0000 - Relieving Order of Mr. Shahid Iqbal by obaidjee

VIEWS: 26 PAGES: 1

									 NESPAK-MML-MMP-ACE Joint Venture
 CONSULTANTS                                                                          House No.1, Javed Town,
                                                                                      G.T Road,
FOR                                                                                   Mianchannu
DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF                                       Ph. 0652661387
REHABILITATION AND UPGRADATION OF BALLOKI BARRAGE                                     Email: re03lbdc@gmail.com
AND LOWER BARI DOAB CANAL SYSTEM

  Ref. No. LBDC/ICB-03/KN/103                                              Dated:          January 07, 2012


                                              MEMORANDUM
              From:          Resident Engineer                To:     Project Manager
                             Contract No. LBDC/ICB-03                 LBDC Consultants
                             Khanewal.                                Lahore.


                             LOWER BARI DOAB CANAL IMPROVEMENT PROJECT (LBDCIP)
                                          CONTRACT NO. LBDC/ICB-03
                                                 RELIEVING ORDER

             Dear Sir,

             With reference to Resignation of Mr. Shahid Iqbal Chaudhary (Inspector) dated December 20,
             2011 AN, he is hereby relieved from the office of the Resident Engineer ICB-03 LBDC
             Consultants, Mian Channu from December 20, 2011 (A.N).

             This is forwarded for your information and further necessary action please.


             Truly Yours,




             (Muhammad Azhar)

             Copy to:
                     1. File




Document1 | Sarfraz Ali Abidi | ORA

								
To top