					                          SANDY TOWN COUNCIL
To:    Mayor and Deputy Mayor of Sandy Town Council
       Chairman and Vice-Chairman of Planning, Parks and Open
       Spaces Committee
       All Members of Planning, Parks and Open Spaces Committee

There will be a Meeting of the Planning, Parks and Open Spaces Committee to be
held on Monday 1st February 2010 in the Council Chamber at 10 Cambridge Road,
Sandy, Beds at 7.30pm.

27th January 2010                                         Jonathan Whitehurst
                                                          Deputy Town Clerk
                                   AGENDA
1.    Apologies

2.    To Receive Statutory Declarations of Interests from Members

      (a) Prejudicial interests.
      (b) Personal interests.

3.     Bridleway 8 – The Baulk and Sandcast paths

To receive and consider Clerk’s report (Copy attached).

4.    Planning applications received for comment by Sandy Town Council

(Any plans received for comment by Sandy Town Council will be on display in the
Committee Room from 7.15 p.m. onwards and Members are requested to view
these prior to this item).

(See List Attached)

5.    To approve the Minutes of the Planning, Parks and Open Spaces
      Committee Meeting held on Monday 14th December 2009.

To sign the Minutes of the Meeting of the Monday 14th December 2009 and as
approved/amended and adopted by Full Council Meeting held on Monday 18th
January 2010. (Previously circulated)
6.   Planning and Enforcement Appeals - Notification from Central
Bedfordshire Council

Site at 29 Bedford Road, Sandy. SG19 1EW Planning Application
CB/09/00851/FULL for the vehicular crossover and erection of 1.8m high close
boarded fence following demolition of wall – retrospective. (Copy of letter
attached)

CBC 10.9.09 Refused

Appeal lodged against refusal by Central Bedfordshire Council.

Appeal will be dealt with by written representation procedure.

(For Information Only)

7.   Verbal report from any local member who attended Development
Control Committee on any matters affecting Sandy

8.    Gypsy and Traveller site – Long Lake Meadow

To receive and consider Deputy Clerk’s report (Copy attached).

9.    Bedford Road Playbuilder

To receive and consider Deputy Clerk’s report (Copy attached).

10.   Sunderland Road Play - Additional Equipment

To receive and consider Deputy Clerk’s report (Copy attached).

11.   Emergency Plan incorporating Flood Plan Working Group

To receive and consider the Minutes of the meeting held on the 21st January 2010
and the Deputy Clerk’s report (Copy attached).

12.   Press Release
                        SANDY TOWN COUNCIL
       PLANNING PARKS AND OPEN SPACES COMMITTEE – 01.02.09

                              Deputy Clerk’s Report

3.    Bridleway 8 – The Baulk and Sandcast paths

Chris Nicol, Rights of Way Contracts Officer, Central Bedfordshire Council and
Adrian Clothier, Amey Projects Officer to attend the Planning, Parks and Open
Spaces meeting to discuss the improvements being made to Bridleway 8 – The
Baulk and Sandcast paths.

Following Town Council meeting on 18th January 2010 the following information
about the work taking place on bridleway 8 was passed to the Clerk (Copy of
email attached). Apologies were made for the previous failure to keep Council
informed about the work.

The Rights of Way Department was given funds to improve the bridleway in this
financial year and although they had talked to Amey about the work involved the
team itself was surprised when the works started.

The coppicing work on the Beeston was carried out in order to widen the path so
that a vehicle carrying a replacement prefabricated bridge for the footpath can go
along it. This will be wider than the present bridge. It is not intended to widen
the path permanently, most of the trees are still viable and will grow again. In
addition extra planting of fruiting trees is planned. Mr Gwillam believes that
within two years it will be difficult to see where the work was undertaken.

Cutting back along the river path has also been done in order to widen the path,
although it is intended that the extra metre of path will be grass and not tarmac.
The path will also be raised 8 – 10” to avoid all but the worst of the floods and
will be resurfaced. The wooden fence will be removed and not replaced. Hopefully
new plans for managing the woods will also be drawn up.

The culvert will be widened and the raised part of the path is also to be renewed
with the barbed wire fences being replaced by plain wire and the unsafe railings
being replaced.

In addition the multi-user path on the Riddy will be installed.

(Members are requested to instruct as to a course of action to take).
                   SANDY TOWN COUNCIL
   DETAILS OF PLANNING APPLICATIONS RECEIVED FROM CENTRAL BEDFORDSHIRE
                                 COUNCIL

DATE/REF     APPLICANT              DETAILS OF            TOWN COUNCIL   CENTRAL    CENTRAL
                                   DEVELOPMENT              COMMENTS       BEDS       BEDS
                                                                         NOTIFIED   DECISION
14/01/10   CB/09/06906/       Full application for                       PP&OS
           FULL               erection of boat shaped
7/10       Mrs J Pibworth     play equipment at                          01/02/10
           Laburnum Lower     Laburnum Lower
           School             School, Sandy, Beds.
           Laburnum Road
           Sandy              Near neighbours 22
           SG19 1HQ           Laburnum Road,
                              Sandy notified.




18/01/10   CB/10/00075/       Full application for                       PP&OS
           FULL               change of use of
8/10       Mr C Waldock       storage and distribution                   01/02/10
           C/O Mr I Taylor    unit to tyre and exhaust
           DH Barford &Co     repair/fitting unit at 14
           Howard House       Darlington Close,
           17 Church Street   Sandy, Beds.
           St Neots
           PE19 2BU           Near neighbours
                              5,12,16 Darlington
                              Close, Sandy notified.




20/01/10   CB/10/00031/LB     Listed Building: The                       PP&OS
           Miss A Crack       removal of gate post at
9/10       RSPB               entrance lodge of RSPB,                    01/02/10
           Potton Road        Potton Road, Sandy,
           Sandy              Beds.
           SG19 2DL




20/01/10   CB/09/06858/       Full application for                       PP&OS
           FULL               creation of lake (part
10/10      Mr P Williams      retrospective) for use as                  01/02/10
           60 Hitchin Road    recreational/leisure
           Upper Caldecote    (non commercial at land
           SG18 9BU           on the south side of
                              New Road, Sandy, Beds
                   SANDY TOWN COUNCIL
   DETAILS OF PLANNING APPLICATIONS RECEIVED FROM CENTRAL BEDFORDSHIRE
                                 COUNCIL

DATE/REF     APPLICANT         DETAILS OF            TOWN COUNCIL   CENTRAL    CENTRAL
                              DEVELOPMENT              COMMENTS       BEDS       BEDS
                                                                    NOTIFIED   DECISION
25/01/10   CB/10/00142/   Full application for                      PP&OS
           FULL           erection of a two
11/10      A&R Bruce      bedroom bungalow with                     01/02/10
           C/o Richard    parking space at land to
           Batchelor      the rear of 43 West
           Architecture   Road, Sandy, Beds.
           29 Newstead
           Way            Near neighbours
           Bedford        1,2,2a,2b,& 2c
           MK41 8RH       Queens Road, Sandy,
                          notified.
                        SANDY TOWN COUNCIL
       PLANNING PARKS AND OPEN SPACES COMMITTEE – 01.02.09

                             Deputy Clerk’s Report

8.    Gypsy and Traveller site – Long Lake Meadow, Seddington

Members may recall that a potential Gypsy and Traveller site – Long Lake
Meadow, Seddington was being considered by Central Bedfordshire Council and
that a request under the Freedom of Information Act for all the Seddington site
papers was made. A letter was received from Central Bedfordshire Council (Copy
attached) and they provided all site papers (documentation and working papers)
a copy of which is available for Members to look at in the Town Council offices.
When the SUSTAINABLE COMMUNITIES OVERVIEW & SCRUTINY COMMITTEE of
Central Bedfordshire Council met on the 4th January 2010, Item 11 Gypsy and
Traveller Development Plan Document for Central Bedfordshire North, Page 142
of the agenda Long Lake Meadow, Seddington (Copy attached).

(Members are requested to note this information).

9.    Bedford Road Playbuilder

Members may recall that additional play equipment was to be installed in Bedford
Road Recreation Ground. Due to the weather and subsequent ground conditions the
project has been delayed, though it is now nearly finished. An official opening of
the event will take place in the next few months.

(Members are requested to note this information).

10.   Sunderland Road Play - Additional Equipment

Members may recall that the Central Bedfordshire Council has £86,107.00 in
Section 106 monies for Sandy Town Council of this £30,000.00 has to be spent by
the end of March 2010 and £30,000.00 by the 6th September 2010. Of this money
the Town Council has gained approval from Central Bedfordshire Council to spend
£31,405.00 on additional play equipment at Bedford Road Recreation Ground. The
total still available to be spent is £54,702.00 and this includes £28,595.00 that has
to be spent by 6th September 2010.

The current play equipment at Sunderland Road is for the under eights, other the
skateboard park no play equipment is provided at Sunderland Road. The Section
106 monies could be used to purchase one or a number of pieces of equipment and
these could include a Goal End, Aeroskate or a RodeoBoard.

Members are asked to consider whether to spend Section 106 monies on
Sunderland Road Play - Additional Equipment and to instruct as to a
course of action to take.
                         SANDY TOWN COUNCIL
Minutes of the Emergency Plan incorporating Flood Plan Working Group meeting held
on Thursday 21st January 2010 at 10.00am in the Council Chamber at 10 Cambridge
Road, Sandy.

                                      PRESENT

Cllrs M Bartlett (Chairman), N Aldis, D Broughton, M Pettitt & Mrs S Sutton.

Also present was Cllr G White & Mr J Walker.

1. Apologies – Mr Berry and Mr Thomas.

2. Minutes of meeting held on the 11th June 2009.

Resolved: That the Minutes of the Meetings of the Emergency Plan
incorporating Flood Plan Working Group held on the 2nd November 2009 be
approved as a correct record.

3. Flooding

Members discussed and as Mr Berry and Mr Thomas had sent apologies they

Resolved: That Mr Berry and Mr Thomas be invited to the next meeting of
the working group.

4. Ice and Snow

Members discussed at length the clearance of snow and ice.

Resolved to recommend: (a) That Sandy Town Council, properly make safe
any area we are responsible for. This includes the following, Town Centre
Car Park, Cemetery, Recreation Grounds, Churchyard, Council Offices and
any other Council premises and that the Council monitor the conditions and
the work and document.

(b) That the Town Council pass on all complaints from residents of Sandy
to Central Bedfordshire Council, instead of the Town Council giving
residents the telephone number of Central Bedfordshire Council.

(c) That the Town Council makes Central Bedfordshire Council aware of the
priority areas that they would like to be gritted by them.

(d) Voluntary initiative, that the Town Council gives moral and practical
support.
(e) Central Bedfordshire Council are keen to devolve services to Town and
Parish Councils and Sandy Town Council would be interested to carry out
snow and ice clearance of footpaths in Sandy on suitable terms as long as
appropriate resources are provided by Central Bedfordshire Council. The
resources required would include, equipment, training, gritting material
and man-power.

(f) That the Town Council pass on as much information as possible to the
general public about the responsibilities of the Town Council and Central
Bedfordshire Council.

(g) Consider requesting from Central Bedfordshire Council the supply of
salt bins, for dangerous icy roads. As Central Bedfordshire Council have
been offering salt bins in other areas for dangerous icy roads.

(h) Maintain a supply of grit and purchase appropriate equipment for the
clearance of snow and ice from the areas Sandy Town Council is
responsible for. The Council staff will then become more efficient. The
equipment would include snow shovels and 1 or 2 gritting machines.

5. Date and time of next meeting

Thursday 4th March 2010 at 10am in the Council Chamber.
                             SANDY TOWN COUNCIL
             PLANNING PARKS AND OPEN SPACES COMMITTEE – 01.02.09

                                  Deputy Clerk’s Report

11. Emergency Plan incorporating Flood Plan Working Group

The Emergency Plan Working Group on the 21st January Resolved to
recommend: (h) Maintain a supply of grit and purchase appropriate
equipment for the clearance of snow and ice from the areas Sandy Town
Council is responsible for. The Council staff will then become more
efficient. The equipment would include snow shovels and 1 or 2 gritting
machines.

Rock salt
25kg bag    £4.65, Winter 2009 / 2010 prices.
10 bags      £46.50
25 bags      £116.25
50 bags      £232.50
100 bags     £465.00
150 bags     £687.50
200 bags     £930.00

Atlas pedestrian spinner salt spreader
Variable flow, suitable for use with White De-icing dry salt to BS3247, 3 metre spread,
25Kg capacity.

1no. Atlas Salt Spreader    £155.00      2no. Atlas Salt Spreader     £310.00
2no. Snow Shovel            £23.90       2no. Snow Shovel             £23.90
                      Total £178.90                             Total £333.90

(Members are requested to recommend on how much salt to maintain on
supply and how much appropriate equipment to purchase for the clearance of
snow and ice from the areas Sandy Town Council is responsible for)

				