Docstoc

93 - Handing Over Taking Over

Document Sample
93 - Handing Over Taking Over Powered By Docstoc
					 NESPAK-MML-MMP-ACE Joint Venture
 CONSULTANTS                                                                  House No.1, Javed Town,
                                                                              G.T Road,
FOR                                                                           Mianchannu
DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF                               Ph. 0652661387
REHABILITATION AND UPGRADATION OF BALLOKI BARRAGE                             Email: re03lbdc@gmail.com
AND LOWER BARI DOAB CANAL SYSTEM

  Ref. No. LBDC/ICB-03/KN/93                                         Dated:    December 24, 2011




                             LOWER BARI DOAB CANAL IMPROVEMENT PROJECT (LBDCIP)
                                          CONTRACT NO. LBDC/ICB-03
                   HANDING OVER / TAKING OVER CHARGE OF RESIDENT ENGINEER



             With reference to office order No. 3072/MA/1B/50/2946 dated December 23, 2011, we the
             undersigned Handover/Takeover the charge of office of Resident Engineer Contract LBDC–
             ICB-03 with effect from 24-12-2011 as per instruction of Chief Resident Engineer LBDC
             Consultants along with attachments.




                      Handing Over By                                Taking Over By




                   (Sarfraz Ali Abidi)                            (Muhammad Azhar)
                   Resident Engineer                            Assistant Resident Engineer




             Enclosure: As above.


             Copy to:
                     1. Chief Resident Engineer, LBDC, Lahore
                     2. File




Document1 | Sarfraz Ali Abidi | ORA

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:147
posted:4/26/2012
language:Latin
pages:1