					  Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                   WO# CN7LM



                                       SCHDULE OF PRICE

BLDG NO.                              ITEM                        Q'TY   UNIT       AMOUNT

 1345      Total Items of A003 to A042                             1      LS    ¥

 1346      Total Items of A003 to A042                             1      LS    ¥

 1350      Total Items of A003 to A042                             1      LS    ¥

 1351      Total Items of A003 to A042                             1      LS    ¥

 1352      Total Items of A003 to A042                             1      LS    ¥


                                                          TOTAL                 ¥




                                SCHEDULE OF IDQ WORK (SEED PROJECT)
                                               PAGE-1
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                                  WO# CN7LM



                                 SCHEDULE OF INDEFINITE QUANTITY WORK


BLDG 1345 (6 Units), YOKOSUKA
                                                                            EST             UNIT       EST AMT
ITEM NO.                          DESCRIPTION                               QTY       UT   PRICE        TOTAL

           Roofing:

           Provide new polymer modified bitumen roofing system with
  A003                                                                       650 SM        ¥   -   ¥             -
           preparation on existing concrete covering surface.

           Coping:

  A011     Remove and reinstall existing aluminum coping.                    130      LM   ¥   -   ¥             -

           Drain:

           Remove existing roof drain strainer and provide new copper
  A013                                                                        10      EA   ¥   -   ¥             -
           roof drain and aluminum die-cast strainer.

           Foundation & Steel Support for Mech and Elec Equipment & Piping:

  A018     Provide new raised concrete foundation. (300x600x400h)             33      EA   ¥   -   ¥             -

  A022     Provide new raised concrete foundation. ( 700x1000x400h)           12      EA   ¥   -   ¥             -

           Replace existing concrete covering for existing vent pipe.
  A025                                                                            6   EA   ¥   -   ¥             -
           (Type-B)


           Remove existing mech equipment (A/C outside unit), concrete
  A028     base and rubber sheet temporarily; and reinstall existing mech     12      EA   ¥   -   ¥             -
           equipment (A/C outside unit) with steel support.


           Remove existing mech refrigerant piping, pipe support,
  A030     concrete base and rubber sheets temporarily; and reinstall        140      LM   ¥   -   ¥             -
           extended mech refrigerant piping and modified pipe support.


  A033     Remove existing elec wiring conduit, and provide new ones.         72      LM   ¥   -   ¥             -


           Remove existing pipe & conduit chamber and A/C control
  A034     cables; reinstall extended A/C control cables; and provide new         6   EA   ¥   -   ¥             -
           pipe & conduit chamber.

           Remove existing pipe chamber and A/C control cables, and
  A035     reinstall extended A/C control cables and modified pipe                3   EA   ¥   -   ¥             -
           chamber.

  A036     Provide new encasement for elec pullbox.                               3   EA   ¥   -   ¥             -

           Loosen and reinstall existing elec wire conduits and
  A037                                                                       240      LM   ¥   -   ¥             -
           equipments.

                             SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1345)
                                                  PAGE-2
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                    WO# CN7LM




          Painting:

          Paint /Repaint exposed surface of new and existing steel &
  A039                                                                 30 SM   ¥   -   ¥          -
          wood surfaces

          Provide new urethane membrane waterproof coating system
  A041                                                                 8 SM    ¥   -   ¥          -
          on existing & new concrete foundation surface.

          Temporary Works:

  A042    Erect and dismantle scaffolding.                             50 SM   ¥   -   ¥          -




          TOTAL ITEMS OF A003 TO A042                                                  ¥          -

                                                                                       $          -
Abbreviation:
           SM = Square Meter
           LM = Linear Meter
           EA = Each
           LS = Lump Sum




                           SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1345)
                                                PAGE-3
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                                  WO# CN7LM



                                 SCHEDULE OF INDEFINITE QUANTITY WORK


BLDG 1346 (6 Units), YOKOSUKA
                                                                            EST             UNIT       EST AMT
ITEM NO.                          DESCRIPTION                               QTY       UT   PRICE        TOTAL

           Roofing:

           Provide new polymer modified bitumen roofing system with
  A003                                                                       650 SM        ¥   -   ¥             -
           preparation on existing concrete covering surface.

           Coping:

  A011     Remove and reinstall existing aluminum coping.                    130      LM   ¥   -   ¥             -

           Drain:

           Remove existing roof drain strainer and provide new copper
  A013                                                                        10      EA   ¥   -   ¥             -
           roof drain and aluminum die-cast strainer.

           Foundation & Steel Support for Mech and Elec Equipment & Piping:

  A018     Provide new raised concrete foundation. (300x600x400h)             33      EA   ¥   -   ¥             -

  A022     Provide new raised concrete foundation. ( 700x1000x400h)           12      EA   ¥   -   ¥             -

           Replace existing concrete covering for existing vent pipe.
  A025                                                                            6   EA   ¥   -   ¥             -
           (Type-B)


           Remove existing mech equipment (A/C outside unit), concrete
  A028     base and rubber sheet temporarily; and reinstall existing mech     12      EA   ¥   -   ¥             -
           equipment (A/C outside unit) with steel support.


           Remove existing mech refrigerant piping, pipe support,
  A030     concrete base and rubber sheets temporarily; and reinstall        140      LM   ¥   -   ¥             -
           extended mech refrigerant piping and modified pipe support.


  A033     Remove existing elec wiring conduit, and provide new ones.         72      LM   ¥   -   ¥             -


           Remove existing pipe & conduit chamber and A/C control
  A034     cables; reinstall extended A/C control cables; and provide new         6   EA   ¥   -   ¥             -
           pipe & conduit chamber.

           Remove existing pipe chamber and A/C control cables, and
  A035     reinstall extended A/C control cables and modified pipe                3   EA   ¥   -   ¥             -
           chamber.

  A036     Provide new encasement for elec pullbox.                               3   EA   ¥   -   ¥             -

           Loosen and reinstall existing elec wire conduits and
  A037                                                                       240      LM   ¥   -   ¥             -
           equipments.

                             SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1346)
                                                  PAGE-4
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                    WO# CN7LM




          Painting:

          Paint /Repaint exposed surface of new and existing steel &
  A039                                                                 30 SM   ¥   -   ¥          -
          wood surfaces

          Provide new urethane membrane waterproof coating system
  A041                                                                 8 SM    ¥   -   ¥          -
          on existing & new concrete foundation surface.

          Temporary Works:

  A042    Erect and dismantle scaffolding.                             50 SM   ¥   -   ¥          -




          TOTAL ITEMS OF A003 TO A042                                                  ¥          -

                                                                                       $          -
Abbreviation:
           SM = Square Meter
           LM = Linear Meter
           EA = Each
           LS = Lump Sum




                           SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1346)
                                                PAGE-5
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                                  WO# CN7LM



                                 SCHEDULE OF INDEFINITE QUANTITY WORK


BLDG 1350 (6 Units), YOKOSUKA
                                                                            EST             UNIT       EST AMT
ITEM NO.                          DESCRIPTION                               QTY       UT   PRICE        TOTAL

           Roofing:

           Provide new polymer modified bitumen roofing system with
  A003                                                                       650 SM        ¥   -   ¥             -
           preparation on existing concrete covering surface.

           Coping:

  A011     Remove and reinstall existing aluminum coping.                    130      LM   ¥   -   ¥             -

           Drain:

           Remove existing roof drain strainer and provide new copper
  A013                                                                        10      EA   ¥   -   ¥             -
           roof drain and aluminum die-cast strainer.

           Foundation & Steel Support for Mech and Elec Equipment & Piping:

  A018     Provide new raised concrete foundation. (300x600x400h)             33      EA   ¥   -   ¥             -

  A022     Provide new raised concrete foundation. ( 700x1000x400h)           12      EA   ¥   -   ¥             -

           Replace existing concrete covering for existing vent pipe.
  A025                                                                            6   EA   ¥   -   ¥             -
           (Type-B)


           Remove existing mech equipment (A/C outside unit), concrete
  A028     base and rubber sheet temporarily; and reinstall existing mech     12      EA   ¥   -   ¥             -
           equipment (A/C outside unit) with steel support.


           Remove existing mech refrigerant piping, pipe support,
  A030     concrete base and rubber sheets temporarily; and reinstall        140      LM   ¥   -   ¥             -
           extended mech refrigerant piping and modified pipe support.


  A033     Remove existing elec wiring conduit, and provide new ones.         72      LM   ¥   -   ¥             -


           Remove existing pipe & conduit chamber and A/C control
  A034     cables; reinstall extended A/C control cables; and provide new         6   EA   ¥   -   ¥             -
           pipe & conduit chamber.

           Remove existing pipe chamber and A/C control cables, and
  A035     reinstall extended A/C control cables and modified pipe                3   EA   ¥   -   ¥             -
           chamber.

  A036     Provide new encasement for elec pullbox.                               3   EA   ¥   -   ¥             -

           Loosen and reinstall existing elec wire conduits and
  A037                                                                       240      LM   ¥   -   ¥             -
           equipments.

                             SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1350)
                                                  PAGE-6
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                    WO# CN7LM




          Painting:

          Paint /Repaint exposed surface of new and existing steel &
  A039                                                                 30 SM   ¥   -   ¥          -
          wood surfaces

          Provide new urethane membrane waterproof coating system
  A041                                                                 8 SM    ¥   -   ¥          -
          on existing & new concrete foundation surface.

          Temporary Works:

  A042    Erect and dismantle scaffolding.                             50 SM   ¥   -   ¥          -




          TOTAL ITEMS OF A003 TO A042                                                  ¥          -

                                                                                       $          -
Abbreviation:
           SM = Square Meter
           LM = Linear Meter
           EA = Each
           LS = Lump Sum




                           SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1350)
                                                PAGE-7
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                                  WO# CN7LM



                                 SCHEDULE OF INDEFINITE QUANTITY WORK


BLDG 1351 (4 Units), YOKOSUKA
                                                                            EST             UNIT       EST AMT
ITEM NO.                          DESCRIPTION                               QTY       UT   PRICE        TOTAL

           Roofing:

           Provide new polymer modified bitumen roofing system with
  A003                                                                       450 SM        ¥   -   ¥             -
           preparation on existing concrete covering surface.

           Coping:

  A011     Remove and reinstall existing aluminum coping.                     90      LM   ¥   -   ¥             -

           Drain:

           Remove existing roof drain strainer and provide new copper
  A013                                                                            6   EA   ¥   -   ¥             -
           roof drain and aluminum die-cast strainer.

           Foundation & Steel Support for Mech and Elec Equipment & Piping:

  A018     Provide new raised concrete foundation. (300x600x400h)             20      EA   ¥   -   ¥             -

  A019     Provide new raised concrete foundation. (300x800x400h)                 2   EA   ¥   -   ¥             -

  A022     Provide new raised concrete foundation. ( 700x1000x400h)               8   EA   ¥   -   ¥             -

           Replace existing concrete covering for existing vent pipe.
  A025                                                                            4   EA   ¥   -   ¥             -
           (Type-B)


           Remove existing mech equipment (A/C outside unit), concrete
  A028     base and rubber sheet temporarily; and reinstall existing mech         8   EA   ¥   -   ¥             -
           equipment (A/C outside unit) with steel support.


           Remove existing mech refrigerant piping, pipe support,
  A030     concrete base and rubber sheets temporarily; and reinstall        110      LM   ¥   -   ¥             -
           extended mech refrigerant piping and modified pipe support.


  A033     Remove existing elec wiring conduit, and provide new ones.         48      LM   ¥   -   ¥             -


           Remove existing pipe & conduit chamber and A/C control
  A034     cables; reinstall extended A/C control cables; and provide new         4   EA   ¥   -   ¥             -
           pipe & conduit chamber.

           Remove existing pipe chamber and A/C control cables, and
  A035     reinstall extended A/C control cables and modified pipe                2   EA   ¥   -   ¥             -
           chamber.

  A036     Provide new encasement for elec pullbox.                               3   EA   ¥   -   ¥             -


                             SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1351)
                                                  PAGE-8
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                       WO# CN7LM




          Loosen and reinstall existing elec wire conduits and
  A037                                                                 160   LM   ¥   -   ¥          -
          equipments.

          Painting:

          Paint /Repaint exposed surface of new and existing steel &
  A039                                                                 20 SM      ¥   -   ¥          -
          wood surfaces

          Provide new urethane membrane waterproof coating system
  A041                                                                 10 SM      ¥   -   ¥          -
          on existing & new concrete foundation surface.

          Temporary Works:

  A042    Erect and dismantle scaffolding.                             50 SM      ¥   -   ¥          -




          TOTAL ITEMS OF A003 TO A042                                                     ¥          -

                                                                                          $          -
Abbreviation:
           SM = Square Meter
           LM = Linear Meter
           EA = Each
           LS = Lump Sum




                            SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1351)
                                                 PAGE-9
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                                  WO# CN7LM



                                 SCHEDULE OF INDEFINITE QUANTITY WORK


BLDG 1352 (4 Units), YOKOSUKA
                                                                            EST             UNIT       EST AMT
ITEM NO.                          DESCRIPTION                               QTY       UT   PRICE        TOTAL

           Roofing:

           Provide new polymer modified bitumen roofing system with
  A003                                                                       450 SM        ¥   -   ¥             -
           preparation on existing concrete covering surface.

           Coping:

  A011     Remove and reinstall existing aluminum coping.                     90      LM   ¥   -   ¥             -

           Drain:

           Remove existing roof drain strainer and provide new copper
  A013                                                                            6   EA   ¥   -   ¥             -
           roof drain and aluminum die-cast strainer.

           Foundation & Steel Support for Mech and Elec Equipment & Piping:

  A018     Provide new raised concrete foundation. (300x600x400h)             20      EA   ¥   -   ¥             -

  A019     Provide new raised concrete foundation. (300x800x400h)                 2   EA   ¥   -   ¥             -

  A022     Provide new raised concrete foundation. ( 700x1000x400h)               8   EA   ¥   -   ¥             -

           Replace existing concrete covering for existing vent pipe.
  A025                                                                            4   EA   ¥   -   ¥             -
           (Type-B)


           Remove existing mech equipment (A/C outside unit), concrete
  A028     base and rubber sheet temporarily; and reinstall existing mech         8   EA   ¥   -   ¥             -
           equipment (A/C outside unit) with steel support.


           Remove existing mech refrigerant piping, pipe support,
  A030     concrete base and rubber sheets temporarily; and reinstall        110      LM   ¥   -   ¥             -
           extended mech refrigerant piping and modified pipe support.


  A033     Remove existing elec wiring conduit, and provide new ones.         48      LM   ¥   -   ¥             -


           Remove existing pipe & conduit chamber and A/C control
  A034     cables; reinstall extended A/C control cables; and provide new         4   EA   ¥   -   ¥             -
           pipe & conduit chamber.

           Remove existing pipe chamber and A/C control cables, and
  A035     reinstall extended A/C control cables and modified pipe                2   EA   ¥   -   ¥             -
           chamber.

  A036     Provide new encasement for elec pullbox.                               3   EA   ¥   -   ¥             -


                             SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1352)
                                                 PAGE-10
   Repair/Replace Housing Roof, Yokosuka, Ikego Negishi                                       WO# CN7LM




          Loosen and reinstall existing elec wire conduits and
  A037                                                                 160   LM   ¥   -   ¥          -
          equipments.

          Painting:

          Paint /Repaint exposed surface of new and existing steel &
  A039                                                                 20 SM      ¥   -   ¥          -
          wood surfaces

          Provide new urethane membrane waterproof coating system
  A041                                                                 10 SM      ¥   -   ¥          -
          on existing & new concrete foundation surface.

          Temporary Works:

  A042    Erect and dismantle scaffolding.                             50 SM      ¥   -   ¥          -




          TOTAL ITEMS OF A003 TO A042                                                     ¥          -

                                                                                          $          -
Abbreviation:
           SM = Square Meter
           LM = Linear Meter
           EA = Each
           LS = Lump Sum




                            SCHEDULE OF IDQ WORK (SEED PROJECT, BLDG 1352)
                                                PAGE-11

				