JOB 117-02 EE1683
Document Sample


State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 01/22/08 WORK PERFORMED BY : Elijah Electric Date of Report : 02/05/08 Cont. Job No.: Contract No. Cont. RPT NO. EE1683 CCO NO. DESCRIPTION OF WORK: ASSES WORK AND DAMAGE EQUIPMENT Equip No. TK-08 EQUIPMENT CLASS/MAKE TRUCK Code Hours/ Units 3 Hrly/Dly Rate $23.63 Delay Factor Extended Amount $70.89 P.R. No. ELC LUIS MONDRAGON LABOR LABORERS, FOREMANS, etc. Hours Reg 3 O.T. Hourly Rate Reg $48.25 O.T. Extended Amount $144.75 Equipment Sub-Total MATERIAL and/or WORK done by specialists Description Units Unt Cst Total $70.89 Labor Surcharge Subsistence Reg. 17% Sub-Total O.T. 16% $144.75 $24.61 Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (28%) Markup on Equipment (10%) $47.42 $7.09 $169.36 $70.89 Material & Specialist Sub-Total Markup on Material (10%) Total This Report $294.76 3ac78d96-3d23-41ec-91aa-1b2f30407e8f.xlsForce Account Analysis 9/5/20082:07 PM Sheet1 DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75 10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10 TOTAL 85 86 6 85 11 85 67 6000 EQUIPMENT 10 11 10 8 8 8 8 8 0 8 8 8 0 6 6 6 450 6 6 6 1500 7 7 7 600 9.5 9.5 9.5 0 6.5 6.5 6.5 600 10 10 10 1800 MATERIAL 250 500 Page 2
Get documents about "