					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 03/10/08 WORK PERFORMED BY : Elijah Electric Date of Report : 03/21/08 Cont. Job No.: Contract No. Cont. RPT NO. EE1537 CCO NO.

DESCRIPTION OF WORK: ADD 2/0 FEEDER TO CONNEX,SPLIT CONNEX TO SEPARATE FEEDERS EQUIPMENT Equip No. EQUIPMENT CLASS/MAKE Code Hours/ Units Hrly/Dly Rate Delay Factor Extended Amount P.R. No. ELC LUIS MONDRAGON TK-08 TRUCK 10 $23.63 $236.30 LABOR

LABORERS, FOREMANS, etc. Hours Reg 8 O.T. 2 Hourly Rate Reg $63.92 O.T. $95.88 Extended Amount $703.12

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description Units Unt Cst

$236.30
Labor Surcharge Total Subsistence Reg. 17%

Sub-Total
O.T. 16%

$703.12
$119.53

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (28%) Markup on Equipment (10%) $230.34 $23.63 $822.65 $236.30

Material & Specialist Sub-Total

Markup on Material (10%)

Total This Report

$1,312.92

9543b686-8b17-4e70-a486-be92ca0da009.xlsForce Account Analysis

9/5/20082:06 PM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800