FEE PROPOSAL - ENGINEERS
(Based on Man-Hours)
By
Date
PROJECT:
A. FEE
1. CONSULTANT'S FEE
Schematic plans (15% ) 0.00
Preliminary plans, specifications & estimate ( 20% ) 0.00
Final plans, specifications & estimate ( 50% ) 0.00
Service during bidding ( 5% ) 0.00
Service during construction ( 10% ) 0.00
TOTAL DESIGN FEE ( 100% ) $0.00
2. ADDITIONAL SERVICES
Civil Engineering (FEE) 0.00
Electrical Engineering (FEE) 0.00
Environmental Engineering (FEE) 0.00
Mechanical Engineering (FEE) 0.00
Structural Engineering (FEE) 0.00
Cost for Estimator (FEE) 0.00
Site Observations (man-hours x hourly rate x 3.0) 0.00
Others 0.00
TOTAL ADDITIONAL SERVICES FEE $0.00
TOTAL FEE ( 1 + 2 ) $0.00
B. SUMMARY OF WORK AND COSTS
1. Work
MAN- HOURS
Branch Total Engineer Engineer Engineer
In-House Sheets * VIII VII VI ** ** **
Architectural 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Civil 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Electrical 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Environmental 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mechanical 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Structural 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTALS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
* Based on 36" x 24" size sheets
** Fill in for personnel position
-2-
2. Costs
a. Personnel Costs
Personnel Man-Hours Hourly Rate *** Cost
Engineer VIII (Registered) 0.00 $ 0.00 $ 0.00
Engineer VII (Registered) 0.00 $ 0.00 $ 0.00
Engineer VI (Registered) 0.00 $ 0.00 $ 0.00
Engineer V (Registered) 0.00 $ 0.00 $ 0.00
Engineer IV (Registered) 0.00 $ 0.00 $ 0.00
Engineer III 0.00 $ 0.00 $ 0.00
Engineer II 0.00 $ 0.00 $ 0.00
Engineer I 0.00 $ 0.00 $ 0.00
Drafting Tech/CAD Operator VI 0.00 $ 0.00 $ 0.00
Drafting Tech/CAD Operator V 0.00 $ 0.00 $ 0.00
Drafting Tech/CAD Operator IV 0.00 $ 0.00 $ 0.00
Drafting Tech/CAD Operator III 0.00 $ 0.00 $ 0.00
Drafting Tech/CAD Operator II 0.00 $ 0.00 $ 0.00
Drafting Tech/CAD Operator I 0.00 $ 0.00 $ 0.00
0.00 $ 0.00 $ 0.00
TOTAL $ 0.00
Factor(x) 3.0
TOTAL PERSONNEL COST $ $0.00
C. SCHEDULE
Proposed A/E Complete Schedule Total CCD ****
Schematic 0
Preliminary 0
Pre-Final 0
Final 0
TOTAL 0
*** For maximum allowable see Compensation and Payment Schedule 3.4
**** Consecutive calendar days (not to include University's or other agencies' review time).
SUBMITTED BY:
Signature Date
Title
Firm