					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 05/22/07 WORK PERFORMED BY : Elijah Electric Date of Report : 05/29/07 Cont. Job No.: Contract No. Cont. RPT NO. EE1664 CCO NO.

DESCRIPTION OF WORK: ADD, INSTALL 6 x 6 BOX AT NEAR + FAR GEAR HOUSE MOTORS EQUIPMENT Equip No. EQUIPMENT CLASS/MAKE Code Hours/ Units Hrly/Dly Rate Delay Factor Extended Amount P.R. No. ELC DENNIS PAJAZETOVIC LABOR

LABORERS, FOREMANS, etc. Hours Reg 5 O.T. Hourly Rate Reg $51.56 O.T. Extended Amount $257.80

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description 6X6 R.T.C NEMA 3R Units 2 Unt Cst 14.19 Total Labor Surcharge Subsistence Reg. 17%

Sub-Total
O.T. 16%

$257.80
$43.83

$28.38

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (33%) Markup on Equipment (15%) $28.38 $99.54 $301.63

Material & Specialist Sub-Total

$28.38

Markup on Material (15%)

$4.26

Total This Report

$433.80

74ce9713-a960-4b63-ad47-bcc291c1c5a4.xlsForce Account Analysis

9/5/20082:03 PM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500

Page 2


				