									NESPAK-MML-MMP-ACE Joint Venture
CONSULTANTS                                                                  House No.1, Javed Town,
                                                                             G.T Road,
FOR                                                                          Mianchannu
DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF                              Ph. 0652661387
REHABILITATION AND UPGRADATION OF BALLOKI BARRAGE AND
                                                                             Email: re03lbdc@gmail.com
LOWER BARI DOAB CANAL SYSTEM


   Ref. No. LBDC/ICB-03/KN/126                                          Dated:    March 29, 2012


         Deputy Director (PIU)
         ICB-03, Project Implementation Unit (PIU),
         PMU, LBDCIP
         Khanewal


                  LOWER BARI DOAB CANAL IMPROVEMENT PROJECT (LBDCIP)
                               CONTRACT NO.LBDC/ICB-03
                                      Verification of Time Sheets

         Reference:       D.D PIU letter no. DD/PIU/KNW/34 Dated 27-03-2012



         Dear Sir,

         As desired in above referred letter please find enclosed herewith the Deployment of
         Inspectors/Field Staff. Kindly process the Time Sheets for the month of March 2012 of
         Inspectors/Lab. Technician and send it back to this office as soon as possible for further
         proceeding.



         With Regards,




         (M. Azhar)
         Resident Engineer
         LBDCIP/ICB-03
         Mian Channu



         Enclosed: Deployment of Field Staff/Lab. Tech. Sheet