					Technology Due Diligence: What
 to consider when choosing a
      single-axis tracker
          Chris Lomibao
        Solar Energy Consultant


             June 16, 2011
Agenda


     Benefits of technology due diligence
     Single-axis tracking market overview – worldwide
     Technical review
     Quality and reliability
     Importance of supply chain
     Installation, operations and maintenance


B&V - 15                                           June 16, 2011
    Benefits of technology
    due diligence


      Supports financeability for
       emerging solar technologies
      Helps investors understand any
       possible risks to the project
      Can help capture the
       bankability of the product
      Piece of mind




B&V - 15                                June 16, 2011
Single-axis tracking market overview - US


     In the US, the majority of the largest crystalline-
      silicon PV plants have been installed using SAT
      systems.
     SunPower has installed some of the largest SAT
      PV plants in the US (T0 and T20).
     Array Technologies has also installed over 60 MW
      of their Duratrack SAT in the US.



B&V - 15                                                June 16, 2011
US SAT Installation Examples

     SunPower T0 trackers at
      DeSoto Energy Center



                                     SunPower T20 trackers at the
                                      Nellis AFB




     ATI Duratrack trackers in
      Alamosa, CO
B&V - 15                                                   June 16, 2011
Single-axis tracking market overview -
International

     Most of the PV systems built internationally were
      built using tracking systems
     Majority of PV systems in Spain are dual-axis
      tracking systems
     Many PV systems in South Korea, Italy and China
      were installed using SAT technology
     Notable international tracking manufacturers
      include: SunCarrier, Meca-Solar, and OSolar

B&V - 15                                              June 16, 2011
International Tracking Installation Examples


                                      6.58 MW Meca-Solar dual-
                                       axis tracker installation in
                                       Italy




    24 MW OSolar SAT
     installation in South Korea




B&V - 15                                                        June 16, 2011
Technical Review


     Not all SAT systems were created equal!
     What are the critical components of the system?
     Design flexibility
     How does the system track?
     Preventative actions, Failure-modes, and
      Corrective actions.



B&V - 15                                           June 16, 2011
Critical Components Examples




B&V - 15                       June 16, 2011
Design Flexibility




B&V - 15             June 16, 2011
How does the system track?

     Electronic controller
              Backtracking
              Wind stow
              Accuracy


     Bearing assembly
              Material
              Wear and tear

B&V - 15                       June 16, 2011
How does the system track?

   AC Motor
          Features
          Motor control
          Failure modes,
           causes, consequences
           and corrective actions




B&V - 15                            June 16, 2011
Preventative Actions, Failure-modes, and
Corrective Actions

     Mostly mechanical system = moving parts
     Possible failures can include:
              Excessive operating load criteria
              Control system failure
              Loss of tracking ability
     Failure-mode and effects analysis (FMEA)


B&V - 15                                           June 16, 2011
Quality


     Organization and Quality Assurance Tools
     Manufacturing Processes and Quality
              ISO Certification
              Quality check points
              Performance or stress tests
     Quality Control


B&V - 15                                         June 16, 2011
Reliability


     Approach on reliability
     Overview of key failure
      modes
     Reliability Testing
              Critical components
              HALT
              FEM analysis
     Field Experience and
      Lessons Learned
B&V - 15                             June 16, 2011
Supply Chain

    Suppliers
          Selection criteria
          Production monitoring
    Transportation and Logistics
          Where to ship?
          Parts tracking and serialization
    Supply Chain Robustness
          Material substitution and substitution strategies
          Portfolio of vendors for critical parts
B&V - 15                                                       June 16, 2011
Installation, Operations and Maintenance


     Installation
              Tracker blocks and recommended layouts
              Guidelines
              Site condition requirements or limitations
              Specialized installation equipment requirements
              Construction tolerances




B&V - 15                                                         June 16, 2011
O&M


     Maintenance activities and frequency
              Scheduled maintenance
              Unscheduled maintenance




B&V - 15                                     June 16, 2011
Conclusions


     Not all SATs are created equal
     Research different SAT manufacturers
     Manufacturers field experience
     Design flexibility
     Quality and reliability
     Importance of supply chain
     O&M
B&V - 15                                     June 16, 2011
           THANK YOU!