					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 08/09/07 WORK PERFORMED BY : Elijah Electric Date of Report : 08/17/07 Cont. Job No.: Contract No. Cont. RPT NO. CCO NO.

DESCRIPTION OF WORK: UNHOOK ALL ELECTRICAL & TELEPHONE LINES TO OCTAVIA JOB TRAILER EQUIPMENT Equip No. TK-08 EQUIPMENT CLASS/MAKE TRUCK Code Hours/ Units 4 Hrly/Dly Rate $19.09 Delay Factor Extended Amount $76.36 P.R. No. ELC LUIS MONDRAGON LABOR

LABORERS, FOREMANS, etc. Hours Reg 4 O.T. Hourly Rate Reg $78.95 O.T. Extended Amount $315.80

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description Units Unt Cst Total

$76.36
Labor Surcharge Subsistence Reg. 17%

Sub-Total
O.T. 16%

$315.80
$53.69

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (33%) Markup on Equipment (15%) $121.93 $11.45 $369.49 $76.36

Material & Specialist Sub-Total

Markup on Material (15%)

Total This Report

$579.23

faf72559-14ef-4c1f-9c77-214e16b2e965.xlsForce Account Analysis

9/5/20082:09 PM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500

Page 2


				