									State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 8/11/06 WORK PERFORMED BY : Elijah Electric Date of Report : 8/28/06 Cont. Job No.: Contract No. Cont. RPT NO. CCO NO.

DESCRIPTION OF WORK: set 2-#5 concrete boxes & 1-#6 concrete box with lids for C.A.N.G. EQUIPMENT Equip No. tk-03 tk-01 BH-02 wk-01 EQUIPMENT CLASS/MAKE truck truck case COMHG Code Hours/ Units 3 3 3 3 Hrly/Dly Rate $20.94 $16.84 $34.14 $2.51 Delay Factor Extended Amount $62.82 $50.52 $102.42 $7.53

1/12/07 Replacing invoice#291 to 291R- Changed Mark up to 25% LABORERS, FOREMANS, etc. P.R. No. labr Jadiel Salgado opr David Rangel LABOR Hours Reg 3 3 3 3 3 O.T. Hourly Rate Reg $37.34 $50.97 $38.34 $52.00 $42.00 O.T. Extended Amount $112.02 $152.91 $115.02 $156.00 $126.00

labr Jose Aguilar labr Tino Ortiz labr Salvador Deanda

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description N30 Concrete box N30 Concrete lid N36 Concrete box N36 Concrete lid Units 2 2 1 1 Unt Cst 35.33 17.81 43.74 30.77

$223.29
Labor Surcharge Total Subsistence Reg. 17%

Sub-Total
O.T. 16%

$661.95
$112.53

$70.66 $35.62 $43.74 $30.77
Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (25%) Markup on Equipment (15%) $774.48 $223.29 $180.79 $193.62 $33.49 $27.12

Material & Specialist Sub-Total

$180.79

Markup on Material (15%)

Total This Report

$1,432.79

bf8e9504-4f93-41ff-89bc-fb6aa1256231.xlsForce Account Analysis

9/5/20082:00 PM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500

Page 2


								