									                                                                                         IRL ETS 013/03


                                                           Joint Application for the transfer of a GHG
                                                                             Permit
                                                                        Issued: 16 January 2009
For CCU Use Only
Date Received
Date Approved & Signature
ETU Reference Number


Introduction to this form

This form is to be used for all applications for transfer, in whole or in part, of a greenhouse gas emissions trading
permit and/or Registry Account. Any such application must be made jointly by the Operator and the new, proposed
Operator /Transferee. This form (IRL ETS 013/03) comprises three parts: Part A is to be completed by the Operator
and Part B is to be completed by the new, proposed Operator/Transferee, Part C comprises a Joint Declaration
between the Operator and new, proposed Operator/Transferee. Once completed by the Operator and the Transferee,
the form must be jointly submitted to the Environmental Protection Agency. The application for transfer will not be
processed until all sections of the form are completed in sufficient detail and to a satisfactory standard with all
relevant attachments submitted.

Confidentiality Statement
The information submitted in respect of this application will be placed on public file, unless specifically requested
otherwise on grounds of confidentiality. Any request for confidentiality must be justified and will be subject to
acceptance by the board of the EPA. For details on how to submit confidential information please see:
http://www.epa.ie

Completion of the Form
This form has been designed in Microsoft Excel to allow it to be filled in electronically. The Form comprises three
parts: Part A to be completed by the Operator, Part B to be completed by the new, proposed Operator/Transferee,
Part C is a joint declaration of Operator and the new, proposed Operator/Transferee. Once all parts are completed,
you should e-mail the form to GHGpermit@epa.ie and send a signed original, to include Parts A, B and C
along with three copies by post to:
                Climate Change Unit,
                Environmental Protection Agency,
                Regional Inspectorate, McCumiskey House,
                Richview,

                Clonskeagh Road, Dublin 14.

We recommend that any additional information should be submitted in a separate e-mail to this form in order to avoid
potential delivery problems.

Emissions Trading Registry
Where the new, proposed Operator/Transferee does not currently hold an operator holding account in the National
Emissions Trading Registry, it will need to complete the relevant application forms in order to partake in emissions
trading. Please refer to the epa website (www.epa.ie) for further information regarding Emissions Trading and to
download the forms. Any queries can be sent to ETRAdmin@epa.ie

Additional Information
Any additional documents that you want to submit as part of this notification need to be identified in the form
(Sections A5 and B10, as appropriate) with a file name (if submitted electronically) or document reference number (if
submitted as a hardcopy).

We can accept additional information in the following formats:
- Microsoft Word
- Microsoft Excel
- Adobe Acrobat pdfs

Help and Advice

We have made this form as straightforward as possible but please contact us if you need any advice on how to set
out the information we need.

You can contact us by email on GHGpermit@epa.ie

END SHEET INTRODUCTION
                                                    PART A - OPERATOR
Section 1 General Details

1.1              GHG Permit Details:

                 GHG Permit Number
                 EPER/ E-PRTR Number (if exists)
                 IPPC Register Number (if exists)


                 Operator Name
                 Operator Address
                 Registered Company Number


                 Installation Name
                 Installation Number


                 Site Name
                 Site Address




1.2              Authorised Contact:

                 Contact Person
                 Company Position
                 Telephone Number
                 Fax Number
                 Mobile Number
                 Email Address


Section 2 Transfer Details

2.1              Authorised Contact for Transfer:

                 Contact Person
                 Company Position
                 Telephone Number
                 Fax Number
                 Mobile Number
                 Email Address

2.2              Type of Transfer:
                 A partial transfer is required when part of a Schedule 1 activity within your installation is to be transferred to another Operator
                 or when one or more (but not all) of the Schedule 1 activities within your installation are transferred to another Operator. A full
                 transfer is required when all the Schedule 1 activities within your installation are transferred to another Operator.


                 Please tick one of the following as appropriate:
                 The application is for a partial transfer

                 The application is for a full transfer




IRL ETS 013/03                                                          Page 2 of 31
Section 3 Partial Transfer Details

3.1              Schedule 1 Activities:
                 Please identify the Schedule 1 activity or part of the Schedule 1 activity to which the transfer applies (the transferred activity).
                 Your description should be consistent with that given in your permit application and permit and should detail relevant capacities
                 (e.g. thermal) of activities transferred.




3.2              Installation Affected:

                 Please identify the part of the installation in which the transferred activity is carried out (the transferred unit).


                 Please identify the part of the installation in which the transferred activity is carried out (the transferred unit).




IRL ETS 013/03                                                            Page 3 of 31
3.3              Allocation of Allowances from New Entrant Set Aside:

                 If an application for an allocation of allowances from the New Entrant Set Aside (NESA) or CHP Set Aside (CHPSA) has been
                 made but has either not been determined or the full allocation has not been issued, please specify whether the application for
                 allowances from the NESA relates to the transferred unit. The application to the NESA or CHPSA should be identified by
                 reference to either the date of the application or the NESA or CHPSA number, if you have been notified of this.




Section 4 Emissions Trading Registry
                 A FULL transfer of a permit must be reflected in the National Emissions Trading Registry through an installation and account
                 transfer. An installation transfer within the Registry will result in that installation/account being associated with the new,
                 proposed operator.
                 Any allowances that the current operator does not wish to transfer to the new operator should be transferred out of
                 the registry account before the installation is transferred.


4.1              Registry Transaction History:
                 The account transaction history (see Account activity screen) can be transferred to the new operator allowing them to view ALL
                 previous transactions that were executed on this account.

                 Please tick one of the following as appropriate:
                 Transfer registry account transaction history (account activity)

                 Do not transfer registry account transaction history (account activity)




IRL ETS 013/03                                                        Page 4 of 31
Section 5 Additional Information


                 If you are providing any other information that you wish us to take into account please tell us here. Please provide this
                 information in an electronic format wherever possible. You can provide information as Microsoft Word, Excel, and Adobe
                 Acrobat formats.
                 Please avoid supplying non-relevant information as it can slow down the processing of your application. Additional
                 documentation provided should be clearly referenced, and the file name / reference number provided below.
                 Please provide file name(s) (if in an electronic format) or document reference number(s) (if hard copy) below:


                         File name or reference                                           Document description




END SHEET PART A.




IRL ETS 013/03                                                        Page 5 of 31
                                                    PART B -TRANSFEREE
Section 6        Transferee Details

6.1              Transferee Details:

                 GHG Permit Number (if exists)
                 EPER-E-PRTR Number (if exists)
                 IPPC Register Number (if exists)


                 Transferee/Operator Name


                 Transferee/Operator Address




                 Legal Status of Transferee /Operator



                 Registered Company Number


                 Particulars of Registered
                 Office/Address




                 Installation Name
                 Installation Number


                 Site Name
                 Site Address




                                                                         Attachment Reference Number
                 Certified Copy of Certificate of
                 Incorporation


6.2              Authorised Contact:

                 Contact Person
                 Company Position
                 Telephone Number
                 Fax Number
                 Mobile Number
                 Email Address




IRL ETS 013/03                                            Page 6 of 31
Section 7        Management

7.1              Monitoring & Reporting Responsibilities:

                 Contact Person
                 Company Position
                 Telephone Number
                 Fax Number
                 Mobile Number
                 Email Address


Section 8        Emissions Trading Registry
                 A FULL transfer of a permit must be reflected in the National Emissions Trading Registry through an installation and account
                 transfer. An installation transfer within the Registry will result in that installation/account being associated with the new, proposed
                 operator.

                 Does the new, proposed Operator/Transferee already hold an Operator Holding Account in the Registry?
                      YES




                      NO

                 If YES the new, proposed Operator/Transferee must complete Sections 8.1, 8.2 and 8.3 below:

                 If NO then the new, proposed Operator/Transferee must open an Operator Holding Account in the Registry.
                 Full details and required forms are available to download from the EPA website www.epa.ie. or contact ETRadmin@epa.ie

8.1              Primary Registry Contact (PRC):
                 An installation transfer in the registry may require a new PRC for that registry account. In this case, the PRC form must be
                 completed and sent to ETRAdmin@epa.ie.

                 Please tick one of the following as appropriate:
                 There is a change to the PRC

                 There is no change to the PRC

8.2              Primary Account Representative (PAR) & Secondary Account Representative (SAR):
                 An installation transfer in the registry may require a new PAR/SAR for that registry account. In this case, the Change of
                 PAR/SAR form must be completed and sent to ETRAdmin@epa.ie.

                 Please tick one of the following as appropriate:
                 There is a change to the PAR/SAR

                 There is no change to the PAR/SAR

8.3              Verifier:
                 An installation transfer within the registry may require a new verifier associated that registry account. In this case, the PAR/SAR
                 must assign a new verifier to the registry account once the installation transfer is complete.

                 Please tick one of the following as appropriate:
                 There is a change to the Verifier

                 There is no change to the Verifier




IRL ETS 013/03                                                      Page 7 of 31
Section 9           Additional Information
If you are providing any other information that you wish us to take into account please tell us here. Please provide this information in an electronic
format wherever possible. You can provide information as Microsoft Word, Excel, and Adobe Acrobat formats.
Please avoid supplying non-relevant information as it can slow down the processing of your application. Additional documentation provided should
be clearly referenced, and the file name / reference number provided below.
Please provide file name(s) (if in an electronic format) or document reference number(s) (if hard copy) below:

                   File name or reference                        Document description




END SHEET PART B




IRL ETS 013/03                                                        Page 8 of 31
          PART C - JOINT DECLARATION
          Section 10                        Transfer of Liabilities

          In applying for a transfer of the permit the new operator is taking on the liability and responsibility for all legal obligations as
          required under SI 437 of 2004 and amendments and as listed in the greenhouse gas emissions permit. This includes, but is not
          limited to:
          o The duty to submit a verified annual installation emissions report (AIER) by 31 March for emissions during the previous year in
          accordance with SI 437 of 2004, article 14 (2)
          o The duty to ensure that the AIER is verified in accordance with SI 437 of 2004, article 14 (3)
          o The duty to surrender, by 30 April each year, a number of allowances equal to the total emissions from that installation in the
          previous year in accordance with SI 437 of 2004, article 12(3).
          o Any reports or amendments to reports outstanding or required in respect of annual emissions for the previous calendar year.
          o Payment of any excess emissions penalties outstanding in accordance with SI 437 of 2004, article 16.
          o The obligation to surrender an amount of allowances equal to those excess emissions in the following calendar year


          Section 11                        Joint Declaration
          The Operator and new, proposed Operator/Transferee must jointly indicate when the transfer is to take effect and jointly complete,
          sign and seal this Part.

          The EPA will not process any application in the absence of a completed declaration.

          Date that Operator and Transferee propose that the transfer shall take effect


                                                                                     Day (dd)    Month (mm)             Year (yyyy)



          We, the undersigned, having read Section 10 above, hereby submit an application for transfer of a GHG emissions permit,
          pursuant to the provisions of the European Communities (Greenhouse Gas Emissions Trading) Regulations 2004 (S.I. 437 of
          2004) and amendments.

          We certify having regard to Section 13(5)( c) of the Environmental Protection Act 1992 that the information given in this
          application is truthful, accurate and complete.

          Signed by :

          (on behalf of the Operator)

          Print signature name:

          Date :

          Position in organisation :

          Company stamp or seal:



          Signed by :

          (on behalf of the Transferee)

          Print signature name:

          Date :

          Position in organisation :

          Company stamp or seal:




IRL ETS013/03                                                         Page 9 of 31
          Application Instructions
          Once this Form is completed, signed and sealed, and together with all supporting documentation,
          please return by email to GHGPermit@epa.ie.

          Please also send one signed and sealed original and three copies to:

        Permitting,
        Climate Change Unit,
        Environmental Protection Agency,
        Regional Inspectorate,
        McCumiskey House,
        Richview, Clonskeagh Road,
        Dublin 14.
          We may request any further information needed by notice issued under the European Communities (Greenhouse Gas Emissions
          Trading) Regulations 2004 (S.I. 437 of 2004) and amendments.

          Upon receipt of the Application for Transfer of a GHG Emissions Permit and the supporting documentation, the EPA will verify the
          information provided.
          If the information provided is satisfactory, the EPA will update the GHG emissions permit and the Emissions Trading Registry to
          reflect the installation transfer.
          END SHEET PART C




IRL ETS013/03                                                      Page 10 of 31
IRL ETS013/03   Page 11 of 31
IRL ETS013/03   Page 12 of 31
IRL ETS013/03   Page 13 of 31
IRL ETS013/03   Page 14 of 31
IRL ETS013/03   Page 15 of 31
IRL ETS013/03   Page 16 of 31
IRL ETS013/03   Page 17 of 31
IRL ETS013/03   Page 18 of 31
IRL ETS013/03   Page 19 of 31
IRL ETS013/03   Page 20 of 31
IRL ETS013/03   Page 21 of 31
IRL ETS013/03   Page 22 of 31
IRL ETS013/03   Page 23 of 31
IRL ETS013/03   Page 24 of 31
IRL ETS013/03   Page 25 of 31
IRL ETS013/03   Page 26 of 31
IRL ETS013/03   Page 27 of 31
IRL ETS013/03   Page 28 of 31
IRL ETS013/03   Page 29 of 31
IRL ETS013/03   Page 30 of 31
IRL ETS013/03   Page 31 of 31

								
To top