Docstoc

122 - IPCs

Document Sample
122 -  IPCs Powered By Docstoc
					NESPAK-MML-MMP-ACE Joint Venture
CONSULTANTS                                                                  House No.1, Javed Town,
                                                                             G.T Road,
FOR                                                                          Mianchannu
DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF                              Ph. 0652661387
REHABILITATION AND UPGRADATION OF BALLOKI BARRAGE AND
                                                                             Email: re03lbdc@gmail.com
LOWER BARI DOAB CANAL SYSTEM


   Ref. No. LBDC/ICB-03/KN/122                                          Dated:    March 24, 2012

         Deputy Director (PIU)
         ICB-03, Project Implementation Unit (PIU),
         PMU, LBDCIP
         Khanewal

                  LOWER BARI DOAB CANAL IMPROVEMENT PROJECT (LBDCIP)
                               CONTRACT NO.LBDC/ICB-03
                            HANDING OVER OF VERIFIED IPCs (03 Nos.)

         Reference:       DD/PIU/KNW/31 Dated March 24, 2012


         Dear Sir,

         As desired in above referred letter please find enclosed 3 nos. verified IPCs (IPC No.03,
         04 and 05). Please returned these verified IPCs as soon as possible positively Monday.


         With Regards,



         (Ch. Shahzad Hameed)
         Acting Resident Engineer
         LBDCIP/ICB-03
         Mian Channu



         Enclosure: As above.

         CC:
            1. File




         Document1 |ORA

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:15
posted:4/28/2012
language:
pages:1