					  NESPAK-MML-MMP-ACE Joint Venture
  CONSULTANTS                                                                             House No.1, Javed Town,
                                                                                          G.T Road,
 FOR                                                                                      Mianchannu
 DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF                                          Ph. 0652661387
 REHABILITATION AND UPGRADATION OF BALLOKI BARRAGE AND
                                                                                          Email: re03lbdc@gmail.com
 LOWER BARI DOAB CANAL SYSTEM

       Ref. No. LBDC/NCB-02/KN/07                                                   Dated:     December 14, 2011

             M/S. Hassan Sarwar Associates
             732-B, Faisal Town
             Lahore

                     REHABILITATION AND UPGRADATION OF 15-L DISTRIBUTARY SYSTEM
                                     CONTRACT No LBDC/NCB-02
                                                        SLOW PROGRESS

             Reference:               1)   SDO Irrigation letter Nr. 1673-74 Dated 30-11- 2011
                                      2)   Our letter Nr. LBDC/NCB-02/KN/03 Dated September 10, 2011
                                      3)   Our letter Nr. LBDC/NCB-03/KN/06 Dated November 19, 2011

             Gentlemen,
             This has been noted with concern that despite our repeated instructions conveyed to you vide
             our letters referred above, you have not expedited the pace of work on 15-L Distributary
             System the reason best known to you. You were asked to furnish us detail of works to be taken
             up and completed during coming Canal Closure of 2011, which is still awaited. The work in idle
             sites is also required to be started immediately as the works should not be left unattended in
             order to avoid any consequences. The quantum of work as compared to the time left is very
             huge. You will have to work on war footing basis so as to complete the remaining by
             07-09-2012. This is in your interest to follow up the work schedule to avoid contractual
             complications.
             You are, therefore, again advised to gear up the construction activities at site and submit your
             revised work plan showing the completion of works within stipulated time.
             Regards,
             Very truly yours,



             (Sarfraz Ali Abidi)
             Resident Engineer
             LBDC/NCB-02
             Khanewal

             Copy to:
                   1. Chief Resident Engineer, LBDC, Lahore
                   2. Executive Engineer Irrigation Department, Khanewal Division, Khanewal for information &
                      necessary action
                   3. File