LEED PRACTICE EXAMS v2.2 by xusuqin

VIEWS: 19 PAGES: 1022

									                                           LEED Practice Exams

Instructions:
1. Take each test individually. Take note of the time you start to try to stay within the 2hour
    timeframe given for the real test.
2. Place an X in the box(es) that correspond to the answers you think are correct.
3. The red box next to the answers will go away once you've selected the correct number of answers.
4. Press Page Down after each question.
5. Your overall test score is shown on each test and is completed when you have answered 80 questions.
6. Click back on this sheet to see how well you did in the 4 LEED Test Categories.
7. After completing each test, Select and Unhide Columns between Columns E and I.
8. Study the questions you marked incorrectly and refer to the reference manual as shown.
9. Take test A, B, C, D no more than once a day until you are receiving consistent percentages
    above 85% for each category.
10. After finishing each test, and studying the questions you got wrong. Close the test without saving.
11. Consider keeping a log of your scores for each test and pool and tracking your improvement and
     areas of study to target.


Pool A                                           0
Understanding LEED Credit Intents             0.0% Please check test again as there
Coordinate Project & Team                     0.0% are some questions, marked with
Implement LEED Process                        0.0% red, that have not been answered
Verify, Participate, & Perform Technical      0.0%              correctly.


Pool B                                           0
Understanding LEED Credit Intents             0.0% Please check test again as there
Coordinate Project & Team                     0.0% are some questions, marked with
Implement LEED Process                        0.0% red, that have not been answered
Verify, Participate, & Perform Technical      0.0%              correctly.


Pool C                                           0
Understanding LEED Credit Intents             0.0% Please check test again as there
Coordinate Project & Team                     0.0% are some questions, marked with
Implement LEED Process                        0.0% red, that have not been answered
Verify, Participate, & Perform Technical      0.0%              correctly.


Pool C                                           0
Understanding LEED Credit Intents             0.0% Please check test again as there
Coordinate Project & Team                     0.0% are some questions, marked with
Implement LEED Process                        0.0% red, that have not been answered
Verify, Participate, & Perform Technical      0.0%              correctly.
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions



         How close does a building's entrance need to be from a rail or bus line to
  1
         qualify for SS Credit 4.1, Public Transportation Access?


         A.
2




              1/2 mile walking distance from two or more separate bus lines
         B.
              1/4 mile walking distance from two or more separate bus lines
         C.
              1/4 mile walking distance from one bus line
CHOOSE




         D.
              1/2 mile walking distance from two or more separate rail lines
         E.
              1/2 mile walking distance from one rail line




                                                                                                     Page 2   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool A Questions



  2 Which of the following standards sets VOC limits for aerosol adhesives?


         A.
1




              CIBSE AM10
         B.
              ASHRAE Standard 62.1-2004
         C.
              GS-36
CHOOSE




         D.
              SCAQMD




                                                                                             Page 3   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool A Questions



         What is the most effective method to minimize stormwater runoff volume
  3
         and treatment according to SS Credit 6.2 Stormwater Design?


         A.
1




              Install pervious paving
         B.
              Install an underground cistern
         C.
              Reduce the amount of impervious area
CHOOSE




         D.
              Plant a pattern of turf grass and naturally filtering native plants




                                                                                                   Page 4   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                         Place "X"(s)
         LEED Practice - Pool A Questions


    A project on a Greenfield site and would like to qualify for SS Credit 5.1
  4 Protect or Restore Habitat. What strategies to limit site disturbance are not
    acceptable for this credit?

         A.
2




              Utilize tuck-under parking
         B.
              Clearly mark construction boundaries
         C.
              Share facilities
CHOOSE




         D.
              Use pervious paving
              While grading entire site, ensure biofertilizers are used to condition
         E.
              soil for vegetation
              Locate the building on the site in an area that will minimize disruption
         F.
              to ecosystems




                                                                                                        Page 5   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool A Questions



    A fuel-efficient vehicle must meet which requirement to qualify for SS
  5 Credit 4.3, Alternative Transportation: Low-Emission & Fuel-Efficient
    Vehicles?

         A.
1




              Green score of 40 or more
         B.
              Green Label score of 30 or more
         C.
              Green Label score of 40 or more
CHOOSE




         D.
              Green Seal score of 30 or more
         E.
              Green-e score of 25 or more




                                                                                            Page 6   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                          Place "X"(s)
         LEED Practice - Pool A Questions




  6 EA Prerequisite 2 - Minimum Energy Performance uses which standard?



         A.
1




              ASHRAE 90.1
         B.
              EPA Act of 1992
         C.
              ANSI/ASTM - E779-03
CHOOSE




         D.
              ASHRAE 62.1
         E.
              Standards for Fundamental Conditioning




                                                                                         Page 7   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool A Questions



         What is the most common failure in daylighting strategies, as part of EQ
  7
         Credit 8.1 Daylight & Views?

         A.
1




              Glare control
         B.
              Low luminance ratio
         C.
              Fritted glazing
CHOOSE




         D.
              Poorly lighted surfaces




                                                                                                   Page 8   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool A Questions



         Do you need to have a LEED AP on the project team to register the
  8
         project on LEED-Online?

         A.
1




              Yes, but the LEED AP can be from the company or subcontractor
         B.
              Yes, but the LEED AP must be part of the team
         C.
              No, but the LEED AP would gain one point for the project
CHOOSE




         D.
              No, but the LEED AP would save you on registration fee




                                                                                             Page 9   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                            Place "X"(s)
         LEED Practice - Pool A Questions


    Fundamental and enhanced commissioning differ in several ways. Select
  9 the additional tasks that the commissioning authority will perform to
    achieve enhanced commissioning.

         A.
2




              Document Owners Project Requirements
         B.
              Verify installation and performance of systems
         C.
            Complete summary commissioning report
CHOOSE




            Review building operation within 10 months after substantial
         D.
            completion
         E.
              Conduct design review prior to mid-construction documents
         F.
              Develop Basis of Design




                                                                                           Page 10   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool A Questions



    A project in a 3 story multi-use building will have operable windows. To
    achieve EQ Credit 6.2 Controllability of Systems, the design does NOT
 10
    require comfort controls for occupants of areas that are ____ feet inside
    and ___ feet to either side of the operable part of the window.

         A.
1




              10, 20
         B.
              20, 20
         C.
              20, 10
CHOOSE




         D.
              10, 10
         E.




                                                                                               Page 11   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool A Questions



    When considering EQ Credit 6.2, Controllability of Systems, designers
 11 should evaluate the closely tied interactions between thermal comfort and
    acceptable indoor air quality, as required by which standards?

         A.
2




              Green Seal Plus, GS-11
         B.
              Green Seal, GC-03
         C.
              PEM
CHOOSE




         D.
              ASHRAE 55-2004
         E.
              SCAQMD Rule 1113
         F.
              ASHRAE 62.1-2004




                                                                                               Page 12   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool A Questions



         A project will renovate an old historic building for new office space. The
         surface area of the existing building structure and envelope is 100,000 sq.
 12
         ft. How much of the existing building structure and envelope would need
         to be resued to achieve MR Credit 1.2 Building Reuse?


         A.
1




              85,000 sq. ft.
         B.
              75,000 sq. ft.
         C.
              95,000 sq. ft.
CHOOSE




         D.
              65,000 sq. ft.
         E.
              50,000 sq. ft.
         F.
              100,000 sq. ft.




                                                                                                      Page 13   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool A Questions



              A company is planning a new 20-story condominium. Which of the
 13
              following should be done for Environmental Tobacco Smoke
              Control?
         A.
2




              Weather strip doors leading to common hallways
         B.
              Locate designated smoking areas 15 feet away from entries
         C.
              Seal penetrations in walls between units
CHOOSE




         D.
              Locate designated smoking areas 20 feet away from entries




                                                                                              Page 14   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions


    Air quality testing of the given contaminants is conducted as part of which
    of the following?
     - Formaldehyde
 14 - Particulates (PM10)
     - Total Volatile Organic Compounds (TVOC)
     - Carbon Monoxide (CO)


         A.
1




              EQ Credit 4.2, Low-Emitting Materials - Paints & Coatings
              EQ Credit 3.1, Construction IAQ Management Plan - During
         B.
              Construction
         C.
              EQ Credit 1, Outdoor Air Delivery Monitoring
CHOOSE




              EQ Credit 3.2, Construction IAQ Management Plan - Before
         D.
              Occupancy
         E.
              EQ Credit 2, Increased Ventilation




                                                                                                 Page 15   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                     Place "X"(s)
         LEED Practice - Pool A Questions



 15 The ASHRAE Standard 55-2004 applies to which of the following?


         A.
2




              EQ Credit 6.2 Controllability of Systems
         B.
              EQ Credit 8.1 Daylight & Views
         C.
              SS Credit 8 Light Pollution Reduction
CHOOSE




         D.
              EA Prerequisite 2 Minimum Energy Performance
         E.
              EQ Credit 7.2 Thermal Comfort
         F.
              EA Credit 1 Optimize Energy Performance




                                                                                    Page 16   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool A Questions



         Energy Conservation Measure Isolation for EA Credit 5, Measurement
 16
         and Verification is most suitable for what type of building?


         A.
1




              Residential complexes
         B.
              Larger / more complex buildings
         C.
              Smaller / less complex buildings
CHOOSE




         D.
              Multiple building campuses




                                                                                             Page 17   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool A Questions


         What are two responsibilities of the contractor during the project
 17
         construction phase that support the LEED documentation process?

         A.
2




              Provide site photometric plans
         B.
              Provide energy modeling calculations
         C.
              Provide calculations for waste diverted from landfill
CHOOSE




         D.
              Provide Material Safety Data Sheets (MSDS) with paint submittals




                                                                                                Page 18   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool A Questions




 18 What are the requirements of SS Credit 8 Light Pollution Reduction?


              Interior lighting including emergency lights shall be automatically
         A.
1




              turned off during non-business hours
              Do not exceed 50% of the lighting power densities for exterior areas
         B.   and building facades as defined by ASHRAE/IESNA Standard 90.1-
              2004
         C.
            All projects must conform to IESNA RP-33
CHOOSE




            LZ1 zones must have designed fixture lumens emitted at an angle of
         D.
            45 degrees or higher
            Do not exceed 80% of the lighting power densities for exterior areas
         E. and building facades as defined by ASHRAE/IESNA Standard 90.1-
            2004




                                                                                                    Page 19   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool A Questions




 19 Which of the following are pre-consumer recycled items?



         A.
2




              Grass clippings
         B.
              Cotton insulation manufactured from denim jean scraps
         C.
              Cabinets made from newspaper print overruns
CHOOSE




         D.
            Carpets made from nylon that include scraps from production
            Steel beams created from metal reclaimed from the manufacturing
         E.
            line
         F.
              Demolition debris used on another project




                                                                                             Page 20   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                     Place "X"(s)
         LEED Practice - Pool A Questions



20 ASHRAE 90.1-2004 does not apply to which of the following?


         A.
1




              Interior doors
         B.
              Parking garage lights
         C.
              Skylight ratings
CHOOSE




         D.
              Ice melting systems
         E.
              Heated swimming pools
         F.
              Parking garage ventilation




                                                                                    Page 21   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions



         For a site to be considered a Brownfield site, what type of information
 21
         does the project team need?


         A.
1




              Declaration from the EPA office or from state agency
         B.
              City Government Certification
         C.
              Declaration from the previous owner
CHOOSE




         D.
              EPA declaration only




                                                                                                  Page 22   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions



22 To obtain a LEED Certification, the project team needs to successfully:

         A.
3




              Gather documentation for all 26 credits of the 69 points available
         B.
              Gather documentation for all the credits intents
         C.
              Gather documentation for all the prerequisites
CHOOSE




         D.
              Register with the USGBC
         E.
              Record all vendors used on the project
         F.
              Hire a USGBC approved consultant




                                                                                                  Page 23   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool A Questions


         What are the main requirements to determine which lighting is used in
23
         which situations for SS Credit 8 Light Pollution Reduction?

         A.
3




              Building facade power density
         B.
              Overhead parking lighting
         C.
              Computer monitor light radiation
CHOOSE




         D.
              Basement parking lighting
         E.
              Interior office lights




                                                                                                Page 24   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions




         Which organization defines the materials that are acceptable as part of MR
24
         Credit 4, Recycled Content?



         A.
1




              ISO
         B.
              Green label
         C.
CHOOSE




              ASHRAE
         D.
              EPA
         E. USGBC




                                                                                                     Page 25   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool A Questions



   A major renovation is happening on a historic warehouse. The team does
25 not want to replace the entire HVAC&R system. What must occur to
   achieve EA Prerequisite 3, Fundamental Refrigerant Management?

         A.
1




              Replace all CFC-based refrigerants
              Buy ozone credits for the total load of CFCs released in the system
         B.
              due to leakage
         C.
              Get a state exemption for the HVAC&R system
CHOOSE




         D.
              Replace the HVAC&R system
         E.
              Make a phase out plan for CFC-refrigerants




                                                                                                   Page 26   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions


   A project with a 30,000 sq. ft. building footprint has been designed with a
   100% green roof. 25% of the building's electricity comes from renewable
26 energy certificates. The project team is revising the design to decrease the
   size of the green roof and add 5,000 sq. ft. of photovoltaic cells to the
   roof. What will this design change effect?

         A.
3




              SS Credit 7.2 Heat Island Effect: Roof
         B.
              EA Prerequisite 1 Fundamental Commissioning of the Building
         C.
              SS Credit 6.1 Stormwater Design: Quantity Control
CHOOSE




         D.
              EA Credit 6 Green Power
         E.
              EA Prerequisite 2 Minimum Energy Performance
         F.
              EA Credit 2 On-Site Renewable Energy




                                                                                                 Page 27   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                     Place "X"(s)
         LEED Practice - Pool A Questions




27 What standard must water be treated to qualify for WE Credit 2?


         A.
1




              Remove 85% solid particles
         B.
              State water cleanliness standards
         C.
              Tertiary standards
CHOOSE




         D.
              Local ordinance
         E.
              EPA Water Cleanliness Standards




                                                                                    Page 28   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions


   Which of the following are common mistakes teams make when using the
28 calculating energy savings using the Performance Rating Method for EA
   Credit 1, Optimize Energy Performance?

         A.
4




            Not accounting for task lighting
            Teams use the Performance Rating Method instead of the Energy
         B.
            Cost Budget Method
            Using Fenestration Assembly U-factor instead of Center-of-Glass
         C.
            Performance
CHOOSE




         D.
              Calculating non-tradable surfaces as tradable surfaces
         E.
              Using Energy Consumption instead of Energy Cost
              Not supplying enough information for energy measures incorporating
         F.
              the Exceptional Calculation methodology




                                                                                                  Page 29   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                            Place "X"(s)
         LEED Practice - Pool A Questions



   A condominium project has 100 residential dwellings with an estimated
   200 FTE occupants. The project team is trying to achieve SS Credit 4.2
29
   Alternative Transportation: Bicycle Storage & Changing Rooms. How
   many secure bicycle storage spaces will be required?

         A.
1




              10
         B.
              40
         C.
              30
CHOOSE




         D.
              5
         E.
              20




                                                                                           Page 30   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool A Questions



30 What are important facts to remember when submitting a CIR?


         A.
2




              Submit in the form of a letter narrative
         B.
              Carefully review credit and reference guide before submitting
         C.
              Include your name and project details
CHOOSE




         D.
              Do not include confidential project information




                                                                                             Page 31   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool A Questions



         All carpet cushions must meet which standard to achieve EQ Credit 4.3
 31
         Low-Emitting Materials: Carpet Systems?


         A.
1




              Carpet and Rug Institute VOC Standard
         B.
              Green Label
         C.
              Green Score
CHOOSE




         D.
              ASHRAE 90.1-2004
         E.
              Green-e
         F.
              Green Seal, GC-03




                                                                                                Page 32   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                     Place "X"(s)
         LEED Practice - Pool A Questions




32 Which of the following are types of LEED Rating Systems?


         A.
3




              Neighborhood development
         B.
              Homes
         C.
              Landscaping
CHOOSE




         D.
              College campuses
         E.
              Core and shell




                                                                                    Page 33   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions



         A new manufacturing building will have employees that work on one of
         three non-overlapping shifts. No local zoning exists for parking. How
33
         would you calculate parking requirements for SS Credit 4.4 Alternative
         Transportation: Parking Capacity?


         A.
1




              Use total number of employees
         B.
              Use FTE of one of the shifts, but use same FTE number consistently
         C.
              Use 1/3 of the total number of employees
CHOOSE




         D.
              Use FTE of largest shift




                                                                                                  Page 34   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions


         As part of an urban redevelopment effort, the city is renovating a 30,000
         sq. ft. timber frame warehouse into a multi-use project with an additional
         50,000 sq. ft. of new construction.

         This 80,000 sq. ft. project reuses the warehouse, replaces single pane
         glazing with energy efficient windows manufactured in a neighboring city,
34
         and installs reclaimed wood floors donated from a local company. The site
         has a zero-lot-line.

         Based upon the given information, which credits may be applicable to this
         project's LEED certification application?


         A.
3




              MR Credit 4.1 Recycled Content
         B.
              MR Credit 1.1 Building Reuse
         C.
              MR Credit 3 Materials Reuse
CHOOSE




         D.
              SS Credit 5.1 Site Development: Protect or Restore Habitat
         E.
              MR Credit 5 Regional Materials




                                                                                                     Page 35   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool A Questions




         Which of the following requires project drawings for LEED
35
         documentation purposes?


         A.
2




              SS Credit 4.2 Alternative Transportation
         B.
              SS Credit 6.1 Stormwater Design
              EQ Credit 8.1 Daylight & Views, using the Glazing Factor
         C.
              Calculation Method
CHOOSE




         D.
              SS Prerequisite 1 Construction Activity Pollution Prevention
         E.
              EQ Credit 3.2 Construction IAQ Management Plan




                                                                                            Page 36   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool A Questions




36 What is needed to be eligible for LEED certification?



         A.
2




            Recycle area with storage bins
            For a naturally ventilated small office building, the air quality must
         B.
            comply with ASHRAE 90.1-2004
            ESC plan that conforms to the most stringent of 2003 EPA
         C.
            Construction General Permit or local codes
CHOOSE




         D.
              Prohibit smoking in the building
         E.
              Reduce potable water consumption for irrigation by 50%
         F.
              LEED AP must be on staff for the project




                                                                                                    Page 37   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool A Questions



         Which statements are true regarding achieving EA Credit 5 Measurement
37
         &Verification?


         A.
3




              The standard of reference for this credit is IPMPV Volume 3
         B.
              ECM isolation is an accepted approach
         C.
              The M&V plan must be uploaded with the submittal documentation
CHOOSE




         D.
              The M&V period shall cover no less than 10 months after occupancy
              The person responsible for energy engineering is the best person to
         E.
              design the M&V plan




                                                                                                   Page 38   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool A Questions


   As part of a redevelopment effort, the city is renovating a 20,000 sq. ft.
   warehouse into office space and will implement a recycling program for
38 the space. To be compliant with MR Prerequisite 1, Storage & Collection
   of Recyclables, what is the minimum calculated size needed for the
   recycling area?

         A.
1




              175 sf.
         B.
              225 sf.
         C.
            125 sf.
CHOOSE




            No minimum size is required to demonstrate compliance with this
         D.
            prerequisite




                                                                                               Page 39   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions




         After reviewing the reference guide, what is the first step a project team
39
         with a question about a LEED credit is likely to take?


         A.
1




              Call their designated LEED Project Manager at USGBC
         B.
              Read the credit intent in the LEED Rating System
         C.
              Submit a credit interpretation request
CHOOSE




         D.
              Consult the credit interpretation database on the LEED web site




                                                                                                     Page 40   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool A Questions




         Which of the following factors are used in the calculation of MR Credit 6
40
         Renewable Resources?



         A.
1




              Area
         B.
              Cost
         C.
              Volume
CHOOSE




         D.
              Weight
         E.
              Regional materials




                                                                                                    Page 41   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool A Questions



         Which of the following salvaged materials contribute to achieving MR
 41
         Credit 3.1, Materials Reuse?


         A.
1




              Elevators
         B.
              Copper pipes
         C.
              Bricks
CHOOSE




         D.
              Wiring




                                                                                               Page 42   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                     Place "X"(s)
         LEED Practice - Pool A Questions




42 Which of the following statements are true about a CIR?



         A.
2




              CIR rulings guarantee credit rewards
         B.
              CIR submission text is limited to 600 words
         C.
              The CIR should be formatted as a letter
CHOOSE




         D.
              The credit name must be stated
         E.
              Your contact information should be included
         F.
              CIRs can be submitted for Prerequisites




                                                                                    Page 43   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions


   On a 20 acre project, local zoning requires 4 acres of open space. How
43 many total acres of open space must the project contain to qualify for SS
   Credit 5.2 Site Development?

         A.
1




              6 acres
         B.
              4 acres
              There is not enough information to answer; you must know the size
         C.
              of the building footprint
CHOOSE




         D.
              5 acres
         E.
              8 acres
         F.
              10 acres




                                                                                                 Page 44   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions


   A 25,000 sq. ft. building project wants to earn 4 points by increasing their
44 level of energy performance. What compliance path must the project
   follow?

         A.
1




              Building Performance Rating Method
         B.
              ASHRAE Advanced Energy Design Guide
         C.
              Advanced Building Benchmark
CHOOSE




         D.
              CBECS




                                                                                                 Page 45   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions



   An office building project will have a total materials cost of $1 million. To
45 qualify for exemplary performance on recycled content, what value of
   recycled materials must be included?


         A.
1




              $250,000
         B.
              $210,000
         C.
              $300,000
CHOOSE




         D.
              $400,000




                                                                                                  Page 46   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                        Place "X"(s)
         LEED Practice - Pool A Questions




         The low-sloped roof of an office building will be approximately 30,000 sq.
46
         ft. What strategy will achieve SS Credit 7.2 Heat Island Effect: Roof?


         A.
3




              12,000 sq. ft. roof surface of SRI 78 plus 7,000 sq. ft. vegetated roof
         B.
              30,000 sq. ft. roof surface of SRI 29
         C.
              15,000 sq. ft. vegetated roof
CHOOSE




         D.
              22,500 sq. ft. roof surface of SRI 78
         E.
              5,000 sq. ft. vegetated roof plus 5,000 sq. ft. high albedo surfaces
         F.
              15,000 sq. ft. roof surface of SRI 29




                                                                                                       Page 47   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool A Questions




47 What is true about the LEED Online Certification Process?


         A.
1




              The process can be done in two, three, or four steps
              Documentation can only be submitted using separate Design and
         B.
              Construction submittals in two steps
         C.
              The LEED-NC fee structure is different than LEED-EB
CHOOSE




         D.
            Building ratings can be given in the Design phase
            The LEED-NC fee structure is the same for LEED-CI and LEED
         E.
            EB




                                                                                             Page 48   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions




         Which of the following statements are true regarding agrifiber products as
48
         they apply to achieving EQ Credit 4.4 Low-Emitting Materials?



         A.
2




              Can be made using old growth trees
         B.
              Must be inside of the building's waterproofing system
         C.
              Requires a Chain of Custody (CoC) document
CHOOSE




         D.
              Requires Green Label certification
         E.
              Can contain no more than 25% urea-formaldehyde resins
         F.
              Must not contain any added urea-formaldehyde resins




                                                                                                     Page 49   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool A Questions



         EA Credit 5, Measurement & Verification, can assist with LEED-EB for
49
         what reason?


         A.
1




              IPMVP will lead to increased energy savings
         B.
              Provide for energy use accountability over time
         C.
              M&V strategies will lower costs for LEED-EB
CHOOSE




         D.
              ECM strategies qualify for LEED-EB credits




                                                                                               Page 50   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool A Questions




         A major renovation project has a $10 million budget. What estimated
50
         value of materials is needed to earn an ID point for regional materials?



         A.
1




              $3 million
         B.
              $3.6 million
         C.
              $4 million
CHOOSE




         D.
              $1.8 million
         E.
              $1 million
         F.
              $2 million




                                                                                                   Page 51   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions



    A project is three points short of receiving a platinum rating. The project
 51 team feels the project earned the three points and want to file an appeal.
    What applies to the appeals process?


         A.
3




              The appeal must be submitted online within 25 business days
         B.
              The appeal will cost $500 / Credit
         C.
              The appeal must include three copies in individual three ring binders
CHOOSE




         D.
              The appeal must be submitted online within 15 business days
         E.
              Original, re-submittal and appeal documentation must be submitted




                                                                                                     Page 52   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                         Place "X"(s)
         LEED Practice - Pool A Questions




   When using natural ventilation to achieve EQ Credit 2, Increased
52 Ventilation, what percent of the occupied areas must be effectively
   ventilated?



         A.
1




              90%
         B.
              95%
         C.
              85%
CHOOSE




         D.
              80%
         E.
              75%




                                                                                        Page 53   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions




         Which of the following uses a Full-Time Equivalent (FTE) factor in the
53
         calculations?


         A.
3




              EQ Credit 8.2 Daylight & Views
         B.
              SS Credit 4.1 Alternative Transportation
         C.
              SS Credit 4.3 Alternative Transportation
CHOOSE




         D.
            EQ Credit 6.1 Controllability of Systems
            Exemplary performance ID credit for WE Credit 3 Water Use
         E.
            Reduction
         F.
              WE Credit 3.1 Water Use Reduction




                                                                                                 Page 54   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool A Questions



   A major renovation of an old office building is underway, including
   replacing the roof. The surface area of the roof is 30% of the building
54 structure and envelope. The foundation, walls, and 75% of the interior
   non-structural elements will be reused for the project. What points could
   this project earn?

         A.
2




              MR Credit 2 Construction Waste Management
         B.
              MR Credit 1.1 Building Reuse
         C.
              ID point for MR Credit 1.3 Building Reuse
CHOOSE




         D.
              MR Credit 1.3 Building Reuse
         E.
              MR Credit 1.2 Building Reuse




                                                                                              Page 55   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                           Place "X"(s)
         LEED Practice - Pool A Questions




         What does a contractor need to document was done to achieve EQ Credit
55
         3.1 Construction IAQ Management Plan: During Construction?


         A.
2




              Use MERV 13 filtration media for temporary air handlers
         B.
              Use MERV 8 filtration media for permanently installed air handlers
              A building flushout using a total air volume of 14,000 cu. ft. per sq. ft.
         C.
              of floor was used
CHOOSE




         D.
              Protect on-site absorptive materials from moisture damage




                                                                                                          Page 56   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions



         The Basis of Design is an important part of the commissioning process.
56
         At a minimum, which items must be included in the BOD?


         A.
3




              Narrative descriptions of systems
         B.
              Primary design assumptions
         C.
              Architectural drawings of system locations
CHOOSE




         D.
              Standards including applicable codes, guidelines, etc.
         E.
              Number of LEED APs on the design team




                                                                                                 Page 57   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions




57 Which of the following are true regarding ID Credit 1.3?




         A.
3




              Can be awarded for using 90% FSC certified wood
         B.
            Title of the ID credit must be submitted
            Earning the ID credit on one project will result in the credit being
         C.
            awarded on other projects
CHOOSE




         D.
              Can be awarded if two or more LEED APs were used on the project
         E.
              Can be awarded for innovative performance
         F.
              Can be awarded for exemplary performance




                                                                                                  Page 58   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool A Questions




         What types of water on a residential condominium project could not be
58
         used to qualify for WE Credits 1.1 and 1.2?


         A.
2




              Recycled waste water
         B.
              Kitchen sink water
         C.
              Laundry water
CHOOSE




         D.
              Black water
         E.
              Public water, non-potable
         F.
              Captured rainwater




                                                                                                Page 59   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                           Place "X"(s)
         LEED Practice - Pool A Questions



   An architect is designing a residential building. What is the minimum
59 distance a designated smoking area must be away from any outdoor air
   intakes to achieve EQ Prerequisite 2, ETS Control?

         A.
1




              25 ft.
         B.
              50 ft.
         C.
              30 ft.
CHOOSE




         D.
              15 ft.
         E.
              20 ft.




                                                                                          Page 60   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions




         Which of the following people will make the final decision on MR Credit
60
         5.1, Regional Materials?


         A.
1




              Engineers
         B.
              Owner - Developer
         C.
              Contractors
CHOOSE




         D.
              Architects




                                                                                                  Page 61   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                           Place "X"(s)
         LEED Practice - Pool A Questions



         The heat island effect can vary temperatures by up to ________.
 61


         A.
1




              15 Degrees Fahrenheit
         B.
              10 Degrees Fahrenheit
         C.
              5 Degrees Fahrenheit
CHOOSE




         D.
              17 Degrees Fahrenheit




                                                                                          Page 62   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool A Questions




         For SS Credit 1 Site Selection, what should the project team do if the site
62
         selection involves special circumstances?



         A.
1




            Provide parkland in equivalent amounts to project site size
            Donate dollars for toxic clean-up in your region equivalent to 5%
         B.
            project cost
            Provide confirmation that the project site does not meet any of the
         C.
            prohibited criteria
CHOOSE




            Explain any site characteristics and non-standard tactics to reach
         D.
            intent
            Provide city approval for development on the site and state approval
         E.
            if necessary




                                                                                                      Page 63   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool A Questions



   The materials cost of a building renovation is $5 million. What cost of
63 reused building materials would you need to have spent to achieve 3
   points for MR Credit 3, Materials Reuse?


         A.
1




              $500,000
         B.
              $250,000
         C.
              $750,000
CHOOSE




         D.
              $100,000




                                                                                            Page 64   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions



         Which of the following types of materials can be utilized for MR Credit 6,
64
         Rapidly Renewable Materials?


         A.
2




              Pine flooring
         B.
              Cotton batt insulation
         C.
              Recycled hardwood flooring
CHOOSE




         D.
              Sunflower seed board panels
         E.
              Light bulbs
         F.
              Granite countertops




                                                                                                     Page 65   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions




         What is the best practice for glare control for EQ Credit 8.1 Daylight and
65
         Views for sidelighting with daylight glazing?



         A.
1




              Louvers
         B.
              Exterior shading devices
         C.
              Interior fins
CHOOSE




         D.
              Adjustable blinds
         E.
              Fixed interior




                                                                                                     Page 66   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool A Questions




         What 3 standards can be used to achieve EA Credit 1 Optimize Energy
66
         Performance?


         A.
3




              ASHRAE 62.1-2004
         B.
              ASHRAE 90.1-2004
         C.
              CBECS
CHOOSE




         D.
              Advanced Buildings Benchmark
         E.
              ASHRAE Advanced Energy Design Guide




                                                                                              Page 67   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool A Questions




         A project wants to provide for the ongoing accountability of building
67
         energy consumption. What must be done to meet this goal?



         A.
2




              Perform a partially measured retrofit isolation
         B.
              Measure energy use at the main meters
         C.
              Install metering equipment
CHOOSE




         D.
              Monitor for no less than one year, post-construction occupancy




                                                                                                Page 68   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool A Questions



   During the design phase, a LEED project for a retail development has
   been denied credit for SS Credit 7.1, Heat Island Effect: Non Roof. The
68
   project anticipated earning the credit by having 50% of the parking spaces
   under deck. What can the project team do to correct the problem?


         A.
1




              Place 100% of the parking under deck
         B.
              Cover the deck with a material with an SRI of 29
         C.
              Plant trees that will provide shade within 10 years
CHOOSE




         D.
              Install open grid paving for 25% of hardscapes




                                                                                               Page 69   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool A Questions




         Planting grass on a disturbed site area can contribute to earning which of
69
         the following?


            SS Prerequisite 1, SS Credit 6.1 Stormwater Design: Quantity Control,
         A.
1




            and SS Credit 7.1 SS Credit 6.1 Stormwater Design: Quantity Control,
            SS Prerequisite 1, Heat Island Effect: Non-Roof
            SS Credit 7.1 Heat Island Effect: Non-Roof, and SS Credit 7.2, Heat
         B.
            Island Effect: Roof
            SS Prerequisite 1 and SS Credit 6.1 Stormwater Design: Quantity
         C.
            Control
CHOOSE




         D.
              SS Prerequisite 1




                                                                                                     Page 70   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions




         A technology firm is deciding on a location to build a new data center.
70
         Which of the following sites would be most appropriate to build on?



         A.
1




              Land with a plant species from the State threatened species list
         B.
              Organic tree nursery defined by the USDA as prime farmland
         C.
            Undeveloped land that is 40 feet from a stream
CHOOSE




            Undeveloped land whose elevation is level with the 100-year flood as
         D.
            defined by FEMA
            Land that is 80 feet from a wetland as defined by the U.S. Code of
         E.
            Regulations CFR
         F.
              Developed site located 30 feet from a fishing stream




                                                                                                  Page 71   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool A Questions




         Which variables are used to determine the daylight factor as part of EQ
 71
         Credit 8.1, Daylight & Views?



         A.
3




              Window geometry
         B.
              Floor area
         C.
              Interior light shelf
CHOOSE




         D.
              Exterior light shelf
         E.
              Window area




                                                                                                  Page 72   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool A Questions




         Which of the following products can be used to help achieve MR Credit 7,
72
         Certified Wood?



         A.
1




              FSC certified wood
         B.
              GreenSpec certified wood
         C.
              Green-e certified wood
CHOOSE




         D.
              Oikos certified wood




                                                                                                   Page 73   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                     Place "X"(s)
         LEED Practice - Pool A Questions




73 Which of the following is NOT true of light shelf design?




         A.
1




              Provides an ideal shelf for building vegetation
         B.
              Can be a roof overhang
         C.
              Depth of overhang depends on building latitude
CHOOSE




         D.
              Creates daylight glazing areas on windows




                                                                                    Page 74   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool A Questions




   During an early design review a project team has decided to consolidate
74 the building footprint and add underground parking. These changes can
   help contribute to earning which credits?


         A.
2




              EA Credit 3, Enhanced Commissioning
         B.
              SS Credit 6.1, Stormwater Design: Quantity Control
         C.
              SS Credit 4.4, Alternative Transportation: Parking Capacity
CHOOSE




         D.
              SS Credit 7.1, Heat Island Effect: Non-Roof




                                                                                            Page 75   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions




         What criteria must be met to qualify for SS Credit 2 Community
75
         Connectivity?



         A.
3




            Construct or renovate on a previously developed site
            Construct or renovate within a community of 60,000 sq. ft. per acre
         B.
            density
            Construct or renovate where the site is located with two metro bus
         C.
            lines within 1/4 mile
CHOOSE




            Construct or renovate where the site has pedestrian access to
         D.
            buildings and services
            Construct or renovate within a community of 50,000 sq. ft. per acre
         E.
            density
            Construct or renovate within 1/2 mile of a neighborhood with an
         F.
            average density of 10 units per acre net




                                                                                                 Page 76   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool A Questions



   A renovation project will incorporate the existing building but will not
76 meet the requirements for MR Credit 1.1 Building Reuse. The reused
   portions of the existing building can be applied to which credits?


         A.
3




              MR Credit 2.1 Construction Waste Management
         B.
              MR Credit 3.2 Materials Reuse
         C.
              MR Credit 3.1 Materials Reuse
CHOOSE




         D.
              MR Credit 7 Certified Wood
         E.
              MR Credit 1.2 Building Reuse




                                                                                             Page 77   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool A Questions



   A project is being built on a 6 acre Greenfield site. A civil engineer has
   determined the existing imperviousness of the site is 25%. The project
77
   team would like to qualify for SS Credit 6.1 Stormwater Design. What are
   the options to qualify for this point?


         A.
2




            Implement a management plan that reduces water runoff by 25%
            Ensure post-development peak discharge is less than or equal to pre-
         B.
            development peak discharge
            Reuse stormwater volume generated for non-potable uses such as
         C.
            landscape irrigation or for custodial uses
CHOOSE




         D.
              Filter and treat water on site
         E.
              Implement a stream channel protection strategy with quantity control




                                                                                                    Page 78   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool A Questions




78 What is the proper method for submitting a credit interpretation?




            Complete the online credit interpretation request on the USGBC web
         A.
1




            site
            Schedule a conference call with the designated LEED Project
         B.
            Manager at USGBC
            Send a letter or fax to USGBC requesting a credit interpretation
         C.
            request form
CHOOSE




            Download, complete, and mail the project registration form from the
         D.
            USGBC web site




                                                                                                 Page 79   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool A Questions




79 Which standard sets VOC limits for commercial interior non-flat paints?




         A.
1




              ASHRAE Standard 62.1-2004
         B.
              GS-03
         C.
              GS-11
CHOOSE




         D.
              GC-11
         E.
              GC-03
         F.
              SCAQMD Rule 1113




                                                                                            Page 80   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool A Questions



   A college building used for engineering classes has a baseline water use of
80 400,000 gallons. What amount of water use after project design will earn
   an exemplary credit in WE Credit 3?


         A.
1




              240,000 gallons
         B.
              300,000 gallons
         C.
              320,000 gallons
CHOOSE




         D.
              160,000 gallons
         E.
              200,000 gallons




                                                                                                Page 81   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 82   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 83   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 84   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 85   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 86   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 87   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 88   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 89   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 90   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 91   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 92   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 93   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 94   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 95   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 96   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 97   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 98   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 99   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 100   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 101   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 102   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 103   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 104   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 105   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 106   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 107   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 108   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 109   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 110   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 111   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 112   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 113   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 114   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 115   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 116   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 117   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 118   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 119   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 120   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 121   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 122   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 123   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 124   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 125   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 126   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 127   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 128   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 129   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 130   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 131   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 132   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 133   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 134   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 135   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 136   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 137   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 138   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 139   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 140   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 141   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 142   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 143   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 144   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 145   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 146   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 147   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 148   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 149   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 150   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 151   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 152   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 153   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 154   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 155   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 156   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 157   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 158   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 159   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 160   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 161   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 162   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 163   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 164   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 165   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 166   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 167   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 168   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 169   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 170   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 171   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 172   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 173   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 174   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 175   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 176   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 177   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 178   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 179   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 180   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 181   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 182   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 183   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 184   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 185   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 186   Pool A Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                              Place "X"(s)
   LEED Practice - Pool A Questions




                                                                             Page 187   Pool A Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool B Questions



         To calculate the percent of local materials in a project, which of the
  1
         following needs to be recorded?


         A.
3




              Costs of materials purchased within 500 miles
         B.
              Total materials cost
         C.
            Costs of materials extracted and manufactured within 500 miles
CHOOSE




            Discount furniture and furnishings costs if recorded in MR Credit 3
         D.
            Materials Reuse
         E.
              Materials salvaged within 500 miles




                                                                                  Page 188            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool B Questions



         What should be submitted for SS Credit 4.1 Public Transportation Access
  2
         Credit?

              Driving directions from entrance of building to rail or bus lines with
         A.
1




              distances
         B.
            Ariel photo of site and addresses of rail or bus lines
            Walking directions from entrance of building to rail or bus lines with
         C.
            distances
CHOOSE




         D.
              Vicinity drawing showing site and location of rail or bus lines
         E.
              Address of project and address of rail or bus lines




                                                                                  Page 189            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions



         What must happen before you can access your LEED project using
  3
         LEED-Online?


         A.
1




              You must pass the LEED AP exam
         B.
            The project administrator must add you to a valid LEED project
            You must have credits assigned to you by the project administrator or
         C.
            another team member
CHOOSE




         D.
            A project team member must add you to a valid LEED project
            A project team member or project administrator must add you to a
         E.
            valid LEED project
         F.
              You must have credits assigned to you by the project administrator




                                                                               Page 190            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions


    A project design will use pervious pavement to earn SS Credit 6.2
  4 Stormwater Design Quality Control. What information is required for the
    submittal?

         A.
2




              Percent of annual rainfall volume treated
         B.
              List of treatment plans with drawings
         C.
              List of BMPs with description of function
CHOOSE




         D.
            Water treatment tests proving water filtration to 80% TSS
            Water treatment engineer sign off of all BMPs and the percent of
         E.
            water treated
            List of structural controls with description of pollutants removal with
         F.
            the percent of rainwater treated




                                                                                Page 191             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                          Place "X"(s)
         LEED Practice - Pool B Questions




  5 Which people are not able to request CIRs?


         A.
1




              USGBC Staffers
         B.
              Project Team members
         C.
              Workshop participants for one year
CHOOSE




         D.
              Paid USGBC.org subscribers




                                                                     Page 192            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool B Questions



         What are the design and implementation options for the pre-occupancy
  6
         phase to achieve EQ Credit 3.2 Construction IAQ Management Plan?


         A.
2




              Air quality testing
         B.
              Prevent absorptive materials
         C.
              Flush-out
CHOOSE




         D.
              Prevent construction debris




                                                                            Page 193            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following tasks must be completed to achieve EQ Credit 7.2
  7
         Thermal Comfort?

         A.
2




            Survey building occupants within a period of 6 to 18 months
            Develop a plan for corrective action if more than 20 percent of
         B.
            occupants are dissatisfied
            Develop a plan for corrective action if more than 25 percent of
         C.
            occupants are dissatisfied
CHOOSE




         D.
            Survey building occupants within a period of 12 to 24 months
            Develop a plan for corrective action if more than 30 percent of
         E.
            occupants are dissatisfied




                                                                              Page 194            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions



         Which features should HVAC equipment have to qualify for EA Credit 4
  8
         Enhanced Refrigerant Management?

         A.
3




              Long service life
         B.
              Energy Star rating
         C.
              No refrigerants
CHOOSE




         D.
              Energy Star warranty
         E.
              Minimum 14 SEER rating
         F.
              Efficient refrigerant charge




                                                                           Page 195            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions


    A project team is considering earning an additional point for EQ Credit 2
  9 Increased Ventilation. The project uses mechanical ventilation. This
    change could have a negative impact on which credits?

         A.
1




              EA Credit 1 Optimize Energy Performance
         B.
              EA Prerequisite 2 Minimum Energy Performance
         C.
              EA Credit 4 Enhanced Refrigerant Management
CHOOSE




         D.
              EA Credit 5 Measurement & Verification




                                                                          Page 196             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                        Place "X"(s)
         LEED Practice - Pool B Questions


         Which of the following variables are used as part of the glazing factor
 10
         calculation equation for EQ Credit 8.1 Daylight and Views?

         A.
3




              Floor area
         B.
              Visible light transmittance of glazing
         C.
              Solar orientation
CHOOSE




         D.
              Wall reflectance
         E.
              Room cavity ratio
         F.
              Window area




                                                                                   Page 197            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions



    A project is being built on a previously developed site with a zero-lot-line
    and is qualified for SS Credit 2 Development Density and Community
    Connectivity. The project team wants to attempt to achieve SS Credit 5.1
 11
    Site Development Protect and Restore Habitat and is considering a
    vegetated roof with native plants. What amount of site area needs to be
    covered with native and/or adaptive plants to earn the point?


         A.
1




              50% including building footprint
         B.
              20% of site area, including building footprint
         C.
              50% excluding building footprint
CHOOSE




         D.
              20% of building footprint




                                                                             Page 198             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool B Questions



    The doors for a new construction project will come from salvaged farm
 12 house doors. How should the costs of the doors be determined for
    documentation as part of MR Credit 3, Materials Reuse?

         A.
1




              45% of the value
         B.
              The greater of actual cost or replacement cost
         C.
              45% of the cost
CHOOSE




         D.
              Actual cost paid
         E.
              Replacement value




                                                                        Page 199            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                            Place "X"(s)
         LEED Practice - Pool B Questions



         Whole Building Calibration for EA Credit 5, Measurement and
 13
         Verification is most suitable for what type of buildings?

         A.
1




              Residential Complexes
         B.
              Multiple Building Campuses
         C.
              Larger / More Complex Buildings
CHOOSE




         D.
              Smaller / Less Complex Buildings




                                                                       Page 200            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions



 14 The ratio of exterior illumination to interior illumination is referred to as:


         A.
1




              Daylight measurement
         B.
              Footcandle factor
         C.
              Glazing factor
CHOOSE




         D.
              Visible light transmittance




                                                                                Page 201            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                          Place "X"(s)
         LEED Practice - Pool B Questions



 15 CIRs are most likely used for what part of the LEED process?


         A.
1




              Documentation for certified wood
         B.
              Updated rulings for LEED Online
         C.
              Administrative inquires
CHOOSE




         D.
              Technical guidance for LEED credits
         E.
              Appealing credits that have been denied




                                                                     Page 202            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions


         A law firm occupying a 50 year old office building is replacing the
         mechanical systems to improve energy performance and implementing
         green procurement and operations policies.
 16
         Which LEED rating system best applies to this project?


         A.
1




              LEED-CS
         B.
              LEED-ND
         C.
              LEED-NC
CHOOSE




         D.
              LEED-EB
         E.
              LEED-CI




                                                                               Page 203            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions



    The roof of an office building is approximately 30,000 sq. ft. Skylights and
    the mechanical equipment account for 5,000 sq. ft. of the total roof area.
 17 What amount of the roof needs to have an appropriate level of SRI or
    vegetated roof to qualify for exemplary performance on SS Credit 7.2
    Heat Island Effect: Roof?

         A.
1




              12,500 sq. ft.
         B.
              30,000 sq. ft.
         C.
              15,000 sq. ft.
CHOOSE




         D.
              25,000 sq. ft.




                                                                            Page 204              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions



         What defines a low-emitting vehicles according to SS Credit 4.3 Low-
 18
         Emission & Fuel-Efficient Vehicles?

            Green score of 40 or more, as defined by the American Council for
         A.
2




            Energy Efficient Economy rating
            Score of 100 or less, as defined by the American Car Emissions
         B.
            Rating Guide
            Zero Emissions Vehicle, as classified by the California Air Resources
         C.
            Board
CHOOSE




         D.
              EPA Low Carbon Footprint Certification
         E.
              LOW-E Vehicle, as classified by the California Air Resources Board




                                                                                Page 205            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool B Questions



         What is the proper method for registering a project for LEED
 19
         certification?


              Have the project architect submit AIA form 5931, request for
         A.
1




              consideration of project for LEED certification
         B.
            Complete the online form available on the USGBC web site
            Download, complete, and mail the project registration form from the
         C.
            USGBC web site
CHOOSE




            Fax a copy of the project description and design intent to the LEED
         D.
            certification coordinator at the USGBC




                                                                             Page 206            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool B Questions


         What percent of occupants within a space must find the thermal
20
         conditions acceptable to comply with ASHRAE 55-2004?

         A.
1




              95%
         B.
              90%
         C.
              80%
CHOOSE




         D.
              70%
         E.
              60%




                                                                          Page 207            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions


    An apartment complex is being built in a suburban area on a Greenfield
    site. The site has an existing imperviousness of 25%. The pre-development
 21 discharge rate of stormwater is 8,000 gallons. What can the maximum post-
    development discharge rate be to qualify for SS Credit 6.1 Stormwater
    Design: Quantity Control?

         A.
1




              4,000 gallons
         B.
              10,000 gallons
         C.
              6,000 gallons
CHOOSE




         D.
              2,000 gallons
         E.
              8,000 gallons




                                                                         Page 208              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions


         What is preferred parking as defined by SS Credit 4.4 Alternative
22
         Transportation?
              Parking spots closest to the main entrance or under cover to the
         A.
2




              entrance
         B.
              Parking spots reserved with signs carrying employees' names
         C.
              Parking spots that are shaded at mid-day
CHOOSE




         D.
              Parking spots closest to the main entrance (excluding handicap)
         E.
              Discounted parking passes
         F.
              Parking passes allowing handicap parking




                                                                                 Page 209            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool B Questions


   A new office building with a retail component on the first floor is
   1,000,000 sq. ft. The building requires a median electrical intensity of
23 1kWh/sf-year. What amount of green power purchased by the operating
   company will qualify the project for exemplary performance for EA Credit
   6 Green Power?

         A.
1




              350,000 kWh per year for two years
         B.
              700,000 kWh over four years
         C.
              175,000 kWh per year for two years
CHOOSE




         D.
              350,000 kWh per year for four years
         E.
              175,000 kWh per year for one year




                                                                       Page 210              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions




         Which of the following are not included in the scope of the credit
24
         calculation for EQ Credit 8.2 Daylight & Views?


         A.
2




              Cubicles
         B.
              Free standing desks
         C.
CHOOSE




              Built in cabinets
         D.
              Movable partitions




                                                                              Page 211            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following are design considerations for recycling areas for
25
         MR Prerequisite 1 Storage & Collection of Recyclables?


         A.
3




              Signage to prevent contamination
         B.
              Non-centralized collection point
         C.
              Protection from the elements
CHOOSE




         D.
              Security for high value materials




                                                                                Page 212            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions



         The Green Label standard relates to which of the following credits for EQ
26
         Credit 4 Low Emitting Materials?

         A.
1




              Paints and coatings
         B.
              Composite wood & agrifiber
         C.
              Carpet systems
CHOOSE




         D.
              Adhesives and sealants




                                                                              Page 213              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool B Questions




27 What are some strategies to increase energy performance for EA Credit 1?


         A.
2




              Use ventilation cooling for space conditioning
         B.
              Purchase Green Power on a two year contract
         C.
              Install monitoring on all major systems
CHOOSE




         D.
              Reduce demand by optimizing the building orientation




                                                                        Page 214             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions


   There is a major renovation project that is cooled with a chilled water
   system. Replacement will be very costly. The project team is concerned
28 that they will not be able to qualify for the EA Prerequisite 3 Fundamental
   Refrigeration Management. What can the team do to continue the LEED
   process?

         A.
1




              Verify leakage rate is lower than 2%
         B.
              Consult the LEED CIR page
         C.
              Show replacement cost is less than 10% of the renovation cost
CHOOSE




         D.
              Show replacement economic payback greater than 10 years
         E.
              Show replacement cost is greater than 10% of the renovation cost




                                                                                 Page 215            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions


   The city of Las Vegas wants you to design a visitor's center on the edge of
29 the city in the desert. Which of the following credits would be applicable
   when calculating the glazing factor?

         A.
1




              EQ Credit 8.1, Daylight and Views
         B.
              EQ Credit 5, Indoor Chemical and Pollutant Source Control
         C.
              EQ Credit 6.2, Controllability of Systems, Thermal Comfort
CHOOSE




         D.
              EQ Credit 4.1, Low Emitting Materials- Adhesives and Sealants
         E.
              EQ Credit 1, Outdoor Air Delivery Monitoring
         F.
              EQ Credit 2, Increased Ventilation




                                                                              Page 216            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions


   The Commissioning Authority has a majority of responsibilities in
30 Enhanced Commissioning, what responsibilities can be helped by other
   members on the team?
            Commissioning design review of the Owner's Project Requirements,
         A.
2




            Basis of Design and Design Documents
            Develop a systems manual that provides future operation staff
         B.
            information to operate systems
            Prior to construction document phase, review the completion of all
         C.
            commissioning process activities
CHOOSE




            Verify the requirements for training operating personnel and building
         D.
            occupants are complete
            Review building operation within 10 months with O&M staff and
         E.
            occupants. Include plans for resolution of issues
            Review contractor submittals applicable to systems being
         F.
            commissioned




                                                                              Page 217             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions



         EA Prerequisite 2 Minimum Energy Performance must comply with
 31
         which sections of ASHRAE 90.1-2004?

              Mandatory provisions and prescriptive requirements, or the
         A.
1




              mandatory provisions and the performance requirements
         B.
              Mandatory provisions and prescriptive requirements
         C.
              Mandatory provisions
CHOOSE




         D.
              Mandatory provisions and performance requirements




                                                                           Page 218            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions



         When calculating the annual water consumption of an office building for
32
         WE Credit 2, which of the following inputs are included?


         A.
2




              Shift with highest FTE
         B.
              Peak occupants
         C.
              Number of water closets and urinals
CHOOSE




         D.
              Transient occupants
         E.
              FTE




                                                                              Page 219            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions




         Which of the following building elements are excluded from the building
33
         material calculation for MR Credit 1.1, Building Reuse?



         A.
2




              Interior doors
         B.
              Floor panels
         C.
              Windows
CHOOSE




         D.
              Roof decking
         E.
              Exterior brick




                                                                              Page 220            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions



   A new office park will be built in downtown Austin, Texas. The project
   will try to earn SS Credit 5.2 Site Development. There is no local zoning
34
   requirement for open space. The project needs to achieve 20% open
   space. What strategies are appropriate to increase the open space?

         A.
4




              Green paving
         B.
              Vegetated pond with minimal slope
         C.
              Share facilities with neighboring office parks
CHOOSE




         D.
              Pedestrian hardscapes
         E.
              Vegetated roof
         F.
              Parking lot instead of a parking deck




                                                                           Page 221            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following items can be included in MR Credit 4, Recycled
35
         Content?


         A.
1




              Appliances
         B.
              Electrical components
         C.
              Plumbing components
CHOOSE




         D.
              Flooring




                                                                             Page 222            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions




         What percentage of wood-based materials needs to be certified by FSC to
36
         achieve exemplary performance for MR Credit 7 Certified Wood?



         A.
1




              50%
         B.
              95%
         C.
              75%
CHOOSE




         D.
              40%
         E.
              25%




                                                                             Page 223             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool B Questions




37 What standard is used for the controllability of lighting systems?


         A.
1




              ASHRAE 62.1-2004
         B.
              ASHRAE 52.2-1999
         C.
              ASHRAE 55-2004
CHOOSE




         D.
              ASHRAE 90.1-2004
         E.
              ASHRAE 62-1999
         F.
              There is no standard of reference




                                                                        Page 224            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool B Questions




   During construction, if permanently installed air handlers are used, what is
38 the minimum MERV rating for the filtration media needed to achieve EQ
   Credit 3.1 Construction IAQ Management Plan?


         A.
1




              MERV 9
         B.
              MERV 5
         C.
              MERV 6
CHOOSE




         D.
              MERV 7
         E.
              MERV 10
         F.
              MERV 8




                                                                           Page 225              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions




         A project will reuse refurbished door hardware obtained off-site. What is
39
         true about this approach?


              The hardware costs could be applied to both MR Credit 3.1 Materials
         A.
2




              Reuse and MR Credit 4.1 Recycled Content
              The replacement cost must be used when calculating the materials
         B.
              cost
         C.
              The hardware costs can be applied to MR Credit 3.1 Materials Reuse
CHOOSE




         D.
              The hardware may be eligible for MR Credit 5 Regional Materials




                                                                                Page 226            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool B Questions



   A project has been awarded Gold certification, but the design team had
   applied for Platinum certification. The team was awarded 50 points for
40
   their project. The project was denied credit for WE Credit 3.1 and MR
   Credit 3.1. What is true regarding this situation?

         A.
1




              The project can not earn Platinum certification
         B.
              The credits can be appealed at a cost of $500
         C.
              A CIR can be submitted to appeal the ruling
CHOOSE




         D.
              The credits can be appealed at a cost of $1000




                                                                        Page 227            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions



         What are the responsibilities of the Commissioning Authority during
 41
         fundamental commissioning?


         A.
3




              Develop Basis of Design
         B.
            Direct commissioning team and process
            Review building operation within 10 months of substantial
         C.
            completion
CHOOSE




         D.
              Update owner's project requirements
         E.
              Coordinate commissioning testing
         F.
              Review results of system performance verification




                                                                               Page 228            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool B Questions




42 Which of the following products qualify as a rapidly renewable material?



         A.
4




              Pine hardwood floors
         B.
              Cotton insulation
         C.
              Linoleum flooring
CHOOSE




         D.
              Wool carpet
         E.
              Bamboo wall coverings




                                                                          Page 229            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions



   You are renovating a 10,000 sq. ft. mill and will be re-using existing
   interior non-structural elements. Part of the design includes creating an
43
   addition to the building. What is the maximum size of the addition you
   can make and still achieve MR Credit 1.3, Building Reuse?

         A.
1




              10,000 sq. ft.
         B.
              25,000 sq. ft.
         C.
              20,000 sq. ft.
CHOOSE




         D.
              5,000 sq. ft.
         E.
              15,000 sq. ft.




                                                                               Page 230            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions


   A new surface parking lot is being planned for a shopping center. What
44 amount of site disturbance beyond the parking area can earn SS Credit 5.1,
   Site Development: Protect or Restore Habitat?

         A.
1




              100 ft.
         B.
              50 ft.
         C.
              40 ft.
CHOOSE




         D.
              10 ft.
         E.
              25 ft.




                                                                         Page 231              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions




         An office park will contain 450 parking spaces. How could the parking be
45
         redesigned to qualify for SS Credit 7.1 Heat Island Effect: Non-Roof?


         A.
1




              Shade 200 parking spaces within 5 years
         B.
              Reduce parking to 200 spaces
         C.
              Use natural asphalt for above ground parking
CHOOSE




         D.
              Design an underground parking deck for at least 225 parking spaces




                                                                              Page 232             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following do not have to be commissioned as part of LEED
46
         certification for a hotel?


         A.
2




              Solar panels
         B.
              Heated swimming pool
         C.
              HVAC
CHOOSE




         D.
              Stormwater quality
         E.
              Vegetated roof
         F.
              Heating




                                                                           Page 233             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions


   The project team on a major building renovation will try to earn EQ
   Credits 3.1 and 3.2, Construction IAQ Management Plan. The building
47
   will have permanently installed air handlers and will use air quality testing
   before occupancy.

         A.
2




              Submit an IAQ testing report
         B.
              Have the general contractor perform the implementation
         C.
            Before Occupancy meet the SMACNA IAQ guidelines
CHOOSE




            Prior to occupancy a perform a building flush-out that supplies a total
         D.
            air volume of 14,000 cu. ft. of outdoor air per sq. ft. of floor area
         E.
              Use MERV 6 air filters at each return air grill




                                                                               Page 234              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool B Questions




         What are some nonstructural techniques to reduce water pollution from
48
         stormwater for LEED certification?



         A.
2




              Filtered drain pipes
         B.
              Rain gardens
         C.
              Vegetated swales
CHOOSE




         D.
              Ponds
         E.
              Vegetated roof
         F.
              Grid pavers




                                                                             Page 235            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                          Place "X"(s)
         LEED Practice - Pool B Questions




49 Which standard sets VOC limits for interior stains and sealers?


         A.
1




              GC-11
         B.
              SCAQMD Rule 1113
         C.
              GS-11
CHOOSE




         D.
              GC-03
         E.
              GS-03
         F.
              ASHRAE Standard 62.1-2004




                                                                     Page 236            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following are required to document credit compliance for SS
50
         Prerequisite 1 Construction Activity Pollution Prevention?


         A.
2




              Civil engineer sign off on all pollution prevention actions
              Provide confirmation project complies with NPDES or local
         B.
              regulations if more stringent
         C.
              Provide copies of project drawings showing implementation
CHOOSE




         D.
              Provide photos of pollution prevention in action
         E.
              Submit training class PowerPoint presentation




                                                                             Page 237              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions




         Refrigeration Equipment Life is estimated from the _____ with a life
 51
         estimated to be ______.


              2007 ASHRAE Application Handbook, Manufacturer's Guaranteed
         A.
1




              Life
         B.
              ASHRAE 55.1, 10 years
         C.
              LEED Online Template, LCDWP x LCODP
CHOOSE




         D.
              2003 ASHRAE Application Handbook, 15 Years




                                                                                Page 238            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool B Questions



   A project team has not been able to perform an energy simulation for EA
   Credit 1. For EA Credit 2 On-Site Renewable Energy, where is the
52
   information found to determine the energy cost supplied by the renewable
   energy systems?


         A.
2




              US DOE Building and Location Energy Average Expenditure Table
         B.
              Commercial Buildings Energy Consumption Survey
         C.
              EPA Energy Guide by Metro Area
CHOOSE




         D.
              USGBC CIR charts
         E.
              US DOE 2003 Commercial Sector Average Energy Costs by State




                                                                            Page 239            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions



   An office facility design includes a rainwater harvesting system that
   collects 16,000 gallons of water annually. The rainwater is used for
53 flushing water closets. What information is not necessary to calculate the
   reduction in potable water for WE Credit 2 Innovative Wastewater
   Technologies?


         A.
1




              Number of FTE building occupants
         B.
              Annual work days
         C.
              Total daily volume of processed water generated
CHOOSE




         D.
              Total daily volume of wastewater generated
         E.
              Gender of the occupants (Male or Female)




                                                                           Page 240            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions




         What renewable energy systems are not eligible for EA Credit 2 On-Site
54
         Renewable Energy?


         A.
2




              Active solar thermal
         B.
              Tradable Renewable Certificates
         C.
              Tidal system
CHOOSE




         D.
              Passive solar architectural features
         E.
              Bio-fuel




                                                                              Page 241            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                          Place "X"(s)
         LEED Practice - Pool B Questions



55 What is the cost of submitting a CIR?


         A.
1




              $100
         B.
              $220
         C.
              $500
CHOOSE




         D.
              $50
         E.
              $0




                                                                     Page 242            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions


   A new 200 unit condominium building with 300 FTE occupants is being
   planned on a previously developed site. All of the parking will be
   underneath the building. The building will have a low sloped roof covered
56
   in material with an SRI of 29. The project location will be 1/2 mile from
   two bus stops, and have storage space for 30 bicycles. What credit can this
   project meet?

         A.
1




            SS Credit 7.1 Heat Island Effect: Non Roof
            SS Credit 4.1 Alternative Transportation: Public Transportation
         B.
            Access
            SS Credit 4.2 Alternative Transportation: Bicycle Storage & Changing
         C.
            Rooms
CHOOSE




         D.
              SS Credit 7.2 Heat Island Effect: Roof




                                                                             Page 243             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following factors is used to determine the percentage of
57
         materials reused on a project for MR Credit 3, Materials Reuse?


         A.
1




              Cost or square footage
         B.
              Cost
         C.
              Weight
CHOOSE




         D.
              Square footage




                                                                                 Page 244            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions




         Which of the following are not considered composite woods as part of
58
         EQ Credit 4.4 Low-Emitting Materials?


         A.
1




              Strawboard
         B.
              OSB
         C.
              Recycled pine molding
CHOOSE




         D.
              Plywood I-beams
         E.
              Wheatboard




                                                                                Page 245            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following designs are acceptable for achieving EQ Credit 5
59
         Indoor Chemical & Pollutant Source Control?

              Chemical storage areas, such as janitor's closets, with shared exhaust
         A.
3




              systems
         B.
              Employ permanent entryway at least 5 ft. long
         C.
            MERV of 13 or more in mechanically ventilated buildings
CHOOSE




            Locate high-volume copy equipment in an open area near the exhaust
         D.
            system
         E.
              Employ permanent entryway at least 6 ft. long
         F.
              Roll-out mats near entryways, if maintained weekly




                                                                                  Page 246            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions


   You have completed a renovation project that had a total building material
   cost of $20 million. Rapidly renewable materials were used extensively in
60
   the project. What must the cost of the renewable materials be to achieve
   MR Credit 6, Rapidly Renewable Materials?

         A.
1




              $1,000,000
         B.
              $100,000
         C.
              $500,000
CHOOSE




         D.
              $250,000
         E.
              $50,000




                                                                         Page 247              Pool B Test
   0         Questions Attempted (With Correct Number of Answers)
0.0%         <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool B Questions



 61 Which of the following must be completed prior to a building flush out to
    achieve EQ Credit 3.2 Construction IAQ Management Plan: Before
    Occupancy?
    A. Installation of all non-fixed workstations
2




    B. Cleaning
CHOOSE




    C. Installation of all non-fixed partitions
    D. Installation of all carpet




                                                                          Page 248             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool B Questions



         Which of the following are true about the LEED Online Certification
62
         Process?


         A.
3




            The LEED-NC fee structure is different than LEED-CI
            Projects can submit a combined review of the Design and
         B.
            Construction submittals in one step
            Early registration increase your ability to achieve your certification
         C.
            goals
CHOOSE




            Documentation is submitted using separate Design and Construction
         D.
            submittals in two steps
         E.
              The LEED-NC fee structure is the same as LEED-EB




                                                                               Page 249             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions




         Which of the following conditions are required to achieve EQ Credit 3.2
63
         Construction IAQ Management Plan?



         A.
3




              Maintain an internal temperature of at least 60 degrees F
         B.
              Maintain a relative humidity no higher than 60%
         C.
              Maintain an internal temperature of at least 70 degrees F
CHOOSE




         D.
              Flush-out 12,000 cu. ft. of air per sq. ft. of floor area.
         E.
              Flush-out 14,000 cu. ft. of air per sq. ft. of floor area.
         F.
              Maintain a relative humidity no higher than 50%




                                                                              Page 250            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool B Questions



         A construction member says a new product has come in with a label
64
         saying 'High Albedo'. What does 'albedo' say about the product?


         A.
1




              The product is made from salvaged material
         B.
              The product reflects a high amount of sunlight
         C.
              The product is made from certified wood
CHOOSE




         D.
              The product is made from recycled material




                                                                             Page 251            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                          Place "X"(s)
         LEED Practice - Pool B Questions



65 What are ways to reduce storm water runoff volume?


         A.
3




              Impervious paving materials
         B.
              Slowing water run off rates to local rivers/streams
         C.
              Install bioswales
CHOOSE




         D.
              Use high albedo roof covering
         E.
              Create retention ponds
         F.
              Use smaller building footprint




                                                                     Page 252            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool B Questions


   An office building has 180 full time (40 hrs/week) and 40 part time (20
   hrs/week) employees. There are also 30 peak period visitors per day. How
66 many changing and showering facilities need to be provided to qualify for
   SS Credit 4.2 Alternative Transportation: Bicycle Storage and Changing
   Rooms?

         A.
1




              0
         B.
              1
         C.
              2
CHOOSE




         D.
              3




                                                                         Page 253             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool B Questions



         What values are required in the submittal templates to calculate SRI for SS
67
         Credit 7.1, Heat Island Effect: Non-Roof?


         A.
2




              Area of shade coverage at 10 a.m., 12 noon, and 3 p.m.
         B.
              Albedo
         C.
              Total hardscape area
CHOOSE




         D.
              Reflectance
         E.
              Emissivity
         F.
              Thermal gradient




                                                                                Page 254              Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions



         Donating material to organizations like Habitat for Humanity may help
68
         achieve point(s) in what credit area?


         A.
1




              MR Credit 1.1, Building Reuse
         B.
              MR Credit 2.1, Construction Waste Management
         C.
              MR Credit 3.1, Materials Reuse
CHOOSE




         D.
              MR Credit 5.1, Regional Materials
         E.
              MR Credit 4.1, Recycled Content




                                                                                 Page 255            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions



         Air filtration media with a MERV rating of 13 or higher is needed for
69
         earning which two combined credits?


              EQ Credit 3.1 Construction IAQ Management Plan: During
         A.
2




              Construction
         B.
            EQ Credit 2 Increased Ventilation
            EQ Credit 3.2 Construction IAQ Management Plan: Before
         C.
            Occupancy
CHOOSE




         D.
              EQ Credit 5 Indoor Chemical & Pollutant Source Control




                                                                                 Page 256            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool B Questions




   Reused and salvaged materials that satisfy the requirements of MR Credits
70 3.1 and 3.2 Materials Reuse may also contribute to which one of the
   following?



         A. Set parking fees at levels to encourage carpooling
1




         B.   Encourage street parking

         C. Create parking further away from building entrance
CHOOSE




         D. Create incentive programs for carpooling




                                                                         Page 257             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool B Questions




         What reference standards do not have to be followed to get a building
 71
         certified?



         A.
4




              ASHRAE 62-1999
         B.
              ASHRAE 55-2004
         C.
              ASHRAE 90.1-1999
CHOOSE




         D.
              ASHRAE 52.2-1999
         E.
              ASHRAE 90.1-2004
         F.
              ASHRAE 62.1-2004




                                                                                 Page 258            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool B Questions




         Which of the following sites could qualify for SS Credits 5.1 or 5.2, Site
72
         Development?




            Previously graded site that has had 50% of the site are restored with
         A.
2




            native vegetation building site with 5,000 sq. ft. of vegetated open
            50,000 sq. ft. office
            space, located where a zoning ordinance exists but there is no
         B.
            requirement for open space.
            Greenfield site where the development was disturbed 50 feet beyond
         C.
            the building perimeter
CHOOSE




            Military complex with 500,000 sq. ft. of building space and 250,000
         D.
            sq. ft of vegetated open space
            1,000,000 sq. ft. warehouse site with 500,000 sq. ft. of the site area
         E.
            covered in native plants, being built on an old industrial complex.




                                                                                  Page 259            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions



   An architect is designing a new 10 story office building in a downtown
   area. The space will be mechanically ventilated with an occupant density of
73
   30 people per 1000 sq. ft. What needs to be added to the project design to
   achieve EQ Credit 1, Outdoor Air Delivery Monitoring?


            Install monitoring equipment that generates an alarm when
         A.
2




            conditions vary by 5% or more
            Install CO2 monitoring locations between 3 and 6 feet above the
         B.
            floor
            Install CO2 monitoring locations between 2 and 4 feet above the
         C.
            floor
CHOOSE




            Install monitoring equipment that generates an alarm when
         D.
            conditions vary by 10% or more




                                                                              Page 260            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions




         What are some useful strategies to achieve WE Credit 1.1 Water Efficient
74
         Landscaping?



         A.
3




              Use bioswales
         B.
              Use drip irrigation
         C.
              Create a sediment basin
CHOOSE




         D.
              Implement mulching
         E.
              Remove turf grass




                                                                              Page 261             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool B Questions




         Which of the following referenced standards relate to EQ Credit 4.1 Low-
75
         Emitting Materials?



         A.
2




              South Coast Rule #1168
         B.
              EPA Indoor Air Quality Publication 32
         C.
              Green Seal Standard 36 (GS-36)
CHOOSE




         D.
              ASHRAE Standard 62.1-2004
         E.
              CIBSE AM10




                                                                              Page 262             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool B Questions




         Which of the following credits requires a photo for LEED documentation
76
         purposes?


         A.
1




              SS Credit 6.1 Stormwater Design
         B.
              SS Credit 4.2 Alternative Transportation
         C.
              SS Credit 2 Development Density & Community Connectivity
CHOOSE




         D.
              EQ Credit 3.1 Construction IAQ Management Plan
         E.
              SS Credit 7.2 Heat Island Effect




                                                                            Page 263             Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool B Questions




77 Which of the following are not required to submit to earn ID Credit 1?




         A.
2




              Documentation of doubling the credit requirements
         B.
              Copy of the LEED AP certificate
         C.
              Separate submittals for each point
CHOOSE




         D.
              Narrative statement of the credit intent
         E.
              Construction drawings
         F.
              Number of LEED APs on the project




                                                                            Page 264            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                         Place "X"(s)
         LEED Practice - Pool B Questions




         To discover interior building lighting information for SS Credit 8 Light
78
         Pollution Reduction, the design team should utilize what reference?



         A.
1




              Manufacturer's photometric data
         B.
              ASHRAE 90.1-2004
         C.
              Lighting power density table
CHOOSE




         D.
              ASHRAE 55




                                                                                    Page 265            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool B Questions




         What standard must be followed to achieve with EA Prerequisite 2
79
         Minimum Energy Performance?



         A.
1




              ASHRAE/IESNA 90.1-2004
         B.
              IESNA 2007
         C.
              ASHRAE 55.1
CHOOSE




         D.
              US DOE Standard 105.2.1




                                                                            Page 266            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool B Questions




         Which one of the following professional's performance most impacts
80
         achieving EQ Credit 3.1 Construction IAQ Management Plan?



         A.
1




              Architects
         B.
              Engineers
         C.
              Owner - Developer
CHOOSE




         D.
              General Contractor




                                                                              Page 267            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 268            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 269            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 270            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 271            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 272            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 273            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 274            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 275            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 276            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 277            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 278            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 279            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 280            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 281            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 282            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 283            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 284            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 285            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 286            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 287            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 288            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 289            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 290            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 291            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 292            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 293            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 294            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 295            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 296            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 297            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 298            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 299            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 300            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 301            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 302            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 303            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 304            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 305            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 306            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 307            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 308            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 309            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 310            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 311            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 312            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 313            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 314            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 315            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 316            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 317            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 318            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 319            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 320            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 321            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 322            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 323            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 324            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 325            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 326            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 327            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 328            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 329            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 330            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 331            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 332            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 333            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 334            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 335            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 336            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 337            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 338            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 339            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 340            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 341            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 342            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 343            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 344            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 345            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 346            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 347            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 348            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 349            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 350            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 351            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 352            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 353            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 354            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 355            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 356            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 357            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 358            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 359            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 360            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 361            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 362            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 363            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 364            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 365            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 366            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 367            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 368            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 369            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 370            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 371            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 372            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 373            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 374            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 375            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 376            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 377            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 378            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 379            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 380            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 381            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 382            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 383            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 384            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 385            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 386            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 387            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 388            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 389            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 390            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 391            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 392            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 393            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 394            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 395            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 396            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 397            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 398            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 399            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 400            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 401            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 402            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 403            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 404            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 405            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 406            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 407            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 408            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 409            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 410            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 411            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 412            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 413            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 414            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 415            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 416            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 417            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 418            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 419            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 420            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 421            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 422            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 423            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 424            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 425            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 426            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 427            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 428            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 429            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 430            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 431            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 432            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 433            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 434            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 435            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 436            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 437            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 438            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 439            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 440            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 441            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 442            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 443            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 444            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 445            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 446            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 447            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 448            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 449            Pool B Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                   Place "X"(s)
   LEED Practice - Pool B Questions




                                                              Page 450            Pool B Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions


    There are several Best Management Practices (BMPs) that give advice to
    help with SS Credit 6.2 Storm Water Design. What should the BMPs have
  1
    to ensure they truly treat runoff to the point of 80% average annual post
    development total suspended solids? (Choose 2)

         A. A design that follows state or local programs
2




         B.   Monitoring data showing compliance

         C. Approval by City Water Management
CHOOSE




         D. Proven compliance with EPA Clean Water Act




                                                                     Page 451                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions


    Which of the following entryway systems must be maintained at least
  2 weekly to achieve EQ Credit 5, Indoor Chemical & Pollutant Source
    Control?

         A. Roll-out mats
1




         B.   Grills

         C. Slotted system
CHOOSE




         D. Grates




                                                                     Page 452                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions


    During the final review of your project one of the credits has been denied
  3 and the project no longer qualifies for LEED certification. What can you
    do to still earn the certification?

         A. Submit an alternate credit
1




         B.   Appeal the credit that was denied

         C. Certify a second LEED AP to earn an additional ID credit
CHOOSE




         D. Submit a CIR to resolve the issue with the credit




                                                                       Page 453                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions



         Which of the following salvaged materials contribute to achieving MR
  4
         Credit 3.1, Materials Reuse? (Choose 3)

         A. Cabinets
3




         B.   Plumbing components

         C. Beams
CHOOSE




         D. Electrical components

         E. Decorative items




                                                                       Page 454                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions



    The design team has elected to pursue design strategies to meet the
  5 requirements of SS Credit 7.1 Heat Island Effect: Non-Roof. Which of the
    following should the LEED AP verify? (Choose 2)

         A. Albedo of the impervious paving materials selected
2




         B.   Area of shading from site trees

         C. Emissivity of impervious surfaces
CHOOSE




         D. Run-off coefficients for the impervious paving materials selected




                                                                        Page 455                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool C Questions



         Total site area must be used consistently in calculations that demonstrate
  6
         compliance with the requirements of which credits? (Choose 2)


         A. SS Credit 6.1, Storm Water Management
2




              SS Credit 4.1, Alternative Transportation: Public Transportation
         B.
              Access
         C. SS Credit 5.2, Site Development
CHOOSE




         D. MR Credit 1.3 Building Reuse

         E. SS Credit 2, Development Density




                                                                          Page 456                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions



         Your team submits all design credits at the end of the design phase. What
  7
         does the USGBC do with these credits?

         A. Nothing until the construction is substantially complete
1




         B.   Marks the credits Achievement Anticipated or Denied

         C. Marks the credits Achieved or Anticipate Denied
CHOOSE




         D. Nothing until the construction phase is complete




                                                                         Page 457                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions


    A 15,000 sq. ft. office building is trying to achieve 4 points for EA Credit
  8 1, Optimize Energy Performance without using a building energy model.
    What is the first task the project team must do?

         A. Determine the baseline system sizing
1




         B.   Calculate the performance rating

         C. Identify the prescriptive requirements for the project
CHOOSE




         D. Identify the climate zone




                                                                       Page 458                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions




  9 In which category can you submit all of the credits in the design submittal?


         A. MR
1




         B.   WE

         C. SS
CHOOSE




         D. ID

         E. EA

         F.   EQ




                                                                     Page 459                     Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions


         Which of the following do not contribute to achieving MR Credit 2.2,
 10
         Construction Waste Management?

         A. Insulation
1




         B.   Stumps

         C. Concrete
CHOOSE




         D. Wallboard

         E. Plastic




                                                                       Page 460                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



         Where would you find the one qualifying method for using ASHRAE 90.1
 11
         on EA, Credit 1?


         A. Performance Rating Method - Appendix G
1




         B.   Advanced Building Benchmark - Item 1.1

         C. Building Envelope Measurements - Segment 3.5.1
CHOOSE




         D. Energy Cost Budget Method - Item 11




                                                                     Page 461                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions



 12 What needs to be done for fundamental commissioning? (Choose 3)

         A. Develop a systems manual
3




         B.   Verify the installation and performance of commissioned systems

         C. Complete a summary commissioning report
CHOOSE




         D. Develop a commissioning plan
              Have the commissioning authority review the building operation
         E.
              within 10 months




                                                                       Page 462                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



         What needs to be complied with to achieve EA Prerequisite 2, Minimum
 13
         Energy Performance?

         A. IMPV
1




         B.   ASHRAE 90.1 only

         C. Local codes only
CHOOSE




         D. ASHRAE 90.1 or local codes if equivalent or more stringent




                                                                     Page 463                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions


    A site is being selected for a company's new corporate headquarters. What
 14 site is the best choice if the project wants to qualify for SS Credit 1 Site
    Selection?

         A. Previously developed site near similar projects
1




         B.   10 acres currently owned by a farmer
              Previously undeveloped land with an elevation 3 feet above FEMA
         C.
              defined 100 year flood
CHOOSE




         D. Land which is the habitat for a rare species of animal

         E. 10 acres of land that is a currently a run down city park




                                                                        Page 464                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions


         Which of the following statements are true regarding MR Credit 2.1,
 15
         Construction Waste Management?

         A. Diverted concrete contributes to this credit
1




              At least 75% of non-hazardous debris must be diverted to achieve
         B.
              this credit
         C. Excavated soil contributes to this credit
CHOOSE




              Calculations can be done by using volume and weight on the same
         D.
              project




                                                                        Page 465                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions


    The cost of the new building materials for a renovation project will be
 16 $1,000,000. What could the design team purchase for the project to earn
    MR Credit 6, Rapidly Renewable Materials? (Choose 2)

         A. $25,000 of pine flooring
2




         B.   $30,000 of bamboo flooring

         C. $20,000 of wool carpeting
CHOOSE




         D. $12,500 of bamboo flooring

         E. $20,000 of bamboo flooring and $20,000 of pine flooring

         F.   $20,000 of wool carpeting and $15,000 of bamboo flooring




                                                                         Page 466                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions


         Using storage tanks to achieve SS Credit 6.1 Stormwater Design: Quantity
 17
         Control can help achieve which of the following credits?

         A. SS Credit 7.2 Heat Island Effect: Roof
1




         B.   SS Prerequisite 1 Construction Activity Pollution Prevention
              WE Credit 1.2 Water Efficient Landscaping, No Potable Water Use
         C.
              or No Irrigation
CHOOSE




         D. SS Credit 6.2 Stormwater Design: Quality Control

         E. SS Credit 7.1 Heat Island Effect: Non-Roof




                                                                         Page 467                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions



    During the construction phase a contractor has painted a wall with high
 18 VOC paint. What is the process for correcting the error or submitting
    information to qualify for EQ Credit 4.2 Paints and Coatings?

              Cover over high VOC paint with 'Green Living' paint with plant
         A.
1




              sterols
         B.   Remove the paint with paint remover

         C. Paint over the high VOC paint with an approved low VOC paint
CHOOSE




         D. Take down the dry wall on which the high VOC was painted

         E. Take in the high VOC paint into overall calculation for VOCs




                                                                       Page 468                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



    An existing commercial office building is being renovated. The project
 19 scope consists of a new core and shell and replacement of the HVAC
    equipment. Which rating system(s) should be used for this project?


         A. LEED-CS
1




         B.   LEED-CS and LEED EB

         C. LEED-NC and LEED CI
CHOOSE




         D. LEED-EB

         E. LEED-CI and LEED EB

         F.   LEED-NC




                                                                     Page 469                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool C Questions


         A new LEED-NC ruling in June - 2007 mandates what important change
20
         to Optimize Energy Performance?

              Project teams must achieve two points on this credit or the team will
         A.
1




              receive no points for the credit
         B.   Only green power will be acceptable for building energy

         C. On-Site energy must make up at least 5% of energy saved
CHOOSE




         D. A computer simulation must be done as the baseline for the credit




                                                                          Page 470                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions


    Your project uses steel for the building frame. No information is available
 21 on the steel's recycled content. Can you count some of the steel as
    recycled content? IF so, what amount?
              Yes, you can count 10% of the steel's cost as part of your recycled
         A.
1




              expenditures
         B.   Yes, you can use 90% as most steel is over 90% recycled
              No, you cannot show the steel as recycled content without Chain of
         C.
              Custody
CHOOSE




         D. No, but you can count the steel as regional material

         E. Yes, you can count 25% as recycled content




                                                                          Page 471                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions


         What types of documentation qualify for SS Credit 3 Brownfield
22
         Redevelopment? (Choose 2)

         A. US CFR Title 7, Volume 6, Parts 400-699
2




         B.   Local, State, or Federal Agency Approval

         C. ASTM Phase II Environmental
CHOOSE




         D. EPA CERCLA Registration

         E. IESNA Certification




                                                                          Page 472                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions


         Which of the following approaches can be used to meet EQ Credit 7.1,
23
         Thermal Comfort?

         A. Both mechanical HVAC systems and natural ventilation can be used
1




         B.   Natural ventilation
              Neither mechanical HVAC systems nor natural ventilation can be
         C.
              used
CHOOSE




         D. Mechanical HVAC system




                                                                      Page 473                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions




         An exemplary performance point can be earned on credits SS Credits 4.1-
24
         4.4 Alternative Transportation for doing which of the following?


            Developing within an urban district with a density of 75,000 SF / acre
         A.
1




            or more
            Instituting a transportation management plan that can reduce
         B.
            automobile use quantifiably
            Providing no new parking on the project and using Low-E vehicles
         C.
            for all company cars
CHOOSE




            Locating within 1/4 mile of two different bus lines AND within 1/2
         D. mile of a light rail station while providing preferred parking to
            employees with Low-E vehicles.




                                                                        Page 474                    Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions




25 Which one of the following does not require a baseline analysis?



         A. Optimize Energy Performance
1




         B.   Water Use Reduction

         C. Fundamental Building Commissioning
CHOOSE




         D. Construction Activity Pollution Prevention




                                                                      Page 475                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions



         To implement efficient landscape irrigation for WE Credits 1.1 and 1.2,
26
         what types of irrigation systems can be used? (Choose 3)

         A. Recycled system
3




         B.   Treated system

         C. Mechanical water system
CHOOSE




         D. Cool water system

         E. Micro-irrigation system




                                                                         Page 476                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions


   A 5 story office building is being constructed on the site of an old
   warehouse. The site has a zero-lot-line and is completely paved. The pre-
27 development discharge rate of stormwater is 10,000 gallons. What must
   the post-development discharge rate be to qualify for SS Credit 6.1,
   Stormwater Design: Quantity Control?

         A. 7,000 gallons
1




         B.   9,000 gallons

         C. 8,000 gallons
CHOOSE




         D. 10,000 gallons




                                                                     Page 477                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions


         Which of these methods will NOT reduce heat island effect, for SS Credit
28
         7.1?

         A. Open grid paving
1




         B.   High emissivity, high reflectance materials

         C. Shading
CHOOSE




         D. Planting small shrubs




                                                                       Page 478                    Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions



         What types of green energy qualify for EA Credit 6, Green Power?
29
         (Choose 2)

         A. Renewable power from third party provider on contract
2




         B.   Renewable energy Tradable Certificates

         C. Energy reductions from the building baseline
CHOOSE




         D. On-site renewable energy




                                                                       Page 479                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



         Which of the following are considered composite woods as part of EQ
30
         Credit 4.4, Low-Emitting Materials? (Choose 4)

         A. Furniture
4




         B.   Plywood

         C. MDF
CHOOSE




         D. OSD

         E. Door Cores

         F.   Particle Board




                                                                     Page 480                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions


    A 10,000 sq. ft. building is undergoing a major renovation and expansion.
    The addition will add an additional 15,000 sq. ft. to the existing building.
 31 To achieve MR Credit 1.2 Building Reuse, what existing surface area
    information must be available to document compliance with this credit?
    (Choose 3)

         A. Mechanical, electrical, and plumbing equipment
3




         B.   Structural floor and roof decking

         C. Landscaped area to be retained
CHOOSE




         D. Interior doors

         E. Window assemblies

         F.   Exterior skin and framing




                                                                       Page 481                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions



         Which of the following are not required to document credit compliance of
32
         EQ Credit 3.1, Construction IAQ Management Plan? (Choose 2)


         A. IAQ Management plan
2




              If permanently installed air handing equipment was used during
         B.
              construction
         C. Photos to highlight the implemented construction IAQ practices
CHOOSE




         D. Narrative of non-standard approaches

         E. List of all filtration media with MERV rating used

         F.   Narrative of special circumstances




                                                                        Page 482                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions




         Which of the following can earn a project innovative performance credit?
33
         (Choose 2)



              Use high volume fly ash in concrete as a partial replacement for
         A.
2




              cement
              Create a comprehensive transportation management plan that reduces
         B.
              personal automobile use
         C. Provide 70% of a project's electricity using green power
CHOOSE




         D. 100% green roof system for each building that is part of the project

         E. Provide 15% on-site renewable energy
              Green housekeeping program that uses cleaning chemicals approved
         F.
              by Green Seal




                                                                        Page 483                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions



   The design of a new college classroom building will need which of the
34 following to achieve SS Credit 4.2 Alternative Transportation: Bicycle
   Storage & Changing Rooms?


         A. Secure bicycle storage for 5% or more of peak building users
1




         B.   Changing facilities for 0.05% of FTE occupants

         C. Bicycle storage within 250 yards of the building entrance.
CHOOSE




         D. Covered bicycle storage for 15% or more of building occupants

         E. Secure bicycle racks for 3% or more of FTE occupants




                                                                         Page 484                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions




         A project designed for Arizona will include no irrigation for the
35
         landscaping. How many points would the project earn for this approach?


         A. 2
1




         B.   0

         C. 1
CHOOSE




         D. 3




                                                                      Page 485                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions




36 Which of the following requires a Chain of Custody (CoC) document?



         A. MR Credit 6, Rapidly Renewable Materials
1




         B.   MR Credit 7, Certified Wood

         C. MR Credit 5, Regional Materials
CHOOSE




         D. MR Credit 1, Building Reuse

         E. MR Credit 2, Construction Waste Management

         F.   MR Credit 4, Recycled Content




                                                                     Page 486                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool C Questions



         The controlled admission of natural light into a space through glazing with
37
         the intent of reducing electric lighting is referred to as:


         A. Glazing factor
1




         B.   Footcandling

         C. Visible light transmittance
CHOOSE




         D. Daylighting




                                                                         Page 487                     Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions




   A project consists of building a 50,000 sq. ft. cafeteria on an Air Force
38 base. What amount of the site area must remain vegetated to qualify for SS
   Credit 5.2 Site Development?


         A. 50,000 sq. ft.
1




         B.   20% of site area

         C. 25,000 sq. ft.
CHOOSE




         D. 100,000 sq. ft.

         E. 50% of site area




                                                                     Page 488                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions




39 A complete LEED submittal must include which items? (Choose 4)



         A. Project Photos by Construction Stage
4




         B.   List of all vendors / contractors who are working on the project

         C. Project Rendering
CHOOSE




         D. At least 3 project highlights in the form of a written description

         E. Site Plan

         F.   Typical or Primary Elevations




                                                                          Page 489                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions




         During fundamental commissioning, Energy and Atmosphere Prerequisite
40
         1, who is in charge of developing the Basis of Design?



         A. Commissioning Authority
1




         B.   Design Team

         C. Owner
CHOOSE




         D. Owner and Commissioning Authority

         E. Project Team




                                                                     Page 490                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions



         What ways can a project qualify for SS Credit 4.3 Low-Emission & Fuel-
 41
         Efficient Vehicles? (Choose 3)


         A. Alternative fuel refueling station for 3% of total vehicle capacity
3




            Preferred parking for low-emitting and fuel-efficient vehicles for 5%
         B.
            of total parking
            Low-emitting and fuel-efficient vehicles for 3% FTE occupants plus
         C.
            preferred parking for those vehicles
CHOOSE




            Preferred parking for 3% of total parking for low-emitting and fuel-
         D.
            efficient vehicles
         E. Low-emitting and fuel-efficient vehicles for 5% of FTEs




                                                                          Page 491                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions




42 What is used to determine the value of on-site salvaged materials?



         A. Actual cost paid
1




         B.   45% of the cost

         C. 45% of the value
CHOOSE




         D. Replacement value




                                                                     Page 492                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions



         The cost of LEED certification for New Construction is based on which
43
         of the following?


         A. USGBC membership and project type
1




         B.   USGBC membership

         C. Project size
CHOOSE




         D. Project size and USGBC membership

         E. Project type (education, non-profit, commercial, government)

         F.   Project size and project type




                                                                      Page 493                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



         How many Innovation & Design Process Points can you have on a
44
         project?

         A. 6
1




         B.   Unlimited

         C. 2
CHOOSE




         D. 8

         E. 5

         F.   4




                                                                     Page 494                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions



   A project team wants to qualify for SS Credit 2 Development Density &
45 Community Connectivity. Which of the following are requirements to
   meet Development Density? (Choose 2)

              Site must be in a community with a minimum density of 50,000 sq.ft.
         A.
2




              per acre net, in the correct density radius
              Site must be in a community with a minimum density of 60,000 sq.ft.
         B.
              per acre net, in the correct density radius
         C. Site must be within 1/2 mile of 10 basic services
CHOOSE




         D. Site must be within 1/4 mile of two different metro bus lines

         E. Select a Brownfield site as qualified by state and local governments

         F.   Construct or renovate on previously developed site




                                                                         Page 495                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



   MR Credit 5.2, Regional Materials, requires a minimum of ______ of
46 building material to extracted, processed, manufactured, or recovered
   within a radius of ______ miles of a project.


         A. 20%, 500
1




         B.   25%, 500

         C. 25%, 750
CHOOSE




         D. 10%, 500

         E. 20%, 750




                                                                     Page 496                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions


   Your office building has 100 full time (40 hrs/week) and 60 part time (20
   hrs/week) employees. There are also 30 peak period visitors a day. How
47
   many secure bike racks do you need to provide to qualify for SS Credit 4.2
   Bicycle Storage and Changing Rooms?

         A. 6
1




         B.   8

         C. 9
CHOOSE




         D. 7

         E. 10




                                                                     Page 497                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions




         What percentage of occupants must have individual comfort controls to
48
         achieve EQ Credit 6.2, Controllability of Systems?



         A. 70 percent
1




         B.   50 percent

         C. 60 percent
CHOOSE




         D. 30 percent

         E. 40 percent




                                                                      Page 498                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions



   Project teams using natural ventilation can use which means of
49 demonstrating credit compliance for EQ Credit 2, Increased Ventilation?
   (Choose 2)


              Documentation using a macroscopic, multi-zone, analytic model that
         A.
2




              predicts room-by-room outdoor air flow rates
         B.   Carbon Trust Building Assessment

         C. ASHRAE Standard 62.1-2004 Ventilation Rate Procedure
CHOOSE




         D. CIBSE AM10




                                                                       Page 499                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions



   The project owner has designated you to hire the Enhanced
   Commissioning Authority for a 100,000 sq. ft. retail center. What are the
50
   restrictions you must ensure the Commissioning Authority has to qualify?
   (Choose 2)


         A. Not a contracted employee through the design firm
2




         B.   Building experience on at least 3 other building projects
              Not an employee of a contractor or construction manager holding
         C.
              construction contracts
CHOOSE




         D. Not an employee or contractor of the owner

         E. Independent of the work of design and construction




                                                                          Page 500                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions




 51 How can the project team calculate the materials costs for MR credits?



         A. Estimate the value of the materials
1




         B.   Apply a 45% factor to total costs (including labor and equipment)

         C. Use CBECS database to estimate the costs of the materials
CHOOSE




         D. Apply a 45% factor to total costs (excluding labor and equipment)




                                                                         Page 501                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions



   In a new office building design, no carpets and fabrics will be used in the
   construction process before occupancy. Which of the following
52
   contaminant tests do NOT need to be performed in order to achieve EQ
   Credit 3.2, Construction IAQ Management Plan?


         A. Carbon Monoxide (CO)
1




         B.   Particulates (PM10)

         C. Total Volatile Organic Compounds (TVOC)
CHOOSE




         D. 4-Phenylcyclohexene (4-PCH)

         E. Formaldehyde




                                                                     Page 502                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool C Questions




         Which of the following are valid entries for the construction submittal of
53
         MR Credit 2.1 & 2.2, Construction Waste Management? (Choose 2)



         A. 150 tons of concrete
2




         B.   1.6 tons of steel and 6 cubic yards of wallboard

         C. ABC Recycling, as the recycling location
CHOOSE




         D. 3 tons of hazardous construction debris

         E. 10 tons of fill dirt




                                                                          Page 503                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool C Questions




         You are starting a 60,000 sq. ft. retail building. Who could serve as the
54
         Commissioning Authority for fundamental commissioning? (Choose 2)


         A. USGBC Commissioning Team Consultant
2




         B.   State or Local Zoning official

         C. A design or construction team member
CHOOSE




         D. Staff member of the owner

         E. A third party consultant




                                                                           Page 504                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions



   When building a small 15,000 sq. ft. office building, what standard is used
55 when taking prescriptive measures for EA Credit 1 Optimize Energy
   Performance?


         A. USGBC Technical and Scientific Regulations Standards
1




         B.   ASHRAE Advance Energy Design Guide

         C. ASHRAE/IESNA 90.1-2004
CHOOSE




         D. Benchmark Version 1.1




                                                                     Page 505                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



   When performing a flush-out to meet EQ Credit 3.2, Construction IAQ
56 Management Plan, what quantity of outside air must be introduced to the
   project space per sq. ft. of floor area?

         A. 20,000 cu. ft.
1




         B.   18,000 cu. ft.

         C. 16,000 cu. ft.
CHOOSE




         D. 14,000 cu. ft.

         E. 12,000 cu. ft.

         F    10,000 cu. ft.




                                                                     Page 506                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



   What should a project manager do to ensure a project has complied with
57 the exterior light trespass requirements of SS Credit 8, Light Pollution
   Reduction?

         A. Develop project drawings
1




         B.   Use candela plots

         C. Build a model using lighting design software
CHOOSE




         D. Measure light trespass after light install




                                                                     Page 507                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool C Questions


   A 1,000,000 sq.ft. previously developed site is located in Phoenix, Arizona.
   What amount of site area (excluding building footprint) needs to be
58
   protected or have vegetation restored to qualify for exemplary
   performance on SS Credit 5.1 Protect or Restore Habitat?

         A. 900,000 sq. ft.
1




         B.   600,000 sq. ft.

         C. 800,000 sq. ft.
CHOOSE




         D. 950,000 sq. ft.

         E. 850,000 sq. ft.

         F.   750,000 sq. ft.




                                                                     Page 508                    Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions



         Which of the following are required to submit to earn ID Credit 2?
59
         (Choose 2)


         A. Number of LEED APs on the project
2




         B.   LEED AP's membership ID

         C. LEED AP's company
CHOOSE




         D. LEED AP's certificate

         E. LEED project history of each LEED AP




                                                                        Page 509                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



   EQ Credits 8.1 & 8.2, Daylight and Views require a minimum Glazing
60 Factor of _______ over ______ of occupied space and direct line of sight
   to vision glazing from _______ of occupied space.


         A. 2%, 90%, 90%
1




         B.   2%, 50%, 90%

         C. 2%, 75%, 90%
CHOOSE




         D. 1%, 75%, 90%

         E. 1%, 50%, 90%




                                                                     Page 510                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions



    A company decides to develop a building that will provide an optimal
    working environment for employees. Among numerous green building
    strategies implemented on the project, the design team includes:
     - Operable windows
     - Task/ambient lighting
 61 - Private offices with glass doors and walls adjacent to the building core
     - Open office areas near the perimeter wall
     - Photocell lighting controls
    These design strategies may help this project achieve which credits?
    (Choose 3)


         A.   EQ Credit 1 Outdoor Air Delivery Monitoring
3




         B.   EQ Credit 8.1 Daylight and Views
CHOOSE




         C.   EA Credit 5 Measurement and Verification
         D.   EQ Credit 5 Indoor Chemical and Pollutant Source Control
         E.   EA Credit 1 Optimize Energy Performance
         F.   EQ Credit 6.1 Controllability of Systems


                                                                     Page 511                   Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



   A renovation project includes reused and salvaged materials that will
   satisfy the requirements of MR Credits 3.1 and 3.2, Materials Reuse.
62
   Which of the following credits could the materials also be applied to earn
   additional points?


         A. MR Credit 7, Certified Wood
1




         B.   MR Credit 6, Rapidly Renewable Materials

         C. MR Credit 4, Recycled Content
CHOOSE




         D. MR Credit 5, Regional Materials




                                                                     Page 512                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



   An office park under construction in a suburban area needs to earn SS
63 Credit 7.1 Heat Island Effect. The project area has 4 acres of hardscape.
   What options can help qualify for this credit? (Choose 3)


         A. Shade 1 acre of hardscape in 5 years
3




         B.   Cover paving materials with SRI minimum of 29

         C. Shade 2 acres of hardscape in 5 years
CHOOSE




         D. Install 2 acres of open grid pavement

         E. Place a minimum of 75% of parking underground

         F.   Install 1 acre of open grid pavement




                                                                     Page 513                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions



         What records must be submitted for SS Credit 6.1 Storm Water Design?
64
         (Choose 2)


         A. Photos of storm water velocity controls
2




              A narrative describing project conditions, measures taken, and
         B.
              controls installed
         C. Structural drawings of storm water recycling systems
CHOOSE




         D. Civil drawings of slope of site

         E. Pre and post development run off rates and quantities




                                                                         Page 514                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions



   A large brick warehouse in a downtown area is being renovated. What
65 percent of the existing walls, floors, and roof must be maintained to
   achieve MR Credit 1.1, Building Reuse?


         A. 25%
1




         B.   50%

         C. 60%
CHOOSE




         D. 75%

         E. 40%




                                                                     Page 515                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions



   WE Credit 1.1 and 1.2 require that the project team submit the baseline
66 total water applied, a narrative describing the landscape and irrigation
   design strategies, and which of the following? (Choose 2)


         A. Design case TWA
2




         B.   Drawings of irrigation systems

         C. Potable water use estimate
CHOOSE




         D. Soil analysis test results

         E. Total non-potable water supply available for irrigation

         F.   List of native plants used




                                                                      Page 516                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool C Questions




         Which statements are true regarding EQ Credit 6.1, Controllability of
67
         Systems? (Choose 2)



              Day-lighting technologies and strategies can be integrated with this
         A.
2




              credit
         B.   For new construction, task lights must be permanently wired

         C. Desk top lights are acceptable for task lighting
CHOOSE




              Conference rooms do not require lighting systems designed for group
         D.
              needs
         E. A minimum of 80% of individual lighting controls is required




                                                                           Page 517                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool C Questions




         In order to maintain IAQ, the contractor shall NOT do which of the
68
         following during construction?



         A. Perform a building flush-out before occupancy
1




         B.   Perform a bake-out of all building controls

         C. Perform minimum IAQ testing before occupancy
CHOOSE




         D. Seal return on HVAC ducts




                                                                      Page 518                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool C Questions




         Which of the following are techniques to meet SS Prerequisite 1,
69
         Construction Activity Pollution Prevention? (Choose 3)




         A. Smaller building footprint
3




         B.   Temporary seeding

         C. Sediment basin
CHOOSE




              Treat stormwater runoff from 90% of the average annual rainfall
         D.
              using BMPs
         E. Cover a minimum of 50% of the site area with native vegitation

         F.   Silt fences




                                                                            Page 519                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions




         What are some strategies to reduce parking requirements for SS Credit 4.4
70
         Alternative Transportation: Parking Capacity? (Choose 3)



         A. Set parking fees at levels to encourage carpooling
3




         B.   Encourage street parking

         C. Create parking further away from building entrance
CHOOSE




         D. Create incentive programs for carpooling

         E. Provide highly reduced parking compared to community needs

         F.   Create a ride share board




                                                                        Page 520                    Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions




         LEED-NC requires registration for both members and non-members.
 71
         What is the fee structure for registering your LEED project?



         A. $600 for member registration, 750 for non-members
1




         B.   $350 for member registration, $500 non-members

         C. $450 for member registration, $600 non-members
CHOOSE




         D. $450 for both members and non-members




                                                                     Page 521                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool C Questions




         When should the M&V period start and conclude to satisfy EA Credit 5
72
         Measurement and Verification?



         A. Start: After Systems Install- End: 18 months after system install
1




         B.   Start: Occupancy and Stabilization - End: One year after stabilization

         C. Start: Occupancy - End: 1 year after building open
CHOOSE




              Start: Substantial Completion - End: One year after substantial
         D.
              completion




                                                                          Page 522                    Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool C Questions




         To calculate the baseline for WE Credit 1, the project team needs to use
73
         which of the following factors? (Choose 3)



         A. Irrigation Efficiency
3




         B.   Density Factor

         C. Average Gallons of Irrigation Water used
CHOOSE




         D. July Median Temperature

         E. Species Factor




                                                                         Page 523                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions




         Which of the following glazing factors are acceptable to achieve EQ
74
         Credit 8.1 Daylight & Views? (Choose 2)



         A. A glazing factor of 3% in 80% of all regularly occupied areas
2




         B.   A glazing factor of 1% in 80% of all regularly occupied areas

         C. A glazing factor of 3% in 70% of all regularly occupied areas
CHOOSE




         D. A glazing factor of 2% in 80% of all regularly occupied areas

         E. A glazing factor of 1% in 70% of all regularly occupied areas

         F.   A glazing factor of 2% in 70% of all regularly occupied areas




                                                                          Page 524                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions




         All of the following are Prerequisites within the LEED rating system
75
         except for:



         A. Increased Ventilation Effectiveness
1




         B.   Environmental Tobacco Smoke Control

         C. Minimum Energy Performance
CHOOSE




         D. Construction Activity Pollution Prevention




                                                                        Page 525                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool C Questions




         When increasing the ventilation of a building for mechanically ventilated
76
         spaces, what can be done to minimize the additional energy consumption?


         A. Alter external driving pressures
1




         B.   Increase airflow paths

         C. Increase outdoor air intakes
CHOOSE




         D. Use heat recovery




                                                                        Page 526                    Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions




77 What happens after the construction submittal?




         A. Construction points are awarded
1




         B.   Design and construction points are awarded

         C. The full application is ruled upon by USGBC
CHOOSE




         D. The design submittal




                                                                     Page 527                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool C Questions




78 What reference standard must a project follow to get a building certified?




         A. ANSI/ASTM-E77903 for office buildings of 20,000 sq. ft. or less
1




         B.   ASHRAE 90.1-2004

         C. Commissioning Authority Reference Guide
CHOOSE




         D. 2003 EPA Construction General Permit

         E. ISO 14021 - 1999




                                                                     Page 528                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions




         Low-VOC paints need to be used in which of the following in order to
79
         achieve EQ Credit 4.2 Low Emitting Materials? (Choose 2)



         A. Anti-corrosive paint on interior ferrous metal substrates
2




         B.   Anti-rust paint on a building's exterior

         C. Stains applied to pre-finished cabinets
CHOOSE




         D. Pre-finished hardwood floors

         E. Anti-rust paint in a building's mechanical room




                                                                        Page 529                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool C Questions




         To be qualified as renewable sources of energy for LEED certification,
80
         what must purchased power products be certified as?



         A. Green Seal
1




         B.   Green-e

         C. Green Score
CHOOSE




         D. Green Label Plus

         E. Green Label




                                                                        Page 530                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 531                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 532                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 533                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 534                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 535                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 536                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 537                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 538                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 539                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 540                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 541                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 542                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 543                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 544                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 545                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 546                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 547                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 548                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 549                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 550                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 551                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 552                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 553                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 554                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 555                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 556                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 557                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 558                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 559                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 560                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 561                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 562                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 563                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 564                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 565                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 566                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 567                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 568                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 569                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 570                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 571                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 572                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 573                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 574                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 575                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 576                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 577                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 578                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 579                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 580                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 581                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 582                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 583                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 584                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 585                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 586                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 587                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 588                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 589                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 590                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 591                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 592                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 593                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 594                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 595                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 596                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 597                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 598                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 599                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 600                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 601                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 602                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 603                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 604                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 605                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 606                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 607                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 608                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 609                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 610                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 611                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 612                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 613                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 614                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 615                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 616                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 617                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 618                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 619                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 620                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 621                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 622                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 623                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 624                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 625                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 626                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 627                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 628                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 629                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 630                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 631                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 632                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 633                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 634                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 635                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 636                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 637                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 638                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 639                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 640                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 641                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 642                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 643                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 644                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 645                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 646                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 647                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 648                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 649                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 650                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 651                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 652                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 653                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 654                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 655                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 656                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 657                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 658                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 659                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 660                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 661                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 662                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 663                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 664                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 665                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 666                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 667                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 668                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 669                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 670                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 671                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 672                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 673                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 674                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 675                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 676                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 677                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 678                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 679                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 680                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 681                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 682                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 683                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 684                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 685                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 686                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 687                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 688                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 689                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 690                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 691                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 692                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 693                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 694                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 695                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 696                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 697                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 698                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 699                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 700                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 701                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 702                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 703                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 704                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 705                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 706                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 707                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 708                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 709                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 710                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 711                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 712                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 713                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 714                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 715                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 716                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 717                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 718                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 719                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 720                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 721                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 722                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 723                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 724                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 725                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 726                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 727                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 728                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 729                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 730                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 731                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 732                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 733                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 734                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 735                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 736                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 737                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 738                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 739                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 740                  Pool C Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                         Place "X"(s)
   LEED Practice - Pool C Questions




                                                              Page 741                  Pool C Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions



         For a naturally ventilated space, what must be done to achieve EQ Credit
  1
         1, Outdoor Air Delivery Monitoring?


         A.
1




            Submit project drawings showing all densely occupied spaces
            Meet the recommendations of the Carbon Trust Good Practice
         B.
            Guide
            Increase breathing zone rates to 30% above the minimum rates of
         C.
            ASHRAE 62.1-2004
CHOOSE




         D.
              CO2 monitoring at 3-6 feet




                                                                            Page 742               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool D Questions


    A new office campus is being developed in a downtown area. There will
    be 660 total parking spaces for the project. How many parking spaces
  2
    would need to be reserved for carpools to achieve SS Credit 4.4,
    Alternative Transportation?

         A.
1




              33
         B.
              40
         C.
              27
CHOOSE




         D.
              20




                                                                      Page 743              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool D Questions


    An owner has changed the landscaping design for a project from non-
    native plants and lawn to a Xeriscape. The original plan called for
    rainwater collection from the building's roof into salvaged cisterns to
  3
    supply water for the landscaping. The cisterns will be removed from the
    design.

         Which credits could be affected by this decision?
         A.
3




            MR Credit 4 Recycled Content
         B.
              SS Credit 6.1 Stormwater Design: Quantity Control
         C.
              WE Credit 3.1 Water Use Reduction
CHOOSE




         D.
              SS Credit 7.1 Heat Island Effect: Roof
         E.
              SS Credit 6.2 Stormwater Design: Quality Control
         F.
              WE Credit 1.1 Water Efficient Landscaping




                                                                        Page 744              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions



  4 Which of the following are required to submit to earn ID Credit 2?


         A.
1




              Exam score
              Copies of any construction drawings or exhibits that will serve to
         B.
              illustrate the project's approach to the credit
         C.
              Specific title for the ID credit being pursued
CHOOSE




         D.
              Description of the LEED AP's project role
         E.
              Narrative statement of the credit intent




                                                                               Page 745              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                         Place "X"(s)
         LEED Practice - Pool D Questions


         For a 30,000 sq. ft. building renovation, the architect's plan indicates the
         reuse of interior elements including wall partitions, flooring, doors,
         windows, cabinets, and ceramic bathroom tile.
  5
         If the total interior non-structural area is 28,000 sq. ft., how many square
         feet must be reused to comply with MR Credit 1.3, Building Reuse?


         A.
1




              15,000 sq. ft.
         B.
              14,000 sq. ft.
         C.
              7,000 sq. ft.
CHOOSE




         D.
              26,600 sq. ft.
         E.
              21,000 sq. ft.




                                                                                  Page 746              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool D Questions



         On a new office complex project at a Greenfield site, which of the
  6
         following strategies will help achieve SS Credit 6.2, Stormwater Design?


         A.
3




              Restoration of deteriorated storm sewers
         B.
              Larger building footprint
         C.
              Disconnection of imperviousness
CHOOSE




         D.
              Albedo rate >= 75%
         E.
              Rainwater recycling
         F.
              Rain garden




                                                                              Page 747              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool D Questions



  7 The efficiency of a heated swimming pool is covered by which standard?


         A.
1




              ASHRAE 55-2004
         B.
              ASHRAE 62-1999
         C.
              ASHRAE 90.1-2004
CHOOSE




         D.
              ASHRAE 90.1-1999
         E.
              ASHRAE 52.2-1999
         F.
              ASHRAE 62.1-2004




                                                                      Page 748              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool D Questions


    An old industrial complex in a downtown area is being rebuilt for mixed-
    use. To achieve SS Credit 2, Development Density & Community
  8
    Connectivity, up to ____ restaurants may be counted if they are within a
    ____ mile radius of the complex.

         A.
1




              3, 1/2
         B.
              3, 1
         C.
              2, 3/4
CHOOSE




         D.
              2, 1
         E.
              2, 1/2
         F.
              3, 1/4




                                                                        Page 749              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool D Questions


    A project is trying to achieve EA Prerequisite 1 and EA Credit 3. Which
  9 person(s) is responsible for verifying the installation and performance of
    commissioned systems?

         A.
1




              Commissioning Authority
         B.
              Owner or Project Team
         C.
              Owner
CHOOSE




         D.
              Contractor
         E.
              Project Team and Commissioning Authority
         F.
              Design Team




                                                                          Page 750              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool D Questions



    In a suburban retail complex you are building an addition that will add
    40,000 sq. ft. to the original building. The original building is connected to
 10 an existing chilled water system that uses CFC-based refrigerants. To earn
    EA Prerequisite 3 Fundamental Refrigerant Management, how many years
    can you take to phase out the CFC-based refrigerants?


         A.
1




              4
         B.
              2
         C.
              0
CHOOSE




         D.
              1
         E.
              5
         F.
              3




                                                                            Page 751                Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                         Place "X"(s)
         LEED Practice - Pool D Questions



         A new 10 story office building will be built in an arid region. Installing
 11
         occupancy sensors could impact which of the following?


         A.
2




              EQ Credit 1 Outdoor Air Delivery Monitoring
         B.
              EA Credit 1 Optimize Energy Performance
         C.
              EQ Credit 6.2 Controllability of Systems: Thermal Comfort
CHOOSE




         D.
              EQ Prerequisite 1 Minimum IAQ Performance
         E.
              EQ Credit 5 Indoor Chemical & Pollutant Source Control




                                                                                  Page 752              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool D Questions


         Which of the following uses a Full-Time Equivalent (FTE) factor in the
 12
         calculations?

         A.
1




              EQ Credit 6.1, Controllability of Systems
         B.
              WE Credit 1, Water Use Reduction
         C.
              SS Credit 4.3, Alternative Transportation
CHOOSE




         D.
              SS Credit 4.5, Alternative Transportation
         E.
              SS Credit 4.1, Alternative Transportation




                                                                            Page 753              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool D Questions



    An apartment complex is being renovated and turned into condominiums.
    You are considering reusing some of the water fixtures. To earn WE
 13
    Credit 3, Water Use Reduction, the existing showerheads would need a
    gpm rate of ____ and the water closets would need a gpf rate of _____.


         A.
1




              2.5, 1.6
         B.
              2.0, 1.28
         C.
              1.6, 1.0
CHOOSE




         D.
              2.5, 1.0
         E.
              1.6, 1.6




                                                                     Page 754               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions



         Which standard describes measures that can be used to control
 14
         sedimentation and erosion?


         A.
1




              Erosion and Sedimentation Control (ESC)
         B.
              Storm Water Pollution Prevention Standard
         C.
              Storm Water Management for Construction Activities
CHOOSE




         D.
              National Pollutant Discharge Elimination System
         E. 10 acres of land that is a currently a run down city park




                                                                         Page 755              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool D Questions



 15 Which of the following statements is true regarding a CIR?


         A.
3




            Attachments are not permitted
            Achievement thresholds can be altered slightly through the CIR
         B.
            process
            A CIR can contain confidential information if it will help the ruling
         C.
            process
CHOOSE




         D.
            A CIR always requests guidance on just one credit
            Before submitting a CIR, you should consult the LEED Reference
         E.
            Guide
            For credit review, the inquiry and ruling must be submitted with the
         F.
            LEED application




                                                                              Page 756              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions


    A project team has decided to revise their design in order to earn
    exemplary performance for SS Credit 7.1, Heat Island Effect: Non Roof.
 16
    The current design has 50% of the parking underground. What can the
    project team change to earn an ID point?

         A.
1




              Install open grid paving to 50% of all hardscapes
         B.
              Put 75% of the parking underground
         C.
            Plant trees that will provide shade of all hardscapes within 5 years
CHOOSE




            Cover 100% of the roof for the underground parking with high-
         D.
            albedo materials




                                                                               Page 757              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions


    Projects that achieve a projected water savings of at least ____ are eligible
 17 for an exemplary performance ID credit in addition to earning WE
    Credits 3.1 and 3.2.

         A.
1




              30%
         B.
              40%
         C.
              60%
CHOOSE




         D.
              50%
         E. SS Credit 7.1 Heat Island Effect: Non-Roof




                                                                            Page 758               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool D Questions



         Which of the following people would need to be consulted with to make a
 18
         decision on EA Prerequisite 3, Fundamental Refrigerant Management?


         A.
2




              Designer
         B.
              Owner
         C.
              Contractor
CHOOSE




         D.
              Mechanical Engineer
         E.
              Architect
         F.
              Civil Engineer




                                                                           Page 759               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                            Place "X"(s)
         LEED Practice - Pool D Questions


    A 30 story condominium project is being developed in a downtown area.
    Which water consuming fixtures can you include in an exemplary
 19
    performance credit calculation for WE Credit 3, Water Use Reduction
    that are excluded from WE Credit 3.2?

         A.
2




              Dishwashers
         B.
              Faucets
         C.
              Showerheads
CHOOSE




         D.
              Water closets
         E.
              Clothes washers




                                                                     Page 760              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions


   An old 4 story warehouse is undergoing a major renovation and
20 expansion. What would be the design strategy for earning EQ Credit 8.2
   Daylight & Views?

         A.
1




              Confirm 90% of unoccupied spaces have Direct Line of Sight
         B.
              Reduce the lighting power density by 30%
         C.
              Locate open plan areas along the exterior walls
CHOOSE




         D.
              Place private offices on the non-daylight side of the building




                                                                               Page 761              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool D Questions




 21 What is needed to be eligible for LEED certification?



         A.
2




              Comply with ASHRAE 62.2-2004

         B.   Developing on previously undeveloped land with an elevation 5 feet
              above the FEMA 100-year flood plain.

         C. Commissioning authority to verify the performance of commissioned
            systems
CHOOSE




         D.
              Comply with ASHRAE 52.2-1999

         E.
              Comply with ASHRAE 90.1-2004

         F.
              Commissioning authority to develop a Basis of Design



                                                                            Page 762              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool D Questions


         Which of the following credits are most likely to require strong
22
         participation by the contractor overseeing a project?

         A.
3




              SS 7.1, Heat Island Effect, Non-Roof
         B.
              SS 7.2, Heat Island Effect, Roof
         C.
              SS 6.1, Stormwater Management, Quality Control
CHOOSE




         D.
              SS 1, Site Selection
         E.
              SS 3, Brownfield Redevelopment
         F.
              SS 5.1, Site Development, Protect or Restore Habitat




                                                                            Page 763              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool D Questions



23 Landscape designs that aim to eliminate the need for irrigation are called:


         A.
1




              Evapotranspiration
         B.
              Xeriscape
         C.
              Drip irrigation
CHOOSE




         D.
              Micro-irrigation




                                                                          Page 764              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool D Questions



   The submittal documentation for SS Credit 7.1 Heat Island Effect: Non-
24 Roof requires calculations for which of the following when using
   reflective paving, shading, and/or open grid pavement?

            Total area of non-roof impervious surfaces constructed with high-
         A.
4




            albedo materials
            Total area of all hardscape surfaces with open-grid paving systems
         B.
            that are at least 50% pervious
            Total effective shaded area of hardscape features shaded by trees and
         C.
CHOOSE




            other landscape features
         D. Total area of all hardscape features having an SRI of at least 29
         E. Total area of all pervious surfaces having an SRI of at least 30
         F. Total area of all non-roof hardscape surfaces on project site




                                                                                Page 765              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions


   Google is installing a new data center in Washington D.C. To protect the
   computer servers in case of fire, a Halon fire suppressions system will be
25
   installed in the main computer room. What credit will this project not be
   eligible for?

         A.
1




              EQ Credit 7.1, Thermal Comfort
         B.
              EA Credit 1, Optimize Energy Performance
         C.
              EQ Credit 2, Increased Ventilation
CHOOSE




         D.
              EA Credit 2, On-Site Renewable Energy
         E.
              EA Credit 4, Enhanced Refrigerant Management




                                                                         Page 766              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool D Questions



         Which of the following are not types of structural controls to achieve SS
26
         Prerequisite 1?

         A.
3




              Earth dike
         B.
              Permanent seeding
         C.
              Temporary seeding
CHOOSE




         D.
              Silt fence
         E.
              Soil-crete
         F.
              Sediment trap




                                                                              Page 767              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool D Questions


   An additional building is being designed for a college campus. The new
   building will not have a shower or changing facilities. To qualify for SS
27 Credit 4.2, Alternative Transportation, the new building can share the
   showering facility of a nearby building if it is within ____ of the entrance
   to the new building.

         A.
1




              400 yards
         B.
              300 yards
         C.
              100 yards
CHOOSE




         D.
              200 yards




                                                                           Page 768              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool D Questions



   During the design phase of a new commercial development the design
   team finds changing the orientation of the building and adding exterior
28
   horizontal louvers above the south-facing windows will be beneficial.
   Which credits would be affected by making these changes?

         A.
3




              EQ Credit 1, Outdoor Air Delivery Monitoring
         B.
              EQ Credit 8.1, Daylight and Views
         C.
              EA Credit 6, Green Power
CHOOSE




         D.
              EA Credit 1, Optimize Energy Performance
         E.
              SS Credit 7.2, Heat Island Effect: Roof
         F.
              SS Credit 7.1, Heat Island Effect: Non-Roof




                                                                        Page 769              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                           Place "X"(s)
         LEED Practice - Pool D Questions



         Which strategy will contribute to earning points for SS Credit 6.1,
29
         Stormwater Design?

         A.
1




              Install a corrugated steel rooftop
         B.
              Maximize spacing between buildings
         C.
              Install a retention pond
CHOOSE




         D.
              Use gray blacktop for the parking lot
         E.
              Increasing building footprint from 10,000 sq. ft. to 12,000 sq. ft.




                                                                                    Page 770              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                            Place "X"(s)
         LEED Practice - Pool D Questions



30 A water use reduction of what percent would earn 2 points?


         A.
1




              20%
         B.
              40%
         C.
              25%
CHOOSE




         D.
              35%
         E.
              30%




                                                                     Page 771              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool D Questions



    A mixed use residential and office project will require 600 parking spaces.
    50% of the parking spaces will be underground. How many preferred
 31
    parking spaces are needed to achieve SS Credit 4.3, Alternative
    Transportation: Low-Emission & Fuel-Efficient Vehicles?


         A.
1




              45
         B.
              60
         C.
              30
CHOOSE




         D.
              15




                                                                          Page 772               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool D Questions


   A 20,000 sq. ft. condominium project wants to earn 4 points by increasing
32 their level of energy performance. What compliance path must the project
   follow?

         A.
1




              CBECS
         B.
              Building Performance Rating Method
         C.
              Advanced Building Benchmark
CHOOSE




         D.
              ASHRAE Advanced Energy Design Guide




                                                                       Page 773               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions




         What reference standards must projects follow to earn LEED
33
         certification?




         A.
2




              Commissioning Authority Reference Guide
         B.
              South Coast Rule #1168
         C.
              ANSI/ASTM-E779-03 for residential buildings that permit smoking
CHOOSE




         D.
              Local erosion and sedimentation control standards
         E.
              ASHRAE 62.1-2004 for buildings with designated smoking rooms
         F.
              ASHRAE 90.1-2002



                                                                         Page 774              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool D Questions



   A building planned for a previously developed site has a zero-lot-line.
34 Given that the project will earn SS Credit 2, what additional credits could
   be earned by installing a vegetated roof surface?


         A.
3




              SS Credit 5.2, Site Development
         B.
              SS Credit 7.2, Heat Island Effect
         C.
              WE Credit 1.1, Water Efficient Landscaping
CHOOSE




         D.
              SS Credit 5.1, Site Development
         E.
              SS Credit 2, Development Density & Community Connectivity




                                                                          Page 775              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions



         Which of the following credits does not have a set measurement to
35
         achieve exemplary performance?


         A.
1




              EQ Credit 8.1, Daylight & Views
         B.
              MR Credit 7, Certified Wood
         C.
              MR Credit 6, Rapidly Renewable Materials
CHOOSE




         D.
              EQ Credit 8.2, Daylight & Views
         E.
              EA Credit 6, Green Power




                                                                             Page 776              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool D Questions



   A new suburban retail project will be implemented using a bio-fuel based
36 electrical system. Which of the following bio-fuels are excluded from
   eligibility for EA Credit 2?


         A.
2




              Pressure treated lumber
         B.
              Landfill gas
         C.
              Forestry biomass waste, other than mill residue
CHOOSE




         D.
              Corn
         E.
              Manure




                                                                       Page 777              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions



         On a project for a new office campus, your credit for WE 1.1 was denied.
37
         At what point in time could you file an appeal?


         A.
2




              After the design phase review
         B.
              After the final review
         C.
              After the construction phase review
CHOOSE




         D.
              Before the final review




                                                                            Page 778               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                         Place "X"(s)
         LEED Practice - Pool D Questions




         For a 2 story, 18,000 sq. ft. office building, what standard will you need to
38
         consult for increasing a building's energy performance above a baseline?


              ASHRAE Advanced Energy Design Guide for Small Office Buildings
         A.
1




              2004
         B.
              SBIC
         C.
              ASHRAE Advanced Buildings Benchmark
CHOOSE




         D.
              ACEEE
         E.
              ASHRAE 90.1-2004
         F.
              IESNA 90.1-2004




                                                                                 Page 779               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions


   The owner of a new oceanfront museum project wants to use green
   power, but the direct purchase of Green-e certified power is not available
39
   through the local utilities. What information is not required on the
   submittal documentation when using Tradable Renewable Certificates?

         A.
1




              Building type
         B.
              Median electrical intensity (kWh/sf-yr)
         C.
              Total building area (sq. ft.)
CHOOSE




         D.
              Emissions criteria for the non-renewable portion




                                                                        Page 780               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool D Questions



   A project for a new library has achieved a 25% reduction in water use.
   40% of wastewater will be treated on site. Native plants will be used for
40
   landscaping to help reduce landscape irrigation by 40%. How many points
   will the project earn for achieving these goals?

         A.
1




              5
         B.
              1
         C.
              3
CHOOSE




         D.
              2
         E.
              0
         F.
              4




                                                                       Page 781               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool D Questions



         The IPMVP Volume III presents four options for new construction
 41
         measurement and verification. Which two are suitable for LEED M&V?


         A.
2




              Calibrated Simulation
         B.
              ECM Isolation
         C.
              Partially Measured ECM Isolation
CHOOSE




         D.
              Whole Facility
         E. Low-emitting and fuel-efficient vehicles for 5% of FTEs




                                                                        Page 782              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                          Place "X"(s)
         LEED Practice - Pool D Questions



         Which of the following should you include with your LEED application
42
         for LEED for New Construction Version 2.2?


         A.
4




              Complete list of all CIRs used, including dates of applied rulings
         B.
              Total projected score
         C.
              Credit card for the appropriate certification fee
CHOOSE




         D.
              Rating system for which you are submitting
         E.
              11x17 inch typical floor plan
         F.
              CD of all application materials




                                                                                   Page 783              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool D Questions




43 What is one potential advantage of building on a Brownfield site?


         A.
1




              No previous development
         B.
              Lower property costs
         C.
              Using solar detoxification technologies
CHOOSE




         D.
              Limited liability
         E.
              Treating contaminants on-site




                                                                       Page 784              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions



         What standard is applicable to EQ Prerequisite 1, Minimum IAQ
44
         Performance?

         A.
1




              ASHRAE 62-1999
         B.
              ASHRAE 90.1-2004
         C.
              ASHRAE 90.1-1999
CHOOSE




         D.
              ASHRAE 52.2-1999
         E.
              ASHRAE 55-2004
         F.
              ASHRAE 62.1-2004




                                                                         Page 785              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions



   A project will provide preferred parking for low-emitting and fuel-efficient
45 vehicles. What is needed for the submittal documentation for SS Credit
   4.3 Alternative Transportation?


         A.
2




              Calculation of the fuel saved
         B.
            Confirmation that each vehicle is a zero-emission vehicle
            Fuel type, number of stations, and fueling capacity for each refueling
         C.
            station.
CHOOSE




         D.
            Total parking capacity of the site
            Project drawing to show the location(s) of the preferred parking
         E.
            spaces for low-emitting fuel-efficient vehicles




                                                                               Page 786              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions


   A project involves the renovation of an existing commercial office
   building, which includes 4 of 5 stories and the core and shell. An issue has
   come up which makes it so the project does not comply with every aspect
   of the requirements for EQ Credit 8.2 Daylight & Views as written.
46 Additionally the EQ Credit 8.2 submittal template does not address the
   issue within its own format.

         For the design submittal, what should the responsible party do?

            Use the alternative compliance path option on the LEED submittal
         A.
1




            template and provide a narrative demonstrating compliance
            Complete the submittal template as though all aspects of the credit's
         B.
            requirements are met as written and submit for review
            Contact the USGBC review team directly to resolve the issue with
         C.
            appropriate documentation
CHOOSE




            Provide a separate narrative explaining the complex issue and how
         D.
            the credit intent is met




                                                                             Page 787              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool D Questions



47 Which refrigerant has the lowest Ozone Depletion Potential (ODP)?


         A.
1




              CFC
         B.
              HCFC
         C.
              HFC
CHOOSE




         D.
              Halon




                                                                       Page 788              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool D Questions



   A new university building has a site area of 600,000 sq. ft.. There is no
   local zoning requirement for open space. How big can the building
48
   footprint be to achieve an Innovation Point for SS Credit 5.2, Site
   Development?


         A.
1




              120,000 sq. ft.
         B.
              100,000 sq. ft.
         C.
              200,000 sq. ft.
CHOOSE




         D.
              300,000 sq. ft.
         E.
              400,000 sq. ft.




                                                                           Page 789              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool D Questions



         What type of erosion and sedimentation control technology is permanent
49
         seeding?


         A.
1




              Structural
         B.
              Maximization
         C.
              Stabilization
CHOOSE




         D.
              Turbidity




                                                                           Page 790              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions



   An architect has designed a plan for a 400-occupant, residential space. The
   initial plan includes 20 covered storage racks for bicycles. How can the
50
   project achieve SS Credit 4.2 Alternative Transportation: Bicycle Storage
   & Changing Rooms?


         A.
1




              Add 60 bicycle racks
         B.
              Add 20 secure bicycle racks within 200 yards of the building entrance
         C.
              Add 2 shower and changing facilities
CHOOSE




         D.
              Add 40 covered storage racks




                                                                              Page 791               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions



    An apartment complex is being rennovated and being converted to an
    office complex. The project will use commingled recycling. What
 51
    documentation will be required for the construction waste calculation for
    MR Credit 2.2 Construction Waste Management?

         A.
2




              Percentage of recycled content used
         B.
              Approximate amount of recycled material
         C.
              Tabulation of each reused material
CHOOSE




         D.
              Summary of diversion rates from the recycler
         E.
              Waste haul receipts for recycled materials




                                                                         Page 792              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions


         An office complex near a lake is being designed. The project will be built
         on a prime tract of undeveloped real-estate 40 ft. from the lake. The
         project will be located 1/8 mile from three public bus lines.
52
         Which credits would not be applicable as part of the LEED application?


         A.
2




              SS Credit 1 Site Selection
         B.
              MR Credit 1.1 Building Reuse
         C.
              SS Credit 6.2 Stormwater Design
CHOOSE




         D.
              SS Credit 4.1 Alternative Transportation
         E.
              WE Credit 2 Innovative Wastewater Technologies




                                                                               Page 793              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions




   A new 80,000 sq. ft. laboratory is trying to earn LEED certification. What
53 needs to be determined to achieve 5 points for EA Credit 1 Optimize
   Energy Performance?



         A.
1




              Core performance
         B.
              Center-of-glass performance
         C.
              Baseline building HVAC system
CHOOSE




         D.
              Advance building benchmark
         E.
              Energy cost budget




                                                                        Page 794               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool D Questions




         Which approaches can be taken to achieve WE Credit 1.2, Water Efficient
54
         Landscaping?


         A.
3




              Use only mono-species plant selection
         B.
              Micro misters
         C.
              Irrigate shrubs from September to June only
CHOOSE




         D.
              Native plants
         E.
              Avoid cypress mulch around flower beds
         F.
              Alternative mowing




                                                                           Page 795               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions




         Which of the following calculations are not required to document as part
55
         of your design submittal to earn WE Credit 3, Water Use Reduction?


         A.
1




              Flush fixture water usage
         B.
              Ratio of men to women
         C.
              Non-potable water supply available for sewage conveyance purposes
CHOOSE




         D.
              Occupants
         E.
              Monthly baseline flush usage




                                                                             Page 796              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                 Place "X"(s)
         LEED Practice - Pool D Questions




56 How can you receive a rebate for all of your LEED certification fees?


              Achieve LEED certification on a building for a non-profit
         A.
1




              organization
         B.
            Have at least 75% of the project owner's staff LEED AP certified
            Achieve LEED gold certification on a project of more than 300,000
         C.
            sq. ft.
CHOOSE




         D.
              Achieve LEED platinum certification




                                                                          Page 797              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions



         Which of the following credits might require the use of the CBECS
57
         database?


         A.
2




              EA Credit 1, Optimize Energy Performance
         B.
              EA Credit 3, Enhanced Commissioning
         C.
              EA Credit 4, Enhanced Refrigerant Management
CHOOSE




         D.
              EA Credit 6, Green Power
         E.
              EA Credit 5, Measurement & Verification
         F.
              EA Credit 2, On-Site Renewable Energy




                                                                             Page 798              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                    Place "X"(s)
         LEED Practice - Pool D Questions




         Replacing filtration media at the completion of construction should be
58
         coordinated with which credits?


         A.
2




              EQ Credit 2, Increased Ventilation
         B.
            EQ Credit 7.2, Thermal Comfort: Verification
            EQ Credit 3.2, Construction IAQ Management Plan: Before
         C.
            Occupancy
CHOOSE




         D.
              EQ Credit 5, Indoor Chemical & Pollutant Source Control




                                                                             Page 799              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool D Questions



   A new college campus building will have 20 full time staff (8 hr/day) and
   4 part-time staff (4 hr/day). There will be 418 students at the peak period.
59
   How many secure bicycle spaces are needed in the design of the building
   to achieve SS Credit 4.2, Alternative Transportation?


         A.
1




              23
         B.
              26
         C.
              30
CHOOSE




         D.
              22
         E.
              20
         F.
              25




                                                                          Page 800               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool D Questions



   The submittal documentation for SS Credit 7.2, Heat Island Effect: Roof
60 requires which of the following when the compliance path used is
   Reflective Roofing Materials?


         A.
2




              Total area (sq. ft.) of installed vegetated roofing system
         B.
              Project roof area (sq. ft.)
         C.
              Albedo rate of all non-SRI compliant roofing materials
CHOOSE




         D.
              Percentage of SRI compliant roof area, based on total roof area
         E.
              Estimate of evapotranspiration plants, shrubs, and trees will provide




                                                                                Page 801              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions


    A project consists of developing a new building in a suburb. The project
    team is considering acheiving SS Credit 4.3, Alternative Transportation.
 61
    What could be done to achieve this credit?

            Provide low-emitting and fuel-efficient vehicles for 3% of the FTE
         A.
3




            occupants with preferred parking
            Install alternative-fuel refueling stations for 3% of the total vehicle
         B.
            parking capacity of the site.
            Provide preferred parking for low-emitting and fuel-efficient vehicles
         C.
            for 3% of the total vehicle parking capacity of the site
CHOOSE




            Provide preferred parking for low-emitting and fuel-efficient vehicles
         D.
            for 5% of the total vehicle parking capacity of the site
            Install alternative-fuel refueling stations for 2% of the total vehicle
         E.
            parking capacity of the site.
            Provide low-emitting and fuel-efficient vehicles for 2% of the FTE
         F.
            occupants with preferred parking




                                                                              Page 802               Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                  Place "X"(s)
         LEED Practice - Pool D Questions



   The project scope for a new building has changed to include graywater for
62 non-potable applications and native plants for landscaping. What credit
   would this not affect?


         A.
1




              WE Credit 3 Water Use Reduction
         B.
              WE Credit 2 Innovative Wastewater Technologies
         C.
              SS Credit 5.1 Site Development: Protect or Restore Habitat
CHOOSE




         D.
              SS Credit 5.2 Site Development: Maximize Open Space
         E.
              WE Credit 1.1 Water Efficient Landscaping




                                                                           Page 803              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool D Questions



   A project will meet EA Prerequisite 1 but not EA Credit 3. Who is
63 responsible for developing a systems manual for the commissioned
   systems?


         A.
1




              Design Team
         B.
              Project Team and Commissioning Authority
         C.
              Commissioning Authority
CHOOSE




         D.
              Nobody, this task is not applicable
         E.
              Owner
         F.
              Contractor




                                                                       Page 804              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                            Place "X"(s)
         LEED Practice - Pool D Questions




64 What factors impact the cost of building certification?



         A.
3




              Square footage
         B.
              Number of CIRs submitted
         C.
              Number of credits earned
CHOOSE




         D.
              Number of credits applied for
         E.
              Having more than one LEED AP on the project




                                                                     Page 805              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                   Place "X"(s)
         LEED Practice - Pool D Questions



   You are working on a downtown revitalization project that includes
   renovating a building for office space. Which of the following are required
65
   to achieve SS Credit 2, Development Density & Community
   Connectivity?

         A.
3




              Build within 1 mile of at least 10 basic services
              Build within a community with a minimum density of 50,000 sq. ft.
         B.
              per acre net
         C.
              Pedestrian access between the building and the services
CHOOSE




         D.
            Build within 1/2 mile of at least 10 basic services
            Build within 1/2 mile of a residential neighborhood with an average
         E.
            density of 10 units/acre
            Build within 1 mile of a residential neighborhood with an average
         F.
            density of 10 units/acre




                                                                            Page 806              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions




         The energy calculations from EA Credit 1 Optimize Energy Performance
66
         can be used for which of the following credits?


         A.
2




              EA Credit 6 Green Power
         B.
              EA Credit 2 On-Site Renewable Energy
         C.
              EA Prerequisite 2 Minimum Energy Performance
CHOOSE




         D.
              EA Credit 3 Enhanced Commissioning
         E.
              EA Credit 5 Measurement & Verification




                                                                         Page 807              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                               Place "X"(s)
         LEED Practice - Pool D Questions



         Credit compliance for SS Credit 2, Development Density & Community
67
         Connectivity requires which of the following?


         A.
2




              Block diagrams or maps of pedestrian access
         B.
              Listing of all community services within 1 mile
         C.
              Gross building area (sq. ft.)
CHOOSE




         D.
              Project site area (sq. ft.)
         E.
              Aerial photos of all Greenfields




                                                                        Page 808              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions



   A new mixed-use building project in an urban area has a site area of
   800,000 sq. ft. A zoning ordinance exists, but there is no requirement for
68
   open space. How big must the open space be to achieve an Innovation
   Point for SS Credit 5.2, Site Development?


         A.
1




              400,000
         B.
              200,000
         C.
              240,000
CHOOSE




         D.
              160,000
         E.
              320,000




                                                                         Page 809              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                     Place "X"(s)
         LEED Practice - Pool D Questions




         Two similar buildings in Dallas, Texas each scored a 50 on their building
69
         energy performance. Which rating was used to compare the buildings?



         A.
1




              Energy-10TM
         B.
              ENERGY STAR
         C.
              DOE-2 eQUEST
CHOOSE




         D.
              ASHRAE 90.1-2004




                                                                              Page 810              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                             Place "X"(s)
         LEED Practice - Pool D Questions




   The renovation of an apartment building will use the wood from the old
70 doors for new cabinets. The project will not qualify for MR Credit 1
   Building Reuse. What credits can the old doors contribute to?



         A.
3




              MR Credit 2.1 Construction Waste Management
         B.
              MR Credit 6 Rapidly Renewable Materials
         C.
              MR Credit 4.1 Recycled Content
CHOOSE




         D.
              MR Credit 5.1 Regional Materials
         E.
              MR Credit 3.1 Materials Reuse




                                                                      Page 811              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions




         Which person(s) would be least likely to be involved in the decision to
 71
         pursue SS Credit 7.2 Heat Island Effect?



         A.
1




              LEED AP
         B.
              Mechanical Engineer
         C.
              Owner
CHOOSE




         D.
              Design Team
         E.
              Contractor




                                                                               Page 812              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                Place "X"(s)
         LEED Practice - Pool D Questions




         A project must comply with the CFR to meet the requirements of which
72
         credit?



         A.
1




              MR 4.1, Recycled Content
         B.
              SS 1, Site Selection (for wetlands)
         C.
              MR P1, Storage and Collection of Recyclables
CHOOSE




         D.
              EQ2, Increased Ventilation
         E.
              EQ 4.3, Low Emitting Materials




                                                                         Page 813              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions




73 Which of the following are considered pre-consumer recycled content?




         A.
2




              1,000 magazines that were overprinted to a subscriber size of 20,000
         B.
              Extra drywall from a residential project
         C.
              Wooden pallets used by a shipping company
CHOOSE




         D.
              Pine bark mulch and nuggets for landscaping from a lumber mill




                                                                               Page 814              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                            Place "X"(s)
         LEED Practice - Pool D Questions




   You are working on a project for a new mixed-use retail/office complex
74 in an urban area. As a LEED AP, you will need to consult the ASHRAE
   90.1-2004 standard for which project areas?


         A.
4




              Service water heating
         B.
              Water efficiency
         C.
              Heating
CHOOSE




         D.
              Lighting
         E.
              Ventilating
         F.
              Reducing heat islands




                                                                     Page 815              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions


         A building has undergone a major renovation and expansion. A new
         copy/printing room has a pressure differential with the surrounding
         spaces of 2 Pa.
75
         To achieve EQ Credit 5, Indoor Chemical & Pollutant Source Control,
         how much does the pressure differential need to be increased?


         A.
1




              5 Pa
         B.
              4 Pa
         C.
              3 Pa
CHOOSE




         D.
              1 Pa
         E.
              2 Pa




                                                                               Page 816              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool D Questions




         How can you earn the innovation point for exemplary performance in SS
76
         Credit 4 Alternative Transportation?


         A.
1




              Locate the project within 1/2 mile of four or more public bus lines
              Provide covered storage facilities for securing bicycles for 25% or
         B.
              more of building occupants
         C.
              Locate the project within 1/4 mile of three or more public bus lines
CHOOSE




         D.
              Demonstrate a quantifiable reduction in personal automobile use
         E.
              Locate the project within 1/4 mile of an existing subway station
              Provide covered storage facilities for securing bicycles for 20% or
         F.
              more of building occupants




                                                                                Page 817              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                      Place "X"(s)
         LEED Practice - Pool D Questions




   Given mechanical equipment, photovoltaic panels, and skylights are
77 excluded, an Innovation & Design point can be awarded for SS Credit 7.2,
   Heat Island Effect: Roof if:



         A.
1




              100% of the project's roof area is comprised of a green roof system
         B.
            Total area of green roof systems >= 60%
            (Area of SRI Roof / 0.75) + (Area of vegetated roof / 0.5) >= Total
         C.
            Roof Area
CHOOSE




         D.
              Total area of installed SRI compliant roofing materials <= 20%




                                                                               Page 818              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                              Place "X"(s)
         LEED Practice - Pool D Questions




78 Which of the following can earn a project exemplary performance credit?




         A.
2




              Installing low-emitting furniture and furnishings
         B.
              Using 7% rapidly renewable materials
         C.
              Having two LEED APs on a project instead of one
CHOOSE




         D.
              Reduce water use within a project's buildings by 40%
         E.
              Reduce potable water consumption for irrigation by 50%
         F.
              Using 30% regional materials




                                                                       Page 819              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                       Place "X"(s)
         LEED Practice - Pool D Questions




         Which of the following projects would be most applicable to LEED NC
79
         instead of LEED EB?



         A.
2




              New construction of a retail store
              Single floor renovation of a two story office building that includes a
         B.
              minimal HVAC change-out
         C.
            Building renovation that includes just the mechanical systems
CHOOSE




            Building renovation that includes a change-out of the mechanical
         D.
            systems




                                                                                Page 820              Pool D Test
   0          Questions Attempted (With Correct Number of Answers)
0.0%          <-- Current Running Score




                                                                                        Place "X"(s)
         LEED Practice - Pool D Questions


         A proposed 80,000 sq. ft. building with four equal floors is being built for
         office space. Local zoning requires 15% open space for the total project
         area.
80
         In order to achieve SS Credit 5.2, Site Development: Maximize Open
         Space the vegetated open space area adjacent to the building must exceed
         the local zoning requirement by what amount?


         A.
1




              20%
         B.
              10%
         C.
              30%
CHOOSE




         D.
              25%
         E.
              No additional vegetated open space is required
         F.
              15%




                                                                                Page 821               Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 822              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 823              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 824              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 825              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 826              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 827              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 828              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 829              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 830              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 831              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 832              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 833              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 834              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 835              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 836              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 837              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 838              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 839              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 840              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 841              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 842              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 843              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 844              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 845              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 846              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 847              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 848              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 849              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 850              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 851              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 852              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 853              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 854              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 855              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 856              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 857              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 858              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 859              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 860              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 861              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 862              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 863              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 864              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 865              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 866              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 867              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 868              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 869              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 870              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 871              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 872              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 873              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 874              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 875              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 876              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 877              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 878              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 879              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 880              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 881              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 882              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 883              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 884              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 885              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 886              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 887              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 888              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 889              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 890              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 891              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 892              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 893              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 894              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 895              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 896              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 897              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 898              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 899              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 900              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 901              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 902              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 903              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 904              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 905              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 906              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 907              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 908              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 909              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 910              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 911              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 912              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 913              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 914              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 915              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 916              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 917              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 918              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 919              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 920              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 921              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 922              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 923              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 924              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 925              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 926              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 927              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 928              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 929              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 930              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 931              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 932              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 933              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 934              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 935              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 936              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 937              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 938              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 939              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 940              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 941              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 942              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 943              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 944              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 945              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 946              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 947              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 948              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 949              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 950              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 951              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 952              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 953              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 954              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 955              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 956              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 957              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 958              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 959              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 960              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 961              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 962              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 963              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 964              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 965              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 966              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 967              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 968              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 969              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 970              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 971              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 972              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 973              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 974              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 975              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 976              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 977              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 978              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 979              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 980              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 981              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 982              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 983              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 984              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 985              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 986              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 987              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 988              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 989              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 990              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 991              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 992              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 993              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 994              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 995              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 996              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 997              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 998              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                     Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 999              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1000              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1001              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1002              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1003              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1004              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1005              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1006              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1007              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1008              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1009              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1010              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1011              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1012              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1013              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1014              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1015              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1016              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1017              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1018              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1019              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1020              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions




                                                              Page 1021              Pool D Test
   0   Questions Attempted (With Correct Number of Answers)
0.0%   <-- Current Running Score




                                                                      Place "X"(s)
   LEED Practice - Pool D Questions