engineers

Reviews
FEE PROPOSAL - ENGINEERS (Based on Man-Hours) By Date PROJECT: A. FEE 1. CONSULTANT'S FEE Schematic plans Preliminary plans, specifications & estimate Final plans, specifications & estimate Service during bidding Service during construction TOTAL DESIGN FEE 2. ADDITIONAL SERVICES Civil Engineering Electrical Engineering Environmental Engineering Mechanical Engineering Structural Engineering Cost for Estimator (FEE) (FEE) (FEE) (FEE) (FEE) (FEE) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL ADDITIONAL SERVICES FEE TOTAL FEE ( 1 + 2 ) B. SUMMARY OF WORK AND COSTS 1. Work Branch In-House Architectural Civil Electrical Environmental Mechanical Structural Others TOTALS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Sheets * 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Engineer VIII (15% ) ( 20% ) ( 50% ) ( 5% ) ( 10% ) ( 100% ) 0.00 0.00 0.00 0.00 0.00 $0.00 Site Observations (man-hours x hourly rate x 3.0) Others $0.00 $0.00 MAN- HOURS Engineer Engineer VII VI ** 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ** 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ** 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * Based on 36" x 24" size sheets ** Fill in for personnel position -22. Costs a. Personnel Costs Personnel Engineer VIII (Registered) Engineer VII (Registered) Engineer VI (Registered) Engineer V (Registered) Engineer IV (Registered) Engineer III Engineer II Engineer I Drafting Tech/CAD Operator VI Drafting Tech/CAD Operator V Drafting Tech/CAD Operator IV Drafting Tech/CAD Operator III Drafting Tech/CAD Operator II Drafting Tech/CAD Operator I Man-Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Hourly Rate *** 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL Factor(x) Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.0 TOTAL PERSONNEL COST C. SCHEDULE Proposed A/E Complete Schedule Schematic Preliminary Pre-Final Final TOTAL $ $0.00 Total CCD **** 0 0 0 0 0 *** For maximum allowable see Compensation and Payment Schedule 3.4 **** Consecutive calendar days (not to include University's or other agencies' review time). SUBMITTED BY: Signature Date Title Firm

Related docs
it engineers (suzhou)
Views: 3  |  Downloads: 0
Engineers
Views: 0  |  Downloads: 0
Brandon of the Engineers
Views: 10  |  Downloads: 0
bbfm engineers
Views: 17  |  Downloads: 0
Engineers Exam
Views: 15  |  Downloads: 2
Engineers
Views: 47  |  Downloads: 4
RESUME - Sugar Engineers
Views: 61  |  Downloads: 3
Records of a Family of Engineers
Views: 10  |  Downloads: 0
Bridge Engineers online
Views: 72  |  Downloads: 3
PROFESSIONAL ENGINEERS
Views: 0  |  Downloads: 0
Engineers Guide
Views: 2  |  Downloads: 0
european council of civil engineers
Views: 0  |  Downloads: 0
european council of civil engineers
Views: 5  |  Downloads: 0
premium docs
Other docs by Abby McCary