                          OWNER / DEVELOPER PROJECT SCHEDULE

Project Address


             Project Number            40

Development Overview:


Proposed Number of Units / Houses                      1

Owner(s) / Developer



                                 Phone:
                                 Mobile:
                                 Email:


Development Consultant:          Abode Design & Construct
                                 P.O.Box 1210
                                 Niddrie, Victoria, 3042

                                 Phone: 1300 737646
                                 Fax: (03) 8648 6363
                                 Email: enquiry@abodedac.com.au
The contents in this package are for the sole purpose of being informative for the planning of a
residential development as noted. Stage quotes do not have to be signed until that particular stage
is in readiness or advised by Abode Design & Construct. Quotes are subject to change.

                            FEASABILITY STUDY / DETAILLED COSTINGS

This feasability / costing study covers the basic costs PREDICTED for a planned project. Although
comprehensive, it may not cover all items incurred in a project. Some items are quotes, others
estimates based on initial information or assumptions.

This study is all inclusive of all predicted items required for a project. However, it does not cover
expenses such as tax, holding costs or solicitors / conveyancing fees. All government, and agents
fees or taxes are just allowances - not actual calculated rates.

                   Purchase Price of Land          $         -     (optional - for feasibility only)
                   Stamp Duty (approx)             $         -
                   Net Price of Land                               $                 -

TOWN PLANNING PERMIT
  Town Planning Permit Documentation               $         -
  Application Fee (Council)                        $         -
  Advertising Fee (Council)                        $         120
  Aborigional Heritage (if required)                               $                 120

BUILDING PERMIT
  Building Pemit Material                                          $                 -

SUBDIVISION PERMIT
  Subdivision Preparation / Submission (Land Surveyor)              $            -
  Titles Office / Conveyancer                                       $            -          $          -
                                                                   (suggested $750)
CONSTRUCTION
    DWELLING 1              Area:           (floor)                         (m2)             (squares)
                                    Total Area - Basement                                       0.00
                                    Total Area - Ground Floor               100                10.76
                                    Total Area - 1st Floor                                      0.00
                                    Total Area - 2nd Floor                                      0.00
                                                                            100                10.76
                                            Construction Cost: $                              28,555.67


    DWELLING 2              Area:           (floor)                         (m2)             (squares)
                                    Total Area - Basement                                       0.00
                                    Total Area - Ground Floor                                   0.00
                                    Total Area - 1st Floor                                      0.00
                                    Total Area - 2nd Floor                                      0.00
                                                                              0                 0.00
                                            Construction Cost: $                                     -

    DWELLING 3              Area:           (floor)                         (m2)             (squares)
                                    Total Area - Basement                                       0.00
                                    Total Area - Ground Floor                                   0.00
                                    Total Area - 1st Floor                                      0.00
                                    Total Area - 2nd Floor                                      0.00
                                                                              0                 0.00
                                            Construction Cost: $                                     -

    DWELLING 4              Area:           (floor)                         (m2)             (squares)
                                    Total Area - Basement                                       0.00
                                    Total Area - Ground Floor                                   0.00
                            Total Area - 1st Floor                  0.00
                            Total Area - 2nd Floor                  0.00
                                                            0       0.00
                                    Construction Cost: $                   -

DWELLING 5          Area:           (floor)                (m2)   (squares)
                            Total Area - Basement                    0.00
                            Total Area - Ground Floor                0.00
                            Total Area - 1st Floor                   0.00
                            Total Area - 2nd Floor                   0.00
                                                            0        0.00
                                    Construction Cost: $                  -

DWELLING 6          Area:           (floor)                (m2)   (squares)
                            Total Area - Basement                    0.00
                            Total Area - Ground Floor                0.00
                            Total Area - 1st Floor                   0.00
                            Total Area - 2nd Floor                   0.00
                                                            0        0.00
                                    Construction Cost: $                  -

DWELLING 7          Area:           (floor)                (m2)   (squares)
                            Total Area - Basement                    0.00
                            Total Area - Ground Floor                0.00
                            Total Area - 1st Floor                   0.00
                            Total Area - 2nd Floor                   0.00
                                                            0        0.00
                                    Construction Cost: $                  -

DWELLING 8          Area:           (floor)                (m2)   (squares)
                            Total Area - Basement                    0.00
                            Total Area - Ground Floor                0.00
                            Total Area - 1st Floor                   0.00
                            Total Area - 2nd Floor                   0.00
                                                            0        0.00
                                    Construction Cost: $                  -

DWELLING 9          Area:           (floor)                (m2)   (squares)
                            Total Area - Basement                    0.00
                            Total Area - Ground Floor                0.00
                            Total Area - 1st Floor                   0.00
                            Total Area - 2nd Floor                   0.00
                                                            0        0.00
                                    Construction Cost: $                  -

DWELLING 10         Area:           (floor)                (m2)   (squares)
                            Total Area - Basement                    0.00
                            Total Area - Ground Floor                0.00
                            Total Area - 1st Floor                   0.00
                            Total Area - 2nd Floor                   0.00
                                                            0        0.00
                                    Construction Cost: $                  -

              TOTALS:
                    Area:           (floor)                (m2)   (squares)
                            Total Area - Basement            0       0.00
                            Total Area - Ground Floor       100     10.76
                            Total Area - 1st Floor           0       0.00
                            Total Area - 2nd Floor           0       0.00
                                                           100     10.76
                    Cost:
                                  ESTIMATED Construction: $                              28,555.67


SUBDIVISION (Works)             ESTIMATED Subdivision Cost: $                                     -
                                 (refer to Subdivision section and input final cost manually).

SITE IMPROVEMENTS / SITE PREPARATION
                                         ESTIMATED Site Cost: $                             5,660.33
                                  (refer to Site Costs section and input final cost manually).

TOTAL OUTLAY                                      $      34,336 (including land)

                 Sale of Unit 1   $                          -
                 Sale of Unit 2   $                          -
                 Sale of Unit 3   $                          -
                 Sale of Unit 4   $                          -
                 Sale of Unit 5   $                          -
                 Sale of Unit 6   $                          -
                 Sale of Unit 7   $                          -
                 Sale of Unit 8   $                          -
                 Sale of Unit 9   $                          -
                Sale of Unit 10   $                          -     $               -
      (minus) Real Estate Fees    $                          -

TOTAL INCOME                       $                         -

GROSS PROFIT                      -$              34,335.99




                              GENERAL PROCESS / PROCEEDURES:

TOWN PLANNING PERMIT (if required)
   Abode Design & Construct conduct the entire process required with Town Planning (TP).
   Unlike a pure design / architectural firm, all elements are performed and invoiced under
   the one account / quote (see attached quote for more details).

   Although required manditorily for the design approval, the owner / developer does not
   need to be heavily involved with the project unless they decide to be. All liaising, and
   tasks are performed for the developer in an efficient and timely manner based upon
   knowledge of how the industry works or can be manipulated.

   Almost all developments are done to be profitable, so this therefore become the major
   goal; and with all profit goals such as these - time is money!

                                                  Task                                  Responsible
                  1) Initial consulation / site visit
                  2) Preparation of recommendations, quotes / feasability                     Abode
                       study.
                  3) Owner(s) / Developer to sign Quote and pay deposit                       Owner
                       as acceptance. No works will begin until this is
                       satisfied.
                  4) Request land survey, feature survey, arborist report (if reqd).          Abode
                  5) Take site & surrounding area photos and report.                          Abode
                  6) Search titles & restrictions. Begin initial concept                      Abode
                       drawings / sketches. Send to developer for feedback.
                       This cannot fully start until land survey is returned.
                  7) Have concept drawings approved in principal by owner.                    Owner
                  8) Begin final draft of architectural drawings.                             Abode
                  9) Begin written responses.                                                 Abode
                 10) Final approval by Owner. Acceptance made by                Owner
                       payment of 50% draw-down and issue of cheque for
                       lodgement to Council (application fee).
                 11) Printing of plans, documents and submit to Council.        Abode
                       Hard copy of plans sent to developer via post.
                 12) Acceptance of plans letter sent from Council to Abode.     Council
                 13) Letter of further information requested by Council sent    Council
                       to Abode.
                 14) Further information responded to. This may include         Abode
                       alterations to plans, addition of certain information or
                       preparation of a landscape plan. Each Council varies.
                 15) Deveoper to approve modified application.                  Owner
                 16) Re-submission to Council.                                  Abode
                 17) Council accept re-submission and elects to "Advertise"     Council
                 18) Errect an advertising sign at front of site and possibly   Abode
                       have to sent information to adjoining neighbours.
                 19) Pull down advertising sign, sign a "stat dec" and          Abode
                       return to council.
                 20) Call council for advice on objections and what process     Abode
                       to take from this point on.
                 ***OFTEN ABODE WILL BEGIN BUILDING PERMIT AT THIS STAGE***
                 21) Council Issue a "Notice of Decision" with Conditions.      Council
                 22) Owner to pay final invoice.                                Owner
                 23) Condition 1 requirements to be responded to.               Abode
                 24) Re-submission of final plans to council for "Endorsement"  Abode
                 25) Receive final "Endorsed" stamped plans from Council        Council
                 26) Send copy of plans and permit to developer.                Abode


BUILDING PERMIT
  If a Town Planning Permit has been approved, this process is very straight forward as
  no additional design input is required. It is simply a process of events to be performed.

  This stage of the development is more controlable as Council is no longer as much of an
  impact on the event. Most items required are done in the private sector whereby AbodeDAC
  has relationships with the consultants.

                                                 Task                                  Responsible
                 1) Initial consulation / site visit (if required)
                 2) Preparation of recommendations, quotes / feasability                  Abode
                      study.
                 3) Owner(s) / Developer to sign Quote and pay deposit                    Owner
                      as acceptance. No works will begin until this is
                      satisfied.
                 4) Request land survey (if required), soil test, property                Abode
                         information, working drawings, energy rating etc.
                 5) Request engineering (once soil test returned).                        Abode
                 6) Submit for build over easment permits (if required)                   Abode
                 7) Submit for drainage plan approval from Council (if required)          Abode
                 8) Apply for any accompanying permits (if required) such as              Abode
                         developer's consent, septic, etc.
                 9) Compile all information and issue to owner / developer.               Abode
                 10) Final approval by Owner. Acceptance made by                          Owner
                         payment of final draw-down.
                 11) Issue to Building Surveyor all documents.                           Abode
                 12) Building Surveyor issue a letter of further information.           Surveyor
                 13) Respond to further information which may include                    Abode
                         alterations to drawings, engineering or additional info.
                 14) Re-submission to Building Surveyor.                                  Abode
                 15) Builder to supply "Warranty Insurance" and general                   Builder
                         details, pay and collect permit from Building Surveyor.
SUBDIVISION
  The subdivision process is different eact time as a result of varying elements such as
  stage of developement, location, site siting, Council, Authorities and size of development.
  For these reasons, it is hard to detail the exact process (and cost) until the application
  is submitted and the Authorities respond. A brief overview is supplied below.

                                                Task                                  Responsible
                 1) Owner(s) / Developer to sign Quote and pay deposit                   Owner
                      as acceptance. No works will begin until this is
                      satisfied.
                 2) Request land surveyor to initiate process and begin site             Abode
                         visits, survey and field notes.
                 3) Surveyor to present initial subdivision for owner approval.         Surveyor
                 4) Initial approval by Owner. Acceptance made by issue of               Owner
                         cheque for lodgement to Council (application fee)
                 5) Council to approve subdivision plans / sketches                    Council
                 6) Council to make referrals to all appropriate Authorities           Council
                 7) Contact Authorities for details on requirements / fees.             Abode
                 8) Pay Authorities fees & perform requested works.                  Owner / Abode
                 9) Get letters of compliance from Authorities - send to Council        Abode
                 10) Have Council issue a statement of compliance.                     Council
                 11) Payment of final draw-down by owner.                               Owner
                 12) Issue statement of compliance to Titles Office.


CONSTRUCTION

  During the construction process, Abode Design & Construct act as builders' consulatants
  and work for the interests of both parties. AbodeDAC receive a commission from these builders.

  Deals & agreements have been established with the selected builders as a result of the
  many opportunities that are presented to a builder such as multiple projects, network
  pricing, less direct owner / developement contact and all pre-construction paperwork
  being performed for the builder. It is for these reasons, that ALL COMMUNICATION
  (where possible) should be done via AbodeDAC. The nominated registered builder has all
  legal ties, responsibilities and other legislated tasks with the end owner / developer,
  however, the pre-arranged agreement is made so the builder can be left to BUILD.

  Contracts are made between the owner / developer and the builder and all payments
  whether direct or from the bank are generally made directly to the builder.

        GENERAL PROCESS:
                 Pre-Construction Phase

                 1) Initial consulation / site visit as required. Owner to supply initial drawings
                 2) Preparation of recommendations, basic estimation / feasability study with optioned
                      specifications list. This will all be done on the internet.
                 3) Owner to review estimation / specifications list and select options.
                 4) Have FINAL architectural and engineering drawings issued.
                 5) Abode to update specifications list and create revised pricing. This to be emailled to
                      owner / developer for final approval or final suggestions.
                 6) Owner to approve final documentation.
                 7) Preparation of all legal documents for signing by owner / developer.
                 8) Signing of all contracts and documents by owner / developer. 3 copies of the contracts
                      are to be signed - 1 x Builder, 1 x Owner & 1 x AbodeDAC. The contracts will include the
                      working drawings, engineering, specifications list and title particulars. Abode to collect
                      5% deposit cheque (or arrange Direct Deposit) to initiate contract and alert builder to
                      obtain Warranty Insurance for the building permit to be issued.
                 9) Builder to sign all contracts.
                 10) Origional copy of the contract to be sent to the Ower / Developer.
      Construction Phase
      Note: Refer to contract for full obligations and requirements.

      1) Builder to issue Owner / Developer a letter of commencement stating the official start
      date of the contract and works. This letter will also state that the Owner / Developer is
      not permitted on site without consent and escort from the builder or builders' consultant.
      2) Owner / Developer to supply to builder proof of ability to pay the contract; this may be
           in the form of a bank letter / guarantee, or supply a monthly statement of available
           funds in the bank. This is a standard proceedure that the bank will happily comply with.
      3) Builder to commence works on site as per contract.
      4) Stage Payments - at completion of each stage, the builder will issue the Owner /
      Developer a tax invoice for the agreed draw-down to be presented to the bank.
      At this stage it is appropriate for the owner to request a site inspection to see progress
      of works.
      5) Stage draw-down made available to the builder.


      Variations / Extras
      Note: Payment of any Variation Requests are generally done at the end of the current
      stage unless prior arranged.

      1) Any variation or extra requested by the owner / developer MUST be done in writing via
          the Variation Request form. This must be fully completed and returned to AbodeDAC.
      2) Variation Request form to be sent to builder for approval and / or response with
          cost involved for the variation.
      3) Final approval (of additional costs - if required) by Owner / Developer. Copies to be
          signed and returned to both Owner / Developer and builder and becomes part of the
          contract.
      4) Proof of ability to pay this Variation Request or up-front payment of this may be
          requested at this stage.

      Hand-Over
      Note: Keys and final hand-over kit will not be issued until full and final payment has been
      paid. All other long-term responsibilities as per signed contract.

      1) Owner / Developer will be invited onto site for an intial inspection of the works at an
          appropriate time nominated by the builder. This will be an opportunity to walk-through
          the developement and make a list of items required to satisfy the contract. These
          items may include inclusions / specifications or defects.
      2) Official letter of final tasks to complete to be issued to builder.
      3) Builder to complete final tasks within Standard Tollerances.
      4) Final inspection of site to approve house for hand over.
      5) Builder to apply and obtain Certificate Of Occupancy.
      6) Owner / Developer to organise and make full and final payment of contract including all
          additional Variation Requests approved and completed.
      7) Builder to make available "Hand Over Kit" which will include all relevant documentation
          and insurances, remotes, manuals etc.
      8) All future maintenence, warranties and repairs should be done DIRECT to builder via
          writing or by standard practices nominated by builder.

SUGGESTED NOTES:

      These suggestions are made in the best intentions and are made as a result of years of
      experience into past issues, delays and conflicts. Generally they are made only to make
      the construction process smoother, faster and cheaper.

      *Eliminate any changes to plans, designs and specifications. This causes delays,
           confusion and extra costs. This is the number 1 issue on a building site.
      *If a Variation or change in design, colour or option is required, try to reduce the amount
           requested, and keep them to suitable times (ie only present these prior to the stage) -
           this will allow multiple changes in mind with the final decision the only one the builder
           is aware of.
*Do not give a builder any excuse to foward blame or responsability to you. This is an
    easy way to create extras and time extensions or general excuses. To avoid this,
    refer to first point, keep site visits and direct contact with builder at a minimum.
*Keep money / stage payments flowing. Quick paying site is a quick site.
*Faults, errors and issues are a weekly occurance on a building site. Houses are not
    purchased "off the shelf" and greatly affected by site constraints, weather and trades.
    Try to ignore this aspect of the project unless you feel it simply it has not been made
    aware to the builder. Generally these items get rectified during the course of the project.
    A house in never finished until it is finished. This component of construction is very
    stressful - leave the stress to the builder / consultant as this is just part of the industry.
*Standards & Tollerances - each property built in Victoria is suject to legislated "Standards
    and Tollerances". This basically refers to a starndard that is acceptable for any
    construction work and the level of finish that is acceptable. No house / unit, regardless
    of the builder, trades or contract amount will ever be flawless due to the nature of what
    is being done/ Therefore, you should always refer to the Building Commission of Victoria's
    publification in this matter to determine if something is acceptable or not.
*ENJOY this exciting stage of your life! Dont take anything to personal - allow the
    builder and consultant take away the stress and make this an enjoyable process...
                                                                                    Wednesday, May 16, 2012

                       QUOTE – TOWN PLANNING APPLICATION
Project Address                            0
                                           0

Owner(s) / Developer                       0

Development Overview:                      0
                                           0

I have pleasure in formally submitting this quote to perform the necessary tasks in the
preparation, submission and co-coordinating the necessary tasks to obtain a town planning permit.

As noted below, the degree of documentation and level of work that is placed in a permit
presented by Abode Design & Construct is extensive. This is to maximise the opportunity for approval
by having thorough, quality applications, while reducing costs for subsequent stages such as
subdivision and construction. These tasks are:

  TRUE       Architectural Drawings                                          1 Units
                         Neighbourhood Character Plan
                         Site Plan
                         Design Response / Floor Plans
                         Elevations
                         Shadow Diagrams
                         Concept Landscape Plan
                         Materials Schedule
                         Other Necessary Details
                                 Photos of streetscape / neighbouring properties
                                 Possible screening details
                                 Building / height envelopes

             Land Survey - this task is done by fully qualified and registered land surveyor. This
                 part of the process costs around $3,600 and is not compulsorary at this stage, but will
                 be during the subdivision stage. This extra cost during the Town Planning Stage makes
                 for a much better and more accurate development.
             TRUE      Feature Survey - by Land Surveyor
                                 Site existing conditions including trees, house, sheds, driveways,
                                     power poles, telephone pits, etc.
                                 Surrounding existing conditions including adjoining property's
                                     houses, eave / ridge heights, windows, trees, open space,
                                     fences, sheds, etc.
                                              This survey is very useful during construction as it also
                                              locates all services, and possible issues prior to
                                              construction starting.
             TRUE      Relocation & Contour Survey
                             Relocation Survey:
                                 This is a survey of existing fence locations in comparison to where they
                                 are meant to be located as per title. This is to be used for subdivision
                                 also and ensure that a design is not made that cannot be catered for in
                                 reality during the construction phase. Abosolutely recommended - will
                                 save $$$ later
                            Contour Survey:
                                 A survey that illustrates existing heights of the property and surrounds.
                                 This survey will show any rise / fall in land and is one of the most
                                 important guides in constructing on your land.


  TRUE     Town Planning Reports
                  Response to ResCode
                            A formal report required by Council illustrating that we have looked at all
                            the guidelines setout by ResCode as well as Local Council Policy.
                  Design Response
                            A written report detailing the proposal’s key designs, and how they
                            respond to the neighbouring houses. It talks about:
                                             Design
                                             Materials used
                                             Impact on adjoining properties / streetscape.

FALSE   3rd Party Report                                                                      $         -
                    Report conducted and prepared by Hansen Partnership (renown Town Planning
                      firm with the highest of respect from all of the town planning community). This
                      report will set out realistic guidelines as to what can be achieved on the
                      development site in terms of:
                           -no of dwellings / units
                           -building footprints
                           -key issues, areas to be mindful of
                           -key site advantages.
                           -local policy
                    This report will be the basis of any design and should not be disputed. It is certainly
                      not compulsorary, but money well spent!

FALSE   Landscaping Plan                                                                   $          -
                Complete landscaping plan as required by Council. This step WILL be compulsorary at
                  some stage of the application (whether as part of the process or as a condition of the
                  permit. The completed landscaping plan will include:
                           -Landscape plan
                           -General Notes
                           -Landscaping Legend
                           -Planting details / Notes

FALSE   Arborist Report                                                                         $           -
                 This will ONLY be required IF the site has significant trees / plants and the site is in a
                   council that has more strict landscaping / vegitation policy. This option will generally be
                   made upon request

FALSE   Traffic Engineers Report                                                              $           -
                  This will ONLY be required IF the site cannot support car parking on site or the site is located
                   off a Vicroads Category 1 road and access is an issue or a basement carpark and
                   car parking dispensation is sought. This option will generally be made upon request
                   from Council.

FALSE   Aborigional Heritage Management Plan                        $0 (estimated min. Cost TBC)
                This will ONLY be required IF the site falls within an area designated to be significant
                  to local traditional Aborigional tribes where past activity is likely. Such areas would be near
                  rivers or lakes. It is a very uncommon item to have performed, but should be investigated if
                  your site is near a river or lake.

TRUE    Council Liaising (included)
                 Application Lodgement
                 Council Liaising / meetings
                 Application co-ordination and time supervision
                           QUOTE $                                 -      (incl. GST and all above points)


                          Payment:
                                                25% Upon Acceptance of Fee Proposal                                      $              -
                                                50% Prior to Lodgement to Council                                        $              -
                                                25% Upon Decision from Council                                           $              -

This fee does NOT include the following:
            Council application fee (approx)                     $ -
            Council Advertising fee (approx)                     $ 120
            VCAT appeals. Separate fee proposal will be issued for additional drawings and works required
              for a VCAT appeal. This will generally be at an hourly rate and will factor any discount or rebate
              for reduced workload from early withdrawal from a Town Planning permit at Council (ie. At time of
              further info).



Quote Accepted:




              Developer




fine print:
                 All costs incurred with the recovery of debts will be liable to the developer noted above. Owner acknowleges that
                          Abode Design & Construct Pty Ltd have a caveatable interest in the property as a result of these works.
                 Due care is taken with application; however a guarantee of outcome can not be made.
                 No responsibility is taken by Abode Design & Construct or its associated representatives for rejected applications.
                 A maximum of 2 reasonable alterations to plans along with a compulsorily “condition 1” change is allowed for in
                          quote. All subsequent changes / alterations made by developer will be charged at an agreed rate.
                 Quotes are valid for 30days from date of document.




  "Our team of highly skilled designers, planners, suppliers and builders are passionate about supporting
residential investors to complete profitable and efficient property development and to love the experience."
 the site is located




 as would be near
d be investigated if
il (ie. At time of
                                                                                       Wednesday, May 16, 2012

                       QUOTE – BUILDING PERMIT MATERIAL

Project Address                             0
                                            0

Owner(s) / Developer                        0

Development Overview:                       0
                                            0

I have pleasure in formally submitting this quote to perform the necessary tasks in the
preparation, submission and co-coordinating the necessary tasks to obtain a building permit as follows:

  TRUE       Working Drawings (prepared by qualified and registered draftsperson)
                  a. Site Plan (including drainage to legal point of discharge)
                  b. Floor Plans
                  c. Elevations
                  d. Sections
                  e. Other Details (as required)
                          i. Stairs
                          ii. Balustrade
                         iii. Deck / balcony
                  f. Window Schedule
                  g. Electrical diagram

  TRUE       Soil Test (prepared by fully qualified and registered Geotech engineer)

  TRUE       Energy Rating Report
                  a. 5 Star energy rating report as required by law (including nomination of either
                                 solar hot water or rain water tank).

  TRUE       Engineering (prepared by fully qualified and registered Engineer)
                  a. Structural Engineering
                          i. Foundation
                         ii. Lintels / beams
                         iii. Joists (if required)
                         iv. Steel (if required)
                         v. Retaining walls (if required)
                  b. Form 11 (certification certificate)
                  c. Computations

  TRUE       Other information:
                   a. Property Information
                          i. Legal Point of discharge
                          ii. Termite, Flood, Bushfire & Planning info
                   b. Build Over Easement Applications (if required).
                   c. Asset Protection (from adjoining properties) – if required
                   d. Developers Consent (if required)
                   e. Council Consent (if required)

  TRUE       Drainage Plan / Retention System
                   a. Drainage Plan as requested by Council - Retention system with pits, grates and
                        PVC storm water retention to Council's nominated Legal Point of Dsicharge
                   Building Surveyor Liaising
                         a. Submission to surveyor
                         b. Follow up of further information / general liaising


                              QUOTE $                                -      (incl. GST and all above points)


                             Payment:
                                                   35% Upon Acceptance of Fee Proposal
                                                   65% Prior to Lodgement to Building Surveyor

 This fee does NOT include the following:
              Surveyor application fee - generally paid by builder
              Contour / Feature Survey (if required)
              Developers Consent (if required)
              Council Consent / Dispensation (if required)
              Septic / Additional Permits (if required)




 Quote Accepted:




               Developer




 fine print:
                     All costs incurred with the recovery of debts will be liable to the developer noted above. Owner acknowleges that
                             Abode Design & Construct Pty Ltd have a caveatable interest in the property as a result of these works.
                    Due care is taken with application; however a guarantee of outcome can not be made.
                    No responsibility is taken by Abode Design & Construct or its associated representatives for rejected applications.
                    A maximum of 2 reasonable alterations to plans along with a compulsorily “further information” change is allowed for in
                             quote. All subsequent changes / alterations made by developer will be charged at an agreed rate.
                    Quotes are valid for 90days from date of document.




  "Our team of highly skilled designers, planners, suppliers and builders are passionate about supporting
residential investors to complete profitable and efficient property development and to love the experience."
0




0

0



0




0




0
                                                                                        Wednesday, May 16, 2012

                       QUOTE – SUBDIVISION

Project Address                               0
                                              0

Owner(s) / Developer                          0

Development Overview:                         0
                                              0

I have pleasure in formally submitting this quote to perform the necessary tasks in the
preparation, submission and co-coordinating the necessary tasks to obtain a subdivision and
associated titles. The below scope of works generally covers all the co-ordination of the
below tasks along with the surveying aspects:

 1. Surveying (performed by qualified and registered land surveyor)
         a. Relocation / feature survey with field notes.
         b. Drawing of proposed title boundaries and plan of subdivision.
         c. Issue to Council as subdivision application for approval.
         d. Amendments to drawings as required by Council.
         e. Approval of plan of subdivision drawings.

 2. Authority Referrals
            A number of authorities will be notified of the intent to subdivide such as Water
            Board, Power Board, Telstra, Gas, etc. They will need to respond to council (via
            the applicant) with a compliance certificate. To obtain a compliance certificate:
                              Application / acceptance fees to be paid to authority.
                                     Not all authorities will have these fees associated. Generally they
                                     are minimal fees and they fluctuate between area and authority –
                                     they are to be paid for directly by developer.
                              Contribution fee paid to authority.
                                     Not all authorities will have these fees associated. Generally they
                                     are based on the amount blocks to be subdivided. These fees
                                     fluctuate between area and authority – they are to be paid for
                                     directly by developer.
                              Works to be performed to satisfaction of authority.
                                     Generally larger developments or smaller developments where
                                     not construction has started. These may include power pits, water
                                     / sewer points, roads, drainage etc. Generally these tasks need to
                                     be performed by approved sub-contractors. Price varies
                                     depending on development. These costs are to be paid for by
                                     developer direct.
                              Issue of certificate to council.

 3. Council Issue of Statement of Compliance
        a. Pay any council fees
                        i. Open Space contributions
                        ii. Drainage levy
                        iii. Bonds
                        iv. Etc.
        b. Issue of statement of compliance to titles office.

 4. Titles Office to issue titles.
            Generally done via developer’s conveyancer. There will be associated fees with the
            titles office and conveyancer.
                             QUOTE $                              -      (incl. GST and all above points)


                           Payment:
                                                   50% Upon Acceptance of Fee Proposal                                  $       -
                                                   50% Prior to Issue to Titles Office                                  $       -

This fee does NOT include the following:
              Council Application fee (approx)                            $ 550.00
              Authority Acceptance / Contribution Fees
              Site Works / Upgrades
              Conveyancing / Lodging to Titles Office


Quote Accepted:




              Developer




fine print:
                 All costs incurred with the recovery of debts will be liable to the developer noted above. Owner acknowleges that
                           Abode Design & Construct Pty Ltd have a caveatable interest in the property as a result of these works.
                 Due care is taken with application; however a guarantee of outcome can not be made.
                 No responsibility is taken by Abode Design & Construct or its associated representatives for rejected applications.
                 A maximum of 2 reasonable alterations to plans along with a compulsorily “condition 1” change is allowed for in
                           quote. All subsequent changes / alterations made by developer will be charged at an agreed rate.
                 Quotes are valid for 90days from date of document.




  "Our team of highly skilled designers, planners, suppliers and builders are passionate about supporting
residential investors to complete profitable and efficient property development and to love the experience."
                 OFFICIAL TENDER




                                     0
                                     0

                                     0
                                     0




                                     0
                                     0




 "Our team of highly skilled designers, planners, suppliers and builders are
passionate about supporting residential investors to complete profitable and
        efficient property development and to love the experience."
I have pleasure in providing you with the enclosed tender. There is a lot of information to get
through, but that's the whole intent of this system. Everything that is presented here is totally
"transparent", there are no hidden costs and our projects are complete. If it is not shown here
then it is not tendered for.

The idea for this totally unique and exclusive system to Abode Design & Construct is to
ensure that the owner is completely informed, and completely comfortable that they will not
be charged "extras" or "variations" at a later date due to sneaky omittions by builders who
try to win tenders then charge extra for non-obvious items during the contract.

The following costs are based on actual cost price to the builder (this includes the raw cost
of the material PLUS a labour or fitting rate). This is the actual price that you will see. This
will then be subject to the builder's margin which is added to the total cost. The reason this is
great for the owner, is that you ONLY pay for what you have in the tender based on actual
price, NOT an over estimated cost plus margin or a square meter rate that allows for most
scenerios). This is also great for later in the contract where you want to make changes or
variations - you know exactly from the start what allowance has been made for the item to
be credited back to you. Even with all these great points, the contract is still a completely
FIXED PRICE contract (subject to standard unforseen extras as per contract such as rock).

Current Tender:
           Subdivision Works $                -   (for all subdivisional site works and improvements)
           Site Improvements $           5,660.33 (for items not directly associated with the dwelling(s))
                 Construction $         28,555.67 (construction cost for the actual dwellings only)

     TOTAL CONTRACT $                          34,215.99        (incl. G.S.T)

Please note that Abode Design & Construct include in our contracts / tenders as a standard
inclusions that many builders do not (unless otherwise instructed):
          - Security Cameras (also available to clients to see activity on sites
          - Soil Removal after excavation and footings for foundation
          - Complete "turn key" developments which include foundations, floor coverings,
              and eveything else nominated on your plans as you would expect (i.e. No tricks!)

These tenders are designed to be simple and not offer too many options. We have selected
the best value specifications of each category; this is to keep the processes simple and
efficient to ensure the quickest development possible. However, should you decided to want
different items than in this specification or other options, you may do this via the special
conditions at the end of the "specifications" section, or by calling the office and arranging
for a different item to be added to the documentation. Everything we do is custom, so why not
the specifications?

I hope this all makes sense, and get as excited about this unique system as we are.

Please fell free to contact this office for any enquiries or to pursue this tender. Contracts and
all legal paper work is only a "push of a button" with this new system - no delays!

Regards,



Andrew Lennox
(Director)
               PLEASE READ CAREFULLY BEFORE COMPLETING THE SCHEDULE.                                                                                                         $
1. This schedule forms part of the contract for the proposed work when executed and initialled by all parties.
2. Where multiple choices are available, only one choice is permitted. If choice/s are not clarified by the proprietor at the time of signing, the choice/s are to be
     at the builder's sole discretion.
3. Items noted in this schedule are generally cost price to the builder or at an estimated cost. All net extra costs include builders margin of             22.5%
     which allows for admin, profit and freight.
4. ALL variations, amendments and changes to any plan, specification or similar must be in writing to the builder or agent whether it has been suggested over the
     phone verbally or not. No responsibility is made by builder or agent for any request not placed in writing within an appropriate time.

                              SUBDIVISIONAL REQUIREMENTS
Definition:
       Subdivision refers to the permits, works and associated tasks involved in the process of dividing a parcel of land into subsequent lots that are formally
        recognised by the Titles Office of Victoria. The process involves input and direction from:
              Council - town planning & engineering department
              Land Surveyors
              Authorities: Council / Melbourne Water - Drainage (storm water)
                            Power - Power pit / group metering
                            Water Board - Sewer & Water
                            Telstra - phone connections
                            Gas - gas lines and connections
              Conveyancers - to prepare legal documents for lodgment to Titles Office
              Titles Office

Comments / Notes:
       A subdivision is best done at the same time as construction. This is for many reasons, all resulting in a faster, cheaper and less documented process.
       Not all sites need to be subdivided such as those wherby the owner has no intent of selling separate sites or there is only one dwelling built on a site.

       PLEASE NOTE: A separate contract for the Subdivision Application to council which covers the Land Surveying and all council and authority liaising
        is to be entered into separately and is performed separate to the construction contract. ONLY costs associated with the works to this Subdivision
        Application certification are included below.

Subdivision Allowances included in contract price.
       Power Authority
       ##### Underground Power Supply (Pit)                            No of Pits                                                                                   PC $         -
             Group Metering                                                                                                                                         PC $         -
             Upgrades - if any                                                                                                                                      PC $         -
             Engineered Drawings - if any                                                                                                                           PC $         -

       Water Board
       ##### Contribution / Acceptance Fee                          No of Lots                                                                                      PC $         -
       ##### Sewer Branch / Extra Points
                            Application to Install                                                                                                                  PC $         -
                            Works by Authority approved plumber                                                                                                     PC $         -
              Water Tappings (estimated)
                FALSE       Dry Tapping                             No of Taps                                                                                      PC $         -
                FALSE       Wet Tapping - mains abutting site                                                                                                       PC $         -
                FALSE       Wet Tapping - mains across road                                                                                                         PC $         -
              Upgrades - if any (for larger developments only)                                                                                                      PC $         -
              Engineered Drawings - if any                                                                                                                          PC $         -
       Gas
              Connection and works - standard setback                                                                                                               PC $         -
       Telstra
              Connections and works (generally by electrician from a Telstra supply point)                                                                          PC $         -
       Drainage
              Contribution / Acceptance Fee (estimated)
       Council
              5% Open Space Contribution (5 or more lots on a site)             estimated value of land         $                     -                             PC $         -
                                                                                                                                                                         $       -
       Many of the items listed above will not be know in its entirety until all necessary "Letters of Offer" are received from the appropriate authorities and notices $        -
           of what works and requirements are manditory. Any shortfall in allowances herby noted above to what is requested will be the responsibility of the            $       -
           proprietor to fund at the appropriate time.
       All subdivisional requirements to be done as requested by Town Planning Permit and associated conditions. These must be done in conjunction with local
           Council requirements and inspected by Council as appropriate.
       Builder / Contractor to refer to local authority to be advised whether a "preferred" or authority accredited contractor should be carrying out the task under their
           local policy.




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                                  22
               PLEASE READ CAREFULLY BEFORE COMPLETING THE SCHEDULE.                                                                                                              $
       SITE IMPROVEMENTS / PROJECT PREPARATION

       Definition:
               Site improvements / Project Preparation are those additional costs and tasks that are not directly related to the construction of an individual house
                  but are a necessary and generally manditory requirement by council when developing. These costs are totalled then divided per unit / house to be
                  constructed and are included in the contract price. Some of these items are done at the very beginning, some at the very end, so no separate
                  stage payment or timeline is placed on these items. If no amount is displayed, then it has not been allowed for.

       Comments / Notes:
               No works to be performed on site until contracts signed, building permit issued and 5% deposit paid.
               Construction start date taken 21days from payment of 5% deposit.

               Unless otherwise specified, the works shall be constructed in accordance with the Building Act 1975 (as amended) Australian Domestic Construction
                 Manual and where appropriate the AS 1684 SAA Timber Framing Code.

               Unless otherwise specified, the proprietor is responsible to provide a house site clear ofany obstructions 10 building including removal of long grass, shrubs
                 and trees where necessary.

               Unless otherwise specified, the contract price allows that town water supply will be available from an existi ng main ofthe Local Authority prior to
                 commencement of construction. Where no such water supply exi sts, the proprietor is to arrange at their expense, a temporary fresh water supply for
                 buiIding purposes by means satisfactory to The Builder and to be available prior to commencement of construction.

               This contract allows for 240 Volt single phase power being available prior to and during the construction of the dwelling. Where no such power is available the
                   proprietor is to arrange temporary power to the satisfaction of The Builder at the proprietor's expense.

               The Builder takes no responsibility for any colour variation in the roof tile, blick, ceram ic wall and floor tile, between those shown in displays or brochures
                 to those delivered by the manufacturer. These products may vary slightly in colour from time to time and any discrepancy is the responsibility of
                 the manufacturer.

               The Builder reserves the right to charge a $200.00 fee for each variation requested by the proprietor subsequent to execution of the contract. Variations are
                 deemed to be changes, additions, deletions and alterations to contract, colour selection, allowances or prior variations. Each variation will add one week to
                 the contract time.

               BUILDING PERMIT                                                                                                                                            $         880.00
                         Applied for by owner / agent of owner          No of Inspections                4                                                                $         440.00
                         To be paid for by builder.            (estimated cost of contract)                                                                               $            -

               WARRANTY INSURANCE & BUILDERS INDEMNITY INSURANCE
                                                                                                                                                                 $
                        All necessary and appropriate insurance to be applied and paid for by builder. A copy of all current insurance policies should be forwarded                    -
                            to the owners prior to construction commencing.                                                                                      $                     -

               DEMOLITION
                 FALSE  Demolition Contract (including Permit)                                                                                          $                              -
                          All application fees and permits to be the responsibility of the builder / contractor.
                          All connections to existing house to be ABOLISHED by the owner / proprietor minimum of 3 weeks prior to commencement of construction.
                              This must be done by direct contact to the supplier of:
                                     -Power Authority                         -Water Supplier
                                     -Gas                                     -Foxtel or similar Optical Cable
                                     -Telstra

                              As part of the Town Planning Permit, the following items are to be retained on site and incorporated into the development:
                                 Each of these items is to be appropriately protected from damage from normal construction works under the guidelines set out in
                                 the Town Planning Permit. This is the responsibility of the builder.




               SITE ESTABLISHMENT
                         It is the responsibility of the owner to ensure that the site is clearly identifable and marked out by survey pegs to the legal title boundaries. If the
                              has not had a recent "Re-Establishment Survey" then it may be done under contract price as below:
                             FALSE      Re-Establishment Survey                                                                                                         $              -
                             FALSE      Site TBM to AHD                                                                                                                 $              -
                                                        (this is a height marker as required by many developments to set levels - often it is required twice)

               SITE CUT / EXCAVATION
                           The proprietor acknowledges that after breaking the surface of the ground, if variations are required by Local or Other Authorities,
                             or due to the nature of site access or due toextra excavations or footings required if rock or other obstacles are encountered, thenThe Builder
                             will notify the proprietor as provided for in the relevant clause of thecontract and the cost of such variation together with a reasonable allowance
                             for overheads and profits shall be adjusted against the contract sum.

                              Site scrape - standard site scrape to a maximum of 300mm has been allowed for in the contract price.



                              Additional Excavation


Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                                    23
                                               Site Cut                                    (hrs req'd))
                                                  FALSE        Bob Cat                                  6 (min 6hrs)                                                  $         -
                                                  FALSE        5.5T Excavator                           8 (min 6hrs)                                                  $         -
                                                  FALSE        12T Excavator                            8 (min 8hrs)                                                  $         -
                                                  FALSE        Truck                                    6 (min 6hrs)                                                  $         -
                                                  FALSE        Truck & Trailer                          6 (min 6hrs)                                                  $         -
                                               Estimated amount of soil to be removed                                0 (m3)                                           $         -
                                                  *All soil to be removed from site has been allowed for under the contract and is the responsibility of the builder.
                                                  *No allowance has been made for the excavation and removal of rock (if found). In such a case, this is to be paid
                                                               for by the owner via a variation.

               SITE SECURITY CAMERAS AND SURVELANCE
                         Site cameras with both colour day vision and infra-red night vision to relay to an on-site compact computer built within the electrical meter box with wireless
                           internet installed to relay images back to a central computer and website. This information will be available for use in security (vandalism & theft) along with
                           images and real-time visualisation of site works and current personnel for use by both the builder and for the owner / client.
                             TRUE       2 x Cameras (one pointing at house, the other at the street frontage / parked cars) with wireless internet access.           $    1,800.00
                            FALSE       2 x Wireless Cameras (one pointing at house, the other at the street frontage / parked cars) with wireless internet access. $            -
                                              0        Additional Wireless Cameras                                                                                   $           -
                            FALSE       Temporary pole for camera mounting.                          0       qty                                                     $           -

               TEMPORARY POWER POLE
                       Temp power pole to be supplied on site by builder when temp power in a perminate position (meter box) is not suitable nor
                         underground power is available.
                          FALSE    Overhead Power Supply                                                                                                             $          -
                          FALSE    Underground Power Supply                                                                                                          $          -
                                                Total Weeks required

               TEMPORARY FENCING
                       Temporary fencing to be erected and maintained on site by builder as appropriate.
                                               Less than 30L/m
                                                 FALSE      9 Months          FALSE    12 Months                                                                     $          -
                                               Greater than 30L/m
                                                 FALSE      9 Months         FALSE       12 Months                                                                   $          -
                                                            Length of Temp Fence
                                                            Additional fencing / protection zones    (allowance)                                                PC


               TEMPORARY TOILET
                       Suppled by builder as appropriate on site in a safe and accessible location. To be maintained in orderly fashion through out development.
                                 months on site        9                    No. Of Pump Out and Clean         2                                               $            1,121.34

               SITE BIN
                              On-site bin to be positioned to allow for general cleaning by all trades as they operate.
                                            No of Bins           1                  No of Empties          3                        No of Weeks   36                 $     1,110.00

               COUNCIL ASSET PERMITS / CROSS OVER PROTECTION
                         An "Asset Protection Permit" must be applied for via all Councils prior to the commencement of construction. Generally a bond must be paid
                            and will be refundible to the builder once Council has inspected its assets to ensure no damage was done to them.
                         Asset Protection Permit is the responsibility of and should be paid for by the builder.                                              $              198.00

               CONCRETE
                  Common Accessways / Driveways / Paving
                 FALSE  Plain Concrete (brushed)     locations                                                     Exposed Aggregate              locations          $          -
                                  area (m2):                                                                           area (m2):




                  FALSE       Coloured Concrete (brushed)         locations                                        Stencil / Coloured Concrete    locations          $          -
                                  area (m2):                                                                           area (m2):
                                     Colour:                                                                              Colour:


               CROSSOVERS                           (qty)
                 FALSE Single Crossover                                                                                                                         $               -
                 FALSE Double Crossover                                                                                                                         $               -
                 FALSE Road Opening Permit                                                                                                                      $               -
                                    Road opening permit to be obtained by the builder unles other organised directly with the contractor. All crossovers to be done in
                                      accordance with local Council guidelines and/or as governed by Town Planning Permit and its conditions. Inspections of these
                                      as requested by Council.

               DRAINAGE
                              Contribution / Acceptance Fee (estimated)
                              Stormwater System
                                            No of Junction Pits                         (qty)                                                                        $          -
                                            No of Grated Access Pits                    (qty)                                                                        $          -
                                            Length of 100mm pipe                        (L/m)                                                                        $          -
                                            Length of 150mm pipe                        (L/m)                                                                        $          -
                                            Length of 225mm pipe                        (L/m)                                                                        $          -



Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                                      24
               LANDSCAPING
                 FALSE  Allowance for landscaping as per approved Town Planning permit conditions. This does not allow for retaining walls or other structural
                          elements discussed later in this specifications.
                           FALSE     Site Clean / Level
                                                         Bob Cat        6      (min 6hrs)                                                                        $        -
                                                            Truck       6      (min 6hrs)                                                                        $        -
                                                        Tip Fees               (m3)                                                                              $        -
                           FALSE     Top Soil                     (m3)                                                                                           $        -
                           FALSE     Weed Mat                     (m2)                                                                                           $        -
                           FALSE     Irrigation                   (L/m)                                                                                          $        -
                           FALSE     Edging                       (L/m)                                                                                          $        -
                           FALSE     Plants                                        (qty)
                                                    small grasses / shrubs                                                                                       $        -
                                                    medium shrubs                                                                                                $        -
                                                    small trees                                                                                                  $        -
                                                    larger trees (when mature)                                                                                   $        -
                            FALSE    Cover            Lawn Seed                 (m2)                                                                             $        -
                                                    Bark / Mulch                (m3)                                                                             $        -
                                                           Stone                (m3)                                                                             $        -
                                                Synthetic Grass                 (m2)                                                                             $        -
                           FALSE     Maintenance Period                         (weeks)                                                                          $        -
                                             (watering of grass, basic weeding)

               FENCING                                                (lin Meters)
                 FALSE        1.7m high Timber Picket Fence                                                                                                      $        -
                 FALSE        1.6m high Timber Paling Fence                                                                                                      $        -
                 FALSE        1.8m high Timber Paling Fence                                                                                                      $        -
                 FALSE        1.2m Brick Pier with Picket In-Fill                                                                                                $        -
                                 *brick piers to have concrete foundation with either powder coated metal or stained timber pickets.
                  FALSE       Gates - to match fence              (qty)                                                                                          $        -
                              Miscellaneous (Capping, Colorbond, etc. )                          (allowance)    $       -



               LETTER BOX                                                   (qty)
                 FALSE  Standard Metal Freestanding                                                                                                              $        -
                 FALSE  Decorative Metal Freestanding                                                               (colour)                                     $        -
                 FALSE  Brick Letter Box                                                             To Match House / Fence                                      $        -

               CLOTHES LINE                                                 (qty)                                   (colour)              (location)
                 FALSE   Standard wall mounted "fold-out"                                                                                 as per plans           $        -



               STORAGE SHED
                 FALSE  Colorbond                    (approx size)          (qty)                    (colour)                             (location)
                                                   2.4 x 1.6 x 1.9                                                                        as per plans           $        -
                                 FALSE             Concrete Base                                                                                                 $        -

               RETAINING WALLS                                                       (length)        (av. Height)
                 FALSE   Treated pine sleeper post and rail                                                                                                      $        -
                 FALSE   Treated pine sleeper rail, galvanised steel post                                                                                        $        -
                 FALSE   Redgum sleeper post and rail                                                                                                            $        -
                 FALSE   Redgum sleeper rail, galvanised steel post                                                                                              $        -
                 FALSE   Block / Brick Retaining Wall                                                                                                            $        -

               AGI DRAIN                                                                                                       (length)
                 FALSE   AG pipe installed in crushed scoria or similar with waterproof membrane behind wall                                                     $        -
                                                                                                                                                                 $   5,549.34
                                                                                                                                                                 $     110.99
                                                                                                                                                                 $   5,660.33




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                                      25
                           Official Commencement Date            6/20/2009


             Foot Note                      Rate        Total Contract       Contractor / Supplier        Email Address          Date Required Days Allowed Deadline         Days Notice




            Demolition- Permit                                                                                                       6/20/2009
                                                                                                          owner@ownersemailaddress.com.au                21      7/11/2009              0
            Demolition - Works                                               Melbourne Demolition         demolition@demolition.com.au 7/11/2009          3      7/14/2009             14




            Relocation Survey                                                Anthony Ford & Associates                                7/15/2009
                                                                                                          landsurveyor@landsurveyor.com.au                2      7/17/2009             14




            Site Cut                                                         Julius Plant Hire            julius@julius.com.au       7/18/2009            3      7/21/2009             14




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                                           26
wireless
along with




    Copyright: Abode Design Construct. This schedule
    cannot be copied or reproduced in any form         27
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         28
Email / SMS Date Initial       SMS Date Final      SMS Number   SMS Text




        6/20/2009                 6/25/2009        0448885000   Demolition works XXXX will be starting in 5 days, please ensure all services have been abolished prior to this date
        7/25/2009                  7/9/2009        0403888008   Just a reminder that demolition at XXXX is due for commencement on XXXXX and needs to be completed by XXXXX




        7/29/2009                 7/13/2009        0448885000   Just a reminder that site relocation at XXXX is due for commencement on XXXXX and needs to be completed by XXXXX




        8/1/2009                  7/16/2009        0448885000   Just a reminder that site cut at XXXX is due for commencement on XXXXX and needs to be completed by XXXXX




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                            29
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         30
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         31
 his date
d by XXXXX




eted by XXXXX




y XXXXX




    Copyright: Abode Design Construct. This schedule
    cannot be copied or reproduced in any form         32
                                                                                                                                                            Wednesday, May 16, 2012
Specifications - Unit 1                                                                                    Ground             1st          2nd      Garage
             (floor)                   (m2)       (squares)                             Perimeter (l/m)             100
     Total Area - Basement               0             0.00                          Area - Living (m2)
  Total Area - Ground Floor            100             10.76                                Height (m)
       Total Area - 1st Floor            0             0.00                      Internal Walls (l/m)
      Total Area - 2nd Floor             0             0.00                                       Total Contract (including subdivision and site costs) $                   34,215.99
                                       100             10.76                                                                        Total (This Dwelling Only) $              28,556


                                    BASE STAGE
  Definition:
       Base stage draw-down covers all site preparation / pre-construction requirements as well as the nominated footings / foundation. Mandatory inspections
        to be performed by relevant building surveyor as required by approved permit. Draw-down will be requested by builder:
          - for a home with timber floor, when the concrete footings For the floor are poured and the base
                brickwork is built to floor level.
          - for a home with timber floor but no brick work, when the stumps, piers or columns are completed.
          - for a home with a suspended concrete slab floor, when the concrete footings are poured.
          - for a home with a concrete floor, when the floor is completed.

  Comments / Notes:
       Excavated soil from foundations to remain on site and be backfilled or spread on site when appropriate, (generally after lock-up) additional or excess soil to be
          removed at expense of builder.
       Often car ports or garages (including porch) may be poured at a later date to keep concrete un-damaged. In this case, it will not be required to be done prior
          to stage draw-down release.

       PRE-SLAB
         FALSE Site Set-Out                      Set-Out by appropriate surveyor or by Builder                                                                          $         -


                         FALSE     P.I.C. Permit to be obtained and paid for by Builder from local water authority or appropriate representative.                       $         -
                                    For all unit development sites, a P.I.C. Permit may only be obtained once the owners have signed a "Letter of Offer" from the
                                       water board - see "Subdivisions"

                       Pre-Slab Plumbing
                                   Standard sewer as per approved plans to sewer branch nominated by water authority. Install drainage under slab for areas required or
                                      for area with limited access after lock-up to "legal point of discharge" nominated by Council. If retention system required - see
                                      "Subdivisions"                                                                                                                    $ 2,850

                       Power / Telephone
                         FALSE     Temporary power in perminate position (meter box) supplied if approprate with draw string for Telstra at same time
                                              Meter Box                                                                                                                 $         -
                                              Setback from boundary        0       (lin meters)                                                                         $         -

                                    All new slabs to have steel mesh in the wet areas to be "earthed" by electrician.
                                    Temporary power connections to be paid and maintained by builder until "hand over"
                                    Owner to pay any contribution fees, upgrades and connections outside property boundary as requested by local power authority
                                        (refer to subdivisions for allowance if any).

          FALSE        Termite Protection
                                   The contract has allowed for termite treatment in accordance with AS3660 Part I and any deviation from this will be at the
                                      proprietor's cost.
                                                No of Penetrations:           10      (min 10)                                                                          $         -
                                                Perimeter (L/m)              100                                                                                        $         -

                                    Note: It is the responsibility of the owner to ensure this is regularly checked and maintained. Refer to Termite information sheets
                                      attached to this schedule which must be signed and adhered to. Subsequent owners of this property must be informed of this
                                      requirement upon any sale.

       FOUNDATION
                Foundations / footings to be done in accordance to the stamped and approved engineering drawings. Any variation must be done with the
                  written permission from the building surveyor and / or engineer.
                  TRUE       Waffle Slab                                                                                                                                $      8,250

                         FALSE      Raft Slab                                                 (depth)      (width)          (length)      (qty)                         $         -
                                                 Additional Concrete Beams                                                                                              $         -
                                                 Additional Concrete Pads                                                                                               $         -
                                                 Additional Steel                                         (allowance)                                                   $         -

                                                 Volume of Concrete in Rate:                       20.0 m3                Additional Concrete Allowed(m3)               $         -

                         FALSE     Strip Footings                            (L/m)                        (depth)                      (width)                          $         -

                         FALSE     Stumps / Pads                             (qty)                        (depth)                      (width)                          $         -

                         FALSE     Concrete Pump (5hr min)               times required                                                                                 $         -

                                                               (area - m2)
                         FALSE     Bondek Slab                                                                                                                          $         -
                                                                                                                          Bondek Slab forseen additional costs:      PC $         -

                       Removal of excess soil - soil to be stock piled on site when possible and removed during the final site clean.
                         FALSE     Early removal of soil for small sites               m3           (including bobcat and truck for 6 hours)                            $         -




    Copyright: Abode Design Construct. This schedule
    cannot be copied or reproduced in any form                                               33
                                FRAME STAGE
Definition:
     Frame stage draw-down covers all structural walls and steel. This includes brick walls to garages
        that support roof or subfloor structures where timber framing is not required. A framing inspection
        must be done and approved by the relevant building surveyor.

     Frame stage does not necessarily cover feature timber structures or straightening and trimming, but
        the structural component of the frame.

Comments / Notes:
     Frame inspection needs to be approved prior to stage draw-down being released. This may be a verbal
        approval from building surveyor in lieu of certificate which are generally only produced upon request of
        the owner or builder.

     Additional frame inspections required are to be at the cost of the builder.

     Brick Work to Garage / Base / Porch
                As per stamped plans.
                Refer to "Lock-Up" for colours and finishes

     Structural Steel
                 Steel work as per engineer’s requirements.
                             89x89 SHS                 (L/m)                                                                                                  $   -
                             100x100 SHS               (L/m)                                                                                                  $   -
                             180PFC                    (L/m)                                                                                                  $   -
                             200PFC                    (L/m)                                                                                                  $   -
                             250PFC                    (L/m)                                                                                                  $   -
                             300PFC                    (L/m)                                                                                                  $   -
                             200UB 25.4                (L/m)                                                                                                  $   -
                             250UB 31.4                (L/m)                                                                                                  $   -
                             "T" Lintel                (L/m)                                                                                                  $   -
                             Bracing                   (qty)                                                                                                  $   -
                 Crane Hire (30T - No Dogman - min 4 hours)                         (hrs)                                                                     $   -
                 Crane Hire (50T - with Dogman - min 4 hours)                       (hrs)                                                                     $   -
                                                                                      Additional forseen costs such as Galvanising, extra steel etc           $   -

     Wall Framing
                Timber pine as per architectural plans and manufacturer’s specifications.
                Bracing as per engineers specifications.
                            Stud Type      MGP10        450mm centres for external and ground floor - 600mm centres for internal walls
                            Timber Lintels / Beams - as per approved engineering / working drawings.
                            Ground                     1st                     2nd                       Garage
                  FALSE 2.4m Height FALSE 2.4m Height FALSE 2.4m Height FALSE 2.4m Height                                                                     $   -
                  FALSE 2.55m Height FALSE 2.55m Height FALSE 2.55m Height FALSE 2.55m Height                                                                 $   -
                  FALSE 2.7m Height FALSE 2.7m Height FALSE 2.7m Height FALSE 2.7m Height                                                                     $   -
                  FALSE 3.0m Height FALSE 3.0m Height FALSE 3.0m Height FALSE No Internal or External Timber Framing                                          $   -

     Sub Floor
                  Timber pine structural joists as per architectural plans and manufacturer’s specifications.
                  "Yellow Tongue" or similar structural particle board glued and nailed to joists for flooring.
                              Joist Type "Posi Strut" or similar        as per approved engineering
                              Joist Centres                 450mm as per approved engineering
                                             Area of Posi Struts (approx)                                                                                     $   -

     Roof Trusses
                Timber pine as per architectural plans and manufacturer’s specifications.
                            Truss Centres                                       *refer to architectural drawings for style of roof and appropriate spacing.
                              FALSE 600mm Centres                   FALSE       900mm Centres                                                                 $   -

     Carpentry
       FALSE      Single Storey Walls & Truss                                                                                                                 $   -
       FALSE      Double Storey Walls & Truss                                                                                                                 $   -
       FALSE      Frame Subfloor                                                                                                                              $   -
       FALSE      Sheet Flooring                                                                                                                              $   -

     Party Walls / Fire Rating
             FireCheck Plaster or Similar                 (m2)                                                                                                $   -
                Hebal Party Wall System                   (m2)                                                                                                $   -




 Copyright: Abode Design Construct. This schedule
 cannot be copied or reproduced in any form                                            34
                                LOCK-UP STAGE
Definition:
     Lock-Up Stage includes the external wall coverings, laying of roof cover, fixing of windows and external doors (even if the doors are only
        temporary). This does not include any main garage doors which will be installed after the plaster (if applicable) is installed inside the garage.

     Eaves to be installed but not necessarily painted.

     Gutter, facia and all other roof plumbing to be installed, however, down pipes and rain heads to be done later.

     Waterproofing of decks / balconies that have impact on lower living areas to be sealed.

     Lock-Up does not include the sealing of doors, articulation joints or other final detailing such as mouldings cappings, or trimmings. Brick cleaning
        is also not required to be completed prior to the stage payment

Comments / Notes:
     Lock-Up inspection in not a mandatory requirement and will not be performed unless requested by the
        owner. This will be at the expense of the owner.


     Windows - Aluminium Framed
       TRUE    Sliding      FALSE              Awning

                                   FALSE      Custom (as per window schedule - i.e. Timber Hardwood, sky lights etc)                                         PC $        -
                                                         Notes:

       FALSE Double Glazing                                                TRUE     Fly Screens to Opening Windows
          Notes / Locations                                                         Colour:
                                                                                    Notes:
                                                                                                                                                                $   2,300.00




                            White                               White Birch                              Primrose                                 Merino




                         Metro Silver                              Black                                  Jasper                             Woodland Grey

     Entry Doors - Paint Grade




                       Flush Panel                               XN1                                    XN5                                     XN7
                  2040mm      $ 279.50               2040mm         $ 357.50                     2040mm    $ 357.50                      2040mm    $ 357.50     $        -
                        Qty:                                  Qty:                                    Qty:                                    Qty:
                  2340mm      $ 319.50               2340mm         $ 754.50                     2340mm    $ 779.50                      2340mm    $ 779.50     $        -
                        Qty:                                  Qty:                                    Qty:                                    Qty:
                             *NOTE include "Side Lites" as 0.5 in qty tab.
                             Clear Glass                           Opaque Glass                       Colour:

     Entry Doors - Stain Grade




                       Flush Panel                             Tema 101                                Tema 04                                Tema 104
                  2040mm      $ 279.50                    2040mm    $ 709.50                     2040mm    $ 743.50                      2040mm    $ 743.50     $        -
                        Qty:                                   Qty:                                   Qty:                                    Qty:
                  2340mm      $ 319.50                    2340mm    $ 784.50                     2340mm    $ 807.50                      2340mm    $ 807.50     $        -
                        Qty:                                   Qty:                                   Qty:                                    Qty:

                                Clear Glass                            Opaque Glass                    Stain:




     External Door - Stain Grade



 Copyright: Abode Design Construct. This schedule
 cannot be copied or reproduced in any form                                           35
                      Flush Panel                              Half Lite                             Full Glass                             10 Lite French
                 2040mm      $ 279.50                    2040mm     $ 354.50                    2040mm     $ 437.50                     2040mm       $ 489.50   $        -
                       Qty:                                   Qty:                                   Qty:                                     Qty:
                 2340mm      $ 319.50                    2340mm     $ 514.50                    2340mm     $ 607.50                     2340mm       $ 566.50   $        -
                       Qty:                                   Qty:                                   Qty:                                     Qty:

                               Clear Glass                            Opaque Glass                    Stain:

   Door Hardware               All external locks to be "keyed to like" including lockable door hardward to any garage doors.




                  Std. Entry Knob / Lock                  Std. Entry Lever / Lock                   Tri-Lock Knob                          Tri-Lock Lever
                    Per Item $     72.00                    Per Item $      77.00                  Per Item $ 165.50                      Per Item $ 177.00     $        -
                         Qty:                                    Qty:                                   Qty:                                   Qty:

                                  FALSE      Satin Chrome                           Chrome                               Brass / Gold

                 Note: sliding glass doors or aluminium bi-fold doors are to be done as per plan under the same specs as the aluminium windows details unless
                      otherwise noted.

   Carpentry                    Carpenter to straighten walls, install eaves, bulk heads, etc                                                                   $      1,320

   Eaves                        450mm Eaves                           (L/m)                                                                                     $        -
                                600mm Eaves                           (L/m)                                                                                     $        -

   Tiled Roof - Concrete                     Standard Concrete tiled roof with standard profile (shown below: Monier "Elebana")




         TRUE           Barramundi                                 Salsa                               Sambucca                                 Toffee          $   4,500.00

   Tiled Roof - Concrete                Standard Concrete tiled roof with standard profile (shown below: Monier "Elebana")
               Concrete "Flat Textured" tile                                                Concrete "Slate Looking" tile




                         Soho Night                          Manhatten Moon                            Soho Night                          Manhatten Moon       $        -

   Tiled Roof - Terracotta




                           Granite                                 Earth                              Autumn Red                               Pacific          $        -




   Colorbond - Roofing, Fascia, Gutter & Flashings                                  NOTE - down pipes to be done in PVC pipe and gravity fed to rain water tank if nominated.
                                                                                     Down pipes to match gutter colour. If Rainwater tank not nominated, use Colorbond.



Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                            36
                          Surfmist                              Shale Grey                Dune                Paperbark




                         Wiindspray                          Woodland Grey            Classic Cream           Sandbank




                           Jasper                                   Bushland          Pale Eucalypt           Plantation




                         Blue Ridge                             Headland                Manor Red             Night Sky

                                                                                                                                 $   1,500.00

   Sisolation
                 Full house wrap of foil sisolation as required
                                 Perferated Sisolation        0.0       (m2)                                                     $        -
                            Non-Perferated Sisolation         0.0       (m2)                                                     $        -

   Brickwork




                        Kimberley                               Ironbark                  Jarrah                Tanami
                      Per m2 $    84.98                      Per m2 $    84.98        Per m2 $      84.98   Per m2 $   84.98     $        -
                          m2                                     m2                       m2                    m2




                      Berwick Rustic                          Amber Blaze               Kurrajong            Brown Terrain
                      Per m2 $    84.98                      Per m2 $   84.98         Per m2 $    85.53     Per m2 $     85.53   $        -
                          m2                                     m2                       m2                    m2




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                       37
                       Mocha 76mm                               Mocha 50mm                                Victorian Blue                      Floretine Limestone
                      Per m2 $  86.63                          Per m2 $ 110.18                           Per m2 $      93.78                    Per m2 $ 106.75     $   -
                          m2                                       m2                                        m2                                      m2


                         Sills                                      Window In-Fills
                                 Brick on edge                                        Painted Cement Sheet

                                  Flat Bricks                             FALSE       Bricks with steel lintel                                                      $   -

                    FALSE         Sill Bricks

              Mortar Joints                                                                                      Mortar Colour
                                                                                                                            Standard grey

                                                                                                                   FALSE       Light Grey / Off White               $   -

                                                                                                                   FALSE       Coloured                             $   -


                                                                                                                 Brick Cleaning                                     $   -



                    TRUE         Raked                     Rolled                     Flush

   Cladding




                 Render over 75mm Foam                     Colorbond Weatherboard                    Axon Vertical Cladding                  Shadow Clad - Timber
                      Per m2 $   99.00                          Per m2 $   85.80                         Per m2 $     96.80                     Per m2 $    96.80   $   -
                          m2                                        m2                                       m2                                     m2
                 (location)                                (location)                               (location)                             (location)
                 (colour)                                  (colour)                                 (colour)                               (colour)




                    Render over Hebal                         Stria Verticle Wide                        Matrix Cladding                       Custom Orb Iron
                      Per m2 $ 132.00                           Per m2 $ 113.30                          Per m2 $ 151.80                        Per m2 $    82.50   $   -
                          m2                                        m2                                       m2                                     m2
                 (location)                                (location)                               (location)                             (location)
                 (colour)                                  (colour)                                 (colour)                               (colour)

   Waterproofing
              Waterproofing of all balcony areas above living areas as required.
                          Area to be waterproofed:               (m2)                                                                                               $   -

   Scaffold                                        (L/m)
                 Roof fall protection                0                                                                                                              $   -

                 Perimeter scaffold                (L/m)                                 (L/m)                                    (L/m)
                             2 Lifts                                    3 Lifts                                  4 Lifts                                            $   -

   Car Ports (to be included in materials / labour from the above sections and done as per plan)




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                              38
                                FIX-OUT STAGE
Definition:
     Fix-Out stage means when all the internal cladding, architraves, skirting (except for areas of tiles, polished floor boards etc), doors, baths,
        basins, trough, sinks, cabinets of the home are at practical completion.

Comments / Notes:
     Fix-Out stage does not require an inspection.
     Often granite bench tops are delayed due to the wait for "templates" from the joiner as they can not be produced until these are made available. It
         is requested that stage payments are made regardless of granite bench tops being fully installed to minimise any delays.

     Carpentry                   Carpenter to fix skirts, arcs and hand all doors (pre-hung and latched)                                                           $     1,540

     Shower Bases




                    M/Trend Pro 900x900                      M/Trend Pro 1200x900                   M/Trend Pro 914x914 Cnr                4 sided delux 900x900
                     Per Base $ 190.00                         Per Base $ 321.00                       Per Base $ 262.00                    Per Base $ 208.00      $        -
                           Qty                                       Qty                                     Qty                                  Qty
                  (location)                                (location)                              (location)                           (location)


                  Tiled Shower Base (screeted and waterproofed as per Australian Standards with "double flange" & chrome waste
                                          (qty)       (rate)      (location)
                             900 x 900                 $ 900.00                                                                                                    $        -

                                900 x 1200                  $ 1,200.00                                                                                             $        -

                                900 x 1500                  $ 1,500.00                                                                                             $        -

                                900 x 1800                   $ 1,800.00                                                                                            $        -
                                   *tiles as specified in tile section (see completion)

     Bath Tubs




                  Stylus Maxton 1525x735                    Stylus Maxton 1675x735                  Stylus Newbury 1700x760              Stylus Mirage 1250x1250
                     Per Base $ 293.00                         Per Base $ 306.00                       Per Base $ 473.00                    Per Base $ 654.00 $             -
                           Qty                                       Qty                                     Qty                                  Qty
                  (location)                                (location)                              (location)                           (location)


                                     FALSE Spa Option (per spa)          $ 555.00                              (qty)                                               $        -

     Ducted Systems
       TRUE       Ducted Heating:
                    Standard 3 star gas ducted heating system included in base price. Location of burner at installer's discretion.
                          No of Ducts (max 10):         5                                                                                                          $     2,300
                                                                                                                                                                   $       -
                                   FALSE      Add-on Cooling (refrigerated)                                                                                   PC
                                                                                                                                         (locations)
                                             No of Zones        1              Additional Zones          0      $ 400.00                                           $        -
                                        No of Controllers       1          Additional Controllers        0      $ 110.00                                           $        -

                  Cooling:                                                 (extra)
       FALSE        Standard Evaporative Cooling (roof mounted)          $ 3,450.00 (5 ducts)                                                                      $        -
                             No of Ducts (max 10):        0                      Additional ducts $ 390.00                                                         $        -

                                                    Colour: (chose from basic Colorbond range)

                  Ducted Vacuum                                                                                                              (rate)
       FALSE        Basic ducted vacuum system with 12m hose, vacuum arm, head and accessories with white outlet points                   $ 1,100.00 (2 points)    $        -
                             No of Ducts (max 5):                     Additional outlets $ 110.00                                                                  $        -

     Insulation Batts
                 Walls - all external walls where appropriate. Please refer to 5 Star Energy Rating report for minimum requirements.
                 Ceilings - Roof space where appropriate (not in subfloor between floors). Please refer to 5 Star Energy Rating report for minimum requirements
                               R Value - Walls              (m2)                   R Value - Ceilings           (m2)
                                                1.5                0                                1.5                                                      $              -
                                                2.0                                                 2.0                                                      $              -
                                                                                                    3.0               0                                      $              -
                                                                                                    3.5                                                      $              -
                                                                                                    4.0                                                      $              -

     Plaster
                  Walls - 10mm standard plaster
                  Ceiling - 10mm standard plaster over metal battens.
                  Wet Areas - Waterproof plaster board as appropriate                                                                                              $   2,700.00


                  Cornice


 Copyright: Abode Design Construct. This schedule
 cannot be copied or reproduced in any form                                               39
        FALSE           55mm Cove                                90mm Cove           FALSE             Square Set         FALSE            Decorative        $      -
                 (location)                               (location)                           (location)                          (location)


   Timber Hardwood Flooring
              Genuine hardwood overlay flooring glued and nailed as appropriate (as per manufacturer's specifications). Generally 13mm or 14mm thick.




                        Tassie Oak                              Spotted Gum                              Jarrah                        Sydney Bluegum
                      Per m2 $ 132.00                          Per m2 $ 143.00                      Per m2 $ 143.00                     Per m2 $ 143.00      $      -
                          m2                                       m2                                   m2                                  m2
                 (location)                               (location)                           (location)                          (location)


                               Satin Finish               Glass Finish

   Skirting / Architrave




                       Square (DAR)                              Half Splayed                       Lambs Tongue                            Colonial
                 (location)                               (location)                           (location)                          (location)


                                               Skirting   Architrave:
                           42mm x 15mm         FALSE       FALSE                   Approx Lineal Meters:       Skirting      100                             $      -
                             67m x 15mm                                                                     Architraves       75                             $      -
                           88mm x 15mm         FALSE                                                                                                         $      -
                           42mm x 18mm                                                                                                                       $      -
                           67mm x 18mm             TRUE     TRUE                                                                                             $   295.75
                           88mm x 18mm                                                                                                                       $      -
                          135mm x 18mm                                                                                                                       $      -

   Staircase
     FALSE       MDF Enclosed staircase with carpet cover (carpet to match rest of house - refer to "completion stage")
                     Number of Treads                    Number of Landings          0                                                                       $      -

      FALSE      MDF with Hardwood Veneer Enclosed stair case (timber to match floor boards or as advised)
                     Number of Treads                  Number of Landings         0                                                                          $      -

      FALSE      Timber Hardwood staircase with open treads.             Colour / Finish:
                      Number of Treads                   Number of Landings       0                                                                          $      -

      FALSE      Custom Feature staircase                     Details:                                                                                  PC

   Internal Balustrade




                        Plain Timber                          Vertical Stainless                    Stainless Wire                     Glass Balustrade
                     Per L/m $ 110.00                         Per L/m $ 132.00                     Per L/m $ 165.00                    Per L/m $ 330.00      $      -
                          L/m                                      L/m                                  L/m                                 L/m
                 (location)                               (location)                           (location)                          (location)




   Internal Doors (including robe doors when nominated - see robes)



Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                           40
                         Flush Panel                                  Oakfield                              Hayman                                Sorrento
                    2040mm      $ 100.00                        2040mm     $ 120.00                   2040mm    $ 163.00                    2040mm     $ 187.00       $   -
                          Qty:                                       Qty:                                  Qty:                                  Qty:
                    2340mm      $ 130.00                                                                                                    2340mm     $ 235.00       $   -
                          Qty:                                                                                                                   Qty:

                                 Number of Cavity Doors:                     (qty)                                                                                    $   -

    Internal Door Hardware




                         Standard Knob                           Amelia                                Carla                                      Cavity Slider
                    Standard      $  24.45            Standard       $   36.00               Standard     $     8.00                        Standard     $    40.00   $   -
                            Qty:                               Qty:                                  Qty:                                          Qty:
                    Privacy       $   8.00            Privacy        $   44.00               Privacy      $     8.00                        Locking      $    54.00   $   -
                            Qty:                               Qty:                                  Qty:                                          Qty:
                    Dummy         $  12.00            Dummy          $   33.00               Dummy        $    12.00                                                  $   -
                            Qty:                               Qty:                                  Qty:
                                 *NOTE - dummy hardware to all storage doors or hinged robe doors or as appropriate.

                                 Satin Chrome                                Chrome                                    Brass / Gold

    Robe Doors (often completed during the "Completion Stage")
              Hinged Doors (refer to internal door section)

                    Sliding Doors (on "Smart Robe" track or similar). Door styles as per internal door section.

                    Sliding Door Inserts
                       FALSE Vinyl - gloss white panel with chrome framed sliding door
                                   FALSE 2100mm high                            (L/Meters)                                                                            $   -
                                   FALSE 2400mm high                            (L/Meters)                                                                            $   -

                                 Mirrored glass over vinyl door system.
                                   FALSE 2100mm high                                     (L/Meters)                                                                   $   -
                                   FALSE 2400mm high                                     (L/Meters)                                                                   $   -

          FALSE     Joinery Robe - complete laminate robe system as per plans - refer to Joinery Section

    Robe Internals
               Standard Package                                 Qty                      Double Package                               Qty                             $   -
                 -1.8m of shelving                                                        -3.6m of shelving
                 -1.8m rod & brackets                                                     -3.6m rod & brackets
                 -1 x 450mm drawer unit                                                   -2 x 600mm drawer units

                    Storage Package                             Qty
                      -3.6m of shelving

Joinery            Refer to architectural drawings for joinery plans and layout. Owner has opportunity to meet with Joiner to discuss any specific requirements
                     that may be required. ALL applicance and sink / basin details to be forwarded to joiner min. 2 weeks prior to delivery on site.
          Laminate Bench Tops




                       90deg Rolled Edge                         180deg Rolled Edge                             D-Mould                          Square edge

                      FALSE      Kitchen                                                   FALSE      Bathroom
                      FALSE      Laundry                                                   FALSE      W/C




                         Bianco Quartz                                Satin Platinum                          Amari Oak                            Starlight



           Granite Bench Tops (Ceasor Stone or similar)
                        17mm Edge             40mm Edge                              80mm Edge
                                                (lin. Meters)                                          (lin. Meters)




 Copyright: Abode Design Construct. This schedule
 cannot be copied or reproduced in any form                                                41
                    FALSE      Kitchen                                        FALSE   Bathroom                                                   $   -
                    FALSE      Laundry                                        FALSE   W/C                                                        $   -




                            1141                                      3141                                  2370                     6100



       Laminate Cupboards




                    90deg Rolled Edge                            Square Edge                           2mm PVC Edge                  Other
                                                           (lin. Meters)                                          (lin. Meters)
                    FALSE      Kitchen                                                Laundry                                                    $   -
                                 Standard                                               Standard                                                 $   -
                                 Floor - Ceiling (P'try)                                Floor - Ceiling (Broom)
                                 Overhead Cupboards                                     Overhead Cupboards
                               Bathroom / Ensuite                                     W/C / Powder
                                 Overhead Cupboards




                      Seductive Limba                            Sultry Mood                             Stipple Seal             Polar White



     Vinyl Wrap Cupboards




                        Flush Panel                              Rolled Edge                             Border Line              Molded Panel
                                                           (lin. Meters)                                          (lin. Meters)
                    FALSE      Kitchen                                                Laundry                                                    $   -
                                 Standard                                               Standard                                                 $   -
                                 Floor - Ceiling (P'try)                                Floor - Ceiling (Broom)
                               Bathroom / Ensuite                                     W/C / Powder




                        Polar White                              Vinyl Wrap 2                            Stipple Seal               Wenge



           Laminate Kickers




                       Stainess Steel                                 Black                                 Other



   Joinery Harware




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                              42
                       Stainess Steel                           Rolled Edge                      Border Line            Molded Panel

   Kitchen Splashback
                FALSE          Tile Splashback (see Tiles)
                                                              (m2)       (rate)
                    FALSE      Glass Splashback                       $ 400.00                                                              $   -
                                 FALSE                       FALSE                  FALSE

                                  FALSE                      FALSE                  FALSE

   Sinks




                    Trough and Cabinet                  45 litre Stainless Trough           1 3/4 S/S sink 1080mm    Single Bowl 780mm
                     Per Item $ 250.00                     Per Item $ 230.00                   Per Item $ 204.00      Per Item $ 175.00     $   -
                           Qty                                    Qty                                Qty                    Qty

   Basins




                      Imperial Novad                          Imperial Arena                    Imperial Avon       Imperial Arena Square
                     Per Item $ 104.00                       Per Item $ 210.00                Per Item $ 134.00       Per Item $ 230.00     $   -
                           Qty                                     Qty                              Qty                     Qty




                       Imperial Vada                           Glass Vessel                         Other 1                 Other 2
                     Per Item $ 230.00                       Per Item $ 265.00                Per Item $       -      Per Item $       -    $   -
                           Qty                                     Qty                              Qty                     Qty




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                          43
                                  COMPLETION STAGE
Definition:
     Completion stage means when all the works required under contract and specifications agreed upon have been completed within the
       BCA and within standard tollerances. Completion stage payment (hand over) to be released upon two items:
                   1. Issue of Certificate Of Occupancy from Building Surveyor as a result from on-site inspection
                   2. Successful site inspection of works by owners with builder
     Hand Over occurs once both parties are satisfied all components of the contract have been fulfilled. At this stage, a kit with manuals, keys,
        will be presented to the owner, but not before final remotes etc payment of the outstanding monies has been made.

Comments / Notes:
     Any dispute or question in supplied materials, quality of work or contracted requirements should first be referred to the "Standards And Tollerances
       Guide" for industry standards. Further dispute should tried to be resolved via the construction consultant. If no resolve can be made, this
       should be referred to the Building Surveyor. In the event this can not be resolved, an independent building advisor (selected by agreement)
       shall have authority to resolve any dispute prior to any legal avenue.
     Hand-Over or settlement can not occur until any issues are resolved. No occupancy of the house is to be allowed until such time.

     Garage Door - style and size as per plans




                       Roller Door                            Regency - Sectional                      Georgian - Sectional             Daintree - (wood look)
                  2800mm      $ 562.10                      2800mm      $ 709.50                     2800mm       $ 709.50             2800mm        $ 341.00 $             -
                        Qty:                                      Qty:                                      Qty:                               Qty:
                  4800mm      $ 924.00                      4800mm      $ 1,045.00                   4800mm       $ 1,045.00           4800mm        $ 407.00 $             -
                        Qty:                                      Qty:                                      Qty:                               Qty:
                                                                                                                                                    Cedar
                         Colorbond Colour:                                                                                                          Natural
                                                                                                                                       *NOTE - this is an extra to the cost
                              Auto Door with 2 remotes $ 440.00                      (qty)                                               of the Regency or Georgian
                           Windows to Regency (each) $    50.00                      (qty)                                               sectional door.
                           Windows to Gergian (each) $    95.00                      (qty)                                                                        $         -

     Paint
       FALSE      2 Coat System                   FALSE     3 Coat System                                                                                         $         -

                        Walls
                     FALSE                        FALSE                                                             White
                                  China White                Cottontail              Whisper White                 Watsonia               Other


                       Ceiling
                     FALSE                        FALSE                     FALSE                      FALSE        White      FALSE
                                  China White                Cottontail              Whisper White                 Watsonia               Other


                       Doors
                     TRUE                         FALSE                     FALSE                      FALSE        White      FALSE
                                  China White                Cottontail              Whisper White                 Watsonia               Other


                  Skirts / Arcs
                     TRUE                         FALSE                     FALSE                      FALSE        White      FALSE
                                  China White                Cottontail              Whisper White                 Watsonia               Other


       FALSE      Feature Wall 1                Location:                                                         $ 240.00                                        $         -

                                    Warm                       Very         FALSE                      FALSE
                     FALSE         Wetlands       FALSE      Terracotta                Pure Zeal                    Wasabi     FALSE      Other


       FALSE      Feature Wall 2                Location:                                                         $ 240.00                                        $         -

                     FALSE          Warm          FALSE        Very         FALSE                      FALSE
                                   Wetlands                  Terracotta                Pure Zeal                    Wasabi     FALSE      Other


       FALSE      Feature Wall 3                Location:                                                         $ 240.00                                        $         -

                     FALSE          Warm          FALSE        Very         FALSE                      FALSE
                                   Wetlands                  Terracotta                Pure Zeal                    Wasabi     FALSE      Other


       FALSE      Feature Wall 4                Location:                                                         $ 240.00                                        $         -

                     FALSE          Warm          FALSE        Very         FALSE                      FALSE
                                   Wetlands                  Terracotta                Pure Zeal                    Wasabi     FALSE      Other


     Tiling - Internal
                   Tiles to all wet areas are to be done over a waterproof membrane or other approved treatment as required by BCA. All internal corners / edges
                       to be sealed with silicon.

                  Waterproofing to floor                    (m2)                                                                                                  $         -
                              locations:


               Screeting to Shower Bases                    (m2)                                                                                                  $         -
                              locations:



           Floor Tiles - Glazed Porceilin



 Copyright: Abode Design Construct. This schedule
 cannot be copied or reproduced in any form                                            44
                    Travertine Natural                Travertine - Noche                    Melbourne - Grey                     Melbourne - Anthricite
                         300x300                           300x300                               330x330                                330x330
                 (Rate - m2) $    57.00            (Rate - m2) $     57.00               (Rate - m2) $   57.00                  (Rate - m2) $    57.00    $   -
                        (m2)                              (m2)                                  (m2)                                   (m2)




                     Fidama - Avorio                   Fidima - Bianco                        Fidima - Grigio                       Fidima - Mocha
                         450x450                           450x450                               450x450                                450x450
                 (Rate - m2) $   62.00             (Rate - m2) $    62.00                (Rate - m2) $     62.00                (Rate - m2) $   62.00     $   -
                        (m2)                              (m2)                                  (m2)                                   (m2)




                   Breeze - Anthracite                  Breeze - Coco                         Breeze - Sage                         Breeze - White
                         400x400                           400x400                               400x400                                400x400
                 (Rate - m2) $    62.00            (Rate - m2) $    62.00                (Rate - m2) $    62.00                 (Rate - m2) $   62.00     $   -
                        (m2)                              (m2)                                  (m2)                                   (m2)




           Wall Tiles - Glazed Porceilin           *NOTE - if you want same floor tile for wall, ADD m2 to the floor section and add note.




                    Travertine Natural                Travertine - Noche                    Melbourne - Grey                     Melbourne - Anthricite
                         300x450                           300x450                               330x600                                330x600
                 (Rate - m2) $    57.00            (Rate - m2) $     57.00               (Rate - m2) $   57.00                  (Rate - m2) $    57.00    $   -
                        (m2)                              (m2)                                  (m2)                                   (m2)




                       Gloss White                       Gloss White                           Gloss White                                   Other
                         200x100                           300x600                               330x600
                 (Rate - m2) $    64.00            (Rate - m2) $    62.00                (Rate - m2) $    60.00                 (Rate - m2)               $   -
                        (m2)                              (m2)                                  (m2)                                   (m2)




               Feature Tiles




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                     45
                      Cosmic Glass                      Platinum Glass                     Silver Glass               Silex Glass
                         150x600                            150x600                          150x600                   150x600
                 (Rate - m2) $ 365.00               (Rate - m2) $ 365.00             (Rate - m2) $ 365.00      (Rate - m2) $ 365.00      $   -
                        (m2)                               (m2)                             (m2)                      (m2)




              External Tiles




                   Breeze - Anthracite                   Breeze - Coco                    Breeze - Sage                 Other
                         400x400                            400x400                          400x400
                 (Rate - m2) $    64.00             (Rate - m2) $    64.00           (Rate - m2) $    64.00    (Rate - m2)               $   -
                        (m2)                               (m2)                             (m2)                      (m2)



   Tapware




                      Aztex Basin Set                   Aztex Bath Set                Aztex Wall Top Assys     Aztex W/Machine Stops
                     Per Item $ 103.00                 Per Item $   86.00              Per Item $     74.00       Per Item $  75.00 $        -
                           Qty                               Qty                             Qty                        Qty




                      Aztex Sink Set                   Alpine Mixer Sink               Alpine Mixer Basin       Alpine Mixer Shower
                     Per Item $ 125.00                 Per Item $ 108.00               Per Item $ 118.00         Per Item $ 118.00       $   -
                           Qty                               Qty                             Qty                       Qty




                 Alpine M/Shower w/Divert             Alto Mixer Sink Hob                Alto Mixer Basin       Alto Mixer Basin Wall
                     Per Item $ 148.00                 Per Item $ 202.00                Per Item $ 155.00        Per Item $     33.00    $   -
                           Qty                               Qty                              Qty                      Qty




                     Alto Mixer Shower             Alto Mixer Shower w/Divert          Alto Mixer Bath Wall              Other
                     Per Item $ 155.00                  Per Item $ 238.00               Per Item $     33.00      Per Item $     33.00   $   -
                           Qty                                Qty                             Qty                       Qty




   Shower Heads




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                      46
                  Dorf Stayfast Shwr Head                  Irwell Retro Shwr Outlet               Caroma Shwr & Bracket                  Caroma Shwr & Rail
                     Per Item $    68.00                      Per Item $ 102.00                     Per Item $ 101.00                     Per Item $ 118.00       $   -
                           Qty                                      Qty                                   Qty                                   Qty


   Toilets




                   Imperial Cleo Panpac                        Imperial Tribune CC                    Imperial Arena                              Other
                     Per Item $ 191.00                          Per Item $ 315.00                    Per Item $ 516.00                     Per Item $     66.00   $   -
                           Qty                                        Qty                                  Qty                                   Qty


   Electrical
                Ceiling Lights               NOTE - include lights to alfresco / porch area here. Matching switches to each light as required.




                       Batten Light                            Down Light - White                       Wall Lights                   Feature - Owner to Supply
                     Per Item $    72.00                       Per Item $    60.00                   Per Item $ 107.00                   Per Item $     22.00 $       -
                           Qty                                       Qty                                   Qty                                 Qty

                                                   (qty)        (rate)
                                 Dimmers:                  $      92.00               Location:                                                                   $   -

          External Lights - Wall Mounted




                        Fluro Light                              Wall Mount 1                       Wall Mount -Feature                       Flood Light
                    Per Item $ 119.00                          Per Item $ 110.00                     Per Item $ 143.00                     Per Item $     99.00   $   -
                          Qty                                        Qty                                   Qty                                   Qty
                  Garage
                                                   (qty)        (rate)
                           Motion Sensors                  $ 109.00                   Location:                                                                   $   -

                Power Points




                  GPO - Double Standard                    GPO - Double S/S Plate                  External GPO - Double                   Appliance Circuits
                    Per Item $    89.00                      Per Item $ 154.00                       Per Item $ 154.00                     Per Item $ 245.00      $   -
                          Qty                                      Qty                                     Qty                                   Qty


             Fans / Combos




                    Ceiling Exhaust Fan                        Exhaust Fan / Light                Heat / Fan / Light Combo             Heat / Fan / Light Combo
                     Per Item $ 109.00                         Per Item $ 154.00                    Per Item $ 189.00                    Per Item $ 239.00 $          -
                           Qty                                       Qty                                  Qty                                  Qty




                Miscellaneous




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                            47
                        Ceiling Fan                          Smoke Alarm                             Telephone Jack                        T.V. Jack
                     Per Item $ 260.00                     Per Item $ 220.00                        Per Item $ 110.00                  Per Item $ 110.00      $      -
                           Qty                                   Qty                                      Qty                                Qty




                       Ethernet Jack                    Video Intercom - Colour                  Alarm System - Hardwire                  TV Antanna
                     Per Item $ 110.00                     Per Item $ 460.00                        Per Item $ 715.00                  Per Item $ 715.00      $      -
                           Qty                                   Qty                                      Qty                                Qty


   Hotwater Systems




                 Dux Gas Hotwater 135ltr                Dux Gas Hotwater 170ltr                    Rinnai Infiniti V1200              Rinnai Infiniti V1500
                   Per Item $ 815.00                      Per Item $ 960.00                         Per Item $ 869.00                  Per Item $ 1,127.00    $      -
                         Qty                                    Qty                                       Qty                                Qty


   Solar Hotwater Systems




                 Rinnai Solar Master 20ltr              Rinnai Solar Master 20ltr                Rinnai Solar Master 26ltr          Rinnai Solar Master 26ltr
                      1 Solar Panel                         2 Solar Panels                            1 Solar Panel                     2 Solar Panels
                    Per Item $ 2,702.00                    Per Item $ 3,342.00                      Per Item $ 2,949.00                Per Item $ 3,589.00 $         -
                          Qty                                    Qty                                      Qty                                Qty


   Rainwater Tank              NOTE - rain water tank to be gravity fed by PVC pipes from ALL down pipes. Rainwater to be used to flush toilets and external taps.




                   Poly Tank - 200litre                Poly Slimline Tank 2000ltr                 Poly Tank - 5000litre                       Other
                  incl. Pump & Bi-Pass                   incl. Pump & Bi-Pass                     incl. Pump & Bi-Pass
                    Per Item $ 2,740.00                    Per Item $ 2,910.00                      Per Item $ 3,260.00                Per Item $       -     $      -
                          Qty                                    Qty                                      Qty                                Qty
                 Colour                                Colour                                    Colour

   Shower Screens




                 Semi-Framed "Executive"           Semi-F/less "Balmoral" - 1950mm               Fix & Swing - 1650 x 1000          Custom Shower Screen
                 Front Only $ 319.00                  Front Only $ 429.00                         Fix & Swing $ 242.00              Allowance $ 187.00 $             -
                        Qty:                                   Qty:                                      Qty:                              Qty:
      FALSE      900 x 900   $ 385.00          FALSE 900 x 900      $ 858.00
                        Qty:                                   Qty:
                 1200 x 900 $ 440.00                  1200 x 900 $ 935.00
                        Qty:                                   Qty:

                    FALSE      1950mm High - extra per screen (Executive Only)      $    22.00                                                                           0




   Bathroom Accessories




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                          48
                  R/Hill Toilet Roll Holder             R/Hill Towel Rail - Single               R/Hill Towel Rail - Double      R/Hill Towel Ring
                    Per Item $       36.00                 Per Item $      43.60                    Per Item $       67.00       Per Item $    38.00   $   -
                          Qty                                    Qty                                      Qty                          Qty




                  Aztex Toilet Roll Holder              Aztex Towel Rail - Single                Aztex Towel Rail - Double       Aztex Towel Ring
                    Per Item $      55.90                  Per Item $     77.00                     Per Item $ 105.00            Per Item $   62.70    $   -
                          Qty                                    Qty                                      Qty                          Qty


   Mirrors
                 Polished Edge Mirror fixed to Plaster / Tiles as appropriate
                   FALSE 600mm wide x 900mm high                                     (qty)        $  59.40                                             $   -
                   FALSE 1200mm wide x 900mm high                                    (qty)        $ 118.80                                             $   -

                 Bevelled Edge Mirror fixed to Plaster / Tiles as appropriate
                   FALSE 600mm wide x 900mm high                                     (qty)        $  68.31                                             $   -
                   FALSE 1200mm wide x 900mm high                                    (qty)        $ 136.62                                             $   -

      FALSE      Custom Bench to Ceiling mirror                      (m2)            $ 660.00                                                          $   -

   Kitchen Appliances




                  Emilia 600mm Slideout                  Emilia 600mm Canopy                      Emilia 900mm Canopy           Emilia 900mm Glass
                   Per Item $ 264.45                      Per Item $ 461.00                        Per Item $ 522.00             Per Item $ 831.00     $   -
                          Qty                                   Qty                                      Qty                           Qty




                    Emilia 600mm Gas                    Emilia 600mm Ceramic                        Emilia 700mm Gas          Emilia 600mm D/Washer
                    Per Item $ 341.65                     Per Item $ 532.40                         Per Item $ 599.05           Per Item $ 737.00 $        -
                          Qty                                   Qty                                       Qty                         Qty




                 Emilia 600mm Wall Oven                Emilia 700mm Wall Oven                    Emilia 600mm F/Standing      Emilia 900mm F/Standing
                   Per Item $ 597.00                     Per Item $ 1,290.30                        Per Item $ 1,378.30          Per Item $ 1,741.00 $     -
                          Qty                                   Qty                                       Qty                          Qty

   Split System Heating / Cooling                                                        (qty)       (rate)
     FALSE 2kw (approx) Split System - Heating & Cooling - 1 head                                 $ 1,490.00     Location:                             $   -

                                                                                         (qty)       (rate)
      FALSE      3kw (approx) Split System - Heating & Cooling                                    $ 2,750.00     Location:                             $   -
                                              (qty)      (rate)
                        Additional heads        0      $ 660.00                                                                                        $   -




   Timber Flooring - Floating Floating (Timber Hardwood Veneer)




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                             49
                          Merbeu                                 Kempas                                 Spotted Gum                         Sydney BlueGum
                      Per m2 $   75.00                        Per m2 $  75.00                          Per m2 $ 106.00                       Per m2 $ 106.00     $      -
                          m2                                      m2                                       m2                                    m2



   Carpet
                 Godfrey Hurst "Callisto" - 100% Polypropylene - Level Loop Pile




                        Beige Grey                              Red Brown                                  Panther                             Charcoal
                      Per m2 $     19.00                      Per m2 $    19.00                        Per m2 $    19.00                    Per m2 $    19.00    $      -
                          m2                                      m2                                       m2                                   m2



                 Quest "Flinders Green" - 100% Polypropylene




                       Ghost Gum                                  Natural                               French Toast                            Taupe
                      Per m2 $   25.70                        Per m2 $    25.70                        Per m2 $    25.70                    Per m2 $    25.70    $      -
                          m2                                      m2                                       m2                                   m2



                 Godfrey Hurst "Maybrook" - 100% Nylon Cut Pile




                           Glow                                    Villa                                 Wild Herb                            Dark Stone
                      Per m2 $       26.50                    Per m2 $       26.50                     Per m2 $    26.50                    Per m2 $     26.50   $      -
                          m2                                      m2                                       m2                                   m2



   House Clean                 Clean all interior, exterior walls, floors, windows and fixtures ready for a "hand-over".                                         $   440.00

   Balconies
                 Balconies to be waterproofed, drained and constructed in accordance with endorsed plans, engineering and done to relevant BCA. All balconies
                    to have min of 50mm min step down from door finished floor level to ensure no water overflow.

                 Floor Cover
                               Tiled Flooring over compressed cement sheet (tiles as noted in tile section)

                               Timber decking - waterproofed as appropriate
                                 FALSE Treated Pine - stained                        (m2)                                                                        $      -

                                                        Stain Colour:
                                                                               Chestnut                  Aust. Jarrah               Maple

                                                                                 Teak                      Walnut                   Cedar

                                  FALSE      Merbau - clear sealed                   (m2)                                                                        $      -




                 Balustrade                  NOTE: include any balustrade required for gound floor decking or steps / porch area.




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                              50
                        Plain Timber                         Vertical Stainless                       Stainless Wire                         Glass Balustrade
                     Per L/m $ 195.00                        Per L/m $ 145.00                        Per L/m $ 195.00                        Per L/m $ 330.00   $   -
                          L/m                                     L/m                                     L/m                                     L/m
                 (location)                              (location)                              (location)                              (location)


   Timber decking

      FALSE      Treated Pine - stained                  (m2)                                                                                                   $   -

                              Stain Colour:
                                              Chestnut                 Aust. Jarrah              Maple

                                              Teak                     Walnut                    Cedar

      FALSE      Merbau - clear sealed                   (m2)                                                                                                   $   -

   Sight Screens (overlooking)
              Sight screens installed as required by endorsed plans. Screens to be securely fixed and painted / stained to match house facade
                           Timber framed "louvered" slats angled - no more tah 25% transparency
                                        Small - Medium Size              qty:             $ 255.00                                                              $   -
                                        Medium - Large Size              qty:             $ 375.00                                                              $   -

                               Metal framed site screen - no more than 25% transparency. Colour to match Windows.
                                           Small - Medium Size               qty:            $ 470.00                                                           $   -
                                           Medium - Large Size               qty:            $ 580.00                                                           $   -

   External Stairs (if required) - refer to plans for location and other details.
     FALSE Treated Pine standard stair case as per plans.                             (number of TREADS in total)                                               $   -

      FALSE      Hardwood stairs - stained                             (number of TREADS in total)                                                              $   -

      FALSE      Concrete Steps - To be done at same time as slab and included in the cost of slab.
                             Brushed Concrete                     Tiles - see external tile section for details.

   Feature Framing / Pergolas
              All external timber features to be made from treated pine as per architectural plans / engineering and stained accordingly.
              Any roof cover to be allowed for in roofing section (in "Lock-Up" stage)
                               No. of 100x100 Posts / Foundation                (qty)                                                                           $   -
                              Timber Members:
                                               70x35               (l/m)                                                                                        $   -
                                               90x45               (l/m)                                                                                        $   -
                                              120x45               (l/m)                                                                                        $   -
                                              180x45               (l/m)                                                                                        $   -
                                              240x45               (l/m)                                                                                        $   -

                              Stain Colour:
                                              Chestnut                 Aust. Jarrah              Maple

                                              Teak                     Walnut                    Cedar




   Special Requirements / Notes
              Special Requirement 1                                                                                             (cost)      (qty)
                          Description:                                                                                      $        -                          $   -
                                                         to be supplied by owner                          Labour to install $        -                          $   -

                                                                  Location / Notes




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                              51
                 Special Requirement 2                                                                   (cost)   (qty)
                            Description:                                                             $        -           $   -
                                                   to be supplied by owner         Labour to install $        -           $   -

                                                           Location / Notes



                 Special Requirement 3                                                                   (cost)   (qty)
                            Description:                                                             $        -           $   -
                                                   to be supplied by owner         Labour to install $        -           $   -

                                                           Location / Notes



                 Special Requirement 4                                                                   (cost)   (qty)
                            Description:                                                             $        -           $   -
                                                   to be supplied by owner         Labour to install $        -           $   -

                                                           Location / Notes



                 Special Requirement 5                                                                   (cost)   (qty)
                            Description:                                                             $        -           $   -
                                                   to be supplied by owner         Labour to install $        -           $   -

                                                           Location / Notes




Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form                                    52
                                        HOME OWNERS TERMITE CONTROL AGREEMENT.

Project Address                     0
                                    0

   1      I will have the house inspected regularly by a competent pest control operator and to seek to comply with the advice of that operator.

   2      I will not build garden beds over weep holes.

   3      If my perimeter barrier is the exposed slab edge, I will maintain it to allow visual inspection.

   4      If I build an extension or renovate, I will reinstate any broken barriers.

   5      I will ensure that if any other work breaks a barrier, the barrier will be reinstated.

   6      I will not store firewood close to the house.

   7      I will comply with the warranty for the system of tennite control installed.

   8      I will regularly inspect for infestations.

   9      I will inspect the perimeter and underside (if appropriate) to detect any breach of the barriers.

   10     I am aware that if' do not keep this agreement both the product warranty and the State's statutoI)' warranty may be voided.



   Signed by Owner / Developer:

                        Date:




       Copyright: Abode Design Construct. This schedule
       cannot be copied or reproduced in any form                                             53
 $         27,996
 $              560




Foot Note                      Rate            Total Contract   Contractor / Supplier   Email Address      Date Required Days Allowed Deadline         Days Notice




Site Set-Out                                                    George Maclaren         george@george.com.au     7/22/2009          2      7/24/2009             14


P.I.C. Permit                                                   Builder                                            6/20/2009
                                                                                        owner@ownersemailaddress.com.au                    7/23/2009                 0




Pre-Slab Plumbing                                               Plumber                 george@george.com.au     7/25/2009          2      7/27/2009             14




Power / Phone                                                   Electrician             george@george.com.au     7/28/2009          3      7/31/2009             14
                                                                Electrical Supplier
                                                                Equipment Hire




       Copyright: Abode Design Construct. This schedule
       cannot be copied or reproduced in any form                                       54
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         55
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         56
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         57
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         58
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         59
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         60
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         61
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         62
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         63
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         64
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         65
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         66
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         67
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         68
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         69
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         70
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         71
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         72
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         73
Copyright: Abode Design Construct. This schedule
cannot be copied or reproduced in any form         74
Email / SMS Date Initial      SMS Date Final        SMS Number SMS Text




       7/8/2009                  7/20/2009          0448885000   Just a reminder that site set-out at XXXX is required in 2 days, and needs to be completed by XXXXX


      6/20/2009                  7/18/2009          0448885000   Just a reminder that P.I.C. Number for the project at XXXX is required in 5 days.




      7/11/2009                  7/23/2009          0448885000   Just a reminder that site set-out at XXXX is required in 2 days, and needs to be completed by XXXXX




      7/14/2009                  7/26/2009          0448885000   Just a reminder that site set-out at XXXX is required in 2 days, and needs to be completed by XXXXX




      Copyright: Abode Design Construct. This schedule
      cannot be copied or reproduced in any form                                         75
                                     VICTORIAN
       NEW HOMES CONTRACT
           OCTOBER 2004
                                                                                      This document is produced by Housing Industry Association (NSW Division) and is available for use only by HIA Members.




              Copyright Reserved - no portion of this agreement may be reproduced by any process whatsoever without the written consent of the Housing Industry Association (NSW Division).




           HOUSING INDUSTRY ASSOCIATION




DEVELOPER / OWNER                                                                0

  PROJECT ADDRESS                                                                0
                                                                                 0




                                                    ©COPYRIGHT HIA 2004
    All rights reserved. No part of this document may be reproduced, stored, copied, distributed
        or transmitted in any form or by any means without the prior written consent of HIA.
                              NOTICE APPROVED BY THE DIRECTOR OF
                               FAIR TRADING AND BUSINESS AFFAIRS
                                   PURSUANT TO SECTION 31 (n)
                          OF THE DOMESTIC BUILDING CONTRACTS ACT 1995


                                   COOLING OFF PERIOD
NOTICE TO BUILDING OWNER: YOU MAY END THIS CONTRACT WITHIN FIVE CLEAR
BUSINESS DAYS AFTER RECEIPT BY YOU OF A SIGNED COPY OF THE CONTRACT BY
FILLING IN THE NOTICE BELOW AND GIVING IT TO THE BUILDER IN ONE OF THE
FOLLOWING WAYS:

               (1) PERSONALLY;
               (2) LEAVING IT AT HIS OR HER ADDRESS SET OUT IN THE CONTRACT WITH A
                PERSON WHO APPEARS TO BE AT LEAST 16 YEARS OLD;
               (3) SENDING IT BY PRE-PAID REGISTERED POST TO THE ADDRESS SET OUT IN
               THIS CONTRACT;
               (4) SENDING IT BY FACSIMILE TO THE FACSIMILE NUMBER (IF ANY) SET OUT
                IN THIS CONTRACT.



                               DETACH ALONG DOTTED LINE


                    NOTICE THAT CONTRACT IS ENDED
A Building Owner cannot withdraw from a contract under the Act if:

        1. The Builder and the Building Owner have previously entered into a major domestic building
        contract that is in substantially the same terms for the carrying out of the work in relation to
        the same home or land; OR

        2. The Building Owner received independent legal advice from a practicing solicitor concerning
         the contract before entering into the contract.


To                                                                                                      (Builder)

I/We
give notice under our contract with you that the Contract is ended. Please refund the deposit less $100 and any
out of pocket expenses incurred by you which I have previously approved.

Building Owner's signature

Date:               /          /
                      NOTICE APPROVED BY THE DIRECTOR OF FAIR TRADING AND
                           BUSINESS AFFAIRS PURSUANT TO SECTION 31 (r)
                          OF THE DOMESTIC BUILDING CONTRACTS ACT 1995




                                    CHECKLIST
                   BEFORE SIGNING THIS LEGALLY BINDING CONTRACT
                                  CHECK THIS LIST
·      Has an insurance policy or certificate of currency for builder's insurance been issued and       YES or NO
provided to you? If not, the Contract is conditional upon you receiving either an insurance policy or
a certificate of currency for builder's insurance.
·     If this Contract is conditional upon the Building Owner receiving written approval for finance    YES or NO
has the Building Owner obtained such approval?
          If you answer 'no' to any of the following questions you are not ready to sign the Contract
·     Has the Building Owner had this Contract long enough to read and understand it?                   YES or NO
·     Has the Building Owner been provided with evidence that the Builder named in this Contract is     YES or NO
registered with the Building Practitioners Board?
·    Are the price and progress payments clearly stated?                                                YES or NO
·    Does the Building Owner understand how the price is calculated and may be varied?                  YES or NO
·    Has the Builder assessed the suitability of the site for the proposed works and if tests are       YES or NO
necessary have they been carried out before signing the Contract?
·    If a Deposit is payable, is it within the legal limit?                                             YES or NO
         The maximum under the Domestic Building Contracts Act is:
          i   10% if the Price is less than $20,000; or
          ii 5% if the Price is $20,000 or more.
·    Is the work shown and described clearly in the Contract, plans or specifications and any other     YES or NO
relevant documents such as engineering computations or soil report?
·    Are the Building Owner's special requirements or finishes included in the plans or                 YES or NO
specifications?
·    Are the commencement date and completion date clearly stated or capable of being ascertained?      YES or NO

·    Is the procedure for extensions of time understood?                                                YES or NO
·    Are any 'provisional sums' or 'prime cost items' clearly stated in the schedules and understood?   YES or NO

·    Is the procedure for variations of plans or specifications understood?                             YES or NO
·    Do you understand the circumstances in which you can end the Contract?                             YES or NO

NOTE: This checklist does not form part of the Contract.
Read, signed and dated by the Building Owner


                                                                 Date:                    /       /
                                             INDEX
                                                                                            Page
PARTICULARS OF CONTRACT                                                                          1, 2
SCHEDULE 1                                                                                    3, 4, 5
SCHEDULE 2          Prime Cost Items and Provisional Sums                                           6
SCHEDULE 3          Construction Stages and Table                                                   7
                    Method 1             Progress Payments                                          8
                    Method 2             Progress Payments                                          9
ATTACHMENT 1                                                                                       10
SCHEDULE 4              Special Conditions                                                         11
SCHEDULE 5              Excluded Items                                                             11
SECTION A       INTERPRETATION
                        Clause 1             Definitions                                      12, 13
                        Clause 2             Headings, Footnotes, etc                             14
                        Clause 3             Contract Complete in Itself                          14
                        Clause 4             Joint and Several Obligations                        14
                        Clause 5             Assignment and Sub-letting                           14
                        Clause 6             Notices                                              14
SECTION B       MAIN OBLIGATIONS OF THE PARTIES
                        Clause 7             Building Act Insurance                               15
                        Clause 8             Finance                                              15
                        Clause 9             Deposit                                              15
                        Clause 10            Builder's Commencement and Completion Times      15, 16
                        Clause 11            Statutory Warranties                                 16
                        Clause 12            Owner Must Pay the Contract Price                16, 17
                        Clause 13            Owner Must Provide Essential Information             18
SECTION C       BEFORE WORK BEGINS
                        Clause 14            Owner to Supply Documents                            19
                        Clause 15            Copyright                                            19
                        Clause 16            Interpretation of Contract Documents             19, 20
                        Clause 17            Owner Must Identify the Land                         20
                        Clause 18            Building Permit Fees                                 20
                        Clause 19            Planning Approvals and Building Permits              21
                        Clause 20            Insurance                                            22


SECTION D       DURING WORK
                        Clause 21            Variations to Statutory Laws                         23
                        Clause 22            Variations to State or Commonwealth Tax Laws         24
                        Clause 23            Requested Variations                                 24
                        Clause 24            Effect of Variations                                 25
                        Clause 25            Owner Must Provide Land Access                       25
                        Clause 26            Vehicular Site Access                                25
                        Clause 27            Owner Must Not Direct Builder's Workers              25
                        Clause 28            Owner Must Arrange Lending Body Inspections          25
                        Clause 29            Builder to Claim Progress Payments               25, 26
                        Clause 30            Owner Must Make Progress Payments                    26
                        Clause 31            Builder's Right to Agreed Damages                    26
                     Clause 32         Unfixed Materials on Site                              26
                     Clause 33         Prime Cost Items and Provisional Sums              26, 27
                     Clause 34         Builder's Right to Extensions of Time              27, 28
                     Clause 35         Suspension of Work                                     29
SECTION E      COMPLETION OF WORKS
                     Clause 36         Final Inspection                                       29
                     Clause 37         List of Defects and Final Payment                   29,30
                     Clause 38         Handover and Final Payment                             30
                     Clause 39         Defects Within the 3 Month Period                      30
                     Clause 40         Owner's Claim for Agreed Damages                       31
                     Clause 41         Ending This Contract Under Bankruptcy or Liquidations 31
                     Clause 42         Builder's Right to End This Contract               31, 32
                     Clause 43         Owner's Right to End This Contract                 32, 33
                     Clause 44         Owner May Get Another Builder to Finish Work           33
                     Clause 45         Subcontracting                                         33
                     Clause 46         No Waiver                                              33
                     Clause 47         Severance                                              33
SECTION F      DISPUTES AND TRIBUNAL
                                       Explanatory Notes                                     33
ATTACHMENT 2                           Directors' Guarantee                               34, 35
                               PARTICULARS OF CONTRACT
THIS CONTRACT
IS BETWEEN:                           OWNER/S:                          0

NOTE                                               of                   0
If the Owner is a company, a                                            0
Directors' Guarantee must be signed
before this Contract is signed. See                          Phone:
Attachment 2.

                                      BUILDER –                        0
                                                                       0
                                                                       0
                                                                   Phone         0
                                                                     Fax         0


                                                           Registration #        0




THE BUILDING WORKS:                   0
                                      0

                                      The SPECIFICATIONS include                pages that were prepared and
                                      supplied by Abode Design & Construct
NOTE                                  There are              sheets of PLANS and they were prepared AND
These documents must be signed        supplied by -Craig Corfiled
and dated with the Contract.
                                      There are              sheets in the ENGINEER'S DESIGNS AND it/they,
                                      were, prepared by
                                      for the OWNER



LENDING DETAILS:                      The LENDING BODY is

                                      of




WARRANTY/                             INSURER:
PROFESSIONAL                          Of
INDEMNITY INSURER                                                                    Postcode
                                      Telephone                                      Fax

                                      Name of Insured

                                      1(a) Except for the Builder's interest in this Contract and the legal
                                      requirement for it to be arranged in respect of the Building Works, the
                                      Builder receives no benefits in relation to arranging such insurance.
                                      1(b) The Builder further confirms that such insurance may be arranged
                                      with an insurer of the Owner's choice.
                                      2 The cost to the Owner for this insurance is              $ N/A
THE LAND                                0
                                        0

                                        The TITLE PARTICULARS are:
                                        Volume No.                         Folio No.
                                        Plan of Subdivision No.
                                        Covenants, Restrictions and/or Easements on the Land


SIGNED OWNER/S                          SIGNED OWNER/S:

NOTES
Only sign this Contract when:
·All the required Contract                                          (If more than one owner, all must sign)
Documents, including the                SIGNED WITNESS:
Specifications and the Plans, are       Name
attached and signed; and
·All the details in the Schedules       Address
have been filled in.


SIGNED BUILDER                          SIGNED BY OR ON BEHALF OF THE BUILDER:

NOTE                                    SIGNED WITNESS:
The Builder must give the Owner a       Name
readily legible signed copy of this
Contract within 5 clear Days after it   Address
is signed


CONTRACT DATE

NOTE                                    DATE OF CONTRACT                                   Wednesday, May 16, 2012
Insert date when Contract is signed
by both parties.
                                        ANTICIPATED COMMENCEMENT DATE:                                          6/13/2012
                                            Note: Official commencement date is the date of either the building permit has
                                            been issued or the date when first soil has been turned on site - which ever is
                                            the later.
                                                       SCHEDULE 1
1. Time for completion                      255     Days including the following estimates for delays:
- building period                                                Deadline:             2/23/2013 (excluding time extensions)
(Clause 11)                                 25      Days inclement weather and the effects of inclement weather
                                            50      Days weekends, public holidays, rostered days off and other
NOTE                                                foreseeable breaks in the continuity of the work
Building Works to be carried out by         30      Days "Other" days that are reasonable having regard to the
the Owner or the Owner's agent are
                                                    nature of the Building Work.
as listed in Schedule 5.


                                      The Builder has excluded from the Contract Price amounts payable to third
                                      parties in relation to the Building Works. The work or things listed below are not
                                      included in the Contract Price and the Builder's reasonable estimates of the amounts
                                       payable in respect to them are listed as follows:

                                      Item                                               Estimate

                                      1     Conveying connection or installation of

                                      (a)           Gas                                  $ NIL
                                      (b)           Electricity                          $200.00
                                      (c)           Telephone to one point               $200.00
                                      (d)           Water                                $ NIL
                                      (e)           Sewerage                             $ NIL

                                      2     Issue of Planning Permit                     $ NIL

                                      3     Issue of Building Permit                     $ NIL

                                      4     Other

                                          (a) Residential Building Code Compliance       $ NIL

                                          (b) Municipal Shire Inspection                 $ NIL

2. Contract Price                     Price excluding GST                    $        31,105.45
(Clause 12)                           GST on the above amount                $         3,110.54
                             Contract Price including GST $                        34,215.99

                                      The Contract Price is GST inclusive and covers all site improvements / subdivision.

The price of this Contract is not fixed, and may be altered as a result of:

          ·   additional costs caused by any deficiency or conflict within the Contract Documents (Refer to Clause 16);
          ·   additional building permit fees (Refer to Clause 18);
          ·   variations including those required by the council/registered building surveyor (Refer to Clause 21);
          ·   the cost of providing access where applicable (Refer to Clause 26);
          ·   interest on overdue payments (Refer to Clause 31); and
          ·   the actual cost of Prime Cost Items and work for which Provisional Sums have been specified
              exceeding the estimates set out in the Contract (Refer to Clause 33).

Ensure that you fully understand how the clauses dealing with these matters affect the Contract Price.
WARNING TO OWNER AS TO PRIME COST ITEMS

It is always better to get a fixed price for all work. However, some fixtures and fittings may need to be selected
after the Contract is signed e.g. a stove, type of taps etc. If these items are specified as Prime Cost Items the
Builder will allow an amount in the Contract Price which should cover the expected cost of the item.

NOTE:      If the actual cost is more than the amount allowed you will have to pay the extra amount.
           You may also have to pay the Builder's margin in the extra amount. If this is intended, the margin should
            be specified, or cannot be claimed unless the Owner agrees in writing to such additional amount. If the
           Prime Cost is less than that allowed for in the Contract, the difference should be deducted from the
           Contract Price.

3. Deposit
 (Clause 9)                                    $             1,710.80 (5 % of Contract Price)

4. Person responsible for                     N/A
obtaining and paying for
planning approval and
number of days to
obtain planning
approval
(Clause 19)

5. Person responsible for                     By Builder within 30 days of the date of this Contract
obtaining and paying for
the Building permit and
number of days to
obtain Building Permit
(Clause 19)

6. Percentage if Contract                     20.0%
is ended                                      (if no percentage stated then 20% to cover Builder's overheads,
(Clauses 19.4 and 21.4)                        supervision and profit)

7. Number of Days to make                     Seven days
Progress Payments after stage
completed and notice received

  (Clause 30)
8. Agreed interest for late                   15 % per annum
Progress Payments
(Clause 31)

9. Agreed damages for                          $       33 per week all inclusive
late completion of the                        (if nothing stated then $250 per week)
Building Works
(Clause 40)

10. Percentage applicable                     2.0%
to extra work
(Clauses 12.2, 17.2 and 21.2)

11. Lending Body Finance                      Finance $......................... With approval to be within .................days
(Clause 8.0)                                  from the date of this Contract (14 days unless otherwise agreed)
12. Agreed damages for                         $       33 per week per unit
delays                                        (if nothing stated then $250 per week)
(Clause 34.1)




                          SCHEDULE 2
             PRIME COST AND PROVISIONAL SUM ITEMS
                       AND ALLOWANCES
                                           Refer to procedures in Clauses 12 and 33


The parties agree that the following allowances are included in the Contract Price. The allowances included
in the Contract Price by the Builder for Prime Cost Items and Provisional Sums must be a reasonable estimate of
the price for the supply of the item and/or the work to be performed, in accordance with Sections 20, 21 and 22 of
the Domestic Building Contracts Act 1995.

                      PRIME COST ITEMS FITTINGS, FIXTURES, MATERIALS ONLY
                                                                                               $       MARGIN
                DETAILED DESCRIPTION OF THE ITEM             QTY          $ PER UNIT                     ON
                                                                                           allowance
                                                                                                       EXCESS
           *Refer to specifications - all dollar amounts                                                2.0%
            displayed in this section are Prime Cost
            allowances and are subject to Builders Margin




                      PROVISIONAL SUM ITEMS LABOUR AND MATERIALS
                                                                                                       MARGIN
                                                                                               $
                DETAILED DESCRIPTION OF THE ITEM             QTY          $ PER UNIT                     ON
                                                                                           allowance
                                                                                                       EXCESS
                                                                                                        2.0%
                                               SCHEDULE 3
                       CONSTRUCTION STAGES APPLICABLE TO PROGRESS PAYMENTS
Clear Site' means                    for sites where existing conditions such as house, trees, rubble etc are
                                     present on a site and the contract allows for the removal of these items
                                     to leave a site which is clear and ready for a builder to commence works.
'Base stage' means                          (a) in the case of a home with a timber floor, the stage when the
                                                          concrete footings for the floor are poured and the base
                                                         brickwork is built to floor level;
                                                 (b) in the case of a home with a timber floor with no base
                                                         brickwork, the stage when the stumps, piers or columns are
                                                         completed;
                                                 (c) in the case of a home with suspended concrete slab floor, the
                                                          stage when the concrete footings are poured;
                                                 (d) in the case of a home with a concrete floor, the stage when
                                                         the floor is completed; and
                                                 (e) in the case of a home for which the exterior walls and roof a
                                                         re constructed before the floor is constructed, the stage when
                                                         the concrete footings are poured.

'Frame stage' means                        the stage when a home's frame is completed and approved by a
                                            building surveyor.
'Lock-up stage' means                      the stage when a home's external wall cladding and roof covering is
                                           fixed, the flooring is laid and external doors and external windows are
                                           fixed (even if those doors or windows are only temporary).
'Fixing stage' means                       the stage when all internal cladding, architraves, skirting, doors, built-in
                                           shelves, baths, basins, troughs, sinks, cabinets and cupboards of a
                                           home are fitted and fixed in position.
'Completion' means                         the Building Works are complete in accordance with the Contract
                                           Documents.




PROGRESS PAYMENTS                          There are five stages. These are described below. Fill in
                                           the percentage of the Contract Price and the amount payable for each
                                           of the stages applicable to your Contract (for example, if the Contract
                                            is to build to lock-up stage, fill in only the first 3 stages and delete the l
                                           ast 2 stages; if the Contract is to complete the Building Works
                                           complete all 5 stages).

                                           There are five different types of construction for the Base Stage - refer
                                           to Schedule 3. In the space * provided below fill in (a), (b), (c), (d) or
                                           (e) to indicate which type will be used under this Contract
UNIT 1 - Construction & Site Improvements
                     STAGE                % CONTRACT              AMOUNT
          Deposit                                5%           $         1,710.80
          Clear Site                            10%           $         3,421.60
          Base Stage                            10%           $         3,421.60
          Frame Stage                           15%           $         5,132.40
          Lock-Up Stage                         30%           $        10,264.80
          Fixing Stage                          20%           $         6,843.20
          Completion                            10%           $         3,421.60
            TOTAL CONTRACT                     100%           $        34,215.99
                                        (Including Deposit)

UNIT 2 - Construction & Site Improvements
                     STAGE                % CONTRACT              AMOUNT
          Deposit                                5%           $            283.02
          Clear Site                            10%           $            566.03
          Base Stage                            10%           $            566.03
          Frame Stage                           15%           $            849.05
          Lock-Up Stage                         30%           $          1,698.10
          Fixing Stage                          20%           $          1,132.07
          Completion                            10%           $            566.03
            TOTAL CONTRACT                     100%           $          5,660.33
                                        (Including Deposit)

UNIT 3 - Construction & Site Improvements
                     STAGE                % CONTRACT              AMOUNT
          Deposit                                5%           $            283.02
          Clear Site                            10%           $            566.03
          Base Stage                            10%           $            566.03
          Frame Stage                           15%           $            849.05
          Lock-Up Stage                         30%           $          1,698.10
          Fixing Stage                          20%           $          1,132.07
          Completion                            10%           $            566.03
            TOTAL CONTRACT                     100%           $          5,660.33
                                        (Including Deposit)

UNIT 4 - Construction & Site Improvements
                     STAGE                % CONTRACT              AMOUNT
          Deposit                                5%           $            283.02
          Clear Site                            10%           $            566.03
          Base Stage                            10%           $            566.03
          Frame Stage                           15%           $            849.05
          Lock-Up Stage                         30%           $          1,698.10
          Fixing Stage                          20%           $          1,132.07
          Completion                            10%           $            566.03
            TOTAL CONTRACT                     100%           $          5,660.33
                                        (Including Deposit)

UNIT 5 - Construction & Site Improvements
                     STAGE                % CONTRACT              AMOUNT
          Deposit                              5%             $            283.02
          Clear Site                          10%             $            566.03
          Base Stage                          10%             $            566.03
          Frame Stage                         15%             $            849.05
          Lock-Up Stage                          30%           $        1,698.10
          Fixing Stage                           20%           $        1,132.07
          Completion                             10%           $          566.03
            TOTAL CONTRACT                      100%           $        5,660.33
                                         (Including Deposit)

UNIT 6 - Construction & Site Improvements
                     STAGE                % CONTRACT               AMOUNT
          Deposit                                5%            $          283.02
          Clear Site                            10%            $          566.03
          Base Stage                            10%            $          566.03
          Frame Stage                           15%            $          849.05
          Lock-Up Stage                         30%            $        1,698.10
          Fixing Stage                          20%            $        1,132.07
          Completion                            10%            $          566.03
            TOTAL CONTRACT                     100%            $        5,660.33
                                        (Including Deposit)

UNIT 7 - Construction & Site Improvements
                     STAGE                % CONTRACT               AMOUNT
          Deposit                                5%            $          283.02
          Clear Site                            10%            $          566.03
          Base Stage                            10%            $          566.03
          Frame Stage                           15%            $          849.05
          Lock-Up Stage                         30%            $        1,698.10
          Fixing Stage                          20%            $        1,132.07
          Completion                            10%            $          566.03
            TOTAL CONTRACT                     100%            $        5,660.33
                                        (Including Deposit)

UNIT 8 - Construction & Site Improvements
                     STAGE                % CONTRACT               AMOUNT
          Deposit                                5%            $          283.02
          Clear Site                            10%            $          566.03
          Base Stage                            10%            $          566.03
          Frame Stage                           15%            $          849.05
          Lock-Up Stage                         30%            $        1,698.10
          Fixing Stage                          20%            $        1,132.07
          Completion                            10%            $          566.03
            TOTAL CONTRACT                     100%            $        5,660.33
                                        (Including Deposit)

UNIT 9 - Construction & Site Improvements
                     STAGE                % CONTRACT               AMOUNT
          Deposit                                5%            $          283.02
          Clear Site                            10%            $          566.03
          Base Stage                            10%            $          566.03
          Frame Stage                           15%            $          849.05
          Lock-Up Stage                         30%            $        1,698.10
          Fixing Stage                          20%            $        1,132.07
          Completion                            10%            $          566.03
            TOTAL CONTRACT                     100%            $        5,660.33
                                        (Including Deposit)
UNIT 10 - Construction & Site Improvements
                     STAGE               % CONTRACT                               AMOUNT
          Deposit                                5%                     $                      283.02
          Clear Site                            10%                     $                      566.03
          Base Stage                            10%                     $                      566.03
          Frame Stage                           15%                     $                      849.05
          Lock-Up Stage                         30%                     $                    1,698.10
          Fixing Stage                          20%                     $                    1,132.07
          Completion                            10%                     $                      566.03
            TOTAL CONTRACT                     100%                     $                    5,660.33
                                        (Including Deposit)




                                              ATTACHMENT 1
                                    FORM 1 OF THE REGULATIONS
                                                                                                            Regulation 6(a)


                      WARNING TO OWNER - CHANGE OF LEGAL RIGHTS


Section 40 of the Domestic Building Contracts Act 1995 provides that a Builder cannot charge more than a
fixed percentage of the total Contract Price at the completion of each stage of building a home.

The Act also allows the parties to agree in writing to change the stages and the percentage of the Contract Price
to be paid at the completion of each stage.
There are several ways in which a particular Contract can vary from the normal, and it is these exceptional cases
which have caused the law to allow for these changes. Examples would include:
          · where it is very expensive to prepare the land for building, for example, where the site is steep or rocky;

         · where the house is so large that it will take a long time to complete, and intermediate Progress Payments
           are therefore required;

         · where exceptionally expensive finishes are required, meaning that the final stage will represent a much
           larger proportion of the whole price;

         · where an architect is engaged to independently assess the value of completed work for Progress Payments.

You should not agree to Progress Payments different from those provided in the Act unless your house is
unusual in some way and you are SURE THAT DIFFERENT PROGRESS PAYMENTS ARE NECESSARY and
you understand clearly why the change is needed in the case of your particular house. If you have any doubts,
you could contact:

           Housing Industry Association
           The Master Builders' Association of Victoria
          Office of Fair Trading and Business Affairs
          Royal Australian Institute of Architects




I acknowledge that I have read this warning before signing the Contract.

Signature of Building Owner.




                                                    SCHEDULE 4
                                                SPECIAL CONDITIONS
SC-1      The builder from time to time may pay the "Builder's Consultant" - Abode Design & Construct a commission for their
            services. This amount is included in the contract and payable by the builder.

SC-2      Abode Design & Construct Pty Ltd take no responsibility for actions or non-actions by the builder. This contract
            is directly between the builder and the owner and all liability and responsibilities are between these two parties.

SC-3      Any global increases in raw materials and labour from date of quotes received may be passed on to the owner
           developer. Any increases must be able to be substantiated by applicable external bodies and should only increase
           by the gross amount (i.e. No builders margin applied). Builder must produce origional quote as varification of any
           costs and increases. This should only be done in rare circumstances.

SC-4




SC-5




SC-6
                                              SCHEDULE 5
                                              EXCLUDED ITEMS
The Owner acknowledges that the Building Works do not include those items of building work and materials
listed below and accepts full responsibility for this work and materials.


As Per Detailed Specification




            The Owner to sign here




A.            INTERPRETATION
Definitions                           1   ·     'Builder' means the person, partnership or company named in the
                                          Particulars of Contract.
NOTE
Throughout the Contract whenever          ·    'Building Period' means the building construction time estimated by the
a defined phrase or word is used it       Builder to carry out the Building Works, as stated in Item 1 of Schedule 1,
is shown in bold print                    subject to Clause 34.

                                          ·      'Building Works' means the works to be carried out and completed
                                          by the Builder as shown in the Contract Documents
                                          and as varied in accordance with this Contract.
                                          ·      'Building Site' means the land upon which the Building Works
                                           are to be carried out.

                                          ·     'Business Day' means a day that is not a Saturday or a Sunday or
                                           a day that is wholly or partly observed as a public holiday
                                          throughout Victoria.

                                          ·   'Commencement' means the day on which the Building Works
                                          commence on the Building Site.

                                          ·     'Completion' means that the Building Works to be carried out
                                          under the Contract have been completed in accordance with the
                                          Plans and the Specifications and the Owner set out in the Contract.

                                          ·    'Contract Documents' means this signed Contract and these
                                          Conditions, signed Specifications, signed Plans and an.
                                          Engineer's Design

                                          ·     'Contract Price' means the amount shown in Item 2 of Schedule
                                          1 as varied by the Contract.
              ·     'Days' means calendar days.

              ·     'Engineer's Design' includes a footing design or other structural
              design that has been prepared by a qualified Engineer for the concrete
              footings, stumps, piers or slab construction, or for a particular part of
              the Building Works that requires a structural design, drainage design
              where appropriate and computations accompanying the foregoing.

              ·     'Final Claim' means the Builder's claim setting out the balance
              of the Contract Price due for payment by the Owner to the Builder,
              taking into account all monies paid by the Owner and all other amounts
              to be added to or deducted from the Contract Price under this Contract

              ·    'Final Payment' means the payment of the amount of the Final
              Claim.

              ·     'Foundations Data' has the same meaning as set out in Section
              30 of the Domestic Building Contracts Act 1995.




Definitions   ·     'Land' means the land containing the Building Site.
Continued     ·     'Lending Body' means a person or corporation which has agreed or
              agrees to make a loan to the Owner to enable the Owner to pay monies which
              become payable to the Builder under this Contract.
              ·    'Notice of Completion' means a notice given by the Builder pursuant to
              Clause 36 informing the Owner that the Building Works have reached
              Completion.
              ·     'Owner' means the person, partnership or company named in the
              Particulars of Contract and wherever appearing in this Contract includes their
              agents, executors and administrators.
              ·    'Plans' means the drawings showing the layout and design details of the
              Building Works with dimensions and elevations, including the Engineer's
              Design.
              ·     'Possession' includes occupancy, use or control.
              ·     'Prime Cost Item' means an item (for example, a fixture or fitting) that
              either has not been selected or whose price is not known at the time which this
              Contract is entered into and for the cost of supply and delivery which the
              Builder has made allowance for in the Contract Price.

              ·    'Progress Payment' means a payment that the Builder may claim on the
              completion of a construction stage as detailed in Schedule 3.

              ·     'Provisional Sum Item' means an item of work (including labour and
              materials) for which the Builder, after making all reasonable inquiries, cannot
              give a definite price at the time that this Contract is entered into and which the
              Builder has made allowance for in the Contract Price.

              ·    'Site Access' means access for delivery and tradesmen's vehicles from the
              roadway to the Building Site on the Land.
                                         ·     'Site Drainage' means drains deemed by the Soil Test Report to be
                                         necessary to protect the Building Works from water damage on the Building
                                         Site.
                                         ·     'Soil Test Report' means an investigation of the Building Site to seek
                                         evidence of filling on the Land, concealed rock and to establish a depth for the
                                         footing excavations.

                                         ·     'Specifications' means the Contract document that shows the full details
                                         of the Building Works and includes the details of the materials to be supplied.


                                         ·     'Statutory or Other Authority' means the Local Government, State or
                                         Federal Government, or any Government Agency or authorised private certifier
                                         that has the power to affect the Building Works.

                                         ·     'Sub-Contractor' means a person, partnership or company who contracts
                                         with the Builder to carry out part of the Building Works.


Headings, footnotes, etc.             2 The headings (but not the boxed explanatory or side notes) form part of this
                                        Contract.

                                      3 This Contract is complete in itself and overrides any earlier agreement, whether
Contract complete
                                        made verbally or in writing.
in itself
                                      4 If there is more than one Owner under this Contract, their obligations are joint
Joint and several obligations           and several.


                                      5 Either party may assign their rights and duties under this Contract with the
Assignment and                          written consent of the other.
sub‑letting
                                      6 A notice is given to the person when:
Notices
                                         ·   it is delivered in person;
                                             ·      2 clear Business Days have passed after it has been
                                             ·      sent by prepaid post to the person; or
                                             ·      sent by facsimile (where this service is available).

                                     6.1 The parties must notify each other promptly of a change of address.

                                     6.2 The notice is deemed to have been served if sent to the address, or facsimile,
                                         which the party sending the notice reasonably believes to be the current
                                         address, or facsimile, of the other party.



B.           MAIN OBLIGATIONS OF THE PARTIES
Building Act Insurance                7 Where an insurance policy is required under Division 3 of Part 9 of the
                                        Building Act in relation to this Contract and it is not issued before this Contract
                                        is entered into then until such an insurance policy is issued:
NOTE
The insurance policy is all of the       ·       the Builder is not able to enforce any provision of this Contract;
terms and conditions of the
insurance policy and not just the               the Building Works must not commence; and
certificate of insurance
                                                no money (including the deposit) is payable under this Contract.
                                     7.1 The Builder is to ensure that a copy of that insurance policy is given to the
                                         Owner within 7 Days after it is issued.
Finance                                 8 If an amount is inserted in Item 11 of Schedule 1 then this Contract is
                                          conditional upon the Lending Body providing to the Owner written approval
                                          of a loan of at least that amount in order to enable the Owner to pay to the
                                          Builder the monies which become payable under this Contract, such approval
                                          unless otherwise stated in Item 11 of Schedule 1 to be provided within 14 Days
                                          of the date of this Contract. The Owner promises diligently to pursue such
                                          written approval.

                                      8.1 Should such written approval not be obtained within the time provided, this
                                          Contract will be voidable within 7 Days at the option of the Owner to be
                                          exercised by notice in writing to the Builder, whereupon all monies paid by the
                                          Owner to the Builder will be refunded except for a sum calculated in
                                          accordance with Sub-Clause 19.4.


Deposit                                 9 The Owner must pay to the Builder the deposit set out in Item 3 of Schedule 1
                                          on the later of:
                                                ·   the signing of the contract; or
                                                ·   the issue of an insurance policy in relation to this Contract under
                                                  Division 3 of Part 9.



                                      9.1           The amount of the deposit must not be:
                                                ·      more than 5% if the Contract Price is $20,000 or more; or
                                                ·      more than 10% if the Contract Price is less than $20,000.

Commencement and Building             10 Commencement must occur within 21 Days after the Builder receives:
Period
NOTE
The Building Period may be                      ·      the essential information from the Owner (Refer to Clause 13);
extended in accordance with
Extensions of Time. Refer to
Clause 34.
                                            ·     all necessary building permits and planning approvals. (Refer to Clause
                                            19); and
                                            ·       payment of the deposit under Clause 9.

                                     10.1 The Building Period starts on the actual day of Commencement.
                                     10.2 The Builder will do everything that is reasonably possible to ensure that the
                                          work will start as soon as possible.
Statutory Warranties                  11 To the extent required by the Domestic Building Contracts Act the Builder
                                         warrants that:
      NOTE
The Building Period may be                  ·    the Building Works will be carried out in a proper and workmanlike
extended due to further unforeseen          manner and in accordance with the Plans and the Specifications set out in this
delays as set out in Clause 34.             Contract;

                                            ·     all materials to be supplied by the Builder for use in the Building Works
                                            will be good and suitable for the purpose for which they are used and that,
                                            unless otherwise stated in this Contract, those materials will be new;
                          ·    the Building Works will be carried out in accordance with, and will
                          comply with, all laws and legal requirements including, without limiting the
                          generality of this warranty, the Building Act 1993 and the regulations made
                          under that Act;
                          ·     the Building Works will be carried out with reasonable care and skill and
                          will be completed by the end of the Building Period;
                          ·     if the Building Works consists of the erection or construction of a home,
                          or is work intended to renovate, alter, extend, improve or repair a home to a
                          stage suitable for occupation, the home will be suitable for occupation at the
                          time the work is completed; and
                          ·    If this Contract states the particular purpose for which the Building
                          Works are required, or the result which the Owner wishes the Building
                          Works to achieve, so as to show that the Owner relies on the Builder's skill
                          and judgement, the Builder warrants that the Building Works and any material
                          used in carrying out the Building Works will be reasonably fit for that purpose
                          or will be of such a nature and quality that they might reasonably be expected to
                          achieve that result.


Owner Must Pay the    12 The Owner must pay the Builder the Contract Price set out in Item 2 of
Contract Price           Schedule 1 and other amounts to be paid by the Owner under this Contract in
                         accordance with Clause 30 or as otherwise stated in this Contract.




                          The Owner may be required to pay more if:
                          ·    there are additional costs payable by operation of Sub-Clause 12.1;
                          ·   additional costs are caused by a deficiency or conflict within the Contract
                          Documents (Refer to Clause 16);
                          ·   a survey of the Land is needed to determine the correct boundaries of the
                          Land (Refer to Clause 17);
                          ·   additional building permit fees are payable by operation of Clause 18;


                          ·    there is a variation to the costs of complying with changed laws (Refer to
                          Clauses 21 and 22);
                          ·    there is an additional amount to pay for an agreed variation (Refer to
                          Clauses 23 and 24);
                          ·    the Owner is to pay the cost of providing access (Refer to Clause 26);

                          ·    interest charges apply by operation of Clause 31; or
                          ·    there are additional costs associated with Prime Cost Items or
                          Provisional Sums in Schedule 2 (Refer to Clause 33).
                     12.1 Should the following circumstances arise:
                          · that the authorised person under the Building Act properly requires that a
                          variation to the Building Works be made;
                          · the variation requirement arose as a result of circumstances beyond the
                          Builder's control;
                          · the Builder gave a notice pursuant to Clause 23 including a copy of such
                          requirement; and
                          ·  the Owner does not within 5 Business Days of receipt of such notice
                          advise in writing that such variation requirement is disputed,
                                    the Building Works are varied by operation of this sub-clause in accordance
                                    with that requirement and the price for the variation will be charged and paid in
                                    accordance with Clause 24.

                        12.1.1      Subject to Clause 12.1.2, where the requirement relates to costs associated with
                                    excavations and/or footings, the Builder must make no charge unless the
                                    Builder has obtained the Foundations Data before entering this Contract and
                                    the cost could not reasonably have been ascertained from the Foundations
                                    Data. For the purposes of this Clause, the Builder does not have to
                                    commission the preparation of Foundations Data to the extent that such data
                                    exists and it is reasonable for the Builder to rely on that data.


                                    Notwithstanding Clause 12.1.1, the Builder is entitled to make an extra charge
                                    for an amount not already provided for in this Contract if the need for the
                                    additional amount could not have been reasonably foreseen had the Builder
                                    obtained the Foundations Data.
                        12.1.2      The price for additional excavations and footings, if any, including an amount
                                    for the Builder’s profit and overheads, being the percentage stated in Item 10
                                    of Schedule 1 applied to the cost of that work, is payable with the next
                                    Progress Payment.

                             12.2 The price for additional excavations and footings, if any, including an amount
                                  for the Builder’s profit and overheads, being the percentage stated in Item 10
                                  of Schedule 1 applied to the cost of that work, is payable with the next
                                  Progress Payment.

                             12.3 If there are any additional charges associated with Sub‑Clause 12.1 which
                                  when added to the Contract Price increase the Contract Price by 15% or
                                  more the Owner may bring this Contract to an end by giving the Builder a
                                  written notice, either personally or by registered post.


                             12.4 If the Contract is brought to an end by the Owner under Sub‑Clause 12.3, the
                                  Builder is entitled to a reasonable price for the work carried out under the
                                  Contract to the date the Contract is ended.


Owner Must Provide
Essential Information            13 The Owner must give the Builder written evidence of the following within 30
                                    Days of the date of this Contract to enable Building Works to commence:


                                    ·   satisfactory evidence of the Owner's title to the Land;
                                    · full details of any easements, restrictions or covenants which affect the
                                    Land;

                                    · satisfactory evidence of the Owner's capacity to pay the sum of the
                                    Contract Price and where monies are to be borrowed, satisfactory written
                                    evidence that any loan has been approved by the Lending Body and that the
                                    mortgage documents have been signed;

                                    ·   details of any inspections required by the Lending Body;
                                    · copies of any town planning approval and proof of payment of the relevant
                                    fees, where the Owner is responsible for obtaining the approval; and
                           · where there are existing structures on the Land to be removed by the
                           Owner, evidence that such structures have been demolished and all debris has
                           been removed.


C. BEFORE WORK BEGINS
Owner to Supply     14     If the Owner supplies the Specifications, the Plans and/or Engineer's Design
                           the Owner must supply a sufficient number of copies to allow the Builder to
Documents                  construct the Building Works and to obtain the necessary approvals.



Copyright           15     If the Builder constructs the Building Works in accordance with the Plans
                           which may incorporate designs which are:

                               ·   supplied by the Owner;
                               ·   prepared under instruction from the Owner; or
                               ·   prepared from sketches supplied by the Owner;

                           then:




                           · the Owner warrants that the Owner has the right to use the design and the
                           Plans and that no breach of copyright is involved in constructing the Building
                           Works in accordance with the Plans; and

                           · the Owner indemnifies the Builder in relation to any claim for breach of
                           copyright.


                    15.1   A claim for breach of copyright brought against the Builder is a breach of this
                           Contract by the Owner.

                    16     If there is any difference between scaled dimensions and figures on the Plans,
                           the these Contract If there is
                           · figures prevail. conditions;any inconsistency between these Contract
                           · the Specifications; then
                           · the Plans.

                    16.1   If the Builder finds any deficiency in the Plans or any conflict between the
                           Plans and the Specifications, the Builder must promptly notify the Owner in
                           writing. The Owner must then advise the Builder in writing how to resolve the
                           problem or which document to follow. If the Owner does not do so within 7
                           Days, the Builder may decide what to do, and must notify the Owner in
                           writing within 7 Days of the decision or the document that will be followed.




                    16.2   If additional costs will be incurred by reason of the operation of Sub-Clause
                           16.1 the Builder must request a variation pursuant to the provisions of Sub-
                           Clause 23.2 and the procedure in relation to such variation as set out in Clauses
                           23 and 24 will apply.

Interpretation of
Contract Documents                  16.2.1      Should the Owner's consent required by the Builder pursuant to Sub-Clause
                                                23.4 not be provided by the Owner within 7 Days of the Builder's notice given
                                                pursuant to Sub-Clause 23.2, then either party may end this Contract within 14
                                                Days of the expiration of such 7 Day period by written notice given to the
                                                other.

                                    16.2.2      If this Contract is ended under this Clause then the Builder is entitled to a
                                                reasonable amount calculated in the manner set out in Sub-Clause 19.4


                                           16.3 The Builder is not entitled to claim for extra costs for errors in Plans and/or
                                                Specifications that the Builder has prepared.
Owner Must Identify
the Land                                     17 The Owner must show the Builder the boundaries of the Land and warrants
                                                that they are correct and put up a sign on the Land showing the Owner's name
                                                and the lot or street number.

                                           17.1 If the Builder has a reasonable doubt about whether the boundaries are correct,
                                                the Builder must notify the Owner in writing and the Owner must obtain a
                                                survey within 7 Days.

                                           17.2 If the Owner does not do so within 7 Days, the Builder may, as the Owner’s
                                                agent, obtain the survey. The Owner must pay to the Builder the price of the
                                                survey, including an amount for the Builder’s profit and overheads being the
                                                percentage as shown in Item 10 of Schedule 1 applied to the cost of the survey,
                                                with the next Progress Payment.


Building Permit
Fees                                         18 Unless shown otherwise in Items 4 and 5 of Schedule 1 the Builder has
                                                included in the Contract Price fees payable for the building permit and
                                                planning approvals.

                                           18.1 In the case of multiple dwellings where additional fees may be applicable, such
                                                as for head works, open space allowances and planning fees, these are not
                                                included in the Contract Price unless specified in Schedule 1 or 4.


                                           18.2 If a building permit fee increases or decreases after the date of this Contract the
                                                Owner must pay any increase and the Builder must credit any decrease and the
                                                next Progress Payment will be varied accordingly.



Planning Approvals
and Building Permits                         19 The Owner is responsible for obtaining and paying for any planning approval
                                                that is required unless stated otherwise in Item 4 of Schedule 1. The party
NOTE                                            obtaining such planning approvals must take all reasonable steps to do so
Some Councils have Planning Laws                within the same time period shown in Item 4 of Schedule 1.
and special requirements that may
affect the
building of a new home within their 19.1        Subject to the receipt of the planning approval and if the Owner has not already
municipality. There may be special              got the necessary building permits, the Builder must apply for them within 14
restrictions on the positioning of the          Days after receiving evidence of the Owner's title to the Land and ability to
home on the land and/or restrictions
                                                pay under Clause 13.
on the type and/or colour of
                                       19.2        If the Builder is to obtain the building permits, the Owner appoints the
                                                   Builder as the Owner's agent for this purpose. After the Builder obtains the
                                                   building permits, the Builder must give copies of the permit documents to the
                                                   Owner, if requested to do so.

                                       19.3        If the
                                                   necessary
                                                   planning
                                                   approval
                                                   · neither party is at fault, either party may bring this Contract to an end by
                                                   giving written notice to the other;

                                                   · the Builder is at fault, the Owner may bring this Contract to an end by
                                                   giving the Builder written notice; or

                                                   · the Owner is at fault, the Builder may bring this Contract to an end by
                                                   giving the Owner written notice,
                                                   provided that the party who wishes to end this Contract under the conditions of
                                                   this Clause must do so within 14 Days of the expiration of the period set out in
                                                   Items 4 or 5 of Schedule 1.


                                              19.4 If this Contract is ended under this Clause and the Builder is not at fault, the
                                                   Builder is entitled to a reasonable price for the work performed, including costs
                                                   incurred and an amount for the Builder’s profit and overheads being the
                                                   percentage shown in Item 6 of Schedule 1 applied to the cost of that work. This
                                                   price:


                                                   ·   may include an amount for the preparation of the Plans and the
                                                   Specifications, the Engineer's Design and Soil Test Report - unless these
                                                   have been allowed for in a separate contract; and

                                                   ·   must not include an amount for work on the Building Site for which
                                                   planning or building approval was not obtained.




Insurance                              20                       The Builder:

NOTE                                               · must insure in the names of the Builder, the Owner and the Lending Body
                                                   (as stated on Page 1), against liability for physical loss, destruction or damage
Re Clause 20.4
                                                   to the Building Works and the goods and materials on the Land as described
The Owner should note that the
                                                   in the Contract Documents; and
Owner will be liable for loss caused
by the Owner or someone for whom
                                              20.1 · must indemnify the Owner in respect of and insure against liability for
the Owner is responsible, i.e.
any sub-contractors, employees etc
                                                   personal injury, death, property loss or damage arising out of the Building
working on the Building Site for the               Works.
Owner to perform any building
                                                   The Builder must maintain the insurance from the date the Owner gives the
works which are not included in the
Building Works. The Owner                          Builder Possession of the Land under Clause 25 to the earlier of:
should therefore consider insuring
against the public liability risk.                 ·  the date that the Owner takes Possession of the Land or any part of the
                                                   Land; or
                                                  ·    the date the Builder hands over Possession of the Land.

                                             20.2 The Builder must provide the Owner with a current 'Certificate of Currency'
                                                  within 7 Days of Commencement of the Building Works. The Certificate
                                                  must show the names of the Builder, Owner, Lending Body and the job
                                                  address.

                                             20.3 The cover for personal injury, death, property loss or damage arising out of the
                                                  Building Works must be for an amount which is not less than $5 million for
                                                  any one claim and the Builder must include as parties to be insured under the
                                                  policy, any Sub-Contractors who do not provide the Builder with evidence of
                                                  adequate and continuing insurance cover.

                                             20.4 The Builder is not responsible for, and does not indemnify the Owner or the
                                                  Owner's employees or agents or any person claiming through the Owner
                                                  against, any loss or liability that arises out of something done or not done by the
                                                  Owner or any person for whom the Owner is responsible. The Owner
                                                  indemnifies the Builder in relation to such claims.

                                             20.5 The Builder must be registered with WorkCover to protect any person
                                                  employed by the Builder in carrying out the Building Works.

D. DURING WORK
Variations to                         21          If the Plans and/or the Specifications have to be varied to comply with either a
Statutory Laws                                    change in the law or statutory requirements after this Contract is entered into
                                                  the Builder must not give effect to any variation unless the following
                                                  circumstances apply:
NOTE
Refer to Clause 24 for information                ·   a building surveyor or other authorised person under the Building Act 1993
relating to variations requested by               requires in a building notice or building order under that Act that the variation
the Owner or the Builder.                         be made;

                                                  ·   the requirement arose as a result of circumstances beyond the Builder's
                                                  control;

                                                  ·    the Builder included a copy of the building notice or building order in the
                                                  notice required by the Act; and

                                                  ·    the Owner does not advise the Builder in writing within 5 Business Days
                                                  of receiving the notice required by the Act that the Owner wishes to dispute the
                                                  building notice or building order.

                                      21.1        The Owner and the Builder may then agree to vary the Plans and the
                                                  Specifications to make them comply or to avoid the need to comply. The
                                                  variation must be in writing and signed by the Owner and the Builder. If the
                                                  Builder and the Owner do not agree within 7 Days to vary the Plans and the
                                                  Specifications, they are varied in accordance with the Builder's notice under
                                                  Sub-Clause 21.0.

                                      21.2        If the variation involves additional cost, the Owner must pay it, plus the
                                                  percentage specified in Item 10 of Schedule 1. If the variation involves a
                                                  saving, the saving is to be deducted from the Contract Price. In each case, the
                                                  adjustment is to be made to the next Progress Payment to the Builder.
                         21.3        If the cost of the variation is greater than 15% of the total of the Contract
                                     Price and other amounts to be added to or deducted from the Contract Price
                                     under this Contract:

                                     ·    the Owner may bring this Contract to an end by giving the Builder a
                                     written notice either personally or by registered post; or

                                     ·    the Builder may bring this Contract to an end by giving the Owner a
                                     written notice either personally or by registered post if the Owner fails to give
                                     written evidence of ability to pay for the variation within 14 Days after
                                     receiving the Builder's notice.
                         21.4        If the Contract is brought to an end by either the Builder or the Owner under
                                     this Clause, the Builder is entitled to a reasonable price for work performed to
                                     the date this Contract is ended, including costs incurred and an amount for the
                                     Builder’s profit and overheads being the percentage shown in Item 6 of
                                     Schedule applied to that cost.




Variations to State or           22 The Owner must pay to the Builder a sum equal to any increase in any tax,
Commonwealth Tax Laws               duty or charge which takes effect after the date of the Contract and which
                                    causes an increase in the cost to the Builder in complying with the Contract.
                                    Such sum must be paid by the Owner to the Builder with the Final Payment.


Requested Variations             23 Either the Owner or the Builder may ask for the Building Works to be varied.
                                    The request must be in writing, must be signed and must set out the reason for
                                    and details of the variations sought.

                                23.1 If the Owner requests the variation and the Builder reasonably believes the
                                     variation will not require a variation to any permit and will not cause any delay
                                     and will not add more than 2% to the Contract Price the Builder may carry out
                                     the variation.

                                23.2 If the Builder requests the variation, the notice given by the Builder must state
                                     the following further particulars:

                                     ·   what effect the variation will have on the Building Works;

                                     · if the variation will result in any delays, the Builder's estimate of such
                                     delays; and

                                     · the cost of the variation and the effect it will have on the amount payable by
                                     the Owner under this Contract.

                                23.3 f the Owner requests a variation and if the Builder has not agreed to carry out
                                     the variation under Sub-Clause 23.1, the Builder must give the Owner, within
                                     a reasonable time of receiving the notice under Sub-Clause 23.0, a notice:



                                     ·    setting out the particulars listed in Sub-Clause 23.2; or
                             ·    stating that the Builder refuses or is unable to carry out the variation and
                             state the reasons therefore.

                        23.4 Subject to Sub-Clause 23.1, the Builder must not give effect to any variation
                             unless the Owner gives the Builder a signed consent to or request for the
                             variation attached to a copy of the notice referred to in Sub-Clauses 23.2 and
                             23.3.

                        23.5 If, within 7 Days of the Builder giving the Owner the notice of particulars
                             under Sub-Clause 23.3, the Owner does not give the Builder:

                             ·   a signed request to the variation under Sub-Clause 23.4; and

                             ·   written evidence of the Owner's ability to pay for the variation,

                             the request by the Owner for the variation is deemed withdrawn.




Effect of Variations     24 When a variation has been effected under Clause 12, 23 or 38:

                             · If the variation increases the amount to be paid by the Owner under this
                             Contract the amount is added to the next Progress Payment after the work is
                             done. If it decreases the amount to be paid by the Owner under this Contract
                             the amount is deducted from the next Progress Payment;

                             ·   The Contract Documents are read as if so varied; and

                             · The Completion Date or the number of Days required to finish the work
                             are read as that date or number of Days, as adjusted to take account of the
                             variation.

Possession               25 The Owner must, within 7 Days of receiving a request from the Builder, give
                            the Builder exclusive Possession of the Land to carry out the Building
                            Works. The Builder’s right to Possession of the Land is under a contractual
                            licence only. The Builder has the Owner's authority to allow or refuse anyone
                            access, and may remove unauthorised people from the Land.


                        25.1 The Owner or an authorised officer of the Lending Body is entitled, after
                             giving the Builder reasonable prior notice, to go on the Land to inspect the
                             Building Works at reasonable times provided that such inspection does not
                             delay or interfere with the progress of the Building Works.

All Weather Access       26 The Owner must, at the Owner’s cost, provide the Builder with all weather
                            access to the Building Site for any vehicle or machinery required for the
                            delivery of materials and for the continued construction of the Building
                            Works. The Owner acknowledges that the cost of all weather access is not
                            included in the Contract Price.

Owner Must Not Direct    27 The Owner, or an agent acting on behalf of the Owner or an officer of the
Builder's Workers           Lending Body, must not make inquiry of or give directions to the Builder's
                            workers or Sub-Contractors on the Building Site or elsewhere.
Owner Must Not Direct                    27 The Owner, or an agent acting on behalf of the Owner or an officer of the
Builder's Workers                           Lending Body, must not make inquiry of or give directions to the Builder's
                                            workers or Sub-Contractors on the Building Site or elsewhere.


Owner Must Arrange                       28 The Owner must notify the Builder in writing if and when the Lending Body
Lending Body                                will want to inspect the Building Works before making a Progress Payment.
Inspections                                 The Builder must do everything reasonable to assist the Lending Body to
                                            inspect the Building Works. This includes sending a notice that a stage has
                                            been completed to the Lending Body at the same time as one is sent to the
                                            Owner.

Builder to Claim                         29 The Builder must give the Owner a written claim for each Progress Payment
Progress Payments                           when each stage has been completed, as set out in Schedule 3. The claim must
                                            set out each of the following:

                                             ·   the amount paid or to be paid for the stage or stages completed to date;

                                             ·   the amount paid or to be paid for, and details of, any variations made and
                                             other amounts paid or to be paid by the Owner under this Contract;

                                             ·   the sum of those amounts;
                                             ·   payments that have already been made by the Owner; and
                                             ·   the total claimed, taking into account the payments already made.

Owner Must Make                          30 The Owner must pay the amount of a Progress Payment set out in Schedule 3
Progress Payments                           within the number of Days set out in Item 7 of Schedule 1 after both:

                                             ·   the stage has been completed; and
                                             ·   the Owner has received a written claim for the Progress Payment.
                                        30.1 If the Owner is getting finance from a Lending Body, the Owner must give
                                             the Lending Body an authority, while this Contract lasts, to make payment
                                             direct to the Builder of any amount the Owner agrees has become due under
                                             this Contract. The Owner must notify the Lending Body when each stage is
                                             completed and the payment is due.

Builder's Right to                       31 If the Owner does not pay the amount of a Progress Payment, or the Final
Agreed Damages                              Payment, within 7 Days after it becomes due, the Builder is entitled to interest
                                            on the unpaid amount, at the rate set out in Item 8 of Schedule 1, from the date
                                            the payment becomes due until the date the payment is made.
NOTE
Section 27 of the Act provides that
if the Owner fails to pay the Builder
any amount due under the Contract
a Domestic Building Dispute exists
between the parties.

                                         32 Any unfixed goods or materials on the Building Site are the property of the
                                            Builder.
Unfixed Materials
on Site                                  33 Where the Owner is to select any Prime Cost Item or a Provisional Sum Item, the
                                             Owner must make the selection within 7 Days of receiving a written request to make
                                             the selection from the Builder.

Prime Cost Items and                    33.1 Allowances for Prime Cost Items do not include amounts for installation,
Provisional Sums                             Builder's profit and overheads and cartage. These are included in the
                                             Contract Price.
NOTE
Prime Cost Items-Certain fixtures       33.2 Allowances for Provisional Sum Items do not include an amount for the
and fittings may need to be selected         Builder’s profit and overheads. The amount for the Builder’s profit and
after the signing of the Contract.           overheads is included in the Contract Price.
These items may include the stove
or special kitchen and bathroom
                                        33.3 If a Prime Cost Item selected by the Owner is unavailable, then the Owner
products.
                                             must specify an alternative item within 7 Days of the Builder’s request to do
The Builder will allow in the                so, and if the Owner fails to comply the Builder shall be entitled to select an
Contract Price an amount which               alternative as near as practical in quality to the original item selected by the
should cover the expected cost,              Owner.
subject to the Owner's final
selection.
continued.

Provisional Sums-Are estimates of       33.4 In relation to each Prime Cost Item and Provisional Sum Item, if the actual
the cost of items of work (labour            price of supplying the item or providing the work is:
and materials) included in the
Contract Price for which the
                                             · less than the allowance, the difference is deducted from the Contract
Builder cannot give a definite price,
for example, site excavation, rock
                                             Price; or
removal and concrete footings.               · more than the allowance, the total of the difference plus the relevant margin
                                             or excess stated in Schedule 2 applied to that difference is added to the
                                             Contract Price and is payable with the Progress Payment in which the
                                             amount for that item or work is included.

                                        33.5 Where there are no further Progress Payments to be made, the Builder must
                                             calculate the amount and notify the Owner as soon as possible. The amount of
                                             the difference must be paid or allowed with the Final Payment as the case may
                                             be.

                                        33.6 In calculating the amount spent, the Builder must pass on normal trade
                                             discounts to the Owner. This does not include cash or special discounts for
                                             bulk purchasing or personal reasons.



                                        33.7 The Builder must give the Owner a copy of any invoice, receipt or other
                                             document that shows the cost to the Builder of any Prime Cost Item or labour
                                             and materials that relate to a Provisional Sum Item, as soon as practicable
                                             after receiving same.


                                        33.8 The Builder warrants that any allowance for a Provisional Sum Item included
                                             by the Builder in the Contract has been calculated with reasonable care and
                                             skill taking into account all of the information reasonably available at the date
                                             the Contract is made, including the nature and location of the Building Site.


Builder's Right to                       34 The date for Commencement is put back or the Building Period is extended if
Extensions of Time                          the carrying out of the Building Works is delayed due to:

                                             ·   a variation or a request for a variation by the Owner in accordance with
                                             Clauses 16, 21, 23 and 24;

                                             ·    a suspension of work in accordance with Clause 35;

                                             ·    inclement weather or conditions resulting from inclement weather in excess
                                             of the Days nominated in Schedule 1;
                                             ·    disputes with neighbouring owners or residents, or proceedings brought or
                                             threatened by them, that are not the Builder's fault;

                                             ·    civil commotion or industrial action affecting the work of tradespeople or
                                             the work of a manufacturer or supplier of materials;

                                             ·   anything done or not done by the Owner or by an agent, contractor or
                                             employee of the Owner;

                                             ·   a delay in getting any approval, provided that it is not the Builder's fault;
                                             (Refer to Clause 19); or

                                             ·   any other cause that is beyond the Builder's direct control.


                                        34.1 The Builder is to give the Owner a written notice informing the Owner of the
                                             extension of time. The written notice must state that cause and the extent of the
                                             delay.

                                        34.2 To dispute the extension of time the Owner must give the Builder a written
                                             notice, including detailed reasons why the Owner disputes the claim, within 7
                                             Days of receiving the Builder’s notice.

         NOTES                          34.3 If there is an extension of time due to anything done or not done by the Owner
The amount to be stated in Item 12           or by an agent, contractor or employee of the Owner, the Builder is, in
of Schedule 1 is negotiable and is           addition to any other rights or remedies, entitled to delay damages, worked out
to reflect the damage the Builder            by reference to the period of time that the Building Period is extended, being
will suffer as a result of the delay.        the greater of $250 per week or that amount set out in Item 12 of Schedule 1.
                                             Delay damages will accrue on a daily basis.

The minimum amount that the
Builder is entitled to is $250 per
week.
                                        34.4 The Owner must pay any delay damages with the next Progress Payment.


Suspension of Work                       35 The Builder may suspend the Building Works if the Owner:

                                             ·   does not make a Progress Payment that is due within 7 Days after it
                                             becomes due; or

                                             ·   is in breach of this Contract.

                                        35.1 If the Builder suspends the Building Works, the Builder must immediately
                                             give notice in writing by registered post to the Owner. The Owner must
                                             remedy the breach within 7 Days after receiving the notice. The Builder must
                                             recommence the Building Works within 21 Days after the Owner remedies
                                             the breach and gives notice of this to the Builder.


                                        35.2 The date on which the Building Works are to be completed is changed and
                                             extended to cover the period of suspension.




E. COMPLETION OF WORKS
Final Inspection      36     When the Builder considers that the Building Works have reached
                             Completion the Builder is to give to the Owner:

                                 ·    a Notice of Completion; and
                                 ·    the Final Claim.


                      36.1   Notwithstanding any other provision of this Contract, the Builder must not
                             demand Final Payment until after the Builder has given to the Owner either:


                             ·    a copy of the occupancy permit under the Building Act 1993, if the
                             building permit for the Building Work requires the issue of an occupancy
                             permit; or

                             ·   in any other case, a copy of the certificate of final inspection.

                      36.2   The Builder and the Owner must meet on the Building Site within 7 Days of
                             the Owner receiving the Notice of Completion and Final Claim to carry out
                             an inspection in accordance with Clause 37.

                      36.3   If the Owner does not meet with the Builder to inspect the Building Works as
                             required by Clause 36.2, the Owner must pay the amount of the Final Claim
                             within a further period of 7 Days.


                      36.4   If within 7 Days after service of the Notice of Completion the Owner fails to
                             attend an inspection of the Building Works, the Final Payment is due and
                             payable at the expiration of a further period of 7 Days.


List of Defects and   37     When the Owner and the Builder meet on the Building Site to inspect the
Final Payment                Building Works, the Owner is to give the Builder a written list of all known
                             defects and incomplete work. The Builder and the Owner are to sign the list
                             and each must keep a copy.

                      37.2   If the Owner gives the Builder a list of known defects and incomplete work
                             the Builder must carry out the work required to rectify any defects or to do any
                             incomplete part of the Building Works for the Building Works to reach
                             Completion.

                      37.3   The Builder is to give the Owner a written notice when the work under Clause
                             37.2 has been done.


                      37.4   The Owner must pay the Final Claim within a further period of 7 Days after
                             the Owner receives the Builder's notice under Clause 37.3.

                      37.5   The fact that the Owner pays the Final Claim is not evidence that there are no
                             defects or incomplete work nor a waiver of any rights under a statutory
                             warranty.


                      37.6   The fact that the Builder signs the list is not an admission that the defects exist
                             or there is incomplete Building Works.

                      37.7   'Defect' does not include a defect arising from the fact that something has to be
                             supplied or done by the Owner.
Handover and          38     When the Owner pays the Final Claim the Builder must hand over Possession
                             of the Land to the Owner together with all keys, certificates and warranties in
                             the Builder's possession.
                                     38        When the Owner pays the Final Claim the Builder must hand over Possession
Final Payment                                  of the Land to the Owner together with all keys, certificates and warranties in
                                               the Builder's possession.

                                               If the Owner takes Possession of the Land or any part of the Land before
                                               paying the Final Claim and without the Builder’s prior written consent the
                                               Owner commits a substantial breach of this Contract entitling the Builder to
                                               elect to either:
                                               ·   treat the Owner's action as a repudiation of this Contract and accept that
                                               repudiation;
                                               ·   give the Owner a notice to remedy breach of contract under Clause 42; or


                                               ·    accept the Owner's actions as a variation of the Building Works to omit
                                               that part of the Building Works not carried out and completed as at the date the
                                               Owner takes such Possession.

                                     38.2      If the Owner breaches (including repudiates) this Contract, nothing in this
                                               Clause prejudices the right of the Builder to recover damages or exercise any
                                               other right or remedy.
                                     38.3      If the Builder accepts the variation of the Building Works under the third
                                               paragraph of Clause 38.1, the Builder is to give the Owner written notice to
                                               that effect and the Builder may give a Notice of Completion and a Final
                                               Claim under Clause 36.

Defects Within the                   39        The Builder must fix any additional defects in the Building Works that the
3 Month Period                                 Owner notifies in writing within 3 months the earlier of:
                                               ·  the date that the Owner takes Possession of the Land or any part of the
                                               Land; or

                                               ·   the date the Builder hands over Possession of the Land.
                                     39.1      Defects that in the reasonable opinion of the Builder affect the safety or
                                               security of the Building Works or may lead to it being damaged must be fixed
                                               by the Builder as soon as practicable after notification by the Owner.


                                     39.2      Other defects must be listed by the Owner and given to the Builder at the end
                                               of the 3 month period. The Builder must fix those defects within 21 Days after
                                               the expiration of the 3 month period or as soon as reasonably practicable.


                                     39.3      The Builder must fix defects without cost to the Owner. The Builder must do
                                               so in normal working hours or at any time agreed between the Builder and the
                                               Owner. The Owner must provide reasonable access to the Builder.


Owner's Claim                               40 If the Building Works have not reached Completion by the end of the
for Agreed Damages                             Building Period the Owner is entitled to agreed damages in the sum set out in
                                               Item 9 of Schedule 1 for each week after the end of the Building Period to and
                                               including the earlier of:
NOTES
Re Clause 40.                                  • the date the Building Works reach Completion;
The amount used to calculate                   ·         the date this Contract is ended; and
agreed damages takes into account
the expenses that will be incurred
by the Owner if the Building Works
are not completed on time (for
example, rent for alternative
housing or interest payments).
The amount used to calculate
agreed damages takes into account           ·        the date the Owner takes Possession of the Land or any part of the
the expenses that will be incurred          Land.
by the Owner if the Building Works
are not completed on time (for
example, rent for alternative
housing or interest payments).
                                     40.1   The Owner may deduct the amount of any such damages from the Final
The amount to be stated in                  Payment.
Item 9 of Schedule 1 is negotiable
and should accurately reflect the
Owner's estimated expenses. If no
amount is stated in Item 9 of

The Building Period shown in Item
1 of Schedule 1 may be extended
due to unforeseen delays. Refer to
Clause 34.




Ending this Contract                 41     Either the Owner or the Builder may bring this Contract to an end by giving
Under Bankruptcy                            written notice to the other by registered post, if the other becomes bankrupt or
or Liquidation                              assigns his or her estate for the benefit of his or her creditors, or makes a
                                            composition or arrangement with them, or, being a corporation goes into
                                            liquidation (except for the purposes of reconstruction), or has a receiver,
                                            manager, mortgagee in possession, administrator, or provisional liquidator
                                            appointed.

Builder's Right to                   42     If the Owner breaches (including repudiates) this Contract, nothing in this
End this Contract                           Clause prejudices the right of the Builder to recover damages or exercise any
                                            other right or remedy.

                                     42.1   The Owner is in substantial breach of this Contract if the Owner:


                                            ·    does not give the Builder any of the essential information required by
                                            Clause 13;

                                            ·   does not pay a progress payment as required by Clause 30;
                                            ·   takes Possession of all or any part of the Land before paying the Final
                                            Claim and without the Builder's prior written consent; or

                                            ·    is otherwise in substantial breach of this Contract.


                                     42.2   If the Owner is in substantial breach of this Contract the Builder may give the
                                            Owner a written notice to remedy the breach:

                                            ·    specifying the substantial breach;

                                            ·    requiring the substantial breach to be remedied within 10 Days after the
                                            notice is received by the Owner; and
                           ·    stating that if the substantial breach is not remedied as required, the
                           Builder intends to end the Contract.

                    42.3   If the Owner does not remedy the substantial breach stated in the notice to
                           remedy breach within 10 Days of receiving that notice, the Builder may end
                           this Contract by giving a further written notice to that effect.

                    42.4   The Builder is not entitled to end this Contract under this Clause when the
                           Builder is in substantial breach of this Contract.

                    42.5   If the Builder brings this Contract to an end under this Clause, the Builder is
                           entitled to the Contract Price and other amounts payable by the Owner under
                           this Contract, less the cost to the Builder of performing the remainder of the
                           Building Works. The Builder is also entitled to reasonable compensation for
                           any other loss caused by the Owner's breach.


                    42.6   Any sum payable by the Owner to the Builder pursuant to the operation of this
                           Clause is due and payable upon the Builder bringing this Contract to an end.


Owner's Right to    43     If the Builder breaches (including repudiates) this Contract, nothing in this
End this Contract          Clause prejudices the right of the Owner to recover damages or exercise any
                           other right or remedy.

                    43.1   The Builder is in substantial breach of this Contract if the Builder:

                           ·   suspends the carrying out of the Building Works, otherwise than in
                           accordance with Clause 35;

                           ·      has the Builder's licence cancelled or suspended; or

                           ·      is otherwise in substantial breach of this Contract.

                    43.2   If the Builder is in substantial breach of this Contract the Owner may give the
                           Builder a written notice to remedy the breach:

                           ·      specifying the substantial breach;

                           ·    requiring the substantial breach to be remedied within 10 Days after the
                           notice is received by the Builder; and

                           ·    stating that if the substantial breach is not remedied as required, the Owner
                           intends to end the Contract.

                           43.3           If the Builder does not remedy the substantial breach stated in the
                                          notice to remedy breach within 10 Days of receiving that notice,
                                          the Owner may end this Contract by giving a further written
                                          notice to that effect.

                           43.4           The Owner is not entitled to end this Contract under this Clause
                                          when the Owner is in substantial breach of this Contract.


Owner May Get              44             If the Owner brings this Contract to an end under Clause 43, then
                                          the Owner's obligations to make further payment to the Builder
                                          are suspended for a reasonable time to enable the Owner to find
                                          out the reasonable cost of completing the Building Works and
                                          fixing any defects.
                                                           are suspended for a reasonable time to enable the Owner to find
                                                           out the reasonable cost of completing the Building Works and
Another Builder to                                         fixing any defects.
Finish Work
                                              44.1         The Owner is entitled to deduct that reasonable cost calculated
                                                           under Clause 44.0 from the total of the unpaid balance of the
                                                           Contract Price and other amounts payable by the Owner under
                                                           this Contract if this Contract had not been terminated and if the
                                                           deduction produces:

                                                           ·   a negative balance - the Builder must pay the difference
                                                           within 7 Days of demand; and
                                                           ·    a positive balance - the Owner must immediately pay the
                                                           difference to the Builder.

Subcontracting                                45           The Builder may subcontract any part of the Building Works but
                                                           such subcontracting does not relieve the Builder from the
                                                           Builder's obligations under this Contract.

No Waiver                                     46           Except as provided at law or in equity or elsewhere in this
                                                           Contract, none of the provisions of this Contract may be varied,
                                                           waived, discharged or released, except with the prior written
                                                           consent of the parties.

Severance                                     47           Any provision in this Contract which is illegal, void or
                                                           unenforceable will be ineffective to the extent only of such
                                                           illegality, voidness or unenforceability and will not invalidate any
                                                           other provision of this Contract.

F. DISPUTES, CONCILIATION and TRIBUNAL
        EXPLANATORY NOTES

If you have a dispute you should first discuss the matter with the other party. Serious disputes can often be avoided by good
communication. It is suggested that in the event of a dispute the parties meet as soon as possible and try to resolve the matter
through discussions.


Make sure that you understand your obligations under the Contract. If necessary obtain independent advice. If the dispute
cannot be resolved informally then either party may refer the dispute to the Building Advice and Conciliation Service (Phone:
1300 557 559) for assistance in negotiating a resolution or for determination by an independent inspector. Alternatively
either party may, at any time, make application to the Victorian Civil and Administrative Tribunal (Phone: 9628 9999) for a
determination

                                              ATTACHMENT 2
                                DEED OF GUARANTEE AND INDEMNITY

INTERPRETATION
“Builder” is
“Owner” is
“Guarantor” is

“Contract” is that between the Builder and the Owner dated


BACKGROUND
The Owner executed the Contract at the Guarantor’s request.
The Guarantor is aware of the Owner’s obligations under the Contract.
OPERATIVE
Guarantee
The Guarantor guarantees to the Builder the fulfilment of the Owner’s obligations under the Contract including
but not limited to the due payment of all money’s arising out of the subject matter of the Contract.

Indemnity
The Guarantor indemnifies the Builder against any claim, loss or damage arising out of the subject matter of the
Contract caused by or resulting from any non-fulfilment of the Owner’s obligations referred to in Clause 1

Principal Debtor
The Guarantor is deemed to be a principal debtor jointly and severally liable with the Owner to discharge the
obligations referred to in Clause 1.
No Merger
The Guarantor agrees that this Deed does not merge on completion or on the ending of the Contract by either
party and continues notwithstanding that the Owner, if a corporation, is placed in liquidation or if a person, is
declared bankrupt.
No Release
This Guarantor is not discharged by:
       · any variation to the Contract including a variation to the building works;
       · any delay or claim by the Builder to enforce a right against the Owner; and
       · any forbearance given to the Owner to perform the Owner's obligations under the Contract.

Severability

Any provision of this Deed which is illegal, void or unenforceable will be ineffective to the extent only of such illegality,
voidness or unenforceability and will not invalidate any other provision of this Deed.

Where More Than One Guarantor
If the Guarantor consists of more than one person, this guarantee and indemnity is not affected by the failure of all .
persons comprising the Guarantor to sign this guarantee and indemnity or this Deed being unenforceable against any
one of them

Waiver of rights
The Guarantor waives all rights as surety inconsistent with any of the terms of this Deed or to the detriment or
disadvantage of the Builder.

GUARANTOR’S STATEMENT

I/We understand the nature, terms and extent of the guarantee and indemnity provided by me/us and further
acknowledge that I/we have obtained independent legal advice prior to executing this Deed.


Signed as a Deed
Insert signing provisions for a Deed


Guarantor’s name:
Guarantor’s signature:
Witness’s name:

Witness’s signature:
Date:




        This page is blank.
               BUILDERS CONSULTING AGREEMENT

PART 1 - GENERAL AGREEMENT - all potential and / or contracted works

Agreement between:

              Abode Design & Construct Pty. Ltd.                  (Builder's Consultant)

                          P.O.Box 1210                            (Address)
                        Niddrie, Vic. 3042

                  Phone: 1300 737646
                   Fax: (03) 8648 6363
           Email: enquiry@abodedac.com.au

                                    and

                                                                  (Builder)

                                                                  (Address)


                                 (registration)

                                             (Phone)
                                             (Fax)
                                             (Mobile)

    NOTE: Part 1 to be signed by builder and consultant at commencement of relationship and governs
     all future works or relationships between builder, consultant and any client or subsiduary. Part 2
     to be signed as agreed prior to each nominated project commencement.

A. DEFINITIONS

    BCA                          Building Codes Australia. Refer to the building commission for full
                                 details of the standards and requirements.

    Builder                      Registered builder as stated in construction contract and as noted
                                 in this agreement.

    Building Commission          The relevant authority or governing body of the building industry in
                                 Victoria.

    Builders' Consultant         Consultant to builder who is not party to the building contract
                                 but offers support to the builder for renumeration to be paid directly
                                 by the builder. The builders' consultant is generally involved from
                                 initial stages of conception of the project until the end of the building
                                 works / completion date. The builders' consultant acts as a "middle
                                 man" in correspondance, non-building tasks and disputes.
                                 Where appropriate, builders' consultant acts as a referral for bulk
                                 purchasing and networking.

    Building Permit              Permit issued by relevent building surveyor to cover the minimum
                                 requirements expected in order to reveive a certificate of occupancy
                                 as goverened by the BCA.
    Builders' Registration   The registration issued by the Building Commission to acknowlege
                             that a builder is a registered building practitioner.

    Building Works           Tasks and works performed on the building site that make up the
                             building contract from start to completion.

    Constrution Insurance    Current insurance to cover theft, public liability and damages on the
                             construction site to the appropriate value of the building contract.

    Constrction Period       Total durartion from commencement of the building contract until the
                             completion date (refer to building contract).

    Building Contract        Refers to the building contract entered into between the builder and the
                             owner(s) / developer for the building works.

    Building Site            Land on which the building works are to be performed.

    Building Surveyor        Relevant building surveyor responsible for the building permit issued
                             for the construction works.

    Extension Of Time        Request by builder for the extension of the construction period due
                             to events out of the control of the builder and not allowed for in the
                             building contract.

    Hand Over                Point at which the builder deems the building works have been
                             completed to a satisfactory standard and are ready to "hand over"
                             the building to the owner(s) / developer upon full and final
                             payment of the agreed building contract price. A list of final tasks
                             or defects are to be made if appropriate prior to final payment.

    Owner(s) / Developers    The financial and legal owner of the site and party responsible for the
                             funding and final decision making for the building works.

    Specifications List      An arrangement of proposed inclusions and materials to be used
                             under the building contract that will detail styles and colours.

    Variation Request        Any variation requested by the builder to the owner(s) / developer
                             (or visa versa) that requests additional monetary contribution for
                             unforseen costs or upgrades / changes to the building contract or
                             specifications list.

    Warranty Insurance       Builder's specific warranty insurance issued to a builder to cover
                             the owner(s) / developers against liability and loss where appropriate
                             (refer to applicable insurance policy).

B. MAIN OBLIGATIONS OF THE PARTIES

    Builder                  To obtain and maintain appropriate builders' registration as approved
                             and acknowleged by the Building Commission for the entire
                             construction period of the building contract.

                             To obtain and maintain approriate builder's construction insurance for
                             an appropriate amount to cover the full building contract for the entire
                             construction period.

                             To apply, obtain and maintain appropriate warranty insurance cover as
                             approved by the relevant building surveyor.

                             To pay for and collect the building permit from the relevant building
                             surveyor.
                       To apply and obtain all subsiduary permits / consent required for the
                       complete construction of the building works unless specifically noted
                       in the building contract. These items may include:
                                   P.I.C. Permit
                                   Road Opening Permits (other road works / closures)
                                   Electrical connections (temp power only)
                                   Local Bi-Law (or others) fines as a result of works on site.
                                   other

                       To perform the obligations of the builder under the building contract
                       in a workman-like manner in an appropriate time frame and within the
                       BCA. Refer to the building contract for full responsabilities. All
                       management, funding and legal responsibilities as governed by law
                       are the full responsibility of the builder as required by the ACT.
                       This includes the site preparation, OH&S and on-going requirements
                       set out by local bi-laws and others.

                       To issue to the builders' consultant any variation requests or
                       extensions in time or other applicable documentation or requests
                       that affect the building contract or building works.


                       To pay the builders' consultant renumeration as set out in this
                       agreement at appropriate times within the nominated timeframe.


                       To report to the builders' consultant when appropriate and at regular
                       intervals:
                                   Past progress
                                   Upcoming works / tasks
                                   Forseeable issues
                                   Any other information deemed necessary in the effective
                                             progress of building works.

                       Allow access to the builders' consultant on the building site at
                       appropriate times unattended. This does not extend to the owner(s) /
                       developers.

                       To meet with the owner(s) / developer to establish an agreed
                       specifications list and / or colour selection if required or not already
                       arranged by the builders' consultant (not always required).

                       To meet with the owner(s) / developer at pre-arranged times on the
                       building site for a site inspection of current works / progress during
                       the construction period.

                       To meet with the owner(s) / developer at Hand Over and establish a
                       final list of tasks required for final payment as required under the
                       building contract.


Builders' Consultant   Where appropriate, have working drawings, engineering and other
                       building related documents prepared and approved by the owner(s) /
                       developer.

                       Where appropriate, prepare a specifications list with the owner(s) /
                       developer that suit the builder and relate to the building contract
                       and contract price. These specifications are to be specific in material,
                       style and colour.
                                  Where appropriate, prepare and manage the necessary tasks and
                                  requirements to have a building permit ready for issue by the
                                  relevant building surveyor for the builder to submit warranty
                                  insurance and collect. The relevant building surveyor is to be
                                  agreed upon prior with the builder.

                                  Create and prepare ready for signing by both the builder and the
                                  owner(s) / developers appropriate contracts, specifications list,
                                  pricing agreements to be used for the building works under the
                                  guidance of the building contract.

                                  To liaise with the owner(s) / developer in all correspondence with the
                                  builder in general where appropriate.

                                  To facilitate the hand over of the building to the owner(s) / developer
                                  in conjunction with the builder at the appropriate time.

                                  To issue a Tax Invoice which will include G.S.T. to the builder at the
                                  appropriate times for the services rendered as per this agreement
                                  within a timely manner.


C. CONDITIONS OF AGREEMENT

    The builders' consultant is not responsible for any actions, non-actions or any misrepresentations
    of the builder under the building contract. The builders' consultant can not be held liable for
    any liability as a result of the actions of either the builder or the owner(s) / developer that are
    not directly a result of the builders' consulatant. Compensation may be sought as a result
    of any early termination of contract by any party.

    All payments in the building contract from the owner(s) / developer or financial instituion are
    to be made directly to the builder via cheque or direct deposit or as prior arranged.

    The builder can not at any time after the initial signing of this agreement have any future works,
    projects or financial or business relationships direct or indirect with the owner(s) / developer
    without the expresses written consent from the builders' consultant.

    Builders' consultant reserves the right to place marketing signage on the frontage of the
    building site or as required.

    Termination of agreement may be done at anytime with the mutual consent of both builder and
    builders' consultant in writing.




D. GENERAL PROCEEDURE

    1)         Builders' consultant to conduct initial works, preperation of concept plans, preliminary
               working drawings, engineering, specifications etc

    2)         Builders' consultant present to builder initial pricing, drawings and specifications for
               initial comment and / or approval.

    3)         Builders' consultant to revise pricing, drawings and specifications to suit builder and
               have finalised and approved by owner(s) / developer.

    4)         Builders' consultant to obtain preferred building surveyor from builder.

    5)         Builders' consultant to prepare and submit for building permit.
6)    Builders' Consultant to prepare building contracts and documents (x3 copies)

7)    Builders' consultant to have owner(s) / developer sign building contract and
      associated documents and prepare / issue payment for 5% deposit to builder.

8)    Builders' consultant to have builder sign building contract and associated documents
      and forward payment of 5% to the builder. 1 copy to builder, 1 copy to owner(s) /
      developer & 1 copy to builders' consultant. Builder to sign "Consulting Agreement"

9)    Builder to arrange for warranty insurance and sumit to relevant building surveyor.

10)   Builder to pay and collect building permit from relevant building surveyor.

11)   Builder to prepare site for works and meet OH&S and local bi-law requirements

12)   Commencement of works

13)   Builder to issue to owner(s) / developers letter of commencement date and advise
      of any access rights they may or may not have on the building site.
PART 1 - PROJECT COMMISSION AGREEMENT

Project Break-down

Project Address:
                                                             0
                                                             0

Project Description:
                                                                                0
                                                                                0

               Agreed Builders Margin:           1.0%
               Agreed Builders Consultancy Commission:               1.0%
                       TOTAL MARGIN APPLIED TO ENTIRE CONTRACT:              2.0%

UNIT 1
    Contract Amount              $          34,215.99
    Abode Fee                    $             338.77
    Stage Payments                     %       Bank Payment          To Builder    To Abode
       Deposit                        5%      $       1,710.80   $         855.40 $ 855.40
       Clear Site                    10%      $       3,421.60   $       3,421.60
       Base                          10%      $       3,421.60   $       3,421.60
       Frame                         15%      $       5,132.40   $       5,390.71 -$ 258.31
       Lock-Up                       30%      $      10,264.80   $      10,264.80
       Fix-Out                       20%      $       6,843.20   $       7,101.51 -$ 258.31
       Completion                    10%      $       3,421.60   $       3,421.60
          TOTAL                      100%     $      34,215.99   $      33,877.22 $ 338.77

UNIT 2
    Contract Amount              $           5,660.33
    Abode Fee                    $              56.04
    Stage Payments                     %       Bank Payment          To Builder    To Abode
       Deposit                        5%      $         283.02   $         141.51 $ 141.51
       Clear Site                    10%      $         566.03   $         566.03
       Base                          10%      $         566.03   $         566.03
       Frame                         15%      $         849.05   $         891.78 -$   42.73
       Lock-Up                       30%      $       1,698.10   $       1,698.10
       Fix-Out                       20%      $       1,132.07   $       1,174.80 -$   42.73
       Completion                    10%      $         566.03   $         566.03
          TOTAL                      100%     $       5,660.33   $       5,604.28 $    56.04

UNIT 3
    Contract Amount              $           5,660.33
    Abode Fee                    $              56.04
    Stage Payments                     %       Bank Payment          To Builder    To Abode
       Deposit                        5%      $         283.02   $         141.51 $ 141.51
       Clear Site                    10%      $         566.03   $         566.03
       Base                          10%      $         566.03   $         566.03
       Frame                         15%      $         849.05   $         891.78 -$   42.73
       Lock-Up                       30%      $       1,698.10   $       1,698.10
       Fix-Out                       20%      $       1,132.07   $       1,174.80 -$   42.73
       Completion                    10%      $         566.03   $         566.03
          TOTAL                      100%     $       5,660.33   $       5,604.28 $    56.04

UNIT 4
    Contract Amount              $           5,660.33
    Abode Fee                    $              56.04
    Stage Payments                     %       Bank Payment          To Builder     To Abode
       Deposit                        5%      $       283.02     $         141.51   $ 141.51
       Clear Site                    10%      $       566.03     $         566.03
     Base                 10%     $           566.03   $         566.03
     Frame                15%     $           849.05   $         891.78 -$   42.73
     Lock-Up              30%     $         1,698.10   $       1,698.10
     Fix-Out              20%     $         1,132.07   $       1,174.80 -$   42.73
     Completion           10%     $           566.03   $         566.03
        TOTAL             100%    $         5,660.33   $       5,604.28 $    56.04

UNIT 5
    Contract Amount   $          5,660.33
    Abode Fee         $             56.04
    Stage Payments          %      Bank Payment            To Builder    To Abode
       Deposit             5%     $         283.02     $         141.51 $ 141.51
       Clear Site         10%     $         566.03     $         566.03
       Base               10%     $         566.03     $         566.03
       Frame              15%     $         849.05     $         891.78 -$   42.73
       Lock-Up            30%     $       1,698.10     $       1,698.10
       Fix-Out            20%     $       1,132.07     $       1,174.80 -$   42.73
       Completion         10%     $         566.03     $         566.03
          TOTAL           100%    $       5,660.33     $       5,604.28 $    56.04

UNIT 6
    Contract Amount   $          5,660.33
    Abode Fee         $             56.04
    Stage Payments          %      Bank Payment            To Builder    To Abode
       Deposit             5%     $         283.02     $         141.51 $ 141.51
       Clear Site         10%     $         566.03     $         566.03
       Base               10%     $         566.03     $         566.03
       Frame              15%     $         849.05     $         891.78 -$   42.73
       Lock-Up            30%     $       1,698.10     $       1,698.10
       Fix-Out            20%     $       1,132.07     $       1,174.80 -$   42.73
       Completion         10%     $         566.03     $         566.03
          TOTAL           100%    $       5,660.33     $       5,604.28 $    56.04

UNIT 7
    Contract Amount   $          5,660.33
    Abode Fee         $             56.04
    Stage Payments          %      Bank Payment            To Builder    To Abode
       Deposit             5%     $         283.02     $         141.51 $ 141.51
       Clear Site         10%     $         566.03     $         566.03
       Base               10%     $         566.03     $         566.03
       Frame              15%     $         849.05     $         891.78 -$   42.73
       Lock-Up            30%     $       1,698.10     $       1,698.10
       Fix-Out            20%     $       1,132.07     $       1,174.80 -$   42.73
       Completion         10%     $         566.03     $         566.03
          TOTAL           100%    $       5,660.33     $       5,604.28 $    56.04

UNIT 8
    Contract Amount   $          5,660.33
    Abode Fee         $             56.04
    Stage Payments          %      Bank Payment            To Builder    To Abode
       Deposit             5%     $         283.02     $         141.51 $ 141.51
       Clear Site         10%     $         566.03     $         566.03
       Base               10%     $         566.03     $         566.03
       Frame              15%     $         849.05     $         891.78 -$   42.73
       Lock-Up            30%     $       1,698.10     $       1,698.10
       Fix-Out            20%     $       1,132.07     $       1,174.80 -$   42.73
       Completion         10%     $         566.03     $         566.03
          TOTAL           100%    $       5,660.33     $       5,604.28 $    56.04

UNIT 9
    Contract Amount   $          5,660.33
    Abode Fee         $             56.04
        Stage Payments                       %      Bank Payment          To Builder    To Abode
         Deposit                            5%     $        283.02    $         141.51 $ 141.51
         Clear Site                        10%     $        566.03    $         566.03
         Base                              10%     $        566.03    $         566.03
         Frame                             15%     $        849.05    $         891.78 -$   42.73
         Lock-Up                           30%     $      1,698.10    $       1,698.10
         Fix-Out                           20%     $      1,132.07    $       1,174.80 -$   42.73
         Completion                        10%     $        566.03    $         566.03
            TOTAL                          100%    $      5,660.33    $       5,604.28 $    56.04

   UNIT 10
       Contract Amount                 $          5,660.33
       Abode Fee                       $             56.04
       Stage Payments                        %      Bank Payment          To Builder    To Abode
         Deposit                            5%     $         283.02   $         141.51 $ 141.51
         Clear Site                        10%     $         566.03   $         566.03
         Base                              10%     $         566.03   $         566.03
         Frame                             15%     $         849.05   $         891.78 -$   42.73
         Lock-Up                           30%     $       1,698.10   $       1,698.10
         Fix-Out                           20%     $       1,132.07   $       1,174.80 -$   42.73
         Completion                        10%     $         566.03   $         566.03
            TOTAL                          100%    $       5,660.33   $       5,604.28 $    56.04


        Builders Approval:

            Name:

            Signed

        Abode Design & Construct

            Name:

            Signed

             Date:




"Our team of highly skilled designers, planners, suppliers and builders are property developments passionate
   about supporting residential investors to complete profitable and efficient and to love the experience."
PERMITS
Category   Sub-Category              Item                             Formula
Overview   Purchase Price            Stamp Duty                      (cost) x .05
           Constructon               Total Area - Basement           (m2) / 9.29
                                     Total Area - Ground Floor       (m2) / 9.29
                                     Total Area - 1st Floor          (m2) / 9.29
                                     Total Area - 2nd Floor          (m2) / 9.29
           Total Outlay              Real Estate Fees                (cost) x .02

Category   Sub-Category              Base rate (1st Unit)            Extra Unit          Margin
TP Quote   Architectural              $                   1.00   $                1.00            1%
           Re-Establish               $                   1.00   $                1.00            1%
           TP Reports                 $                   1.00   $                1.00            1%
           3rd Party Report           $                   1.00   $                1.00            1%
           Landscaping Plan           $                   1.00   $                1.00            1%
           Arborist Report            $                   1.00   $                1.00            1%
           Traffic Engineer           $                   1.00   $                1.00            1%
           Arorigional                $                   1.00   $                1.00            1%
           Advertising                $                   1.00   $                1.00            1%
                                     Cost Of Development                Fee              Margin
           Council Application Fee   $10,001 to $250,000         $            586.00              0%
                                     $250,001 to $500,000        $            686.00              0%
                                     $500,001 to $1mil           $            791.00              0%
                                     $1mil to $7mil              $          1,119.00              0%
                                     $7mil to $10mil             $          4,696.00              0%

Category   Sub-Category              Item                               Rate             Margin
BP Quote   Working Drawings          Basement                    $                1.00            1%
                                     Ground Floor                $                1.00            1%
                                     1st Floor                   $                1.00            1%
                                     2nd Floor                   $                1.00            1%
           Engineering
           Property Info                                         $                1.00            1%
                                     Base rate (1st Unit)            Extra Unit
           Soil Test                 $                    1.00   $                1.00            1%
           Energy Rating             $                    1.00   $                1.00            1%
           Drainage Plan             $                    1.00   $                1.00            1%

Category                             Base rate (1st Unit)            Extra Unit          Margin
SP Quote                             $                    1.00   $                1.00            1%
TOTAL ($)
(a + b) x c
(a + b) x c
(a + b) x c
(a + b) x c
(a + b) x c
(a + b) x c
(a + b) x c




TOTAL ($)
(total size input from oveview) x rate x margin
(total size input from oveview) x rate x margin
(total size input from oveview) x rate x margin
(total size input from oveview) x rate x margin
(same as working drawings)
rate x margin

(a + b) x c
(a + b) x c
(a + b) x c


(a + b) x c
   Category              Sub-Category                        Item                 Rate      Labour / Extra            Supplier         Size   Colour
Power Authority                              Underground Power Supply (pit)   $   1,515.00                 Powercor
                                             Group Meter                                                   Private Electrician
Water Board       Contribution Fee           Contribution / Acceptance Fee    $     550.00                 City West Water
                  Sewer Branch               Application to Install           $      90.50                 Yarra Valley water
                  Water Tapping              Dry Tap                          $     405.40                 Yarra Valley water
                                             Wet Tap Standard                 $   1,298.50                 Yarra Valley water
                                             Wet Tap Road Bore                $   1,488.00                 Yarra Valley water
Drainage          Contribution Fee                                                                         COUNCIL
                  Retention System            Junction Pits                   $     550.00
                                              Grated Access Pit               $     770.00
                                              100mm PVC                       $      50.00
                                              150mm PVC                       $      60.00
                                              225mm PVC                       $      75.00
Council           Open Space Contribution Fee (estimated value of land)                  5%                COUNCIL
Building Permit   Application Fee             Base Fee                        $     880.00                 ACME Building Consultants
                                              Cost Per Inspections            $     110.00                 ACME Building Consultants
                                              Duty / Tax                             0.08%                 ACME Building Consultants
Insurance         Warranty Insurance          Rate per $1                     $     0.0040                 Insurance House
                  Construction Liability      Rate per $1                     $     0.0025                 Insurance House
Survey            Relocation Survey                                           $   1,100.00                 Anthony Ford & Associates
                  Site TBM to AHD                                             $     660.00                 Anthony Ford & Associates
Excavation                                     Bob Cat p/hr (min 6 hrs)       $      77.00                 Julius Plant Hire
                                               5.5T p/hr (min 8 hrs)          $      88.00                 Julius Plant Hire
                                               5.5T Float                     $     176.00                 Julius Plant Hire
                                               12T p/hr (min 8 hrs)           $     110.00                 Julius Plant Hire
                                               12T Float                      $     704.00                 Julius Plant Hire
                                               Truck                          $      93.50                 Julius Plant Hire
                                               Truck & Trailor                $     143.00                 Julius Plant Hire
                                               Soil Removal (m3)              $        8.80                Julius Plant Hire
                                               Tip Fees (m3)                  $      35.00                 Julius Plant Hire
Site Securty Camera                            2 x Cameras & Computer - Wired $   1,800.00                 AbodeSite
                                               2 x Cameras & Computer - W/Less$   1,950.00                 AbodeSite
                                               Additional wireless camera     $     165.00
                                               Temporary Pole                 $     220.00
Temp Power Pole Overhead Power Supply          Supply & Install               $     791.23                 Quipsmart
                  Underground Power Supply     Supply & Install               $     929.83                 Quipsmart
                                               Extra Weeks                    $      12.50                 Quipsmart
Temp Fencing      Less Than 30L/m              9 months                       $     495.00                 Quipsmart
                                              12 months                       $     605.00                 Quipsmart
                  More Than 30L/m              9 months (L/m)                 $      13.20                 Quipsmart
                                              12 months (L/m)                 $      16.50                 Quipsmart
Temp Toilet                                   Hire per Cal. Month             $      95.26                 Quipsmart
                                                Delivery                              $      132.00                Quipsmart
                                                Toilet Pump / Clean                   $       66.00                Quipsmart
Bin Hire           Lockable Bin 6m3             Weekly Hire                           $       12.50                SITA Environmental
                                                Bin Empty                             $      220.00                SITA Environmental
Asset Protection                                Asset Protection application          $      198.00                COUNCIL
Concrete                                        Plain Concrete                        $       55.00                Concreting by Rudy
                                                 Coloured Concrete                    $       65.00                Concreting by Rudy
                                                 Stencil Concrete                     $       75.00                Concreting by Rudy
                                                 Exposed Concrete                     $       95.00                Concreting by Rudy
                                                 single crossover                     $    1,430.00                Concreting by Rudy
                                                 double crossover                     $    1,650.00                Concreting by Rudy
                                                 Permit Fee                                                        COUNCIL
Landscaping        General                      Top Soil                              $      44.00    $    25.00   AbodeDAC
                                                Weed Mat                              $       2.20    $     2.00   AbodeDAC
                                                Irrigation                            $       6.60    $     3.50   AbodeDAC
                                                Edging                                $       2.20    $     2.20   AbodeDAC
                   Plants                       small grasses / shrubs                $      15.00    $     5.50   AbodeDAC
                                                medium shrubs                         $      22.00    $     5.50   AbodeDAC
                                                small trees                           $      35.00    $     7.70   AbodeDAC
                                                larger trees (when mature)            $      55.00    $     8.80   AbodeDAC
                   Cover                        Lawn Seed                             $       0.50    $     0.50   AbodeDAC
                                                Bark / Mulch                          $      77.00    $    25.00   AbodeDAC
                                                Stone                                 $     198.00    $    77.00   AbodeDAC
                                                Synthetic Grass                       $     110.00                 AbodeDAC
                                                Maintenance Period                                    $   165.00   AbodeDAC
Fencing            Timber                       1.2m Timber Pickett                   $      42.00
                                                1.6m Timber Paling                    $      46.00
                                                1.8m Timber Paling                    $      50.00
                   Brick Fence                  Strip Footing                         $      88.00
                                                1.2m Brick Pier                       $     140.00                 R & R Wilke Bricklaying
                                                400mm brick base                      $      77.00                 R & R Wilke Bricklaying
                   Gates                        Standard Gate                         $     132.00
Letter Box         Metal                        Standard                              $      65.00    $    44.00 AbodeDAC
                                                Decorative                            $      95.00    $    44.00 AbodeDAC
                   Brick                        Built into Brick Pier Fence           $     440.00               R & R Wilke Bricklaying
Clothes Line                                    Fold-Out Clothes Line                 $     110.00    $    44.00
Storage Shed       Colorbond                    2.4x1.6x1.9                           $     499.00    $    77.00
                   Base                         Concrete Base                         $     275.00               Concreting by Rudy
Retaining Walls    Sleeper                      Treated Pine                          $      66.00
                                                Redgum                                $      88.00
                   Post                         Steel Post                            $      20.00
                   Labour to install (per m2)                                                         $    88.00 Caneva Building

                   Brick Retaining Wall                                                $
                                                Brick / Blockwork (incl core fill & reo)    220.00                 R & R Wilke Bricklaying
            Strip footing     $   88.00   Concreting by Rudy
Agi Drain   Agi Drain (L/m)   $   32.00
    Category          Sub-Category                         Item                       Rate     Labour / Extra         Supplier           Size
BASE STAGE     Survey                      Site Set-Out                           $     308.00                George Maclaren
               P.I.C. Permit                                                      $     165.00
               Plumbing                    Estimated pluming cost (m2)            $      28.50




               Electrical                  Meter Box Install                      $   1,320.00                 Parklight Electrical
                                           Rate per L/m for underground           $      44.00                 Parklight Electrical
               Termite Protection          Pipes and Penetrations (0-10)          $     250.00                 Natural Pest Control
                                           additional pipes                       $      25.00                 Natural Pest Control
                                           Perimeter barrier                      $      18.00                 Natural Pest Control
               Concrete Foundation         Raft Slab (not including extras)       $      77.00                 Concreting by Rudy
                                           Extra Concrete (m3)                    $     165.00                 Concreting by Rudy
                                           Waffle Slab                            $      82.50                 Concreting by Rudy
               Concrete Strip / Stump      Cubic meter rate (excavate and pour)   $     275.00                 Concreting by Rudy
               Concrete Pump               Pump Hire (5 hr min)                   $     132.00                 Always Concrete Pumping
                                           Average extra for concrete pumped      $     132.00                 Always Concrete Pumping
               Concrete Bondek                                                    $     242.00                 Concreting by Rudy

FRAME STAGE    Structural Steel            89x89 SHS                              $      80.00   $     40.00
                                           100x100 SHS                            $      90.00   $     45.00
                                            180PFC                                $      75.00   $     37.50
                                            200PFC                                $      80.00   $     40.00
                                            250PFC                                $      90.00   $     45.00
                                            300PFC                                $     100.00   $     50.00
                                            200UB 25.4                            $      85.00   $     42.50
                                            250UB 31.4                            $      95.00   $     47.50
                                            "T" Lintel                            $      90.00   $     45.00
                                            Brace plate - approx 50x6 welded      $      45.00   $     22.50
               Pre-Fabricated Framing       Wall Frames - External 2.4m           $      42.90               Trussfab
                                            Wall Frames - External 2.7m           $      45.10               Trussfab
                                            Wall Frames - External 3.0m           $      50.60               Trussfab
                                            Wall Frames - Internal 2.4m           $      40.70               Trussfab
                                            Wall Frames - Internal 2.7m           $      42.90               Trussfab
                                            Wall Frames - Internal 3.0m           $      48.40               Trussfab
               Posi Struts (incl Ancil.)    Posi Struts - 300mm                   $      22.00               Trussfab
               Roof Trusses                 Roof Trusses - 600mm                  $      32.00               Trussfab
                                            Roof Trusses - 900mm                  $      28.00               Trussfab
               Crane Hire                   Crane hire - 30T (min 4 hours)        $     154.00               Elite Cranes
                                            Crane hire - 50T (min 4 hours)        $     198.00   $     93.50 Elite Cranes
               Party Walls                  Fire Check Plaster or Similar         $      14.00   $     12.00
                                         Hebal Panels - supplied and installed   $    77.00                Wall Solutiions
                Carpentry               Single Storey Walls & Truss                           $    26.95   Caneva Building
                                        Double Storey Walls & Truss                           $    29.70   Caneva Building
                                        Frame Subfloor                                        $    15.40   Caneva Building
                                        Sheet Flooring                           $    15.00   $     6.60   Caneva Building


LOCK-UP STAGE   Windows                 Sliding                                  $    21.00                A&L Windows
                                        Awning                                   $    35.00                A&L Windows
                                        Custom                                                             A&L Windows
                                        Double Glazing                           $    10.00                A&L Windows
                                        Fly Screens                              $     2.00                A&L Windows
                                                                                                           A&L Windows
                                                                                                           A&L Windows
                                                                                                           A&L Windows
                                                                                                           A&L Windows
                                                                                                           A&L Windows
                                                                                                           A&L Windows
                                                                                                           A&L Windows
                                                                                                           A&L Windows
                Entry Door - Paint      FlushPanel - 2040                        $   120.00   $   159.50   The Door Store
                                        FlushPanel - 2340                        $   160.00   $   159.50   The Door Store
                                        XN1 - 2040                               $   198.00   $   159.50   The Door Store
                                         XN1 - 2340                              $   595.00   $   159.50   The Door Store
                                         XN5 - 2040                              $   198.00   $   159.50   The Door Store
                                         XN5 - 2340                              $   620.00   $   159.50   The Door Store
                                         XN7 - 2040                              $   198.00   $   159.50   The Door Store
                                         XN7 - 2340                              $   620.00   $   159.50   The Door Store
                Entry Door - Stain      FlushPanel - 2040                        $   120.00   $   159.50   The Door Store
                                        FlushPanel - 2340                        $   160.00   $   159.50   The Door Store
                                        Tema 101 - 2040                          $   550.00   $   159.50   The Door Store
                                        Tema 101 - 2340                          $   625.00   $   159.50   The Door Store
                                         Tema 04 - 2040                          $   584.00   $   159.50   The Door Store
                                         Tema 04 - 2340                          $   648.00   $   159.50   The Door Store
                                         Tema 104 - 2040                         $   584.00   $   159.50   The Door Store
                                         Tema 104 - 2340                         $   648.00   $   159.50   The Door Store
                External Door - Stain   Flush Panel - 2040                       $   120.00   $   159.50   The Door Store
                                        Flush Panel - 2340                       $   160.00   $   159.50   The Door Store
                                         Half Lite - 2040                        $   195.00   $   159.50   The Door Store
                                         Half Lite - 2340                        $   355.00   $   159.50   The Door Store
                                        Full Glass - 2040                        $   278.00   $   159.50   The Door Store
                                        Full Glass - 2340                        $   448.00   $   159.50   The Door Store
                                        10 Lite French - 2040                    $   330.00   $   159.50   The Door Store
                                        10 Lite French - 2340                    $   407.00   $   159.50   The Door Store
Door Hardwre   Std. Entry knob / lock    $    50.00   $   22.00   The Door Store
               Std. Entry Lever / Lock   $    55.00   $   22.00   The Door Store
               Tri-Lock Knob             $   143.50   $   22.00   The Door Store
               Tri-Lock Lever            $   155.00   $   22.00   The Door Store
Carpenter      Lock-Up                                $   13.20
Eaves          450mm                     $    15.00   $   12.00
               600mm                     $    18.00   $   12.00
Tiled Roof     Concrete - Standard       $    45.00               Supervised Roofing
                                         $    45.00               Supervised Roofing
                                         $    45.00               Supervised Roofing
                                         $    45.00               Supervised Roofing
               Concrete Flat Texture     $    65.00               Supervised Roofing
                                         $    65.00               Supervised Roofing
               Concrete Slate Look       $    65.00               Supervised Roofing
                                         $    65.00               Supervised Roofing
               Terracotta                $    77.00               Supervised Roofing
                                         $    77.00               Supervised Roofing
                                         $    77.00               Supervised Roofing
                                         $    77.00               Supervised Roofing
Colobond                                 $    15.00               Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
                                                                  Supervised Roofing
Sisolation     Perferated                $     4.40               Construct Ramsay
               Non-Perferated            $     5.50               Construct Ramsay
Bricks         Kimberley                 $    30.53   $   54.45   Boral Bricks
               Iron Bark                 $    30.53   $   54.45   Boral Bricks
               Jarrah                    $    30.53   $   54.45   Boral Bricks
               Tanami                    $    30.53   $   54.45   Boral Bricks
               Berwick Rustic            $    30.53   $   54.45   Boral Bricks
               Amber Blaze               $    30.53   $   54.45   Boral Bricks
               Kurrajjong                $    31.08   $   54.45   Boral Bricks
                                    Brown Terrain                          $     31.08     $    54.45   Boral Bricks
                                    Mocha 76mm                             $     32.18     $    54.45   Boral Bricks
                                    Mocha 50mm                             $     45.83     $    64.35   Boral Bricks
                                    Victorian Blue                         $     39.33     $    54.45   Boral Bricks
                                    Floretine Limestone Block              $     39.02     $    67.73   Boral Bricks
                                    Brick Cleaning (per 1000)              $      7.70
                Cladding            Render over 75mm Foam                  $     99.00                  Wall Solutions
                                    Colorbond Weatherboard                 $     85.80                  Wall Solutions
                                    Axon Vertical Cladding                 $     77.00     $    19.80   Wall Solutions
                                    ShadowClad                             $     77.00     $    19.80   Wall Solutions
                                    Render over Hebal                      $    132.00                  Wall Solutions
                                    Stria Vertical Wide                    $     93.50     $    19.80   Wall Solutions
                                    Matrix                                 $    132.00     $    19.80   Wall Solutions
                                    Custom Orb Iron                        $     82.50                  Wall Solutions
                Waterproofing

                Scaffold            Fall protection - roof                 $     35.00                  Quipsmart
                                    Perimeter scaffold 2 Lifts             $     99.00                  Quipsmart
                                    Perimeter scaffold 3 Lifts             $    159.50                  Quipsmart
                                    Perimeter scaffold 4 Lifts             $    209.00                  Quipsmart

FIX-OUT STAGE   Carpentry                                                                  $    15.40
                Shower Bases        Marble Trend Pro 900x900               $     145.00    $    45.00   Hardings Hardware
                                    Marble Trend Pro 1200x900              $     276.00    $    45.00   Hardings Hardware
                                    Marble Trend Pro 914x914 corner        $     217.00    $    45.00   Hardings Hardware
                                    Marble Trend Aztex 900x900 4 lip       $     163.00    $    45.00   Hardings Hardware
                Tiled Shower Base   900x900                                $     900.00
                                    1200x900                               $   1,200.00
                                    1500x900                               $   1,500.00
                                    1800x900                               $   1,800.00
                Bath Tubs           Stylus Maxton 1525x735                 $     129.00    $   164.00   Hardings Hardware
                                    Stylus Maxton 1675x735                 $     142.00    $   164.00   Hardings Hardware
                                    Stylus Newbury 1700x760                $     309.00    $   164.00   Hardings Hardware
                                    Stylus Mirage 1250x1250                $     490.00    $   164.00   Hardings Hardware
                Spa Option                                                 $     390.00    $   165.00   Hardings Hardware
                Ducted Heating      Ducted Heating System - 5 outlets      $   2,300.00                 Everlasting Air
                                    Ducted Heating System - 8-10 outlets   $   2,450.00                 Everlasting Air
                                    Ducted Heating additional outlets      $     160.00                 Everlasting Air
                                    Add-on Cooling                         $    8,000.00                Everlasting Air
                                    Zone - each zone                       $     400.00                 Everlasting Air
                                    Additional controllers                 $     110.00                 Everlasting Air
                Evap Cooling        Evap Cooling (max 10 outlets)          $   3,450.00                 Everlasting Air
                                    Additional Outlets                     $     390.00                 Everlasting Air
                Ducted Vacuum       2Hp Ducted Vac - Installed             $   1,100.00                 Aussie Vac
                          Additional Points                      $   110.00               Aussie Vac
Insulation Batts          Bulk Insulation R1.5                   $     3.35   $    2.00   Urban Insulation   0401302015
                          Bulk Insulation R2.5                   $     4.27   $    2.80   Urban Insulation
                          Bulk Insulation R3.0                   $     4.92   $    2.80   Urban Insulation
                          Bulk Insulation R3.5                   $     5.36   $    2.80   Urban Insulation
                          Bulk Insulation R4.0                   $     7.24   $    2.80   Urban Insulation
Plaster                   Standard 10mm Plaster                  $    27.00
                          Cornice - 55mm Cove                    $     7.50
                          Cornice - 90mm Cove                    $     8.50
                          Cornice - Square Set                   $    11.00
                          Cornice - Decorative                   $    17.00
Timber Hardwood Flooring Tassie Oak                              $   132.00
                          Spotted Gum                            $   143.00
                          Jarrah                                 $   143.00
                          Sydney Bluegum                         $   143.00
Skirting / Architraves    42mm x 15mm                            $     1.15               The Door Store
                          67m x 15mm                             $     1.60               The Door Store
                          88mm x 15mm                            $     1.95               The Door Store
                          42mm x 18mm                            $     1.39               The Door Store
                          67mm x 18mm                            $     1.69               The Door Store
                          88mm x 18mm                            $     2.53               The Door Store
                          135mm x 18mm                           $     3.68               The Door Store
Stair Case - MDF          Cost per Tread                                250
                          Cost per Landing                       $   450.00
Stair Case - Veneer       Cost per Tread                         $   350.00
                          Cost per Landing                       $   550.00
Stair Case - Open HardwoodCost per Tread                         $   550.00
                          Cost per Landing                       $   770.00
                          Plain Timber                           $   110.00
                          Vertical Stainless                     $   132.00
                          Stainless Wire                         $   165.00
                          Glass Balustrade                       $   330.00
Internal Doors            Flush Panel 2040 (prehung & Latched)   $    55.00   $   45.00 The Door Store
                          Flush Panel 2340 (prehung & Latched)   $    85.00   $   45.00 The Door Store
                          Oakfield 2040 (prehung & Latched)      $    75.00   $   45.00 The Door Store
                                                                                        The Door Store
                          Hayman 2040 (prehung & Latched)        $   118.00   $   45.00 The Door Store
                                                                                        The Door Store
                          Sorrento 2040 (prehung & Latched)      $   142.00   $   45.00 The Door Store
                          Sorrento 2340 (prehung & Latched)      $   190.00   $   45.00 The Door Store
                          Cavity Door Insert                     $   132.00   $   38.50
Internal Door Hardware    Standard Knob - Std                    $    16.45   $    8.00
                          Standard Knob - Privacy                $      -     $    8.00
                          Standard Knob - Dummy w/ fittings      $      -     $   12.00
                                 Amelia - Std                             $     28.00    $    8.00
                                 Amelia - Privacy                         $     36.00    $    8.00
                                 Amelia - Dumy w/ fittings                $     21.00    $   12.00
                                 Carla - Std                              $       -      $    8.00
                                 Carla - Privacy                          $       -      $    8.00
                                 Carla - Dummy w/ fittings                $       -      $   12.00
                                 Cavity Clider - Std                      $     28.00    $   12.00
                                 Cavity Sliding - Locking                 $     36.00    $   18.00
             Robe Doors          Vinyl Door 2100                          $    198.00    $     -     Premium Showers & Robes
                                 Vinyl Door 2400                          $    209.00    $     -     Premium Showers & Robes
                                 Mirror Door 2100                         $    233.20    $     -     Premium Showers & Robes
                                 Mirror Door 2400                         $    265.10    $     -     Premium Showers & Robes
             Robe Internals      Standard Package                         $    395.12                Premium Showers & Robes
                                 Double Package                           $    812.24                Premium Showers & Robes
                                 Storage Package                          $    102.96                Premium Showers & Robes
             Joinery             Ceasor Stone Bench Top                   $    550.00                Bright Cabinets
                                 Laminate Cupboards - Standard            $    418.00                Bright Cabinets
                                 Laminate Cupboards - Floor - Ceiling     $    836.00                Bright Cabinets
                                 Vinyl Wrap Cupboards - Standard          $    495.00                Bright Cabinets
                                 Vinyl Wrap Cupboards - Floor - Ceiling   $    990.00                Bright Cabinets
             Glass Splash Back                                            $    400.00                c/o Bright Cabinets
             Sinks               Trough & Cabinet                         $    185.00    $   65.00   Hardings Hardware
                                 45 Litre S/S Trough                      $    185.00    $   45.00   Hardings Hardware
                                 1 3/4 S/S Sink 1080mm                    $    159.00    $   45.00   Hardings Hardware
                                 Single Bowl 780mm                        $    130.00    $   45.00   Hardings Hardware
             Basins              Imperial Novad                           $     59.00    $   45.00   Hardings Hardware
                                 Imperial Arena                           $    165.00    $   45.00   Hardings Hardware
                                 Imperial Avon                            $     89.00    $   45.00   Hardings Hardware
                                 Imperial Arena Square                    $    185.00    $   45.00   Hardings Hardware
                                 Imperial Vada                            $    185.00    $   45.00   Hardings Hardware
                                 Glass Vessel                             $    220.00    $   45.00   Hardings Hardware
                                 Blank 1                                  $       -      $     -
                                 Blank 2                                  $       -      $     -

COMPLETION   Garage Doors        Roller Door - 2800mm                     $     562.10               Centurion Doors
                                 Roller Door - 4800mm                     $     924.00               Centurion Doors
                                 Regency - 2800mm                         $     709.50               Centurion Doors
                                 Regency - 4800mm                         $   1,045.00               Centurion Doors
                                 Georgian - 2800mm                        $     709.50               Centurion Doors
                                 Georgian - 4800mm                        $   1,045.00               Centurion Doors
                                 Daintree - 2800mm                        $     341.00               Centurion Doors
                                 Daintree - 4800mm                        $     407.00               Centurion Doors
                                 Auto Door with Remotes                   $     440.00               Centurion Doors
                                 Windows to Regency                       $      50.00               Centurion Doors
                     Windows to Gerogian               $    95.00                Centurion Doors
Paint                2 Coat System (m2)                $    62.00
                     3 Coat System (m2)                $    85.00
                     Feature Walls                     $   240.00
Tiles - Waterproof   per m2                                         $   110.00   Fowles
Tiles - Screeting    per m2                                         $   220.00   Fowles
Tiles - Floor        Travertine - Natural              $    13.00   $    44.00   Fowles
                     Travertine - Noche                $    13.00   $    44.00   Fowles
                     Melbourne 1                       $    13.00   $    44.00   Fowles
                     Melbourne 2                       $    13.00   $    44.00   Fowles
                     Fidama - Avorio                   $    18.00   $    44.00   Fowles
                     Fidama - Bianco                   $    18.00   $    44.00   Fowles
                     Fidama - Grigio                   $    18.00   $    44.00   Fowles
                     Fidama - Mocha                    $    18.00   $    44.00   Fowles
                     Breeze - Anthracite               $    18.00   $    44.00   Fowles
                     Breeze - Coco                     $    18.00   $    44.00   Fowles
                     Breeze - Sage                     $    18.00   $    44.00   Fowles
                     Breeze - White                    $    18.00   $    44.00   Fowles
Tiles - Wall         Travertine - Natural              $    13.00   $    44.00   Fowles
                     Travertine - Noche                $    13.00   $    44.00   Fowles
                     Melbourne 1                       $    13.00   $    44.00   Fowles
                     Melbourne 2                       $    13.00   $    44.00   Fowles
                     Gloss White - 200x100             $    20.00   $    44.00   Fowles
                     Gloss White - 300x600             $    18.00   $    44.00   Fowles
                     Gloss White - 330x600             $    16.00   $    44.00   Fowles
Feature Tiles        Cosmic Glass                      $   300.00   $    65.00   Fowles
                     Platinum Glass                    $   300.00   $    65.00   Fowles
                     Silver Glass                      $   300.00   $    65.00   Fowles
                     Silex Glass                       $   300.00   $    65.00   Fowles
External Tiles       Breeze - Anthracite               $    20.00   $    44.00   Fowles
                     Breeze - Coco                     $    20.00   $    44.00   Fowles
                     Breeze - Sage                     $    20.00   $    44.00   Fowles
Tapware              Aztex Basin Set                   $    70.00   $    33.00   Hardings Hardware
                     Aztex Bath Set                    $    53.00   $    33.00   Hardings Hardware
                     Aztex Wall Top Assys              $    41.00   $    33.00   Hardings Hardware
                     Aztex W/Machine Stops             $    42.00   $    33.00   Hardings Hardware
                     Aztex Sink Set                    $    92.00   $    33.00   Hardings Hardware
                     Alpine Mixer Sink                 $    75.00   $    33.00   Hardings Hardware
                     Alpine Mixer Basin                $    85.00   $    33.00   Hardings Hardware
                     Alpine Mixer Shower               $    85.00   $    33.00   Hardings Hardware
                     Alpine Mixer Shower w/ Diverter   $   115.00   $    33.00   Hardings Hardware
                     Alto Mixer Sink Hob               $   169.00   $    33.00   Hardings Hardware
                     Alto Mixer Basin                  $   122.00   $    33.00   Hardings Hardware
                     Alto Mixer Basin Wall                          $    33.00   Hardings Hardware
                            Alto Mixer Shower                      $    122.00    $    33.00   Hardings Hardware
                            Alto Mixer Shower with Diverter        $    205.00    $    33.00   Hardings Hardware
                            Alto Mixer Bath Wall with Spout                       $    33.00   Hardings Hardware
                            Other                                                 $    33.00
Shower Head                 Dorf Stayfast Head                     $     35.00    $    33.00   Hardings Hardware
                            Irwell Retro Shower Outlet             $     69.00    $    33.00   Hardings Hardware
                            Caroma Shower Head and Bracket         $     68.00    $    33.00   Hardings Hardware
                            Caroma Shower Head and Rail            $     85.00    $    33.00   Hardings Hardware
Toilets                     Imperial Cleo Panpac                   $    125.00    $    66.00   Hardings Hardware
                            Imperial Tribune CC Panpac             $    249.00    $    66.00   Hardings Hardware
                            Imperial Arena                         $    450.00    $    66.00   Hardings Hardware
                            Other                                                 $    66.00
External - Ceiling Lights   Batten Light                           $     50.00    $    22.00
                            Down Light - White                     $     45.00    $    15.00
                            Down Light - Chrom Feature             $     85.00    $    22.00
                            Feature Light                                         $    22.00
                            Dimmer Switch                          $      80.00   $    12.00
External Lights - Wall      Fluro Light                            $      75.00   $    44.00
                            Wall Mount 1                           $      66.00   $    44.00
                            Wall Mount - Feature                   $      99.00   $    44.00
                            Spot Light                             $      55.00   $    44.00
                            Motion Sensor                          $      65.00   $    44.00
Power Points                GPO Double Standard                    $      45.00   $    44.00
                            GPO Double S/S Plate                   $     110.00   $    44.00
                            External GPO                           $     110.00   $    44.00
                            Appliance Circuits                     $      25.00   $   220.00
Fans / Combos               Ceiling exhause fan                    $      65.00   $    44.00
                            Exhaust Fan / Light                    $     110.00   $    44.00
                            Heat / Fan / Light Combo Standard      $     145.00   $    44.00
                            Heat / Fan / Light Combo Delux         $     195.00   $    44.00
Miscellaneous               Ceiling Fan                            $     195.00   $    65.00
                            Smoke Alarm                            $     165.00   $    55.00
                            Telephone Jack                         $      45.00   $    65.00
                            T.V. Jack                              $      45.00   $    65.00
                            Ethernet Jack                          $      45.00   $    65.00
                            Video Intercom - Colour                $     350.00   $   110.00
                            Alarm System - Hardwired               $     495.00   $   220.00
                            T.V. Antenna                           $     495.00   $   220.00
Hotwater Systems            Dux Gas Hotwater 135litre              $     750.00   $    65.00   Hardings Hardware
                            Dux Gas Hotwater 170litre              $     895.00   $    65.00   Hardings Hardware
                            Rinnai Infiniti V1200                  $     804.00   $    65.00   Hardings Hardware
                            Rinnai Infiniti V1500                  $   1,062.00   $    65.00   Hardings Hardware
                            Rinnai Solar Master 20 Litre 1 Panel   $   2,482.00   $   220.00   Hardings Hardware
                            Rinnai Solar Master 20 Litre 2 Panel   $   3,082.00   $   260.00   Hardings Hardware
                           Rinnai Solar Master 26 Litre 1 Panel   $   2,729.00   $   220.00   Hardings Hardware
                           Rinnai Solar Master 26 Litre 2 Panel   $   3,329.00   $   260.00   Hardings Hardware
Rainwater Tanks            Poly 2000 litre                        $   2,480.00   $   260.00   Hardings Hardware
                           Poly 2000 litre Slimline               $   2,650.00   $   260.00   Hardings Hardware
                           Poly 5000litre                         $   3,000.00   $   260.00   Hardings Hardware
                           Other
Shower Screens             Semi-Framed "Executive" - Front        $     319.00                Premium Showers & Robes 1000mm x 1850mm
                           Semi-Framed "Executive" - Front & Side $     385.00                Premium Showers & Robes 900mm x 900mm x 1850mm
                           Semi-Framed "Executive" - Front & Side $     440.00                Premium Showers & Robes 1200mm x 900mm x 1850mm
                           Upgrade to 1950mm height               $      22.00                Premium Showers & Robes
                           Semi-Framed "Balmoral" - Front         $     429.00                Premium Showers & Robes 1000mm x 1950mm
                           Semi-Framed "Balmoral" - Front & Side $      858.00                Premium Showers & Robes 900mm x 900mm x 1950mm
                           Semi-Framed "Balmoral" - Front & Side $      935.00                Premium Showers & Robes 1200mm x 900mm x 1950mm
                           Fix & Swing                            $     242.00                Premium Showers & Robes 1650mm x 1000mm
                           Custom Shower Screen                   $     660.00                Premium Showers & Robes
Bathroom Accessories       Rosehill Toilet Roll Holder            $      21.00   $    15.00   Hardings Hardware
                           Rosehill Towel Rail Single             $      28.60   $    15.00   Hardings Hardware
                           Rosehill Towel Rail Double             $      52.00   $    15.00   Hardings Hardware
                           Rosehill Towel Ring                    $      23.00   $    15.00   Hardings Hardware
                           Aztex Toilet Paper Holder              $      40.90   $    15.00   Hardings Hardware
                           Aztex Towel Rail Single                $      62.00   $    15.00   Hardings Hardware
                           Aztex Towel Rail Double                $      90.00   $    15.00   Hardings Hardware
                           Aztex Towel Ring                       $      47.70   $    15.00   Hardings Hardware
Mirror                     Polished Edge 600x900                  $      59.40   $      -     Premium Showers & Robes
                           Polished Edge 1200x900                 $     118.80   $      -     Premium Showers & Robes
                           Bevelled Edge 600x900                  $      68.31   $      -     Premium Showers & Robes
                           Bevelled Edge 1200x900                 $     136.62   $      -     Premium Showers & Robes
                           Custom Mirror (m2)                     $     110.00   $      -     Premium Showers & Robes
Appliances                 Emilia 600mm Slide Our R/Hood          $     154.45   $   110.00   Terry McLennan
                           Emilia 600mm Canopy                    $     351.00   $   110.00   Terry McLennan
                           Emilia 900mm Canopy                    $     390.00   $   132.00   Terry McLennan
                           Emilia 900mm Glass Canopy              $     699.00   $   132.00   Terry McLennan
                           Emilia 600mm Gas Cook Top              $     231.65   $   110.00   Terry McLennan
                           Emilia 600mm Ceramic Cook Top          $     422.40   $   110.00   Terry McLennan
                           Emilia 700mm Gas Cook Top              $     489.05   $   110.00   Terry McLennan
                           Emilia 600mm Dishwasher                $     605.00   $   132.00   Terry McLennan
                           Emilia 600mm Wall Oven                 $     465.00   $   132.00   Terry McLennan
                           Emilia 700mm Wall Oven                 $   1,158.30   $   132.00   Terry McLennan
                           Emilia 600mm Freestanding Oven         $   1,158.30   $   220.00   Terry McLennan
                           Emilia 900mm Freestanding Oven         $   1,521.00   $   220.00   Terry McLennan
Split System               2Hp System                             $   1,490.00   $      -     Everlasting Air
                           3Hp System                             $   2,750.00   $      -     Everlasting Air
                           Additional Heads                       $     660.00   $      -     Everlasting Air
Timber Flooring - Veneer   Merbeu                                 $      75.00   $      -     Fowles
                          Kempas                           $    75.00   $     -     Fowles
                          Spotted Gum                      $   106.00   $     -     Fowles
                          Sydney BlueGum                   $   106.00   $     -     Fowles
Carpet                    Godfrey Hurst Callisto           $    19.00   $     -     Fowles   Beige Grey
                                                                                    Fowles   Red Brown
                                                                                    Fowles   Panther
                                                                                    Fowles   Charcoal
                          Quest Carpets Flinders Green     $    25.70   $     -     Fowles   Ghost Gum
                                                                                    Fowles   Natural
                                                                                    Fowles   French Toast
                                                                                    Fowles   Taupe
                          Godfrey Hurst Maybrook           $    26.50   $     -     Fowles   Glow
                                                                                    Fowles   Villa
                                                                                    Fowles   Wild Herb
                                                                                    Fowles   Dark Stone
House Clean               House clean                      $     4.40
Balcony                   Treated Pine Stained             $   110.00   $   45.00            Chestnut
                                                                                             Aust. Jarrah
                                                                                             Maple
                                                                                             Teak
                                                                                             Walnut
                                                                                             Cedar
                          Merbeu Decking - Sealed          $   132.00   $   63.00
External Balustrade       Plain Timber                     $   110.00   $   35.00
                          Vertical Stainless               $   132.00   $   30.00
                          Stainless Wire                   $   165.00   $   30.00
                          Glass Balustrade                 $   330.00   $     -
Decking                   Treated Pine Stained             $   165.00   $   85.00            Chestnut
                                                                                             Aust. Jarrah
                                                                                             Maple
                                                                                             Teak
                                                                                             Walnut
                                                                                             Cedar
                           Merbeu Decking - Sealed         $   165.00   $   85.00
Site Screens               Timber Framed & Stained - S-M   $   220.00   $   35.00
                           Timber Framed & Stained - M-L   $   330.00   $   45.00
                           Metal Framed - S-M              $   450.00   $   20.00
                           Metal Framed - S-M              $   550.00   $   30.00
External Steps             Treated Pine                    $    40.00   $   20.00
                           Hardwood Stairs                 $    60.00   $   20.00
Feature Framing / Pergolas 100x100 posts                   $     9.00   $    9.00
                           Foundation / Stirrups           $    25.00   $   25.00
                           T/P 70x35                       $     3.50   $    3.50
                           T/P 90x45                       $     4.00   $    4.00
T/P 120x45   $   5.00   $   5.00
T/P 180x45   $   6.00   $   6.00
T/P 240x45   $   7.00   $   7.00
Colour
White
White Birch
Primrose
Merino
Metro Silver
Black
Jasper
Woodland Grey
Baramundi
Salsa
Sambucca
Toffee
Soho Night
Manhatten Moon
Soho Night
Manhatten Moon
Granite
Earth
Autumn Red
Pacific
Surfmist
Shale Grey
Dune
Paperbark
Windspray
Woodland Grey
Classic Cream
Sandbank
Jasper
Bushland
Pale Eucalypt
Plantation
Blue Ridge
Highland
Manor Red
Night Sky
95609777 (Construct Ramsay)   Richard Neasey REP 0403 047481
                              ****Sam Anderson 0437586583
 1850mm
900mm x 1850mm
 900mm x 1850mm

 1950mm
900mm x 1950mm
 900mm x 1950mm
 1000mm
                                                                                                           P.O.Box 1210,
                                                                                                  Niddrie, Victoria. 3042
                                                                                                          O: 1300 737646
                                                                                                      F: (03) 8648 6363
                                          TAX INVOICE                                       E: enquiry@abodedac.com.au
                               ABN: 129 869 610        ACN: 129 869 610

           Invoice Number                     2012-05-16 40

                         DATE: 5/16/2012

                 INVOICE TO:                 0
                                             0
                                             0

       PROJECT ADDRESS:                      0
                                             0

                       STAGE:



         DESCRIPTION
                                                                          $                    -
                                                                          $                    -
                                                                          $                    -

                       TOTAL CONTRACT                                     $                    -

                       % CLAIM (This Claim)                        35% $                       -
                       % REMAINING                                  65% $                          -

                plus                                                      $                    -
                                                                          $                    -

                                                       THIS INVOICE $                          -
                                                           G.S.T.   $                          -
                                           PAYABLE (inc. GST)             $                    -



         PAYMENT DETAILS
                 EFT:                  Bank       ANZ Bank
                                       BSB:       013 497
                                    Account:      4812 17955
                                      Name:       Abode Design & Construct Pty Ltd

                       Cheque:        Pay To:     Abode Design & Construct Pty Ltd
                                     Post To:     P.O.Box 1210
                                                  Niddrie, Vic 3042

       *Please input on back of cheque or EFT description invoice number:              2012-05-16 40




"Our team of highly skilled designers, planners, suppliers and builders are property developments passionate
   about supporting residential investors to complete profitable and efficient and to love the experience."

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:31
posted:5/16/2012
language:English
pages:146
fanzhongqing fanzhongqing http://
About