					                                        Name of iNDUSTRIES
                                                 Address of industries
                                          Daily Production Report
Machine Name & No.             :                                            Operator Name :
Product code                   :                                                        Date :
Product Description            :                                                 Shift Time :

                                        Break Down Time Analyser
Wire Changing                                      :
Wire Shortage                                      :
Tool Changing                                      :
Tool Shortage                                      :
Setting Change                                     :
Setting Correction                                 :
Under Maintenance                                  :
Operator Shortage                                  :
Power cut                                          :
No Order                                           :
                                        Raw material Consumption Detail
                         Wire Size                        Wire Hardness in HRB
  Serial                                                                                                Wire weight in
                                                                                           Wire Grade
 Number         Before drawn       After drawn         Before drawn       After drawn                        KG




                                             Tool Consumption Details
Main die            -          2nd Punch           -           Thread Roll Die    -                         -

Main die Pin        -          Cutter              -           Sooper             -                         -

1st Punch           -          Cutting die         -           Trim Die           -                         -

1st punch pin       -          Slotting Wheel      -           Trim Punch         -                         -

2nd Punch holder    -          Slotting Index      -           Trim Pin           -                         -


Pieces per Minute                                              Total Down Time in Minutes

Quantity produced                                              Total Working Time in Minutes

Cumulative Quantity                                            Efficiency

Accepted Quantity                                              Rejected Quantity
Operator signature :   Q.C Inspector Signature :   Checked By:
                                                                      Name of Industries
                                                                         Address of industries
                                                                   Daily Production Report
Machine Name & No.                        :                                                                         Operator Name :
Product code                              :                                                                                       Date :
Product Description                       :                                                                                  Shift Time :


                                                                       Down Time Analyser




                                                                                                    Maintenance
                  Wire change




                                          correction

                                                       Power cut


                                                                   Shortage

                                                                              Shortage

                                                                                         Shortage




                                                                                                                  No Order
                                                                                         Operator
        Running
        Machine




                                Setting

                                           Setting




                                                                                                       Under
 Time




                                                                     Wire

                                                                                Tool
                                                                                                                                            Remark


8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
1:00
1:30
2:00
2:30
3:00
3:30
4:30
5:00
5:30
6:00
6:30
7:00


Pieces per Minute                                                                                   Total Down Time in Minutes

Quantity produced                                                                                   Total Working Time in Minutes

Cumulative Quantity                                                                                 Efficiency

Accepted Quantity                                                                                   Rejected Quantity
Operator signature :   Q.C Inspector Signature :   Checked By:

				