Docstoc

CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC

Document Sample
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC Powered By Docstoc
					CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC   POLO
PROJECT REPORT/ RELAZIONE DI PROGETTO




NQC                                                9
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC PROJECT REPORT/ RELAZIONE DI PROGETTO   POLO


GENERAL OBJECTIVES                                                     Vicinity Plan
The general aim is to create a unique, vital, sustainable and
challenging new development at the NQC, which will have a
character of its own and feature a special quality in its urban
environment, building, landscape design and service concept.
One of the most important objectives is to foster a distinctive
quality and image for the NQC which will render it attractive to all
sources of investment.

.




                                                                                          0
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC PROJECT REPORT/ RELAZIONE DI PROGETTO                                                                                                                 POLO


Major conceptual elements include the following:                         CORSO CORNAREDO                                                      The design of the new entry axis is characterised by
- Corso Cornaredo, the new city axis acting as the backbone of           Turning from the roundabout towards the city one enters the new      -   Four lane divided road section
  the new quarter                                                        entrance road to the city designed as spacious concourse lined       -   50 m wide building frontage
- Functional clusters accommodating                                      by several rows of trees. A strong spatial, functional and visual    -   Landscaped median and four rows of trees
- Cornaredo Forum as the principal focus and activity centre             element, the Corso Cornaredo will lend the NQC the type of           -   Convenience strip parking
- Cornaredo stadium and new sports arena                                 prestigious image that is key to successfully marketing the new      -   Wide sidewalks
- Green and open spaces interlinked with the surrounding                 development.
  landscape.                                                                                                                                  Entering the city one will experience a sequence of different
                                                                         The design of the boulevard-type Corso attempts to reconcile         situations along the Corso which consists of two sections with a
These are briefly described in the following.                            mobility and urbanity – the beauty of the city for the car-driver:   smaller roundabout acting as the turning point to the southern
                                                                         open views, rhythm and movement, sequence of spaces – and            section from where the city view opens. That also serves to
                                                                         that of the pedestrian: enclosed space, scale, architectural         connect the local road network that accesses the parking
TUNNEL EXIT/ENTRY POINT                                                  details, sense of intimacy etc.                                      garages placed off the Corso. Ramps lead off the Corso to the
                                                                                                                                              park and ride facilities before it reaches Cornaredo Forum.
The end of the tunnel will be screened for sound by a glazed
arch, the galleria come to light, made from transparent or
translucent material that leads the motorist to the roundabout.                                                                               Corso Cornaredo
The roundabout is the element that provides both the terminal
point of the 3 km tunnel section and the formal entry to the urban
roadscape, lending it a sense of spaciousness and ease of
orientation. A separate bypass lane off the roundabout will
handle critical city-bound traffic so as to avoid traffic tailing back
into the tunnel. The roundabout also provides for the ready
extension of the road tunnel to Gandria in the future.


               Screened tunnel exit




                                                                         Cornaredo entry from east




                                                                                                                                                                                                                 2
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC PROJECT REPORT/ RELAZIONE DI PROGETTO   POLO




                                                                                          4
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC PROJECT REPORT/ RELAZIONE DI PROGETTO   POLO




                                                                                          5
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC PROJECT REPORT/ RELAZIONE DI PROGETTO                                                                                                                POLO


MAIN ROAD AXIS                                                        CORNAREDO SPORTS ARENA                                                LANDSCAPING
In order to relief the Forum from traffic, we have studied various    A new sports centre is proposed on the site of the Cornaredo          At northern edge of the planning area Cassarate valley opens up
possibilities including an underpass which however is not felt        Stadium, combining that with the planned sports hall and possibly     towards the alluvial plains, the lake and city of Lugano, providing
consistent with contemporary urban planning and also not an           the Olympic indoor pool hall into one big sports arena.               a sudden contrast between the wide flat valley and the hillsides
appropriate way of approach along the new Cassarate road axis.        With the sports hall located adjacent to Forum Cornaredo and the      that envelope it on three sides.
                                                                      cinema, as proposed, it can become a multifunction facility for all
The problem is the east-west section of via Sonvico handling both     kinds of events seating up to 3,000.                                  The new built-up clusters create a pattern that appears to float
vehicular traffic and bus terminals, and the heavy load on the                                                                              along the valley in a continuous flow of the landscape. In this
interchange with the new entry boulevard.                             The compact complex will help economise on support facilities,        manner, the characteristic landscape features - the river valley
                                                                      services and shared management. Cut from the Forum                    and wooded hills – are recreated in the form of the new Trevano
We propose to substitute this section of via Sonvico by a new         underground space will be used to create an elevated plateau          Park. It attempts to integrate the various urban and landscape
road linking via Trevano and via Ciani, the two north-south           that embeds the stadium bowl with most ancillary space                elements of the NQC, with tree lined avenues and rows of trees
arterial roads. This road is located on the present P+R area to the   underground.                                                          that lead towards the city.
south of the stadium where it will also serve to access the car
parks of the proposed new sports arena.                                                                                                     Urban and landscape areas interrelate at the Cornaredo Forum to
                                                                                                                                            form a multifunctional space that serves as a major transfer point
This leaves a T-junction connecting the road to Pregassona (via                                                                             for commuters to the city, a place for large events as well as a
delle scuole) the peak hour traffic of which is manageable.                                                                                 major open space link to the city through the the green axis (asse
                                                                                                                                            verde) that terminates at the Forum.




Cornaredo Forum




                                                                                                                                                                                                             6
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC PROJECT REPORT/ RELAZIONE DI PROGETTO   POLO


TRANSPORT AND CIRCULATION

Traffic System
We have made an estimate on the future road traffic generated in
the NQC, and deviced the local road network that adequately
meets future demand once the area is fully developed. The
roundabouts and junctions, in particular, have been designed
accordingly.
Traffic Management
To ensure a high capacity during peak phases (events etc.) the
traffic to and from the underground parking facility will be guided
and controlled with an electronic traffic management system. The
system ensures that that main road axis and roundabouts have a
constant flow of traffic without being overloaded.
The junction around the Cornaredo Forum will be controlled with
traffic lights. That way Shuttle buses will be given priority in the
traffic stream. The roads leading to the Cornaredo Forum and the
bus station have separate bus lanes. As a result the bus network
can maintain a stable timetable. It also makes it possible to
control the traffic flows during peak phases (events etc.).


PARKING
P+R Parking
In order to provide for the most convenient transfer from car to
bus, requisite to the functioning of a P+R system, the required
1,200 car parks are proposed in an underground parking facility
located under the Forum with direct access to the bus stops
above. To limit excavation and groundwater impact, the Forum is
raised by a meter.

For ease of orientation entrance and exit are ubiquitous. An
information system will give the necessary guidance all along the
Corso. The underground parking is accessed by ramps directly
from Corso Cornaredo before it reaches Forum Cornaredo.
Commuters will find convenient stairways and escalators that
lead up to the Forum bus stops, while visitors can enter both the
shopping facilities and the sports arena from the parking level.
The parking area is structured by the central spine that divides it
into two main sections which can be built in several stages,
starting with the northeastern section. Escalators lead up to the
bus stations. A second entrance/exit from via Trevano provides
for users from the city.
On-site Parking
For the on-site parking requirements of the individual land uses in
the functional clusters underground and/or multi-storey parking
garages will be the typical arrangement. Due to groundwater
constraints in some areas multi-storey car parks may be used for
which there are exist many aesthetically convincing examples.
The number of car parks has been calculated for each block
based on the indicated gross floor area and parking standards
used in Lugano for various uses. A certain amount of
convenience/visitor parking is provided on-street throughout the
area.
                                                                                          7
CONCORSO DI IDEE NUOVO QUARTIERE CORNAREDO NQC PROJECT REPORT/ RELAZIONE DI PROGETTO                                                                                                        POLO


COST ESTIMATE                                                          PLANNING DATA
We have attempted a rough estimate of the cost involved in the
development as required by the terms of reference.                                                                     Gross floor area (gfa) by type of use
Superstructure Costs                                                    No     Area                   Total gfa*     Commercial         Commercial   Residential   Education   Expected
                                                                                                                     services, hotel    offices                    Sports      employment
The construction costs for the superstructure have been                                                  sqm         sqm                 sqm         sqm           sqm         persons
estimated based on the gross floor area for the various types of
use, totalling                                                          1      Cluster 1              30.000,00      10.000,00         20.000,00                                600,00
500,000 m2 of built space, comprising
                                                                        2      Cluster 2              91.000,00      20.000,00         54.000,00     17.000,00                  770,00
- 372,800 m2 gfa above-ground
- 137.500 m2 underground                                                3      Cluster 3              118.000,00     40.000,00         78.000,00                               2.280,00
the net construction costs for buildings and outdoor facilities will    4      University             44.000,00                                                    44.000,00     880,00
be in the range of CHF 1.6 billion, excluding VAT.
                                                                        5      Sports Arena/Forum     36.500,00      6.000,00                                      30.500,00     25,00
Infrastructure Costs
                                                                        6      Pregassona             53.300,00              8.000,00        45.300,00                          200,00
The costs for the public infrastructure has been assessed as
follows:
                                                                               Total                  372.800,00     76.000,00         160.000,00    62.300,00     74.500,00   4.680,00
- CHF 30 million for road construction, excluding tunnel section
- CHF 3,75 for junctions and roundabouts
- CHF 7 million for public squares, maily Cornaredo Forum               * redeveloped or new areas, excluding existing land uses that area kept
Adding contingencies total infarstructure cost are estimated at
CHF 50 million

Overall Investment Costs
If VAT, the cost of land, site preparation and site development,
marketing and interest costs are added, total investment cost
may well reach CHF 2.5 billion.