Docstoc

JOB 117-02 EE1683

Document Sample
JOB 117-02  EE1683 Powered By Docstoc
					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 01/22/08 WORK PERFORMED BY : Elijah Electric Date of Report : 02/05/08 Cont. Job No.: Contract No. Cont. RPT NO. EE1683 CCO NO.

DESCRIPTION OF WORK: ASSES WORK AND DAMAGE EQUIPMENT Equip No. TK-08 EQUIPMENT CLASS/MAKE TRUCK Code Hours/ Units 3 Hrly/Dly Rate $23.63 Delay Factor Extended Amount $70.89 P.R. No. ELC LUIS MONDRAGON LABOR

LABORERS, FOREMANS, etc. Hours Reg 3 O.T. Hourly Rate Reg $48.25 O.T. Extended Amount $144.75

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description Units Unt Cst Total

$70.89
Labor Surcharge Subsistence Reg. 17%

Sub-Total
O.T. 16%

$144.75
$24.61

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (28%) Markup on Equipment (10%) $47.42 $7.09 $169.36 $70.89

Material & Specialist Sub-Total

Markup on Material (10%)

Total This Report

$294.76

3ac78d96-3d23-41ec-91aa-1b2f30407e8f.xlsForce Account Analysis

9/5/20082:07 PM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500

Page 2


				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:12
posted:9/5/2008
language:
pages:2