FIA PM Video Conference Call
Document Sample


FIA PM Conference Calls
May 20-29, 2008
Action Items:
What Who When
Timberland: Work with RMRS staff (DAB/IM) to identify NIMS issues Michael
related to site tree and timberland/woodland classification (stand size?) and
day-light/clarify
Timberland: Respond to Greg Kujawa on plans for timberland/woodland Chip
issue
IM Core Team: Direct IM Team to update their Charter and address specific Michael
roles/responsibilities/functions/ decision-making/accountability (within group
and to PMs). The IM Core Team may need to review IM sub-team charters as
well.
IM Core Team: IM Core charged with assigning a Forest Service D-Team Michael
lead and having the team revisit their Charter.
IM Core Team: Evaluate a process for setting priorities and assignments, and Michael
recommend what level may need to have PM concurrence(alignment)
Communication Plan: Livia will review Communication Plan and other Livia/Bill
supporting documents; will work with Bill (& others). She will also help
work on some of our guiding principles, common issues, and core priorities
we all use to make decisions both internally & externally (part of the vision).
Look at current briefing papers and identify gaps; look at current tools
Indicator Advisors: Draft Indicator Advisor roles into the future, re-evaluate Greg/PMs
the budget needs based on the anticipated roles
DAB Meeting: Talk with DAB about agenda, location, travel restriction Sue
issues for their meeting in September in Savannah, GA
CORE Bands: Consider having some PM time with the Band Leads to Greg/PMs 6/08
discuss how the restructure is working. Do we need to have a joint Core
Team meeting? Meet at June Mgmt meeting.
P3 Data: Ask Chuck to tell PMs what would it take to get MESS P3 (where Michael
current codes/protocol were used) into NIMS
Biomass/Carbon: What will each unit do? Would like to have procedure in Dennis
place and have FIADB updated for Aug. ‘09 carbon numbers to EPA. Charter
new team
Plot Mapping: Task team should be formed to develop a metric for Sue
measuring the type of non-repeatability discussed in Appendix 1 and to
monitor progress toward increasing the repeatability. Ask Phyllis to add this
to her list.
Updating Old Data: Ask the AB to evaluate the scope and level of Bill
significance and ask the IMB to evaluate the implications.
Implementation Plan: PMs review the draft Implementation Plan in advance ALL 6/08
to see if it helps the Bands and staff understand Program vision and priorities,
and/or if there are other changes needed. Then discuss at the June FIA
Management Team perhaps in place of regional updates. PMs will work on
plan for 2009. It needs to provide adequate guidance to Bands on setting
priorities.
Lidar: Forward PNW documentation on LIDAR requirements Sue
Decisions:
PMs agree that Champions should avoid conflict of interest during the Band review and
decision on their proposal. Band should determine how to implement.
Continue mapping on the subplot. For every attribute that can occur anywhere on the
subplot, when there is a mapped boundary on the subplot, there has to be instructions on how
the attribute is assigned a condition class. Add to the change proposal form “Are the
attributes in this change proposal affected by mapped boundaries on the subplot? If so, then
how are mapped boundaries on the subplot dealt with
*************************************************************************
May 20, 2008
Chip, Michael, Sue, Bill, Dennis
Forest/Timber
Forest Land definition work (aka Mother) – target is end of June for Regional analyses;
specifically, what is the impact of going from 5% cover and/or 10% cover to a strictly 10%
cover minimum for forest land (assuming non-stocked forest is still forest even with no
cover, etc.). Units need to get information to John Shaw.
o PNW - Potential change of 12 million acres in 3 States; still working on AK estimates
o SRS - Texas: 17-36% reduction in stocked area, and almost 13 million in non-stocked.
Non-issue for other southern States, though S. Florida/OK may show some impact, OK
probably proportional to Texas.
o NRS has declared there is no impact for NRS.
Definition of Timberland - consistency
o Change in site tree criteria caused land area to go from woodland to timberland
o Some Units are putting woodland types into “non-timberland” regardless of site
o Other Units using site trees to designate timber/woodland.
o NRS does see changes in site/productivity just do to crew selection of tree (spp.) over
time. NRS freezes site class at past inventory’s measurement.
o NIMS algorithm uses site tree species/growth to classify woodland/timberland though
some Units hard code.
ACTION: Michael will work with his staff (DAB/IM) to identify NIMS issues related to site
tree and timberland/woodland (stand size?) and day- light/clarify.
Definition of Timberland – email from Greg Kujawa
o Question was focused on withdrawn vs. not withdrawn designations related to reserved
status.
o PMs need to inform Greg Kujawa this topic was about classification. Just looking at how
it is calculated in processing system vs. Andy Gray’s team regarding administratively
withdrawn.
Forest
Forest-reserved
Forest-reserved-woodland
Forest-reserved-woodland-administratively withdrawn from harvest
o We have seen no change proposals re: reserved.
ACTION: Chip will respond to Greg Kujawa.
IM Core team (alias Go5/Fab5)
Roles/responsibilities/Decision-space (Chuck, Group Leads/sub-teams/UNLV)
o There are concerns over who provides what level of direction for IM resources and how
do individuals respond to direction/suggestions (Greg needs to be engaged with solution)
o Need to designate technical member D-Team Lead.
o What guiding principle/issues are needed? PMs can provide clarification where needed.
ACTION: Direct IM Team to update their Charter and address specific
roles/responsibilities/functions/ decision-making/accountability (within group and to PMs).
The IM Core Team may need to review IM sub-team charters as well.
ACTION: IM Core charged with assigning a Forest Service D-Team lead and having the
team revisit their Charter.
Unclear/dynamic plan/schedule issues, making changes to assignments/priorities; Over-
arching framework on what needs to be done.
Some level of priority setting needs to be reviewed by PMs;
ACTION: Include in IM Charter update.
Slow progress to a national system
o What IS a national system (what regional IM issues/needs will exist forever such as
regional compilations/analysis, etc) and what must be moved into a corporate system?
o Not always clear PM alignment/commitment; each Unit’s “HAVE TO HAVE” impacting
ability to make progress. Plus last minute changes…
o PMs need to provide Guiding Principles
o How do we get NIMAC, NWOS, and TPO into main flow of system?
o D-Team needs FS lead.
Communication Plan
Livia Marques has been detailed to SRS until Dec. 2008; has background in horticulture,
science application/tech transfer. Worked with NRCS for 14 years.
FIA needs to put some emphasis on our shared common vision; PMs need to get vision
(principles) solidified in our own minds.
Need to update congressional papers re: climate change, carbon, range, urban…Should be
ready this fall to inform FSRET for their plans and the first of next CY for congressional
visits.
Identify priority topics and get them on our PM Agenda.
Needs to be updated for 2008-2009.
ACTION: Livia will review Communication Plan and other supporting documents; will work
with Bill (& others). She will also help work on some of our guiding principles, common issues,
and core priorities we all use to make decisions both internally & externally (part of the vision).
Look at current briefing papers and identify gaps; look at current tools. Livia should have
something to share with Core Team at or before MT Meeting.
May 21, 2008
Chip, Michael, Sue, Bill, Dennis
Satellite Phones/SPOT –
NRS Sat. phones have been inadequate. PNW and IW are using a new satellite company
(Iridium) that is working well; the phones cost is $1,400/phone, plus monthly charges. NRS just
purchased SPOTs “under the wire” for Technical Approval and between these and cell phones
they should have good coverage. NRS ordered SPOTs but not enough for everyone. SPOTs
costs about $100 to purchase and $100/year. PNW also received some SPOTs, but IW’s order is
hung-up in the Technical Approval process.
Budget PART 1
What will it take to get in each remaining State? What is left by Unit?
We currently have $64.6M. The Foundation document shows that we need $8M. Current
target is $73.4M. This is a ‘03-‘04 target and will be short of the ACTUAL costs to be fully
implemented.
The foundation document shows $3M for Urban, which should be sufficient.
The foundation document shows Range at $25 million, short the likely funds required
actually do the full grid on all nonforest. IW estimates national cost for rangeland ~$35
million without AK.
Indicator Advisors Role and Funding PART 1
What do we want indicator advisors to do once protocol/analyses are complete? We need to
define scope of their job through time. Originally envisioned field protocol, QA,
compilation, through some analyses and reporting. Once GTR completed, we need to transfer
knowledge to Units (train analysts, support and review of first reports with indicator). Goal
is to get the indicators into State 5-year reports.
For more mature indicators, we could reduce the level national support. Soils, DWM, and
Crowns seem to be stable. The Soils IA may also have a lab and QA role.
Beyond: Are there national reports Brad could use their input/support? Should be keeping
procedures and analysis current and relevant, review for Regional analyses (10-15%
maintenance mode); reviewing/QA for contract soils analyses; lead on national reporting;
respond to requests? They would not necessarily serve as an analyst for State reports.
However, they could have a significant role in national reports. Need to discuss this with
Brad and Greg. Bechtold’s RTP group may be able to serve this role.
Budgeting for indicators – we have not reviewed the necessary funding in a number of years,
and should be reviewed especially considering that the funds have been rolled into the
respective Unit’s “base”.
See ACTION below under Indicator Advisors Role and Funding PART 2
Quality Assurance (with Phyllis)
Status of Program of work – Phyllis reviewed what she has been working on, including the
Documentation Plan, websites and Unit trips.
o P2 DWM task team has developed a table of questions for DWM data. Team has sent list
to AB to prioritize categories by client (e.g., biomass for national, fuels for NFS, fire
models). At this point, all these will be core optional, and the level/scope of analyses
needed may dictate whether to use P3 or P2. PMs will need to look at proposals/elements
and see if some Region edge-matching is necessary and whether some of the DWM
elements may need to become national core.
o Analytical QA Task team – looking at categories checked by each Region’s analysts
(e.g., area checks). Phyllis sent out request to the analysts for a checklist of error checks
that they perform. They are also looking at QA tools and will have a demo on the call
tomorrow. The current version is pretty complex, but it should be flexible enough to
handle more checks. The tools will not perform all the checks, but the checklist will help
with this. A spatial component is being contracted, and there should be the ability to
display multiple states. The focus need to be on both on the running average and
evaluating individual panels.
o QA Score Team – this is more than just agreeing on weights for scoring. Are units doing
cold checks similarly? Are there other ways to look at cold-check data? Phyllis is
revising charter for DAB review. Running into field season participation constraints…
o MQO analysis – not much to report. She has been going through the PNW data with Olaf
Kuegler.
o QA Documentation Plan for FIA systems – a team has developed an IM Documentation
Work Plan. They are first building a status library, over-arching framework. Currently
using a PNW link with a documentation status table (internal). This will include, for
example, flowchart, MIDAS, NIMS navigation, NIMS tables, population tables, FIADB.
Topic/subject
Types of documents (format)
Category (what part of flow diagram processes)
Target audience, clients served (internal, dynamic)
Author/source
Links to existing documentation (need to centralize; Helen taking care of NIMS
pieces)
Time-line/Assignments for additional work.
The Keywords, Abstract and Links are not needed during the planning process, but
will be helpful in the searchable webpage at the end
QA Website
o Currently maintaining sites for Analytical QA and P2 DWM currently in Analysis Band
web site (using Eric Wharton’s template for volume/biomass)
o National QA (external) could be kept on external Band web site: QA overview, flow
diagrams, definitions, high-level news; could also eventually include post-edit QA data
sets, equations/methods, error budgets, variance partitioning, etc. First cut would be
descriptive then provide data and analysis. Include a streamlined version of the
documentation table (see above). These pages, especially analyses, will need to be
reviewed
QA Travel request
o DAB meeting in Sept; would like to combine with a trip to Knoxville and to meet with
QA score team or just more QA staff for a more comprehensive meeting (haven’t had a
QA meeting in 8 years). PMs feel that Savannah, GA seems like an expensive out-of-the-
way place for a large meeting, and would like to wait until next year. Recommend
postponing QA score team/other field QA due to travel restrictions, etc. DAB agenda
may suggest whether or not Phyllis goes to the regular Band meeting.
ACTION: Sue will talk with DAB about agenda, location, travel restriction issues.
o FIA Symposium (October). YES, PMs agreed that Phyllis should attend.
QA on remeasurement (Chip) – issue related to QA blind check remeasurement data that is
copied from the prior occasion may not make sense where boundaries, azimuths, other
information provided at time-1 always comes back as the same value. Phyllis is evaluating;
no clear remeasurement QA protocol.
Core Band Meeting
Do we need a Fall Core Band meeting; see how it’s going, mid-course adjustments? We had
agreed to an annual meeting, however, there is concern about the travel costs.
o How the overall process is going?
o How well did they do on 2008 work plan?
o What is their 2009 work plan?
And we need some discussion on how to integrate band priorities across bands (we didn’t do
this well for FY08).
Include new issues we need to incorporate e.g., Range, Urban
Band Leads or Actings will be in Maine so can raise the process (Band restructuring) issue
during the FIA Mgt. Team meeting.
ACTION: Consider having some PM time with the Band Leads to discuss how the
restructure is working. Do we need to have a joint Core Team meeting?
Indicators/Task Teams
P3 data availability prior to 2003 – issue: P3 data still in two locations: data re in MESS up
through 2003, and in FIADB to current; how are units handling this for analysis? Some
within MESS are still useful (like soils after 2001, or lichens, ozone where protocol are
generally current). RTP and IA’s are handling it with workarounds – what are they doing?
ACTION: Michael will ask to Chuck tell PMs what would it take to get MESS P3 (where
current codes/protocol) into NIMS. Else each Unit/analysts will have to chunk them
together.
Damage
o AB is preparing a final reply to Manfred re: his feedback, likely by June/July. Key
sticking points include lack of defoliators (more critical in the West) and pathogens
importance ranking. The defoliator issue is perhaps valuable in the West, since they visit
a higher proportion of the plots in the summer and the trees don’t refoliate. Bill noted
that the FHP Aerial Survey can do a better job of this for hardwoods in the South. In the
East many defoliators hit 10-12 species and some species can re-flush if >50% (maybe
thinner crowns).
o Do we have proper question framed? Some are National vs. regional issues? Some issues
assumed that there are better sources.
May 22, 2008
Chip, Michael, Sue, Bill, Dennis
Potential Conflicts with Change Champions (often an Indicator Advisor)
We do not have a clear role specified for change proposal champions, particularly as related
to the Band reviews. Should they serve as the author and in the review? There is concern
that the IA should not be involved in the review. Champion for a proposal should not serve as
a Band review lead or the representative of the Band for review of their own proposals
(unless the Band itself is championing the proposal), and maybe not be included in
deliberations or vote on a decision, but be available for responding to questions.
DECISION: PMs agree that Champions should avoid conflict of interest during the Band
review and decision on their proposal. Band should determine how to implement.
Volume/Biomass and Forest Management Center (FMC)
What do we do on a national basis, what are the holes we want plugged?
PMs agree that the volume definition team is doing what they are supposed to do, focusing
on the short term consistency fixes while considering the long term.
For Dennis’ bigger issue, we need a national decision on whether we fix current problems
within FIADB using the quick fix for ALL regions. Assumption is that everyone’s regional
equations are their best (regionally responsive), then figure out the biomass per ft3 ratios
from specific gravity equations, and then prorate the component parts from the Jenkins et al.
national equations (i.e., tops equal a % bole volume, limbs a % of bole volume, etc.). This
would last until volume team gets to working with FMC to collectively address volume and
biomass in a consistent set of equations that are sensitive to ecosystems differences. Broken
top or other individual tree issues could be accommodated at some level (if broken top then
adjust ratio with no top or such). DECISION needed: What will each unit do? Would
like to have procedure in place and have FIADB updated for Aug. ‘09 carbon numbers
to EPA.
Every future refinement of ft3estimates would impact tons of biomass & component parts.
There’s still the issue for how far back we take this (e.g., no missing top); but as long as you
have a ft3 volume for a tree, you can get a biomass estimate for all the parts.
This approach would make everything additive and consistent between volume and biomass.
Brad Smith would like to apply this same “fix” to FIADB as well. We would like to
negotiate an approach with Forest Management Service Center (FVS folks) for a longer term
solution. The question is do we want to make the fix to FIADB prior to the long-term
solution? We agree that there is merit in the approach, but need the team to evaluate the
implications and potential implementation. For example, what happens to the biomass
estimates when a top gets blown out? Xiaoping Zhou, Ray Sheffield, Mark Hansen and
Larry DeBlander will continue working on this. Dennis will communicate the above to the
team. Carbon folks may want us to re-compute biomass back to 1990. Linda Heath needs to
give EPA biomass estimates by August 2009.
Budget part 2
NC/NE NRS – Originally, the combined Unit’s projection added to $19 million, but now
Brad’s numbers have that down to a combined $17 million program. They are $800k short
of providing infrastructure need just to get to $17, $2.24 million less than what they were
aiming for 2005.
SRS – language says increase in funds/language for MS; OK needs $475k. SRS
infrastructure needs $750k to stay afloat.
IW – NM $606k (total for NM $1.3m, assumed they received ~½ in 2008 though no net
increase to program), $778.5k NV, $958k WY, leaves $2.2m shortfall for infrastructure, field
(using 2007 Strategic Planning numbers).
PNW – $2.7m AK, $350k, $800,000 for infrastructure just to stay in the black.
Issue: Absorbing indicator funds into the Unit pool dilutes ability to do the rest of the job…
Needed just for the field work:
NM $606K
OK $475K
MS $0K*
AK $2.7M
NV $778K
WY $958K
HI $350K
* But funds did not make it to SRS.
Total $10.4 million, but still well below need. That’s $2.4 million short of the $8 million, and
every year it gets worse. We have to do things differently, or not do things.
ACTION: Add to Greg discussion BIN list.
Condition Mapping Proposal – Michael presented a proposal entitled “Mapping Condition
Boundaries on Subplots”. Majority of PMs want to “not change”; can live with costs and
complications. Note: There still is the remaining question as to whether the variability in
measurement area doesn’t swamp bias. DECISION: The majority of PMs support Option 2:
“Continue mapping on the subplot.” For every attribute that can occur anywhere on the subplot,
when there is a mapped boundary on the subplot, there has to be instructions on how the attribute
is assigned a condition class. Add to the change proposal form “Are the attributes in this change
proposal affected by mapped boundaries on the subplot? If so, then how are mapped boundaries
on the subplot dealt with?” Also we recommend that a task team be formed to develop a metric
for measuring the type of non-repeatability discussed in Appendix 1 and to monitor progress
toward increasing the repeatability.” We need to anticipate the implications for new attributes,
new indicator suites (e.g., Range), and explaining to new users. ACTION: We will ask Phyllis
Adams to add this to her list to lead.
Updating Old Data - What is the process when a new equation or method is used for current
values, or an error in the data is identified (esp. periodic data)? Some Units update once yearly
including changes in the periodic data base. Users complain that the database keeps changing.
We agree that we need a national standard for updating the database. Initial thinking is that we
would make an annual update of any significant changes. The changes would be listed in
metadata. The focus will be on the annual data and the last periodic inventory. ACTION: Ask
the AB to evaluate the scope and level of significance and ask the IMB to evaluate the
implications. DARSy (Data Anomaly Resolution System) developed by PNW could help with
this.
May 27, 2008
Greg, Chip, Michael, Sue, Bill, Dennis
Foundation Document for FSRET
PMs have received latest foundation document (5/18/08). It includes $8 million for
remaining Forest (includes $5 million S&PF), $3 million for Urban, and $25 million over 5
years for Range.
Implementing the current all-50-States forest plan ($62m current + $5m S&PF + $8m) still
leaves FIA $2.5 shortfall of the real need. Some new infrastructure will need to be covered
for other new platforms anyway, e.g., staff time to get what data we collect up to some
useable state. Could add increment D and E (in platform document) to include development
of database, etc., to ensure data/database/etc. ready to move attributes (e.g., urban, carbon
numbers) to a new stage. Any work we’re now doing in climate change, carbon, biomass,
etc. is consuming current IM and analytical resources.
PMs believe these foundation/platform cost estimates should reflect our best estimate of what
it will cost to implement; the source of funds can come from wherever as the “who pays” is a
different question. FS may need to just commit R&D funds to leverage funds from USGS,
BLM, NFS, etc.
FSRET meeting in Boise next week will discuss budget for foundation Programs and growth
platforms; Greg attending. Rich returns tomorrow.
PMs may want to discuss these issues with our respective Directors.
Implementation Plan
Have a current draft implementation plan that is focused on the base program in 50 States.
Need to revise the plan to incorporate the likely upcoming urban and range work, weave in
FSRET platforms and foundation (urban/range) issues, including climate change,
biomass/bioenergy, but we also need to specify how much time and energy we spend on
new/improved when we’re not in all 50 States.
Note: it appears that S&PF is currently looking at Urban FIA as separate from the S&PF
competitive funding process/options; want to just fully fund urban FIA through R&D (3 mil).
For Urban, still need to get the IM system functioning and fully integrate protocol into the
FIA manual. We’re not yet operationally-ready in urban FIA, and how does this compare to
other priorities such as understory vegetation (where we’re not fully operational as we’re not
yet in all 50 States).
Need to develop a plan, and we need to identify the start-up period: what are steps/costs to
get issue (urban, range, whatever) fully integrated? Need to manage expectations…
What percent of effort needs to be in incorporating Urban IM to make it self-sustaining?
What would it take: 10-20% of our time to invest in preparing (trade-offs for 5.0, etc.), or
additional funding to hire additional staff to get the work done? Or do we just continue to
work on a smaller non-integrated approach to get data out until funds show up.
It would be useful for IM Band to hear from PMs that they need to move from the “Forest
land” bias in our current system and focus on all vegetation/lands and let the information fall
into buckets in the end. Our IM system needs to be comprehensive but parse-able into
historic buckets.
Need to keep the vision in front of us: What would it take to make this (data collection,
IM, etc.) work for other potential landscapes? This is reminiscent of one-track/two-track
conversation; we can now create an FIADB file for forest land, but not much else. Maybe
need to put one or a small sub-group at a second track for development opportunities (but
well enough integrated with current or it may fail like before). Need to keep staff focused on
both the production AND the emerging.
An Implementation Plan should provide guiding principles to meet short and long-term
objectives. Should use this as a tool to help next tier of the organization bridge the gap
between the big vision and the nuts-and-bolts of what we’re doing today.
ACTION: PMs will review the draft Implementation Plan in advance to see if it helps the
Bands and staff understand Program vision and priorities, and/or if there are other changes
needed. Then discuss at the June FIA Management Team perhaps in place of regional
updates. PMs will work on plan for 2009. It needs to provide adequate guidance to Bands on
setting priorities. Next step take to MT (what’s missing).
State Assessments PART 1
This year kept allocation at 15% for competitive funds; several States initiating assessments:
o In IW, CO has hired TNC to develop CO State Assessment
o In the South, Texas is doing a prototype assessment that they will share with other
Southern States the 2nd week in June, using it as a template. To date, TX is using
publicly available FIA data and others (Burl). TX has a strong analytical workforce, but
maybe not other States.
o In PNW, OR has taken the Spatial Analysis program but have not engaged FIA – has
shared what they are doing but have not requested FIA data. Unknown whether their
information will be pulled from a recent OR state indicators/strategies for sustainability
pub. Sue is sitting in on evaluation panel for S&PF 15%; but since not all assessments
are completed or available, this is not really an evaluation criterion at this point (maybe in
the future). No clear standards or expectations for assessments.
It appears that S&PF is taking a hands-off approach (not prescriptive); there is no template.
Funds are currently competed within FS mega-regional frameworks (WFLC helping staff out
for western process); in South they may be using last year’s approach for funding allocation,
as many States did not put in for anything.
What if all States in West use different fire potential models? How will S&PF compare
consistently across to ensure apples and apples? Competition now focused on partners and
process. It’s all about perceived leverage. And multi-State proposals > single State
proposals.
Does FIA HAVE a role? Or SHOULD FIA have a role? Is it worth having a set of regional
analyses that can we do that would put States in context with its neighbors based on a
number of drivers?
What if we are asked to provide coordinates? After they don’t come to us in the beginning…
What are issues if FIA does 5-year reports, the RPA is out there, and now a State does an
assessment?
Note: Connie Carpenter did a summary on C&I for northern States. Also southern Forest
resource assessment (here’s everything we know); this Forest futures project w/States &R&D,
given current pressures/issues, here’s where we think things will be in 50 years. NRS is also
initiating a northern forest futures project. Bill will be talking with Burl Wednesday & will get
back to PMs.
LANDFIRE Part 1
Just a heads up to the PMs: the RMRS/Fire lab is disengaging from the remaining LANDFIRE
production work effective Oct 1 (LANDFIRE Program is moving away from R&D and into
operations and maintenance). LANDFIRE leadership will be contracting out the remaining HI
and AK work. Several issues may be coming our way – current LANDFIRE-FIA MOU is within
RMRS, no external partners. Contractors may/may not be federal agencies. FIA’s TERM
appointments to LANDFIRE expire first of next CY, and we may be asked to extend
appointments to at least get LANDFIRE through HI and AK work. FIA may be essential for the
LANDFIRE operations and maintenance plans, but we have not been contacted. Then there’s
the whole issue of fire and fuel work moving from FS to DOI…
May 29, 2008
Greg, Chip, Michael, Sue, Bill, Dennis
Indicator Advisors Role and Funding PART 2 (continued from above PM calls)
Are the “tasks” the right ones for the Indicator Advisors, what role do they have at the
national level, and do we have the right level of funding. Currently a manual may be done,
and GTR may be published, but do we have the coding for NIMS completed?
Is another role for IA to flesh out next steps for analysis and reporting? Maybe list as an
expectation that IA will participate in various national reporting avenues.
ACTION: Greg will prepare a draft of Indicator Advisor roles/responsibilities. We Need to
ensure each indicator is fully incorporated into the FIA system; support in translation and
shepherding through IM is part of the IA responsibility. PMs and Greg/Brad need review
financial aspects of indicator advisors (short and long term)
Lidar Study – Various issues
Need to get Zhi caught up on AK remote sensing issues; this is broader than Lidar.
Greg has asked Zhi and Hans Anderson to put together a workshop in the next 3-4 months,
likely focused on Alaska. Audience is USGS, EROS, others who have or want to
use/leverage with FS.
The Techniques Band was also internally coordinating the RS within FIA.
PNW in process of hiring a Research remote sensing specialist
There was a recent proposal from USGS for another Lidar study in SRS.
Ohio has flown northern ½ of State in Lidar and plans to do the other ½. Chip is thinking of
using this in terms of stratification. There are many other efforts going on around the West,
but little evidence of coordination. PNW has put together some documentation on
requirements (Sue will forward to PMs)
LANDFIRE PART 2
When MOU expires (May 15, 2009), we intend to send a letter to LANDFIRE
(RMRS/EROS?) asking them for a certification that coordinates have been purged from their
systems.
Zhi may need to hook up with Chris Toney on specifics of future needs
State Assessments PART 2
Burl C. is preparing the Texas draft this month to serve as a template for the southern States. He
expects FIA data to play a key role in Southern State Assessments (area, volume, distribution,
etc). How can we integrate the 5-year reports with State assessment reporting needs, and
identify some regional issues we could focus some of our analyses?
Policy for sensitive species
There is no (change in) policy. We affirm our current policy of not providing that information
associated with an actual plot coordinate to any source; we would only use the publicly available
information.
Upcoming MT meeting
National FIA update. Greg will touch on growth platforms but provide a broader summary and
our planned direction Thursday.
Communication Plan – share with MT what is happening.
Band Lead substitution: Ali or Tom for Sharon, Dave A. for Ray.
Need to carve out more time than a meal for PMs/Greg to meet with Core Leads
Next Calls/Meetings
June MT meeting – Breakfast on 6/24 just PMs & Greg; breakfast 6/25 w/Band Leads
PM Core Tuesday July 22, 12-2 ET
PM-only Wednesday August 20, 12-2 ET
PM Core Wednesday Sept 24 12-2 ET
Proposal: Aug 26 MT Conference Call
Get documents about "