                                         March 1, 2010
                             Request for Statement of Qualifications
                        Infrastructure Construction: Western Portion of
                            Roundhouse Railroad Museum Complex

                                            RFSQ# 10-063



The Coastal Heritage Society is accepting statements of qualification from general contractors for the
Infrastructure Construction: Western Portion of Roundhouse Railroad Museum Complex. Pre-
qualification is mandatory for all contractors who wish to submit bids on this project. Bids will only be
accepted from contractors who are pre-qualified through this process. This request for Statement of
Qualifications is the first step in a two-step process whereby potential bidders are required to:

    1) Submit qualifications, which will be subject to a review process, and
    2) Submit bids for the work

Instructions for preparation and submission of the statement of qualifications are contained in this
package.

The Coastal Heritage Society (CHS) is contracted by the City of Savannah to manage and operate the
physical complex housing the Roundhouse Railroad Museum, Savannah Visitor Information Center, and
Savannah History Museum. For all pre-qualification, bidding, and contractual documents, the Coastal
Heritage Society will be defined as the Owner.

All statements of qualification are due in the Office of the Purchasing Director, 3rd Floor, City Hall, 2
East Bay Street, Savannah, Georgia 31401 (P.O. Box 1027, 31402) no later than 1:30 p.m. on Tuesday,
March 30, 2010. The names of the respondents will be read at the public bid opening shortly thereafter.

Thank you for your interest in doing business with the Coastal Heritage Society and the City of Savannah.


Sincerely,



Stewart Dohrman
Curator of Buildings
Infrastructure for Western Portion of Roundhouse Complex                                 RFSQ #10-063


                                Requirements for Pre-Qualification

1.0    Construction bid specifications are currently being finalized for Infrastructure Construction:
       Western Portion of Roundhouse Railroad Museum Complex. The following is provided for
       reference only. The Coastal Heritage Society reserves the right to revise the scope of work prior
       to bidding. The work included in this project consists of:

              Installation of approximately 144 linear feet (LF) of 4” PVC water line; 636 linear
               feet (LF) of 6” water line; 724 linear feet (LF) of 8” PVC water line; 125 linear feet
               (LF) of 10” water line; and 246 linear feet (LF) of 12” PVC water line including all
               fittings, valves, and appurtenances.

              Installation of approximately 353 linear feet (LF) of 4” PVC sanitary sewer line and
               632 linear feet (LF) of 8” PVC sanitary sewer line including all fittings and
               manholes.

              Installation of approximately 156 linear feet (LF) of 1” chilled water line; 20 linear
               feet (LF) of 1.5” PVC water line; 786 linear feet (LF) of 2” chilled water line; 246
               linear feet (LF) of 2.5” chilled water line; 36 linear feet (LF) of 3” chilled water line;
               340 linear feet (LF) of 4” chilled water line; 804 linear feet (LF) of 5” chilled water
               line; 602 linear feet (LF) of 8” chilled water line; and 1,074 linear feet (LF) of 10”
               chilled water line including all fittings, valves, and appurtenances.

              Installation of approximately 400 linear feet (LF) of 36” RCP storm pipe including
               joints, inlets, manholes, and appurtenances.

              Installation of water chiller and concrete chiller pads including all appurtenances.

              Installation of erosion control measures including all appurtenances.

       Additional work to be completed concurrently with the infrastructure construction includes the
       following:

              Construction of concrete, subterranean tunnel spanning approximately 100’ along
               the north of the Paint Shop (See attached drawings).

              Waterproofing exposed portions of the Paint Shop north façade with EPDM.

2.0    The Coastal Heritage Society will pre-qualify contractors prior to accepting sealed bids. Only
       those contractors who meet the pre-qualification requirements shall be allowed to submit bids on
       this project. The purpose of this RFSQ is to present the requirements for pre-qualification.

       The award of the construction contract will subsequently be made to the pre-qualified bidder with
       the lowest responsive and responsible bid.

3.0    The following information will be used to determine if a contractor is qualified for the specific
       project under consideration. Contractor shall also provide a copy of the Statement of
       Qualifications for each sub-contractor that will be engaged during the work. The Coastal
       Heritage Society reserves the right to disqualify any sub-contractor based upon their ability to
       meet the requirements for pre-qualification. This includes poor past performance on other

                                                   2
Infrastructure for Western Portion of Roundhouse Complex                                 RFSQ #10-063


       Coastal Heritage Society or City of Savannah projects. To be considered, each contractor must
       submit the following information by the indicated deadline:

       3.1    Contractor shall submit information regarding the business entity, its main focus, and its
              personnel.

       3.2    Contractor must include information about their Georgia Contractors License(s)
              including types, numbers, and dates of issuance.

       3.3    Contractor shall submit data concerning the total dollar value of five (5) projects
              successfully completed over the past 5 years.

              3.3.1   Contractor shall submit the total numbers of persons currently employed (broken
                      down into the following categories: management, clerical, professional,
                      technical, skilled labor, and common labor).

       3.4    Contractor must include a list of projects currently under construction, and under
              contract.

       3.5    Contractor shall submit evidence of its financial ability to complete the project. Evidence
              may include Standards and Poor’s rating, credit ratings and information, or other
              financial information.

       3.6    Contractor shall submit evidence of insurability for a project of this type. Contractor
              shall submit evidence of liability ($5,000,000 minimum) and workmen’s compensation
              insurance. Contractor shall submit evidence of liability for all sub-contractors
              ($2,000,000 minimum) and workmen’s compensation insurance. Contractor shall list the
              Coastal Heritage Society as a Named Additional Insured and shall provide a copy of the
              Additional Insured Endorsement. Contractor’s insurance shall serve as the primary
              insurance, over and above and City of Savannah and Coastal Heritage Society policies.

              Contractor shall submit evidence of performance and payment bonding capability
              ($750,000 minimum). Contractor shall provide discussion regarding bonding limit versus
              work under contract, not completed totals. Contractor shall provide a copy of the sub-
              contractor bond, should the contractor choose to require one.

       3.7    Contractor shall submit for the Coastal Heritage Society’s approval the qualifications,
              resume, and a list of project completed by its proposed superintendent(s) for the project.

       3.8    Contractor shall submit for the Coastal Heritage Society’s approval the qualifications,
              resume, and a list of projects completed by its proposed quality assurance /quality control
              employee(s) for the project. As a condition of the contract, the contractor will employ a
              full-time quality assurance/quality control manager assigned to the project.

       3.9    Contractor shall submit evidence of related experience, as the general contractor, in
              construction of similar projects during the past five (5) years. Contractor shall
              demonstrate experience in historic, large commercial, public and/or museum buildings
              containing sensitive and valuable interior contents. Evidence should include client name,
              location of work, description of similar experience gained as part of the project, dollar
              value of the project, project photographs, reference name, and telephone number(s).


                                                  3
Infrastructure for Western Portion of Roundhouse Complex                                  RFSQ #10-063


              Contractor shall submit evidence of related experience in construction of projects that
              include the following items:

                     Installation of approximately 144 linear feet (LF) of 4” PVC water line; 636
                      linear feet (LF) of 6” water line; 724 linear feet (LF) of 8” PVC water line;
                      125 linear feet (LF) of 10” water line; and 246 linear feet (LF) of 12” PVC
                      water line including all fittings, valves, and appurtenances.

                     Installation of approximately 353 linear feet (LF) of 4” PVC sanitary sewer
                      line and 632 linear feet (LF) of 8” PVC sanitary sewer line including all
                      fittings and manholes.

                     Installation of approximately 156 linear feet (LF) of 1” chilled water line; 20
                      linear feet (LF) of 1.5” PVC water line; 786 linear feet (LF) of 2” chilled
                      water line; 246 linear feet (LF) of 2.5” chilled water line; 36 linear feet (LF)
                      of 3” chilled water line; 340 linear feet (LF) of 4” chilled water line; 804
                      linear feet (LF) of 5” chilled water line; 602 linear feet (LF) of 8” chilled
                      water line; and 1,074 linear feet (LF) of 10” chilled water line including all
                      fittings, valves, and appurtenances.

                     Installation of approximately 400 linear feet (LF) of 36” RCP storm pipe
                      including joints, inlets, manholes, and appurtenances.

                     Installation of water chiller and concrete chiller pads including all
                      appurtenances.

                     Installation of erosion control measures including all appurtenances.

                     Construction of poured, reinforced concrete structures.

                     Waterproofing masonry walls using EPDM.

       3.10   Contractor must disclose information on any claims between the contractor and an owner
              within the preceding five years that were filed in court, or resulted in arbitration and the
              refusal by any insurer to renew any insurance policy issued to the contractor within the
              preceding five (5) years. If there have been no claims in the preceding five (5) years then
              the Contractor shall submit in writing a letter that states such.

       3.11   Contractor must disclose information on any projects, including details of any instances
              within the past five (5) years where a surety company has “completed a project” or “paid
              for completion” because of a default termination of a construction contract. If there has
              been no surety company involvement in the preceding five (5) years, then the Contractor
              shall submit in writing a letter that states such.

       3.12   Contractors shall disclose any nonpayment issues with any subcontractors, suppliers, or
              equipment companies. If there have been no issues of nonpayment then the Contractor
              shall submit in writing a letter that states such.

       3.13   Contractor must demonstrate a consistent ability to meet bid prices with a minimum of
              construction related change orders.

                                                   4
Infrastructure for Western Portion of Roundhouse Complex                                   RFSQ #10-063



       3.14   Contractor shall disclose any current litigation. If there is no current litigation then the
              Contractor shall submit in writing a letter that states such.

       3.15   Contractor shall demonstrate an industry standard safety record. The Contractor shall
              submit the following:

              1) An Experience Modifier Rating of 1.0 or less, as determined by the NCCI (National
                 Council on Compensation Insurance), for the preceding three (3) years.

              2) Any OSHA citations or violations in the preceding three (3) years. If there were no
                 citations or violations then the Contractor shall submit in writing a letter that states
                 such.

       3.16   Contractors and sub-contractors will be required to pay fair wage as specified in bid
              documents. Contractor shall provide corporate policies regarding wages paid to
              employees. At a minimum, the City of Savannah and the Coastal Heritage Society
              require wages based on Davis-Bacon wage decisions issued per project. The contractor
              shall provide detail of benefits packages offered to employees. In lieu of benefits, the
              contractor may offer an additional percentage added to the hourly rate as a bonus.

       3.17   A project specific goal for utilization of Minority Women Owned Business Enterprises
              (M/WBEs) as suppliers and/or sub-contractors will be established prior to bidding.

              The contractor shall submit M/WBE Compliance Plan to demonstrate their corporate
              policy regarding M/WBEs and their recent history involving achievement of M/WBE
              utilization goals. Attach a separate sheet detailing your compliance plan and the
              methodology you propose to achieve the specified utilization goal.

                  a) Please attach information to demonstrate your corporate policy regarding
                     M/WBEs and your recent history involving achievement of M/WBE utilization
                     goals. This information will be close reviewed by the City of Savannah and
                     Coastal Heritage Society before including the Contractor on the pre-qualification
                     list.

                  b) Please attach a separate sheet detailing the proposed methodology to achieve the
                     specified goal.

       3.18   Each respondent shall supply information on the Statement of Qualification Form
              provided. Additional pages may be attached as needed but responses shall be in the order
              as listed in the request and numbered accordingly. The submittal must be signed by a
              corporate officer or principal. Four (4) copies of the submittal area required.

       3.19   The Coastal Heritage Society will review all submittals and determine the pre-
              qualification status of all respondents. A list of pre-qualified contractors will be prepared
              at the completion of this review and sent to all respondents to this RFSQ.

       3.20   Contractor shall demonstrate a familiarity with the Secretary of the Interior’s Standards
              for the Treatment of Historic Properties.



                                                   5
Infrastructure for Western Portion of Roundhouse Complex                  RFSQ #10-063


       SUBMITTED BY:


       CONTRACTOR:


       BY:
                                   Signature

       NAME (PRINT):


       ADDRESS:


       CITY/STATE:                                                 ZIP:


       TELEPHONE: (         )                      FAX: (         )
                     AREA CODE                             AREA CODE


       FEDERAL TAX IDENTIFICATION NUMBER:



       INDICATE MINORITY OWNERSHIP STATUS OF BIDDER (FOR STATISTICAL
       PURPOSES ONLY):
       CHECK ONE:
            NON-MINORITY OWNED            ASIAN AMERICAN
            AFRICAN AMERICAN              AMERICAN INDIAN
            HISPANIC                      OTHER MINORITY
            WOMEN




                                               6
Infrastructure for Western Portion of Roundhouse Complex                     RFSQ #10-063


                            STATEMENT OF QUALIFICATIONS

       4.1     FIRM NAME/ADDRESS/PHONE/FAX




       4.1.1   YEAR FIRM ESTABLISHED

       4.1.2   SPECIFY TYPE OF OWNERSHIP

       4.1.3   NAMES OF TWO PRINCIPALS TO CONTACT: TITLE/TELEPHONE




       4.2     GEORGIA CONTRACTOR LICENSES:

               Type                        License No.               Year issues

               Type                        License No.               Year issues

               Type                        License No.               Year issues


       4.3     TOTAL VALUE OF PROJECTS COMPLETED (PAST ____ YEARS): $_________

       4.3.1   CURRENT EMPLOYMENT (NUMBERS OF EMPLOYEES): TOTAL

               Management________         Clerical________    Professional________

               Technical__________        Skilled Labor________ Common Labor________

       4.4     PROJECTS CURRENTLY UNDER CONSTRUCTION:




                                             7
Infrastructure for Western Portion of Roundhouse Complex          RFSQ #10-063



       4.5    PROJECTS CURRENTLY UNDER CONTRACT:




       4.6    EVIDENCE OF FINANCIAL ABILITY TO COMPLETE THE PROJECT




       4.7    EVIDENCE OF INSURABILITY AS AN ATTACHMENT:


       4.8    EVIDENCE OF ABILITY TO BOND THIS PROJECT AS AN ATTACHMENT:


       4.9    PROPOSED SUPERINTENDENT AND/OR PROJECT MANAGER
              NAME/ADDRESS:




                                             8
    4.10   SELECTED PROJECT EXAMPLES:


       Project Name   Owner Name and    Location/Description   Bid $   Final $    # of     Projected     Actual
                       Phone Number                                              Change   Completion   Completion
                                                                                 Orders      Date         Date




9
                                                                                                                    Infrastructure for Western Portion of Roundhouse Complex
                                                                                                                    RFSQ #10-063
     4.11     SIMILAR PROJECTS – HISTORIC:


            Project Name   Owner Name and    Location/Description   Bid $   Final $    # of    Completion    Bond
                            Phone Number                                              Change     Date       Amount
                                                                                      Orders




10
                                                                                                                     Infrastructure for Western Portion of Roundhouse Complex
                                                                                                                     RFSQ #10-063
     4.12     SIMILAR PROJECTS – LARGE COMMERCIAL:


            Project Name   Owner Name and   Location/Description   Bid $   Final $    # of    Completion    Bond
                            Phone Number                                             Change     Date       Amount
                                                                                     Orders




11
                                                                                                                    Infrastructure for Western Portion of Roundhouse Complex
                                                                                                                    RFSQ #10-063
     4.13     SIMILAR PROJECTS – PUBLIC BUILDINGS:


            Project Name   Owner Name and   Location/Description   Bid $   Final $    # of    Completion    Bond
                            Phone Number                                             Change     Date       Amount
                                                                                     Orders




12
                                                                                                                    Infrastructure for Western Portion of Roundhouse Complex
                                                                                                                    RFSQ #10-063
     4.14     SIMILAR PROJECTS – MUSEUMS:


            Project Name   Owner Name and   Location/Description   Bid $   Final $    # of    Completion    Bond
                            Phone Number                                             Change     Date       Amount
                                                                                     Orders




13
                                                                                                                    Infrastructure for Western Portion of Roundhouse Complex
                                                                                                                    RFSQ #10-063
Infrastructure for Western Portion of Roundhouse Complex                            RFSQ #10-063


       4.15   DEMONSTRATED EXPERIENCE – URBAN SETTINGS (DESCRIBE):




       4.16   DEMONSTRATED EXPERIENCE WITH INFRASTRUCTURE PROJECTS OF AT
              LEAST $500,000:

        Project Name    Owner Name/Phone       Location/Description      Bid $          Final $




       4.17   PROJECTS COMPLETED ON TIME WITH MINIMAL CHANGE ORDERS:

                                                               # of     Projected       Actual
        Project
                  Owner Name/ Phone    Bid $        Final $   Change   Completion     Completion
         Name
                                                              Orders      Date           Date




                                               14
Infrastructure for Western Portion of Roundhouse Complex                    RFSQ #10-063


       4.18   DISCLOSURE OF CLAIMS:




       4.19   DISCLOSURE OF NON-PAYMENT ISSUES:




       4.20   DISCLOSURE OF ANY CURRENT LITIGATION:




       4.21  DEMONSTRATED SAFETY RECORD:
        1) Experience Modifier Rating of 1.0 or Less:




        2) Disclosure of any OSHA Citations in Preceding three (3) years:




                                                15
Infrastructure for Western Portion of Roundhouse Complex                            RFSQ #10-063


       4.22   MINORITY/WOMEN OWNED BUSINESS ENTERPRISES:
              (Please attach information demonstrating your corporate policy regarding M/WBEs and
              your recent history involving achievement of M/WBE utilization goals)

            Project              Owner                                      M/WBE        M/WBE
                                                     Project Description
        Name/Description   Name/Address/Phone                               Goal %       Actual %




       4.22   DEMONSTRATED FAMILIARITY WITH SECRETARY OF THE INTERIOR’S
              STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES (EXPLAIN):




       4.23   PROPOSED QUALITY CONTROL PERSONNEL (NAME/ADDRESS/COMPLETED
              PROJECTS):




                                                16

				