In the past the Construction
Department:
Loan Numbers were written in a
columnar pad.
Would type the Construction Loan
Request Approval sheet.
Manually calculate the weekly draws
given to each builder for each home.
Checks given to each builder would
by typed.
Clerks kept track of After the inspector
the loan numbers with returned with the
percentage of
columnar pads in progress of each
which they would home it was
write the next loan calculated with the
number with the loan amount and its
property address. first draw. This
The clerk would have would be manually
to type the builder done in a 10-key
calculator.
name, loan number,
the property After the amount was
calculated a check
addresses, sales was typed out for
price, the current each builder with the
loans for that builder corresponding
in the Construction information.
In the present the Construction
Department:
Loan numbers and property
addresses are kept in Excel.
The Construction Loan Request
Approval Sheet is done in Word
The progressing percentages of
each home are imputed in Excel
Check are printed in Solomon.
In an Excel The progressing
spreadsheet it is percentages of each
easier to keep track home are imputed in
of the loan numbers Excel where the draw
and property address. amounts are
automatically
calculated with a
The Construction formula.
Loan Request
Approval Sheet is
done in Word where it The software
is linked with the Solomon keeps all the
Excel spreadsheet builder information
where the loan where the only
number and property information needed is
address are kept. the draw amount and
Therefore, that the check is printed
information is only out.
In future the Construction Department
plans to:
Transfer all the information from Excel and
Word into Access. This will allow it to keep the
loan number automated, all the information in the
Construction Loan Request Sheet will be used for
draw purposes where the draw amounts will be
calculated with formulas. This amounts will be
exported to Solomon where the checks will be
printed. This allow the department to have all
their information in one program, which makes it
easier to use and since information will have to be
entered only once it will also be time efficient.