									NESPAK-MML-MMP-ACE Joint Venture
CONSULTANTS                                                               House No.1, Javed Town,
                                                                          G.T Road,
FOR                                                                       Mianchannu
DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF                           Ph. 0652661387
REHABILITATION AND UPGRADATION OF BALLOKI BARRAGE AND
                                                                          Email: re03lbdc@gmail.com
LOWER BARI DOAB CANAL SYSTEM


   Ref. No. LBDC/ICB-03/KN/127                                        Dated:   March 30, 2012


         Deputy Director (PIU)
         ICB-03, Project Implementation Unit (PIU),
         PMU, LBDCIP
         Khanewal


                  LOWER BARI DOAB CANAL IMPROVEMENT PROJECT (LBDCIP)
                               CONTRACT NO.LBDC/ICB-03
                                      Verification of Time Sheets

         Reference:       D.D PIU letter no. DD/PIU/KNW/37 Dated 29-03-2012



         Dear Sir,

         We have to send these time sheets to LBDC Consultants Head Office today otherwise
         salaries of Inspectors/Lab. Technician should get delayed.

         It is requested that these time sheets be signed on our assurance that we shall submit
         according to PIU requirement as per given format by PIU.



         With Regards,




         (M. Azhar)
         Resident Engineer
         LBDCIP/ICB-03
         Mian Channu



         Enclosed: Time Sheets

         CC:
            1. File