016 2016 $1,256 $1,256
NEWSOME ROAD.
SALISBU CONSTRUCT BIKE
CMAQ C-5160 C-5160 RY LANES. ROWAN CONCORD ENGINEERING 2016 2016 $14 $14
NEWSOME ROAD.
SALISBU CONSTRUCT BIKE
CMAQ C-5160 C-5160 RY LANES. ROWAN CONCORD RIGHT-OF-WAY 2016 2016 $126 $126
IRISH BUFFALO CREEK
GREENWAY.
KANNAP CONSTRUCT
CMAQ C-5161 C-5161 OLIS GREENWAY. CABARRUS CONCORD CONSTRUCTION 2017 2017 $1,944 $1,944
IRISH BUFFALO CREEK
GREENWAY.
KANNAP CONSTRUCT
CMAQ C-5161 C-5161 OLIS GREENWAY. CABARRUS CONCORD ENGINEERING 2017 2017 $146 $146
OLD RALEIGH ROAD.
CONSTRUCT
SIDEWALKS ON NORTH
SIDE, APEX PEAKWAY
TO US 64 AND ALONG
WEST
SIDE OF SHEPHERDS
VINEYARD DRIVE,
OLD RALEIGH ROAD TO
CMAQ C-5162 C-5162 APEX US 64. WAKE RALEIGH CONSTRUCTION 2013 2013 $380 $380
OLD RALEIGH ROAD.
CONSTRUCT
SIDEWALKS ON NORTH
SIDE, APEX PEAKWAY
TO US 64 AND ALONG
WEST
SIDE OF SHEPHERDS
VINEYARD DRIVE,
OLD RALEIGH ROAD TO
CMAQ C-5162 C-5162 APEX US 64. WAKE RALEIGH RIGHT-OF-WAY 2013 2013 $45 $45
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CRABTREE CREEK
GREENWAY.
CONSTRUCT A
CONNECTOR BETWEEN
CAPITAL AREA
GREENWAY SYSTEM,
CARY GREENWAY
SYSTEM AND THE
MORRISVILLE
GREENWAY SYSTEM
AND THE RESEARCH
CMAQ C-5163 C-5163 CARY TRIANGLE PARK. WAKE RALEIGH ENGINEERING 2014 2014 $383 $383
CRABTREE CREEK
GREENWAY.
CONSTRUCT A
CONNECTOR BETWEEN
CAPITAL AREA
GREENWAY SYSTEM,
CARY GREENWAY
SYSTEM AND THE
MORRISVILLE
GREENWAY SYSTEM
AND THE RESEARCH
CMAQ C-5163 C-5163 CARY TRIANGLE PARK. WAKE RALEIGH RIGHT-OF-WAY 2015 2015 $500 $500
CRABTREE CREEK
GREENWAY.
CONSTRUCT A
CONNECTOR BETWEEN
CAPITAL AREA
GREENWAY SYSTEM,
CARY GREENWAY
SYSTEM AND THE
MORRISVILLE
GREENWAY SYSTEM
AND THE RESEARCH
CMAQ C-5163 C-5163 CARY TRIANGLE PARK. WAKE RALEIGH CONSTRUCTION 2016 2016 $2,815 $2,815
SMITH AND SANFORD
CREEK GREENWAY AND
SIDEWALKS.
CONSTRUCT TRAIL
AND SIDEWALKS TO
CONNECT MAJOR
WAKE ACTIVITY CENTERS IN
CMAQ C-5164 C-5164 FOREST WAKE FORESY. WAKE RALEIGH ENGINEERING 2013 2013 $416 $416
SMITH AND SANFORD
CREEK GREENWAY AND
SIDEWALKS.
CONSTRUCT TRAIL
AND SIDEWALKS TO
CONNECT MAJOR
WAKE ACTIVITY CENTERS IN
CMAQ C-5164 C-5164 FOREST WAKE FORESY. WAKE RALEIGH CONSTRUCTION 2014 2014 $3,006 $3,006
CARY PARKWAY AND
HIGH HOUSE ROAD.
CONSTRUCT A SINGLE
QUADRANT
CMAQ C-5165 C-5165 CARY INTERSECTION. WAKE RALEIGH ENGINEERING 2013 2013 $360 $360
CARY PARKWAY AND
HIGH HOUSE ROAD.
CONSTRUCT A SINGLE
QUADRANT
CMAQ C-5165 C-5165 CARY INTERSECTION. WAKE RALEIGH RIGHT-OF-WAY 2014 2014 $1,200 $1,200
CARY PARKWAY AND
HIGH HOUSE ROAD.
CONSTRUCT A SINGLE
QUADRANT
CMAQ C-5165 C-5165 CARY INTERSECTION. WAKE RALEIGH CONSTRUCTION 2015 2015 $2,160 $2,160
CREEDM EASTERN SEGMENT OF
CMAQ C-5166 C-5166A OOR GREENWAY. GRANVILLE RALEIGH ENGINEERING 2013 2013 $148 $148
CREEDM WESTERN SEGMENT OF
CMAQ C-5166 C-5166B OOR GREENWAY. GRANVILLE RALEIGH ENGINEERING 2013 2013 $125 $125
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CREEDM EASTERN SEGMENT OF
CMAQ C-5166 C-5166A OOR GREENWAY. GRANVILLE RALEIGH RIGHT-OF-WAY 2014 2014 $30 $30
CREEDM WESTERN SEGMENT OF
CMAQ C-5166 C-5166B OOR GREENWAY. GRANVILLE RALEIGH RIGHT-OF-WAY 2014 2014 $30 $30
CREEDM EASTERN SEGMENT OF
CMAQ C-5166 C-5166A OOR GREENWAY. GRANVILLE RALEIGH CONSTRUCTION 2015 2015 $956 $956
CREEDM WESTERN SEGMENT OF
CMAQ C-5166 C-5166B OOR GREENWAY. GRANVILLE RALEIGH CONSTRUCTION 2015 2015 $802 $802
KNIGHTDALE
BOULEVARD.
CONSTRUCT A
DEDICATED RIGHT TURN
LANE ALONG
EASTBOUND
KNIGHTDALE
BOULEVARD ONTO
KNIGHTD SOUTHBOUND
CMAQ C-5167 C-5167 ALE SMITHFIELD ROAD. WAKE RALEIGH CONSTRUCTION 2013 2013 $625 $625
KNIGHTDALE
BOULEVARD.
CONSTRUCT A
DEDICATED RIGHT TURN
LANE ALONG
EASTBOUND
KNIGHTDALE
BOULEVARD ONTO
KNIGHTD SOUTHBOUND
CMAQ C-5167 C-5167 ALE SMITHFIELD ROAD. WAKE RALEIGH ENGINEERING 2013 2013 $75 $75
KNIGHTDALE
BOULEVARD.
CONSTRUCT A
DEDICATED RIGHT TURN
LANE ALONG
EASTBOUND
KNIGHTDALE
BOULEVARD ONTO
KNIGHTD SOUTHBOUND
CMAQ C-5167 C-5167 ALE SMITHFIELD ROAD. WAKE RALEIGH RIGHT-OF-WAY 2013 2013 $50 $50
CRABTREE CREEK
GREENWAY.
CONSTRUCT
GREENWAY
CONNECTING EXISTING
MORRIS GREENWAY WITH
CMAQ C-5168 C-5168 VILLE MORRISVILLE. WAKE RALEIGH ENGINEERING 2013 2013 $554 $554
CRABTREE CREEK
GREENWAY.
CONSTRUCT
GREENWAY
CONNECTING EXISTING
MORRIS GREENWAY WITH
CMAQ C-5168 C-5168 VILLE MORRISVILLE. WAKE RALEIGH CONSTRUCTION 2015 2015 $3,693 $3,693
PARK AND RIDE LOT.
NORTH CONSTRUCT A ONE
CAROLIN ACRE 170 SPACE LOT
A STATE NEAR NC STATE
UNIVERS UNIVERSITY
CMAQ C-5169 C-5169 ITY CENTENNIAL CAMPUS. WAKE RALEIGH CONSTRUCTION 2013 2013 $346 $346
BICYCLE LANE STRIPING
AND
RESTRIP VARIOUS
CMAQ C-5170 C-5170 RALEIGH LANES WITHIN CITY. WAKE RALEIGH CONSTRUCTION 2013 2015 $1,116 $372 $372 $372
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CAPITAL AREA TRANSIT
(CAT) BUS
REPLACEMENTS.
PURCHASE SEVEN
BIODIESEL HYBRID
BUSES FOR EXPANSION
SERVICES TO
NORTHWEST AND
CMAQ C-5171 C-5171 RALEIGH SOUTHWEST RALEIGH. WAKE RALEIGH ACQUISITION 2013 2013 $4,025 $4,025
COLERIDGE DRIVE TO
WAKE FOREST ROAD.
CONSTRUCT A FIVE
CMAQ C-5172 C-5172 RALEIGH FOOT SIDEWALK. WAKE RALEIGH ENGINEERING 2013 2013 $33 $33
COLERIDGE DRIVE TO
WAKE FOREST ROAD.
CONSTRUCT A FIVE
CMAQ C-5172 C-5172 RALEIGH FOOT SIDEWALK. WAKE RALEIGH RIGHT-OF-WAY 2014 2014 $217 $217
COLERIDGE DRIVE TO
WAKE FOREST ROAD.
CONSTRUCT A FIVE
CMAQ C-5172 C-5172 RALEIGH FOOT SIDEWALK. WAKE RALEIGH CONSTRUCTION 2015 2015 $233 $233
EXPANDED EXPRESS
BUS SERVICE, HOLLY
SPRINGS TO
DOWNTOWN RALEIGH
VIA APEX AND CARY.
OPERATING
ASSISTANCE TO EXTEND
CURRENT ROUTE
TRIANGL BETWEEN APEX AND
E DOWNTOWN RALEIGH
TRANSIT AND CONSTRUCT TWO
AUTHORI NEW PARK AND RIDE WAKE,DURHAM, RALEIGH,DURH
CMAQ C-5173 C-5173 TY LOTS. ORANGE AM CONSTRUCTION 2013 2013 $819 $819
EXPANDED EXPRESS
BUS SERVICE, HOLLY
SPRINGS TO
DOWNTOWN RALEIGH
VIA APEX AND CARY.
OPERATING
ASSISTANCE TO EXTEND
CURRENT ROUTE
TRIANGL BETWEEN APEX AND
E DOWNTOWN RALEIGH
TRANSIT AND CONSTRUCT TWO
AUTHORI NEW PARK AND RIDE WAKE,DURHAM, RALEIGH,DURH
CMAQ C-5173 C-5173 TY LOTS. ORANGE AM ENGINEERING 2013 2013 $351 $351
EXPANDED EXPRESS
BUS SERVICE, HOLLY
SPRINGS TO
DOWNTOWN RALEIGH
VIA APEX AND CARY.
OPERATING
ASSISTANCE TO EXTEND
CURRENT ROUTE
TRIANGL BETWEEN APEX AND
E DOWNTOWN RALEIGH
TRANSIT AND CONSTRUCT TWO
AUTHORI NEW PARK AND RIDE WAKE,DURHAM, RALEIGH,DURH
CMAQ C-5173 C-5173 TY LOTS. ORANGE AM RIGHT-OF-WAY 2013 2013 $1,604 $1,604
EXPANDED EXPRESS
BUS SERVICE, HOLLY
SPRINGS TO
DOWNTOWN RALEIGH
VIA APEX AND CARY.
OPERATING
ASSISTANCE TO EXTEND
CURRENT ROUTE
TRIANGL BETWEEN APEX AND
E DOWNTOWN RALEIGH
TRANSIT AND CONSTRUCT TWO
AUTHORI NEW PARK AND RIDE WAKE,DURHAM, RALEIGH,DURH
CMAQ C-5173 C-5173 TY LOTS. ORANGE AM OPERATIONS 2013 2015 $1,692 $564 $564 $564
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
I-440 RAMP METERING.
INSTALL RAMP METERS
AT HILLSBOROUGH
STREET, WESTERN
BOULEVARD AND JONES IMPLEMENTATI
CMAQ C-5174 C-5174 RALEIGH FRANKLIN ROAD. WAKE RALEIGH ON 2017 2017 $1,005 $1,005
DURHAM AREA TRANSIT
AUTHORITY (DATA)
OPERATING
ASSISTANCE FOR
CMAQ C-5175 C-5175 DURHAM NEW FIXED ROUTE. DURHAM DURHAM OPERATIONS 2013 2014 $2,438 $1,189 $1,249
ATT AMERICAN TOBACCO
(AMERIC TRAIL, NEW HOPE
AN CHURCH ROAD
TOBACC TRAILHEAD PARK AND TRIANGLE
CMAQ C-5176 C-5176 O TRAIL) RIDE LOT. CHATHAM AREA CONSTRUCTION 2013 2013 $841 $841
MLK, JR. SHARED
PATHWAY,
CONSTRUCT PATHWAY
ALONG
MLK, JR. BOULEVARD,
HOMESTEAD
CHAPEL ROAD TO PINEY
CMAQ C-5177 C-5177 HILL MOUNTAIN ROAD. ORANGE DURHAM CONSTRUCTION 2013 2013 $681 $681
MLK, JR. SHARED
PATHWAY,
CONSTRUCT PATHWAY
ALONG
MLK, JR. BOULEVARD,
HOMESTEAD
CHAPEL ROAD TO PINEY
CMAQ C-5177 C-5177 HILL MOUNTAIN ROAD. ORANGE DURHAM RIGHT-OF-WAY 2013 2013 $225 $225
CAMPUS WALK AVENUE,
MORREENE ROAD TO
LASALLE STREET AND
LASALLE STREET,
KANGAROO DRIVE TO
ERWIN ROAD.
CONSTRUCT
CMAQ C-5178 C-5178 DURHAM SIDEWALKS. DURHAM DURHAM CONSTRUCTION 2014 2014 $336 $336
NORTH ESTES DRIVE,
CONSTRUCT A TEN
FOOT PATHWAY, FIVE
CHAPEL FOOT SIDEWALKS AND A
CMAQ C-5179 C-5179 HILL FOUR FOOT BIKE LANE. ORANGE DURHAM RIGHT-OF-WAY 2014 2014 $207 $207
NORTH ESTES DRIVE,
CONSTRUCT A TEN
FOOT PATHWAY, FIVE
CHAPEL FOOT SIDEWALKS AND A
CMAQ C-5179 C-5179 HILL FOUR FOOT BIKE LANE. ORANGE DURHAM CONSTRUCTION 2015 2015 $975 $975
DURHAM AREA TRANSIT
AUTHORITY (DATA),
REPLACEMENT OF FIVE
HYBRID CUTAWAYS
(LIGHT TRANSIT
CMAQ C-5180 C-5180 DURHAM VEHICLES). DURHAM DURHAM ACQUISITION 2015 2015 $729 $729
JONES CREEK
GREENWAY,
CONSTRUCT
A 100 FOOT BRIDGE AND
650 FOOT PAVED TRAIL
TO FILL GAP BETWEEN
THE
CARRBORO UPPER
BOLIN TRAIL AND TWIN
CREEKS GREENWAY
AND IMPLEMENT
PROGRAM TO SUPPORT
NON-VEHICLE TRIPS TO
CARRBO MORRIS GROVE
CMAQ C-5181 C-5181 RO ELEMENTRY SCHOOL. ORANGE DURHAM CONSTRUCTION 2015 2015 $258 $258
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
JONES CREEK
GREENWAY,
CONSTRUCT
A 100 FOOT BRIDGE AND
650 FOOT PAVED TRAIL
TO FILL GAP BETWEEN
THE
CARRBORO UPPER
BOLIN TRAIL AND TWIN
CREEKS GREENWAY
AND IMPLEMENT
PROGRAM TO SUPPORT
NON-VEHICLE TRIPS TO
CARRBO MORRIS GROVE
CMAQ C-5181 C-5181 RO ELEMENTRY SCHOOL. ORANGE DURHAM ENGINEERING 2015 2015 $30 $30
JONES CREEK
GREENWAY,
CONSTRUCT
A 100 FOOT BRIDGE AND
650 FOOT PAVED TRAIL
TO FILL GAP BETWEEN
THE
CARRBORO UPPER
BOLIN TRAIL AND TWIN
CREEKS GREENWAY
AND IMPLEMENT
PROGRAM TO SUPPORT
NON-VEHICLE TRIPS TO
CARRBO MORRIS GROVE IMPLEMENTATI
CMAQ C-5181 C-5181 RO ELEMENTRY SCHOOL. ORANGE DURHAM ON 2016 2016 $12 $12
HOPE VALLEY ROAD,
CONSTRUCT
SIDEWALKS AND BIKE
LANES BETWEEN MLK,
JR. PARKWAY AND US 15-
CMAQ C-5182 C-5182 DURHAM 501 BUSINESS DURHAM DURHAM CONSTRUCTION 2016 2016 $1,252 $1,252
HOPE VALLEY ROAD,
CONSTRUCT
SIDEWALKS AND BIKE
LANES BETWEEN MLK,
JR. PARKWAY AND US 15-
CMAQ C-5182 C-5182 DURHAM 501 BUSINESS DURHAM DURHAM RIGHT-OF-WAY 2016 2016 $134 $134
CAMERON BOULEVARD,
ERWIN ROAD AND DUKE
CMAQ C-5183 C-5183A DURHAM UNIVERSITY ROAD. DURHAM DURHAM CONSTRUCTION 2016 2016 $972 $972
ALSTON AVENUE,
CARPENTER FLETCHER
ROAD TO SEDWICK
CMAQ C-5183 C-5183B DURHAM ROAD. DURHAM DURHAM CONSTRUCTION 2017 2017 $1,155 $1,155
RIVERWALK TRAIL,
PHASE III. CONSTRUCT
A PAVED OFF-ROAD TAIL
ALONG ENO RIVER
CONNECTING RIVER
PARK, GOLD PARK AND
THE OCCONEECHEE
HILLSBO MOUNTAIN STATE
CMAQ C-5184 C-5184 ROUGH NATURAL AREA. ORANGE DURHAM ENGINEERING 2017 2017 $50 $50
RIVERWALK TRAIL,
PHASE III. CONSTRUCT
A PAVED OFF-ROAD TAIL
ALONG ENO RIVER
CONNECTING RIVER
PARK, GOLD PARK AND
THE OCCONEECHEE
HILLSBO MOUNTAIN STATE
CMAQ C-5184 C-5184 ROUGH NATURAL AREA. ORANGE DURHAM RIGHT-OF-WAY 2017 2017 $433 $433
RIVERWALK TRAIL,
PHASE III. CONSTRUCT
A PAVED OFF-ROAD TAIL
ALONG ENO RIVER
CONNECTING RIVER
PARK, GOLD PARK AND
THE OCCONEECHEE
HILLSBO MOUNTAIN STATE
CMAQ C-5184 C-5184 ROUGH NATURAL AREA. ORANGE DURHAM CONSTRUCTION 2018 2018 $138 $138
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
GASTON MALL-
FRANKLIN SQUARE
GASTONI AREA, DEVELOP A PARK
CMAQ C-5185 C-5185 A AND RIDE LOT. GASTON GASTONIA ENGINEERING 2013 2013 $164 $164
GASTON MALL-
FRANKLIN SQUARE
GASTONI AREA, DEVELOP A PARK
CMAQ C-5185 C-5185 A AND RIDE LOT. GASTON GASTONIA CONSTRUCTION 2014 2014 $3,266 $3,266
GASTON MALL-
FRANKLIN SQUARE
GASTONI AREA, DEVELOP A PARK
CMAQ C-5185 C-5185 A AND RIDE LOT. GASTON GASTONIA RIGHT-OF-WAY 2014 2014 $1,440 $1,440
GASTONIA CCTV
CAMERAS. INSTALL 6
CCTV CAMERAS TO THE
EXISTING COMPURIZED
TRAFFIC SIGNAL
SYSTEM
ON I-85 AT NC 7 (OZARK
AVENUE);
US 29-74 AT FRANKLIN
SQUARE II;
NC 279 (NEW HOPE
ROAD) AT OZARD
AVENUE; US 321
(CHESTER STREET)
GASTONI AT TULIP DRIVE-BULB
CMAQ C-5186 C-5186 A AVENUE; GASTON GASTONIA ENGINEERING 2013 2013 $3 $3
GASTONIA CCTV
CAMERAS. INSTALL 6
CCTV CAMERAS TO THE
EXISTING COMPURIZED
TRAFFIC SIGNAL
SYSTEM
ON I-85 AT NC 7 (OZARK
AVENUE);
US 29-74 AT FRANKLIN
SQUARE II;
NC 279 (NEW HOPE
ROAD) AT OZARD
AVENUE; US 321
(CHESTER STREET)
GASTONI AT TULIP DRIVE-BULB
CMAQ C-5186 C-5186 A AVENUE; GASTON GASTONIA CONSTRUCTION 2014 2014 $120 $120
GREENSBORO TRANSIT
AUTHORITY - ROUTE 15.
INCREASE FREQUENCY
GREENS FROM 1 HOUR TO 30
CMAQ C-5187 C-5187 BORO MINUTES. GUILFORD GREENSBORO OPERATIONS 2013 2015 $684 $228 $228 $228
GREENSBORO TRANSIT
AUTHORITY
(GTA) - ROUTE 12. SPLIT
ROUTE INTO TWO
SEGMENTS TO ADDRESS
OVER-CROWDING AND
GREENS ON TIME
CMAQ C-5188 C-5188 BORO PERFORMANCE. GUILFORD GREENSBORO OPERATIONS 2013 2015 $1,854 $618 $618 $618
GREENSBORO TRANSIT
AUTHORITY EXPANDION
OF SUNDAY SERVICE
GREENS WITH
CMAQ C-5189 C-5189 BORO 8 ADDITIONAL ROUTES. GUILFORD GREENSBORO OPERATIONS 2013 2015 $1,128 $376 $376 $376
GREENSBORO TRANSIT
AUTHORITY.
IMPROVEMENTS TO
GREENS BATTLEGROUND
CMAQ C-5190 C-5190 BORO AVENUE, GTA ROUTE 8. GUILFORD GREENSBORO OPERATIONS 2014 2016 $879 $293 $293 $293
GREENSBORO TRANSIT
AUTHORITY.
IMPROVEMENTS TO
NORTH ELM
GREENS CONNECTOR, GTA
CMAQ C-5191 C-5191 BORO ROUTE 3. GUILFORD GREENSBORO OPERATIONS 2014 2016 $879 $293 $293 $293
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
GREENSBORO TRANSIT
AUTHORITY.
IMPROVEMENTS TO
WEST MARKET STREET
GREENS CONNECTOR, GTA
CMAQ C-5192 C-5192 BORO ROUTE 9. GUILFORD GREENSBORO OPERATIONS 2014 2016 $879 $293 $293 $293
GREENSBORO TRANSIT
AUTHORITY. PURCHASE
3 NEW HYBRID BUSES
FOR NEW
BATTLEGROUND, NORTH
GREENS ELM AND WEST MARKET
CMAQ C-5193 C-5193 BORO CONNECTORS. GUILFORD GREENSBORO ACQUISITION 2014 2014 $2,206 $2,206
BATTLE GROUND
AVENUE, OLD
BATTLEGROUND
GREENS AVENUE TO BENJAMIN
CMAQ C-5194 C-5194A BORO PARKWAY. GUILFORD GREENSBORO CONSTRUCTION 2013 2013 $566 $566
GREENS CONE BOULEVARD, US
CMAQ C-5194 C-5194B BORO 29 TO ST. REGIS ROAD. GUILFORD GREENSBORO CONSTRUCTION 2013 2013 $510 $510
WEST FRIENDLY
AVENUE, FRANCIS KING
GREENS TO WEST MARKET
CMAQ C-5194 C-5194C BORO STREET. GUILFORD GREENSBORO CONSTRUCTION 2013 2013 $470 $470
MCCONNELL ROAD,
GREENS WILLOW ROAD TO
CMAQ C-5194 C-5194D BORO ENGLISH STREET. GUILFORD GREENSBORO CONSTRUCTION 2013 2013 $106 $106
CONSTRUCT
SIDEWALKS AT VARIOUS
CLAREM LOCATIONS TO BE
CMAQ C-5195 C-5195 ONT SELECTED. CATAWBA HICKORY CONSTRUCTION 2013 2013 $650 $650
16TH. STREET (SANDY
RIDGE ROAD)
AT 29 TH. AVENUE NE
AND 21 ST.
AVENUE NE. ADD TURN
LANES AND
HICKOR MAKE SIGNAL
CMAQ C-5196 C-5196 Y IMPROVEMENTS. CATAWBA HICKORY CONSTRUCTION 2015 2015 $2,437 $2,437
16TH. STREET (SANDY
RIDGE ROAD)
AT 29 TH. AVENUE NE
AND 21 ST.
AVENUE NE. ADD TURN
LANES AND
HICKOR MAKE SIGNAL
CMAQ C-5196 C-5196 Y IMPROVEMENTS. CATAWBA HICKORY RIGHT-OF-WAY 2015 2015 $254 $254
PURCHASE UP TO FIVE
HYBRID VEHICLES TO
SERVE STAFF OF MPO
HIGH MEMBER
CMAQ C-5197 C-5197 POINT JURISDUCTIONS. GUILFORD HIGH POINT ACQUISITION 2013 2013 $100 $100
LYDIA GREENWAY
TRAIL, CONSTRUCT
PEDESTRIAN WALKWAY
CONNECTING
JAMESTOWN WITH
RAGSDALE SCHOOL
COMPLEX AND
HIGH GUILFORD TECHNICAL
CMAQ C-5198 C-5198 POINT COMMUNITY COLLEGE. GUILFORD HIGH POINT CONSTRUCTION 2013 2013 $145 $145
LYDIA GREENWAY
TRAIL, CONSTRUCT
PEDESTRIAN WALKWAY
CONNECTING
JAMESTOWN WITH
RAGSDALE SCHOOL
COMPLEX AND
HIGH GUILFORD TECHNICAL
CMAQ C-5198 C-5198 POINT COMMUNITY COLLEGE. GUILFORD HIGH POINT ENGINEERING 2013 2013 $16 $16
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NC 56, INSTALL TRAFFIC
SIGNAL AND
SYNCHRONIZATION
WITH THREE EXISTING
CMAQ C-5199 C-5199 BUTNER SIGNALS ALONG NC 56. GRANVILLE KERR TAR CONSTRUCTION 2013 2013 $180 $180
NC 56, INSTALL TRAFFIC
SIGNAL AND
SYNCHRONIZATION
WITH THREE EXISTING
CMAQ C-5199 C-5199 BUTNER SIGNALS ALONG NC 56. GRANVILLE KERR TAR ENGINEERING 2013 2013 $20 $20
NC 115 AND NC 150.
CONSTRUCT DEDICATED
RIGHT TURN LANE AT
NC 115 SOUTHBOUND
AND AT
MOORES NC 150 AND MAKE
CMAQ C-5200 C-5200 VILLE SIGNAL MODIFICATIONS. IREDELL LAKE NORMAN CONSTRUCTION 2013 2013 $231 $231
NC 115 AND NC 150.
CONSTRUCT DEDICATED
RIGHT TURN LANE AT
NC 115 SOUTHBOUND
AND AT
MOORES NC 150 AND MAKE
CMAQ C-5200 C-5200 VILLE SIGNAL MODIFICATIONS. IREDELL LAKE NORMAN ENGINEERING 2013 2013 $42 $42
NC 115 AND NC 150.
CONSTRUCT DEDICATED
RIGHT TURN LANE AT
NC 115 SOUTHBOUND
AND AT
MOORES NC 150 AND MAKE
CMAQ C-5200 C-5200 VILLE SIGNAL MODIFICATIONS. IREDELL LAKE NORMAN RIGHT-OF-WAY 2013 2013 $77 $77
NC 115, MECKLENBURG
COUNTY LINE TO
NORMAN AVENUE.
CONSTRUCT FOUR
MOORES FOOT BIKE LANES
CMAQ C-5201 C-5201 VILLE ALONG BOTH SIDES. IREDELL LAKE NORMAN CONSTRUCTION 2017 2017 $2,250 $2,250
TRANSPORTATION
CHOICES. INCREASE
EDUCATION EFFORTS
GREAT THAT INFORM VISITORS
SMOKY ABOUT THE ROLE THEIR
MOUNTA TRANSPORTATION
INS CHOICES HAVE IN
NATIONA RELATION TO AIR LAND OF
L PARK POLLUTION ISSUES HAYWOOD,SWAI SKY,SOUTHWE IMPLEMENTATI
CMAQ C-5202 C-5202 (GSMNP) IN GSMNP. N STERN ON 2013 2017 $194 $56 $34 $34 $34 $36
BIG COVE MIXED USE
PATH, CHEROKEE
CENTRAL SCHOOL
NORTHWARD ON
BOTH SIDES OF THE
OCONALUFTEE
EASTER RIVER TO THE EXISTING
N BAND BIG COVE
OF ROAD MIXED USE TRAIL.
CHEROK CONSTRUCT
EE PEDESTRIAN AND BIKE
INDIANS PATH, PHASES SOUTHWESTER
CMAQ C-5203 C-5203 (EBCI) 3 AND 4. SWAIN N ENGINEERING 2015 2015 $63 $63
BIG COVE MIXED USE
PATH, CHEROKEE
CENTRAL SCHOOL
NORTHWARD ON
BOTH SIDES OF THE
OCONALUFTEE
EASTER RIVER TO THE EXISTING
N BAND BIG COVE
OF ROAD MIXED USE TRAIL.
CHEROK CONSTRUCT
EE PEDESTRIAN AND BIKE
INDIANS PATH, PHASES SOUTHWESTER
CMAQ C-5203 C-5203 (EBCI) 3 AND 4. SWAIN N RIGHT-OF-WAY 2016 2016 $125 $125
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BIG COVE MIXED USE
PATH, CHEROKEE
CENTRAL SCHOOL
NORTHWARD ON
BOTH SIDES OF THE
OCONALUFTEE
EASTER RIVER TO THE EXISTING
N BAND BIG COVE
OF ROAD MIXED USE TRAIL.
CHEROK CONSTRUCT
EE PEDESTRIAN AND BIKE
INDIANS PATH, PHASES SOUTHWESTER
CMAQ C-5203 C-5203 (EBCI) 3 AND 4. SWAIN N CONSTRUCTION 2017 2017 $125 $125
EASTER
N BAND
OF CHEROKEE TRANSIT
CHEROK EXPANSION, CHEROKEE
EE TO CLINGMAN'S DOME
INDIANS USING LOW-EMISSIONS SOUTHWESTER
CMAQ C-5204 C-5204 (EBCI) VEHICLES. SWAIN N OPERATIONS 2013 2015 $237 $79 $79 $79
SUGAR CREEK ROAD-
RUMPLE ROAD.
CONSTRUCT A
SOUTHBOUND TURN
LANE ON SUGAR CREEK
CHARLO ROAD ONTO RUMPLE
CMAQ C-5205 C-5205 TTE ROAD. MECKLENBURG CHARLOTTE CONSTRUCTION 2013 2013 $986 $986
GEM STREET
EXTENSION EASTWARD
TO OAK STREET.
CORNELI CONSTRUCT A NEW
CMAQ C-5206 C-5206 US CONNECTOR. MECKLENBURG CHARLOTTE ENGINEERING 2011 2011 $45 $45
GEM STREET
EXTENSION EASTWARD
TO OAK STREET.
CORNELI CONSTRUCT A NEW
CMAQ C-5206 C-5206 US CONNECTOR. MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2011 2011 $18 $18
GEM STREET
EXTENSION EASTWARD
TO OAK STREET.
CORNELI CONSTRUCT A NEW
CMAQ C-5206 C-5206 US CONNECTOR. MECKLENBURG CHARLOTTE CONSTRUCTION 2012 2012 $538 $538
GEM STREET
EXTENSION EASTWARD
TO OAK STREET.
CORNELI CONSTRUCT A NEW
CMAQ C-5206 C-5206 US CONNECTOR. MECKLENBURG CHARLOTTE OPERATIONS 2012 2012 $3 $3
LIVERPOOL PARKWAY
ROUNDABOUT.
CONSTRUCT A
ROUNDABOUT AT
INTERSECTION WITH
CORNELI CHARTWELL
CMAQ C-5207 C-5207 US CENTER DRIVE. MECKLENBURG CHARLOTTE ENGINEERING 2013 2013 $35 $35
LIVERPOOL PARKWAY
ROUNDABOUT.
CONSTRUCT A
ROUNDABOUT AT
INTERSECTION WITH
CORNELI CHARTWELL
CMAQ C-5207 C-5207 US CENTER DRIVE. MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2013 2013 $50 $50
LIVERPOOL PARKWAY
ROUNDABOUT.
CONSTRUCT A
ROUNDABOUT AT
INTERSECTION WITH
CORNELI CHARTWELL
CMAQ C-5207 C-5207 US CENTER DRIVE. MECKLENBURG CHARLOTTE CONSTRUCTION 2014 2014 $428 $428
HEAVY DUTY HYBRID
REFUSE TRUCK.
REPLACE EXISTING
LEXINGT TRUCK WITH HYBRID PIEDMONT
CMAQ C-5208 C-5208 ON TRUCK. DAVIDSON TRIAD ACQUISITION 2013 2013 $160 $160
FLEET VEHICLE
REPLACEMENT.
PURCHASE FOUR
HYBRID MINI-VANS
DAVIDSO AS REPLACEMENTS OF
N REGULAR GASOLINE PIEDMONT
CMAQ C-5209 C-5209 COUNTY FLEET VEHICLES. DAVIDSON TRIAD ACQUISITION 2013 2013 $104 $104
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SIDEWALK
IMPROVEMENTS AT PIEDMONT
CMAQ C-5210 C-5210 DENTON SELECTED LOCATIONS. DAVIDSON TRIAD CONSTRUCTION 2013 2013 $113 $113
SIDEWALK
IMPROVEMENTS AT PIEDMONT
CMAQ C-5210 C-5210 DENTON SELECTED LOCATIONS. DAVIDSON TRIAD ENGINEERING 2013 2013 $38 $38
PARK AND RIDE LOTS.
DEVELOP
LEXINGT TWO FACILITIES, ONE IN
ON AND LEXINGTON PIEDMONT
CMAQ C-5211 C-5211 DENTON AND ONE IN DENTON. DAVIDSON TRIAD CONSTRUCTION 2013 2013 $504 $504
PARK AND RIDE LOTS.
DEVELOP
LEXINGT TWO FACILITIES, ONE IN
ON AND LEXINGTON PIEDMONT
CMAQ C-5211 C-5211 DENTON AND ONE IN DENTON. DAVIDSON TRIAD ENGINEERING 2013 2013 $78 $78
PARK AND RIDE LOTS.
DEVELOP
LEXINGT TWO FACILITIES, ONE IN
ON AND LEXINGTON PIEDMONT
CMAQ C-5211 C-5211 DENTON AND ONE IN DENTON. DAVIDSON TRIAD RIGHT-OF-WAY 2013 2013 $194 $194
HYBRID YARD WASTE
TRUCK. REPLACE
EXISTING DIESEL TRUCK
WITH A MEDIUM-DUTY
LEXINGT DIESEL-ELECTRIC PIEDMONT
CMAQ C-5212 C-5212 ON TRUCK. DAVIDSON TRIAD ACQUISITION 2014 2014 $118 $118
PART HYBRID BUS
(PIEDMO REPLACEMENTS.
NT PURCHASE THREE 28
AUTHORI FOOT, 31 PASSENGER
TY DIESEL-ELECTRIC
REGION HYBRID BODIES ON
AL CHASSIS, MEDIUM DUTY PIEDMONT
TRANSP BUSES TO REPLACE TRIAD,HIGH
ORTATIO EXISTING BUSES ON POINT,WINSTO
CMAQ C-5213 C-5213 N) PART EXPRESS SYSTEM. DAVIDSON N-SALEM ACQUISITION 2015 2015 $375 $375
COMPACT NATURAL GAS
(CNG) UTILITY TRUCKS.
REPLACE TWO 2-TON
LEXINGT DIESEL WITH CNG PIEDMONT
CMAQ C-5214 C-5214 ON TRUCKS. DAVIDSON TRIAD ACQUISITION 2013 2013 $120 $120
PIEDMONT AUTHORITY
FOR REGIONAL
TRANSPORTATION.
PURCHASE FIVE (5)
DAVIDSO VANS TO EXPAND
N REGIONAL VANPOOL PIEDMONT
CMAQ C-5215 C-5215 COUNTY PROGRAM. DAVIDSON TRIAD ACQUISITION 2015 2015 $125 $125
SOUTH MAIN STREET.
EXTEND SIDEWALKS ON
SOUTH MAIN STREET
AND PROVIDE WIDE
PAVED SHOULDERS ON
ANNA LEWIS DRIVE AND
EMERGENCY DRIVE TO
PROVIDE BICYCLE
LEXINGT ACCESS TO LEXINGTON PIEDMONT
CMAQ C-5216 C-5216 ON MEMORIAL HOSPITAL. DAVIDSON TRIAD CONSTRUCTION 2014 2014 $425 $425
SOUTH MAIN STREET.
EXTEND SIDEWALKS ON
SOUTH MAIN STREET
AND PROVIDE WIDE
PAVED SHOULDERS ON
ANNA LEWIS DRIVE AND
EMERGENCY DRIVE TO
PROVIDE BICYCLE
LEXINGT ACCESS TO LEXINGTON PIEDMONT
CMAQ C-5216 C-5216 ON MEMORIAL HOSPITAL. DAVIDSON TRIAD ENGINEERING 2014 2014 $75 $75
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BIKE AND PEDESTRIAN
IMPROVEMENTS
IN VICINITY OF SCHOOL.
BISECKER AND MIZE
ROADS, PROVIDE WIDE
PAVED SHOULDERS AND
CONSTRUCT SIDE-
WALKS ON CORNEILA
LEXINGT STREET AND HILLSIDE PIEDMONT
CMAQ C-5217 C-5217 ON DRIVE. DAVIDSON TRIAD CONSTRUCTION 2014 2014 $160 $160
BIKE AND PEDESTRIAN
IMPROVEMENTS
IN VICINITY OF SCHOOL.
BISECKER AND MIZE
ROADS, PROVIDE WIDE
PAVED SHOULDERS AND
CONSTRUCT SIDE-
WALKS ON CORNEILA
LEXINGT STREET AND HILLSIDE PIEDMONT
CMAQ C-5217 C-5217 ON DRIVE. DAVIDSON TRIAD ENGINEERING 2014 2014 $40 $40
CHATHAM TRANSIT
ALTERNATE FUEL
VEHICLE CONVERSION.
CONVERT 12 VEHICLES
(VANS AND LIGHT
COUNTY TRANSIT) FROM TRIANGLE IMPLEMENTATI
CMAQ C-5218 C-5218 WIDE GASOLINE TO PROPANE. CHATHAM AREA ON 2013 2013 $150 $150
PHASE 3: INTERIM
TRANSIT SIGNAL
SYSTEM. INSTALL FIBER
OPTIC AND INTEGRATED
TRAFFIC SIGNALS FROM
CITY HALL TO THE
SOUTH AND
SOUTHWEST PORTIONS
WINSTO OF THE TRAFFIC SIGNAL WINSTON-
CMAQ C-5219 C-5219 N-SALEM SYSTEM. FORSYTH SALEM CONSTRUCTION 2013 2013 $3,600 $3,600
PHASE 3: INTERIM
TRANSIT SIGNAL
SYSTEM. INSTALL FIBER
OPTIC AND INTEGRATED
TRAFFIC SIGNALS FROM
CITY HALL TO THE
SOUTH AND
SOUTHWEST PORTIONS
WINSTO OF THE TRAFFIC SIGNAL WINSTON-
CMAQ C-5219 C-5219 N-SALEM SYSTEM. FORSYTH SALEM ENGINEERING 2013 2013 $1,150 $1,150
WINSTON-SALEM
TRANSIT AUTHORITY.
PURCHASE FIVE (5)
LARGE HYBRID BUSES
AND TWELVE (12) SMALL
WINSTO HYBRID BUSES TO WINSTON-
CMAQ C-5220 C-5220 N-SALEM EXPAND FLEET. FORSYTH SALEM ACQUISITION 2013 2013 $4,375 $4,375
WINSTON-SALEM
TRANSIT AUTHORITY
(WSTA). PURCHASE
FIVE (5) MID SIZE
HYBRID BUSES TO
WINSTO REPLACE DIESEL WINSTON-
CMAQ C-5221 C-5221 N-SALEM BUSES. FORSYTH SALEM ACQUISITION 2013 2013 $469 $469
PIEDMONT AUTHORITY
FOR REGIONAL
TRANSPORTATION
(PART). IMPLEMENT
A REGIONAL AIR
QUALITY AWARENESS NORTHWEST BEFORE
CMAQ C-5222 C-5222 VARIOUS PROGRAM. DAVIE PIEDMONT 2011 $250 $250
CONGESTION
MITIGATION AIR
QUALITY (CMAQ)
PROGRAM BALANCE IN
STATEWI NON-ATTAINMENT
CMAQ C-9999 C-9999 DE AREAS STATEWIDE CONSTRUCTION 2016 2020 $123,000 $12,000 $21,000 $30,000 $30,000 $30,000
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
PRESERVE HISTORIC
ENHANCEME BRIDGES FROM BEFORE
NT E-3821 E-3821 VARIOUS DEMOLITION. STATEWIDE 2011 $250 $250
NORTH CAROLINA
TRANSPORTATION
MUSEUM BACK SHOP
PROJECT AND
ENHANCEME SALISBU RAIL TRACK BEFORE
NT E-3822 E-3822 RY REPLACEMENT. ROWAN CONCORD 2011 $6,551 $6,551
ENHANCEME NATIONAL
NT E-4018 E-4018 VARIOUS RECREATIONAL TRAILS. STATEWIDE CONSTRUCTION 2011 2020 $12,000 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200
ENHANCEME NATIONAL BEFORE
NT E-4018 E-4018 VARIOUS RECREATIONAL TRAILS. STATEWIDE 2011 $645 $645
FAYETTEVILLE AREA
CONVENTION AND
VISITORS BUREAU.
PHASE A: DEPOT
RESTORATION AND
ESTABLISHMENT OF
VISITORS CENTER-
TRANSPORTATION
MUSEUM IN CAPE FEAR
AND YADKIN
VALLEY DEPOT, PHASE
B: LANDSCAPING
AND STREETSCAPING IN
ENHANCEME FAYETTE THE AREA OF BEFORE
NT E-4118 E-4118 VILLE THE DEPOT. CUMBERLAND FAYETTEVILLE 2011 $2,126 $2,126
MULTI-USE TRAIL ATOP
THE JACOB
SWAMP DIKE, EAST 2ND
STREET
ENHANCEME LUMBER TO CHESTNUT STREET BEFORE
NT E-4120 E-4120 TON EXTENSION. ROBESON LUMBER RIVER 2011 $679 $679
GREATER WHITEVILLE
CHAMBER OF
COMMERCE -
WACCAMAW CYPRESS
TRAIL COMMITTEE.
ENHANCEME WHITEVI REHABILITATE HISTORIC BEFORE
NT E-4121 E-4121 LLE RAILROAD DEPOT. COLUMBUS CAPE FEAR 2011 $1,074 $1,074
SNYDER GREENWAY.
DON MONTGOMERY
MEMORIAL PARK TO
NORTH SIDE OF WEST
MAIN STREET WEST OF
MARKET STATION.
ENHANCEME ALBEMA CONSTRUCT BEFORE
NT E-4129 E-4129 RLE GREENWAY. STANLY ROCKY RIVER 2011 $440 $440
NEW RIVER COMMUNITY
PARTNERS. VISITOR
ENHANCEME JEFFERS CENTER IN ASHE BEFORE
NT E-4131 E-4131 ON COUNTY COURTHOUSE. ASHE HIGH COUNTRY 2011 $508 $508
PHASE B - TRAIL TO
PISGAH NATIONAL
FOREST, INTERSECTION
OF STRAUS
PARKWAY-US 64 TO
INTERSECTION OF
MORRIS ROAD-ECUSTA
ROAD AND
INTERSECTION OF
STRAUS PARKWAY-
US 64 TO INTERSECTION
ENHANCEME BREVAR OF CALDWELL BEFORE
NT E-4143 E-4143 D AND BROAD STREETS. TRANSYLVANIA LAND OF SKY 2011 $682 $682
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 1420 (CASWELL
BRANCH BRICK ROAD)
AND BRIDGE
REHABILITATION AND
ENHANCEME RIVER RHEM ROAD BEFORE
NT E-4505 E-4505 BEND LANDSCAPING. CRAVEN DOWN EAST 2011 $347 $347
TRYON PALACE
HISTORIC SITES AND
GARDENS-DCR.
ENHANCEME NEW STREETSCAPING OF BEFORE
NT E-4508 E-4508 BERN GEORGE STREET. CRAVEN DOWN EAST 2011 $707 $707
US 74 (EASTWOOD
ROAD), SR 1409
(MILITARY CUTOFF
ROAD) TO CARDINAL
ENHANCEME WILMING LANE. CONSTRUCT BEFORE
NT E-4516 E-4516 TON MULTI-USE TRAIL. NEW HANOVER WILMINGTON 2011 $435 $435
REHABILITATE HISTORIC
PRINCEVILLE TOWN
HALL INTO A VISITOR
CENTER AND CULTURAL
ENHANCEME PRINCEV TRANSPORTATION UPPER BEFORE
NT E-4522 E-4522 ILLE MUSEUM. EDGECOMBE COASTAL PLAIN 2011 $467 $467
ROANOKE CANAL
COMMISSION, INC. AND
CITY OF ROANOKE
RAPIDS. PHASE A:
REHABILITATE CANAL
ARTS CENTER
TO CONVERT TO THE
ROANOKE CANAL
ROANOK MUSEUM. PHASE B:
ENHANCEME E IMPROVE THE ROANOKE BEFORE
NT E-4523 E-4523 RAPIDS CANAL TRAIL. HALIFAX PEANUT BELT 2011 $536 $536
NC 71 (NORTH
PATTERSON STREET),
US 74 BUSINESS (DR.
MARTIN LUTHER
KING JR. DRIVE) AND
ENHANCEME CENTRAL STREET. BEFORE
NT E-4533 E-4533 MAXTON STREETSCAPING. ROBESON LUMBER RIVER 2011 $25 $25
AVERASBORO
BATTLEFIELD
COMMISSION, INC.
CREATE DRIVING
TOUR AND A PORTION
OF HISTORIC-
SCENIC BYWAY FROM
FAYETTEVILLE
THROUGH THE
BATTLEFIELD, REPAIR
AND REINSTALL
FAYETTE HISTORIC HIGHWAY
ENHANCEME VILLE MARKERS AND CUMBERLAND,H BEFORE
NT E-4534 E-4534 DUNN LANDSCAPING. ARNETT FAYETTEVILLE 2011 $3 $3
DEVELOPMENT OF THE
OAKBORO RAILROAD
ENHANCEME OAKBOR MUSEUM AND ITS BEFORE
NT E-4561 E-4561 O SETTINGS. STANLY ROCKY RIVER 2011 $309 $309
SHAWNEEHAW
GREENWAY, TOWN
PARK
TO DOWNTOWN, TO THE
MILL POND AND ALONG
ENHANCEME BANNER SHAWNEEHAW AVENUE BEFORE
NT E-4567 E-4567 ELK AND ELK RIVER. AVERY HIGH COUNTRY 2011 $212 $212
STREETSCAPE
IMPROVEMENTS ALONG
US 29-74, CATAWBA
RIVER TO THE
INTERSECTION OF
WILKINSON
BOULEVARD, CATAWBA
ENHANCEME BELMON STREET, BEFORE
NT E-4572 E-4572 T AND HAZELINE AVENUE. GASTON GASTONIA 2011 $143 $143
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
CONSTRUCT PAVED
SHOULDERS ON 3RD
STREET, MAIN AND 1ST
AVENUE, NORTH
CENTER STREET, 5TH
AND 8TH AVENUE,
STASAVICH PLACE, 26TH
AVENUE, 2ND STREET,
28TH, 17TH AND 10TH
AVENUE. CONSTRUCT
SIDEWALKS AND CURB
AND GUTTER ALONG
ENHANCEME HICKOR MAIN AVENUE AND 5TH BEFORE
NT E-4575 E-4575 Y STREET. CATAWBA HICKORY 2011 $195 $195
STREETSCAPE ON THE
PROPOSED BRIDGE ON
BAILEY BRANCH ROAD
ENHANCEME MARSHA ACROSS THE FRENCH BEFORE
NT E-4584 E-4584 LL BROAD RIVER. MADISON LAND OF SKY 2011 $63 $63
CONSTRUCT
SIDEWALKS AND
PEDESTRIAN FEATURES
ON AMBROY
ROAD ALONG THE
FRENCH BROAD
RIVER BETWEEN THE
ENHANCEME ASHEVIL CARRIER BRIDGE BEFORE
NT E-4585 E-4585 LE AND MICHIGAN AVENUE. BUNCOMBE ASHEVILLE 2011 $203 $203
CONSTRUCT
GREENWAY,
INDUSTRIAL PARK NEAR
LAKE JUNALUSKA TO
ENHANCEME WAYNES THE DOWNTOWN MAIN BEFORE
NT E-4589 E-4589 VILLE STREET DISTRICT. HAYWOOD ASHEVILLE 2011 $326 $326
ENHANCEME INSTALL RIVER BASIN BEFORE
NT E-4599 E-4599 VARIOUS HIGHWAY SIGNS. STATEWIDE 2011 $187 $187
GIS ARCHAEOLOGICAL
DATABASE.
STATEWIDE DATABASE
TO CALCULATE
ARCHAEOLOGICAL
SITES LOCATED
ENHANCEME WITHIN OR NEAR NCDOT BEFORE
NT E-4602 E-4602 VARIOUS PROJECTS. STATEWIDE 2011 $750 $750
ECOSYSTEMS
ENHANCEMENT
PROGRAM.
STRUCTURED
MITIGATION
FOR PROTECTION,
ENHANCEMENT
AND RESTORATION OF
ECOLOGICAL
FUNCTIONS AS
COMPENSATION
FOR PROJECT IMPACTS
ENHANCEME AT THE BEFORE
NT E-4603 E-4603 VARIOUS WATERSHED LEVEL. STATEWIDE 2011 $625 $625
PHASE A: CONSTRUCT
AN ELEVATED BICYCLE-
PEDESTRIAN CORRIDOR
ALONG THE ROANOKE
RIVER TO CONNECT THE
SKEWARKEE TRAIL
WITH MORATOC PARK
ENHANCEME WILLIAM AND ROANOKE RIVER BEFORE
NT E-4731 E-4731 STON TRAIL. MARTIN MID-EAST 2011 $269 $269
RESTORATION OF
ENHANCEME HAVELO HAVELOCK TRAIN BEFORE
NT E-4735 E-4735 CK STATION. CRAVEN DOWN EAST 2011 $100 $100
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
TRYON PALACE
HISTORIC SITE AND
GARDENS, POLLOCK
STREET
ENHANCEMENTS,
METCALF
ENHANCEME NEW STREET TO EDEN BEFORE
NT E-4737 E-4737 BERN STREET. CRAVEN DOWN EAST 2011 $234 $234
IMPROVEMENTS TO
STABILIZE AND
PRESERVE THE CSS
NEUSE STATE
ENHANCEME HISTORIC SITE ON THE EASTERN BEFORE
NT E-4739 E-4739 KINSTON NEUSE RIVER. LENOIR CAROLINA 2011 $31 $31
RESTORATION OF
WALLACE DEPOT ON
ENHANCEME WALLAC RAILROAD STREET IN EASTERN BEFORE
NT E-4744 E-4744 E THE HISTORIC DISTRICT. DUPLIN CAROLINA 2011 $463 $463
CONSTRUCT A BIKE
PATH CONNECTING THE
RIVER TO SEA BIKEWAY
ENHANCEME WILMING TO THE EASTWOOD BEFORE
NT E-4749 E-4749 TON ROAD PATH. NEW HANOVER WILMINGTON 2011 $185 $185
ON-ROAD BICYCLE
PILOT PROJECT AT
BERKLEY BOULEVARD
ENHANCEME GOLDSB AND PARKWAY DRIVE BEFORE
NT E-4754 E-4754 ORO INTERSECTION. WAYNE GOLDSBORO 2011 $116 $116
RELOCATION AND
RENOVATION OF
ENHANCEME MOUNT THE MOUNT OLIVE EASTERN BEFORE
NT E-4755 E-4755 OLIVE RAILROAD DEPOT. WAYNE CAROLINA 2011 $98 $98
CONSTRUCT
SIDEWALKS, SPRING
STREET TO WARREN
HEALTH INSTITUTE
ENHANCEME WARREN INCLUDING BRIDGE BEFORE
NT E-4760 E-4760 TON OVER STREAM. WARREN KERR TAR 2011 $124 $124
CONSTRUCT A FIVE-
FOOT CONCRETE
SIDEWALK ON WEST
ENHANCEME BLADEN SIDE OF SR 1100 BEFORE
NT E-4763 E-4763 BORO (VILLAGE STREET). BLADEN MID-CAROLINA 2011 $90 $90
CONSTRUCT FIVE-FOOT
SIDEWALKS AT
VARIOUS LOCATIONS
ALONG BROWN
STREET, ELM STREET,
PINE STREET
ENHANCEME CHADBO AND STRAWBERRY BEFORE
NT E-4766 E-4766 URN BOULEVARD. COLUMBUS CAPE FEAR 2011 $54 $54
MOVE AND
REHABILITATE THE OAK
ENHANCEME AVERAS GROVE PLANTATION BEFORE
NT E-4768 E-4768 BORO HOUSE. CUMBERLAND MID-CAROLINA 2011 $424 $424
US 74 STREETSCAPING,
BIVENS DRIVE
TO CAMDEN STREET.
PROVIDES ACCESS
BETWEEN WINGATE
ENHANCEME WINGAT UNIVERSITY AND BEFORE
NT E-4798 E-4798 E DOWNTOWN. UNION CHARLOTTE 2011 $144 $144
PHASE A: STREETSCAPE
ALONG BOTH SIDES OF
NC 194 (CRANBERRY
STREET),
NC 181 (LINVILLE ROAD)
TO NOTTALLEE STREET
AND ON NORTH SIDE OF
ENHANCEME NEWLAN NC 181 BEFORE
NT E-4801 E-4801 D FOR 250 FEET. AVERY HIGH COUNTRY 2011 $395 $395
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
PHASE A: LENOIR
GREENWAY
EXTENSION ALONG
ZACK'S FORK
CREEK, CALDWELL
COUNTY LIBRARY
ENHANCEME TO PENNTON AVENUE BEFORE
NT E-4802 E-4802 LENOIR NW. CALDWELL HICKORY 2011 $92 $92
IMPROVEMENTS TO
ELKIN GREENWAY
INCLUDING THREE
ENHANCEME BRIDGES AND PAVING NORTHWEST BEFORE
NT E-4804 E-4804 ELKIN OF GREENWAY. SURRY PIEDMONT 2011 $256 $256
ENHANCE PUBLIC
ACCESS TO THE
ENHANCEME CLAREM BUNKER HILL COVERED BEFORE
NT E-4806 E-4806 ONT BRIDGE. CATAWBA HICKORY 2011 $80 $80
SIDEWALK EXTENSION,
SHOPPING
CENTER ON WEST SIDE
KINGS OF TOWN
ENHANCEME MOUNTA TO THE KINGS BEFORE
NT E-4807 E-4807 IN MOUNTAIN HOSPITAL. CLEVELAND LAKE NORMAN 2011 $49 $49
CONSTRUCT
SIDEWALKS, CURB AND
GUTTER AND STORM
DRAINAGE ON EAST
SIDE OF AVON ROAD,
EAST ASHEVILLE
LIBRARY AND
COMMUNITY CENTER TO
HAW CREEK PARK. ON
WEST SIDE OF
AVON ROAD, HAW
CREEK PARK TO
BEVERLY ROAD AND ON
SOUTH SIDE
ENHANCEME ASHEVIL OF SR 2032 (NEW HAW BEFORE
NT E-4814 E-4814 LE CREEK ROAD) BUNCOMBE ASHEVILLE 2011 $172 $172
STREETSCAPE
ENHANCEMENTS
ON CLINGMAN AVENUE
AND THE
DEVELOPMENT OF
PARALLEL
GREENWAY THROUGH
ENHANCEME ASHEVIL THE BEFORE
NT E-4815 E-4815 LE CLINGMAN FOREST. BUNCOMBE ASHEVILLE 2011 $172 $172
PACK SQUARE
RENAISSANCE
STREETSCAPE TO
COLLEGE STREET,
PATTON AVENUE AND
US 25 (BILTMORE
AVENUE) PROVIDING
BETTER BALANCE
ENHANCEME ASHEVIL BETWEEN PEDESTRIANS BEFORE
NT E-4816 E-4816 LE AND VEHICLES BUNCOMBE ASHEVILLE 2011 $140 $140
RELOCATE VISITORS
ENHANCEME MARS CENTER TO THE BEFORE
NT E-4818 E-4818 HILL MONTAGUE BUILDING. MADISON LAND OF SKY 2011 $99 $99
PHASE A: CONSTRUCT A
PEDESTRIAN
SYSTEM UTILIZING
ASPHALT PATHS
AND CONCRETE
SIDEWALKS PARALLEL
ENHANCEME LAKE TO US 64-74A BEFORE
NT E-4819 E-4819 LURE (MEMORIAL HIGHWAY). RUTHERFORD ISOTHERMAL 2011 $350 $350
PHASE A: MAIN STREET
STREETSCAPING
ENHANCEME ROBBINS AROUND COURTHOUSE SOUTHWESTER BEFORE
NT E-4821 E-4821 VILLE SQUARE. GRAHAM N 2011 $142 $142
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
COLLOWHEE
GREENWAY
CONNECTOR,
CULLOWHEE VALLEY
ELEMENTARY SCHOOL
AND SR 1329 (LYLE
WILSON ROAD) TO SR
1330 (COUNTRY CLUB
DRIVE) PROVIDING
ENHANCEME CULLOW ACCESS TO WESTERN SOUTHWESTER BEFORE
NT E-4823 E-4823 HEE CAROLINA UNIVERSITY. JACKSON N 2011 $19 $19
NANTAHALA NATIONAL
FOREST.
UPGRADE PULL-OFF AT
TEN SITES
(SITES 2, 3, 4, 6, 7, 8, 9,
11, 13 AND 14)
ENHANCEME IN THE NANTAHALA SOUTHWESTER BEFORE
NT E-4825 E-4825 US 19 GORGE. SWAIN N 2011 $14 $14
BARNES STREET SOUTH
TO THE TOWN-COUNTY
RECREATIONAL
ENHANCEME NAGS COMPLEX. CONSTRUCT BEFORE
NT E-4900 E-4900 HEAD A MULTI-USE FACILITY. DARE ALBEMARLE 2011 $132 $132
NC 24, MAIN STREET TO
WHITE OAK
MANOR APARTMENTS.
CONSTRUCT
ENHANCEME SWANSB SIDEWALK ALONG BEFORE
NT E-4911 E-4911 ORO SOUTHERN SIDE. ONSLOW DOWN EAST 2011 $152 $152
CAROLINA BEACH
AVENUE, HARPER
AVENUE TO SANDPIPER
LANE AND
CANAL DRIVE, SEAGULL
LANE TO
VIRGINIA AVENUE.
ENHANCEME CAROLIN CONSTRUCT BEFORE
NT E-4914 E-4914 A BEACH MULTI-USE FACILITY. NEW HANOVER WILMINGTON 2011 $270 $270
INSTALLATION OF A
CONCRETE
MONOLITHIC ISLAND
AND LIGHTGUARD
(IN PAVEMENT LIGHTING
SYSTEM) ON
ENHANCEME JACKSO SR 1403 (HARGETT BEFORE
NT E-4916 E-4916 NVILLE STREET). ONSLOW JACKSONVILLE 2011 $113 $113
PHASE 1: RAILROAD
STREET, HILL STREET
ENHANCEME WARSA TO COLLEGE STREET. EASTERN BEFORE
NT E-4917 E-4917 W STREETSCAPING. DUPLIN CAROLINA 2011 $156 $156
I-40 (NC 903 EXIT) TO
OUTSIDE OF
ENHANCEME KENANSVILLE. EASTERN BEFORE
NT E-4918 E-4918 NC 24 LANDSCAPE MEDIANS. DUPLIN CAROLINA 2011 $35 $35
ROANOKE CANAL
COMMISSION, INC.
AND ROANOKE RAPIDS.
CONSTRUCT
THE ROANOKE CANAL
MUSEUM AT
ROANOK JACKSON STREET AND
ENHANCEME E ROANOKE BEFORE
NT E-4920 E-4920 RAPIDS AVENUE. HALIFAX PEANUT BELT 2011 $685 $685
NORTHWEST CENTER
STREET, JAMES STREET
ENHANCEME MOUNT TO JOHN STREET. BEFORE
NT E-4921 E-4921 OLIVE LANDSCAPING. WAYNE GOLDSBORO 2011 $260 $260
RELOCATION AND
RENOVATION OF THE
CSX TRANSPORTATION
TRAIN DEPOT ON
BROAD STREET
ENHANCEME ELM BETWEEN MAIN AND UPPER BEFORE
NT E-4922 E-4922 CITY NASH STREETS. WILSON COASTAL PLAIN 2011 $258 $258
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SOUTH MAIN STREET
INSIDE THE
WARRENTON HISTORIC
ENHANCEME WARREN DISTRICT. CONSTRUCT BEFORE
NT E-4926 E-4926 TON SIDEWALKS. WARREN KERR TAR 2011 $157 $157
NORTH CAROLINA
STATE CAPITOL
FOUNDATION. PHASE I:
PROVIDE
HANDICAP
ACCESSIBILITY ALONG
THE
SOUTHEAST GROUNDS
OF THE STATE
CAPITOL BUILDING
(FAYETTEVILLE
STREET AT MORGAN
ENHANCEME STREET TO THE BEFORE
NT E-4927 E-4927 RALEIGH CAPITOL). WAKE RALEIGH 2011 $348 $348
EASTERN TERMINUS OF
I-440
PEDESTRIAN BRIDGE
NORTH TO
GLEN EDEN DRIVE.
BICYCLE & CONSTRUCT BEFORE
PEDESTRIAN E-4929 E-4929 RALEIGH MULTI-USE FACILITY. WAKE RALEIGH 2011 $200 $200
NC 24, WEST OF WADE-
STEDMAN ROAD
EAST TO BAINBRIDGE
ROAD. STREET-
ENHANCEME STEDMA SCAPING NORTH SIDE BEFORE
NT E-4931 E-4931 N OF NC 24. CUMBERLAND FAYETTEVILLE 2011 $263 $263
PHASE I: RESTORATION
OF THE HISTORIC
ENHANCEME PARKTO ATLANTIC COAST LINE BEFORE
NT E-4932 E-4932 N RAILWAY DEPOT. ROBESON LUMBER RIVER 2011 $149 $149
SR 1515 (WHITE LAKE
DRIVE), MELWOOD
STREET TO THE
REALIGNMENT OF
SR 1515. CONSTRUCT
ENHANCEME WHITE SIDEWALK ON BEFORE
NT E-4933 E-4933 LAKE THE WEST SIDE. BLADEN MID-CAROLINA 2011 $50 $50
NC 210 AT NC 55.
LANDSCAPING AND
ENHANCEME PEDESTRIAN BEFORE
NT E-4937 E-4937 ANGIER IMPROVEMENTS. HARNETT MID-CAROLINA 2011 $26 $26
CYPRESS DRIVE,
BELMONT DRIVE
TO WESTOVER DRIVE.
ENHANCEME REIDSVI CONSTRUCT PIEDMONT BEFORE
NT E-4941 E-4941 LLE A MULTI-USE FACILITY. ROCKINGHAM TRIAD 2011 $603 $603
CONSTRUCT MULTI-USE
FACILITY ADJACENT TO
MCDOWELL CREEK,
LINKING BIRKDALE
NEIGHBORHOOD IN
HUNTERSVILLE TO
ENHANCEME CORNELI WESTMORELAND BEFORE
NT E-4953 E-4953 US ROAD IN CORNELIUS. MECKLENBURG CHARLOTTE 2011 $172 $172
CONSTRUCT A MULTI-
USE FACILITY,
TORRANCE CREEK
GREENWAY IN
THE CEDARFIELD
ENHANCEME HUNTER NEIGHBORHOOD BEFORE
NT E-4954 E-4954 SVILLE TO ROSEDALE PARK. MECKLENBURG CHARLOTTE 2011 $270 $270
PHASE I: WILSON DRIVE.
CONSTRUCT
ENHANCEME FOUR-FOOT PAVED BEFORE
NT E-4955 E-4955 BOONE SHOULDERS. WATAUGA HIGH COUNTRY 2011 $388 $388
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
WORLD WAR II
VETERANS MEMORIAL
FOOT BRIDGE OVER BIG
ELKIN CREEK BETWEEN
FRONT STREET AND
ENHANCEME MEMORIAL PARK DRIVE. NORTHWEST BEFORE
NT E-4956 E-4956 ELKIN REHABILITATE BRIDGE. SURRY PIEDMONT 2011 $80 $80
NC 194 (SCENIC BYWAY),
CENTER OF
TOWN TO LEES-MCRAE
COLLEGE.
CONSTRUCT
ENHANCEME BANNER SIDEWALKS ON BOTH BEFORE
NT E-4957 E-4957 ELK SIDES. AVERY HIGH COUNTRY 2011 $167 $167
NC 194 (CRANBERRY
STREET), NOTTALLEE
ROAD TO NC 181.
ENHANCEME NEWLAN STREETSCAPING BOTH BEFORE
NT E-4958 E-4958 D SIDES. AVERY HIGH COUNTRY 2011 $51 $51
PHASE II: TRADE,
COLLEGE, HOFFMAN
ENHANCEME AND WILKINS STREETS. BEFORE
NT E-4959 E-4959 DALLAS STREETSCAPING. GASTON GASTONIA 2011 $106 $106
SOUTH OF SR 1154
(RADIO STATION ROAD)
ENHANCEME TO NC 10. CONSTRUCT BEFORE
NT E-4961 E-4961 NEWTON GREENWAY. CATAWBA HICKORY 2011 $100 $100
CANSLER STREET, ORR
TERRACE TO WACO
KINGS ROAD. CONSTRUCT
ENHANCEME MOUNTA SIDEWALKS BEFORE
NT E-4963 E-4963 IN ON EAST SIDE. CLEVELAND LAKE NORMAN 2011 $63 $63
NC 16 (THORNBURG
DRIVE). LANDSCAPING
MEDIAN AT SR 1739
ENHANCEME CONOVE (EMMANUEL CHURCH BEFORE
NT E-4965 E-4965 R ROAD). CATAWBA HICKORY 2011 $50 $50
SR 3548 (HAYWOOD
ROAD), ROBERTS
STREET TO THE
WESTERN END OF WEST
ASHEVILLE RIVERLINK
BRIDGE OVER THE
ENHANCEME ASHEVIL FRENCH BROAD RIVER. BEFORE
NT E-4966 E-4966 LE STREETSCAPING. BUNCOMBE ASHEVILLE 2011 $235 $235
MILL STREET, MAIN
STREET TO DEPOT
ENHANCEME FOREST STREET. BEFORE
NT E-4967 E-4967 CITY STREETSCAPING. RUTHERFORD ISOTHERMAL 2011 $203 $203
SR 2185 (WITHROW
ROAD) TO SR 2187
(FAIRGROUNDS ROAD).
ENHANCEME COUNTY CONSTRUCT BEFORE
NT E-4968 E-4968 WIDE A MULTI-USE FACILITY. RUTHERFORD ISOTHERMAL 2011 $85 $85
TOWN SQUARE,
CONSTRUCT
SIDEWALKS ON THE
SOUTH SIDE OF
HERBERT STREET,
NORTH SIDE OF
COUNTY CHURCH STREET, WEST
WIDE SIDE OF MAIN STREET
ENHANCEME TOWN AND EAST SIDE OF SOUTHWESTER BEFORE
NT E-4970 E-4970 SQUARE SANDERSON STREET. CLAY N 2011 $178 $178
DEPOT STREET,
EVERETT STREET TO
ENHANCEME BRYSON COLLINS STREET. SOUTHWESTER BEFORE
NT E-4972 E-4972 CITY STREETSCAPING. SWAIN N 2011 $199 $199
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
COURT STREET, SR 1106
(NORTH
MAIN STREET) TO SR
1106 (EAST
ENHANCEME ROBBINS MAIN STREET). SOUTHWESTER BEFORE
NT E-4974 E-4974 VILLE STREETSCAPING. GRAHAM N 2011 $157 $157
HAYWOOD,HEN
DERSON,GRAHA
M,CLAY,JACKSO
N,SWAIN,MACON
,POLK,MCDOWE
LL,BURKE,MITCH
ELL,RUTHERFOR HIGH
D,TRANSYLVANI COUNTRY,SOU
A,YANCEY,CHER THWESTERN,LA
OKEE,MADISON, ND OF
BUNCOMBE,AVE SKY,ISOTHERM
BLUE RIDGE NATIONAL RY,ASHE,WILKE AL,ASHEVILLE,
HERITAGE SITES. S,WATAUGA,SU UNIFOUR,NORT
ENHANCEME INTERPRETATIVE AND RRY,ALLEGHANY HWEST BEFORE
NT E-4975 E-4975 VARIOUS GATEWAY MARKERS. ,CALDWELL PIEDMONT 2011 $576 $576
KINSTON-LENOIR
COUNTY PARKS
AND RECREATION
DEPARTMENT
AND LENOIR COUNTY.
RENOVATION
AND CONSTRUCTION OF
A 2200
SQUARE FOOT VISITORS
CENTER AT
ENHANCEME INTERSECTION OF US 70 EASTERN BEFORE
NT E-4976 E-4976 KINSTON AND US 258. LENOIR CAROLINA 2011 $320 $320
MARITIME MUSEUM ON
FRONT STREET.
PEDESTRIAN
ENHANCEME BEAUFO INFRASTRUCTURE BEFORE
NT E-4990 E-4990 RT IMPROVEMENTS. CARTERET DOWN EAST 2011 $100 $100
DOWNTOWN
ENHANCEME ROCKY REDEVELOPMENT NASH,EDGECOM BEFORE
NT E-4992 E-4992 MOUNT PROJECT. BE ROCKY MOUNT 2011 $665 $665
NC 123, ADD
DECORATIVE LIGHTING
ENHANCEME HOOKER ON BRIDGE NO. 23 OVER EASTERN BEFORE
NT E-5020 E-5020 TON CONTENTNEA CREEK. GREENE CAROLINA 2011 $38 $38
SIR WALTER RALEIGH
STREET AND
BIDFORD STREET.
LANDSCAPING AND
ENHANCEME RELATED AMENITIES IN BEFORE
NT E-5021 E-5021 MANTEO ROUNDABOUT. DARE ALBEMARLE 2011 $50 $50
RESTORATION OF THE
EDENTO ROANOKE RIVER BEFORE
E-5100 E-5100 N LIGHTHOUSE. CHOWAN ALBEMARLE 2011 $1,200 $1,200
SR 3503 (OVERLOOK
ROAD) AT PINCHOT
DRIVE. INSTALL
PEDESTRIAN SIGNAL
AND CROSSWALK AT
INTERSECTION
AND CONSTRUCT 400
FEET OF SIDEWALK
ALONG PINCHOT
BICYCLE & ASHEVIL STREET TO ESTES BEFORE
PEDESTRIAN E-5105 E-5105 LE ELEMENTARY SCHOOL. BUNCOMBE ASHEVILLE 2011 $37 $37
ENHANCEME STATEWI ENHANCEMENT
NT E-9999 E-9999 DE BALANCE. STATEWIDE CONSTRUCTION 2011 2013 $3,000 $1,000 $1,000 $1,000
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
AMERICAN TOBACCO
RAIL TRAIL.
DURHAM COUNTY LINE
TO WAKE
COUNTY LINE.
BICYCLE & CONSTRUCT A BEFORE
PEDESTRIAN EB-2921F EB-2921F DURHAM MULTI-PURPOSE TRAIL. CHATHAM DURHAM 2011 $2,392 $2,392
ENHANCEME STATEWIDE BICYCLE
NT EB-2956 EB-2956 VARIOUS PROGRAM. STATEWIDE CONSTRUCTION 2011 2020 $5,000 $500 $500 $500 $500 $500 $500 $500 $500 $500 $500
ENHANCEME STATEWIDE BICYCLE BEFORE
NT EB-2956 EB-2956 VARIOUS PROGRAM. STATEWIDE 2011 $8,645 $8,645
BICYCLE & SAFETY-EDUCATION
PEDESTRIAN EB-2966 EB-2966 VARIOUS PROJECTS. STATEWIDE BOOKLETS 2011 2020 $250 $25 $25 $25 $25 $25 $25 $25 $25 $25 $25
BICYCLE & SAFETY-EDUCATION BEFORE
PEDESTRIAN EB-2966 EB-2966 VARIOUS PROJECTS. STATEWIDE 2011 $420 $420
BICYCLE & COUNTY BICYCLE ROUTE BEFORE
PEDESTRIAN EB-3132 EB-3132 WIDE MAPPING AND SIGNING. ROWAN CONCORD 2011 $30 $30
GRANT'S CREEK
GREENWAY, PHASE 2:
HOGANSVILLE WAY TO
FORESTDALE
BICYCLE & SALISBU DRIVE. CONSTRUCT BEFORE
PEDESTRIAN EB-3308 EB-3308 RY BIKE TRAIL. ROWAN CONCORD 2011 $300 $300
STATEWIDE
BICYCLE & PEDESTRIAN FACILITIES
PEDESTRIAN EB-3314 EB-3314 VARIOUS PROGRAM. STATEWIDE CONSTRUCTION 2011 2020 $1,500 $150 $150 $150 $150 $150 $150 $150 $150 $150 $150
STATEWIDE
BICYCLE & PEDESTRIAN FACILITIES BEFORE
PEDESTRIAN EB-3314 EB-3314 VARIOUS PROGRAM. STATEWIDE 2011 $4,100 $4,100
LUMBER
ANSON,RANDOL RIVER,ROCKY
UWHARRIE LAKES PH,RICHMOND,S RIVER,PIEDMO
REGION BICYCLE TANLY,ROWAN, NT
BICYCLE & COUNTY ROUTE MAPPING AND MONTGOMERY, TRIAD,CONCOR BEFORE
PEDESTRIAN EB-3410 EB-3410 WIDE SIGNING. DAVIDSON D 2011 $94 $94
COUNTY BICYCLE ROUTE DURHAM,TRIAN BEFORE
EB-3606 EB-3606 WIDE MAPPING AND SIGNING. ORANGE GLE AREA 2011 $50 $50
AMBOY ROAD TO
HOMINY CREEK
ROAD CONNECTOR. OFF
ROAD
BICYCLE PATH ALONG
BICYCLE & ASHEVIL THE FRENCH BEFORE
PEDESTRIAN EB-3608 EB-3608 LE BROAD RIVER. BUNCOMBE ASHEVILLE 2011 $300 $300
NORTH CAROLINA
BICYCLING HIGHWAYS
NO. 10 (SANDHILLS
BICYCLE & SECTOR): MAPPING BEFORE
PEDESTRIAN EB-4012 EB-4012 VARIOUS AND SIGNING. STATEWIDE 2011 $0
SPOT IMPROVEMENTS:
SHORT
PAVEMENT SECTIONS,
BICYCLE
BICYCLE & RACKS AND SIGNING
PEDESTRIAN EB-4013 EB-4013 VARIOUS NEEDS. STATEWIDE CONSTRUCTION 2011 2020 $1,000 $100 $100 $100 $100 $100 $100 $100 $100 $100 $100
SPOT IMPROVEMENTS:
SHORT
PAVEMENT SECTIONS,
BICYCLE
BICYCLE & RACKS AND SIGNING BEFORE
PEDESTRIAN EB-4013 EB-4013 VARIOUS NEEDS. STATEWIDE 2011 $2,830 $2,830
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BRUSHY FORK CREEK
GREENWAY,
WATERWORKS ROAD TO
REYNOLDS
BICYCLE & WINSTO PARK ROAD. PAVED WINSTON- BEFORE
PEDESTRIAN EB-4020 EB-4020 N-SALEM MULTI-USE TRAIL. FORSYTH SALEM 2011 $842 $842
WILMA DIKEMAN
RIVERWAY GREENWAY
BICYCLE & ASHEVIL SECTION FROM US 25 FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4406 EB-4406 LE TO AZALEA ROAD. BUNCOMBE ASHEVILLE STUDY 2011 $0 STUDY
OKLAWAHA GREENWAY,
SECTIONS 2 THROUGH
HENDER 8, JACKSON PARK TO
BICYCLE & SONVILL PATTON PARK. MULTI- BEFORE
PEDESTRIAN EB-4408 EB-4408 E USE PATH. HENDERSON ASHEVILLE 2011 $400 $400
AREA-WIDE BICYCLE
BICYCLE & REGION IMPROVEMENTS
PEDESTRIAN EB-4410 EB-4410 AL FEASIBILITY STUDIES. STATEWIDE STUDY 2011 2020 $50 $5 $5 $5 $5 $5 $5 $5 $5 $5 $5
AREA-WIDE BICYCLE
BICYCLE & REGION IMPROVEMENTS BEFORE
PEDESTRIAN EB-4410 EB-4410 AL FEASIBILITY STUDIES. STATEWIDE 2011 $150 $150
ROADWAY
IMPROVEMENTS FOR
BICYCLE SAFETY ON
STATE AND LOCAL
BICYCLE & DESIGNATED BIKE
PEDESTRIAN EB-4411 EB-4411 VARIOUS ROUTES. STATEWIDE CONSTRUCTION 2011 2020 $2,000 $200 $200 $200 $200 $200 $200 $200 $200 $200 $200
ROADWAY
IMPROVEMENTS FOR
BICYCLE SAFETY ON
STATE AND LOCAL
BICYCLE & DESIGNATED BIKE BEFORE
PEDESTRIAN EB-4411 EB-4411 VARIOUS ROUTES. STATEWIDE 2011 $7,880 $7,880
CAPE FEAR RIVER
GREENWAY, CLARK
PARK SOUTH TO THE
CAPE FEAR
BOTANICAL GARDENS.
CONSTRUCT
SECOND PHASE OF AN
BICYCLE & EB- FAYETTE OFF-ROAD
PEDESTRIAN 4539B EB-4539B VILLE MULTI-USE TRAIL. CUMBERLAND FAYETTEVILLE CONSTRUCTION 2011 2011 $2,500 $2,500
SOUTH TAR RIVER
GREENWAY, SOUTH
OF TAR RIVER FROM
TOWN COMMONS
TO GREEN MILL RUN
GREENWAY.
BICYCLE & GREENVI CONSTRUCT BEFORE
PEDESTRIAN EB-4702 EB-4702 LLE GREENWAY. PITT GREENVILLE 2011 $2,488 $2,488
COASTA
L COASTAL CAROLINA
BICYCLE & CAROLIN RAIL TRAIL, FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4703 EB-4703 A TRAIL STOKES TO PACTOLUS. PITT MID-EAST STUDY 2011 $0 STUDY
LEJEUNE BOULEVARD
GREENWAY,
SOUTH SIDE OF NC 24
(LEJEUNE
BOULEVARD), E-3407 TO
BICYCLE & JACKSO MONT-
PEDESTRIAN EB-4705 EB-4705 NVILLE FORD POINT ROAD. ONSLOW JACKSONVILLE CONSTRUCTION 2011 2011 $650 $650
GREENWAY ALONG
BUFFALOE CREEK
AND THE NEUSE RIVER.
CONNECTS DOWNTOWN
BICYCLE & SMITHFI WITH NEIGHBORHOODS, UPPER BEFORE
PEDESTRIAN EB-4706 EB-4706 ELD PARKS AND SCHOOLS JOHNSTON COASTAL PLAIN 2011 $900 $900
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 2220 (OLD CHAPEL
HILL ROAD)-
SR 1838 (OLD DURHAM
ROAD), SR 1116
(GARRETT ROAD) IN
DURHAM COUNTY
TO US 15-501 IN
DURHAM ORANGE COUNTY.
BICYCLE & CHAPEL BICYCLE ORANGE,DURHA
PEDESTRIAN EB-4707 EB-4707 HILL IMPROVEMENTS. M DURHAM CONSTRUCTION 2011 2011 $4,000 $4,000
SR 2220 (OLD CHAPEL
HILL ROAD)-
SR 1838 (OLD DURHAM
ROAD), SR 1116
(GARRETT ROAD) IN
DURHAM COUNTY
TO US 15-501 IN
DURHAM ORANGE COUNTY.
BICYCLE & CHAPEL BICYCLE ORANGE,DURHA BEFORE
PEDESTRIAN EB-4707 EB-4707 HILL IMPROVEMENTS. M DURHAM 2011 $1,450 $1,450
BICYCLE & WAKE WAKE FOREST BYPASS FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4708 EB-4708 FOREST GREENWAY. WAKE RALEIGH STUDY 2011 $0 STUDY
MARKLAND DRIVE TO
BICYCLE & GREENS SPRING GARDEN
PEDESTRIAN EB-4709 EB-4709B BORO STREET - IN PROGRESS. GUILFORD GREENSBORO CONSTRUCTION 2011 2012 $3,538 $1,769 $1,769
BICYCLE & GREENS BATTLEGROUND BEFORE
PEDESTRIAN EB-4709 EB-4709 BORO AVENUE RAIL-TRAIL. GUILFORD GREENSBORO 2011 $2,696 $2,696
NORTH CAROLINA ZOO
BIKE TRAIL,
EAST DIXIE DRIVE, US
BICYCLE & ASHEBO 64, AND PIEDMONT FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4711 EB-4711 RO NORTH CAROLINA ZOO. RANDOLPH TRIAD STUDY 2011 $0 STUDY
KELSEY-SCOTT PARK,
CATAWBA
BICYCLE & SALISBU COLLEGE GREENWAY
PEDESTRIAN EB-4713 EB-4713 RY CONNECTOR. ROWAN CONCORD CONSTRUCTION 2011 2011 $400 $400
IRWIN CREEK BIKEWAY:
IRWIN AVENUE
ELEMENTARY SCHOOL
TO CEDAR YARD
BICYCLE & CHARLO (NEAR BANK OF
PEDESTRIAN EB-4714 EB-4714 TTE AMERICA STADIUM). MECKLENBURG CHARLOTTE CONSTRUCTION 2011 2011 $600 $600
BICYCLE & CHARLO
PEDESTRIAN EB-4715 EB-4715E TTE TYVOLA ROAD TO I-485 MECKLENBURG CHARLOTTE CONSTRUCTION 2014 2014 $1,000 $1,000
BICYCLE & CHARLO LITTLE SUGAR CREEK BEFORE
PEDESTRIAN EB-4715 EB-4715 TTE GREENWAY. MECKLENBURG CHARLOTTE 2011 $5,113 $5,113
NORTH MECKLENBURG-
CATAWBA AVENUE BIKE
LANES: DAVIDSON
COLLEGE ALONG NC 115
AND WEST ALONG
CATAWBA AVENUE TO
TIE TO JETTON PARK,
BICYCLE & RAMSEY CREEK PARK FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4716 EB-4716 VARIOUS AND BLYTH LANDING. MECKLENBURG CHARLOTTE STUDY 2011 $0 STUDY
BIKE/PEDESTRIAN TRAIL:
BICYCLE & ALONG TOWN SEWER FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4717 EB-4717 LOCUST EASEMENTS STANLY ROCKY RIVER STUDY 2011 $0 STUDY
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ADD WIDE PAVED
SHOULDERS TO
BICYCLE & SELECTED BIKE HICKORY,UNIF FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4718 EB-4718 VARIOUS ROUTES. CALDWELL OUR STUDY 2011 $0 STUDY
ADD WIDE PAVED
SHOULDERS TO
BICYCLE & SELECTED BIKE NORTHWEST FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4719 EB-4719 VARIOUS ROUTES. YADKIN PIEDMONT STUDY 2011 $0 STUDY
MUSEUM GREENWAY:
FREE NANCY ROAD TO
BROAD STREET
BICYCLE & STATESV INCLUDING BEFORE
PEDESTRIAN EB-4722 EB-4722 ILLE STATESVILLE PARK. IREDELL LAKE NORMAN 2011 $550 $550
WOODFIN RAIL-TRAIL-
GREENWAY; RAIL
BICYCLE & WOODFI CORRIDOR ALONG FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4723 EB-4723 N RIVERSIDE DRIVE. BUNCOMBE ASHEVILLE STUDY 2011 $0 STUDY
US 64 WEST, SR 1756,
HENDER US 25 SOUTH.
BICYCLE & SONVILL CONSTRUCT BIKEWAYS- FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4726 EB-4726 E GREENWAYS. HENDERSON ASHEVILLE STUDY 2011 $0 STUDY
BICYCLE & FLETCHE FLETCHER GREENWAY: FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4727 EB-4727 R PHASES IB, II, III HENDERSON ASHEVILLE STUDY 2011 $0 STUDY
ADD WIDE PAVED
SHOULDERS ON
SELECTED SECTIONS OF
BICYCLE & DESIGNATED FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4728 EB-4728 VARIOUS BIKE ROUTES. TRANSYLVANIA LAND OF SKY STUDY 2011 $0 STUDY
MOUNTAINS TO SEA
TRAIL: NEUSE RIVER
GREENWAY. FALLS
LAKE DAM SOUTH
TO THE WRAL SOCCER
COMPLEX ON
BICYCLE & SR 2006 (PERRY CREEK BEFORE
PEDESTRIAN EB-4829 EB-4829 RALEIGH ROAD). WAKE RALEIGH 2011 $4,144 $4,144
EAST TO HOWELL ROAD
BRICES TO US 70 BUSINESS.
BICYCLE & CREEK WIDEN PAVED CRAVEN,PAMLIC BEFORE
PEDESTRIAN EB-4977 EB-4977 ROAD SHOULDERS. O,JONES DOWN EAST 2011 $563 $563
EDWARDS MILL ROAD
EXTENSION,
REEDY CREEK ROAD TO
TRINITY ROAD.
BICYCLE & CONSTRUCT MULTI-USE
PEDESTRIAN EB-4978 EB-4978 RALEIGH PATH. WAKE RALEIGH CONSTRUCTION 2011 2011 $750 $750
HOUSE CREEK
GREENWAY, CRABTREE
CREEK TO Lake Boone
BICYCLE & Trail. CONSTRUCT BEFORE
PEDESTRIAN EB-4979 EB-4979 RALEIGH GREENWAY. WAKE RALEIGH 2011 $400 $400
SR 1006
ORANGE CONSTRUCT
BICYCLE & GROVE PEDESTRIAN BRIDGE FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4980 EB-4980 ROAD OVER I-40. ORANGE DURHAM STUDY 2011 $0 STUDY
ENDOR IRON FURNACE
GREENWAY,
KIWANIS FAMILY PARK
ON CARBONTON
ROAD TO BOONE DRIVE
IN SANFORD.
BICYCLE & SANFOR CONSTRUCT MULTI-USE TRIANGLE BEFORE
PEDESTRIAN EB-4981 EB-4981 D TRAIL. LEE AREA 2011 $1,400 $1,400
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SALEM CREEK
GREENWAY EXTENSION
TRAIL, TERMINUS OF
THE EXISTING
SALEM LAKE TRAIL AT
MARKET-
PLACE MALL TO
FORSYTH TECHNICAL
COMMUNITY COLLEGE
AND ALONG
BICYCLE & WINSTO PETERS CREEK TO WINSTON- FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4983 EB-4983 N-SALEM ARDSLEY STREET. FORSYTH SALEM STUDY 2011 $0 STUDY
PIEDMONT GREENWAY
TRAIL. PHASE I - TRAIL,
EXISTING SALEM LAKE
TRAIL AT LINVILLE ROAD
BICYCLE & WINSTO TO EAST FORSYTH HIGH WINSTON- FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4984 EB-4984 N-SALEM SCHOOL. FORSYTH SALEM STUDY 2011 $0 STUDY
BICYCLE & HARRISB BACK CREEK FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4986 EB-4986 URG GREENWAY: PHASE 1 CABARRUS CONCORD STUDY 2011 $0 STUDY
YADKIN RIVER
GREENWAY: PHASE 2:
SOUTH BANK YADKIN
RIVER TO CURTIS
BRIDGE ROAD AND US
BICYCLE & WILKESB 421 SEGMENT FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4987 EB-4987 ORO 1A AND SEGMENT 1B. WILKES HIGH COUNTRY STUDY 2011 $0 STUDY
BLACK MOUNTAIN-
MONTREAT
BLACK CONNECTOR: MULTI-
BICYCLE & MOUNTA USE TRAIL: FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-4988 EB-4988 IN PHASE 1 AND PHASE 2. BUNCOMBE ASHEVILLE STUDY 2011 $0 STUDY
REED CREEK
BICYCLE & ASHEVIL GREENWAY MULTI-USE BEFORE
PEDESTRIAN EB-4989 EB-4989 LE PATH: PHASE 2 BUNCOMBE ASHEVILLE 2011 $400 $400
US 17 BYPASS TO
PRITCHARD STREET.
BICYCLE & ELIZABE CONSTRUCT
PEDESTRIAN EB-4991 EB-4991 TH CITY GREENWAY. PASQUOTANK ALBEMARLE CONSTRUCTION 2011 2011 $550 $550
NEUSE RIVER MULTI-
USE TRAIL,
WAKE-JOHNSTON
COUNTY LINE
TO SMITHFIELD.
BICYCLE & CONSTRUCT UPPER BEFORE
PEDESTRIAN EB-4993 EB-4993 VARIOUS MULTI-USE TRAIL. JOHNSTON COASTAL PLAIN 2011 $1,878 $1,878
GREEN MILL RUN
GREENWAY,
CHARLES BOULEVARD
TO EVANS
BICYCLE & GREENVI PARK. CONSTRUCT
PEDESTRIAN EB-4996 EB-4996 LLE GREENWAY. PITT GREENVILLE CONSTRUCTION 2012 2012 $1,375 $1,375
PARKERS CREEK
GREENWAY, TAR RIVER
BICYCLE & GREENVI TO US 13. CONSTRUCT BEFORE
PEDESTRIAN EB-4997 EB-4997 LLE GREENWAY. PITT GREENVILLE 2011 $0
OCRACOKE ISLAND
LIMITS TO
OCRACOKE
OCRACO CAMPGROUND.
BICYCLE & KE CONSTRUCT MULTI-USE BEFORE
PEDESTRIAN EB-5000 EB-5000 ISLAND TRAIL. HYDE ALBEMARLE 2011 $900 $900
SAMS BRANCH
GREENWAY.
BICYCLE & CLAYTO CONSTRUCT MULTI-USE BEFORE
PEDESTRIAN EB-5001 EB-5001 N TRAIL. JOHNSTON RALEIGH 2011 $600 $600
BICYCLE & KNIGHTD MINGO CREEK
PEDESTRIAN EB-5002 EB-5002 ALE GREENWAY. WAKE RALEIGH CONSTRUCTION 2011 2011 $2,780 $2,780
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
BICYCLE & KNIGHTD MINGO CREEK BEFORE
PEDESTRIAN EB-5002 EB-5002 ALE GREENWAY. WAKE RALEIGH 2011 $609 $609
BICYCLE & KNIGHTD BEAVERDAM CREEK FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5003 EB-5003 ALE GREENWAY. WAKE RALEIGH STUDY 2011 $0 STUDY
LOVES CREEK
GREENWAY TRAIL,
BICYCLE & SILER SR 2208 TO PONY FARM TRIANGLE FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5004 EB-5004 CITY ROAD. CHATHAM AREA STUDY 2011 $0 STUDY
RICH PARK GREENWAY -
BICYCLE & MOCKSV US 158, CAMPBELL NORTHWEST FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5005 EB-5005 ILLE ROAD, AND RICH PARK. DAVIE PIEDMONT STUDY 2011 $0 STUDY
DANBURY GREENWAY,
STOKES COUNTY
BICYCLE & DANBUR GOVERNMENT CENTER NORTHWEST FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5006 EB-5006 Y TO MORATOCK PARK. STOKES PIEDMONT STUDY 2011 $0 STUDY
BICYCLE & CONCOR FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5008 EB-5008 D VILLAGE GREENWAY. CABARRUS CONCORD STUDY 2011 $0 STUDY
MCDOWELL CREEK
GREENWAY,
JETTON ROAD TO
BICYCLE & CHARLO BIRKDALE FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5009 EB-5009 TTE COMMONS PARKWAY. MECKLENBURG CHARLOTTE STUDY 2011 $0 STUDY
CORNELIUS GREENWAY
TRAIL.
CORNELIUS OPEN
BICYCLE & CORNELI SPACE TO FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5010 EB-5010 US BAILEY ROAD PARK. MECKLENBURG CHARLOTTE STUDY 2011 $0 STUDY
BEARSKIN CREEK
GREENWAY.
BICYCLE & DICKENSON PARK TO FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5011 EB-5011 MONROE CREFT PARK. UNION CHARLOTTE STUDY 2011 $0 STUDY
YADKIN VALLEY
GREENWAY. NC 268
(YADKIN RIVER ROAD)
BICYCLE & COUNTY TO YADKIN RIVER, FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5012 EB-5012 WIDE PHASE I. CALDWELL UNIFOUR STUDY 2011 $0 STUDY
GREENWAY
CONNECTING MOUNT
AIRY
BICYCLE & COUNTY TO THE BLUE RIDGE NORTHWEST FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5013 EB-5013 WIDE PARKWAY. SURRY PIEDMONT STUDY 2011 $0 STUDY
BICYCLE & MOUNT MOUNT AIRY NORTHWEST FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5014 EB-5014 AIRY GREENWAY LOOP. SURRY PIEDMONT STUDY 2011 $0 STUDY
YADKIN RIVER
GREENWAY. ALONG
BICYCLE & JONESVI YADKIN RIVER IN NORTHWEST FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5015 EB-5015 LLE JONESVILLE. YADKIN PIEDMONT STUDY 2011 $0 STUDY
DOWNTOWN
CRAMERTON-SOUTH
FORK RIVER GREENWAY
EXTENSION.
BICYCLE & CRAMER PEDESTRIAN BRIDGES
PEDESTRIAN EB-5016 EB-5016 TON AND TRAIL. GASTON GASTONIA CONSTRUCTION 2011 2011 $500 $500
AVON-CATAWBA CREEK
BICYCLE & GASTONI GREENWAY TRAIL BEFORE
PEDESTRIAN EB-5017 EB-5017 A EXTENSION. GASTON GASTONIA 2011 $215 $215
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
ADD WIDE PAVED
SHOULDERS ON
SELECTED SECTIONS OF
BICYCLE & COUNTY DESIGNATED FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5018 EB-5018 WIDE BIKE ROUTES. POLK ISOTHERMAL STUDY 2011 $0 STUDY
BICYCLE PATHWAY,
PISGAH NATIONAL
BICYCLE & BREVAR FOREST TO FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5019 EB-5019 D DOWNTOWN BREVARD. TRANSYLVANIA LAND OF SKY STUDY 2011 $0 STUDY
BICYCLE/PEDESTRIAN
BICYCLE & FACILITY FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5100 EB-5100 DUCK IMPROVEMENTS. DARE ALBEMARLE STUDY 2011 $0 STUDY
KINSTON WATERFRONT
INITIATIVE:
BICYCLE & PEDESTRIAN BRIDGE EASTERN BEFORE
PEDESTRIAN EB-5101 EB-5101 KINSTON OVER NEUSE RIVER. LENOIR CAROLINA 2011 $0
EMERALD ISLE TO
BICYCLE & INDIAN BEACH. BEFORE
PEDESTRIAN EB-5102 EB-5102 NC 58 CONSTRUCT BIKE PATH. CARTERET DOWN EAST 2011 $500 $500
BICYCLE & ROCKY FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5104 EB-5104 MOUNT RAIL TO TRAIL PROJECT. NASH ROCKY MOUNT STUDY 2011 $0 STUDY
BICYCLE & TARBOR BIKE ROUTE THROUGH UPPER FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5105 EB-5105 O TOWN. EDGECOMBE COASTAL PLAIN STUDY 2011 $0 STUDY
EAST MARTIN STREET,
FAYETTEVILLE
BICYCLE & STREET TO CHAVIS WAY FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5106 EB-5106 RALEIGH GREENWAY. WAKE RALEIGH STUDY 2011 $0 STUDY
BICYCLE & MORRIS CRABTREE CREEK FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5107 EB-5107 VILLE GREENWAY. WAKE RALEIGH STUDY 2011 $0 STUDY
SR 1112 (DAIRYLAND
ROAD), SR 1111
UNION (CHAPEL GROVE
ROAD) TO
SR 1006 (ORANGE
GROVE ROAD).
BICYCLE & ADD WIDE PAVED FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5108 EB-5108 VARIOUS SHOULDERS. ORANGE DURHAM STUDY 2011 $0 STUDY
BATTLEGROUND
BICYCLE & GREENS AVENUE RAIL TRAIL FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5109 EB-5109 BORO PHASE II. GUILFORD GREENSBORO STUDY 2011 $0 STUDY
BOLIN CREEK
GREENWAY, NC 86
(MARTIN LUTHER KING,
BICYCLE & CHAPEL JR. BOULEVARD FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5110 EB-5110 HILL TO UMSTEAD PARK. ORANGE DURHAM STUDY 2011 $0 STUDY
LAKE TOM-A-LEX TO
BICYCLE & LEXINGT FINCH PARK. PIEDMONT BEFORE
PEDESTRIAN EB-5111 EB-5111 ON GREENWAY. DAVIDSON TRIAD 2011 $0
BICYCLE & MOCKSV NORTHWEST FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5112 EB-5112 ILLE RICH PARK GREENWAY. DAVIE PIEDMONT STUDY 2011 $0 STUDY
HIGHLAND RAIL TRAIL -
BICYCLE & GASTONI LONG CREEK FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5113 EB-5113 A GREENWAY. GASTON GASTONIA STUDY 2011 $0 STUDY
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
MOUNT HOLLY
BICYCLE & MOUNT RIVERFRONT FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5114 EB-5114 HOLLY GREENWAY. GASTON GASTONIA STUDY 2011 $0 STUDY
FRENCH BROAD RIVER
BICYCLE & ASHEVIL RHODODENDRON FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5115 EB-5115 LE MULTI-USE TRAIL. BUNCOMBE ASHEVILLE STUDY 2011 $0 STUDY
BICYCLE FACILITY IN
LAKE JAMES,
SR 1001 AND CONNELLY
BICYCLE & LAKE SPRINGS FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5116 EB-5116 JAMES ROAD TO I-40. BURKE UNIFOUR STUDY 2011 $0 STUDY
LAKE JAMES, ADD WIDE
BICYCLE & PAVED FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
PEDESTRIAN EB-5117 EB-5117 NC 126 SHOULDERS. BURKE UNIFOUR STUDY 2011 $0 STUDY
STATEWIDE BIKE AND
BICYCLE & PEDESTRIAN FACILITY BEFORE
PEDESTRIAN EB-5118 EB-5118 VARIOUS DEVELOPMENT. STATEWIDE 2011 $3,331 $3,331
CAROLINA THREAD
TRAIL: DOWNTOWN
BICYCLE & GASTONI CONNECTOR TO BEFORE
PEDESTRIAN EB-5119 EB-5119 A HIGHLAND RAIL TRAIL. GASTON GASTONIA 2011 $850 $850
CHARLOTTE, TOBY
CREEK GREENWAY,
NC 49 AT HARRIS
BOULEVARD TO
MALLARD CREEK
THROUGH THE UNC
CHARLOTTE CAMPUS.
BICYCLE & CHARLO CONSTRUCT BEFORE
PEDESTRIAN EB-5120 EB-5120 TTE GREENWAY. MECKLENBURG CHARLOTTE 2011 $1,170 $1,170
EAST COAST
GREENWAY.
BICYCLE & WILMING CONSTRUCT BEFORE
PEDESTRIAN EB-5121 EB-5121 TON GREENWAY. NEW HANOVER WILMINGTON 2011 $2,000 $2,000
BICYCLE & KANNAP NORTH LOOP ROAD. BEFORE
PEDESTRIAN EB-5127 EB-5127 OLIS CONSTRUCT TUNNEL. CABARRUS CONCORD 2011 $1,200 $1,200
PROPOSED
MULTIPURPOSE TRAIL IN
VICINITY OF SOUTHEAST
HIGH-SPEED RAIL
CORRIDOR, FROM WAKE,FRANKLIN
BICYCLE & CSX S- RALEIGH TO VIRGINIA ,VANCE,WARRE KERR BEFORE
PEDESTRIAN EB-5128 EB-5128 LINE STATE LINE. N TAR,RALEIGH 2011 $0
GREEN MILL RUN
GREENWAY: PHASE II,
ONE MILE FROM
CHARLES BOULEVARD
TO HOOKER ROAD.
GREENVI CONSTRUCT FEASIBILITY BEFORE
EB-5129 EB-5129 LLE GREENWAY. PITT GREENVILLE STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
BICYCLE & NORTH CAROLINA
PEDESTRIAN EB-5130 EB-5130A VARIOUS BICYCE HIGHWAY MAPS. STATEWIDE MAPPING 2011 2020 $50 $5 $5 $5 $5 $5 $5 $5 $5 $5 $5
BICYCLE &
PEDESTRIAN EB-5130 EB-5130B VARIOUS LOCAL BICYCLE MAPS. STATEWIDE MAPPING 2011 2020 $50 $5 $5 $5 $5 $5 $5 $5 $5 $5 $5
BICYCLE & URBAN, REGIONAL AND
PEDESTRIAN EB-5130 EB-5130C VARIOUS COUNTY BICYCLE MAPS. STATEWIDE MAPPING 2011 2020 $500 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
HIGHLAND RAIL TRAIL -
GASTONI LONG CREEK FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
EB-5131 EB-5131 A GREENWAY. GASTON GASTONIA STUDY 2011 $0 STUDY
MOUNT HOLLY
MOUNT RIVERFRONT FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
EB-5132 EB-5132 HOLLY GREENWAY. GASTON GASTONIA STUDY 2011 $0 STUDY
FRENCH BROAD
ASHEVIL RHODODENDRON FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
EB-5133 EB-5133 LE MULTI-USE TRAIL. BUNCOMBE ASHEVILLE STUDY 2011 $0 STUDY
BICYCLE FACILITIES IN
LAKE JAMES,
SR 1001 AND CONNELLY
LAKE SPRINGS FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
EB-5134 EB-5134 JAMES ROAD TO I-40. BURKE UNIFOUR STUDY 2011 $0 STUDY
LAKE NC 126. ADD WIDE FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
EB-5135 EB-5135 JAMES PAVED SHOULDERS. BURKE UNIFOUR STUDY 2011 $0 STUDY
BICYCLE & BIKE-PEDESTRIAN
PEDESTRIAN EB-9999 EB-9999 VARIOUS BALANCE STATEWIDE CONSTRUCTION 2015 2020 $30,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000
NORTHAMPTON,
PERQUIMANS,HE
RTFORD,WASHI
NGTON,BERTIE,
MARTIN,DARE,C
ECOSYSTEMS URRITUCK,CHO
ENHANCEMENT WAN,CAMDEN,H ALBEMARLE,MI
PROGRAM YDE,PASQUOTA D-
FOR DIVISION 1 NK,TYRRELL,GA EAST,PEANUT BEFORE
EE-4901 EE-4901 VARIOUS PROJECT MITIGATION. TES BELT 2011 $22,551 $22,551
GREENE,JONES, DOWN
ECOSYSTEMS LENOIR,CRAVEN EAST,EASTERN
ENHANCEMENT ,PITT,BEAUFORTCAROLINA,GRE
PROGRAM FOR DIVISION ,PAMLICO,CART ENVILLE,MID- BEFORE
EE-4902 EE-4902 VARIOUS 2 PROJECT MITIGATION. ERET EAST 2011 $0
EASTERN
CAROLINA,MID-
CAROLINA,DO
ONSLOW,BRUNS WN
ECOSYSTEMS WICK,SAMPSON, EAST,JACKSON
ENHANCEMENT DUPLIN,NEW VILLE,CAPE
PROGRAM FOR DIVISION HANOVER,PEND FEAR,WILMING BEFORE
EE-4903 EE-4903 VARIOUS 3 PROJECT MITIGATION. ER TON 2011 $5,022 $5,022
UPPER
COASTAL
PLAIN,EASTERN
CAROLINA,GOL
ECOSYSTEM JOHNSTON,WAY DSBORO,ROCK
ENHANCEMENT NE,WILSON,EDG Y
PROGRAM FOR DIVISION ECOMBE,HALIFA MOUNT,PEANU BEFORE
EE-4904 EE-4904 VARIOUS 4 PROJECT MITIGATION. X,NASH T BELT 2011 $21,431 $21,431
ECOSYSTEM PERSON,WARRE
ENHANCEMENT N,GRANVILLE,DU
PROGRAM FOR DIVISION RHAM,FRANKLIN RALEIGH,KERR BEFORE
EE-4905 EE-4905 VARIOUS 5 PROJECT MITIGATION. ,WAKE,VANCE TAR,DURHAM 2011 $5,167 $5,167
LUMBER
ECOSYSTEM HARNETT,ROBE RIVER,CAPE
ENHANCEMENT SON,COLUMBUS FEAR,MID-
PROGRAM FOR DIVISION ,BLADEN,CUMBE CAROLINA,FAY BEFORE
EE-4906 EE-4906 VARIOUS 6 PROJECT MITIGATION. RLAND ETTEVILLE 2011 $16,921 $16,921
PIEDMONT
ECOSYSTEM ALAMANCE,ORA TRIAD,GREENS
ENHANCEMENT NGE,ROCKINGH BORO,BURLING
PROGRAM FOR DIVISION AM,CASWELL,G TON,DURHAM,T BEFORE
EE-4907 EE-4907 VARIOUS 7 PROJECT MITIGATION. UILFORD RIANGLE AREA 2011 $7,221 $7,221
PIEDMONT
MOORE,SCOTLA TRIAD,HIGH
ECOSYSTEM ND,RICHMOND,M POINT,TRIANGL
ENHANCEMENT ONTGOMERY,LE E
PROGRAM FOR DIVISION E,CHATHAM,RAN AREA,DURHAM, BEFORE
EE-4908 EE-4908 VARIOUS 8 PROJECT MITIGATION. DOLPH,HOKE LUMBER RIVER 2011 $8,756 $8,756
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTHWEST
PIEDMONT,WIN
STON-
ECOSYSTEM SALEM,PIEDMO
ENHANCEMENT STOKES,FORSY NT TRIAD,HIGH
PROGRAM FOR DIVISION TH,DAVIE,DAVID POINT,CONCOR BEFORE
EE-4909 EE-4909 VARIOUS 9 PROJECT MITIGATION. SON,ROWAN D 2011 $3,723 $3,723
ECOSYSTEM
ENHANCEMENT STANLY,MECKLE CONCORD,ROC
PROGRAM FOR DIVISION NBURG,UNION,A KY
10 PROJECT NSON,CABARRU RIVER,CHARLO BEFORE
EE-4910 EE-4910 VARIOUS MITIGATION. S TTE 2011 $28,773 $28,773
ECOSYSTEM SURRY,YADKIN, HIGH
ENHANCEMENT ALLEGHANY,WIL COUNTRY,UNIF
PROGRAM FOR DIVISION KES,ASHE,WATA OUR,HICKORY,
11 PROJECT UGA,CALDWELL, NORTHWEST BEFORE
EE-4911 EE-4911 VARIOUS MITIGATION. AVERY PIEDMONT 2011 $10,986 $10,986
ECOSYSTEM
ENHANCEMENT CATAWBA,GAST LAKE
PROGRAM FOR DIVISION ON,LINCOLN,ALE NORMAN,GAST
12 PROJECT XANDER,IREDEL ONIA,UNIFOUR, BEFORE
EE-4912 EE-4912 VARIOUS MITIGATION. L,CLEVELAND HICKORY 2011 $12,930 $12,930
ISOTHERMAL,U
ECOSYSTEM MITCHELL,MADIS NIFOUR,HICKO
ENHANCEMENT ON,BUNCOMBE, RY,HIGH
PROGRAM FOR DIVISION YANCEY,RUTHE COUNTRY,ASH
13 PROJECT RFORD,BURKE,M EVILLE,LAND BEFORE
EE-4913 EE-4913 VARIOUS MITIGATION. CDOWELL OF SKY 2011 $29,337 $29,337
GRAHAM,POLK,H
ECOSYSTEM ENDERSON,HAY
ENHANCEMENT WOOD,TRANSYL SOUTHWESTER
PROGRAM FOR DIVISION VANIA,SWAIN,CH N,LAND OF
14 PROJECT EROKEE,CLAY,M SKY,ASHEVILLE BEFORE
EE-4914 EE-4914 VARIOUS MITIGATION. ACON,JACKSON ,ISOTHERMAL 2011 $17,537 $17,537
AMERICAN TOBACCO
RAIL TRAIL. NC 54
TO CHATHAM COUNTY
LINE. CONSTRUCT
BICYCLE & A MULTI-PURPOSE BEFORE
PEDESTRIAN EL-2921E EL-2921E DURHAM TRAIL. DURHAM DURHAM 2011 $5,762 $5,762
MORGAN CREEK
GREENWAY (EAST).
US 15-501-CULBETH
ROAD TO SMITH
LEVEL ROAD. TEN FOOT
MULTI-USE
ASPHALT PATH
BICYCLE & CHAPEL INCLUDING ACCESS BEFORE
PEDESTRIAN EL-4601 EL-4601 HILL TO MERRITT PASTURE. ORANGE DURHAM 2011 $1,290 $1,290
MORGAN CREEK
GREENWAY (WEST).
SMITH LEVEL ROAD TO
UNIVERSITY
BICYCLE & CARRBO LAKE. CONSTRUCT
PEDESTRIAN EL-4828 EL-4828 RO GREENWAY. ORANGE DURHAM CONSTRUCTION 2011 2011 $495 $495
MORGAN CREEK
GREENWAY (WEST).
SMITH LEVEL ROAD TO
UNIVERSITY
BICYCLE & CARRBO LAKE. CONSTRUCT BEFORE
PEDESTRIAN EL-4828 EL-4828 RO GREENWAY. ORANGE DURHAM 2011 $40 $40
BICYCLE & CARRBO BOLIN CREEK
PEDESTRIAN EL-4994 EL-4994 RO GREENWAY. ORANGE DURHAM CONSTRUCTION 2011 2011 $738 $738
BICYCLE & CARRBO BOLIN CREEK BEFORE
PEDESTRIAN EL-4994 EL-4994 RO GREENWAY. ORANGE DURHAM 2011 $738 $738
CARRBO
RO
BICYCLE & CHAPEL BEFORE
PEDESTRIAN EL-4995 EL-4995 HILL DRY CREEK GREENWAY. ORANGE DURHAM 2011 $36 $36
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SCHEDU SCHEDU
LED FOR LED FOR
CARRBO REPRIO REPRIO
RO RITIZATI RITIZATI
BICYCLE & CHAPEL ON IN ON IN
PEDESTRIAN EL-4995 EL-4995 HILL DRY CREEK GREENWAY. ORANGE DURHAM CONSTRUCTION 2012 2012 $700 700.00
DEVELOPMENT OF
BICYCLE & PEDESTRIAN BEFORE
PEDESTRIAN EL-4998 EL-4998 CARY BIKE PATHS. WAKE RALEIGH 2011 $3,463 $3,463
BICYCLE AND
PEDESTRIAN TRAILS
IN DURHAM AND
DURHAM COUNTY.
ACQUISITION OF RAIL
BICYCLE & CORRIDORS BEFORE
PEDESTRIAN EL-4999 EL-4999 DURHAM AND CONSTRUCTION. DURHAM DURHAM 2011 $0
PEDESTRIAN, BICYCLE,
AND TRANSIT
PROJECTS IN THE
CAPITAL AREA
METROPOLITAN FRANKLIN,HARN
PLANNING ETT,JOHNSTON,
BICYCLE & ORGANIZATION WAKE,GRANVILL
PEDESTRIAN EL-5100 EL-5100 VARIOUS (CAMPO). E RALEIGH CONSTRUCTION 2011 2011 $8,335 $8,335
PEDESTRIAN, BICYCLE,
AND TRANSIT
PROJECTS IN THE
CAPITAL AREA
METROPOLITAN FRANKLIN,HARN
PLANNING ETT,JOHNSTON,
BICYCLE & ORGANIZATION WAKE,GRANVILL BEFORE
PEDESTRIAN EL-5100 EL-5100 VARIOUS (CAMPO). E RALEIGH 2011 $949 $949
PEDESTRIAN AND
BICYCLE PROJECTS
IN THE GREENSBORO
URBAN AREA
METROPOLITAN URBAN
PLANNING
BICYCLE & ORGANIZATION
PEDESTRIAN EL-5101 EL-5101 VARIOUS (GUAMPO). GUILFORD GREENSBORO CONSTRUCTION 2011 2012 $5,825 $4,041 $1,784
PEDESTRIAN AND
BICYCLE PROJECTS
IN THE GREENSBORO
URBAN AREA
METROPOLITAN URBAN
PLANNING
BICYCLE & ORGANIZATION BEFORE
PEDESTRIAN EL-5101 EL-5101 VARIOUS (GUAMPO). GUILFORD GREENSBORO 2011 $1,459 $1,459
PEDESTRIAN PROJECTS
WITHIN THE
FAYETTEVILLE AREA
METROPOLITAN
PLANNING
BICYCLE & ORGANIZATION BEFORE
PEDESTRIAN EL-5102 EL-5102 VARIOUS (FAMPO). CUMBERLAND FAYETTEVILLE 2011 $390 $390
CARRBORO, INSTALL
BUS SHELTERS
AT SELECTED BEFORE
EL-5103 EL-5103 VARIOUS LOCATIONS. ORANGE DURHAM 2011 $76 $76
SR 1349 (AIRPORT
ROAD), NC 84
(WEDDINGTON ROAD)
TO SR 1162
(GOLDMINE ROAD).
UPGRADE
FEASIBILITY ROADWAY, SOME NEW FEASIBILITY BEFORE
STUDY FS-0210A FS-0210A MONROE LOCATION. UNION CHARLOTTE STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
SR 1520 (FAIRVIEW
ROAD-INDIAN TRAIL
SR 1501 ROAD) TO I-485.
FEASIBILITY IDLEWIL UPGRADE EXISTING UNION,MECKLEN FEASIBILITY BEFORE
STUDY FS-0210B FS-0210B D ROAD ROADWAY. BURG CHARLOTTE STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 3412 (SAND HILL
ROAD)-NC 112 (SARDIS
ROAD), US 19-23
(SMOKEY PARK
HIGHWAY) TO NC 191
ASHEVIL (BREVARD ROAD). FEASIBILITY BEFORE
HIGHWAY FS-0213A FS-0213A LE WIDEN TO MULTI-LANES. BUNCOMBE ASHEVILLE STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
5TH STREET IN
CHARLOTTE TO I-85.
ADDITIONAL LANES AND
EXTENSION FEASIBILITY BEFORE
HIGHWAY FS-0510A FS-0510A I-77 OF HOV FACILITY. MECKLENBURG CHARLOTTE STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
US 19-64-74-129, END OF
4-LANE DIVIDED
SECTION TO SR 1556.
FEASIBILITY SAFETY SOUTHWESTER FEASIBILITY BEFORE
STUDY FS-0514A FS-0514A MURPHY IMPROVEMENTS. CHEROKEE N STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
US 17 TO
INTRACOASTAL
WATERWAY
AT SURF CITY. WIDEN FEASIBILITY BEFORE
HIGHWAY FS-0703A FS-0703A NC 210 TO MULTI-LANES. PENDER CAPE FEAR STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
NEW ROUTE, SR 1850
(SANDY RIDGE
ROAD) AT SR 1008
(WEST MARKET
STREET) TO NC 68 NEAR
PIEDMONT
NEW TRIAD INTERNATIONAL FEASIBILITY BEFORE FEASIBILITY STUDY IN PROGRESS
HIGHWAY FS-0707A FS-0707A ROUTE AIRPORT. GUILFORD GREENSBORO STUDY 2011 $0 BY OTHERS
HIGH POINT, NORTH-
SOUTH CONNECTOR,
US 311 (FUTURE I-74) TO
NC 68. WINSTON-
NEW FREEWAY ON NEW GUILFORD,FORS SALEM,HIGH FEASIBILITY BEFORE FEASIBILITY STUDY IN PROGRESS
HIGHWAY FS-0707B FS-0707B ROUTE LOCATION. YTH POINT STUDY 2011 $0 BY OTHERS
SR 1001(CHERRY
STREET), US 421
BYPASS TO NC 18-268
WILKESB (MAIN STREET). WIDEN FEASIBILITY BEFORE
HIGHWAY FS-0711B FS-0711B ORO TO MULTI-LANES. WILKES HIGH COUNTRY STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
NEW ROUTE,
PROPOSED US 70
BYPASS TO NC 11-58.
CONSTRUCT MULTI-
LANE FACILITY ON NEW EASTERN FEASIBILITY BEFORE
HIGHWAY FS-0802A FS-0802A KINSTON LOCATION. LENOIR CAROLINA STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
JAMES CITY TO
PROPOSED HAVELOCK
BYPASS. ACCESS
MANAGEMENT FEASIBILITY BEFORE
HIGHWAY FS-0802B FS-0802B US 70 IMPROVEMENTS. CRAVEN DOWN EAST STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
PROPOSED I-140 TO NC
133 (VILLAGE ROAD). WILMINGTON,C FEASIBILITY BEFORE
HIGHWAY FS-0803A FS-0803A US 17 ADD ADDITIONAL LANES. BRUNSWICK
APE FEAR STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
WILMINGTON,C
APE
I-140 TO NC 50 IN ONSLOW,PENDE FEAR,JACKSON
ONSLOW COUNTY. R,NEW VILLE,DOWN FEASIBILITY BEFORE
HIGHWAY FS-0803B FS-0803B US 17 ADD ADDITIONAL LANES. HANOVER EAST STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
PROPOSED NORTH
CAROLINA
INTERNATIONAL PORT
TO US 17.
EVALUATE EXISTING
AND NEW
ROUTES TO PROVIDE A
FS- MULTI- FEASIBILITY BEFORE
0803C FS-0803C NC 87 LANE FACILITY. BRUNSWICK CAPE FEAR STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
SR 1997 (FAYETTEVILLE
ROAD),
23RD STREET TO
LUMBER FARRINGDON FEASIBILITY BEFORE
HIGHWAY FS-0806A FS-0806A TON STREET. ROBESON LUMBER RIVER STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 1600 (CHAPEL HILL
ROAD)/ODELL
ROAD, FORT BRAGG
BOUNDARY TO
NC 210. WIDEN TO
SPRING MULTI-LANES WITH FEASIBILITY BEFORE FEASIBILITY STUDY IN PROGRESS
HIGHWAY FS-0806B FS-0806B LAKE SOME NEW LOCATION. CUMBERLAND FAYETTEVILLE STUDY 2011 $0 BY OTHERS
I-77, SOUTH CAROLINA
LINE TO 5TH STREET IN
FEASIBILITY CHARLOTTE. ADD FEASIBILITY BEFORE
STUDY FS-0810A FS-0810A I-77 ADDITIONAL LANES. MECKLENBURG CHARLOTTE STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
NC 107, US 23 BUSINESS
TO WESTERN CAROLINA
FEASIBILITY UNIVERSITY. UPGRADE SOUTHWESTER FEASIBILITY BEFORE
STUDY FS-0814A FS-0814A NC 107 ROADWAY. JACKSON N STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
MOREHEAD CITY TO THE
BEAUFORT CAUSEWAY. FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
HIGHWAY FS-1002A FS-1002A US 70 WIDEN TO MULTI-LANES. CARTERET DOWN EAST STUDY 2011 $0 STUDY
US 264
(GREEN
VILLE NC 11 TO NC 33. WIDEN
BOULEV AND IMPROVE FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
HIGHWAY FS-1002B FS-1002B ARD) INTERSECTIONS. PITT GREENVILLE STUDY 2011 $0 STUDY
US 17 TO NC 24.
SR 1470 CONSTRUCT MEDIAN,
(WESTE ACCESS MANAGEMENT
RN IMPROVEMENTS, AND
BOULEV DRAINAGE FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
HIGHWAY FS-1003A FS-1003A ARD) IMPROVEMENTS. ONSLOW JACKSONVILLE STUDY 2011 $0 STUDY
US 421
(CAROLI
NA SANDERS ROAD TO NC
BEACH 132 (COLLEGE ROAD). FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
HIGHWAY FS-1003B FS-1003B ROAD) WIDEN ROADWAY. NEW HANOVER WILMINGTON STUDY 2011 $0 STUDY
US 17 TO NC 172 AND NC
172, USMC GATE
FS- NC 172- TO NC 210. WIDEN TO FEASIBILITY BEFORE
HIGHWAY 1003CFS-1003C 210 MULTI-LANES. ONSLOW DOWN EAST STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
SR 1709 INTERSECTION WITH SR
(CENTRA 1560 (ROYAL AVENUE)
L AND US 13 (BERKELEY
ENHANCEME HEIGHT BOULEVARD). REALIGN FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
NT FS-1004A FS-1004A ROAD) INTERSECTION. WAYNE GOLDSBORO STUDY 2011 $0 STUDY
WEST OF SR 1728
(WADE AVENUE) TO
EAST OF SR 1375 (LAKE
WHEELER ROAD).
UPGRADE CORRIDOR,
INCLUDING ADDITIONAL
LANES, PAVEMENT
REHABILITATION,
INTERCHANGE
MODIFICATIONS, AND
I-40/US OPERATIONAL FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
HIGHWAY FS-1005A FS-1005A 64 IMPROVEMENTS. WAKE RALEIGH STUDY 2011 $0 STUDY
NC 54, NC 540 TO
NORTHWEST MAYNARD
MORRIS ROAD. WIDEN TO MULTI- FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
HIGHWAY FS-1005B FS-1005B VILLE LANES. WAKE RALEIGH STUDY 2011 $0 STUDY
NC 54, I-40 TO NC 55 IN
DURHAM.
WIDEN TO MULTILANES
WITH TRANSIT
ACCOMMODATIONS,
FS- BIKE LANES, AND FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
1005C FS-1005C DURHAM SIDEWALKS. DURHAM DURHAM STUDY 2011 $0 STUDY
US 311 INTERCHANGE.
RECONSTRUCT
EXISTING INTERCHANGE
TO BETTER
ACCOMMODATE FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
HIGHWAY FS-1008A FS-1008A I-85 TRAFFIC. RANDOLPH HIGH POINT STUDY 2011 $0 STUDY
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NC 751, US 64 IN
CHATHAM COUNTY TO
NORTH OF SR 1118
(FAYETTEVILLE ROAD) IN
DURHAM COUNTY.
WIDEN TO MULTILANES CHATHAM,DURH DURHAM,TRIAN FEASIBILITY BEFORE SCHEDULED FOR FEASIBILITY
FS-1008B FS-1008B DURHAM WITH BICYCLE LANES. AM GLE AREA STUDY 2011 $0 STUDY
DAVIDSON RIVER
VILLAGE CONNECTOR
ROAD, US 64 TO US
NEW 276/64 IN PISGAH FEASIBILITY BEFORE
HIGHWAY FS-1014A FS-1014A ROUTE FOREST TRANSYLVANIA LAND OF SKY STUDY 2011 $0 FEASIBILITY STUDY SCHEDULED
EXPAND INTELLIGENT
TRANSPORTATION
SYSTEM BEYOND
PROJECT (U-3635) TO
FAYETTE INCLUDE ENTIRE FEASIBILITY BEFORE
HIGHWAY FS-9906F FS-9906F VILLE URBANIZED AREA. CUMBERLAND FAYETTEVILLE STUDY 2011 $0 FEASIBILITY STUDY IN PROGRESS
SR 1006 NEAR
HILLSBOROUGH TO
HIGHWAY I-0305 I-0305A I-85 EAST OF SR 1709. ORANGE DURHAM RIGHT-OF-WAY 2017 2019 $30,400 $10,134 $10,133 $10,133
SR 1006 NEAR
HILLSBOROUGH TO
HIGHWAY I-0305 I-0305A I-85 EAST OF SR 1709. ORANGE DURHAM UTILITIES 2017 2019 $1,225 $409 $408 $408
SR 1006 NEAR
HILLSBOROUGH TO
HIGHWAY I-0305 I-0305A I-85 EAST OF SR 1709. ORANGE DURHAM MITIGATION 2019 2019 $538 $538
I-40 AT HILLSBOROUGH
TO DURHAM
COUNTY LINE. WIDEN
TO SIX LANES
AND RECONSTRUCT
INTERCHANGES BEFORE
HIGHWAY I-0305 I-0305 I-85 AND STRUCTURES. ORANGE DURHAM 2011 $1,800 $1,800
SR 1006 NEAR
HILLSBOROUGH TO AFTER
HIGHWAY I-0305 I-0305A I-85 EAST OF SR 1709. ORANGE DURHAM CONSTRUCTION 2020 2020 $79,000 $26,334 52,666.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
EAST OF SR 1709 TO ON IN ON IN
HIGHWAY I-0305 I-0305B I-85 DURHAM COUNTY LINE. ORANGE DURHAM CONSTRUCTION 2012 2012 $79,000 79,000.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
EAST OF SR 1709 TO ON IN ON IN
HIGHWAY I-0305 I-0305B I-85 DURHAM COUNTY LINE. ORANGE DURHAM MITIGATION 2012 2012 $359 359.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
EAST OF SR 1709 TO ON IN ON IN
HIGHWAY I-0305 I-0305B I-85 DURHAM COUNTY LINE. ORANGE DURHAM RIGHT-OF-WAY 2012 2012 $19,700 19,700.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
EAST OF SR 1709 TO ON IN ON IN
HIGHWAY I-0305 I-0305B I-85 DURHAM COUNTY LINE. ORANGE DURHAM UTILITIES 2012 2012 $560 560.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
PAVEMENT UNIFOUR,HICK ON IN ON IN
HIGHWAY I-0801 I-0801B I-40 REHABILITATION. BURKE ORY CONSTRUCTION 2012 2012 $53,200 53,200.00
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SR 1484 (4TH AVENUE)
IN CONOVER
TO SR 1717 (EXIT 138).
CONCRETE
PAVEMENT AND BRIDGE
HIGHWAY I-0906 I-0906 I-40 DECK REHABILITATIONS. CATAWBA HICKORY CONSTRUCTION 2016 2016 $41,500 $41,500
SR 1704 (MILE MARKER
106) TO SR 1002 (MILE
MARKER 119).
PAVEMENT BEFORE
HIGHWAY I-0910 I-0910 I-40 REHABILITATION. BURKE HICKORY 2011 $10,195 $10,195
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
RITIZATI RITIZATI
PAVEMENT ON IN ON IN
HIGHWAY I-0910 I-0910B I-40 REHABILITATION. BURKE HICKORY CONSTRUCTION 2012 2012 $50,400 50,400.00
WEST OF NC 801 (EXIT
180) TO WEST OF
SR 1122. PAVEMENT
REHABILITATION
AND CONSTRUCT FIFTH
AND SIXTH
LANES. (COORDINATE WINSTON- BEFORE
HIGHWAY I-0911 I-0911 I-40 WITH I-2102) FORSYTH,DAVIE SALEM 2011 $27,223 $27,223
SCHEDU SCHEDU
LED FOR LED FOR
WEST OF NC 801 IN REPRIO REPRIO
DAVIE COUNTY TO SR RITIZATI RITIZATI
1101 (HARPER ROAD) IN WINSTON- ON IN ON IN
HIGHWAY I-0911 I-0911A I-40 FORSYTH COUNTY. FORSYTH,DAVIE SALEM CONSTRUCTION 2012 2012 $47,000 47,000.00
SCHEDU SCHEDU
LED FOR LED FOR
WEST OF NC 801 IN REPRIO REPRIO
DAVIE COUNTY TO SR RITIZATI RITIZATI
1101 (HARPER ROAD) IN WINSTON- ON IN ON IN
HIGHWAY I-0911 I-0911A I-40 FORSYTH COUNTY. FORSYTH,DAVIE SALEM RIGHT-OF-WAY 2012 2012 $650 650.00
SOUTH OF US 158 IN
VANCE COUNTY TO
NORTH OF SR 1237
(MANSON ROAD) IN
HIGHWAY I-0914 I-0914BA I-85 WARREN COUNTY. VANCE,WARREN KERR TAR RIGHT-OF-WAY 2013 2013 $100 $100
NORTH OF SR 1237
(MANSON ROAD) TO
HIGHWAY I-0914 I-0914BB I-85 VIRGINIA STATE LINE. VANCE,WARREN KERR TAR RIGHT-OF-WAY 2013 2013 $100 $100
SOUTH OF US 158 IN
VANCE COUNTY TO
NORTH OF SR 1237
(MANSON ROAD) IN
HIGHWAY I-0914 I-0914BA I-85 WARREN COUNTY. VANCE,WARREN KERR TAR CONSTRUCTION 2014 2016 $60,000 $20,000 $20,000 $20,000
NORTH OF SR 1237
(MANSON ROAD) TO
HIGHWAY I-0914 I-0914BB I-85 VIRGINIA STATE LINE. VANCE,WARREN KERR TAR CONSTRUCTION 2014 2016 $52,000 $17,334 $17,333 $17,333
US 158 (MILE POST
213.5) IN VANCE COUNTY
TO VIRGINIA STATE
LINE. PAVEMENT
REHABILITATION AND BEFORE
HIGHWAY I-0914 I-0914 I-85 SIGN UPGRAGES. VANCE,WARREN KERR TAR 2011 $500 $500
NORTH OF SR 2120 (EXIT
81) IN ROWAN COUNTY
TO NORTH OF NC 150 IN PIEDMONT
DAVIDSON COUNTY - DAVIDSON,ROW TRIAD,CONCOR
HIGHWAY I-2304 I-2304AC I-85 UNDER CONSTRUCTION. AN D CONSTRUCTION 2011 2012 $19,194 $9,597 $9,597
NORTH OF NC 150 TO US
29-70-52 / BUSINESS 85
(EXIT 87) IN DAVIDSON PIEDMONT
COUNTY - RIGHT OF DAVIDSON,ROW TRIAD,CONCOR
HIGHWAY I-2304 I-2304AD I-85 WAY IN PROGRESS. AN D CONSTRUCTION 2011 2013 $142,999 $47,667 $47,666 $47,666
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
NORTH CAROLINA PIEDMONT
RAILROAD MP 327.4 - DAVIDSON,ROW TRIAD,CONCOR
HIGHWAY I-2304 I-2304AE I-85 CURVE REALIGNMENT. AN D CONSTRUCTION 2011 2013 $3,385 $705 $1,621 $1,059
NORTH CAROLINA PIEDMONT
RAILROAD MP 327.4 - DAVIDSON,ROW TRIAD,CONCOR
HIGHWAY I-2304 I-2304AE I-85 CURVE REALIGNMENT. AN D ENGINEERING 2011 2013 $343 $113 $114 $116
NORTH CAROLINA PIEDMONT
RAILROAD MP 327.4 - DAVIDSON,ROW TRIAD,CONCOR
HIGHWAY I-2304 I-2304AE I-85 CURVE REALIGNMENT. AN D RIGHT-OF-WAY 2011 2013 $291 $57 $116 $118
IMPLEMENTATION OF
INTELLIGENT PIEDMONT
TRANSPORTATION DAVIDSON,ROW TRIAD,CONCOR
HIGHWAY I-2304 I-2304AF I-85 SYSTEM (ITS). AN D CONSTRUCTION 2013 2013 $1,041 $1,041
NORTH OF SR 2120 (EXIT
81) IN ROWAN COUNTY
TO NORTH OF NC 150 IN PIEDMONT
DAVIDSON COUNTY - DAVIDSON,ROW TRIAD,CONCOR GARVEE RIGHT-
HIGHWAY I-2304 I-2304AC I-85 UNDER CONSTRUCTION. AN D OF-WAY 2011 2020 $8,120 $812 $812 $812 $812 $812 $812 $812 $812 $812 $812
NORTH OF NC 150 TO US
29-70-52 / BUSINESS 85
(EXIT 87) IN DAVIDSON PIEDMONT
COUNTY - RIGHT OF DAVIDSON,ROW TRIAD,CONCOR GARVEE RIGHT-
HIGHWAY I-2304 I-2304AD I-85 WAY IN PROGRESS. AN D OF-WAY 2011 2020 $7,570 $757 $757 $757 $757 $757 $757 $757 $757 $757 $757
NORTH OF SR 2120 (EXIT
81) IN ROWAN
COUNTY TO US 29-52-
70/I-85 BUSINESS
(EXIT 87). ADDITIONAL
LANES AND
BRIDGE
RECONSTRUCTION. PIEDMONT
(PROJECT INCLUDES B- DAVIDSON,ROW TRIAD,CONCOR BEFORE
HIGHWAY I-2304 I-2304 I-85 3833) AN D 2011 $37,085 $37,085
NORTH OF SR 2120 (EXIT
81) IN ROWAN COUNTY
TO NORTH OF NC 150 IN PIEDMONT
DAVIDSON COUNTY - DAVIDSON,ROW TRIAD,CONCOR GARVEE AFTER
HIGHWAY I-2304 I-2304AC I-85 UNDER CONSTRUCTION. AN D CONSTRUCTION 2011 2020 $134,706 $12,246 $12,246 $12,246 $12,246 $12,246 $12,246 $12,246 $12,246 $12,246 $12,246 12,246.00
ASHEVILLE, I-26 TO US
19-23-70.
ASHEVIL MULTI-LANE FREEWAY,
LE NEW PART BEFORE
HIGHWAY I-2513 I-2513 ROUTE ON NEW LOCATION. BUNCOMBE ASHEVILLE 2011 $12,368 $12,368
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL NORTH OF I-26-40 SPLIT RITIZATI RITIZATI
LE NEW TO NORTH OF SR 3548 ON IN ON IN
HIGHWAY I-2513 I-2513A ROUTE (HAYWOOD ROAD). BUNCOMBE ASHEVILLE CONSTRUCTION 2012 2012 $88,900 88,900.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL NORTH OF SR 3548 RITIZATI RITIZATI
LE NEW (HAYWOOD ROAD) TO ON IN ON IN
HIGHWAY I-2513 I-2513B ROUTE EXISTING US 19-23-70. BUNCOMBE ASHEVILLE CONSTRUCTION 2012 2012 $200,000 200,000.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL RITIZATI RITIZATI
LE NEW I-26/40/240 ON IN ON IN
HIGHWAY I-2513 I-2513C ROUTE INTERCHANGE. BUNCOMBE ASHEVILLE CONSTRUCTION 2012 2012 $100,000 100,000.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL NORTH OF I-26-40 SPLIT RITIZATI RITIZATI
LE NEW TO NORTH OF SR 3548 ON IN ON IN
HIGHWAY I-2513 I-2513A ROUTE (HAYWOOD ROAD). BUNCOMBE ASHEVILLE MITIGATION 2012 2012 $407 407.00
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL NORTH OF SR 3548 RITIZATI RITIZATI
LE NEW (HAYWOOD ROAD) TO ON IN ON IN
HIGHWAY I-2513 I-2513B ROUTE EXISTING US 19-23-70. BUNCOMBE ASHEVILLE MITIGATION 2012 2012 $3,265 3,265.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL RITIZATI RITIZATI
LE NEW I-26/40/240 ON IN ON IN
HIGHWAY I-2513 I-2513C ROUTE INTERCHANGE. BUNCOMBE ASHEVILLE MITIGATION 2012 2012 $1,608 1,608.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL NORTH OF I-26-40 SPLIT RITIZATI RITIZATI
LE NEW TO NORTH OF SR 3548 ON IN ON IN
HIGHWAY I-2513 I-2513A ROUTE (HAYWOOD ROAD). BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2012 2012 $22,000 22,000.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL NORTH OF SR 3548 RITIZATI RITIZATI
LE NEW (HAYWOOD ROAD) TO ON IN ON IN
HIGHWAY I-2513 I-2513B ROUTE EXISTING US 19-23-70. BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2012 2012 $65,000 65,000.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO
ASHEVIL RITIZATI RITIZATI
LE NEW I-26/40/240 ON IN ON IN
HIGHWAY I-2513 I-2513C ROUTE INTERCHANGE. BUNCOMBE ASHEVILLE RIGHT-OF-WAY 2012 2012 $1,000 1,000.00
US 21 IN YADKIN
COUNTY (EXIT 79) TO US
21 BYPASS (EXIT 83) IN NORTHWEST
HIGHWAY I-2808 I-2808B I-77 SURRY COUNTY. YADKIN,SURRY PIEDMONT CONSTRUCTION 2017 2017 $53,400 $53,400
SOUTH OF SR 1125
(ASHBURY CHURCH
ROAD-MILEPOST 71) TO
US 21 IN YADKIN
COUNTY (EXIT 79) - NORTHWEST GARVEE
HIGHWAY I-2808 I-2808A I-77 COMPLETE. YADKIN,SURRY PIEDMONT CONSTRUCTION 2011 2018 $29,968 $3,746 $3,746 $3,746 $3,746 $3,746 $3,746 $3,746 $3,746
SOUTH OF SR 1125 (MILE
MARKER 71)
IN YADKIN COUNTY TO
US 21 BYPASS
(MILE MARKER 83.5) IN
SURRY COUNTY
(EXIT 83). PAVEMENT NORTHWEST BEFORE
HIGHWAY I-2808 I-2808 I-77 REHABILITATION. YADKIN,SURRY PIEDMONT 2011 $65,540 $65,540
GRANVILLE COUNTY
LINE (MILE POST
208.5) TO US 158
BYPASS (MILE POST
213.5) IN VANCE
COUNTY. PAVEMENT
AND BRIDGE GARVEE
HIGHWAY I-2810 I-2810 I-85 REHABILITATION. VANCE KERR TAR CONSTRUCTION 2011 2019 $30,321 $3,369 $3,369 $3,369 $3,369 $3,369 $3,369 $3,369 $3,369 $3,369
GRANVILLE COUNTY
LINE (MILE POST
208.5) TO US 158
BYPASS (MILE POST
213.5) IN VANCE
COUNTY. PAVEMENT
AND BRIDGE BEFORE
HIGHWAY I-2810 I-2810 I-85 REHABILITATION. VANCE KERR TAR 2011 $12,780 $12,780
SR 1717 (EXIT 138) IN
CATAWBA COUNTY TO
WEST OF SR 1512 (EXIT
146) IN IREDELL
COUNTY. PAVEMENT
AND BRIDGE CATAWBA,IREDE HICKORY,LAKE
HIGHWAY I-3302 I-3302 I-40 REHABILITATION. LL NORMAN RIGHT-OF-WAY 2017 2017 $800 $800
SR 1717 (EXIT 138) IN
CATAWBA COUNTY TO
WEST OF SR 1512 (EXIT
146) IN IREDELL
COUNTY. PAVEMENT
AND BRIDGE CATAWBA,IREDE HICKORY,LAKE
HIGHWAY I-3302 I-3302 I-40 REHABILITATION. LL NORMAN CONSTRUCTION 2018 2019 $38,000 $19,000 $19,000
COST
MODE TIP # SEGMENT ROUTES DESCRIPTION COUNTIES MPO_RPO ACTIVITY START END ($000) PRIOR YEARS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 AFTER 2020 COMMENT
I-85 IN ORANGE COUNTY
TO NC 147 (BUCK DEAN
FREEWAY) IN DURHAM
COUNTY. DURHAM,ORANG BEFORE
HIGHWAY I-3306 I-3306 I-40 ADD ADDITIONAL LANES. E DURHAM 2011 $81,452 $81,452
I-85 TO DURHAM DURHAM,ORANG AFTER
HIGHWAY I-3306 I-3306A I-40 COUNTY LINE. E DURHAM CONSTRUCTION 2019 2020 $47,000 $11,750 $11,750 23,500.00
NORTH OF I-277/NC 16
(BROOKSHIRE
FREEWAY) TO NORTH
HIGHWAY I-3311 I-3311E I-77 OF I-85. MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2014 2014 $100 $100
NORTH OF I-277/NC 16
(BROOKSHIRE
FREEWAY) TO NORTH
HIGHWAY I-3311 I-3311E I-77 OF I-85. MECKLENBURG CHARLOTTE CONSTRUCTION 2016 2017 $16,400 $8,200 $8,200
I-485 (CHARLOTTE
OUTER LOOP) TO NC 73
HIGHWAY I-3311 I-3311B I-77 (SAM FURR ROAD). MECKLENBURG CHARLOTTE MITIGATION 2017 2017 $226 $226
I-485 (CHARLOTTE
OUTER LOOP) TO NC 73
HIGHWAY I-3311 I-3311B I-77 (SAM FURR ROAD). MECKLENBURG CHARLOTTE RIGHT-OF-WAY 2017 2017 $100 $100
5TH STREET IN
CHARLOTTE TO NC 73
(SAM FURR ROAD). BEFORE
HIGHWAY I-3311 I-3311 I-77 ADDITIONAL LANES. MECKLENBURG CHARLOTTE 2011 $100,885 $100,885
I-485 (CHARLOTTE
OUTER LOOP) TO NC 73 AFTER
HIGHWAY I-3311 I-3311B I-77 (SAM FURR ROAD). MECKLENBURG CHARLOTTE CONSTRUCTION 2020 2020 $36,999 $9,250 27,749.00
SCHEDU SCHEDU
LED FOR LED FOR
REPRIO REPRIO