119 - Slow Progress

Document Sample
119 - Slow Progress Powered By Docstoc
					NESPAK-MML-MMP-ACE Joint Venture
CONSULTANTS                                                                  House No.1, Javed Town,
                                                                             G.T Road,
FOR                                                                          Mianchannu
DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF                              Ph. 0652661387
REHABILITATION AND UPGRADATION OF BALLOKI BARRAGE AND
                                                                             Email: re03lbdc@gmail.com
LOWER BARI DOAB CANAL SYSTEM


   Ref. No. LBDC/ICB-03/KN/119                                          Dated:      March 10, 2012

         Deputy Director (PIU)
         ICB-03, Project Implementation Unit (PIU),
         PMU, LBDCIP
         Khanewal

                  LOWER BARI DOAB CANAL IMPROVEMENT PROJECT (LBDCIP)
                               CONTRACT NO.LBDC/ICB-03
                    NO STRUCTURAL ACTIVITY VERY SLOW PROGRESS AT SITE


         Reference:       DD/PIU/KNW/24 Dated March 08, 2012

         Dear Sir,

         Structural activity is stopped because contractor is facing manufacturing shortage of
         steel. Contractor has already been informed in written to submit Revised Work Plan.

         Earthwork progress is slow because the reaches hold mature trees that may be
         cut/uprooted during the execution of work. It is, therefore, requested to approach the
         DFO Chichawatni to nominate his representative for preparation of joint tree inventory.

         Consultant’s field staff is present at site, observing all the Earthwork activities and
         keeping the record. Field tests are being carried out as per QAP and record is being
         maintained.

         Your suggestions at site will highly be appreciated.

         With Regards,



         (Ch. Shahzad Hameed)
         Acting Resident Engineer
         LBDCIP/ICB-03
         Mian Channu


         CC:
            1. CRE (LBDC Consultants), Lahore
            2. File