CIM for Enterprise Integration _IEC 61968 Series_ by ert554898

VIEWS: 128 PAGES: 82

									CIM for Enterprise Integration
                              for the
          CIM University, CIM Users Group
                           in Charlotte, NC
                          November 10, 2009




                     For further information, contact:
                Greg Robinson (grobinson@xtensible.net),
                      Convener of IEC TC57 WG14
      Co-Chair of SG-Systems WG (of OpenSG of UCA Users Group)
   ZigBee & HomePlug SEA – Smart Energy Profile 2.0 Leadership Team
Agenda


• CIM for enterprise integration (IEC 61968)
   – Overall Scope, Approach
   – Model Evolution
   – Messaging
   – Highlights for Using CIM
         • AMI, DMS, OMS, GIS, CIS
         • Asset management, work management
   – Supporting the smart grid




                                                                     Slide 2
                   CIM Users Group: CIM for Enterprise Integration
Key Premise: The Common Language Should Provide
Relevant Information To A User Regardless of Source



                                         Materials
                                        Management                         Construction
         Engineering                     Concerns
          Concerns                                                          Concerns




     Operations                    Protection                            Maintenance
     Concerns                      Concerns                               Concerns




                                                                                          Slide 3
                       CIM Users Group: CIM for Enterprise Integration
This is Not a Good Practice For Wires Integration;
It’s Not Good For Data Integration Either!




                                  Wires Integration Anarchy!



                                                                              Slide 4
                            CIM Users Group: CIM for Enterprise Integration
 Goal: Interface Standards Should Be Based on Common Semantics
 (e.g., CIM) to Avoid Adding to ‘Integration Anarchy’



                OMS                              GIS                     CIS



                    Integration Infrastructure




                WMS                              DMS                    AMR
                                                                               Data Integration Anarchy!
Integration anarchy is a chaos of:                                             Without
    (1)   duplicated logic,                                                   Common
    (2)   duplicated data,                                                   Semantics,
                                                                            Point-to-Point
    (3)   duplicated effort,                                               Integration Will
    (4)   newly acquired integration difficulties,                         Continue at the
    (5)   lack of ability to easily create new application functionality from Data Level
        services, and
    (6) lack of ability to support business processes with applications
Integration anarchy will result in higher costs and an inflexible, brittle Smart Grid
System of Systems               CIM Users Group: CIM for Enterprise Integration
                                                                                 Slide 5
The IEC 61968-1 Interface Reference Model (IRM) Provides The Framework For
Identifying Information Exchange Requirements Among Utility Business Functions

    All IEC 61968 Activity Diagrams and Sequence Diagrams are organized by the IRM
                                                                                                           Business Functions
                   Distribution Management
                                                                                                         External To Distribution
                     Business Functions
                                                                                                              Management
                       (AM)                (OP)                  (MC)                         (EMS)                                   (SC)
   (NO)
                     Records &         Operational            Maintenance                    Energy                 (RET)            Supply
  Network
                       Asset            Planning &                 &                      Management &              Retail          Chain and
 Operation
                    Management         Optimization           Construction                Energy Trading                            Logistics


   Interface           Interface          Interface              Interface                     Interface           Interface           Interface
Standard: Part 3    Standard: Part 4   Standard: Part 5       Standard: Part 6             Standard: Part 10   Standard: Part 10   Standard: Part 10



                                                 IEC 61968 Compliant Middleware Services


   Interface           Interface          Interface                       Interface            Interface           Interface           Interface
Standard: Part 7    Standard: Part 8   Standard: Part 9               Standard: Part 10    Standard: Part 10   Standard: Part 10   Standard: Part 10



   (NE)                                   (MR)                       (ACT)
                       (CS)                                                                                                           (HR)
  Network                                 Meter                    Customer                    (FIN)               (PRM)
                     Customer                                                                                                        Human
 Extension                              Reading &                   Account                  Financial            Premises
                      Support                                                                                                       Resources
 Planning                                Control                  Management



   Electric Distribution Network                                 Generation and Transmission Management,
      Planning, Constructing,                                  Enterprise Resource Planning, Supply Chain, and
    Maintaining, and Operating                                            General Corporate Services
                                                                                                                                         Slide 6
                                            CIM Users Group: CIM for Enterprise Integration
  Key Concept: Incremental Integration
  - in Step With Business Needs




                                                 GIS
                OMS
                  OR                                                                  CIS
                                                                                       TT
  IEC 61968
IRM Interface


                             Semantically Consistent ESB




                WMS                                                                   AMR

                                                DMS                                   Information Flow Design
                                                                                        CIS        OMS        DMS

                                                                     Trouble Ticket           TT
                                                                                                         OR
                                                                     Outage Record
                                                                                                         Slide 7
                              CIM Users Group: CIM for Enterprise Integration
Key Concept:
Replace Large Monolithic Applications ‘a Chunk at a Time’




                                                                                    Other Apps
                                                        MDI/CIM Messages             Other Apps
                                                                                       Other Apps




                                                        Maintenance &
                                         Construction
                        Scheduling




                                                                        Recording
                                                         Inspection
               Design


                           Work




                                                                          Field
                                      WMS




                                                                                           Slide 8
                        CIM Users Group: CIM for Enterprise Integration
Agenda


• CIM for enterprise integration (IEC 61968)
   – Overall Scope, Approach
   – Model Evolution
   – Messaging
   – Highlights for Using CIM
         • AMI, DMS, OMS, GIS, CIS
         • Asset management, work management
   – Supporting the smart grid




                                                                     Slide 9
                   CIM Users Group: CIM for Enterprise Integration
IEC 61968-11: CIM Extension for Distribution
                                 IEC61968CIMVersion

                  +   date: AbsoluteDateTime [0..1] = 2009- 04- 01
                  +   version: String [0..1] = IEC61968CIM10v23
                                                                               Transitioning from
                                                                                 Rational Rose
                  Common
                                                                             To Enterprise Architect
                                                                                 (Depending the state of a
                                                                                Package, some diagrams in
                                                                               this presentation are in Rose
                  Assets                         AssetModels                       and others are in EA)

         Part 4




                  Work

         Part 6



                  Customers
         Part 8




                  Metering                       LoadControl                  PaymentMetering
         Part 9


                                                                                                       Slide 10
                           CIM Users Group: CIM for Enterprise Integration
Priorities:
WG14 Roadmap priorities by NC


                                                                             NC         Averag
                    CAN      CH      DE      FR       UK      US     ZA     Positio        e              comment
                                                                              ns        Priority
       61968-9        3      3         3       3       3       3              6           3.0             Metering
       61968-11       3      3         3       3       3       3              6           3.0              DCIM
       61968-3        2      3         3       3       3       3      3       7           2.9      Operations (DMS/OMS)
       61968-4        2      3         3       3       3       3      3       7           2.9       Asset & record mgmt.
       61968-1        3      3         3       3       3       2              6           2.8      Reference architecture
       61968-13       3      3         3       3       2       3              6           2.8             CDPSM
        Security      1      3         3       2               3              5           2.4
      61968-1-2       3      1         3       2       1       3              6           2.2        Naming/Design rules
       61968-6        2      1         1       2       3       3      3       7           2.1           Work mgmt.
       61968-10       2                                                       1           2.0               n/a
      61968-14-1      3      1         1       1       2       3              6           1.8           MultiSpeak
      61968-14-2      3      1         1       1       2       3               6          1.8            MultiSpeak
       61968-2        3      2         2       1       1                       5          1.8             Glossary
       61968-5        2      2         2       2       1                       5          1.8        Operations Planning
       61968-7        2      2         2       2       1                       5          1.8        Extensions Planning
         DER          1      2         1       2               3               5          1.8
      61968-1-1       3      1         1       2       1       2               6          1.7          Integration profile
      PHEV/PEV        1      2         2       1               2               5          1.6
                                                                                                      Customers (mgmt,
        61968-8       2      1         1       1       1       2      3        7          1.6
                                                                                                           billing)
         HAN          1      1         1       1               3               5          1.4


       current     pending       postponed         non-modelling
                                                                                           [source: Tanja Kostic]

                                                                                                                     Slide 11
                                      CIM Users Group: CIM for Enterprise Integration
Priorities:
Current modelling priorities


   • Driven by interoperability (IOP) tests
         – 2009: Metering (Part 9) + balanced and unbalanced CDPSM (Part
           13 Ed.2)
         – 2010: NetworkDataSet (Part 4 Ed.2) for CDPSM needs (GIS-
           DMS/OMS exchange)
   • Those common classes that support the above
   • Overall CIM modelling principles, naming rules, network model
     for T&D, coordination with CMM
   • Part 4 maintenance cycle
   • Part 3 maintenance cycle (some useful for Part 5)
   • Metering-related packages (Part 9 Ed. 2)
   • (continuous: clean-up for consistency/correctness,
     simplification, diagrams, documentation)

                                                                            [source: Tanja Kostic]

                                                                                                     Slide 12
                          CIM Users Group: CIM for Enterprise Integration
CIM model and Part 11 evolution:
Normative vs. informative
  •   Introduced in January 2009
  •   WG14 package split to normative and informative (unstable, work-in-
      progress)
       – WG13 also started applying this approach to their obsolete packages 
  •   Condition for “normativity”
       – Be used in messages of Part 9 Ed.1 and Part 13 Ed.2
       – Be used in messages of Ed.2 of Parts 4, 3, 5 (priority by the WG14 roadmap)
  •   WG14 uses Informative package as a sandbox, with expiration date for
      elements
       – Move (potentially refactored) classes to normative packages – these are
         maintained by WG14
  •   After expiry date, delete informative classes/relationships from the
      model
       – WG14 SharePoint has the archive of all model releases where deleted
         elements can be found
       – CIM users can take over and evolve deleted elements and potentially submit
         through standard CIM issues form the request for inclusion into standard
         CIM – modelling team decides whether the extension is considered as
         globally useful and thus provided as standard CIM (and not custom for a
         product/project/customer/vendor)
                                                                               [source: Tanja Kostic]
                                                                                                        Slide 13
                             CIM Users Group: CIM for Enterprise Integration
CIM model and Part 11 evolution
Model releases and IOPs
  • WG14 follows the same timing as WG13
  • IOPs take place in Q4 of a year
       – WG13 does not have IOP this year, but in April 2010, for CIM14
  • Given model version (used for IOPs) is frozen 2-3 months
    before IOPs
       – Base CIM end July (14v12), DCIM mid September (10v27)
  • Modelling team evolves new versions of the model with
    changes in informative parts only
  • Issues identified in IOPs are addressed and resolutions
    included in official DCIM release (Q1 of next year) used for Part
    11 FDIS
       – WG13 has the same approach for IEC61970-301
  • After January meeting, we branch the model
       – Version 14vXX-10vYY (developed during 2009) is for Part 11/301
         FDIS
       – IEC61968 package is merged by CMM into the combined 15vYY
       – Copy of it is saved as 15vYY-11v01 and evolved for IOPs in 2010
                                                                                [source: Tanja Kostic]
                                                                                                         Slide 14
                              CIM Users Group: CIM for Enterprise Integration
Schedule until 2010-Q2

 • Models for 2009 IOPs:
    – CPSM IOP based on CIM14 (14v12)
       • frozen end July 2009
    – Metering and CDPSM IOPs based on DCIM10 (10v27)
       • frozen mid September 2009
       • no changes that would impact Part 9 FDIS messages
       Model usable for all IOPs 2009
 • Part 11 CDV comments:
    – Arrived end August 2009
    – We’ll address them in October 20 conference call
 • CIM and DCIM FDIS:
       • FDIS of 61970-301 Ed.4 and FDIS of 61968-11 Ed.1 planned
         after January 2010 meetings
       • Will include fixes, provided as high priority IOP issues
       • To be submitted not later than end Q1-2010

                                                                       [source: Tanja Kostic]

                                                                                                Slide 15
                     CIM Users Group: CIM for Enterprise Integration
Agenda


• CIM for enterprise integration (IEC 61968)
   – Overall Scope, Approach
   – Model Evolution
   – Messaging
   – Highlights for Using CIM
         • AMI, DMS, OMS, GIS, CIS
         • Asset management, work management
   – Supporting the smart grid




                                                                     Slide 16
                   CIM Users Group: CIM for Enterprise Integration
IEC 61968 Basic Message Structure




                                                                     Slide 17
                   CIM Users Group: CIM for Enterprise Integration
Message Header




                                                                   Slide 18
                 CIM Users Group: CIM for Enterprise Integration
Message Types Are Created By Combining IEC 61968 Verbs With
Information Exchange Topics, Referred To As Nouns

            Verbs                      Meaning                              Message Body
          CREATE    The CREATE verb is used to publish a request to        All sections (data
                    the master system to create a new document.            required to create the
                                                                           document)
          CHANGE    The CHANGE verb is used to publish a request to        All sections (key(s) +
                    the master system to make a change in the              data to be changed)
                    document based on the information in the
                    message.
          CANCEL    The CANCEL verb is used to publish a request to        Header information +
                    the master system to cancel the document. The          message content key(s)
                    CANCEL verb is used when the business content
                    of the document is no longer valid due to error(s).
          CLOSE     The CLOSE verb is used to publish a request to         Header information +
                    the master system to close the document. The           message content key(s)
                    CLOSE verb is used when the business document
                    reaches the end of its life cycle due to successful
                    completion of a business process.
          DELETE    The DELETE verb is used to publish a request to        Header information +
                    the master system to delete the document. The          message content key(s)
                    DELETE verb is used when the business
                    document should no longer be kept in the
                    integrated systems either due to error(s) or due to
                    archiving needs.
          GET       The GET verb is used to publish a request to the       One or more document
                    master system to get the current data for a given      reference codes +
                    document reference code or a set of documents.         Key(s)

                                                                                                    Slide 19
                         CIM Users Group: CIM for Enterprise Integration
  Verbs                         Meaning                             Message Body
CREATED      The CREATED verb is used to publish the               All sections
             creation of a document as a result of either an
             external request or an internal action within the
             master system of that document.
CHANGED      The CHANGED verb is used to publish the               All sections (key(s) +
             change of a document as a result of either an         changed content)
             external request or an internal action within the
             master system of that document.
CLOSED       The CLOSED verb is used to publish the normal         Header information +
             closure of a document as a result of either an        message content key(s)
             external request or an internal action within the
             master system of that document.
CANCELED     The CANCELED verb is used to publish the
             cancellation of a document as a result of either an
                                                                   Header information +
                                                                   message content key(s)
                                                                                             (IEC 61968
             external request or an internal action within the
             master system of that document.
                                                                                             Verbs - continued)
SHOW         The SHOW verb is used to publish the most             All sections
             current content of a document as a result of either
             an external GET request or an internal action
             within the master system of that document.
REPLY        The REPLY verb is used to publish the processing      Header information +
             result of an external request to the master system    message content key(s)
             to create, change, delete, cancel, or close a         + confirmation
             document. The REPLY message type could                information +
             contain specific confirmation information as to       alternatives (optional)
             whether the request is processed successfully or
             not and provide alternatives if applicable.
SUBSCRIBE    The SUBSCRIBE verb is used to publish the             Header information +
             request to ask the master system of a document        message content key(s)
             to publish a CHANGED document whenever there
             is a change to the document.
UNSUBSCRIB   The UNSUBSCRIBE verb is used to publish the           Header information +
E            request to ask the master system of a document        message content key(s)
             to stop publishing a CHANGED document
             whenever there is a change to the document.

                                                                                                            Slide 20
                                      CIM Users Group: CIM for Enterprise Integration
Message Payload of “End Device Control” of IEC 61968-9




                                                                       XSD Tag Names Are
                                                                       From Relevant Data
                                                                       Elements in the CIM




                                                                                        Slide 21
                     CIM Users Group: CIM for Enterprise Integration
“End Device Control” Sample XML
<?xml version="1.0" encoding="UTF-8"?>
<!--Sample XML file generated by XMLSpy v2009 sp1 (http://www.altova.com)-->
<m:EndDeviceControls xsi:schemaLocation="http://iec.ch/TC57/2009/EndDeviceControls#
EndDeviceControls.xsd" xmlns:m="http://iec.ch/TC57/2009/EndDeviceControls#"
xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
          <m:EndDeviceControl>
                     <m:mRID>53185955_D0AB</m:mRID>
                     <m:drProgramLevel>3</m:drProgramLevel>
                     <m:drProgramMandatory>true</m:drProgramMandatory>
                     <m:priceSignal>0.2</m:priceSignal>
                     <m:type>PRICE</m:type>
                     <m:DemandResponseProgram>
                                <m:type>RTP</m:type>
                     </m:DemandResponseProgram>
                     <m:scheduledInterval>
                                <m:end>2001-12-17T10:30:47Z</m:end>
                                <m:start>2001-12-17T09:30:47Z</m:start>
                     </m:scheduledInterval>
          </m:EndDeviceControl>
</m:EndDeviceControls>
Agenda


• CIM for enterprise integration (IEC 61968)
   – Overall Scope, Approach
   – Model Evolution
   – Messaging
   – Highlights for Using CIM
         • AMI, DMS, OMS, GIS, CIS
         • Asset management, work management
   – Supporting the smart grid




                                                                     Slide 23
                   CIM Users Group: CIM for Enterprise Integration
IEC 61968-4: Records and Asset Management

•   Network Data Set
     – Contains data for any part of a distribution network:
          •   Typically selected for operational or extension planning studies
          •   Used in numerous implementations for GIS to DMS integration
          •   Can be part of a feeder, a single feeder or more than one feeder
          •   Can be either the ‘As built’ network or a proposed network selected for analysis
          •   It is a superset of CDPSM (i.e., Distribution’s CPSM)
     – Contains references to other static data such as:
          •   Elements of a TypeAssetCatalogue
          •   Elements of a AssetCatalogue
          •   Assets performing the roles of the associated types of PowerSystemResources
          •   Other “leaf node” elements such as Organisations, Locations, and Measurements
•   Change Set
     – Contains updates required in a transaction for an existing NetworkDataSet
     – Each step in the ChangeSet is described through a separate ChangeItem.
          • A change item identifies the change type (add, delete, modify)
          • Sequence number for a particular change within a set of changes of a ChangeSet.
     – Only the identifiers of the relevant NetworkDataSet messages are to be included
       in a ChageSet message.
          • The actual contents are provided in accompanying NetworkDataSets messages.




                                                                                                 Slide 24
                                CIM Users Group: CIM for Enterprise Integration
                                   ChangeSet                      The NetworkDataSet is organized by logical
                              (from DataSets)                     Role (vs. physical asset) and may represent
                                          0..n                     various views, such as as-built, nominal,
                                          ...                                operational, study, etc.
                            NetworkDataSet
                              (from DataSets)                                                                                     ChangeItem
                                                                0..n                                                             (from DataSets)
                     0..1                                                  0..n
                                   0..n                                                                            0..1
                                                 0..n
                                                                                                                          0..n
                            0..n
                                                                             PowerSystemResource                                       0..n
              0..1
                                                                                           (f rom Core)
LoadDataSet           LandBase
                     (f rom DataSets)
                                                                                                                                       0..1
(f rom DataSets)
                                                                                                     1..n
                                                                                  0..n                      0..n                        Asset
                                                                                                                           0..n    (f rom AssetBasics)

                                          0..n
                                                                                                   0..n
                                          Circuit        0..n                            CircuitSection
                                      (f rom DataSets)                                   (f rom DataSets)
                                                         1..n                0..n



                                                                 Everything from the IEC 61970 Wires
                                                                Package may be included. Connectivity
                                                                   Is based on IEC 61970 Topology
                                                                                                                                              Slide 25
                                                  CIM Users Group: CIM for Enterprise Integration
From the logical view to the physical asset view of the same object.
      PowerSystemResource                         0..n
                                                                                                     Organisation
                       (from Core)                                                                  (from TopLevel)
                                                                                          0..n
                                                                     OrgPsrRole
                         0..n   0..n                                (from AssetBasics)

                                                                                                                     1..n




   DocPsrRole                                                                            OrgAssetRole
  (from AssetBasics)                                                                     (from AssetBasics)
                                       AssetPsrRole
                                       (f rom AssetBasics)

                                                                                                                                 ErpInventory
                                                                                                                               (from ERP_Support)


                                                                                                                                  0..1

            +Documents                                        DocAssetRole                          0..n             0..n
                    0..n                                      (from AssetBasics)                                        0..1
                                                                                         0..n
                       Document                  0..n                                                         Asset
      (from DocumentInheritance)                                                                 (from AssetBasics)

                                                                                                              0..1

                                                                                                                     0..1
                       AssetModel      0..n      0..1        TypeAsset                           FinancialProperties
                 (from AssetBasics)                      (from TypeAsset)                           (from AssetBasics)


                                                                                                                                           Slide 26
                                                 CIM Users Group: CIM for Enterprise Integration
IEC 61968-4: Records and Asset Management

• Presentation:
   – Can contain location information for most any element
     represented in the CIM, particularly elements of the distribution
     network.
   – Provides location information of individual assets or power
     system resources
   – Provides a set of location information as a companion to the
     NetworkDataSet.
• Asset List:
   – Can contain various amounts of data for any set of utility assets
   – Contains references to static reference data such as:
       • Elements of an AssetCatalogue
       • Elements of a TypeAssetCatlogue
       • PowerSystemResources that specify the role in which the Asset is
         being used
           – If it has been installed rather than sitting in inventory
       • Other “leaf node” elements such as Organisations, Locations, and
         Measurements


                                                                           Slide 27
                         CIM Users Group: CIM for Enterprise Integration
Graphical Rendering

 • GML has been designed to uphold the principle
   of separating content from presentation
 • GML provides mechanisms for the encoding of
   geographic feature data without regard to how
   the data may be presented to a human reader
 • Since GML is an XML application, it can be
   readily styled into a variety of presentation
   formats including vector and raster graphics, text,
   sound and voice
 • GML is standardized through ISO
        • ISO 19136 - Geographic information - Geography Markup
          Language (GML)

                                                                        Slide 28
                      CIM Users Group: CIM for Enterprise Integration
    Presentation of Real World Objects – Key Classes




                                                                                                                                                     GmlPointGeometry
                                         Location                                         GmlDiagramObject                                            (f rom GML_Support)
                                    (from Locations)                                      (from GML_Support)
                                                                                                                                                     GmlLineGeometry
                                                     1                                                             0..10..1
                                                                                                               0..1                                   (f rom GML_Support)
                                                                                                       0..1
                                           0..n                                        0..n   0..1

    Diagram                             GmlPosition                                                                                                  GmlPolygonGeometry
                                                                                                                                                         (f rom GML_Support)
(from Presentation)               (from GML_Support)

                          0..n                    0..n

                                                                                                                                                       0..n
                                    1      0..1          1..n
          Map
                                                                                                                                                      GmlTextSymbol
   (f rom Presentation)          GmlCoordinateSystem                                                                                                  (f rom GML_Support)
                                  (from GML_Support)


                                                                                                                                      0..n                0..n
                                                                               0..n                     0..n
                                                                GmlRasterSymbol               GmlPointSymbol                  GmlLineSymbol         GmlPolygonSymbol
                                                                 (f rom GML_Support)           (f rom GML_Support)            (f rom GML_Support)    (f rom GML_Support)




                                                                                                                                                                 Slide 29
                                                          CIM Users Group: CIM for Enterprise Integration
Case Study: Asset Management System Used to Initialize System Control
Center System (source: DistribuTECH2002)




                                                  Asset
                                                Management

                                                                   Asset data sent in XML
                                                   Adapter Transformation into CIM Objects
                                                          Publish AMS data in CIM format
                                               Integration Bus


                                                   Adapter Subscribe to Asset data


                                                  System
                                               Control Center
    [presented at DistribuTECH 2001]

                                                                                            Slide 30
                                       CIM Users Group: CIM for Enterprise Integration
Case Study: Operations Model Capabilities (source: DistribuTECH2002)




                                                                             AMS




    DMS



                                                                                   Slide 31
                           CIM Users Group: CIM for Enterprise Integration
Case Study: LIPA Asset Management and Organization                                     (source: IEEE 2009)




Asset Owner                                                                                           Asset Manager
 Responsibilities:                                                                                    • Asset Optimization
• Asset valuation                                                                                     • Asset yield contribution
• Investment analysis & strategy                                                                        understanding
• Contract negotiation/structuring                                                                    • Financial structuring
• Regulatory oversight                                                                                • Business development
• Market & economic analysis                                                                          • Asset specifications &
• Portfolio management                                                                                  standards
• Capital allocation                                                                                  • Full lifecycle asset
• Asset financial & operating                                                                           management
  performance analysis                                                                                • Asset data management
• Asset planning                                                                                      • Workload management
• Asset acquisition &                                                                                 • Asset financial and
  monetization                                                                                          operating performance
                                                                                                        analysis
                                                                                                      • Asset strategy & plan
Service Provider
                                                                                                        development
 Responsibilities:                                                                                    • Asset full lifecycle
• Construction & maintenance                                                                            financial & operational
  project management                                                                                    data analysis
• Materials sourcing & inventory                                                                      • Regulatory strategy &
  management                                                                                            negotiation
• System engineering & design                                                                         • Contract management
• Bargaining unit negotiations                                                                        • Risk management
• Workforce scheduling &                                                                              • Asset data requirements
  deployment                                                                                            definition
• Work practice design &                                                                              • Asset opportunity
  development                                                                                           development & analysis
• Asset data input and collection                                                                     • Industry Best Practices
• Workforce training
• Marketing & sales of services
• Competitor analysis




                                                                                                                        Slide 32
                                     CIM Users Group: CIM for Enterprise Integration
Case Study: LIPA Asset Management Concept (source: IEEE 2009)


                                                                                           MSA
                                         Asset Management
                                         AssetManagement
                                               Management
                                              Asset                             Service
                                              Owner         Asset Manager       Provider
     LIPA
     LIPA             Risk
                    Management                                           Impl      Exe
     Goals                                   Strategy Plan




                                                                                                 Assess Effectiveness
      Goals                                                             ement      cute
     Customer
    Satisfaction                             Data and Process Integration – CIM/IB/SOA

     Financial                                            Risk Assessment
                                                          Risk Assessment
    Technical                               Risk                  Risk            Risk
   Performance                              Status               Drivers        Tolerance

    Regulatory
                                         Assets & Processes (O&M&Planning) aspects
                                                                                 KRIs/Risk
       KPIs                            Visualization Dynamic Criticality
                                                        FMEA                     Indicators



                                                                                                   Slide 33
                      CIM Users Group: CIM for Enterprise Integration
Some Foundational Relationships
of the IEC CIM for Asset Management


          Document                                                                      Organisation
 Information Containers Such As                                                Entities Performing One or More
Asset Catalogues, Trouble Tickets,                                            Roles Such As Customer, Supplier,
        Work Orders, etc.                                                     Manufacturer, Service Provider, etc.

           Location
  A Street Address, Coordinates                                                          Erp Person
 For a Geographic or Schematic                                                  A Person Performing Roles Such
      reference system, etc.                                                     Dispatcher, Field Operator, etc.


 Power System Resource                                                                 Activity Record
Electrical Network Role Used For
                                                                                    Used to Record Each State
   Planning, Operations, etc.
                                                                                      change of CIM objects




       Type Asset                           Asset Model                                      Asset
    Compatible Unit For            Particular Model and Version                   Physical Plant Filling A Role
   Design & Procurement                of a Vendor's Product                    Such As A Transformer, Pole, etc.


                                                                                                         Slide 34
                                  CIM Users Group: CIM for Enterprise Integration
             PowerSystemResource
                      (from Core)

                      0..n

                                     DocPsrRole
                                    (from AssetBasics)

                                                                DocAssetRole
                                                                (from AssetBasics)
                      0..n
                                                                                                                                           AssetListRole
                      Document              0..n                                       0..n            Asset                               (from AssetBasics)
               (from DocumentInheritance)                                                     (from AssetBasics)
                                                    0..n                                                                     0..n



                                                                                                         Collecti on                0..n        AssetList
 Specification
(f rom AssetBasics)                                                                             0..n    (from Collections)                  (f rom AssetBasics)




                                                                                 TypeAssetCatalogue                             AssetCatalogue
                                                                                      (from AssetBasics)                        (from AssetBasics)

                                                                                                 0..1                                                1


                                                                                                 0..n

                                        AssetModel                0..n         0..1     TypeAsset
                                    (from AssetBasics)                                (from TypeAsset)

                                                                                                                                                  0..n
                                                                   0..1

                                                                                                                                AssetCatalogueItem
                                                                                                                   0..n              (f rom AssetBasics)

                                                                                                                                                                  Slide 35
                                                         CIM Users Group: CIM for Enterprise Integration
IEC 61968-4: Records and Asset Management

• Asset Catalogue:
   – A collection of information regarding available types of products and
     materials that are used to build or install an Asset(s), to maintain an
     Asset(s) or to operate an Asset(s).
   – Each catagoue item is for a specific product available from a specific
     supplier.
   – Contains references to static reference data such as:
       • Elements of a TypeAssetCatalogue
       • Specifications
       • Other “leaf node” elements such as Organisations
• Type Asset Catalogue
   – Contains data for a set of utility asset types
   – It is a collection of information regarding generic types of assets that
     may be used for design purposes, analysis, and so on
   – A TypeAsset is not associated with a particular manufacturer
   – Contains references to other Documents containing static reference
     data such as:
       • Elements of an AssetCatalogue
       • Other “leaf node” elements such as Organisation




                                                                            Slide 36
                         CIM Users Group: CIM for Enterprise Integration
IEC 61968-6: Maintenance & Construction

• Work is created any time a person is required to
  perform an activity related to company assets.
  Examples of work include
  – Construction work (e.g. service installations, line
    extensions, and system betterment projects)
  – Service work (e.g meter replacements, Turn-on, Turn-
    off, etc.)
  – Maintenance work (e.g. routine oil changes, painting,
    etc.)
  – Inspection work (e.g. pole inspections, vault
    inspections, Substation inspections)
  – Trouble work (e.g. Power outage, voltage quality
    problem, etc.)


                                                                   Slide 37
                 CIM Users Group: CIM for Enterprise Integration
IEC 61968-6: Construction & Maintenance

• Current Message Types:
  –   Compatible Units
  –   Construction Work
  –   Crew
  –   Design
  –   Inspect & Test
  –   Labor
  –   One Call Request
  –   Procedure
  –   Service Work
  –   Trouble Work
  –   Work Cost Detail
  –   Work Scheduling
  –   Work Status
  –   Work Task
                                                                    Slide 38
                  CIM Users Group: CIM for Enterprise Integration
Generic “TypeAssets” are used for Design


                                                                                                               CostType             0..1
                                                                 CUGroup
                                                                                                           (f rom WorkClosing)
                                                          (f rom WorkStandards)


                                                           0..1             0..n
                                                                     0..n                                            0..1

                                                          0..n
                                                                                          0..n
                                                   CompatibleUnit                                0..n      CUContractorItem
                                               (from WorkDesign)                                            (f rom WorkStandards)
                                                                                      0..n
                                                                                     0..n
                                     0..n                                           0..n           0..n
                                                   0..n                 0..n
                                                                                                                     Procedure
                                                                                                           (f rom WorkInspectionMaintenance)


                    0..n                                                                                0..n
                                            0..n                            0..n
CUMaterialItem                                                                                              CULaborItem
(f rom WorkStandards)
                                CUAsset                             CUEquipmentItem                       (f rom WorkStandards)
                           (from WorkStandards)                    (from WorkStandards)
           0..n
                                               0..1
                                                                                   0..1
                                                          0..1
    0..1
                                                                            0..1
  TypeMaterial
(f rom WorkStandards)                                       TypeAsset
                                                      (from TypeAsset)



                                                                                                                                           Slide 39
                                        CIM Users Group: CIM for Enterprise Integration
IEC 61968-3: Network Operations

• Current Message Types:
  – Measurement list;
  – Operational restrictions;
  – Outage records;
  – Safety documents;
  – Switching schedules.
• More to be added during maintenance
  cycles



                                                                  Slide 40
                CIM Users Group: CIM for Enterprise Integration
An Example: Safety Document Classes


                                                                                                    Organisation
                                                                                                     (from TopLevel)                       OrgErpPersonRole
                                                                DocOrgRole
                                                                                                                                                (from TopLevel)
                                                                (from TopLevel)
                                                                                                                           0..n
                                                                                                    0..n
                                                                                                                                       0..n
                                                                                    0..n
     SafetyDocument                                                Document                                                             ErpPerson
                                                           (from DocumentInheritance)                                                (from ERP_Support)
        (from Operational)
                                                                                        0..n
                                                                   0..n                 0..n
                                                                             0..n
                                                                                                                        ActivityRecord
                       OperationalRestriction                                                                0..n      (from ActivityRecords)
                             (from Operational)


                                                                                                     0..n

                                                                                           PowerSystemResource
                                                                                                      (from Core)
                                                                                                                    0..n

                                                                                                                              0..1
 ClearanceTag                1         ConductingEquipment                                 Equipment                           PSRType
   (from Outage)
                                                  (from Core)                                  (from Core)                      (from Core)
                    0..n




                                                                                                                                                             Slide 41
                                                  CIM Users Group: CIM for Enterprise Integration
Safety Document Message Type




                                                                      Slide 42
                    CIM Users Group: CIM for Enterprise Integration
IEC 61968-8: Customer Support

• Current Message Types:
  –   Trouble Ticket
  –   Failure Event
  –   Planned Outage Notification
  –   Call Back
  –   Compliance Event
  –   Outage History
  –   Service Extension Request
  –   ServiceRequest
  –   CustomerServiceAgreement
  –   Customer Billing
  –   Construction Billing


                                                                     Slide 43
                   CIM Users Group: CIM for Enterprise Integration
       Aspects of Customer Accounts




                                                                                                     Agreement
                                          CustomerAccount                                            (from TopLevel)                      Equipment                           ConductingEquipment
                                               (from Consumers)                                                                            (f rom Core)                             (f rom Core)

                                                   1..n                     1                                                      0..n

                                               1                                0..n                                   0..n

                                  CustomerData                                         CustomerAgreement                          0..n       ServiceLocation                    EnergyConsumer
                                  (from Consumers)                                                                                                                                  (f rom Wires)
                                                                                              (from Consumers)                                  (from Locations)
                                                                                                                                    0..n
                                                                                                                                                                                             1
                           0..1         0..1                                               0..n               0..n                                    0..1


                                                                                       1                                                             0..n                                 0..n
                    0..1                       0..n
Organisation                         ErpPerson                           ServiceKind                                                            SDPLocation          0..n    ServiceDeliveryPoint
                           0..n                                      (f rom Consumers)                                                          (from Locations)
(f rom TopLev el)                  (f rom ERP_Support)                                                                                                                           (from Metering)
                    0..n                                                                                                                                           0..n

                                                                                              1                                                                                             0..n



                                                                                                       0..n 0..n
                                                                                                                                                                                            0..n
                                                          Tariff                                  PricingStructure            1                                                PowerQualityPricing
                                                      (from Consumers)                            (f rom Consumers)                                                              (f rom Consumers)
                                                                         0..n          0..n                                                                           0..n




                                                                                                                                                                                       Slide 44
                                                                     CIM Users Group: CIM for Enterprise Integration
A Customer Account Message Type for AMI (IEC 61968-9)




                                                                      Slide 45
                    CIM Users Group: CIM for Enterprise Integration
IEC 61968-9
Reference
Model
IEC 61968-9: Automated Meter Reading and Control

• Current Message Types
  – CustomerMeterDataSet
  – MeterAsset
  – MeterAssetReading
  – EndDeviceControls
  – EndDeviceEvents
  – MeterReadings
  – MeterReadSchedule
  – MeterServiceRequest
  – MeterSystemEvents
  – EndDeviceFirmware


                                                                 Slide 47
               CIM Users Group: CIM for Enterprise Integration
Metering Inheritance Package




                                                                       Slide 48
                     CIM Users Group: CIM for Enterprise Integration
Customer Overview – from a 61968-9 perspective




                                                                       Slide 49
                     CIM Users Group: CIM for Enterprise Integration
                                                                                                          Document
  Pricing structure model                                                                         Customers::
                                                                                                PricingStructure


                                                                                + PricingStructures        0..*


•TariffProfile determines the cycle of                                                        + Tariffs    0..*

                                                                                                     Document
operation for the tariff, such as hourly,
                                                                                                  Customers::
daily, weekly, monthly, etc, at the end                                                             Tariff

of which it resets to start at the
                                                                                              + Tariffs     0..*
beginning of the process again.
•TimeTariffInterval determines the                                                     + TariffProfiles     0..*

starting time for a particular interval                           + TariffProfiles
                                                                                                              Document
                                                                                                                            + TariffProfiles
                                                                                                  TariffProfile
and several instances of                                                        0..*
                                                                                          +   tariffCycle: String [0..1] 0..*
TimeTariffInterval may be used to
construct a series of time intervals to        + TimeTariffIntervals
                                                                                                                           + ConsumptionTariffIntervals
realise a time of use tariff for example.                  0..*                                                                        0..*

•ConsumptionTariff Interval                                 TimeTariffInterval                                             ConsumptionTariffInterval

determines the starting value of a             +   sequenceNumber: Integer [0..1]                                    +    sequenceNumber: Integer [0..1]
                                               +   startDateTime: AbsoluteDateTime [0..1]                            +    startValue: RealEnergy [0..1]
consumption interval and several
                                                             0..*                                                                          0..*
instances of                                       + TimeTariffIntervals                                                  + ConsumptionTariffIntervals
ConsumptionTimeInterval may be
used to construct a series of                                                                              I dent ifiedObject
                                                                                                  Charge                        + Charges
consumption intervals to realise a                           + Charges

block tariff or a step tariff for example.                             0..* +     kind: ChargeKind [0..1]             0..*
                                                                            +     fixedPortion: AccountingUnit [0..1]
                                                                            +     variablePortion: PerCent [0..1]
                                                            + ParentCharge
                                                                                                                         + ChildCharges
                                                            0..1
                                                                                                                         0..*
                                                                                                                                              Slide 50
                                   CIM Users Group: CIM for Enterprise Integration
Auxiliary agreements


• Receipting payments for
  ‘other items’ such as debt,
  rates, taxes, municipal fines,
  TV licences, garbage
  collection charges, etc.
• The collection of such
  revenue may be integrated
  with token sales and
  customer account payments
  by means of auxiliary
  agreements and auxiliary
  accounts.
• AuxiliaryAccount captures the
  dynamic information about
  the charges and payments
  made against the account.


                                                                         Slide 51
                       CIM Users Group: CIM for Enterprise Integration
                                                  Slide 52
CIM Users Group: CIM for Enterprise Integration
                                                  Slide 53
CIM Users Group: CIM for Enterprise Integration
Example of Meter Reading Schedules and Readings




                                                                       Slide 54
                     CIM Users Group: CIM for Enterprise Integration
Meter Reading Options

• Meter Readings may be requested using a
  variety of parameters:
  – Specific meter, using the MeterAsset mRID
  – Specific meter, using a meter name as known
    to the Metering System
  – EndDeviceGroups, where a EndDeviceGroup
    identifies a group address used within the
    Metering System
  – As specified using a TimeSchedule
  – Reading types can be specified to identify the
    desired reading types


                                                                 Slide 55
               CIM Users Group: CIM for Enterprise Integration
                                                  Slide 57
CIM Users Group: CIM for Enterprise Integration
Meter Readings Type

• Key to the reporting of a value from a meter is
  the reading type. The ReadingType class allows
  the capture of the following information:
   –   mRID (to uniquely identify a reading type)
   –   channel number
   –   default quality
   –   default value data type
   –   dynamic configuration
   –   forward chronology
   –   interval length (in seconds)
   –   measurement type category
   –   unit of measure
   –   register digits
        • Refer to IEC 61968-9 Annex for details


                                                                        Slide 58
                      CIM Users Group: CIM for Enterprise Integration
Device Control




  Example type controls:
  •Load control signal
  •Price signal or schedule
  •Remote disconnect
  •Remote reconnect
  •Demand reset
  •Demand reduction signal
End Device Updates




                                                                       Slide 60
                     CIM Users Group: CIM for Enterprise Integration
Meter System Events (page 1)




                                                                         Slide 61
                       CIM Users Group: CIM for Enterprise Integration
Meter System Events (page 2)




                                                                       Slide 62
                     CIM Users Group: CIM for Enterprise Integration
Meter
Service
Requests
         Example Meter Relationship from IEC 61968-9

Description of Item                   Value                                          CIM Location              Type


This communication       MCM-ID                   EndDeviceAsset.DeviceFunction.ComFunction.amrAddress   name/mRID
      module


is servicing this end    End-device ID            MeterAsset.name                                        name/mRID
       device

(which is let’s say an   End-device type          ServiceDeliveryPoint.serviceType                       Attribute
      electricity
      meter)

using this connection    Port Number              EndDeviceAsset.DeviceFunction.ComPort                  Attribute

                         Upstream CommAsset       EndDeviceAsset.DeviceFunction.                         name/mRID


at this location         ServiceDeliveryPoint     ServiceDeliveryPoint.name                              name/mRID


for this account         Account ID               CustomerAccount.name                                   name/mRID


and this customer        Customer ID              CustomerAccount.Customer.name                          name/mRID


In this utility          Business Unit




Commencing at this       Installation date        ActivityRecord.statusDateTime                          Attribute
    date

Because                  “In-Service”             ActivityRecord.status                                  Attribute


                                                                                                          Slide 64
                                                CIM Users Group: CIM for Enterprise Integration
Agenda


• CIM for enterprise integration (IEC 61968)
   – Overall Scope, Approach
   – Model Evolution
   – Messaging
   – Highlights for Using CIM
         • AMI, DMS, OMS, GIS, CIS
         • Asset management, work management
   – Supporting the smart grid




                                                                     Slide 65
                   CIM Users Group: CIM for Enterprise Integration
GWAC Stack – Levels of Interoperability




                                    [Source: GridWise Architectural Council Interoperability Context Setting Framework]
                                                                                                          Slide 66
                    CIM Users Group: CIM for Enterprise Integration
NIST Conceptual Model




                        CIM Users Group: CIM for Enterprise Integration
                                                                                                Roadmap]
                                                                          [Source: NIST InterimSlide 67
Interoperability Layers




                                                                      Slide 69
                    CIM Users Group: CIM for Enterprise Integration
                                                         (of UCAIug/OpenSG/SG-Systems WG)




•The scope of AMI-ENT is the systems and/or applications within and around the utility enterprise and the inter-systems
related business functions and stops at the boundaries of applications and the edge of utility enterprise.
       •The focus is on how these systems are to be integrated and composed to support AMI related business processes and
       functions.
       •Edge applications are those applications that communicate with networks and devices in the field, as well as those that
                                                                                                                         Slide 70
                                              enterprises (generally Enterprise third parties).
       communicate with other businesses or CIM Users Group: CIM fordefined as Integration
Case Study: Consumers Energy and AMI-Ent TF
                                                     Customer                      Distribution
                                                   Info. & Billing                 Management
                                                                                                                  HAN
                                                                                                               Management

                                         Outage
                                                                     Revenue                   AMI Service
                                       Management
                                                                     Protection                 Manager




                                                    Enterprise Bus + Common Model & Service




                                                                       AMI-
                                                                       AMI-ENT


                                                                                    Demand
                                                   Customer
                                                                                   Response
                                                    Portal                                                   AMI Network
                                                                                  Management
                                                                                                               Asset
                                                                                                             Management
                                     Third Party                  Meter
                                                                                           Meter Asset
                                       Portal                     Data
                                                                                           Management
                                                               Management



          Representative of AMI-ENT components, not all inclusive.


                                                                                                                       Slide 71
                                CIM Users Group: CIM for Enterprise Integration
Case Study: AMI-Ent Use Cases




                                                                   Slide 72
                 CIM Users Group: CIM for Enterprise Integration
Case Study: AMI-Ent Service Identification




                                                                    Slide 73
                  CIM Users Group: CIM for Enterprise Integration
Case Study: AMI-Ent Inventory of 142 CIM-Based Services
Supporting Use Cases for AMI-Enterprise
Use Case & Integration   Functional Description of Operation      Service Name                Service Operation           Service       Service Provider Information Object
Scenario   Requirement   the Service               Pattern                                                                Consumer      (Inbound - WS) (normalized)
                                                                                                                          (Outbound)
B1-S1      REQ-B1004     MDUS receives the meter Created          MeterReading                CreatedMeterReading         Head End      MDUS             MeterReading
                         reading results on
B1-S12     REQ-B1011     scheduled basis.
                         MDUS receives meter       Created        MeterReading                CreatedMeterReading         Field Tool    MDUS             MeterReading
                         reads
B1-S15     REQ-B1012     MDUS notifies meters with Created        MeterSystemEvent            CreatedMeterSystemEvent     MDUS?         MDUS             MeterSystemEvent
                         reading problems
B1-S15     REQ-B1013     AMI Head End operator       Created      MeterServiceOrder           CreatedMeterServiceOrder    MDUS          Head End         MeterServiceOrder
                         receives meter service
                         orders
B1-S17     REQ-B1014     Request billing determinant Create       BillingDeterminantRequest   CreateBillingDeterminant    CIS           MDUS             BillingDeterminant

B1-S17     REQ-B1014     Request billing determinant Created      BillingDeterminant          CreatedBillingDeterminant   MDUS          CIS              BillingDeterminant

B1-S2      REQ-B1001     Head End receives the       Create       MeterReading                CreateMeterReading          TBD           Head End         MeterReading
                         request for a meter reading
B1-S2      REQ-B1002     on demand
                         MDUS receives a meter       Created      MeterReading                CreatedMeterReading         Head End      MDUS             MeterReading
                         reading on demand

B1-S2      REQ-B1003     A user or system receives   Created      MeterReading                CreatedMeterReading         MDUS          TBD              MeterReading
                         a meter reading on
                         demand
B1-S3      REQ-B1006     CIS receives meter event    Created      MeterSystemEvent            CreatedMeterSystemEvent     Head          CIS              MeterSystemEvent
                                                                                                                          End/MDUS
B1-S7      REQ-B1009     MDUS receives the request Create         MeterReading                CreateMeterReading          Third Party   MDUS             MeterReading
                         for meter readings                                                                               Portal
B1-S7      REQ-B1010     Third party receives the    Created      MeterReading                CreatedMeterReading         MDUS          Third Party Portal MeterReading
                         meter readings
B1-S8      REQ-B1009     MDUS receives the request Create         MeterReading                CreateMeterReading          Third Party   MDUS             MeterReading
                         for meter readings                                                                               Portal
B1-S8      REQ-B1010     Third party receives the    Created      MeterReading                CreatedMeterReading         MDUS          Third Party Portal MeterReading
                         meter readings
B2-S1      REQ-B2001     Send scheduled shut off     Created      ScheduledEvent              CreatedScheduledEvent       CIS           Head End         ScheduledEvent
                         notification
B2-S1      REQ-B2002     Send scheduled shut off     Created      ConnectDisconnect           CreatedConnectDisconnect    CIS           Head End         ConnectDisconnect
                         command
B2-S1      REQ-B2003     Send scheduled shut off     Created      CommonConfirmation          CreatedCommonConfirmation   Head End      CIS              CommonConfirmation
                         command confirmation
B2-S1      REQ-B2004     Send meter read (final)     Created      MeterReading                CreatedMeterReading         Head End      MDUS             MeterReading

B2-S2      REQ-B2005     Request AMI Meter status    Create       MeterStatusRequest          CreateMeterStatus           CIS           Head End         MeterStatus

                                                                                                                                                            Slide 74
                                                               CIM Users Group: CIM for Enterprise Integration
                                                        Status/Plans:
                                                        1) Verified applicable XSDs are
                                                            compliant with IEC 61968-9
                                                        2) Submitted to CIM
                                                            InterOperability Testing; TBD
                                                            for when it will be included
                                                            (Margaret)
                                                        3) Proposed requirements and
                                                            extensions being submitted
                                                            to WG14 for consideration.




http://osgug.ucaiug.org/sgsystems/Pages/Voting%20Ballots.aspx

                                                                                            Slide 75
                       CIM Users Group: CIM for Enterprise Integration
OpenHAN - Home Area Network – Collaboration between UCA, ZigBee,
and IEC
                                                                                                                                      SEP 2.0 is being developed by ZigBee/
OpenHAN SRS given to ZigBee                                                                                                         HomePlug SEA, is intended to be CIM-based
  and was used for SEP 1.0                                                                                                             which is being coordinated with IEC
                                                                                                                                                 (and NIST, et al.)




                                                                                                                                                                Ot
                                                                                                                                                                  h
                                                                                                                                                               Ga er Pr
                                                              ns                                                                                             (In tewa emis
                                                          atio                 Ce                                                                               ter       e
                                                      plic
                                                                                 rtif
                                                                                     ied                                                                           ne y
                                                    Ap                                   DG                                                                          t)
                                               tive             Ce
                                            rac
                                                                  rtif
                                                                      ied
                                         nte                      Hy Plu
                                       yI
                                 Utilit                                bri g-In
                                                                          d
                              er                    Ad
                            um                        va                                                              P Ce
                          ns
                                                        nc
                                                          ed                                                     Uti rem rtifie                                          (e. HA
                        Co                                   IHD                                                    lity ise
                                                                                                                         A   E
                                                                                                                                d                                           g.,
                                                                                                                                                                                Se Cont
                                       Lo                                                    tion                  Ga pplic MS                                                    t T rol
                                                                                                                                                                                     op ler
                                         ad                                               ica                           tew ati
                                                                                                                           ay on                                                       Bo
                                            Co
                                              ntr                                       un                                                                     Sm
                                                                                                                                                                                         x)
                                                 ol                                  mm                                                                          art
                                                                                                                                                                     Ap
                                                                                  Co l                                                                                 plia
                               PC                                             ured anne                                                               Ho                   nc
                                                                                                                                                                             e
                                 T                                          ec Ch                                                                       me
                                                                          yS                                                                            Ca Healt
                                                                     tilit
                                                                    U R                                                                                   re    h
                                                                      No eve                                                        Lig
                                                                          n-e nu                                                       htin
                                                                             lec e G                                                       gC                                              ns
                                                                                tric ra                                                      on                                        atio
                                                            Re                      Me de                            Ho                        tro                                 plic
                                                               ve
                                                           Ele nu
                                                                                      ter                              me                         l
                                                                                                                                                                             r   Ap
                                                              ctr    eG                                                   Se                                               me
                                                                 ic M ra
                                                                     ete de
                                                                                                                            cu
                                                                                                                              rity                                      nsu
                                                                                                 s                                                                    Co
                                                                        r                    tion
                         Uti                                                            plica
                            lity AM                                                   Ap
                                Ow I G                                           lity
                                  ne atew
                                    da                                        Uti
                                       nd ay
                                         Op                                                                           t
                                           era                                                                      as al)
                                              ted                                                                 dc
                                                                                                               oa sign
                                                                                                             Br ce
                                                                                                         lic    i
        AM                                                                                             ub ., pr
          IB
                                                                                                    y P (e.g,
            ac
              kh
                au
                                                                                               tilit el
                                                                                              U n
                  lN                                                                             an
                    etw
                       ork                                                                    Ch




                                                                                                                                                                                                Slide 76
                                                            CIM Users Group: CIM for Enterprise Integration
Distributed Energy Resources - Collaboration between NIST,
UCA, ZigBee, and IEC




                                                                  [source: Jose A. Salazar, SCE]
                                                                                                   Slide 77
                    CIM Users Group: CIM for Enterprise Integration
Future State- PHEV Connection (120VAC) &
Communication Scenario B




                                                                  [source: Jose A. Salazar, SCE]
                                                                                                   Slide 78
                    CIM Users Group: CIM for Enterprise Integration
Future State- Battery EV w/ PLC Connection & Communication
Scenario A




                                                                  [source: Jose A. Salazar, SCE]
                                                                                                   Slide 79
                    CIM Users Group: CIM for Enterprise Integration
OpenSG’s OpenADE - Automated Data Exchange –
Collaboration among NIST, UCA and IEC



                                             Third Parties




                       Energy
                                                                         Energy
                       Usage
                                                                       Management



                                               AMI &
                                               AMI &
                                             Internet
                                              Internet


           Utilities
                                                                               Consumers

                                            Energy
                                   Delivery and Management

                            The Changing Dynamics of Energy Services


                                                                                           Slide 80
                            CIM Users Group: CIM for Enterprise Integration
OpenADE Scope




                                                                     • Authorization
                                                                     • Publication
                                                                     • 1.0 –
                                                                       Interval
                                                                       consumption,
                                                                       after “VEE”
                                                                     • 2.0 – (TBD)
                                                                       Near-realtime
                                                                       (from HAN)
                                                                       Pricing / billing
                                                                       information

October 19, 2009            OpenSG - OpenADE                                           81
                                                                                    Slide 81
                   CIM Users Group: CIM for Enterprise Integration
OpenSG’s OpenADR – Automated Demand Response –
Collaboration among NAESB, NIST, UCA, OASIS, ZigBee, and IEC




                                     OpenADR                                                              OpenADR
                                     Message                                                              Message


                                                                 LOAD                                                      EMCS               LOADS
         Utility/ISO                                                               Utility/ISO
                                                       Facility                                                                   Facility



                                                                                                                       Direct Load Control,
                                                                                                                          (not OpenADR
                                                                                                                            Messages)
                                                                   Facility
                                                  Proprietary                                       OpenADR
                       OpenADR                  Communications                                      Message
                       Message
                                                                                                                                                 Facility
   Utility/ISO
                                                                                  Utility/ISO
                                 Intermediary                                                             Third Party
                                                                                                        Service Provider

                                                                    Facility




                                                                                                                                          Slide 82
                                                  CIM Users Group: CIM for Enterprise Integration
Thank you for your time!

• Good news: The CIM is being used
  extensively – so learning about it is time
  well spent.
• Bad news: The CIM continues to need a
  lot of work and must therefore users must
  be prepared for revision management
• Fun news: The CIM is a key NIST
  standard – so we have many exciting
  adventures (HAN, DER, PEV, ADE, DR,
  etc.) to look forward to!

                                                                Slide 83
              CIM Users Group: CIM for Enterprise Integration

								
To top