JOB 175 EE1673
Document Sample


State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 08/08/07 WORK PERFORMED BY : Elijah Electric Date of Report : 08/13/07 Cont. Job No.: Contract No. Cont. RPT NO. EE1673 CCO NO. DESCRIPTION OF WORK: FINISH STANDING POLES,WALKED PARKING LOT W/CITY OF SAN JOSE EQUIPMENT Equip No. TK-08 BT-02 HYLIFT EQUIPMENT CLASS/MAKE TRUCK BUCKET TRUCK BOOM Code Hours/ Units 8 8 8 Hrly/Dly Rate $19.09 $23.63 $27.35 Delay Factor Extended Amount $152.72 $189.04 $218.80 P.R. No. ELC LUIS MONDRAGON LBR WILLY CAULDERON LABOR LABORERS, FOREMANS, etc. Hours Reg 8 8 O.T. Hourly Rate Reg $57.27 $37.35 O.T. Extended Amount $458.16 $298.80 Equipment Sub-Total MATERIAL and/or WORK done by specialists Description #10 WIRE FUSE HOLDERS Units 0.12 2 Unt Cst 200.26 60.99 $560.56 Labor Surcharge Total Subsistence Reg. 17% Sub-Total O.T. 16% $756.96 $128.68 $24.03 $121.98 Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (28%) Markup on Equipment (15%) $885.64 $560.56 $146.01 $247.98 $84.08 $21.90 Material & Specialist Sub-Total $146.01 Markup on Material (15%) Total This Report $1,946.18 a8f185de-c428-4c78-ab01-75d871eca113.xlsForce Account Analysis 9/5/20082:04 PM Sheet1 DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75 10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10 TOTAL 85 86 6 85 11 85 67 6000 EQUIPMENT 10 11 10 8 8 8 8 8 0 8 8 8 0 6 6 6 450 6 6 6 1500 7 7 7 600 9.5 9.5 9.5 0 6.5 6.5 6.5 600 10 10 10 1800 MATERIAL 250 500 Page 2
Related docs
Get documents about "