Preliminary Subdivision Plans
            Planning Department                    2-5
            Engineering Division                   6-8
            Traffic Engineering Division           9-10
            Fire Services                          11
            Gainesville Public Utilities           12-25
            Soil and Water Conservation Services   26-29
            Environmental Health                   30




                                       1
             Hall County Preliminary Subdivision Plat Checklist


       Subdivision Name                                          Entered:
Developer:                                   Surveyor/Engineer

Phone                                        Phone
Public water       Individual septic         Site Location             Tax parcel number
Individual well    Public sewer
Number of lots         Linear feet of road   Total Acreage             Zoning district




Date Approved ______________________________________________________________________

        Approved Road Names
        ________________________________________________________________________

        _______________________________________________________________________

        ________________________________________________________________________
        ________________________________________________________________________

        ________________________________________________________________________

        ________________________________________________________________________
        ________________________________________________________________________

        ________________________________________________________________________

        ________________________________________________________________________

        ________________________________________________________________________
        ____________

        Please return this checklist with the original
        plans


                                             2
     Total acreage
1
     Number of lots
2
3    Average lot size
4    Minimum lot size
     Proposed use of each lot.
5
     Water supply system
6
     Sewer system
7
8    Length of proposed roads


9    Phasing of the subdivision
10   Estimated time of completion
11   An outline of any proposed organization to control a portion or all of the
     tract, i.e., homeowners association of equivalent body
     Notice of intent to dedicate any portion of the property to the public
12
13   Proposed name of subdivision to be approved by the planning department
14   Name, address, telephone number of owner of record
     Name, address, telephone number, seal, and signature of the registered
     Engineer, Surveyor, or Landscape Architect responsible for the construction
15   plans and Surveyor responsible for the boundary survey
     Name, address, and telephone number of the subdivider
16
17   Date of survey, north point, and graphic scale, source of datum, date of plat
     drawing, and space for revisions
18   Natural features within the proposed subdivision, including drainage
     channels, bodies of water, wooded areas and significant features. On all
     water courses leaving the tract the direction of the flow shall be shown
19   Cultural features within the proposed subdivision, including right-of-way
     and pavement widths, and names of existing and platted streets adjoining, or
     abutting the subdivision, all easements, city and county lines and other
     significant information. Location of bridges, utility lines and structures,
     buildings culverts, cemeteries, and other features should also be indicated




                         3
20   Location (land district and land lot) and acreage
21   Location sketch locating the subdivision in relation to the surrounding area
     with regard to well-known landmarks such as major thoroughfares, railroad
     or others. Sketches may be drawn in freehand and a scale sufficient to show
     clearly the information required, but not less than one inch to two thousand
     feet. U.S. Geological Survey Maps may be used as a reference guide for
     location sketch
22   Name of former subdivision, and the Plat book and page numbers where it
     was recorded, of any or all of the preliminary plat that has been previously
     subdivided
     The location and specifications of proposed streets, including right-of-way
23   lines, proposed roadbed type, roadbed width, and proposed grades
24   Exact boundary lines of the tract indicated by a heavy line giving lengths
     and bearings
25   Proposed layout including lot line widths with rough dimensions, lot
     numbers, block letters, street lines with letter designations for proposed
     street names, right-of-way widths, sites reserved through covenants,
     easements, dedication or otherwise for public uses, for single-family
     dwellings, for non-residential, or for multi-family dwellings
26   Contour lines based on sea level datum. These shall be drawn at intervals of
     five feet for hilly terrain slopes (slopes > 10%), two feet for rolling
     terrain(2% - 10%) and one foot for flat terrain (slopes <2%). Contour lines
     shall be based on field surveys and photogrammetric methods for arterial
     photographs
27   The Preliminary Plan for any existing and proposed water lines, sanitary
     sewers and storm sewers. Such plans shall include the proposed size of the
     pipe to be installed and the proposed percent grades of the lines of all
     sewers.
28   The distance and direction to public water lines and sanitary sewer lines
29   Location of drainage easements for all storm drain facilities, outlets, and
     subsequent drainage ways, streams and at other locations as required
30   Proposed unit division or stage development, if any , as proposed by the
     subdivider
31   Location and results of percolation tests for lots which will not be served by
     public or community sanitary sewer system, as required by the Health
     Department
32   Location or statement of flood hazard areas
33   Such other information as may be required by the Health Department and
     Planning Commission to determine whether or not the proposed design of
     the subdivision will conform to the design requirements of these
     Regulations




                         4
34   Any outstanding zoning violations ( or failure to fully comply with zoning
     requirements ) on this property have been resolved
35   Attach copy of action letter from County Commission regarding zoning of
     property
36   Location of tract (Militia District, Land District, and Land Lot), giving area
     of each individual lot
37   Primary control point to which all dimensions, angles, bearings, and similar
     data on the plat shall be refered
38   Tract boundary lines, right-of-way lines of streets, easements, and other
     right-of-way and property lines of all lots with accurate dimensions;
     bearings, or deflected angles, radii arcs, and central angles of all curves
39   Name of each street.
40   Reference to recorded subdivision plats of adjoining platted land by record
     name, date, and number, when known.
41   Certification by surveyor as to the accuracy of the survey and plat
42   Lot lines with dimensions and lot area.
43   When the tract of land to be subdivided abuts on U.S. Government property,
     then the final plat of the land shall show a tie or ties of Land Lot lines
     conforming to U.S. Government Take Line descriptions.
44   Lots or sites numbered in numerical order and blocks lettered alphabetically.
     In general, all lots should be numbered in numerical sequence.
45   Lot lines with dimensions to the nearest foot, and minimum lot area.
46   Location and description of monuments.
47   If the property is zoned PRD, all specifications and requirements of that
     zone have been met or noted.
48   Proposed lots adjacent to arterial roads have required setback indicated
49   Any driveway restriction has been noted or shown.
50   Minimum setback lines on all lots and other sites.




                          5
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
HALL COUNTY, GEORGIA
______________________________________________________________________________________
JAMES H. MILLER, P.E. POST OFFICE DRAWER 1435
County Engineer GAINESVILLE, GEORGIA 30503
Phone: 770/531-6800
Fax: 770/531-3945
PLAN REVIEW CHECKLIST
NAME OF DEVELOPMENT:
LOCATION:
REVIEWED BY:          --------------------------------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------- ___________ ______ ______ ______ ______ ________ ______ ______ ______ ___   DATE OF REVIEW:_________
SITE PLAN
1. PROJECT INFORMATION: Subdivision Name, Total and Disturbed Acreage.
2. LOCATION INFORMATION: Location Sketch, Land Lot Line or G. M. D., Etc.
3. OWNER INFORMATION: Name(need corporate officer if business), Address, Telephone Number of
Owner/Subdivider.
4. DRAWING INFORMATION: Name, Address, Telephone Number, Seal, and Signature of PE, RLS,
LA, or Architect.
5. SURVEY INFORMATION: Survey Date, North Arrow, and Graphic Scale.
6. TOPOGRAPHIC INFORMATION: Show Existing and Final Contours. Tell How Contour Lines were
Derived (i.e. field
run survey, aerial survey, USGS Quad-Map, interpolation, etc.)
7. LOT LAYOUT INFORMATION: Show Lot Layout, Lot Numbering, Rough Dimensions of Lots,
Exact Boundary, and
Phasing.
8. ADJOINING PROPERTY OWNER INFORMATION: Show all Adjoining Property Owners.
9. PREVIOUS SUBDIVISION INFORMATION: Show any previous subdivision of the property with
boundary.
10. ROADWAY INFORMATION: Show Existing/Proposed Road R/W and Pavement.
11. UTILITY/DRAINAGE INFORMATION: Show Existing/Proposed Drainage/Utility Locations and
Easements.
12. EXISTING INFORMATION: Locate any Existing Structures, Cemeteries, Etc.
13. STATE WATERS INFORMATION: Locate All State Waters, Drainage Easements, and Show Lake
Lanier Notes if
Applicable.
14. GEOGRAPHIC INFORMATION: Show all City Limits, County Lines, Land Lot Lines, Etc.
15. EXISTING VEGETATION: The existing tree lines, grassy areas, or unique vegetation shown on the
plan.
16. SOILS INFORMATION: A brief description of the soils on the site giving such information as soil
names, mapping unit,
erodibility, permeability, depth, texture, and soil structure. Indicate how information was developed.
17. SOIL BOUNDARIES: The boundaries of the different soil types shown on the plan.
18. EXISTING DRAINAGE PATTERNS: The dividing lines and the direction of flow for the different
drainage areas shown
on the plan. The direction of all waters leaving site must be shown.
19. LIMITS OF CLEARING AND GRADING Areas that are to be cleared and graded shown on the
plan.
20. DISPOSAL AREAS: Location of stumps and debris to be deposited on-site shown on the plan. If the
debris is to be
deposited off-site, indicate off-site location. Must meet GA DNR code 391-3-4-.06.
21. LOCATION OF PRACTICES: The location of erosion and sediment control and storm water
management practices used on the site shown on the plan using uniform coding symbols.




                                                                                                                                                                                                                                                                                                                                                                     6
22. DELINIATIONS: If present, delineate the 50’ or 25’ undisturbed vegetative buffer, wetland areas, and
flood hazard areas.
NARRATIVE
23. PROJECT DESCRIPTION: Briefly describe the nature and purpose of the land-disturbing activity,
zoning classification,
and the amount of grading involved in both area and volume.
24. EXISTING SITE CONDITIONS: A description of the existing topography, vegetation, and drainage.
25. ADJACENT AREAS: A description of neighboring areas such as streams, lakes, residential areas,
roads, etc., which might
be affected by the land disturbance.
26. CRITICAL AREAS: Provide a description of area on the site which have potentially serious erosion
problems, including
but not limited to certain cut and fill slopes greater than 5’ feet in height.
27. CONSTRUCTION SCHEDULE: A graphical description of how construction activities will be
timed. Show maintenance
of erosion and sediment controls throughout the duration of the project.
28. STORMWATER MANAGEMENT CONSIDERATIONS: Will the development of the site result in
increased peak rates
of runoff? Will this result in flooding or channel degradation downstream? If so, provide storm water
control structures onsite
where applicable.
29. EROSION/SEDIMENT CONTROL AND DISTURBED AREA STABILIZATION: A description
of methods used to
control erosion and sediment and to stabilize disturbed area on site
30. FLOOD HAZARD AREA: Indicate whether or not the property is in a flood hazard area with FIRM
panel number
NOTES
31. THE FOLLOWING NOTES MUST APPEAR ON PLANS:
“No additional construction or improvements, including but not limited to walls, fences, signs, sprinkler systems, lights, trees, etc. will
be allowed
on the road R/W.”
“Centerline must be surveyed and staked for the grading inspection.”
“Fire hydrants to be placed a minimum of 6' behind curb and water valves out of pavement.”
“All corrugated pipe must be asphalt-coated or type II aluminized.”
“Sidewalks will be installed before final plat / one year after final plat / on a lot by lot basis”
”F-Mix topping will be placed before / one year after final plat”
“All BMPs will be inspected daily and any deficiencies noted will be corrected by the end of each day. Additional BMPs will be
installed if
deemed necessary by on-site inspection”
“The installation of BMPs shall take place prior to or concurrent with land disturbing activities”
“All fill slopes will have silt fence at the toe of slope”
“A 50’/25’ undisturbed vegetative buffer adjacent to all state waters will be left maintained”
“This site does / does not contain state waters”
“This site does / does not contain wetlands”
“No cut or fill slope steeper than 2:1 are allowed”
“All cut and fill slopes shall be surfaced roughened and vegetated within seven (7) days after grading is completed”
“Double row type C silt fence required when placed along state waters and at the toe of slopes exceeding 10’ vertical.”
“Sign every lot or 100’, which ever is less, stating: “Streamside Buffer – Do Not Remove or Alter Existing Native Vegetation.”
“Bi-weekly inspection, performed by a professional, will be submitted to Hall County Engineering until project is accepted into
maintenance.”
P&P SHEETS
32. SCALE: Minimum Horizontal and Vertical Scale.
33. STREET LAYOUT: Show Street Layout, Road Names, CL Stations, Horizontal Curve Data,
Minimum Radii (CL, EP, and
R/W)
34. REVERSE CURVES: Distance Between Reverse Curves.
35. VERTICAL ALIGNMENT: Vertical Curve Data, Minimum Length, Maximum/Minimum Grade,
Including Turnaround
and Intersection Grades.
36. SIGHT DISTANCE: Intersection Sight Distance.



                                                                    7
37. STORM SEWER: Location, Length, Size, Type, Percent Grade, Drainage Area, Q, Etc.
38. CATCH BASINS: Catch Basin Types and Outlet location (Headwalls Required on Storm Sewer Over
18")
39. CONSTRUCTION EASEMENT: Construction Easement for Street if Needed
40. CITY LIMIT/COUNTY LINE: City Limit/ County Line tied to Centerline
41. STREET JOGS: Minimum Distance Between Street Jogs.
42. L-BACK CURB: L Back C&G in Negative Grade Turnaround (Transition in 30’ R)
43. CUL-DE SAC INFORMATION: CDS Data (40-ft asphalt, min length, ROW diameter)
44. INTERSECTION ANGLE: CL Street Intersection Angle
45. WATER VALVE: Water Valve Conflict with Pavement (Esp. at Entrance)
DETAIL SHEETS
46. TYPICAL: Typical Section (Check vs. Plate in Regs)
47. CURB AND GUTTER: C&G Detail
48. INTERSECTION: Intersection Detail (with existing county road)
49. CROSS DRAIN CROSS SECTION: Cross Section at Cross Drains
50. STORM SEWER: CB, HW, DI, JB Details
51. UTILITY CROSS SECTION: Utility Location Cross Section
52. EROSION AND SEDIMENT CONTROL: BMP Details (standards set by the Manual for Erosion
and Sediment Control
in Georgia or other local handbooks)
53. EROSION AND SEDIMENT CODING: Uniform coding system for BMPs
54. DETENTION POND: Detention Pond Details (outlet pipes RCP), Including Silt Gauge and Fence
55. SIDEWALK: Sidewalk Details
GENERAL
56. NPDES PERMIT: Permit required for disturbed areas greater than 5 acres.
57. DOT PERMIT: Permit required for access on a state route. A copy of the actual permit is required.
58. WATERSHED DISTRICT: Is site inside a special watershed district?
59. STORM WATER MANAGEMENT REPORT: Report to accompany preliminary plans.
60. MISC. ITEMS:
___________________________________________________________________________________
NOTE: Items marked with a red "X" must be corrected before Hall County Engineering can sign a
development permit.




                                                  8
                                     DEPARTMENT OF PUBLIC WORKS
                                      TRAFFIC Engineering division
                                                    HALL COUNTY, GEORGIA


_____________________________________________________________________________________________________________
  SCOTT G. PUCKETT                                                                        POST OFFICE DRAWER 1435
    Traffic Engineer                                                                    GAINESVILLE, GEORGIA 30503
                                                                                                      Phone: 770/531-6800
                                                                                                       Fax: 770/531-3945



                             ACCESS PLAN REVIEW SHEET

             DEVELOPMENT:
             ________________________________________________

             LOCATION:
             ____________________________________________________

             REVIEW DATE: ________________REVIEWED BY: ______________

             ITEMS:

             ___ 1. Location sketch map.
             ___ 2. North arrow.
             ___ 3. Scale in feet per inch. The scale should be 1”=20’ or larger. If a smaller scale is used on
             the overall plans, then the access details and work on the roadway right-of-way must be enlarged.
             ___ 4. Show existing features with dash or “light” lines and all proposed features with solid or
                      “heavy” lines.
             ___ 5. Show the distance from the centerline of the roadway to the right-of-way line.
             ___ 6. Show the width of existing roadway pavement, lane lines and lane widths.
             ___ 7. Show State Route numbers and U.S. numbers (if applicable) and names of all roadways
             which appear on the plans.
             ___ 8. Show the distance from one corner of the property, measured along the right-of- way line,
             to the centerline of the nearest named intersecting roadway or highway.
             ___ 9. Show the location of existing and proposed structures.
             ___ 10. Show the posted speed limit of the roadway on which access is desired (note if none
             posted).
             ___ 11. Show all existing roadway signs within the frontage being developed (note if none
             exists).
             ___ 12. Show the distance between structures or foundations on the property and right-of-way
             lines.
             ___ 13. Show the proposed driveway(s) or roadway(s) – include the width to the face of the
             proposed curb or to the edge of asphalt if no curb is proposed or required.




                                                             9
___ 14. Show the proposed decel lane(s), left turn lane(s), tapers, and lane shifts (if applicable)
include lengths, widths, and required pavement markings.
___ 15. Add the following notes:
        ___ “Contact Hall County Engineering at (770) 531-6800 24 hours (minimum) prior to
required inspections. Hall County must inspect subgrade, base, and be present during paving”.
        ___ “Sawcut required at edge of existing pavement to provide joint uniformity”.
        ___ “All temporary traffic control must be in accordance with the current edition of the
        Manual on Uniform Traffic Control Devices.”

___ 16. Show the angle of the proposed driveway(s) or roadway(s) to the roadway alignment.

___ 17. Show the distance between driveway(s) or roadway(s) to the property line measured
along the right-of-way line.
___ 18. Show the distance between driveways or roadways if more than one is proposed.
___ 19. Show the radii of all curves on the proposed driveway(s) or roadway(s)
         measured to the face of the proposed curb or edge of pavement as applicable.
___ 20. Show the sight distances from each proposed driveway or roadway using the standards
for intersection sight distance set forth in the current edition of AASHTO’s “A Policy on
        Geometric Design of Highways and Streets”.
___ 21. Access profile – including all lanes of existing roadway and the proposed access
         to the right-of-way line. Include percent slope.
___ 22. D.O.T. driveway permit (if applicable) – required prior to Hall County Traffic
         Engineering approval.
___ 23. Pavement cross section detail.
___ 24. Pavement marking details.
___ 25. Curb and gutter detail (including end taper).
___ 26. Street lighting preliminary letter from electric utility company (Subdivision
          requirement)

NOTE: Items marked with a red “X” must be corrected prior to Hall County Traffic
       Engineering approval.

COMMENTS:




                                                 10
                                Hall County Fire Services
                                Development Comments
1. A water main with hydrants spacing as necessary to facilitate a 300-foot lay of fire
     hose to any portion of all buildings. This distance is measured ‘as the truck travels’.
     All fire hydrants shall be capable of providing a minimum flow of 1250 gallons per
     minute.
2. Hydrants and mains shall be installed and under pressure before any combustible
     construction is started.
3. Certification and flow tests shall be provided to the Fire Department after installation
     of the water mains.
4. Every building hereafter constructed shall be accessible to fire department vehicles.
5. Maintain access for emergency vehicles around and to all buildings under
     construction. i.e.: In times of rain or mud, roads shall be capable of carrying the
     weight of a fire truck by being paved or having a crushed stone base etc. This
     emergency access shall be a minimum of 20 feet wide (NFPA 1141) .
6. All burning of land clearing debris must be done according to Hall County Fire
     Services and EPD regulations.


Any questions or concerns should be directed to David Kimbrell Hall County Fire
Marshal at 770-531-6838.


dk




                                              11
                                                     Gainesville Public Utilities
                                                           Department
     PLAN REVIEW CHECKLIST
              FOR
        WATER MAINS AND
        SANITARY SEWERS

JANUARY 2003



************************************************************************
****************************
PROJECT NAME
                        ______________________________________________
PLANS RECEIVED
                        __________________________
PLANS REVIEWED
                        __________________________
PLANS RETURNED TO ENGINEER/ARCHITECT
WITH CORRECTIONS TO BE MADE
                                                ________________________
                                                __
REVIEWED BY: _____________________________ PHONE#:__________________
************************************************************************
****************************
COMMENTS:___________________________________________________________
________________________________________________________________________
_________________________________________________________________

**ORIGINAL RED-LINE COMMENTS MUST BE RETURNED WITH REVISED
PLANS FOR FINAL PLAN APPROVAL. CONTACT PLAN REVIEWEE AND
SCHEDULE APPOINTMENT FOR PLAN APPROVAL/SIGN-OFF. **

GENERAL

1)_______   2 sets of preliminary drawings furnished for initial review.

2)_______   Plans stamped by Professional Engineer or Registered Land Surveyor.
            (Fire sprinkler drawings prepared by sprinkler contractor and stamped
            with “Certificate of Competency” will not be accepted or approved.)

3)_______   Project location map provided.



                                         12
4)_______      Elevation data referenced to mean sea level (MSL) and survey referenced
               to state-plane coordinate system.

5)_______      Drawings shall bear the following notes:

“The Gainesville Public Utilities Department shall be notified 24 hours prior to any water
or sewer line construction or repairs. Call Engineering Inspector/Aide, at (770) 538-
2407.

“All water main and sanitary sewer materials and workmanship shall be in accordance
with the City of Gainesville "Standard Specifications for Construction of Water Mains
and Sanitary Sewers, latest edition.”

“The Contractor shall be responsible for maintaining a marked-up set of design drawings
showing “as-built” conditions. These “record drawings” shall be made available to the
designer and/or the City Inspector upon request. The mark-ups shall be at the site at all
times and shall be utilized to develop final record drawings. Final acceptance of water
and/or sewer main construction will not be granted until as-built drawings have been
received by Utilities Engineering and Planning office.”

 6)_______     Water & Sewer details used match City of Gainesville PUD standard
               details, latest edition.

 7)_______     The City’s Tree Protection Ordinance shall be considered and addressed
               by the project owners, designers, and contractors as is applicable. No
               trees shall be located within perpetual water or sewer easements or above
               fire protection water mains in order to prevent pipeline root damage.

 8)_______     Minimum 10 feet horizontal distance between water & sewer lines.

 9)_______     Minimum 18 inch vertical distance between water and sewer lines.

10)_______     Where water and sanitary sewer lines cross, the water main shall be 18
               inches above the sewer. If the sewer must be above the water main the
               sewer shall be at least 18 inches above and encased in concrete a
               minimum of 10 feet on each side of the water main. Joints shall be spaced
               to provide maximum distance from crossing.

11)_______     Minimum cover over water and sewer lines shall be 4 feet. Water mains
               12-inches and larger shall have a minimum of 5-feet of cover




12)_______     Water mains and sanitary sewers shall be located outside of paved areas.
               Locating water mains and sanitary sewers in paved areas will only be



                                           13
             allowed when no other alternative exists. No 2” P.V.C. water mains will
             be allowed under roadways. Bore under existing roadways where possible
             to prevent pavement damage.

13)_______   A post indicator valve and a free standing Siamese fire department
             connection shall be installed a minimum of 40 feet from the building on
             all fire sprinkler system water mains. Said valve and connection shall be
             placed immediately downstream of the double detector check backflow
             preventer in the same vault and shall be in accordance with NFPA 24.
14)_______   A new or existing fire hydrant shall be located within 50 feet up stream of
             the fire department connection. These requirements will be strictly
             enforced unless a written variance from the Fire Marshall of jurisdiction is
             obtained

WATER
1)_______    A 20'-0" permanent, recorded, easement shall be required on all water
             mains crossing private property. The main shall be on the centerline of the
             easement and no buildings or other structures shall be built within
             easements. Easements shall be shown on all plans including landscape
             plan. All water main easements shall be fully executed and recorded prior
             to plan approval.

2)_______    Developments requiring installation of public water mains within public
             right-of-way shall be required to sign “Facilities Dedication” prior to plan
             approval.

3)_______    Existing water supply facilities shall have adequate capacity to meet future
             potable water demands of proposed development.

 4)_______   Water mains shall be placed in the back 5'-0" of City, County, or D.O.T.
             Rights-of-Way as applicable.

 5)_______   No fire hydrants shall be placed on water mains which are smaller than 8"
             diameter unless the main is looped or the developer can show the farthest
             hydrant can maintain a flow of 1250 gpm @ 30 psi. Note: The Fire
             Marshall of Jurisdiction should be contacted to see if stricter requirements
             are in order for specific project types.

 6)_______   No fire hydrant shall be placed on water mains smaller than 6" diameter in
             any case

7)_______    In commercial and industrial areas, fire hydrants shall be placed such that
             the maximum hose lay length (as a truck travels) shall be no greater than
             300 feet, unless the Fire Department requires closer spacing for specific
             reasons.




                                          14
 8)_______   As a minimum, fire hydrants shall be placed such that the maximum hose
             lay length (as a truck travels) shall be no greater than 500 feet in single
             family residential areas and 350 feet in multi-family residential housing
             complexes. Note: The Fire Marshall of jurisdiction should be contacted to
             see if stricter requirements are in order for specific project types.

 9)_______   Blow-off assemblies (or fire hydrants if applicable) shall be placed at the
             terminus of all dead end lines.

10)_______   Water mains 6" and larger shall be ductile iron pipe, including fire
             protection water mains.

11)_______   Pipe for 2-inch diameter water mains shall be SDR 13.5 PVC with a
             pressure rating of not less than 315 psi.

12)_______   In general, 2-inch diameter PVC pipe will only be allowed around the
             radii of cul-de-sacs and located outside of paved areas.

13)_______   Tapping sleeves & valves shall be shown on plan when connecting to an
             existing water main. A back tap shall be shown when applicable

14)_______   In-line gate valves are required every 1800 to 2000 feet.

15)_______   Each tax parcel shall be served by separate water meter. Master meters to
             serve more than one tax parcel will not be allowed.

16)_______   Commercial multi-unit buildings containing units to be leased and used as
             restaurants or other business types requiring installation of a sanitary
             sewer pre-treatment device, shall be required to install a separate water
             meter.

SEWER

1)_______    Developments proposing to connect to City of Gainesville sanitary sewer
             system shall be annexed into the City of Gainesville or sign agreement to
             annex once property becomes contiguous.
2)_______    A 30'-0" permanent, recorded, easement shall be required on all 8-inch
             through 18-inch diameter sanitary sewers with up to 20' - 0" of cover and a
             40' - 0" permanent, recorded easement shall be required if cover is over 20'
             - 0". A 40' - 0" permanent, recorded easement shall be required on all 24-
             inch diameter sanitary sewers regardless of depth of cover. The sewer
             shall be on the centerline of the easement and no buildings or other
             structures shall be built within easements. Easements shall be shown on
             all plans including landscape plan. All sanitary sewer easements shall be
             fully executed and recorded prior to plan approval




                                          15
3)_______    Developments requiring installation of public sewer mains within public
             right-of-way shall be required to sign “Facilities Dedication” prior to plan
             approval.

4)_______    All downstream wastewater facilities including wastewater treatment
             plant, gravity sanitary sewer lines and wastewater pumping stations shall
             have adequate capacity for future wastewater flows from proposed
             development.

5)_______    All stream buffer encroachment variances shall be obtained from Georgia
             Environmental Protection Division (E.P.D.) and/or U.S. Army Corps of
             Engineers Permit prior to plan approval.

6)_______    Minimum slope for 8-inch and larger gravity sanitary sewer pipe shall be
             0.50%, the maximum slope shall be 15.0%.

7)_______    Gravity sanitary sewer pipe material shall be SDR 26 PVC or vitrified clay
             unless depth of cover is 20' or greater, less than 4', or the sewer is to be
             laid in fill area. In these cases, the pipe shall be ductile iron, Class 50 with
             Polybond Plus or Protecto 401 interior coating.

8)_______    Bedding for sanitary sewers shall be Class B or greater.

9)_______    Sanitary sewer force mains shall be ductile iron pipe, Class 50 with
             Polybond Plus or Protecto 401 interior coating.

10)______    Service lateral pipe material shall be SDR 26 PVC or vitrified clay sewer
             pipe. If PVC sewer service is used, the connection to the VC sewer main
             shall be made with an appropriate bell donut. The bell donut shall be
             equivalent to those manufactured by Fernco, Inc.

11)_______   Cleanouts shall be placed on all building service laterals at the point at
             which City maintenance terminates. This point shall be the curb line, the
             property line, the right of way line, or the easement line as applicable.
             Cleanouts shall be 6-inch and have a brass cap. Use traffic-grade
             cleanouts when located within pavement areas

12)______    All service lines shall be connected to gravity sewer pipe if at all possible.
             If connection to manhole is required, the invert of building service lines
             shall be placed at or above the crown of the City sewer but not to exceed
             2-feet above the crown of the City sewer.

13)_______   The minimum diameter of sanitary sewer pipe shall be 8-inches with the
             exception of building service laterals which may be 6-inches.




                                           16
14)_______   Manholes shall be placed at all changes in direction and grade of sanitary
             sewers. Manholes shall be spaced such that the distance between
             manholes does not exceed 350 feet. The minimum angle between lines
             entering and exiting a manhole is 900.

15)_______   Outside drop connections shall be constructed at manholes on all influent
             sewers where the invert elevation is greater than 2 feet over the invert
             elevation of the effluent sewer. Slope of incoming pipe into outside drop
             manhole may not exceed 10%.

16)_______   Sewage pumping stations will not be permitted unless the developer can
             demonstrate extreme hardship would result if the station were denied.
             Pumping stations will be discouraged and therefore, only permitted on a
             case by case basis.

17)_______   All sewage pumping stations shall have an auxiliary power source and a
             yard hydrant for wash down purposes. Additionally, they shall be
             provided with a remote telemetry system compatible with the City’s
             existing system.

18)_______   Plans and profiles showing all utility and pipeline crossings as well as
             existing and proposed grades shall be provided for all sanitary sewers.
             Building services are excepted.

19)_______   Sewer Maintenance Access shall be maintained on all existing and
             proposed Sanitary Sewer Easements. Maintenance Access is defined as
             grades, soil compaction and cross slopes which will allow a sewer jet
             truck (weighing approximately 50,000 lbs.) to navigate easily. Maximum
             slope shall not exceed 20% and easement contour lines shall be shown on
             grading plans. Minimum of 2’ contour intervals shall be used. Access to
             existing sanitary sewer easements located within proposed construction
             areas shall be maintained during all phases of construction.

BACKFLOW PREVENTION AND PRETREATMENT

1)_______    As a minimum, commercial, industrial, and institutional establishments
             and multi-family housing shall install and maintain double check valve
             assemblies immediately downstream from the City meter in a separate
             meter box or vault as applicable.

2)_______    All water service lines installed for landscaping and/or irrigation purposes
             shall have a double check valve assembly installed in them immediately
             downstream from the City’s meter

3)_______    Establishments determined to present a high hazard backflow potential,
             including swimming pools, doctor’s offices, car washes, and sanitary



                                          17
               sewer pump stations shall install and maintain reduced pressure zone
               (RPZ) backflow preventers in above ground, non-freezing enclosures.

4)_______      Sand traps and oil separators with sample station manholes shall be
               installed in all sanitary sewer service lines from service stations, garages,
               car washes, and similar operations. Domestic sewage shall not pass
               through sand traps, oil separators, or sample stations.

5)_______      Grease traps and sample station manholes shall be installed in process
               waste lines of all sanitary service sewers for commercial, industrial, and
               institutional establishments with food preparation areas. Domestic sewage
               shall not pass through grease traps or sample stations.
 6)_______     Lint traps and sample station manholes shall be installed in all sanitary
               sewer service lines from laundry mats. Domestic sewage shall not pass
               through lint traps or sample stations.

7)_______      If dumpster pad drains are to be tied onto the sanitary sewer, a grease trap
               and sample station manhole shall be placed between the pad and the City
               sewer. Domestic wastewater shall be excluded from the trap. Food
               process waste streams may utilize the same trap if sized appropriately.

8)_______      Rainwater shall be prevented from entering the sanitary sewer at all
               dumpster pad locations. Method must be detailed on drawings.

9)_______      Grease trap and oil separator details shall appear on the project drawings
               and shall be approved prior to installation.

10)_______     Oil separators shall be sized to handle two (2) times the expected flow
               rate.

11)_______     Grease traps shall be sized as necessary with the minimum allowable size
               being 1000 gallons. If a dumpster pad is tied into the grease trap the
               minimum size is 1500 gallons.

12)_______     Sample station manholes may be required on commercial, industrial, and
               institutional sanitary service sewers. Domestic sewage shall not pass
               through sample station manholes.
13)_______ Double detector check valves shall be installed on all fire sprinkler mains.
Valves shall be housed in a vault as close to the City main as is possible. A double check
valve and a detector check valve in combination may be provided in lieu of the double
detector check.




                                             18
DEVELOPMENT GUIDELINES FOR
  WATER MAINS & SANITARY
      SEWER SYSTEMS

CITY OF GAINESVILLE - PUBLIC
   UTILITIES DEPARTMENT

REVISION DATE: JANUARY 2003




 This list of guidelines has been put together as an aid for developers during the permitting
 process. Although an effort has been made to include all City standards pertaining to the
 development of the Water and Sewer System, other items may be necessary as required
 by the Public Utilities Department. This listing should not be considered as a static
 document and therefore, every effort to obtain the latest revision should be made.
 Contact the Public Utilities Department Engineering and Planning Division at (770) 535-
 6892 for the latest revision of this document and/or the City's “Standard Specifications
 for Water Mains and Sanitary Sewers.”


 GENERAL

 1.     Minimum 10 feet horizontal distance between water and sewer lines.

 2.     Minimum 18 inches vertical distance between water and sewer lines.

 3.     Where water and sanitary sewer lines cross, the water main shall be 18-inches
        above the sewer. If the sewer must be above the water main the sewer shall be at
        least 18-inches above and encased in concrete a minimum of 10' on each side of
        the water main. Joints shall be spaced to provide maximum distance from
        crossing.

 4.     The minimum cover over water and sewer lines shall be 4 feet. Water mains 12-
        inches and larger shall have minimum of 5 feet of cover.

 5.     Water mains and sanitary sewers shall be located outside of paved areas.
        Locating water mains and sanitary sewers in paved areas will only be allowed
        when no other alternative exists. No 2” PVC water mains will be allowed under
        roadways. Bore under existing roadways where possible to prevent pavement
        damage.




                                             19
All elevation data shall be referenced to mean sea level (MSL) and survey horizontal data
               shall be referenced to state-plane coordinate system.

6.     A legible project location map shall be provided on the drawings.
7.     The City of Gainesville Public Utilities Department shall be furnished 2 initial
       sets of preliminary drawings for review prior to permit being issued.

9.     Fire sprinkler system drawings must be reviewed for backflow prevention
       compliance by the Gainesville Public Utilities Department prior to installation.
       Four (4) sets of sprinkler drawings showing all heads, valves, etc., must be
       submitted for review to Backflow Prevention Section at (770) 297-5443. One set
       bearing the Department stamp will be returned to the developer as proof of
       compliance. City requires 3 sets for its records, if additional sets are required by
       developer, then correct number of extra sets shall be submitted.

10.    Fire mains shall be constructed in accordance with the City's "Standard
       Specifications for Water Mains and Sanitary Sewers" latest edition, and meet the
       same standards as those for water mains or NFPA Pamphlet No. 24, whichever is
       strictest.

       A post indicator valve and a free standing Siamese fire department connection
       shall be installed a minimum of 40 feet from the building on all fire sprinkler
       system water mains. Said valve and connection shall be placed immediately
       downstream of the double detector check backflow preventer in the same vault
       and shall be in accordance with NFPA 24. A new or existing fire hydrant shall be
       located within 50 feet up stream of the fire department connection. These
       requirements will be strictly enforced unless a written variance from the Fire
       Marshall of jurisdiction is obtained.

       Fire sprinkler systems containing antifreeze will not be allowed to connect on to
       the City water system.

11.    The drawings shall bear the following notes:

       The Gainesville Public Utilities Department shall be notified 24 hours prior to any
       water or sewer line construction or repairs. Call Construction Inspector’s office at
       (770) 538-2407.

All water main and sanitary sewer materials and workmanship shall be in accordance
              with the City of Gainesville's “Standard Specifications for Water Mains
              and Sanitary Sewers”, latest edition.

The Contractor shall be responsible for maintaining a marked-up set of design drawings
              showing all "as-built conditions". These "record drawings" shall be made
              available to the designer and/or the City Inspector upon request. The
              mark-ups shall be at the site at all times and shall be utilized to develop



                                           20
                final record drawings. Final acceptance of water and/or sewer main
                construction will not be granted until as-built drawings have been received
                by Utilities Engineering and Planning office
12.      The following note shall appear on the final plat and/or as-built drawing:

                                          Owners Dedication Certificate
                                              City of Gainesville
                                             Hall County, Georgia

                                 The owner of the land shown on this plat and whose name
                                 is subscribed thereto, and in person or through a duly
                                 authorized agent, acknowledges that this plat was made
                                 From an actual survey and dedicated to the City of
                                 Gainesville forever, all water mains, sanitary sewers,
                                 Easements, and associated appurtenances thereon shown.

                                 Owner_________________________________________________
                                 Date _________________________________________________

13.      Design professionals are required to use the latest edition of the City of
         Gainesville’s standard details wherever applicable. Copies of the standard details
         are included as part of this document.

14.      Three sets of prints and one Mylar sepia of the record drawings shall be furnished
         to the Public Utilities Department after construction is completed. Building
         service stub-outs shall be measured from manholes and the length the stub-out
         extends from the sewer line shall be provided. Water line valves shall be
         measured from hydrants, valve monuments, or other permanent structures. A
         minimum of three horizontal measurements per valve will be required excluding
         fire hydrant lead valves.

15.      The City's Tree Protection Ordinance shall be considered and addressed by the
         project owners, designers, and contractors as is applicable. No trees shall be
         located within perpetual water or sewer easements.

      16. Contractors are required to possess a business license to work within the
          applicable jurisdiction. Proof of said license and all other applicable permits
          (Erosion Control, DOT, etc) shall be on the job site.

      WATER
      1. A 20'-0" permanent, recorded, easement shall be required on all water mains. The
         main shall be on the centerline of the easement and no buildings or other
         structures shall be built within easements. Easements shall be shown on all plans
         including landscape plan. All water main easements shall be fully executed and
         recorded prior to plan approval.

2.       Water mains shall be placed in the back 5'-0" of City, County, or DOT Rights-of-
         Way as applicable.
3.       No more than one (1) fire hydrant shall be placed on water mains that are smaller
         than 8" diameter unless the main is "looped" or the developer can show the


                                                  21
         farthest hydrant can maintain a flow of 1250 gpm @ 30 psi. Note: The Fire
         Marshall of Jurisdiction should be contacted to see if stricter requirements are in
         order for specific project types.

4.       No fire hydrant shall be placed on water mains smaller than 6" diameter in any
          case.

5.       In commercial and industrial areas, fire hydrants shall be placed such that the
         maximum hose lay length (as a truck travels) shall be no greater than 300 feet,
         unless the Fire Department requires closer spacing for specific reasons.

6.       As a minimum, fire hydrants shall be placed such that the maximum hose lay
         length (as a truck travels) shall be no greater than 500 feet in single family
         residential areas and 350 feet in multi-family residential housing complexes.
         Note: The Fire Marshall of jurisdiction should be contacted to see if stricter
         requirements are in order for specific project types.

7.       Fire hydrants shall have a maximum spacing of 1000 feet.

8.       Gate valves shall b 9. Valve location markers shall be installed for all valves
         (except hydrant lead valves). The markers shall be four feet long concrete posts
         with brass discs cast into one side. The marker posts shall extend from 12 to 18
         inches above finished grade.

10.      Blow-off assemblies (or fire hydrants if applicable) shall be placed at terminus of
         all dead end lines.

11.      Water mains 6" and larger shall be ductile iron pipe, including fire protection
         water mains.

12.      Pipe for 2-inch diameter water mains shall be polyvinyl chloride (PVC) pressure
         rated pipe. The pipe shall have a SDR of 13.5 and a pressure rating of not less
         than 315 psi.

13.      A continuous tracer wire shall be attached to the pipe on all 2-inch polyvinyl
         chloride (PVC) water main installations.

14.    In general, 2-inch diameter pipe will only be allowed around the radii of cul-de-
        sacs.
15.    Tapping sleeve and valves shall be required on all connections to an existing
water main.

16.      In-line gate valves are required every 1800 to 2000 feet.

      17. Each tax parcel shall be served by a separate water meter. Master meters to serve
          more than one tax parcel will not be allowed.



                                             22
SEWER

      A 30'-0" permanent, recorded, easement shall be required on all 8-inch through 18-
         inch diameter sanitary sewers with up to 20' - 0" of cover and a 40' - 0"
         permanent, recorded easement shall be required if cover is over 20' - 0". A 40' -
         0" permanent, recorded easement shall be required on all 24-inch and larger
         diameter sewers regardless of depth of cover. The sewer shall be on the
         centerline of the easement and no buildings or other structures shall be built
         within easements. Easements shall be shown on all plans including landscape
         plan. All sanitary sewer easements shall be fully executed and recorded prior to
         plan approval.

2.       Minimum slope for 8-inch and larger gravity sanitary sewer pipe shall be 0.50%,
         the maximum slope shall be 15.0%.

3.       Gravity sanitary sewer pipe material shall be SDR 26 PVC or vitrified clay unless
         depth of cover is 20' or greater, less than 4', or the sewer is to be laid in fill area.
         In these cases, the pipe shall be ductile iron, Class 50 with Polybond Plus or
         Protecto 401 interior coating.

Bedding for sanitary sewers shall be Class B or greater.

Sanitary sewage force mains shall be ductile iron pipe, Class 50 with Polybond Plus or
        Protecto 401 interior coating.

6.       Service lateral pipe material shall be SDR 26 PVC or vitrified clay sewer pipe. If
         PVC sewer service is used, the connection to a VC sewer main shall be made with
         an appropriate bell donut. The bell donut shall be equivalent to those
         manufactured by Fernco, Inc.

7.       Cleanouts shall be placed on all building service laterals at the point at which City
         maintenance terminates. This point shall be the curb line, the property line, the
         right of way line, or the easement line as applicable. Cleanouts shall be 6-inch
         and have a brass cap. Clean-outs shall not be placed in pavement areas if at all
         possible.

8.       All service lines shall be connected to gravity sewer pipe if at all possible. If
         connection to manhole is required, then, the invert of building service lines shall
         be placed at or above the crown of the City sewer but not to exceed 2 feet above
         the crown of the City sewer.

9.       The minimum diameter of sanitary sewer pipe shall be 8-inches with the
         exception of building service laterals that may be 6-inches.
10.      Manholes shall be placed at all changes in direction and grade of sanitary sewers.
         Manholes shall be spaced such that the distance between manholes does not



                                               23
      exceed 350 feet.    The minimum angle between lines entering and exiting a
      manhole is 90o .

11.   Outside drop connections shall be constructed at manholes on all influent sewers
      where the invert elevation is greater than 2 feet above the invert elevation of the
      effluent sewer. Slope of incoming pipe into outside drop manhole may not
      exceed 10%.

12.   Sewage pumping stations will not be permitted unless the developer can
      demonstrate extreme hardship would result if the station were denied. Pumping
      stations will be discouraged and therefore, only permitted on a case-by-case basis.
      All pumping stations shall be located above the 100-year flood plain and out of
      storm drainage flow paths.

13.   All sewage-pumping stations shall have an auxiliary power source. Additionally,
      they shall be provided with a remote telemetry system compatible with the City's
      existing system and a potable water service with a reduced pressure zone (RPZ)
      backflow preventer.

14.   Plans and profiles showing all utility and pipeline crossings as well as existing
      and proposed grades shall be provided for all sanitary sewers. Building services
      are excepted.

15.   Sewer Maintenance Access shall be maintained on all Sanitary Sewer Easements.
      Maintenance Access is defined as alignment grades, soil compaction and cross
      slopes that will allow a sewer jet truck (weighing approximately 50,000 lbs.) to
      navigate easily. Maximum grade shall not exceed 20% and easement contour lines
      shall be shown on grading plans. Minimum of 2’ contour intervals shall be used.


BACKFLOW PREVENTION AND PRETREATMENT

1.    Backflow prevention devices shall be required on all multi-family housing and on
      all commercial, industrial, and institutional establishments' water service lines.

2.    As a minimum, commercial, industrial, and institutional establishments and multi-
      family housing shall install and maintain double check valve assemblies
      immediately downstream from the City meter in a separate meter box or vault as
      applicable.

3.    All water service lines installed for landscaping and/or irrigation purposes shall
      have a double check valve assembly installed in them immediately downstream
      from the City's meter.
4.    Establishments determined to present a high hazard backflow potential, including
      swimming pools, doctor’s offices, car washes and sanitary sewer pump stations




                                          24
      shall install and maintain reduced pressure zone (RPZ) backflow preventers in
      above ground, non-freezing enclosures.

5.    Double detector check valves shall be installed on all fire sprinkler mains. Valves
      shall be housed in a vault as close to the City main as is possible. A double check
      valve and a detector check valve in combination may be provided in lieu of the
      double detector check.
6.    More detailed information available from office of Backflow Prevention and
      Inspection at (770) 297-5443.

7.    Sand traps and oil separators with sample station manholes shall be installed in all
      sanitary sewer service lines from service stations, garages, car washes, and similar
      operations. Domestic sewage shall not pass through sand traps or oil separators.

8.    Grease traps and sample station manholes shall be installed in process waste lines
      of all sanitary service sewers for commercial, industrial, and institutional
      establishments with food preparation areas.

9.    If dumpster pad drains are to be tied onto the sanitary sewer, a grease trap and
      sample station manhole shall be placed between the pad and the City sewer.
      Domestic wastewater shall be excluded from the trap. Food process waste
      streams may utilize the same trap if sized appropriately.
10.   Rainwater shall be prevented from entering the sanitary sewer at all dumpster pad
      locations. Method must be detailed on drawings.
11.   Rainwater shall be prevented from entering the sanitary sewer at all dumpster pad
      locations. Method must be detailed on drawings.
12.   Grease trap and oil separator details shall appear on the project drawings and shall
      be approved prior to installation.
13.   Oil separators shall be sized to handle two (2) times the expected flow rate.
14.   Grease traps shall be sized as necessary with the minimum allowable size being
      1000 gallons. If a dumpster pad is tied into the grease trap the minimum size is
      1500 gallons.
15.   Sample station manholes may be required on all commercial, industrial, and
      institutional sanitary service sewers. Domestic sewage shall not pass through
      sample station manholes




                                          25
  AFTER REQUIRED CORRECTIONS HAVE BEEN MADE, PLEASE CALL 770-531-6827 TO
               SCHEDULE AN APPOINTMENT FOR FINAL REVIEW!
      HALL COUNTY SOIL AND WATER CONSERVATION
                      DISTRICT
         EROSION AND SEDIMENT CONTROL PLAN REVIEW CHECKLIST
Project Name: __________________________________________________________________
     Location: __________________________________________________________________
      Contact: __________________________________________________________________
     Address: __________________________________________________________________
                __________________________________________________________________
         Soils: __________________________________________________________________
      Agency: ______________________Land use:____________________________________
Project Review Number: ________________
    Date of 1st Review: ________________
    Date of 2nd Review: ________________
             Telephone: ________________
            Total Acres: ________________
        Acres Disturbed: ________________
         Date Received: ________________
NARRATIVE: This project specific information must be placed on a plan sheet in a notes section.
_____ 1. APPLICANT INFORMATION: The name, address and telephone number of the
      developer, and identify the 24-hour contact responsible for erosion control.
_____ 2. PROJECT DESCRIPTION: A description of the nature and purpose of the land
      disturbing activity; giving the zoning classification, total size of the project and disturbed
      area size in acres, and volume of earthwork.
_____ 3. ADJACENT AREA INFORMATION AND EXISITING SITE CONDITIONS: Provide a
      description of features on and surrounding the property.This should adequately describe
      the properties and environments potentially affected by the planned activities. Existing
      vegetation, major topographic features, including drainage areas, State waters and current
      land use, etc. of the site should be described as well.
_____ 4. SOILS INFORMATION: Soil names, mapping units, erodibility, and permeability. Such
      information is available in the Hall County Survey.
_____ 5. CONSTRUCTION SCHEDULE: A graphical description of how construction phases will
      be timed; including but not limited to:
              a. Installation of sediment control measures
              b. Clearing, grubbing, and grading operations.
             c. Grassing – including temporary as well as permanent vegetation. All cut and fill
slopes must be surface roughened and vegetated within seven (7) days of their construction.


                                                  26
              d. Maintain erosion and sediment control measures for the entire project.
              e. Final landscaping, grassing, cleaning out of storm drains, etc.
_____ 6. CRITICAL AREAS: A table or list of any areas on the site which have potentially
      serious erosion problems; including, but not limited to cuts and fills with slopes less than
      2:1, fills greater than five (5) feet in height, stream crossings and a description of how
      these critical areas will be treated to control erosion. If there are no critical areas include a
      statement saying there are none.
_____ 7. DISPOSAL OF DEBRIS: Will debris be buried on the site, (if so, where), or will it be
      hauled to an off-site location?
_____ 8. STORMWATER MANAGEMENT CONSIDERATIONS: Attach hydrological study or
      display on plans ALL calculations and designs for sediment and stormwater detention and
      management structures; including drainage areas off-site and on-site.
_____ 9. FLOOD HAZARD STATEMENT: "This property (is/is not) located within a 100 year
      flood plain as per FIRM Panel No.__________________.
_____ 10. STREAM BUFFER/WETLAND STATEMENT/CORPS OF ENGINEERS PERMIT/EPD
                            BUFFER VARIANCE:
           _____a. Site (does/does not) have State waters requiring undisturbed buffer 25' 35'
        100'.
            _____b. Site (does/does not) contain wetlands.
           If a permit or variance is required by the U.S. Army Corps of Engineers and/or the
           Environmental Protection Division attach a copy of the approval permit to drawings.
_____ 11. CERTIFICATION: The plans shall carry the signed stamp of a registered or certified
professional in engineering, architecture, landscape architecture, land surveying, or erosion
control.



STANDARD NOTES: All plans must include the following notes on a plan sheet.
_____ 12. INSTALLATION STATEMENT: Statement in bold letters, "THE INSTALLATION OF
      EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO
      OR CONCURRENT WITH LAND DISTURBING ACTIVITIES."
_____ 13. MAINTENANCE STATEMENTS: "All erosion and sediment control measures will be
      checked daily and any deficiencies noted will be corrected by the end of the day.
      Additional erosion and sediment control measures will be installed if deemed necessary
      after on-site inspection by the issuing authority."
_____ 14. OTHER EROSION CONTROL NOTES:
           _____ a. All cut and fill slopes must be surfaced roughened and vegetated within
                        seven (7) days of the construction.
           _____ b. All fill slopes will have silt fence at toe of slopes.




                                                  27
                  _____ c. An undisturbed vegetative buffer meeting county and state regulations
            will be preserved adjacent to all streams & lakes.
      PLANS SHALL CONTAIN THE FOLLOWING:
      _____ 15. VICINITY MAP: A small map locating the site in relation to the surrounding area.
      _____ 16. SURVEY INFORMATION: Boundary survey including all easements and names of
            adjacent property owners. Survey will include a North arrow and graphic scale.
      _____ 17. EXISTING AND FINAL CONTOURS: Existing and planned (final) contours drawn with
            an interval in accordance with the following:

               MAP SCALE                       GROUND SLOPE                   CONTOUR INTERNAL, FT.
             1 inch = 100 ft or                 Flat    0-2%                         0.5 or 1
                larger scale                    Rolling 2-8%                          1 or 2
                                                Steep 8% - +                        2.5 or 10

        _____ 18. DELINEATIONS AND DESIGNATIONS:
                     _____ a. Existing vegetation and unique vegetation, including wetland vegetation
                     _____ b. Soil series boundaries
                     _____ c. Flood Hazard areas must be delineated if present
                     _____ d. Limits of clearing and grading or subdivision statement
                     _____ e. Undisturbed vegetative buffer on State water/trout streams 25' 35' 100'
                     _____ f. Critical erosion areas
        _____ 19. LOCATION AND DETAIL DRAWINGS FOR ALL STRUCTURAL PRACTICES: The
               location of the erosion and sediment control and stormwater management practices used
               on the site shall be shown using UNIFORM CODING SYMBOLS and specifications which
               meet or exceed standards, both found in "Manual for Erosion and Sediment Control in
               Georgia", Fifth Edition 2000. These shall include, but are not limited to:
                                                                CORRECT SITE              CORRECT DETAIL
                                                                   LOCATION
a. Construction entrance/exit                 Co
b. Sediment barriers                          Sdl
c. Sediment basins/retrofitting               Sd3, Rt
d. Storm drain inlet/outlet protection        Sd2, St
(La on Plan)
e. Ditch checkdams/rock dams                  Cd, Rd
f. Surface roughening                         Su
g. Vegetative stabilization                   Dsl,
Ds2, Ds3
h. Matting Blanket                            Mb
i.



                                                    28
j.

     _____ 20. DISTURBED AREA STABILIZATION: Dsl-Mulching; Ds2-Temporary Seeding; Ds3-
     Permanent Vegetation. A vegetative plan for all temporary
                     and permanent vegetative practices. Include species, planting dates, seeding,
     fertilizer, lime rates, and mulching rates.




                                                   29
                                                                                            Jim Martin, Commissioner
                                                             Kathleen E. Toomey, M. D., M. P. H., Division Director
                                                     Melody A. Stancil, M. D., District Health Director, DHR District 2

                  Georgia Department of Human Resources - Two Peachtree Street, NW - Atlanta, GA 30303-3142
                   Division of Public Health - Two Peachtree Street, NW - Atlanta, GA 30303-3142
        Division of Public Health - District 2 - 1280 Athens Street, SE - Gainesville, GA 30501 (770 535-5743
          Hall County Environmental Health - 450 Prior Street, SE - Gainesville, GA 30501 (770)531-3973

Final Subdivision Checklist
    Developers must turn in a final plat for review prior to providing copies for signing.
Combined on one sheet, the following is required:
1. Proposed lot lines an property line dimensions
2. 2' topography contours
3. Level 3 soil evaluation boundary lines and legend (if a level 3 is done for preliminary review,
     the soil scientist must complete an update at the time of the final. This will reflect any
     alterations when the roads are built)
4. Lot sizes exceeding 2 acres must have soil evaluations in the area of development (where
     the preliminary and secondary sewage systems are to be placed). This soil study area must
     be a minimum of one acre.
5. 50' drain line setbacks from creeks, rivers, streams and lakes
6. 100' drain line setbacks (radius) from all wells or spring heads located within 100' of property
     boundaries
7. Location of flood plain if applicable
8. Location of 1085 elevation in association with property located on Lake Lanier
9. All existing and proposed easements needed for lot size calculation in accordance with Hall
     County Board of Health lot size requirements
10. List of non-restricted area for each lot when calculated by in accordance with the Board of
     Health requirements
11. Soil boundary lines must be placed on the final plat used for recording (this can be done on
     the main plat or as a 2nd sheet (e.g. sheet 2 of 2) etc.)
 Minimum lot size: See attached sheets for lot size calculation (Hall County Board of Health
                                      Resolution, Dec., 2001)
 Developers must turn in a final plat for review prior to providing copies for signing. The
HCEHD may require statements to be placed on the final plat that would be specific to
the development.
                                     Located within the plans:
   A statement about potable water (individual wells or is public water available to this property)
   Lot sizes stated according to Board of Health minimum lot size resolution. This includes the
    total lot square footage, the square footage excluded, and the square footage remaining (total
    minus excluded)
Separate:
•   Soil legend sheets which include soil names, symbol legend, depth to bedrock, depth to
    seasonal high water table, % of slope, estimated percolation rate, depth to optimum
    percolation, provided by soil scientist
• If soil map is updated, must submit a copy of the new soil map showing soil boundaries and
    boring locations
• Vicinity map
• Must pay $25.00 per lot prior to or at time of approval of preliminary plans. The fee is
    charged per lot turned in on the initial review
The HCEHD may require statements to be placed on the final plat that would be specific to
the development.

Please refer any specific questions to either Tim Callahan or Patricia Lacey by calling (770)
531-3973.




                                                     30

								