Docstoc

ZOA-JTA

Document Sample
ZOA-JTA Powered By Docstoc
					                                                                                                                                                                                                                                                         NAS Operations Manager (NOM) JT/A




Task Validity: Y=Yes, N=No
Media Interface: N/A, D=Display, P=Printer, I=Internet, IC=Intercom, T=Telephone, F=Face-to-Face, M=Computer Modem
Support Tools: D=Documentation, E=Special Equipment, S=Special Software, T=Test Tools
Task Difficulty: E=Easy, S=Somewhat Difficult, D=Difficult/Complex
Task Criticality: N=Not Critical, M= Must be Acted Upon Within 24 hrs, C= Critical
Task Frequency: D=Daily Activity(on-going), W=Weekly Activity, M=Monthly Activity, A=As Required
B=Bi-Monthly Activity, S=Semi-Annual Activity, Q=Quarterly Activity, Y=Yearly Activity
Mental/Physical Demands: H=High, M=Moderate, L=Low
Task Manpower: O=One person, M=More than one person
Task Allocation: M=Manual, A=Automated
Task Priority Category: Primary=Task With Highest Rating on At Least 4 of the Following
Assessment Factors (I.e., ""Difficulty", "Criticality", "Frequency", "M/P Demands", "Task Manpower")
Principal=Task With Highest Rating on At Least 3 of the Aforementioned Factors. Other=All Other Tasks
Notes:
(1) Requirement for LRU repl. and return to operation in 30 minutes is the only known maintenance requirment for these COTs.
(2) A co-discriminator is safety. An unsafe design or maintenance procedure is a discriminator in the selection process.
(3) The human factors checklist and questionnaire will
serve as discriminators for usability and suitability.
Considerations:
     Ease of Understanding System Status - Simple Controls - Displays - Information Complete/Accurate
  Ease of Clearing Alarm - Letters / Colors / Knobs Appropriate-Controls Accessible/Responsive
     Ease of Switching to Backup System
     Ease of Checking History - Sorts Easily/Flexible
     Ease of Running Diagnostics / Feedback / Stats. Useful /Logical
     Ease of Returning System to Operational Status
 Position                BASELINE
   NOM               Activity/Sub-activity                                        Assessment Factors




                                                                                                                                                Mental/Physical Demands




                                                                                                                                                                                                             Primary; Principal; Other
                                                                                                                                                                                                             Priority Category:
                                                                                                                                                                          Task Manpower


                                                                                                                                                                                          Task Allocation
                                                                                                                                D,W,B,M,S,Q,Y
                                                                                     Support Tools




                                                                                                                                Frequency--A,
                                                                    D,P,T,I,IC,F,M
                                                    Task Validity




                                                                                                                  Criticality
                                                                                                     Difficulty
                                                                                     D,E,S,T




                                                                                                                  N,M,C
                                                                    Media




                                                                                                                                                H,M,L
                                                                                                     E,S,D




                                                                                                                                                                          O,M


                                                                                                                                                                                          M,A
                                                    Y,N




                                                                                                                                                                                                                                                  Comments/Remarks
NOM 1.0 Perform Facility Monitoring
  1.1   Monitor/evaluate LRUs, external/              Y              D,P                 D             D*            C              D                 M                       M            M/A              PRIMARY                      *Task difficulty depends on                         0   1   1   0   1   3
        internal interfaces and software                                                                                                                                                                                                 situation.                                          0   0   0   0   0   0
        components                                                                                                                                                                                                                                                                           0   0   0   0   0   0
  1.2   Manipulate display screen data/               Y             D,P,                 D              E            C              A                    L                    O               M             OTHER                                                                            0   1   1   0   0   2
        examine and enter parameters/                                                                                                                                                                                                                                                        0   0   0   0   0   0
        print and analyze sys. messages
   1.3    Direct system start-up, shut-               Y             D,P,                 D              E            C              A                    L                    O               M             OTHER                        Task performed approximately
          down, recovery, and special                               F,T                                                                                                                                                                  every 40 days.                                      0   0   0   0   0   0
          commands/procedures                                                                                                                                                                                                                                                                0   0   0   0   0   0
   1.4    Direct system switch-overs,start-           Y             P,D,                 D              E            C          W,A                      L                    O               M             OTHER                                                                            0   1   1   0   0   2
          overs, program aborts, recovery,                          T,F                                                                                                                                                                                                                      0   0   0   0   0   0
          PSW re-starts, element and unit                                                                                                                                                                                                                                                    0   0   0   0   0   0
          replacements (REPLs)                                                                                                                                                                                                                                                               0   0   0   0   0   0




                                                                                                                                                                                                                                                                       Nom-ZOA                                       Page 1
                                                                                                                                                                                                                                                NAS Operations Manager (NOM) JT/A




Position                  BASELINE
 NOM                  Activity/Sub-activity                                                                  Assessment Factors




                                                                                                                                                 Mental/Physical Demands




                                                                                                                                                                                                               Primary; Principal; Other
                                                                                                                                                                                                               Priority Category:
                                                                                                                                                                           Task Manpower


                                                                                                                                                                                           Task Allocation
                                                                                                                                 D,W,B,M,S,Q,Y
                                                                                      Support Tools




                                                                                                                                 Frequency--A,
                                                                     D,P,T,I,IC,F,M
                                                     Task Validity




                                                                                                                   Criticality
                                                                                                      Difficulty
                                                                                      D,E,S,T




                                                                                                                   N,M,C
                                                                     Media




                                                                                                                                                 H,M,L
                                                                                                      E,S,D




                                                                                                                                                                           O,M


                                                                                                                                                                                           M,A
                                                     Y,N
                                                                                                                                                                                                                                           Comments/Remarks
  1.5      Direct system re-configuration/             Y             D,P,                 D              E            C          W,A                      L                    O               M              OTHER                                                                 0   1   1   0   0   2
           verification                                              F,T                                                                                                                                                                                                            0   0   0   0   0   0
  1.6      Execute health checking                     N                                                                                                                                                                                                                            0   0   0   0   0   0
           procedures for status and                                                                                                                                                                                                                                                0   0   0   0   0   0
           reliability                                                                                                                                                                                                                                                              0   0   0   0   0   0
  1.7      Review and analyze failures,                Y             D,P,              D,S,              S            M              A                  M                      M            M/A               OTHER                                                                 0   0   1   0   1   2
           degraded conditions, and system/                          T,F                                                                                                                                                                                                            0   0   0   0   0   0
           sub-system performance and                                                                                                                                                                                                                                               0   0   0   0   0   0
           recovery                                                                                                                                                                                                                                                                 0   0   0   0   0   0
  1.8      Direct execution of diagnostics/            Y             D,P,                 D              E            C           ALL                     L                    O               M              OTHER                                                                 0   1   1   0   0   2
           isolate faults, initiate recovery of                      T,F                                                                                                                                                                                                            0   0   0   0   0   0
           system/sub-systems, elements                                                                                                                                                                                                                                             0   0   0   0   0   0
           and units                                                                                                                                                                                                                                                                0   0   0   0   0   0
  1.9      Identify problems, solutions/               Y             D,P,                 D              S            C              A                  M                      O               M              OTHER                                                                 0   1   1   0   0   2
           perform failure recovery actions,                         T,F                                                                                                                                                                                                            0   0   0   0   0   0
           and execute preventive measures                                                                                                                                                                                                                                          0   0   0   0   0   0
  1.1      Coordinate and schedule routine             Y               I,P,               D              S            C              A                    L                    O               M              OTHER                                                                 0   1   1   0   0   2
           preventive and corrective                                   T,F                                                                                                                                                                                                          0   0   0   0   0   0
           maintenance and actions with AT,                                                                                                                                                                                                                                         0   0   0   0   0   0
           AF, and other users                                                                                                                                                                                                                                                      0   0   0   0   0   0
 1.11      Execute special remote command              Y             D,P,              D,E               E            C              A                    L                    O               M              OTHER                                                                 0   1   1   0   0   2
           on outlying facilities                                     T                                                                                                                                                                                                             0   0   0   0   0   0
 1.12      Perform remote status                       Y             D,P,                 D              S            C              D                   H                     O            M/A              PRINCIPAL                                                              0   1   1   1   0   3
           monitoring of radars,                                     T,F,                                                                                                                                                                                                           0   0   0   0   0   0
           navigational aids, communication                           M                                                                                                                                                                                                             0   0   0   0   0   0
           and weather equipment, LRUs,                                                                                                                                                                                                                                             0   0   0   0   0   0
           external interfaces and software
           components                                                                                                                                                                                                                                                               0   0   0   0   0   0
 1.13      Support analysis of system/sub-             Y             P,D,                 D              S            C              A                  M                      M               M             PRINCIPAL                                                              0   1   1   0   1   3
           system/equipment histories to                             T,F                                                                                                                                                                                                            0   0   0   0   0   0
           identify outage trends and
           solutions                                                                                                                                                                                                                                                                0   0   0   0   0   0
 1.14      Ensure task reliability/availability of     Y              T,F,                D              S            C              A                  M                      M               M             PRINCIPAL                                                              0   1   1   0   1   3
           systems, sub-systems, equipment                            D,P                                                                                                                                                                                                           0   0   0   0   0   0
           and remote facilities associated                                                                                                                                                                                                                                         0   0   0   0   0   0
           with the geographical area of                                                                                                                                                                                                                                            0   0   0   0   0   0
           radars, RCAGs, NAVAIDS, and
           weather facilities                                                                                                                                                                                                                                                       0   0   0   0   0   0
           Present System/Sub-system                                                                                                                                                                                                                                                0   0   0   0   0   0
           DR&A Server                                                                                                                                                                                                                                                              0   0   0   0   0   0
           AIDC                                                                                                                                                                                                                                                                     0   0   0   0   0   0
           MS ODL                                                                                                                                                                                                                                                                   0   0   0   0   0   0
           CPDLC                                                                                                                                                                                                                                                                    0   0   0   0   0   0
           TP                                                                                                                                                                                                                                                                       0   0   0   0   0   0




                                                                                                                                                                                                                                                            Nom-ZOA                                         Page 2
                                                                                                                                                                                                                                                   NAS Operations Manager (NOM) JT/A




Position              BASELINE
  NOM             Activity/Sub-activity                                                              Assessment Factors




                                                                                                                                         Mental/Physical Demands




                                                                                                                                                                                                       Primary; Principal; Other
                                                                                                                                                                                                       Priority Category:
                                                                                                                                                                   Task Manpower


                                                                                                                                                                                   Task Allocation
                                                                                                                         D,W,B,M,S,Q,Y
                                                                              Support Tools




                                                                                                                         Frequency--A,
                                                             D,P,T,I,IC,F,M
                                             Task Validity




                                                                                                           Criticality
                                                                                              Difficulty
                                                                              D,E,S,T




                                                                                                           N,M,C
                                                             Media




                                                                                                                                         H,M,L
                                                                                              E,S,D




                                                                                                                                                                   O,M


                                                                                                                                                                                   M,A
                                             Y,N
                                                                                                                                                                                                                                            Comments/Remarks
        ISD                                                                                                                                                                                                                                                                            0   0   0   0   0   0
        DSR                                                                                                                                                                                                                                                                            0   0   0   0   0   0
        ODAPS/S1R:                                                                                                                                                                                                                                                                     0   0   0   0   0   0
        G3, TCCU, KPR, HSP, KVDT,                                                                                                                                                                                                                                                      0   0   0   0   0   0
        Tape Drives(MAG), DASD                                                                                                                                                                                                                                                         0   0   0   0   0   0
NOM 2.0 Resolve System Alarms/Service                                                                                                                                                                                                                                                  0   0   0   0   0   0
        Problems                                                                                                                                                                                                                                                                       0   0   0   0   0   0
  2.1   Recognize/respond to system            Y             D,P,              D,E              S*            C              A                  M                      O               M              OTHER                        *Task difficulty depends on type of                 0   1   1   0   0   2
        alarms/alerts                                        T,F                                                                                                                                                                   problem                                             0   0   0   0   0   0
  2.2   Analyze/respond to catastrophic        Y             D,P,              D,E               S            C              A                  M                      O            M/A               OTHER                                                                            0   1   1   0   0   2
        communication-line failures                          T,F,                                                                                                                                                                                                                      0   0   0   0   0   0
                                                             C,M                                                                                                                                                                                                                       0   0   0   0   0   0
   2.3  Analyze/respond to radio voice         Y             D,P,              D,E               S            C              A                  M                      O               M              OTHER                                                                            0   1   1   0   0   2
        and frequency communications                         T,F                                                                                                                                                                                                                       0   0   0   0   0   0
        outages/degradation and                                                                                                                                                                                                                                                        0   0   0   0   0   0
        performance reports                                                                                                                                                                                                                                                            0   0   0   0   0   0
  2.4   Analyze/respond to system/sub-         Y              D,T,                D              S            C              A                  M                      O            M/A               OTHER                                                                            0   1   1   0   0   2
        system equipment outages/                              F                                                                                                                                                                                                                       0   0   0   0   0   0
        degradation                                                                                                                                                                                                                                                                    0   0   0   0   0   0
  2.5   Analyze/respond to external/           Y             D,P,              D,E               E            C              A                    L                    O               M              OTHER                                                                            0   1   1   0   0   2
        internal interface problem
        alarms/alerts                                         M,T                                                                                                                                                                                                                      0   0   0   0   0   0
  2.6   Analyze/resolve problems with          Y              D,T,                S              S            C              A                  M                      M            M/A              PRINCIPAL                                                                         0   1   1   0   1   3
        remote monitoring of system,                          F,M                                                                                                                                                                                                                      0   0   0   0   0   0
        sub-systems, and outlying
        facilities                                                                                                                                                                                                                                                                     0   0   0   0   0   0
  2.7   Analyze/resolve software               Y              D,P                 D             D*            C              A                   H                  O/M             M/A              PRIMARY                       Task difficulty depends on type of                  0   1   1   1   1   4
        problems/failures/anomalies/                                                                                                                                                                                               problem
        performance                                                                                                                                                                                                                                                                    0   0   0   0   0   0
  2.8   Facilitate/coordinate actions to       Y              T,F,                D             D*            C            A                    M                      O               M              OTHER                                                                            0   1   1   0   0   2
        improve performance of systems,                        D                                                          M,D                                                                                                                                                          0   0   0   0   0   0
        equipment, and services                                                                                                                                                                                                                                                        0   0   0   0   0   0
NOM 3.0 Direct Technical Maintenance                                                                                                                                                                                                                                                   0   0   0   0   0   0
        Activities (Preventive/Corrective)                                                                                                                                                                                                                                             0   0   0   0   0   0
  3.1   Direct and coordinate system           Y              T,F,             N/A               D            M           ALL                     L                    D               M              OTHER                                                                            1   0   1   0   0   2
        changes for maintenance                                D                                                                                                                                                                                                                       0   0   0   0   0   0
  3.2   Coordinate, analyze, and respond       Y              T,F,                D              E            C              A                    L                    O               M              OTHER                                                                            0   1   1   0   0   2
        to radio frequencies/radar/                                                                                                                                                                                                                                                    0   0   0   0   0   0
        equipment re-assignment requests                                                                                                                                                                                                                                               0   0   0   0   0   0
  3.3   Direct, manage, and control all        Y             D,P,                 D              D            C              A                    L                    O               M             PRINCIPAL                                                                         1   1   1   0   0   3
        maintenance activities                               T,F,                                                                                                                                                                                                                      0   0   0   0   0   0




                                                                                                                                                                                                                                                               Nom-ZOA                                         Page 3
                                                                                                                                                                                                                                                        NAS Operations Manager (NOM) JT/A




Position               BASELINE
  NOM              Activity/Sub-activity                                                                Assessment Factors




                                                                                                                                            Mental/Physical Demands




                                                                                                                                                                                                           Primary; Principal; Other
                                                                                                                                                                                                           Priority Category:
                                                                                                                                                                      Task Manpower


                                                                                                                                                                                      Task Allocation
                                                                                                                            D,W,B,M,S,Q,Y
                                                                                 Support Tools




                                                                                                                            Frequency--A,
                                                                D,P,T,I,IC,F,M
                                                Task Validity




                                                                                                              Criticality
                                                                                                 Difficulty
                                                                                 D,E,S,T




                                                                                                              N,M,C
                                                                Media




                                                                                                                                            H,M,L
                                                                                                 E,S,D




                                                                                                                                                                      O,M


                                                                                                                                                                                      M,A
                                                Y,N
                                                                                                                                                                                                                                                   Comments/Remarks
NOM 4.0 Perform Certification and                                                                                                                                                                                                                                                           0   0   0   0   0   0
        Verification                                                                                                                                                                                                                                                                        0   0   0   0   0   0
  4.1   Direct/coordinate certification           Y             T,F,                 D              E            C              D                    L                    O            M/A               OTHER                                                                              0   1   1   0   0   2
        activities with AT, AF, and others                       M                                                                                                                                                                                                                          0   0   0   0   0   0
  4.2   Analyze performance of services to        Y             D,P,                 D             S*            C              D                  M                      M               M             PRINCIPAL *Task difficulty depends on type of                                       0   1   1   0   1   3
        verify system integrity during                           T                                                                                                                                                problem                                                                   0   0   0   0   0   0
        assigned shift                                                                                                                                                                                                                                                                      0   0   0   0   0   0
  4.3   Perform service-type certification        Y             D,P,                 D             E             C              D                  L                      M            M/A              PRINCIPAL                                                                           0   1   1   0   1   3
  4.4   Analyze/respond to internal/              Y             T,F                  D             S*            M              A                  M                      M             M                OTHER    *Task difficulty depends on type of                                       0   0   1   0   1   2
        external system failures/incidents                                                                                                                                                                        incident                                                                  0   0   0   0   0   0
  4.5   Coordinate and document system            Y               D,F                D             S*            M              A                  M                      M               M              OTHER    *Task difficulty depends on type of                                       0   0   1   0   1   2
        and sub-system failures/incidents                                                                                                                                                                         incident                                                                  0   0   0   0   0   0
  4.6   Record all factual and concise data       Y              P,T,                D             D*            M              A                  M                      O               M              OTHER    *Task difficulty depends on type of                                       0   0   1   0   0   1
        (e.g.,Significant Event Report,                           F                                                             A                                                                                 problem                                                                   0   0   1   0   0   1
        SER) in accordance with                                                                                                                                                                                                                                                             0   0   0   0   0   0
        appropriate documentation                                                                                                                                                                                                                                                           0   0   0   0   0   0
NOM 5.0 Manage Position Resources                                                                                                                                                                                                                                                           0   0   0   0   0   0
  5.1   Brief/communicate with NAS                Y              P,T,                D              E            C           D/A                     L                    O               M              OTHER                                                                              0   1   1   0   0   2
        Operations Manager relief and                             F                                                                                                                                                                                                                         0   0   0   0   0   0
        others as required                                                                                                                                                                                                                                                                  0   0   0   0   0   0
  5.2   Communicate and log routine               Y              T,F,                D              E            C              A                  M                      O               M              OTHER                                                                              0   1   1   0   0   2
        operational/maintenance                                  D,P                                                                                                                                                                                                                        0   0   0   0   0   0
        information                                                                                                                                                                                                                                                                         0   0   0   0   0   0
  5.3   Assume other position                     Y               T,F             N/A              S*            C              A                   H                     O               M             PRINCIPAL                                                                           0   1   1   1   0   3
        responsibilities including assisting,                                                                                                                                                                                                                                               0   0   0   0   0   0
        directing, reviewing, coordinating,                                                                                                                                                                                                                                                 0   0   0   0   0   0
        managing activities, security                                                                                                                                                                                                                                                       0   0   0   0   0   0
        and facility operations in the                                                                                                                                                                                                                                                      0   0   0   0   0   0
        absence of facility management                                                                                                                                                                                                                                                      0   0   0   0   0   0
NOM 6.0 Perform Special Actions                                                                                                                                                                                                                                                             0   0   0   0   0   0
  6.1   Respond to various emergencies,           Y              F,T,                D              D            C              A                   H                     M               M             PRIMARY                                                                             1   1   1   1   1   5
        disasters, and security situations                       P,M                                                                                                                                                                                                                        0   0   0   0   0   0
  6.2   Serve as leader for special               Y              P,T,             N/A              S*            C              A                  M                      M               M             PRINCIPAL *Task difficulty depends on type of                                       0   1   1   0   1   3
        projects manager/participate in                           F                                                                                                                                               project                                                                   0   0   0   0   0   0
        special assignments                                                                                                                                                                                                                                                                 0   0   0   0   0   0
  6.3   Participate in daily and periodic AF      Y               F,T             N/A               E            M              D                    L                    O               M              OTHER                         Includes attendance daily AT                         0   0   1   0   0   1
        meetings                                                                                                                                                                                                                       briefings                                            0   0   0   0   0   0




                                                                                                                                                                                                                                                                    Nom-ZOA                                         Page 4
                                                                                                                                                                                                                                                   NAS Operations Manager (NOM) JT/A




Position                BASELINE
 NOM                Activity/Sub-activity                                                              Assessment Factors




                                                                                                                                           Mental/Physical Demands




                                                                                                                                                                                                       Primary; Principal; Other
                                                                                                                                                                                                       Priority Category:
                                                                                                                                                                     Task Manpower


                                                                                                                                                                                     Task Allocation
                                                                                                                           D,W,B,M,S,Q,Y
                                                                                Support Tools




                                                                                                                           Frequency--A,
                                                               D,P,T,I,IC,F,M
                                               Task Validity




                                                                                                             Criticality
                                                                                                Difficulty
                                                                                D,E,S,T




                                                                                                             N,M,C
                                                               Media




                                                                                                                                           H,M,L
                                                                                                E,S,D




                                                                                                                                                                     O,M


                                                                                                                                                                                     M,A
                                               Y,N
                                                                                                                                                                                                                                            Comments/Remarks
  6.4      Coordinate/perform security           Y              F,T,                D             S*            C              A                  M                   M/O                M             OTHER                       *Task difficulty depends on type of                 0   1   1   0   0   2
           activities                                            P                                                                                                                                                                 situation                                           0   0   0   0   0   0
  6.5      Coordinate facility housekeeping      Y              F,T,             N/A               E            M             A                     L                    O               M             OTHER                                                                           0   0   1   0   0   1
           duties/responsibilities                                I                                                           W                                                                                                                                                        0   0   0   0   0   0
  6.6      Act as operational lead in the        Y              T,F,                D             S*            C             A                   M                   O/M                M             OTHER                       *Task difficulty depends on type of                 0   1   1   0   0   2
           installation, modification,                           P                                                                                                                                                                 situation                                           0   0   0   0   0   0
           integration, development of                                                                                                                                                                                                                                                 0   0   0   0   0   0
           systems, services and new
           facilities                                                                                                                                                                                                                                                                  0   0   0   0   0   0
  6.7      Direct and test all installation/     Y             D,P,                 D             S*            C              A                  M                      O            M/A              OTHER                       *Task difficulty depends on type of                 0   1   1   0   0   2
           removal of software/firmware                        T,F                                                                                                                                                                 situation                                           0   0   0   0   0   0
           upgrades and necessary changes                                                                                                                                                                                                                                              0   0   0   0   0   0
           to hardware                                                                                                                                                                                                                                                                 0   0   0   0   0   0
  6.8      Coordinate the conduct of joint       Y              P,D                 D              S            C              A                  M                   O/M             M/A              OTHER                                                                           0   1   1   0   0   2
           baseline tests of major system                                                                                                                                                                                                                                              0   0   0   0   0   0
           software deliveries/test new or                                                                                                                                                                                                                                             0   0   0   0   0   0
           modified systems/identify                                                                                                                                                                                                                                                   0   0   0   0   0   0
           needed improvements                                                                                                                                                                                                                                                         0   0   0   0   0   0




                                                                                                                                                                                                                                                               Nom-ZOA                                         Page 5
                                                                                                                                                                                                                                                                 NAS Area Specialist (NAS) JT/A




Task Validity: Y=Yes, N=No
Media Interface: N/A, D=Display, P=Printer, I=Internet, IC=Intercom, T=Telephone, F=Face-to-Face, M=Computer Modem
Support Tools: D=Documentation, E=Special Equipment, S=Special Software, T=Test Tools
Task Difficulty: E=Easy, S=Somewhat Difficult, D=Difficult/Complex
Task Criticality: N=Not Critical, M= Must be Acted Upon Within 24 hrs, C= Critical
Task Frequency: D=Daily Activity(on-going), W=Weekly Activity, M=Monthly Activity, A=As Required
B=Bi-Monthly Activity, S=Semi-Monthly Activity, Q=quarterly Activity, Y=Yearly Activity
Mental/Physical Demands: H=High, M=Moderate, L=Low
Task Manpower: O=One person, M=More than one person
Task Allocation: M=Manual, A=Automated
Task Priority Rating: Pramary=Task With Highest Rating on At Least 4 of the Following
Assessment Factors (I.e., "Difficulty", "Criticality", "Frequency", "M/P Demands", "Task Manpower")
Principal=Task With Highest Rating on At Least 3 of the Aforementioned Factors. Other=All Other Tasks.
   "Manpower" Rating Scales; Principal=Task With Highest Rating on 3 of These Same Scales; Other=All Other Tasks
Notes:
(1) Requirement for LRU repl. and return to operation in 30 minutes is the only known maintenance requirment for these COTs.
(2) A co-discriminator is safety. An unsafe design or maintenance procedure is a discriminator in the selection process.
(3) The human factors schecklist and questionnaire will serve
as discriminators for usability and suitability.
Considerations:
     Ease of Understanding System Status - Simple Controls - Displays - Information Complete/Accurate
  Ease of Clearing Alarm - Letters / Colors / Knobs Appropriate-Controls Accessible/Responsive
     Ease of Switching to Backup System
     Ease of Checking History - Sorts Easily/Flexible
     Ease of Running Diagnostics / Feedback / Stats. Useful /Logical
     Ease of Returning System to Operational Status
 Position                 BASELINE
    NAS               Activity/Sub-activity                                       Assessment Factors




                                                                                                                                                Mental/Physical Demands




                                                                                                                                                                                                               Primary; Principal; Other
                                                                                                                                                                                                               Priority Category:
                                                                                                                                                                          Task Manpower


                                                                                                                                                                                          Task Allocation
                                                                                                                                D,W,B,M,S,Q,Y
                                                                                     Support Tools




                                                                                                                                Frequency--A,
                                                                    D,P,T,I,IC,F,M
                                                    Task Validity




                                                                                                                  Criticality
                                                                                                     Difficulty
                                                                                     D,E,S,T




                                                                                                                  N,M,C
                                                                    Media




                                                                                                                                                H,M,L
                                                                                                     E,S,D




                                                                                                                                                                          O,M


                                                                                                                                                                                          M,A
                                                    Y,N




                                                                                                                                                                                                                                                   Comments/Remarks
NAS 1.0 Perform Facility Monitoring
  1.1   Monitor/evaluate LRUs, external/              Y              D,P, D,E,T                        D*            C           D/A                   M                      M            M/A              PRIMARY                        *Task difficulty depends on                            0   1   1   0   1   3
        internal interfaces and software                             I,T,                                                                                                                                                                  situation.                                             0   0   0   0   0   0
        components                                                   F,M                                                                                                                                                                                                                          0   0   0   0   0   0
  1.2   Manipulate display screen data/               Y              D,P, D,S,E                         D            C           D/A                   M                      M            M/A              PRIMARY                                                                               1   1   1   0   1   4
        examine and enter parameters/                                T,M                                                                                                                                                                                                                          0   0   0   0   0   0
        print and analyze system
        messages                                                                                                                                                                                                                                                                                  0   0   0   0   0   0
  1.3   Direct system start-up,                       Y              D,P, D,E,S                         D            C           D/A                    H                     O            M/A              PRINCIPAL Approximately every 40 days.                                                1   1   0   1   0   3
        shut-down, recovery, and special                             M,T                                                                                                                                                                                                                          0   0   0   0   0   0
        commands/procedures                                                                                                                                                                                                                                                                       0   0   0   0   0   0
  1.4   Direct system switch-overs, start-            Y             D,M,                 D              E            C              A                   H                     O            M/A              PRINCIPAL                                                                             0   1   1   1   0   3
        overs, program aborts, recovery,                             F                                                                                                                                                                                                                            0   0   0   0   0   0
        PSW re-starts, element and unit                                                                                                                                                                                                                                                           0   0   0   0   0   0
        replacements (REPLs)                                                                                                                                                                                                                                                                      0   0   0   0   0   0




                                                                                                                                                                                                                                                                           NAS-ZOA                                        Page 6
                                                                                                                                                                                                                                                           NAS Area Specialist (NAS) JT/A




Position               BASELINE
  NAS              Activity/Sub-activity                                                              Assessment Factors




                                                                                                                                          Mental/Physical Demands




                                                                                                                                                                                                        Primary; Principal; Other
                                                                                                                                                                                                        Priority Category:
                                                                                                                                                                    Task Manpower


                                                                                                                                                                                    Task Allocation
                                                                                                                          D,W,B,M,S,Q,Y
                                                                               Support Tools




                                                                                                                          Frequency--A,
                                                              D,P,T,I,IC,F,M
                                              Task Validity




                                                                                                            Criticality
                                                                                               Difficulty
                                                                               D,E,S,T




                                                                                                            N,M,C
                                                              Media




                                                                                                                                          H,M,L
                                                                                               E,S,D




                                                                                                                                                                    O,M


                                                                                                                                                                                    M,A
                                              Y,N
                                                                                                                                                                                                                                             Comments/Remarks
  1.5   Direct system re-configuration/         Y              D,P,                D              S            C              A                   H                     O            M/A              PRINCIPAL                                                                             0   1   1   1   0   3
        verification                                                                                                                                                                                                                                                                        0   0   0   0   0   0
  1.6   Execute health checking                 Y              D,P,                D              S            C           D/A                     L                    O            M/A               OTHER                                                                                0   1   1   0   0   2
        procedures (for status and                                                                                                                                                                                                                                                          0   0   0   0   0   0
        reliability)                                                                                                                                                                                                                                                                        0   0   0   0   0   0
  1.7   Review and analyze failures,            Y              D,P                 D              S            C              A                   H                  O,M             M/A              PRINCIPAL                                                                             0   1   1   1   0   3
        degraded conditions, and system/                                                                                                                                                                                                                                                    0   0   0   0   0   0
        sub-system performance and                                                                                                                                                                                                                                                          0   0   0   0   0   0
        recovery                                                                                                                                                                                                                                                                            0   0   0   0   0   0
  1.8   Execute on-line and off-line            Y              D,P                 D              S            C              A                  M                      O            M/A               OTHER                                                                                0   1   1   0   0   2
        diagnostics/isolate faults/initiate                                                                                                                                                                                                                                                 0   0   0   0   0   0
        recovery of system, sub-systems,                                                                                                                                                                                                                                                    0   0   0   0   0   0
        elements, and units                                                                                                                                                                                                                                                                 0   0   0   0   0   0
  1.9   Identify problems, solutions            Y              D,P                 D              S            C              A                  M                      O            M/A               OTHER                                                                                0   1   1   0   0   2
        and execute preventive measures                                                                                                                                                                                                                                                     0   0   0   0   0   0
  1.1   Coordinate and schedule routine         Y               T,F                D             S*            C              A                    L                    O               M              OTHER                        Difficulty depends on type of                           0   1   1   0   0   2
        preventive and corrective                                                                                                                                                                                                   problem.                                                0   0   0   0   0   0
        maintenance and actions with AT,                                                                                                                                                                                                                                                    0   0   0   0   0   0
        AF, and other users                                                                                                                                                                                                                                                                 0   0   0   0   0   0
 1.11   Perform remote status and               Y                                                                                                                                                                                   ATOP does not impact this task                          0   0   0   0   0   0
         monitoring of radars,                                                                                                                                                                                                                                                              0   0   0   0   0   0
        navigational aids, communications,                                                                                                                                                                                                                                                  0   0   0   0   0   0
        and weather equip., LRUs, external                                                                                                                                                                                                                                                  0   0   0   0   0   0
        interfaces, and software                                                                                                                                                                                                                                                            0   0   0   0   0   0
        components
 1.12   Analyze system/sub-system/              Y              D,P                 D              S            N              A                    L                    O               M              OTHER                                                                                0   0   1   0   0   1
        equipment histories to identify
        outage trends and solutions                                                                                                                                                                                                                                                         0   0   0   0   0   0
        Present System/Sub-system                                                                                                                                                                                                                                                           0   0   0   0   0   0
        OCS                                                                                                                                                                                                                                                                                 0   0   0   0   0   0
        Micro-EARTS                                                                                                                                                                                                                                                                         0   0   0   0   0   0
        DSR                                                                                                                                                                                                                                                                                 0   0   0   0   0   0
NAS 2.0 Resolve System Alarm/Service                                                                                                                                                                                                                                                        0   0   0   0   0   0
        Problems                                                                                                                                                                                                                                                                            0   0   0   0   0   0
  2.1   Recognize/respond to system             Y              D,P,                D              S            C              A                    L                    O               M              OTHER                                                                                0   1   1   0   0   2
        alarms/alerts                                          T,F                                                                                                                                                                                                                          0   0   0   0   0   0
  2.2   Analyze/respond to catastrophic         Y                                                                                                                                                      OTHER                        ATOP does not impact this task                          0   0   0   0   0   0
        communication line-failures                                                                                                                                                                                                                                                         0   0   0   0   0   0
  2.3   Analyze/respond to radio voice          Y                                                                                                                                                      OTHER                        ATOP does not impact this task                          0   0   0   0   0   0
        and frequency communications                                                                                                                                                                                                                                                        0   0   0   0   0   0
        outages/degradation and                                                                                                                                                                                                                                                             0   0   0   0   0   0
        performance reports                                                                                                                                                                                                                                                                 0   0   0   0   0   0
  2.4   Analyze/respond to system/sub-          Y              D,P,                D              S            C              A             M,H                         O               M             PRINCIPAL                                                                             0   1   1   1   0   3
        system equipment outages/                              T,S                                                                                                                                                                                                                          0   0   0   0   0   0
        degradation                                                                                                                                                                                                                                                                         0   0   0   0   0   0
  2.5   Analyze/respond to external/            Y              D,P,                D              S            C              A              L,M                        O               M              OTHER                                                                                0   1   1   0   0   2
        internal interface problem alarms/
        alerts                                                                                                                                                                                                                                                                              0   0   0   0   0   0
  2.6   Analyze/resolve problems with           Y                                                                                                                                                      OTHER                        ATOP does not impact this task                          0   0   0   0   0   0
        remote monitoring of system, sub-                                                                                                                                                                                                                                                   0   0   0   0   0   0
        systems, and outlying facilities                                                                                                                                                                                                                                                    0   0   0   0   0   0
  2.7   Recognize and initiate corrective       Y              D,P,             N/A               S            C              A                  M                      O               M              OTHER                        Perform startover, rescue, and                          0   1   1   0   0   2
        actions to resolve software                            F,T                                                                                                                                                                  and document for AOS resolution.                        0   0   0   0   0   0
        problems/failures/anomalies/                                                                                                                                                                                                                                                        0   0   0   0   0   0
        performance                                                                                                                                                                                                                                                                         0   0   0   0   0   0
NAS 3.0 Direct Technical Maintenance                                                                                                                                                                                                                                                        0   0   0   0   0   0
        Activities (Preventive/Corrective)                                                                                                                                                                                                                                                  0   0   0   0   0   0
  3.1   Coordinate necessary system             Y               T,F             N/A               E            C              A                    L                    O               M              OTHER                                                                                0   1   1   0   0   2
        changes                                                                                                                                                                                                                                                                             0   0   0   0   0   0
  3.2   Coordinate, analyze, and respond        Y                                                                                                                                                      OTHER                        ATOP does not impact this task                          0   0   0   0   0   0
        to radio frequencies/radars/                                                                                                                                                                                                                                                        0   0   0   0   0   0
        equipment re-assignment requests                                                                                                                                                                                                                                                    0   0   0   0   0   0
  3.3   Direct, manage, and control all         Y               T,F             N/A               S            C              A                  M                      O               M              OTHER                                                                                0   1   1   0   0   2
        maintenance activities                                                                                                                                                                                                                                                              0   0   0   0   0   0




                                                                                                                                                                                                                                                                     NAS-ZOA                                        Page 7
                                                                                                                                                                                                                                                               NAS Area Specialist (NAS) JT/A




Position                BASELINE
  NAS               Activity/Sub-activity                                                                Assessment Factors




                                                                                                                                             Mental/Physical Demands




                                                                                                                                                                                                            Primary; Principal; Other
                                                                                                                                                                                                            Priority Category:
                                                                                                                                                                       Task Manpower


                                                                                                                                                                                       Task Allocation
                                                                                                                             D,W,B,M,S,Q,Y
                                                                                  Support Tools




                                                                                                                             Frequency--A,
                                                                 D,P,T,I,IC,F,M
                                                 Task Validity




                                                                                                               Criticality
                                                                                                  Difficulty
                                                                                  D,E,S,T




                                                                                                               N,M,C
                                                                 Media




                                                                                                                                             H,M,L
                                                                                                  E,S,D




                                                                                                                                                                       O,M


                                                                                                                                                                                       M,A
                                                 Y,N
                                                                                                                                                                                                                                                 Comments/Remarks
NAS 4.0 Perform Certification and                                                                                                                                                                                                                                                               0   0   0   0   0   0
        Verification                                                                                                                                                                                                                                                                            0   0   0   0   0   0
  4.1   Direct/coordinate certification            Y               T,F                D              E            M              D                    L                    O               M               OTHER                                                                                0   0   1   0   0   1
        activities with AT, AF, and others                                                                                                                                                                                                                                                      0   0   0   0   0   0
  4.2   Analyze performance of services/           Y              D,P              D,E              S*            M              D                    L                    O               M               OTHER                        *Difficulty depends on type of task                     0   0   1   0   0   1
        verify system integrity during                                                                                                                                                                                                                                                          0   0   0   0   0   0
        assigned shift                                                                                                                                                                                                                                                                          0   0   0   0   0   0
  4.3   Perform system/sub-system                  Y              D,P                 D              E            M              D                    L                    O               M               OTHER                                                                                0   0   1   0   0   1
        certification                                                                                                                                                                                                                                                                           0   0   0   0   0   0
  4.4   Perform service certification              Y              D,P                 D              E            M              D                    L                    O               M               OTHER                                                                                0   0   1   0   0   1
                                                                                                                                                                                                                                                                                                0   0   0   0   0   0
  4.5   Analyze/respond to internal/               Y              D,P                 D             S*            C              A                    L                    O               M               OTHER                        *Difficulty depends on type of                          0   1   1   0   0   2
        external system failures/incidents                                                                                                                                                                                              incident.                                               0   0   0   0   0   0
NAS 5.0 Manage Position Resources                                                                                                                                                                                                                                                               0   0   0   0   0   0
  5.1   Assume other position                      Y               T,F             N/A              S*            C              A                   M                     O                M              OTHER                        ATOP does not impact this task                          0   1   1   0   0   2
        responsibilities. including assisting,                                                                                                                                                                                                                                                  0   0   0   0   0   0
        directing, reviewing, coordinating,                                                                                                                                                                                                                                                     0   0   0   0   0   0
        managing activities, security,                                                                                                                                                                                                                                                          0   0   0   0   0   0
        and facilities operations in the
        absence of facility management                                                                                                                                                                                                                                                              0   0   0   0   0
  5.2   Cummunicate and log routine                Y              D,P                 D              E            C              A                  M                      O               M               OTHER
        information
  5.3   Brief and communicate with NAS             Y               P,T                D              E            C           D/A                     L                    O               M               OTHER
        Operations Manager relief, and                              F
        others (as required)                                                                                                                                                                                                                                                                    0   0   0   0   0   0
NAS 6.0 Perform Special Actions                                                                                                                                                                                                                                                                 0   0   0   0   0   0
  6.1   Respond to various emergencies,            Y                                                                                                                                                                                    ATOP does not impact this task                          0   0   0   0   0   0
        disasters, and security situations                                                                                                                                                                                                                                                      0   0   0   0   0   0
  6.2   Participate in daily and periodic AF       Y                                                                                                                                                                                    ATOP does not impact this task                          0   0   0   0   0   0
        meetings                                                                                                                                                                                                                        Includes daily AT briefings                             0   0   0   0   0   0
  6.3   Serve as lead for special projects/        Y               P,T             N/A              S*            C              A                  M                      M               M             PRINCIPAL                      *Difficulty depends on type of
        manage/participate in special                               F                                                                                                                                                                   project.
        assignments
  6.4   Act as operational lead in the             Y               P,T                D              S            C              A                  M                   O/M                M               OTHER
        installlation, modification,                                F
        integration, development of system
        services and new facilities




                                                                                                                                                                                                                                                                         NAS-ZOA                                        Page 8
                                                                                                                                                                                                                                                             NAS Area Specialist (NAS) JT/A




Position                 BASELINE
  NAS                Activity/Sub-activity                                                                Assessment Factors




                                                                                                                                              Mental/Physical Demands




                                                                                                                                                                                                          Primary; Principal; Other
                                                                                                                                                                                                          Priority Category:
                                                                                                                                                                        Task Manpower


                                                                                                                                                                                        Task Allocation
                                                                                                                              D,W,B,M,S,Q,Y
                                                                                   Support Tools




                                                                                                                              Frequency--A,
                                                                  D,P,T,I,IC,F,M
                                                  Task Validity




                                                                                                                Criticality
                                                                                                   Difficulty
                                                                                   D,E,S,T




                                                                                                                N,M,C
                                                                  Media




                                                                                                                                              H,M,L
                                                                                                   E,S,D




                                                                                                                                                                        O,M


                                                                                                                                                                                        M,A
                                                  Y,N
                                                                                                                                                                                                                                               Comments/Remarks
  6.5      Coordinate/perform security              Y                                                                                                                                                                                 ATOP does not impact this task                          0   0   0   0   0   0
           activities                                                                                                                                                                                                                                                                         0   0   0   0   0   0
  6.6      Coordinate facility housekeeping         Y                                                                                                                                                                                 ATOP does not impact this task                          0   0   0   0   0   0
           duties/responsibilities                                                                                                                                                                                                                                                            0   0   0   0   0   0
  6.7      Direct and test all installation and     Y              D,P                 D             S*            C              A                  M                   O/M             M/A              OTHER                       *Difficulty depends o situation
           removal of software/firmware                            T,F
           upgrades, and necessary changes
           to hardware
  6.8      Coordinate the conduct of joint          Y                                                                                                                                                                                 ATOP does not impact this task                          0   0   0   0   0   0
           baseline tests for major system                                                                                                                                                                                                                                                    0   0   0   0   0   0
           software deliveries/test new or                                                                                                                                                                                                                                                    0   0   0   0   0   0
           modified systems/identify                                                                                                                                                                                                                                                          0   0   0   0   0   0
           needed improvements                                                                                                                                                                                                                                                                0   0   0   0   0   0




                                                                                                                                                                                                                                                                        NAS-ZOA                                       Page 9
                                                                                                                                                                                                                                                   Airways Facilities System Performance Specialist (SPS) JT/A




Task Validity: Y=Yes, N=No
Media Interface: N/A, D=Display, P=Printer, I=Internet, IC=Intercom, T=Telephone, F=Face-to-Face, M=Computer Modem
Support Tools: D=Documentation, E=Special Equipment, S=Special Software, T=Test Tools
Task Difficulty: E=Easy, S=Somewhat Difficult, D=Difficult/Complex
Task Criticality: N=Not Critical, M= Must be Acted Upon Within 24 hrs, C= Critical
Task Frequency: D=Daily Activity(on-going), W=Weekly Activity, M=Monthly Activity, A=As Required
Bi-Monthly Activity, S=Semi-Annual Activity, Quarterly Activity, Y=Yearly Activity
Mental/Physical Demands: H=High, M=Moderate, L=Low
Task Manpower: O=One person, M=More than one person
Task Allocation: M=Manual, A=Automated
Task Priority Category: Primary=Task With Highest Rating on AT Least 4 of the Above Assessment Factors
(I.e., "Difficulty", "Criticality", "Frequency", "M/P Demands", "Task Manpower") Principal=Task With
Highest Rating on At Least 3 of the Aforementioned Factors. Other=All Other Tasks
Notes:
(1) Requirement for LRU repl. and return to operation in 30 minutes is the only known maintenance requirment for these COTs.
(2) A co-discriminator is safety. An unsafe design or maintenance procedure is a discriminator in the selection process.
(3) The human factors checklist and questionnaire will serve as
discriminators for usability and suitability.
Considerations:
       Ease of Understanding System Status - Simple Controls - Displays - Information Complete/Accurate
   Ease of Clearing Alarm - Letters / Colors / Knobs Appropriate-Controls Accessible/Responsive
       Ease of Switching to Backup System
       Ease of Checking History - Sorts Easily/Flexible
       Ease of Running Diagnostics / Feedback / Stats. Useful /Logical
       Ease of Returning System to Operational Status
 POSITION                    BASELINE
                        Activity/Sub-activity                               Assessment Factors




                                                                                                                                                                                                Primary; Principal;
                                                                                                                                                                                                Priority Category:
                                                                                                                                                              Task Manpower
                                                                                                                                            Mental/Physical




                                                                                                                                                                              Task Allocation
                                                                                                                            D,W,B,M,S,Q,Y
                                                                                 Support Tools




                                                                                                                            Frequency--A,
                                                                D,P,T,I,IC,F,M
                                                Task Validity




                                                                                                              Criticality




                                                                                                                                            Demands
                                                                                                 Difficulty
                                                                                 D,E,S,T




                                                                                                              N,M,C
                                                                Media




                                                                                                                                            H,M,L




                                                                                                                                                                                                Other
                                                                                                 E,S,D
  AF




                                                                                                                                                              O,M

                                                                                                                                                                              M,A
                                                Y,N




 SPS                                                                                                                                                                                                                      Comments/Remarks
AFS 1.0 Perform Periodic Maintenance
  1.1   Power-off and shut-down                     Y             D,P                D              S            C              A                M                M             M/A PRINCIPAL Difficult task for DSR                                                                                             0   1   1   0   1   3
        system (as required)                                                                                                                                                                  Task could introduce
                                                                                                                                                                                              other problems.                                                                                                    0   0   0   0   0   0
   1.2    Monitor LRUs, external/internal           Y             D,P                D              S            C              A                M                M             M/A PRINCIPAL                                                                                                                    0   1   1   0   1   3
          interfaces and software                                                                                                                                                                                                                                                                                0   0   0   0   0   0
          components                                                                                                                                                                                                                                                                                             0   0   0   0   0   0
   1.3    Execute equipment performance             Y             D,P              D,S             S*            N              A                 L               M             M/A             OTHER                 *Difficulty depends on                                                                     0   0   1   0   1   2
          checks/certify equipment                                                                                                                                                                                    system load & availability                                                                 0   0   0   0   0   0




                                                                                                                                                                                                                                                                           SPS-ZOA                                                       Page 10
                                                                                                                                                                                                                                       Airways Facilities System Performance Specialist (SPS) JT/A




POSITION               BASELINE
                   Activity/Sub-activity                                                            Assessment Factors




                                                                                                                                                                                              Primary; Principal;
                                                                                                                                                                                              Priority Category:
                                                                                                                                                            Task Manpower
                                                                                                                                          Mental/Physical




                                                                                                                                                                            Task Allocation
                                                                                                                          D,W,B,M,S,Q,Y
                                                                               Support Tools




                                                                                                                          Frequency--A,
                                                              D,P,T,I,IC,F,M
                                              Task Validity




                                                                                                            Criticality




                                                                                                                                          Demands
                                                                                               Difficulty
                                                                               D,E,S,T




                                                                                                            N,M,C
                                                              Media




                                                                                                                                          H,M,L




                                                                                                                                                                                              Other
                                                                                               E,S,D
  AF




                                                                                                                                                            O,M

                                                                                                                                                                            M,A
                                              Y,N
 SPS                                                                                                                                                                                                                Comments/Remarks
  1.4   Perform preventive maintenance,           Y             N/A                D              E            N              A                 L               O                M            OTHER                                                                                                  0           0           1           0           0           1
        including equipment cleaning and                                                                                                                                                                                                                                                             0           0           0           0           0           0
        inspection                                                                                                                                                                                                                                                                                   0           0           0           0           0           0
  1.5   Power-on/start-up system                  Y             D,P                D             S*            C              A                M                M             M/A PRINCIPAL *Difficult task for DSR.                                                                                 0           1           1           0           1           3
        (as required)                                                                                                                                                                                                                                                                                0           0           0           0           0           0
  1.6   Assess impact, and report                 Y            T,F,                D              E            N              A                 L               O                M            OTHER                                                                                                  0           0           1           0           0           1
        completion of maintenance actions                      P,D                                                                                                                                                                                                                                   0           0           0           0           0           0
        (including MMS) to AT and others                                                                                                                                                                                                                                                             0           0           0           0           0           0
  1.7   Execute system restoration                Y             D,P                D             S*            C              A                M                M             M/A PRINCIPAL *Difficult task for ODL.                                                              #REF!                  #REF!       #REF!       #REF!       #REF!       #REF!
        procedures                                               T                                                                                                                          *Easy task for DSR.                                                                                      0           1           1           0           1           3
        Present System/Sub-system                                                                                                                                                                                                                                                                    0           0           0           0           0           0
        DR&A Server                                                                                                                                                                                                                                                                                  0           0           0           0           0           0
        AIDC                                                                                                                                                                                                                                                                                         0           0           0           0           0           0
        MS ODL                                                                                                                                                                                                                                                                                       0           0           0           0           0           0
        CPDLC                                                                                                                                                                                                                                                                                        0           0           0           0           0           0
        TP                                                                                                                                                                                                                                                                                           0           0           0           0           0           0
        ISD                                                                                                                                                                                                                                                                                          0           0           0           0           0           0
        DSR                                                                                                                                                                                                                                                                                          0           0           0           0           0           0
        ODAPS/S1R:                                                                                                                                                                                                                                                                                   0           0           0           0           0           0
        G3, TCCU, KPR, HSP, KVDT,                                                                                                                                                                                                                                                                    0           0           0           0           0           0
        Tape Drives(MAG), DASD                                                                                                                                                                                                                                                                       0           0           0           0           0           0
AFS 2.0 Perform Corrective Maintenance                                                                                                                                                                                                                                                               0           0           0           0           0           0
        (CM)                                                                                                                                                                                                                                                                                         0           0           0           0           0           0
  2.1   Respond to maintenance trouble            Y            P,T,                D              E            C              A                M                O                M             OTHER Occurs more often with                                                                          0           0           0           0           0           0
         calls                                                 D,F                                                                                                                                    new releases                                                                                   0           1           1           0           0           2
  2.2   Run diagnostics (including LAN)           Y            D,P              D,S,              D            C              A                 H               M             M/A             PRIMARY East task for DSR                                                                              0           0           0           0           0           0
        and execute troubleshooting                                              T                                                                                                                                                                                                                   1           1           1           1           1           5
        procedures                                                                                                                                                                                                                                                                                   0           0           0           0           0           0
  2.3   Switch to alternate/backup system         Y           D,P,                 D              S            C              A                 H               M             M/A             PRIMARY Easy task for DSR                                                                              0           0           0           0           0           0
                                                               T,F                                                                                                                                                                                                                                   0           1           1           1           1           4
  2.4      Shut-down/recover/start-up             Y           D,P,T              D,S              S            C              A                 H               M             M/A             PRIMARY                                                                                                0           0           0           0           0           0
           system                                                                                                                                                                                                                                                                                    0           1           1           1           1           4
  2.5      Remove/replace failed/faulty LRU       Y             N/A              E,D              S            C              A                 H               M             M/A             PRIMARY
  2.6      Execute system configuration/          Y             D,P              D,S              D            C              A                 H               M             M/A             PRIMARY Easy task for DSR                                                                              0           1           1           1           1           4
           re-configuration procedures                                                                                                                                                                                                                                                               1           1           1           1           1           5
  2.7      Perform system restoration             Y            D,P,              D,S              D            C              A                 H               M             M/A             PRIMARY Easy task for DSR                                                                              0           0           0           0           0           0
                                                               T,F                                                                                                                                                                                                                                   1           1           1           1           1           5
  2.8      Report completion of maintenance       Y            D,P,              D,S              E            N              A                 L               O                M            OTHER                                                                                                  0           0           0           0           0           0
           actions                                             T,F,                                                                                                                                                                                                                                  0           0           1           0           0           1
                                                                M                                                                                                                                                                                                                                    0           0           0           0           0           0
  2.9      Coordinate actions with AT and         Y            T,F               N/A              S            C              A                M                O                M            OTHER                                                                                                  0           0           0           0           0           0
           others                                                                                                                                                                                                                                                                                    0           1           1           0           0           2
  2.1      Maintain spares/repair parts           Y             D,P              D,S              S            N              A                 L               O                M          S1R is performed
                                                                                                                                                                                              OTHER
           inventory for LRU                                                                                                                                                                by contractors.                                                                                          0           0           1           0           0           1
  2.11     Control shipment of failed items       Y            T,F,                D              S            M              A                M                O                M          S1R is performed by
                                                                                                                                                                                              OTHER                                                                               #REF!                  #REF!       #REF!       #REF!       #REF!       #REF!
           to depot repair sites                               D,P                                                                                                                          contractors                                                                                              0           0           1           0           0           1
  2.12     Perform check-out and testing of       Y            D,P,              D,S             S*            C              A                M                M             M/A PRINCIPAL *Difficult task for ODL.                                                                                 0           0           0           0           0           0
           replacement items                                   T,F,                                                                                                                         *Easy task for DSR.                                                                                      0           1           1           0           1           3




                                                                                                                                                                                                                                                               SPS-ZOA                                                                                               Page 11
                                                                                                                                                                                                                                                    Airways Facilities System Performance Specialist (SPS) JT/A




POSITION                BASELINE
                    Activity/Sub-activity                                                                Assessment Factors




                                                                                                                                                                                                   Primary; Principal;
                                                                                                                                                                                                   Priority Category:
                                                                                                                                                                 Task Manpower
                                                                                                                                               Mental/Physical




                                                                                                                                                                                 Task Allocation
                                                                                                                               D,W,B,M,S,Q,Y
                                                                                    Support Tools




                                                                                                                               Frequency--A,
                                                                   D,P,T,I,IC,F,M
                                                   Task Validity




                                                                                                                 Criticality




                                                                                                                                               Demands
                                                                                                    Difficulty
                                                                                    D,E,S,T




                                                                                                                 N,M,C
                                                                   Media




                                                                                                                                               H,M,L




                                                                                                                                                                                                   Other
                                                                                                    E,S,D
  AF




                                                                                                                                                                 O,M

                                                                                                                                                                                 M,A
                                                   Y,N
 SPS                                                                                                                                                                                                                         Comments/Remarks
AFS 3.0 Perform System Hardware                                                                                                                                                                                                                                                                                   0           0           0           0           0           0
        Modifications                                                                                                                                                                                                                                                                                             0           0           0           0           0           0
  3.1   Power-off and shut-down system                 Y            D,P, D,S                          S*            C              A                 H               M             M/A             PRIMARY *Easy task for DSR.                                                                                    0           0           0           0           0           0
        (as required)                                               T,F                                                                                                                                                                                                                                           0           1           1           1           1           4
  3.2   Receive modification requests                  Y             I,T D,T                          E             N              A                L                O              M   OTHER                                                                                                                     0           0           0           0           0           0
  3.3   Install system hardware                        Y            D,P T,D,E                         S*            C              A                M                M             M/A PRINCIPAL *Difficult task for ODL.                                                                                         0           0           1           0           0           1
        modifications                                                                                                                                                                                                                                                                                             0           1           1           0           1           3
  3.4   Perform functional check-out/                  Y           D,P,T D,S,T                        S*            C              A                M                M             M/A PRINCIPAL *Difficult task for ODL.                                                                                         0           0           0           0           0           0
        testing of system modifications                                                                                                                                                          *Easy Task for DSR.                                                                                              0           1           1           0           1           3
  3.5   Report completion of system                    Y            D,F,                D             S*            N              A                 L               O              M   OTHER *Easy task for DSR.                                                                                                 0           0           0           0           0           0
        modifications                                               T,P                                                                                                                                                                                                                                           0           0           1           0           0           1
AFS 4.0 Perform Certification (If Required)                                                                                                                                                                                                                                                                       0           0           0           0           0           0
  4.1   Execute unit certification                     Y             D,P              S,D             S*            C          M,Q,                 M                M             M/A PRINCIPAL For ODL it is cerification,                                                                                      0           0           0           0           0           0
        procedures                                                                                                              A                                                                for ODAPS it is verification.                                                                                    0           1           1           0           1           3
                                                                                                                                                                                                 *Easy task for DSR.                                                                                              0           0           0           0           0           0
  4.2      Execute system certification                Y             D,P                D              S            C          M,Q,                 M                M             M/A PRINCIPAL ODL is quarterly.                                                                                                0           0           0           0           0           0
           procedures                                                                                                           A                                                                For ODAPS is verification.                                                                                       0           1           1           0           1           3
  4.3      Verify certification procedures/            Y             D,P                D             S*            C          Q,A                  M                M             M/A PRINCIPAL *Easy task for DSR.                                                                           #REF!                  #REF!       #REF!       #REF!       #REF!       #REF!
           parameters                                                                                                                                                                                                                                                                                             0           1           1           0           1           3
  4.4      Identify/correct certification errors       Y             D,P                D             S*            C              A                M                O                M             OTHER                *Difficult task for ODL.                                                                 0           0           0           0           0           0
                                                                                                                                                                                                                         *Easy task for DSR.                                                                      0           1           1           0           0           2
  4.5      Report completion of certification          Y           T,F,D                D              E            N              A                 L               O                M             OTHER
           process                                                                                                                                                                                                                                                                                                0           0           1           0           0           1
  4.6      Re-certify hardware/software/               Y             D,P                D             S*            C           Q,A                 M             O/M              M/A              OTHER                *Difficult task for ODL.                                                                 0           0           0           0           0           0
           firmware components                                                                                                                                                                                                                                                                                    0           1           1           0           0           2
           (as required)                                                                                                                                                                                                                                                                                          0           0           0           0           0           0




                                                                                                                                                                                                                                                                            SPS-ZOA                                                                                               Page 12
                                                                                                                                                                                                                                                 Airways Facilities System Performance Specialist (SPS) JT/A




POSITION              BASELINE
                  Activity/Sub-activity                                                              Assessment Factors




                                                                                                                                                                                               Primary; Principal;
                                                                                                                                                                                               Priority Category:
                                                                                                                                                             Task Manpower
                                                                                                                                           Mental/Physical




                                                                                                                                                                             Task Allocation
                                                                                                                           D,W,B,M,S,Q,Y
                                                                                Support Tools




                                                                                                                           Frequency--A,
                                                               D,P,T,I,IC,F,M
                                               Task Validity




                                                                                                             Criticality




                                                                                                                                           Demands
                                                                                                Difficulty
                                                                                D,E,S,T




                                                                                                             N,M,C
                                                               Media




                                                                                                                                           H,M,L




                                                                                                                                                                                               Other
                                                                                                E,S,D
  AF




                                                                                                                                                             O,M

                                                                                                                                                                             M,A
                                               Y,N
 SPS                                                                                                                                                                                                                     Comments/Remarks
AFS 5.0 Documenting Procedures                                                                                                                                                                                                                                                                                 0           0           0           0           0           0
  5.1   Document (i.e., log & MMS)                 Y            D,P,                D              E            N              A                 L               O                M            OTHER                                                                                                           0           0           0           0           0           0
        periodic maintenance actions                                                                                                                                                                                                                                                                           0           0           1           0           0           1
  5.2   Document (i.e., log & MMS)                 Y             D,P                D              E            N              A                 L               O                M            OTHER                                                                                                           0           0           0           0           0           0
        corrective maintenance actions                                                                                                                                                                                                                                                                         0           0           1           0           0           1
  5.3   Document system modifications              Y             D,P                D              E            N              A                 L               O                M            OTHER                 Documented in log and                                                                     0           0           0           0           0           0
                                                                                                                                                                                                                     MMS.                                                                                      0           0           1           0           0           1
  5.4   Maintain on-site publications              Y             D,P                D              E            N              A                 L               O                M            OTHER
        (e.g., handbooks, tech. manuals,                                                                                                                                                                                                                                                                       0           0           1           0           0           1
        FRDF, and red-lined prints                                                                                                                                                                                                                                                                             0           0           0           0           0           0
  5.5   Manage spares documentation/               Y             D,P                D              E            N              A                 L               O                M            OTHER                 Performed by contractors.                                                                 0           0           0           0           0           0
        process logistical data and                                                                                                                                                                                                                                                                            0           0           1           0           0           1
        reports (e.g., Maintenance                                                                                                                                                                                                                                                                             0           0           0           0           0           0
        Analysis Workload Report)                                                                                                                                                                                                                                                                              0           0           0           0           0           0
  5.6   Document i.e., log & MMS)                  Y             D,P                D              E            N              A                 L               O                M            OTHER                                                                                                           0           0           0           0           0           0
        certification processes/actions                                                                                                                                                                                                                                                                        0           0           1           0           0           1
AFS 6.0 Diagnostic Maintenance                                                                                                                                                                                                                                                                                 0           0           0           0           0           0
  6.1   Maintain MDM (e.g. adaptation              Y             P,D            D,S,T              S            C              A                 H               O             M/A PRINCIPAL                                                                                                                   0           0           0           0           0           0
        data base, JCL execution,                                                                                                                                                                                                                                                                              0           1           1           1           0           3
        assembler, etc.)                                                                                                                                                                                                                                                                                       0           0           0           0           0           0
  6.2   Provide/maintain diagnostic                Y             P,D                D              S            C              A                M                M             M/A PRINCIPAL                                                                                                                   0           0           0           0           0           0
        procedures                                                                                                                                                                                                                                                                                             0           1           1           0           1           3
  6.3   Provide OJT for diagnostic                 Y           D,P,                 D              S            C              A                M                M             M/A PRINCIPAL                                                                                                                   0           0           0           0           0           0
        procedures                                             T,F                                                                                                                                                                                                                                             0           1           1           0           1           3
  6.4   Analyze diagnostic results (high           Y           D,P,               D,S              S            C              A                 H               M             M/A             PRIMARY                                                                                                         0           0           0           0           0           0
        level), and proposed upgrades                          T,F,I                                                                                                                                                                                                                                           0           1           1           1           1           4
        to diagnostic tools                                                                                                                                                                                                                                                                                    0           0           0           0           0           0
AFS 7.0 Maintain On-line Certification                                                                                                                                                                                                                                                                         0           0           0           0           0           0
        Program                                                                                                                                                                                                                                                                                                0           0           0           0           0           0
  7.1   Build/maintain on-line certification       Y           D,P,               D,S              D            C              A                 H               M             M/A             PRIMARY                                                                                                         0           0           0           0           0           0
        tools                                                  T,F,I                                                                                                                                                                                                                                           1           1           1           1           1           5
  7.2   Provide/maintain on-line                   Y           D,P,               D,S              D            C              A                 H               M             M/A             PRIMARY                                                                                                         0           0           0           0           0           0
        certification procedures                               T,F,I                                                                                                                                                                                                                                           1           1           1           1           1           5
  7.3   Analyze certification results              Y           D,P,               D,S              S            C              A                 H               M             M/A             PRIMARY                                                                                                         0           0           0           0           0           0
        information (e.g., QARS, ERIT)                         T,F,I                                                                                                                                                                                                                                           0           1           1           1           1           4
                                                                                                                                                                                                                                                                                            #REF!                  #REF!       #REF!       #REF!       #REF!       #REF!
                                                                                                                                                                                                                                                                                                               0           0           0           0           0           0




                                                                                                                                                                                                                                                                         SPS-ZOA                                                                                               Page 13
           AF
          SPS
                                    BASELINE         POSITION
                                Activity/Sub-activity




          Task Validity
          Y,N
          Media
          D,P,T,I,IC,F,M
          Support Tools
          D,E,S,T
          Difficulty
          E,S,D
          Criticality
          N,M,C
          Frequency--A,
          D,W,B,M,S,Q,Y
          Mental/Physical
          Demands
                                Assessment Factors




          H,M,L
          Task Manpower
          O,M
          Task Allocation
          M,A

          Priority Category:
          Primary; Principal;
          Other
          Comments/Remarks




SPS-ZOA
                                                                Airways Facilities System Performance Specialist (SPS) JT/A




Page 14
           AF
          SPS
                                    BASELINE         POSITION
                                Activity/Sub-activity




          Task Validity
          Y,N
          Media
          D,P,T,I,IC,F,M
          Support Tools
          D,E,S,T
          Difficulty
          E,S,D
          Criticality
          N,M,C
          Frequency--A,
          D,W,B,M,S,Q,Y
          Mental/Physical
          Demands
                                Assessment Factors




          H,M,L
          Task Manpower
          O,M
          Task Allocation
          M,A

          Priority Category:
          Primary; Principal;
          Other
          Comments/Remarks




SPS-ZOA
                                                                Airways Facilities System Performance Specialist (SPS) JT/A




Page 15
           AF
          SPS
                                    BASELINE         POSITION
                                Activity/Sub-activity




          Task Validity
          Y,N
          Media
          D,P,T,I,IC,F,M
          Support Tools
          D,E,S,T
          Difficulty
          E,S,D
          Criticality
          N,M,C
          Frequency--A,
          D,W,B,M,S,Q,Y
          Mental/Physical
          Demands
                                Assessment Factors




          H,M,L
          Task Manpower
          O,M
          Task Allocation
          M,A

          Priority Category:
          Primary; Principal;
          Other
          Comments/Remarks




SPS-ZOA
                                                                Airways Facilities System Performance Specialist (SPS) JT/A




Page 16
           AF
          SPS
                                    BASELINE         POSITION
                                Activity/Sub-activity




          Task Validity
          Y,N
          Media
          D,P,T,I,IC,F,M
          Support Tools
          D,E,S,T
          Difficulty
          E,S,D
          Criticality
          N,M,C
          Frequency--A,
          D,W,B,M,S,Q,Y
          Mental/Physical
          Demands
                                Assessment Factors




          H,M,L
          Task Manpower
          O,M
          Task Allocation
          M,A

          Priority Category:
          Primary; Principal;
          Other
          Comments/Remarks




SPS-ZOA
                                                                Airways Facilities System Performance Specialist (SPS) JT/A




Page 17
                                                                                          Computer Specialist
                                                                                                JT/A




Task Validity: Y=Yes, N=No
Media Interface: N/A, D=Display, P=Printer, I=Internet, IC=Intercom, T=Telephone, F=Face-to-Face, M=Computer Modem
Support Tools: D=Documentation, E=Special Equipment, S=Special Software, T=Test Tools
Task Difficulty: E=Easy, S=Somewhat Difficult, D=Difficult/Complex
Task Criticality: N=Not Critical, M= Must be Acted Upon Within 24 hrs, C= Critical
Task Frequency: D=Daily Activity(on-going), W=Weekly Activity, M=Monthly Activity, A=As Required
B=Bi-Monthly Activity, Q=Quarterly Activity, S=Semi-Annual Activity, Y=Yearly Activity
Mental/Physical Demands: H=High, M=Moderate, L=Low
Task Manpower: O=One person, M=More than one person
Task Allocation: M=Manual, A=Automated
Task Priority Category: Primary=Task With Highest Rating of At Least 4 on the Following Assessment
Factors (I.e., "Difficulty", "Criticality", "Frequency", "M/P Demands", "Task Manpower")Principal=
Task With Highest Rating of At Least 3 on The Same Aforementioned Factors Other=All Other Tasks
Notes:
(1) Requirement for LRU repl. and return to operation in 30 minutes is the only known maintenance requirment for these COTs.
(2) A co-discriminator is safety. An unsafe design or maintenance procedure is a discriminator in the selection process.
(3) The human factors checklist and questionnaire will
serve as discriminators for usability and suitablity.
Considerations:
   Ease of Understanding System Status - Simple Controls - Displays - Information Complete/Accurate
  Ease of Clearing Alarm - Letters / Colors / Knobs Appropriate-Controls Accessible/Responsive
   Ease of Switching to Backup System
   Ease of Checking History - Sorts Easily/Flexible
   Ease of Running Diagnostics / Feedback / Stats. Useful /Logical
   Ease of Returning System to Operational Status
  Comp.                     BASELINE
  Spec.                Activity/Sub-activity                                     Assessment Factors




                                                                                                                                               Mental/Physical Demands




                                                                                                                                                                                                           Primary; Principal; Other
                                                                                                                                                                                                           Priority Category:
                                                                                                                                                                         Task Manpower


                                                                                                                                                                                         Task Allocation
                                                                                                                               D,W,B,M,S,Q,Y
                                                                                    Support Tools




                                                                                                                               Frequency--A,
                                                                   D,P,T,I,IC,F,M
                                                   Task Validity




                                                                                                                 Criticality
                                                                                                    Difficulty
                                                                                    D,E,S,T




                                                                                                                 N,M,C
                                                                   Media




                                                                                                                                               H,M,L
                                                                                                    E,S,D




                                                                                                                                                                         O,M


                                                                                                                                                                                         M,A
                                                   Y,N




                                                                                                                                                                                                                                         Comments/Remarks
COP 1.0 Perform Computer Operations
  1.1   Start-up and shut-down computer              Y             D,P,              D,T               S            C              A                  M                      O            M/A              OTHER                       Also ATSS
        software                                                    T,F                                                                                                                                                                responsibility
  1.2   Log-on system                                Y             D,F,T             N/A               E            C              A                   L                     O               M             OTHER




                                                                                        Comp Specialist-ZOA                                                                                                                                                 Page 18
                                                                                    Computer Specialist
                                                                                          JT/A



Comp.                 BASELINE
Spec.             Activity/Sub-activity                                                            Assessment Factors




                                                                                                                                         Mental/Physical Demands




                                                                                                                                                                                                        Primary; Principal; Other
                                                                                                                                                                                                        Priority Category:
                                                                                                                                                                   Task Manpower


                                                                                                                                                                                   Task Allocation
                                                                                                                         D,W,B,M,S,Q,Y
                                                                              Support Tools




                                                                                                                         Frequency--A,
                                                             D,P,T,I,IC,F,M
                                            Task Validity




                                                                                                           Criticality
                                                                                              Difficulty
                                                                              D,E,S,T




                                                                                                           N,M,C
                                                             Media




                                                                                                                                         H,M,L
                                                                                              E,S,D




                                                                                                                                                                   O,M


                                                                                                                                                                                   M,A
                                            Y,N
                                                                                                                                                                                                                                      Comments/Remarks
 1.3    Perform hardware operations           Y               D,P              D,T               E            C              A                  M                      O               M              OTHER
        (e.g., tape drive, printers, and
        terminals)
 1.4    Perform software operations           Y              D,P,   D,S                          S            C              A                  H                      O            M/A              PRINCIPAL Software starts-up
                                                             T,F                                                                                                                                               automatically
 1.5    Back-up system files                  Y             D,T,F    D                           E            C           D,A                   E                      O             M                OTHER
 1.6    Recover operational programs          Y             D,T,F, D,S                           S            C            A                    M                      O            M/A               OTHER
        (coldstart)                                           P
 1.7    Recover operational programs          Y             D,T,P,   D                           E            C              A                  M                      O            M/A               OTHER
        (warm start)                                          F
 1.8    Initialize system software            Y             D,P,T, D,S,T                         E            C              A                  M                      O            M/A               OTHER
                                                              F
 1.9    Perform support system software       Y             D,P,T, D,S                           S            C          W,A                    M                      O            M/A               OTHER
        (PC adaptation) testing                               F
 1.1    Run support system software           Y             D,T,F    D                           E            C           D,A                    L                     O            M/A               OTHER
        utility programs
1.11    Execute software de-bug tools        N
1.12    Perform system start-overs           Y              D,P,T,F               D              S            C           A,W                   M                      O            M/A               OTHER
        and aborts
1.13    Modify software data bases            Y              D,T,F                D              S            C           A                     M                      O            M/A               OTHER
1.14    Perform system switch-overs           Y             D,P,T,F               D              D            C          W/A                    H                      O            M/A              PRIMARY
1.15    Detect/acknowledge system             Y             D,P,T,F               D              D            C           A                     H                      O            M/A              PRIMARY
        alarms
1.16    Restore main processor to service     Y              D,T,F             D,T               D            C              A                  H                      O            M/A              PRIMARY
1.17    Display data (e.g., availability      Y             D,P,T,F             D                E            C              A                  L                      O            M/A               OTHER
        status, events/alerts, etc.)
1.18    Change operational mode               Y             D,P,T,F               D              S            C          W/A                    H                      O            M/A              PRINCIPAL
1.19    Perform event analysis after          Y             D,P,T,F               D              D            C           A                     H                      O            M/A               PRIMARY
        interruptions
1.20    Mount, dismount, and archive          Y             D,P,T,F               D              E            C              D                   L                     O            M/A               OTHER
        magnetic tapes and disks
1.21    Perform coordination activities       Y              T,F,I             N/A               E            C              D                  M                      O               M              OTHER                         Also ATSS function
1.22    Change-out CDR packs for                                                                                                                                                                                                    Optional for Micro-
        optical drives                        Y               N/A              N/A               E            C              D                   L                     O               M              OTHER                         EARTS
1.23    Restore system files                  Y                D                S                E            C              A                   L                     O               M              OTHER                         Task results from loss
                                                                                                                                                                                                                                    or failure




                                                                                  Comp Specialist-ZOA                                                                                                                                                        Page 19
                                                                                      Computer Specialist
                                                                                            JT/A



 Comp.                BASELINE
 Spec.            Activity/Sub-activity                                                              Assessment Factors




                                                                                                                                           Mental/Physical Demands




                                                                                                                                                                                                       Primary; Principal; Other
                                                                                                                                                                                                       Priority Category:
                                                                                                                                                                     Task Manpower


                                                                                                                                                                                     Task Allocation
                                                                                                                           D,W,B,M,S,Q,Y
                                                                                Support Tools




                                                                                                                           Frequency--A,
                                                               D,P,T,I,IC,F,M
                                              Task Validity




                                                                                                             Criticality
                                                                                                Difficulty
                                                                                D,E,S,T




                                                                                                             N,M,C
                                                               Media




                                                                                                                                           H,M,L
                                                                                                E,S,D




                                                                                                                                                                     O,M


                                                                                                                                                                                     M,A
                                              Y,N
                                                                                                                                                                                                                                     Comments/Remarks
        Present System/Sub-system
        DR&A Server
        AIDC
        MS ODL
        CPDLC
        TP
        ISD
        DSR
        ODAPS/S1R:
        G3, TCCU, KPR, HSP, KVDT,
        Tape Drives(MAG), DASD
COP 2.0 Sotware Records Keeping/
         Documentation of Data
  2.1   Maintain supply inventory control       Y             D,T,F,                D              E            C             A*                  M                      O                M            OTHER                       *Task is performed on
        procedures                                              P,I                                                                                                                                                                bi-weekly basis
  2.2   Maintain file of adaptation changes     Y               N/A                 D              E            N           W,A                     L                    O                M            OTHER
  2.3   Record system outages                   Y               N/A                 D              E            C            A                      L                    O                M            OTHER
  2.4   Maintain operational program            Y             D,P,T,F               D              E            C            D                      L                    O                M            OTHER
        records and listings
  2.5   Execute off-line programs               Y             D,P,T,F               D              E            C              D                    L                    O                M            OTHER
  2.6   Maintain system reference file          Y               D,P                 D              E            C              D                    L                    O                M            OTHER
        (including software user's manual,
        operational program listings,
        off-line program listings, FAA
        PTRs, orders, operational logs,
        system back-up tapes, etc.)
COP 3.0 Respond to Information Requests
  3.1   Power-on/start-up computer              Y                F,T                D              E            C              A                    L                    O                M            OTHER
        system
  3.2   Power-off/shut-down computer            Y                F,T                D              E            C              A                    L                    O                M            OTHER
        system/recover system data
  3.3   Dump system data files                  Y                D                  D              E            C              A                  L                      O              M              OTHER
  3.4   Execute data reduction and analysis     Y             D,P,T,F               D              S            C              D                  M                      O             M/A             OTHER
        of other system programs
        (e.g., equipment failure/status
        reports, hardware/software test
        schedules, trend analysis reports,




                                                                                    Comp Specialist-ZOA                                                                                                                                                    Page 20
                                                                                 Computer Specialist
                                                                                       JT/A



Comp.                BASELINE
Spec.            Activity/Sub-activity                                                          Assessment Factors




                                                                                                                                      Mental/Physical Demands




                                                                                                                                                                                                    Primary; Principal; Other
                                                                                                                                                                                                    Priority Category:
                                                                                                                                                                Task Manpower


                                                                                                                                                                                Task Allocation
                                                                                                                      D,W,B,M,S,Q,Y
                                                                           Support Tools




                                                                                                                      Frequency--A,
                                                          D,P,T,I,IC,F,M
                                         Task Validity




                                                                                                        Criticality
                                                                                           Difficulty
                                                                           D,E,S,T




                                                                                                        N,M,C
                                                          Media




                                                                                                                                      H,M,L
                                                                                           E,S,D




                                                                                                                                                                O,M


                                                                                                                                                                                M,A
                                         Y,N
                                                                                                                                                                                                                                Comments/Remarks
        etc.)
  3.5   Perform scheduled system           Y             D,P,T,F               D              D            C              D                   H                     O             M/A             PRIMARY
        outages/interruptions
  3.6   Respond to unscheduled system      Y             D,P,T,F               D              D            C              A                   H                     O             M/A             PRINCIPAL
        outages/interruptions,
        test reports, etc.)
COP 4.0 Respond to System Failures/
        Incidents
  4.1   Coordinate and report system       Y             D,T,F                 D              D            C              A                   H                     O                M            PRINCIPAL
        failures/incidents
COP 5.0 Perform Tasks Associated With
        System Certification
  5.1   Re-configure hardware elements     Y             D,P,T,F               D              D            C           D,W                    H                     O             M/A             PRINCIPAL




                                                                               Comp Specialist-ZOA                                                                                                                                                 Page 21
Computer Specialist
      JT/A




                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2




Comp Specialist-ZOA                           Page 22
Computer Specialist
      JT/A




                      0   1   1   0   0   2

                      0   0   0   0   0   0
                      0   1   1   1   0   3
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   1   1   0   0   2

                      0   1   1   0   0   2
                      1   1   1   1   0   4
                      1   1   1   1   0   4
                      0   0   0   0   0   0
                      1   1   1   1   0   4
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   1   0   3
                      1   1   1   1   0   4
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                          1   1   0   0   2



                      0




Comp Specialist-ZOA                           Page 23
Computer Specialist
      JT/A




                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   1   0   0   0   1
                      0   0   0   0   0   0
                      0   0   1   0   0   1
                      0   1   1   0   0   2
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   1   1   0   0   2
                      0   1   1   0   0   2
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      0   0   0   0   0   0
                      1   0   0   0   0   1




Comp Specialist-ZOA                           Page 24
        Computer Specialist
              JT/A




                              0   0   0   0   0           0
                              1   1   1   1   0           4
                              0   0   0   0   0           0
#REF!                             1   1   1   0   #REF!
#REF!                             0   0   0   0   #REF!
                              1   0   0   0   0           1
                                  0   0   0   0           0
                              0
                              0   1   1   1   0           3
                              0   0   0   0   0           0
                              1   0   0   0   0           1
                                  0   0   0   0           0
                                  1   1   1   0           3




        Comp Specialist-ZOA                                   Page 25
                                                                                                                                                                                                                                                         AOS Adaptation JT/A




Task Validity: Y=Yes, N=No
Media Interface: N/A, D=Display, P=Printer, I=Internet, IC=Intercom, T=Telephone, F=Face-to-Face, M=Computer Modem
Support Tools: D=Documentation, E=Special Equipment, S=Special Software, T=Test Tools
Task Difficulty: E=Easy, S=Somewhat Difficult, D=Difficult/Complex
Task Criticality: N=Not Critical, M= Must be Acted Upon Within 24 hrs, C= Critical
Task Frequency: D=Daily Activity(on-going), W=Weekly Activity, M=Monthly Activity, A=As Required
B=Bi-Monthly Activity, S=Semi-Annual Activity, Q=Quarterly Activity, Y=Yearly Activity
Mental/Physical Demands: H=High, M=Moderate, L=Low
Task Manpower: O=One person, M=More than one person
Task Allocation: M=Manual, A=Automated
Task Priority Category: Primary=Task With Highest Rating on At Least 4 of the following
Assessment Factors, (I.e., "Difficulty", "Criticality", "Frequency", "M/P Demands", "Task Manpower") Principal=Task
With Highest rating on At Least 3 of the Same Aforementioned Factors. Other=All Other Tasks
Notes:
(1) Requirement for LRU repl. and return to operation in 30 minutes is the only known maintenance requirment for these COTs.
(2) A co-discriminator is safety. An unsafe design or maintenance procedure is a discriminator in the selection process.
(3) The human factors checklist and questionnaire are
discriminators for usability and suitability.
Considerations:
     Ease of Understanding System Status - Simple Controls - Displays - Information Complete/Accurate
  Ease of Clearing Alarm - Letters / Colors / Knobs Appropriate-Controls Accessible/Responsive
     Ease of Switching to Backup System
     Ease of Checking History - Sorts Easily/Flexible
     Ease of Running Diagnostics / Feedback / Stats. Useful /Logical
     Ease of Returning System to Operational Status
    AOS                       BASELINE
   Adap.                Activity/Sub-activity                                             Assessment Factors




                                                                                                                                                                                                        Primary; Principal;
                                                                                                                                                                                                        Priority Category:
                                                                                                                                                                     Task Manpower
                                                                                                                                                   Mental/Physical




                                                                                                                                                                                     Task Allocation
                                                                                                                                   D,W,B,M,S,Q,Y
                                                                                        Support Tools




                                                                                                                                   Frequency--A,
                                                                       D,P,T,I,IC,F,M
                                                       Task Validity




                                                                                                                     Criticality




                                                                                                                                                   Demands
                                                                                                        Difficulty
                                                                                        D,E,S,T




                                                                                                                     N,M,C
                                                                       Media




                                                                                                                                                   H,M,L




                                                                                                                                                                                                        Other
                                                                                                        E,S,D




                                                                                                                                                                     O,M



                                                                                                                                                                                     M,A
                                                       Y,N




                                                                                                                                                                                                                                     Comments/Remarks
 AOS 1.0    Automation Info. & RMMS Security
   1.1      Maintain oceanic security                     Y                D                D              E            N              A                 L               O                M             OTHER                 Performed by contractor.                         0   0   1   0   0   1

 AOS 2.0    Field Support                                                                                                                                                                                                                                                      0   0   0   0   0   0
   2.1      Notify vendor of problems                     Y             D,T,             D,S               E            C              A                 L               O                M             OTHER                                                                  0   1   1   0   0   2
            (information system)                                        F,M                                                                                                                                                                                                    0   0   0   0   0   0
    2.2     Develop software/hardware                     Y             D,P,             D,S              D             C              A                M                M                M            PRIMARY                                                                 1   1   1   0   1   4
            work-arounds                                                T,F                                                                                                                                                                                                    0   0   0   0   0   0
    2.3     Conduct advisory functions/                   Y            D,P,F,            D,S              S*            C              A                 L               O                M             OTHER                 *Depends upon individual case.                   0   1   1   0   0   2
            coordination activities                                     T,M                                                                                                                                                                                                    0   0   0   0   0   0
    2.4     Perform 1st level support/                    Y            D,P,F,               E              S            C              A                H                M                M            PRIMARY 40% Easy, 45% somewhat difficult                                0   1   1   1   1   4
            adaptation                                                  T,M                                                                                                                                    5% difficult                                                    0   0   0   0   0   0
    2.5     Support priority restorations                 Y             D,P,             N/A               S            C              A                 L               O                M             OTHER                                                                  0   1   1   0   0   2
                                                                        F,T                                                                                                                                                                                                    0   0   0   0   0   0
    2.6     Ensure hardware, firmware, etc.,              Y            T,F,P                D              E            C              D                 L               M                M            PRINCIPAL Wouldn"t normally call unles                                  0   1   1   0   1   3
            availability                                                D,M                                                                                                                                      somewhat critical.                                            0   0   0   0   0   0
    2.7     Perform system capacity analysis              Y              D               N/A               E            N              A                L                O                M             OTHER    Includes CPU utilization % age.                               0   0   1   0   0   1
    2.8     Perform problem reporting                     Y             D,P,             D,S               E            N              A                M                O                M             OTHER    Includes interfacing with                                     0   0   1   0   0   1
                                                                        T,F                                                                                                                                      controllers & documenting issues                              0   0   0   0   0   0
 AOS 3.0    Life Cycle Management                                                                                                                                                                                                                                              0   0   0   0   0   0
   3.1      Manage contractor support                     Y                 F            S,D               E            N              A                 L               O                M             OTHER                 Performed by Automation Mgr.                     0   0   1   0   0   1




                                                                                                                                                                                                                                                          AOS_ADAP-ZOA                                 Page 26
                                                                                                                                                                                                                                              AOS Adaptation JT/A




AOS                     BASELINE
Adap.               Activity/Sub-activity                                                                   Assessment Factors




                                                                                                                                                                                              Primary; Principal;
                                                                                                                                                                                              Priority Category:
                                                                                                                                                           Task Manpower
                                                                                                                                         Mental/Physical




                                                                                                                                                                           Task Allocation
                                                                                                                         D,W,B,M,S,Q,Y
                                                                              Support Tools




                                                                                                                         Frequency--A,
                                                             D,P,T,I,IC,F,M
                                             Task Validity




                                                                                                           Criticality




                                                                                                                                         Demands
                                                                                              Difficulty
                                                                              D,E,S,T




                                                                                                           N,M,C
                                                             Media




                                                                                                                                         H,M,L




                                                                                                                                                                                              Other
                                                                                              E,S,D




                                                                                                                                                           O,M



                                                                                                                                                                           M,A
                                             Y,N
                                                                                                                                                                                                                                Comments/Remarks
  3.2     Maintain system software              Y              D,P                D              D            N              A                 L               O                M             OTHER                 Involves managing sub-systems                   1   0   1   0   0   2
          configuration/changes                                                                                                                                                                                                                                     0   0   0   0   0   0
  3.3     Implement quality performance         Y             D,F,                D              E            C              A               M*                M                M            PRINCIPAL * Depends upon situation                                     0   1   1   0   1   3
          criteria (e.g., peer reviews)                        T                                                                                                                                                                                                    0   0   0   0   0   0
  3.4     Integrate oceanic system with         Y             D,P,                T              S            N              A                M                M                M             OTHER                 Interfaces include AIDC,FDIO,                   0   0   1   0   1   2
          new interfaces                                      T,F                                                                                                                                                   flight strip printers, etc.                     0   0   0   0   0   0
  3.5     Develop/manage software               Y             D,P              N/A               S            N              A                 L               O                M             OTHER                 Some modifications may be                       0   0   1   0   0   1
          modifications                                                                                                                                                                                             critical.
  3.6     Accomplish engineering support        Y             D,P,             N/A               S            M              A                M                O                M             OTHER                                                                 0   0   1   0   0   1
                                                              F,M,                                                                                                                                                                                                  0   0   0   0   0   0
                                                               T                                                                                                                                                                                                    0   0   0   0   0   0
AOS 4.0   Documentation                                                                                                                                                                                                                                             0   0   0   0   0   0
  4.1     Maintain tech. instruction books      Y                F              D                E            N              A                 L               O                M             OTHER                                                                 0   0   1   0   0   1
  4.2     Maintain CPFS                         Y                D             N/A               E            N              A                 L               O                M             OTHER                                                                 0   0   1   0   0   1

  4.3     Maintain user/operator manuals        Y             F                 D                E            N              A                 L               O                M             OTHER                                                                 0   0   1   0   0   1
  4.4     Extract system statistical            Y            D,P,I             D,S               E            N              D                 L               O                M             OTHER                                                                 0   0   1   0   0   1
          information, and prepare usage                                                                                                                                                                                                                            0   0   0   0   0   0
          and error reports                                                                                                                                                                                                                                         0   0   0   0   0   0




                                                                                                                                                                                                                                                AOS_ADAP-ZOA                                Page 27
                                                                                                                                                                                                                                                Airways Facilities Transportation System Specialist (ATSS) JT/A




Task Validity: Y=Yes, N=No
Media Interface: N/A, D=Display, P=Printer, I=Internet, IC=Intercom, T=Telephone, F=Face-to-Face, M=Computer Modem
Support Tools: D=Documentation, E=Special Equipment, S=Special Software, T=Test Tools
Task Difficulty: E=Easy, S=Somewhat Difficult, D=Difficult/Complex
Task Criticality: N=Not Critical, M= Must be Acted Upon Within 24 hrs, C= Critical
Task Frequency: D=Daily Activity(on-going), W=Weekly Activity, M=Monthly Activity, A=As Required
Activity, B=Bi-Monthly Activity, Q=Quarterly Activity, S=Semi-Annual Activity, Y=Yearly Activity
Mental/Physical Demands: H=High, M=Moderate, L=Low
Task Manpower: O=One person, M=More than one person
Task Allocation: M=Manual, A=Automated
Task Priority Catgeory: Primary=Task With Highest Rating On At Least 4 of
the Above Assessment Factors, (I.e., "Difficulty", "Criticality", "Frequency", "M/P Demands",
"Task Manpower") Principal=Task With Highest Rating on 3 of These Same Factors.              Other= All Other Tasks
Notes:
(1) Requirement for LRU repl. and return to operation in 30 minutes is the only known maintenance requirment for these COTs.
(2) A co-discriminator is safety. An unsafe design or maintenance procedure is a discriminator in the selection process.
(3) The human factors checklist and questionnaire will serve as
Discriminators for usability and suitability.
Considerations:
     Ease of Understanding System Status - Simple Controls - Displays - Information Complete/Accurate
  Ease of Clearing Alarm - Letters / Colors / Knobs Appropriate-Controls Accessible/Responsive
     Ease of Switching to Backup System
     Ease of Checking History - Sorts Easily/Flexible
     Ease of Running Diagnostics / Feedback / Stats. Useful /Logical
     Ease of Returning System to Operational Status
 POSITION                BASELINE
                     Activity/Sub-activity                                    Assessment Factors




                                                                                                                                                                                                 Primary; Principal;
                                                                                                                                                                                                 Priority Category:
                                                                                                                                                               Task Manpower
                                                                                                                                             Mental/Physical




                                                                                                                                                                               Task Allocation
                                                                                                                             D,W,M,A,S,Q,Y
                                                                                  Support Tools
                                                                 D,P,T,I,IC,F,M
                                                 Task Validity




                                                                                                                             Frequency
                                                                                                               Criticality




                                                                                                                                             Demands
                                                                                                  Difficulty
                                                                                  D,E,S,T




                                                                                                               N,M,C
                                                                 Media




                                                                                                                                             H,M,L




                                                                                                                                                                                                 Other
                                                                                                  E,S,D

  AF




                                                                                                                                                               O,M

                                                                                                                                                                               M,A
                                                 Y,N




 ATSS                                                                                                                                                                                                                      Comments/Remarks
AFS 1.0 Perform Periodic Maintenance
  1.1   Power-on and start-up,                       Y             D,P                D             S*            C              A                M                M            M/A PRINCIPAL *Difficult task for DSR                                                                                             0   1   1   0   1   3
        power-off and shut-down                                                                                                                                                               Could introduce other
        system (as required)                                                                                                                                                                  problems                                                                                                            0   0   0   0   0   0
  1.2   Monitor LRUs, external/internal              Y             D,P                D              S             C             A                M                M            M/A PRINCIPAL                                                                                                                     0   1   1   0   1   3
        interfaces & software                                       F                                                                                                                                                                                                                                             0   0   0   0   0   0
        components
  1.3   Execute equipment performance                Y            D,P               D,S             S*             N             A                 L               M            M/A              OTHER                 Difficult task for DSR                                                                     0   0   1   0   1   2
        checks/certify equipment (tape                            T,F,
        drives, printers and terminals)




                                                                                                                                                                                                                                                                       AF(ATSS)-ZOA                                                       Page 28
                                                                                                                                                                                                                                                  Airways Facilities Transportation System Specialist (ATSS) JT/A




POSITION                BASELINE
                    Activity/Sub-activity                                                              Assessment Factors




                                                                                                                                                                                                 Primary; Principal;
                                                                                                                                                                                                 Priority Category:
                                                                                                                                                               Task Manpower
                                                                                                                                             Mental/Physical




                                                                                                                                                                               Task Allocation
                                                                                                                             D,W,M,A,S,Q,Y
                                                                                  Support Tools
                                                                 D,P,T,I,IC,F,M
                                                 Task Validity




                                                                                                                             Frequency
                                                                                                               Criticality




                                                                                                                                             Demands
                                                                                                  Difficulty
                                                                                  D,E,S,T




                                                                                                               N,M,C
                                                                 Media




                                                                                                                                             H,M,L




                                                                                                                                                                                                 Other
                                                                                                  E,S,D
  AF




                                                                                                                                                               O,M

                                                                                                                                                                               M,A
                                                 Y,N
 ATSS                                                                                                                                                                                                                      Comments/Remarks
  1.4   Perform preventive maintenance,              Y             N/A                D             S*             N             A                 L               O                M            OTHER                                                                                                              0   0   1   0   0   1
        including equipment cleaning and                                                                                         **                                                                                                                                                                                 0   0   0   0   0   0
        inspection                                                                                                                                                                                                                                                                                                  0   0   0   0   0   0
  1.5   Power-on/start-up system                     Y            D,P                 D             S*             C             A                M                M            M/A PRINCIPAL                                                                                                                       0   1   1   0   1   3
        (as required)                                             T,F,                                                                                                                                                                                                                                              0   0   0   0   0   0
  1.6   Assess impact, and report                    Y            D,P                 D             S*             N             A                 L               O            M/A              OTHER                 *Difficulty depends upon                                                                     0   0   1   0   0   1
        completion of maintenance actions                         T,F,                                                                                                                                                 system workload and                                                                          0   0   0   0   0   0
        (including MMS) to AT and others                                                                                                                                                                               availability                                                                                 0   0   0   0   0   0
  1.7   Perform housekeeping routines                Y            P,T,                D              D             E             C                 D                L           M/A              OTHER                                                                                                              1   0   0   0   0   1
        (e.g., archive data, clear open                            F
        error logs, etc.)                                                                                                                                                                                                                                                                                           0   0   0   0   0   0
  1.8   Execute system restoration                   Y             D,P              D,T             S*             C             A                M                M            M/A              OTHER                 *Difficult task for ODL.                                                                     0   1   1   0   1   3
        procedures                                                 T,F               E                                                                                                                                 Easy task for DSR                                                                            0   0   0   0   0   0
        Present System/Sub-system                                                                                                                                                                                                                                                                                   0   0   0   0   0   0
        DR&A Server                                                                                                                                                                                                                                                                                                 0   0   0   0   0   0
        AIDC                                                                                                                                                                                                                                                                                                        0   0   0   0   0   0
        MS ODL                                                                                                                                                                                                                                                                                                      0   0   0   0   0   0
        CPDLC                                                                                                                                                                                                                                                                                                       0   0   0   0   0   0
        TP                                                                                                                                                                                                                                                                                                          0   0   0   0   0   0
        ISD                                                                                                                                                                                                                                                                                                         0   0   0   0   0   0
        DSR                                                                                                                                                                                                                                                                                                         0   0   0   0   0   0
        ODAPS/S1R:                                                                                                                                                                                                                                                                                                  0   0   0   0   0   0
        G3, TCCU, KPR, HSP, KVDT,                                                                                                                                                                                                                                                                                   0   0   0   0   0   0
        Tape Drives(MAG), DASD                                                                                                                                                                                                                                                                                      0   0   0   0   0   0
AFS 2.0 Perform Corrective Maintenance                                                                                                                                                                                                                                                                              0   0   0   0   0   0
        (CM)                                                                                                                                                                                                                                                                                                        0   0   0   0   0   0
  2.1   Respond to maintenance trouble               Y            P,T,                D              E             C             A                M                O                M            OTHER                                                                                                              0   1   1   0   0   2
         calls                                                    D,F                                                                                                                                                                                                                                               0   0   0   0   0   0
  2.2   Run diagnostics including (LAN)              Y            D,P              D,S,             S*             C             A                 H               M            M/A              PRIMARY *Easy task for DSR                                                                                         0   1   1   1   1   4
        and execute troubleshooting                                                 T                                                                                                                                                                                                                               0   0   0   0   0   0
        procedures                                                                                                                                                                                                                                                                                                  0   0   0   0   0   0
  2.3   Switch to alternate/backup system            Y           D,P,                 D             S*             C             A                 H               M            M/A              PRIMARY *Easy task for DSR                                                                                         0   1   1   1   1   4
                                                                  T,F                                                                                                                                                                                                                                               0   0   0   0   0   0
  2.4      Shut-down/recover/start-up                Y           D,P,T              D,S              S             C             A                 H               M            M/A              PRIMARY                                                                                                            0   1   1   1   1   4
           system
  2.5      Remove/replace failed/faulty LRU          Y             N/A              E,D             S              C             A                 H               M            M/A              PRIMARY                                                                                                            0   1   1   1   1   4
  2.6      Execute system configuration/             Y             D,P              D,S             D*             C             A                 H               M            M/A              PRIMARY *Easy task for DSR                                                                                         0   1   1   1   1   4
           re-configuration procedures                                                                                                                                                                                                                                                                              0   0   0   0   0   0
  2.7      Perform system restorations               Y            D,P,              D,S             D*             C             A                 H               M            M/A              PRIMARY *Easy task for DSR                                                                                         0   1   1   1   1   4
                                                                  T,F                                                                                                                                                                                                                                               0   0   0   0   0   0
  2.8      Report completion of maintenance          Y            D,P,              D,S              E             N             A                 L               O                M            OTHER                                                                                                              0   0   1   0   0   1
           actions                                                T,F,                                                                                                                                                                                                                                              0   0   0   0   0   0
                                                                   M                                                                                                                                                                                                                                                0   0   0   0   0   0
  2.9      Coordinate actions with AT/others         Y            T,F               N/A             S              C             A                M                O                M            OTHER                                                                                                              0   1   1   0   0   2
  2.1      Maintain spares/repair parts              Y            D,P               D,S             S*             N             A                L                O                M            OTHER                 S1R performed by                                                                             0   0   1   0   0   1
           inventory for LRU                                                                                                                                                                                           contractors.
  2.11     Control shipment of failed items to       Y            T,F,                D              S            M              A                M                O                M            OTHER                 S1R performed by                                                                             0   0   1   0   0   1
           depot repair sites                                     D,P                                                                                                                                                  contractors.
                                                                                                                                                                                                                                                                                                                    0   0   0   0   0   0
  2.12     Perform check-out and testing of          Y            D,P,              D,S             S*             C             A                M                M            M/A PRINCIPAL *Difficult task for ODL.                                                                                              0   1   1   0   1   3
           replacement items                                      T,F,                                                                                                                        *Easy task for DSR                                                                                                    0   0   0   0   0   0




                                                                                                                                                                                                                                                                         AF(ATSS)-ZOA                                                       Page 29
                                                                                                                                                                                                                                               Airways Facilities Transportation System Specialist (ATSS) JT/A




POSITION              BASELINE
                  Activity/Sub-activity                                                             Assessment Factors




                                                                                                                                                                                              Primary; Principal;
                                                                                                                                                                                              Priority Category:
                                                                                                                                                            Task Manpower
                                                                                                                                          Mental/Physical




                                                                                                                                                                            Task Allocation
                                                                                                                          D,W,M,A,S,Q,Y
                                                                               Support Tools
                                                              D,P,T,I,IC,F,M
                                              Task Validity




                                                                                                                          Frequency
                                                                                                            Criticality




                                                                                                                                          Demands
                                                                                               Difficulty
                                                                               D,E,S,T




                                                                                                            N,M,C
                                                              Media




                                                                                                                                          H,M,L




                                                                                                                                                                                              Other
                                                                                               E,S,D
  AF




                                                                                                                                                            O,M

                                                                                                                                                                            M,A
                                              Y,N
 ATSS                                                                                                                                                                                                                   Comments/Remarks
AFS 3.0 Perform System Hardware                                                                                                                                                                                                                                                                                  0   0   0   0   0   0
        Modifications                                                                                                                                                                                                                                                                                            0   0   0   0   0   0
  3.1   Power-off and shut-down system            Y            D,P, D,S                          S*             C             A                 H               M            M/A              PRIMARY *Easy task for DSR                                                                                         0   1   1   1   1   4
        (as required)                                          T,F                                                                                                                                                                                                                                               0   0   0   0   0   0
  3.2   Receive modification requests             Y             I,T D,T                          E              N           A                  L              O               M               OTHER                                                                                                              0   0   1   0   0   1
  3.3   Install system hardware                   Y            D,P T,D,E                         S*             C          A***                M              M**            M/A           *Difficult task for ODL.
                                                                                                                                                                                              OTHER                                                                                                              0   1   0   0   0   1
        modifications                                                                                                                                                                      ** Requires more than 1
                                                                                                                                                                                           person
                                                                                                                                                                                           *** Daily task for DSR
                                                                                                                                                                                           Requires special software                                                                                             0   0   0   0   0   0
  3.4   Perform functional check-out and          Y           D,P,T D,S,T                        S*             C             A                M                M            M/A PRINCIPAL *Difficult task for ODL.                                                                                              0   1   1   0   1   3
        testing of system modifications                                                                                                                                                    *Easy task for DSR                                                                                                    0   0   0   0   0   0
  3.5   Report completion of system               Y            D,F,                D             S*             N             A                 L               O             M   OTHER *Easy task for DSR                                                                                                       0   0   1   0   0   1
        modifications                                          T,P                                                                                                                                                                                                                                               0   0   0   0   0   0
AFS 4.0 Perform Certification (If Required)                                                                                                                                                                                                                                                                      0   0   0   0   0   0
  4.1   Execute unit certification                Y             D,P              S,D             S*             C         M,Q,                M**               M            M/A PRINCIPAL *Difficult task for DSR.                                                                                              0   1   1   0   1   3
        procedures (preventive and                                                                                         A                                                               **Daily task for DSR                                                                                                  0   0   1   0   0   1
        corrective maintenance)                                                                                                                                                            Requires special software                                                                                             0   0   0   0   0   0
  4.2   Execute system certification              Y             D,P                D              S             C         M,Q,                 M                M            M/A PRINCIPAL Task performed quarterly                                                                                              0   1   1   0   1   3
        procedures (preventive and                                                                                         A                                                               For ODL, is cerification, but                                                                                         0   0   0   0   0   0
        corrective maintenance)                                                                                                                                                            for ODAPS, is verification
  4.3   Verify certification procedures/          Y             D,P                D             S*             C          Q,A                 M                M            M/A PRINCIPAL *Easy task for DSR                                                                                                    0   1   1   0   1   3
        parameters (preventive and                                                                                                                                                                                                                                                                               0   0   0   0   0   0
        corrective maintenance)
  4.4   Identify/correct certification            Y             D,P                D             S*             C             A                M                O                M            OTHER                 *Difficult task for ODL.                                                                     0   1   1   0   0   2
        errors (preventive and corrective
        maintenance)
  4.5   Report completion of certification        Y           T,F,D                D             S*             N             A                 L               O                M            OTHER                 *Easy task for DSR                                                                           0   0   1   0   0   1
        processes (preventive and                                                                                                                                                                                                                                                                                0   0   0   0   0   0
        corrective maintenanace)
  4.6   Re-certify hardware/software/             Y             D,P                D             S*             C          Q,A                 M             O/M             M/A              OTHER                 Difficult task for ODL.                                                                      0   1   1   0   0   2
        firmware components                                                                                                                                                                                                                                                                                      0   0   0   0   0   0
        (as required) (corrective                                                                                                                                                                                                                                                                                0   0   0   0   0   0
        maintenance only)
  4.7   Collect certification data and            Y             D,P                D              S             C             D                M                O                M            OTHER
        and analyze data (preventive                             F
        and corrective maintenance)




                                                                                                                                                                                                                                                                      AF(ATSS)-ZOA                                                       Page 30
                                                                                                                                                                                                                                    Airways Facilities Transportation System Specialist (ATSS) JT/A




POSITION             BASELINE
                 Activity/Sub-activity                                                           Assessment Factors




                                                                                                                                                                                           Primary; Principal;
                                                                                                                                                                                           Priority Category:
                                                                                                                                                         Task Manpower
                                                                                                                                       Mental/Physical




                                                                                                                                                                         Task Allocation
                                                                                                                       D,W,M,A,S,Q,Y
                                                                            Support Tools
                                                           D,P,T,I,IC,F,M
                                           Task Validity




                                                                                                                       Frequency
                                                                                                         Criticality




                                                                                                                                       Demands
                                                                                            Difficulty
                                                                            D,E,S,T




                                                                                                         N,M,C
                                                           Media




                                                                                                                                       H,M,L




                                                                                                                                                                                           Other
                                                                                            E,S,D
  AF




                                                                                                                                                         O,M

                                                                                                                                                                         M,A
                                           Y,N
 ATSS                                                                                                                                                                                                            Comments/Remarks
AFS 5.0 Documentation of Procedures                                                                                                                                                                                                                                                                   0   0   0   0   0   0
  5.1   Document (i.e., log & MMS)             Y            D,P,                D              E             N             A                 L               O                M            OTHER                                                                                                      0   0   1   0   0   1
        periodic maintenance actions                                                                                                                                                                                                                                                                  0   0   0   0   0   0
  5.2   Document (i.e., log & MMS)             Y             D,P                D              E             N             A                 L               O                M            OTHER                                                                                                      0   0   1   0   0   1
        corrective maintenance actions                                                                                                                                                                                                                                                                0   0   0   0   0   0
  5.3   Document system modifications          Y             D,P                D              E             N             A                 L               O                M            OTHER                                                                                                      0   0   1   0   0   1
  5.4   Maintain on-site publications          Y             D,P                D              E             N             A                 L               O                M            OTHER                                                                                                      0   0   1   0   0   1
        (e.g., handbooks, tech. manuals,                                                                                                                                                                                                                                                              0   0   0   0   0   0
        FRDF, and red-lined prints)                                                                                                                                                                                                                                                                   0   0   0   0   0   0
  5.5   Manage spares documentation/           Y             D,P                D              E             N             A                 L               O                M            OTHER                                                                                                      0   0   1   0   0   1
        process logistical data and                                                                                                                                                                                                                                                                   0   0   0   0   0   0
        reports (e.g.,Maintenance                                                                                                                                                                                                                                                                     0   0   0   0   0   0
        Analysis Workload Report)                                                                                                                                                                                                                                                                     0   0   0   0   0   0
  5.6   Document (I.e., log & MMS)             Y             D,P                D              E             N             A                 L               O            M/A              OTHER                                                                                                      0   0   1   0   0   1
        certification processes/actions




                                                                                                                                                                                                                                                           AF(ATSS)-ZOA                                                       Page 31
                AF
               ATSS
                                         BASELINE         POSITION
                                     Activity/Sub-activity




               Task Validity
               Y,N
               Media
               D,P,T,I,IC,F,M
               Support Tools
               D,E,S,T
               Difficulty
               E,S,D
               Criticality
               N,M,C
               Frequency
               D,W,M,A,S,Q,Y
               Mental/Physical
               Demands
                                     Assessment Factors




               H,M,L
               Task Manpower
               O,M
               Task Allocation
               M,A

               Priority Category:
               Primary; Principal;
               Other
               Comments/Remarks




AF(ATSS)-ZOA
                                                                     Airways Facilities Transportation System Specialist (ATSS) JT/A




Page 32
                AF
               ATSS
                                         BASELINE         POSITION
                                     Activity/Sub-activity




               Task Validity
               Y,N
               Media
               D,P,T,I,IC,F,M
               Support Tools
               D,E,S,T
               Difficulty
               E,S,D
               Criticality
               N,M,C
               Frequency
               D,W,M,A,S,Q,Y
               Mental/Physical
               Demands
                                     Assessment Factors




               H,M,L
               Task Manpower
               O,M
               Task Allocation
               M,A

               Priority Category:
               Primary; Principal;
               Other
               Comments/Remarks




AF(ATSS)-ZOA
                                                                     Airways Facilities Transportation System Specialist (ATSS) JT/A




Page 33
                AF
               ATSS
                                         BASELINE         POSITION
                                     Activity/Sub-activity




               Task Validity
               Y,N
               Media
               D,P,T,I,IC,F,M
               Support Tools
               D,E,S,T
               Difficulty
               E,S,D
               Criticality
               N,M,C
               Frequency
               D,W,M,A,S,Q,Y
               Mental/Physical
               Demands
                                     Assessment Factors




               H,M,L
               Task Manpower
               O,M
               Task Allocation
               M,A

               Priority Category:
               Primary; Principal;
               Other
               Comments/Remarks




AF(ATSS)-ZOA
                                                                     Airways Facilities Transportation System Specialist (ATSS) JT/A




Page 34
                AF
               ATSS
                                         BASELINE         POSITION
                                     Activity/Sub-activity




               Task Validity
               Y,N
               Media
               D,P,T,I,IC,F,M
               Support Tools
               D,E,S,T
               Difficulty
               E,S,D
               Criticality
               N,M,C
               Frequency
               D,W,M,A,S,Q,Y
               Mental/Physical
               Demands
                                     Assessment Factors




               H,M,L
               Task Manpower
               O,M
               Task Allocation
               M,A

               Priority Category:
               Primary; Principal;
               Other
               Comments/Remarks




AF(ATSS)-ZOA
                                                                     Airways Facilities Transportation System Specialist (ATSS) JT/A




Page 35

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:4/24/2012
language:
pages:35