Docstoc

M AZeem

Document Sample
M AZeem Powered By Docstoc
					To
                 The Assistant Executive Engineer, (AEN’s)
                 Pakistan Railways Hyderabad.


         Subject: Reply of CHARGE SHEET.

Respected Sir,

  I response of your honors memo bearing No: 22-E/HDR dated: 22/12/2011, I have to
                                  submit my reply as under:
     That I am serving under your honors kind control since longs and according to terms
     and conditions of my job’s I am bound and I have been acted upon for such terms and
     conditions since my appointment.
     Sir during your motor Trolly inspection conduct by you on 21/12/2011 your absorbs
     that failed to complete the works of Oiling, Graph-ting and Loose of T-Bolts not
     tightened at DN line at KM NO 184/2-3, it is request inform you that the KM NO is
     not in my beat area as mention above.
     My beat is KM NO 186/5 to 192/5, is look after I and works is complete over our beat
     area punctual and Oiling, Graph-ting and T-Bolts are tightened properly and checked
     daily.
     I shall be very thankful to you to please take crucial action on wrongly issues
     CHARGE SHEET KM-No. As mention above to me.
     Please take humanitarian action and consider.
                                                      Thanks




Pakistan Railway’s

Name: Mohammad Azeem.
Father’s Name: Dodo.
Designation: KeyMan Gang NO.47.
Posting Station: PWI-HDR.
Through: PWI-HDR

				
DOCUMENT INFO
Shared By:
Tags:
Stats:
views:40
posted:4/19/2012
language:English
pages:1